JP2000238973A - Method for repairing elevator - Google Patents

Method for repairing elevator

Info

Publication number
JP2000238973A
JP2000238973A JP11042315A JP4231599A JP2000238973A JP 2000238973 A JP2000238973 A JP 2000238973A JP 11042315 A JP11042315 A JP 11042315A JP 4231599 A JP4231599 A JP 4231599A JP 2000238973 A JP2000238973 A JP 2000238973A
Authority
JP
Japan
Prior art keywords
existing
elevator
hoistway
update
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11042315A
Other languages
Japanese (ja)
Inventor
Hisao Kato
久夫 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP11042315A priority Critical patent/JP2000238973A/en
Publication of JP2000238973A publication Critical patent/JP2000238973A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten the period of the second process by executing the first process for mounting a new apparatus in a position close to an existing apparatus and the second process for resting the operation of an elevator over a time longer than the first process work all day night, removing the existing apparatus and installing the new apparatus in the existing apparatus position. SOLUTION: In the first process, a new control board 25 is installed to a position close to an existing control board, and a new wiring duct 26 is installed to a position close to an existing wiring duct. In the second process, an existing hoist is removed, and a new hoist 27 is installed to this position. An existing landing switch is removed, and a new landing switch 39 is installed to this position. Further, an existing hall button is removed, and a hall button 40 is installed to this position. Further, an existing operation board is removed, and a new operation board 33 is installed to this position. An existing moving cable is removed, and a new moving cable 30 is connected to the new control board 25 by a connecting tool, also connected to the new operation board 33 by a splicer 31, and suspended so as to form a curved part in the lower end.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、エレベーターの
運転を一時休止して機器を更新するエレベーターの改修
工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator repair method for temporarily suspending the operation of an elevator and updating equipment.

【0002】[0002]

【従来の技術】図3は、エレベーターの構成を概念的に
示す立面図である。図において、1はエレベーターの昇
降路、2は昇降路1の上に設けられた機械室で、床3、
天井4並びに床3に設けられた第一開口部5及び第二開
口部6により構成されている。7は機械室2に設置され
た巻上機で、駆動綱車8及び電動機9が設けられてい
る。10は駆動綱車8に巻掛けられた主索で、一端がか
ご11に他端はつり合おもり12に連結されている。
2. Description of the Related Art FIG. 3 is an elevational view conceptually showing the structure of an elevator. In the figure, 1 is a hoistway of an elevator, 2 is a machine room provided on the hoistway 1, and a floor 3,
It is constituted by a first opening 5 and a second opening 6 provided in the ceiling 4 and the floor 3. Reference numeral 7 denotes a hoisting machine installed in the machine room 2 and is provided with a drive sheave 8 and an electric motor 9. Reference numeral 10 denotes a main rope wound around the drive sheave 8, one end of which is connected to the car 11 and the other end of which is connected to the counterweight 12.

【0003】13は機械室2の床3に設置された制御
盤、14はかご11に設けられた操作盤、15は昇降路
1に設けられた乗場(図示しない)のそれぞれに対応し
て配置され、図示が省略してあるがかご11の案内レー
ルから突設された取付腕に装着された着床スイッチ、1
6は昇降路1に設けられた乗場のそれぞれに設けられた
乗場釦である。
[0003] 13 is a control panel installed on the floor 3 of the machine room 2, 14 is an operation panel provided on the car 11, 15 is disposed corresponding to each of the landings (not shown) provided on the hoistway 1. Although not shown, the landing switch mounted on the mounting arm protruding from the guide rail of the car 11, 1
Reference numeral 6 denotes a hall button provided at each of the halls provided on the hoistway 1.

【0004】17は配線ダクトで、機械室2の床3に埋
設状態に設けられて巻上機7と制御盤13の間に配置さ
れている。18は昇降路配線で、一端が制御盤13に接
続されて配線ダクト17及び第二開口部6を経て下垂し
て昇降路1に設けられ、着床スイッチ15、乗場釦16
に接続され、また長手の適所が固定具19によって昇降
路1壁に固定されている。
[0004] Reference numeral 17 denotes a wiring duct, which is buried in the floor 3 of the machine room 2 and disposed between the hoisting machine 7 and the control panel 13. Reference numeral 18 denotes hoistway wiring, one end of which is connected to the control panel 13, and is provided on the hoistway 1 so as to hang down via the wiring duct 17 and the second opening 6. The landing switch 15, the landing button 16
Are fixed to the wall of the hoistway 1 by fixing members 19 in the longitudinal direction.

【0005】20は移動ケーブルで、一端が制御盤13
に接続されて配線ダクト17及び第一開口部5を経て昇
降路1に下垂して下端に湾曲部を形成して配置され、他
端は操作盤14に接続され、またかご11の昇降行程の
1/2位置よりも上方位置で固定具21によって昇降路
1壁に固定されている。22は駆動配線で、一端が制御
盤13に接続されて他端は配線ダクト17を経て巻上機
7に接続されている。なお、図示が省略してあるが、動
力電源線が外部から引き込まれて制御盤13に接続され
ている。
Reference numeral 20 denotes a moving cable, one end of which is a control panel 13.
Is connected to the operation duct 14 via the wiring duct 17 and the first opening 5, and hangs down to the hoistway 1 to form a curved portion at the lower end. The other end is connected to the operation panel 14. It is fixed to the hoistway 1 wall by the fixture 21 at a position above the position. A drive wiring 22 has one end connected to the control panel 13 and the other end connected to the hoisting machine 7 via the wiring duct 17. Although not shown, a power supply line is drawn in from the outside and connected to the control panel 13.

【0006】上記のようなエレベーターにおいて、それ
ぞれの機器は定期的な保守、点検が行われて所要の機能
が維持される。また、エレベーターの性能向上のために
既設エレベーターよりも省電力性、乗り心地向上等を目
的とし、最新の電子技術を採用した改修工事が行われ
る。このような改修工事では、一部機器について既設機
器を使用し、他部機器、主として制御機器を中心に更新
機器に取り替える作業が行われる。
[0006] In the elevator as described above, each device is regularly maintained and inspected to maintain required functions. In order to improve the performance of the elevator, renovation work using the latest electronic technology will be carried out with the aim of saving power and improving ride comfort compared to the existing elevator. In such repair work, an existing device is used for some devices, and work is performed to replace other devices, mainly control devices, with updated devices.

【0007】[0007]

【発明が解決しようとする課題】上記のような一部機器
について既設機器を使用し、他部機器を更新する改修工
事において、動力電源を遮断して初めに更新される既設
機器について順次撤去する作業が行われる。次いで、撤
去された既設機器の場所に更新機器を装着する作業が行
われる。しかし、このような機器の撤去及び更新作業に
おいて次に述べる問題点がある。
In the repair work in which existing equipment is used for some of the equipment described above and other equipment is updated, the power supply is cut off and the existing equipment that is updated first is sequentially removed. Work is performed. Next, an operation of attaching the updated device to the location of the removed existing device is performed. However, there are the following problems in removing and updating such devices.

【0008】すなわち、一般的に更新巻上機及び更新制
御盤は、外形寸法、配線の引き込み位置が対応した既設
品とは異なるので、既設配線ダクト17の位置を変更す
る必要がある。このため、例えば機械室2の床3の配線
ダクト17を撤去し、その跡に更新配線ダクトを設置す
る作業には煩雑であって長時間の作業を要する。また、
更新昇降路配線及び更新移動ケーブルの既設配線ダクト
17内への収納、また昇降路1壁への固定のために多く
の労力と長時間の作業を要する。
That is, in general, the update hoisting machine and the update control panel are different from the existing products corresponding to the external dimensions and the positions where the wiring is drawn in. Therefore, it is necessary to change the position of the existing wiring duct 17. For this reason, for example, the work of removing the wiring duct 17 on the floor 3 of the machine room 2 and installing the renewal wiring duct in its place is complicated and requires a long time. Also,
A lot of labor and a long time are required for storing the updated hoistway wiring and the updated moving cable in the existing wiring duct 17 and for fixing the updated hoistway cable to the wall of the hoistway 1.

【0009】また、一般的に更新移動ケーブルはドラム
に巻かれた状態で工事現場に搬入される。このため、巻
き癖が付いていてドラムから繰り出した直後にかご11
を昇降させると、湾曲部分が昇降路1壁への固定部近く
において複雑に揺動し、更新移動ケーブルが昇降路1の
機器に接触する不具合がある。したがって、更新移動ケ
ーブルの湾曲部分について、懸垂工事後の所定時間につ
いて鉛直状態で静止し巻き癖を除去する必要がある。
[0009] Generally, the renewal moving cable is carried to a construction site in a state of being wound around a drum. For this reason, the basket 11 has a winding habit immediately after being pulled out of the drum.
When the is moved up and down, the curved portion swings complicatedly near the fixed portion to the wall of the hoistway 1, and there is a problem that the update moving cable contacts the equipment of the hoistway 1. Therefore, it is necessary to stop the curving portion of the renewal moving cable in the vertical state for a predetermined time after the suspension work and remove the curl.

【0010】上記のような事由によって、作業音が発生
し、廃コンクリート等の塵埃が発生し、また廃機器の搬
出が行われる改修工事が長期間になる。このためにエレ
ベーターの設置建物の使用者の静穏を妨げたり、また改
修工事が長引くことによるエレベーターの長期間休止に
よってエレベーターの利用者の便益を損なったりするこ
とになる。
[0010] Due to the above-mentioned reasons, work noise is generated, dust such as waste concrete is generated, and repair work for carrying out waste equipment takes a long time. For this reason, the user of the building where the elevator is installed is hindered from being calm, and the benefit of the user of the elevator is impaired due to long-term suspension of the elevator due to prolonged repair work.

【0011】この発明は、かかる問題点を解消するため
になされたものであり、改修工事の前期では時間帯によ
ってはエレベーターが使用でき、また改修工事の後期に
はエレベーターの休止期間を短くできるエレベーターの
改修工法を得ることを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve such a problem. In the first half of the repair work, the elevator can be used depending on the time zone, and in the latter half of the repair work, the elevator can be stopped for a shorter period of time. The purpose is to obtain a renovation method.

【0012】[0012]

【課題を解決するための手段】この発明に係るエレベー
ターの改修工法においては、終日の所定時間においてエ
レベーターの運転を休止し更新機器を既設機器の近似位
置に装着する前期工程と、終日において前期工程作業よ
りも長時間にわたってエレベーターの運転を休止し、既
設機器を撤去してその既設機器位置に更新機器を装着す
る後期工程とが実施される。
In the repair method for an elevator according to the present invention, the first step of suspending the operation of the elevator at a predetermined time throughout the day and mounting the renewal equipment at an approximate position of the existing equipment; A later step of suspending the operation of the elevator for a longer time than the work, removing the existing equipment, and installing the update equipment at the existing equipment position is performed.

【0013】また、この発明に係るエレベーターの改修
工法においては、前期工程において、エレベーター機械
室の既設配線ダクトの近似位置に更新配線ダクトが装着
される。
[0013] In the elevator repair method according to the present invention, the renewal wiring duct is mounted at an approximate position of the existing wiring duct in the elevator machine room in the first step.

【0014】また、この発明に係るエレベーターの改修
工法においては、前期工程において、エレベーターの機
械室から下垂された既設移動ケーブルの近似位置に更新
移動ケーブルを配置し、エレベーターのかごの昇降行程
の1/2位置よりも上方位置で更新固定具によって更新
移動ケーブルがエレベーターの昇降路壁に固定されて下
端側が所定時間懸垂される。
In the elevator repair method according to the present invention, the renewal moving cable is disposed at an approximate position of the existing moving cable suspended from the machine room of the elevator in the first half of the process, and one of the steps of ascending and descending the elevator car is performed. At the position above the / 2 position, the update moving cable is fixed to the hoistway wall of the elevator by the update fixture, and the lower end is suspended for a predetermined time.

【0015】また、この発明に係るエレベーターの改修
工法においては、前期工程において、エレベーターの機
械室から昇降路に配線された既設昇降路配線の近似位置
に更新昇降路配線が装着される。
Further, in the elevator repair method according to the present invention, in the first step, the updated hoistway wiring is installed at an approximate position of the existing hoistway wiring wired from the machine room of the elevator to the hoistway.

【0016】[0016]

【発明の実施の形態】実施の形態1.図1及び図2は、
この発明の実施の形態の一例を示す図で、図1は改修工
事の前期状況を示すエレベーターの概念的立面図、図2
は改修工事の終了状況を示す図1相当図である。図にお
いて、1はエレベーターの昇降路、2は昇降路1の上に
設けられた機械室で、床3、天井4並びに床3に設けら
れた第一開口部5、第一開口部5に隣接して新設された
第三開口部23及び床3に設けられた第二開口部6に隣
接して新設された第四開口部24により構成されてい
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 1 and 2
FIG. 1 is a view showing an example of an embodiment of the present invention. FIG. 1 is a conceptual elevation view of an elevator showing the first half of a repair work, and FIG.
FIG. 2 is a diagram corresponding to FIG. In the figure, 1 is a hoistway of an elevator, 2 is a machine room provided on the hoistway 1, and is adjacent to a floor 3, a ceiling 4, a first opening 5 provided in the floor 3, and a first opening 5. The third opening 23 is newly provided and the fourth opening 24 is provided adjacent to the second opening 6 provided on the floor 3.

【0017】7は機械室2に設置された既設巻上機で、
既設駆動綱車8及び既設電動機9が設けられている。1
0は既設駆動綱車8に巻掛けられた主索で、一端がかご
11に他端はつり合おもり12に連結されている。13
は機械室2の床3に設置された既設制御盤、14はかご
11に設けられた既設操作盤、15は昇降路1に設けら
れた乗場(図示しない)のそれぞれに対応して配置さ
れ、図示が省略してあるがかご11の案内レールから突
設された取付腕に装着された既設着床スイッチである。
Reference numeral 7 denotes an existing hoisting machine installed in the machine room 2,
An existing drive sheave 8 and an existing electric motor 9 are provided. 1
Reference numeral 0 denotes a main rope wound around the existing drive sheave 8, one end of which is connected to the car 11 and the other end of which is connected to the counterweight 12. 13
Is an existing control panel installed on the floor 3 of the machine room 2, 14 is an existing operation panel provided on the car 11, and 15 is disposed corresponding to each of the landings (not shown) provided on the hoistway 1, Although not shown, it is an existing landing switch mounted on a mounting arm projecting from the guide rail of the car 11.

【0018】16は昇降路1に設けられた乗場(図示し
ない)のそれぞれに設けられた既設乗場釦、17は既設
配線ダクトで、機械室2の床3に埋設状態に設けられて
既設巻上機7と既設制御盤13の間に配置されている。
18は既設昇降路配線で、一端が既設制御盤13に接続
されて既設配線ダクト17及び第二開口部6を経て下垂
して昇降路1に設けられ、既設着床スイッチ15、既設
乗場釦16に接続され、また長手の適所が既設固定具1
9によって昇降路1壁に固定されている。
Reference numeral 16 denotes an existing landing button provided at each of the landings (not shown) provided in the hoistway 1. Reference numeral 17 denotes an existing wiring duct, which is provided in a state buried in the floor 3 of the machine room 2 and is provided with an existing hoist. It is arranged between the machine 7 and the existing control panel 13.
Reference numeral 18 denotes an existing hoistway wiring, one end of which is connected to the existing control panel 13 and is provided in the hoistway 1 by hanging through the existing wiring duct 17 and the second opening 6, and the existing landing switch 15, the existing landing button 16 To the existing fixture 1
9 is fixed to the hoistway 1 wall.

【0019】20は既設移動ケーブルで、一端が既設制
御盤13に接続されて既設配線ダクト17及び第一開口
部5を経て昇降路1に下垂し下端に湾曲部を形成して配
置され、他端は既設操作盤14に接続され、またかご1
4の昇降行程の1/2位置よりも上方位置で既設固定具
21によって昇降路1壁に固定されている。22は既設
駆動配線で、一端が既設制御盤13に接続されて他端は
既設配線ダクト17を経て既設巻上機7に接続されてい
る。
Reference numeral 20 denotes an existing moving cable, one end of which is connected to the existing control panel 13 and hangs down the hoistway 1 via the existing wiring duct 17 and the first opening 5 to form a curved portion at the lower end. The end is connected to the existing operation panel 14 and the car 1
4 is fixed to the wall of the hoistway 1 by the existing fixture 21 at a position higher than a half position of the hoisting stroke. An existing drive wiring 22 has one end connected to the existing control panel 13 and the other end connected to the existing hoisting machine 7 via the existing wiring duct 17.

【0020】なお、図示が省略してあるが、動力電源線
が外部から引き込まれて既設制御盤13に接続されてい
る。25は機械室2内における既設制御盤13との対向
位置、すなわち既設機器の近似位置に装着された更新機
器からなる更新制御盤である。
Although not shown, a power supply line is drawn in from the outside and connected to the existing control panel 13. Reference numeral 25 denotes an update control panel including an update device mounted at a position facing the existing control panel 13 in the machine room 2, that is, an approximate position of the existing device.

【0021】26は更新配線ダクトで、機械室2の既設
配線ダクト17との対向位置、すなわち既設機器の近似
位置に装着された更新機器であり、一端が第四開口部2
4に開口して機械室2の天井4に立ち上がり、天井4面
に沿って配置されて下方に延長され、他端は既設巻上機
7位置、第三開口部23及び更新制御盤25位置にそれ
ぞれ開口部が設けられている。27は更新巻上機で、機
械室2の床3の既設巻上機7位置、すなわち既設機器を
撤去してその既設機器位置に装着された更新機器であ
り、更新駆動綱車28及び更新電動機29が設けられて
いる。
Reference numeral 26 denotes an update wiring duct, which is an update equipment mounted at a position facing the existing wiring duct 17 in the machine room 2, that is, an approximate position of the existing equipment, and one end of which is the fourth opening 2.
4, rises to the ceiling 4 of the machine room 2, is arranged along the surface of the ceiling 4 and extends downward, and the other end is located at the position of the existing hoisting machine 7, the third opening 23 and the update control panel 25. Each has an opening. Reference numeral 27 denotes an update hoist, which is an update device installed at the position of the existing hoist 7 on the floor 3 of the machine room 2, that is, at the position of the existing device after removing the existing device. 29 are provided.

【0022】30は更新移動ケーブルで、昇降路1の既
設移動ケーブル20との対応位置、すなわち既設機器の
近似位置に装着された更新機器であり、一端が更新制御
盤25に接続されて更新配線ダクト26及び第三開口部
23を経て昇降路1に下垂し、他端は先端に接続具31
が設けられて一旦下垂して配置され、またかご14の昇
降行程の1/2位置よりも上方位置で更新固定具32に
よって昇降路1壁に固定されている。
Reference numeral 30 denotes an update moving cable, which is an updating device mounted at a position corresponding to the existing moving cable 20 of the hoistway 1, that is, an approximate position of the existing device. It hangs down to the hoistway 1 through the duct 26 and the third opening 23, and the other end is connected to the connector 31.
Is provided, and is temporarily suspended, and is fixed to the wall of the hoistway 1 by the update fixture 32 at a position above a half position of the hoisting stroke of the car 14.

【0023】なお、更新移動ケーブル30は工場におい
て所要長さに調製されて、前述の接続具31等の接続具
が端部に装備される。そして、改修工事の後期工程では
かご11に設けられた更新操作盤33に接続具31によ
り接続されて下端に湾曲部を形成して吊設される。
The renewal moving cable 30 is adjusted to a required length at a factory, and a connecting tool such as the connecting tool 31 described above is provided at an end. In a later stage of the repair work, the car 11 is connected to an update operation panel 33 provided on the car 11 by a connecting tool 31, and is suspended at a lower end thereof to form a curved portion.

【0024】34は更新昇降路配線で、昇降路1の既設
昇降路配線18との対応位置、すなわち既設機器の近似
位置に装着された更新機器であり、一端が更新制御盤2
5に接続されて更新配線ダクト26及び第四開口部24
を経て下垂して昇降路1に設けられ、後述する更新着床
スイッチ、更新乗場釦にそれぞれ対応した接続具35が
設けられ、また長手の適所が更新固定具36によって昇
降路1壁に固定されている。なお、更新昇降路配線34
は工場において電線束として所要長さに調製されて前述
の接続具35等の接続具が装備される。
Reference numeral 34 denotes an updated hoistway wiring, which is an updating device mounted at a position corresponding to the existing hoistway wiring 18 of the hoistway 1, that is, an approximate position of the existing device, and one end of which is the update control panel 2;
5 and the updated wiring duct 26 and the fourth opening 24
Are provided on the hoistway 1 by hanging through, and a connecting tool 35 corresponding to an updating landing switch and an updating hall button, which will be described later, respectively, is provided, and a suitable longitudinal portion is fixed to the hoistway 1 wall by the updating fixture 36. ing. The updated hoistway wiring 34
Is prepared to have a required length as a wire bundle at a factory, and is equipped with a connecting tool such as the connecting tool 35 described above.

【0025】37は更新駆動配線で、機械室2の既設駆
動配線22との対応位置、すなわち既設機器の近似位置
に装着された更新機器であり、一端が更新制御盤25に
接続されて他端は更新配線ダクト26を経て更新巻上機
27位置に配置されて、先端に更新巻上機27に対応し
た接続具38が設けられている。なお、更新駆動配線3
7は工場において電線束として所要長さに調製されて前
述の接続具38等の接続具が装備される。
Reference numeral 37 denotes an update drive wiring, which is an update device mounted at a position corresponding to the existing drive wiring 22 in the machine room 2, that is, an approximate position of the existing device, one end of which is connected to the update control panel 25 and the other end thereof. Is disposed at the position of the update hoist 27 via the update wiring duct 26, and a connecting tool 38 corresponding to the update hoist 27 is provided at the end. The update drive wiring 3
Reference numeral 7 denotes a wire bundle which is prepared at a factory to a required length, and is equipped with a connector such as the connector 38 described above.

【0026】39は更新着床スイッチで、昇降路1に設
けられた乗場のそれぞれに対応して設けられた既設着床
スイッチ15位置、すなわち既設機器を撤去してその既
設機器位置に装着された更新機器であり、工場において
接続具35に対応した接続具が装着されていて、接続具
35を介して更新昇降路配線34に接続される。
An update landing switch 39 is provided at the position of the existing landing switch 15 provided corresponding to each of the landings provided on the hoistway 1, that is, at the position of the existing equipment after removing the existing equipment. It is an update device, and a connection tool corresponding to the connection tool 35 is mounted at a factory, and is connected to the updated hoistway wiring 34 via the connection tool 35.

【0027】40は更新乗場釦で、昇降路1に設けられ
た乗場のそれぞれに対応して設けられた既設乗場釦16
位置、すなわち既設機器を撤去してその既設機器位置に
装着された更新機器であり、工場において接続具35に
対応した接続具が装着されていて、接続具35を介して
更新昇降路配線34に接続される。
Reference numeral 40 denotes an updated hall button, and the existing hall buttons 16 provided corresponding to the halls provided on the hoistway 1, respectively.
Position, that is, an update device that has been removed from the existing device and attached to the existing device position, and a connector corresponding to the connector 35 is attached at the factory, and the updated hoistway wiring 34 is connected via the connector 35. Connected.

【0028】上記のように構成されたエレベーターにお
いて、次に述べるようにしてエレベーターの改修工事が
行われる。すなわち、先ず終日の所定時間においてエレ
ベーターの運転を休止して、更新機器を既設機器の近似
位置に装着する定時的作業を行う前期工程の作業が行わ
れる。例えば、エレベーターの運転を一日の昼間帯の数
時間休止して定時的作業が行われる。このため、朝夕の
通勤、通学時にはエレベーターが使用できてエレベータ
ー利用者の便益が確保される。
In the elevator configured as described above, repair work of the elevator is performed as described below. In other words, first, the operation of the elevator is suspended at a predetermined time all day, and the work of the first half of the period is performed in which a regular work of mounting the update equipment at an approximate position of the existing equipment is performed. For example, the operation of the elevator is paused for several hours in the daytime zone of the day to perform a periodic work. For this reason, the elevator can be used when commuting to work in the morning and evening, and the benefits of the elevator user can be secured.

【0029】具体的には、既設巻上機7、既設制御盤1
3等の既設機器によってエレベーターが運転できる状態
で、第三開口部23、第四開口部24が設けられる。そ
して、既設制御盤13の近似位置に更新制御盤25が装
着され、また既設配線ダクト17の近似位置に更新配線
ダクト26が装着される。
Specifically, the existing hoisting machine 7, the existing control panel 1
The third opening 23 and the fourth opening 24 are provided in a state where the elevator can be operated by existing equipment such as 3. Then, the update control panel 25 is mounted at an approximate position of the existing control panel 13, and the update wiring duct 26 is mounted at an approximate position of the existing wiring duct 17.

【0030】また、更新配線ダクト26を経て既設移動
ケーブル20の近似位置に更新移動ケーブル30が装着
され、先端側の巻き癖を除去するために静止状態に一旦
下垂して配置される。また、更新配線ダクト26を経て
既設昇降路配線18の近似位置に更新昇降路配線34が
装着され、また、更新配線ダクト26を経て既設駆動配
線22の近似位置に更新駆動配線37が装着される。
The renewal moving cable 30 is mounted at an approximate position of the existing moving cable 20 via the renewal wiring duct 26, and is once suspended in a stationary state in order to remove the curl on the tip side. Further, the updated hoistway wiring 34 is mounted at an approximate position of the existing hoistway wiring 18 via the updated wiring duct 26, and the updated drive wiring 37 is mounted at an approximate position of the existing drive wiring 22 via the updated wiring duct 26. .

【0031】次いで、終日において前述の前期工程作業
よりも長時間にわたってエレベーターの運転を休止し、
既設機器を撤去してその既設機器位置に更新機器を装着
する作業を中心とし、更新機器の電気的接続等の作業を
行う全日的作業が行われる後期工程の作業が行われる。
すなわち、既設巻上機7が撤去されてその位置に更新巻
上機27が装着される。また、既設着床スイッチ15が
撤去されてその位置に更新着床スイッチ39が装着され
る。また、既設乗場釦16が撤去されてその位置に更新
乗場釦40が装着される。
Next, the operation of the elevator is suspended for a longer period of time than the above-mentioned first-stage work on the whole day,
A late-stage operation is performed in which an all-day operation is performed to remove an existing device and mount an update device at the existing device position, and electrically connect the update device.
That is, the existing hoisting machine 7 is removed, and the updated hoisting machine 27 is mounted at that position. Further, the existing landing switch 15 is removed, and the updated landing switch 39 is mounted at that position. Further, the existing hall button 16 is removed, and the updated hall button 40 is mounted at that position.

【0032】さらに、既設操作盤14撤去されてその位
置に更新操作盤33が装着される。また、既設移動ケー
ブル20が撤去されて、更新移動ケーブル30が接続具
により更新制御盤25に接続され、また接続具31によ
り更新操作盤33に接続されて下端に湾曲部を形成して
吊設される。
Further, the existing operation panel 14 is removed, and the update operation panel 33 is mounted at that position. In addition, the existing moving cable 20 is removed, the updating moving cable 30 is connected to the update control panel 25 by the connecting tool, and the updating moving cable 30 is connected to the updating operation panel 33 by the connecting tool 31 to form a curved portion at the lower end and hang. Is done.

【0033】また、既設昇降路配線18が撤去されて、
更新昇降路配線34が接続具により更新制御盤25に接
続され、また接続具35により更新着床スイッチ39及
び更新乗場釦40に接続される。また、既設駆動配線2
2が撤去されて、更新駆動配線37が接続具により更新
制御盤25に接続され、また接続具38によって更新巻
上機27に接続される。なお、図示が省略してあるが、
動力電源線が外部から引き込まれて更新制御盤25に接
続される。
Also, the existing hoistway wiring 18 is removed,
The update hoistway wiring 34 is connected to the update control panel 25 by a connector, and is connected to the update landing switch 39 and the update hall button 40 by the connector 35. In addition, the existing drive wiring 2
2 is removed, the update drive wiring 37 is connected to the update control panel 25 by a connector, and connected to the update hoisting machine 27 by a connector 38. Although illustration is omitted,
A power supply line is drawn in from the outside and connected to the update control panel 25.

【0034】このように、先ず終日の所定時間において
エレベーターの運転を休止して、更新機器を既設機器の
近似位置に装着する定時的作業を行う前期工程の作業が
行われる。例えば、エレベーターの運転を一日の昼間帯
の数時間休止して定時的作業が行われる。このため、朝
夕の通勤、通学時にはエレベーターが使用できてエレベ
ーター利用者の便益が確保される。
As described above, firstly, the operation of the elevator is suspended at a predetermined time throughout the day, and the work of the first step of performing the regular work of mounting the update equipment at the approximate position of the existing equipment is performed. For example, the operation of the elevator is paused for several hours in the daytime zone of the day to perform a periodic work. For this reason, the elevator can be used when commuting to work in the morning and evening, and the benefits of the elevator user can be secured.

【0035】そして、更新移動ケーブル30、既設昇降
路配線18等の電線類は、工場において電線束として所
要長さに調製されて端部に接続具が装備される。このた
め、改修工事現場における作業が少なくなって、前期工
程の工数が減少し期間を短縮することができる。次い
で、終日において前述の前期工程の作業よりも長時間に
わたってエレベーターの運転を休止して、既設機器を撤
去してその既設機器位置に更新機器を装着する作業を中
心とし、更新機器の電気的接続等を行う全日的作業が行
われる後期工程の作業が実施される。
The wires such as the renewal moving cable 30 and the existing hoistway wiring 18 are adjusted to a required length as a bundle of wires at a factory, and a connector is provided at an end. For this reason, the number of operations at the repair work site is reduced, so that the man-hours of the first-stage process are reduced and the period can be shortened. Next, on the whole day, the operation of the elevator was suspended for a longer time than the work of the above-mentioned first step, the existing equipment was removed, the update equipment was installed at the existing equipment position, and the electrical connection of the update equipment was performed. The work of the latter stage in which the whole-day work of performing the above is performed is performed.

【0036】そして、前期工程において時間帯によって
はエレベーターが使用でき、また全日的な作業を行う後
期工程の期間を短縮することができる。これにより、エ
レベーターの改修工事の費用を低減することができると
共に、改修工事における全体としてのエレベーターの休
止期間を短縮することができる。このため、エレベータ
ーの利用者の不便を少なくすることができる。また、作
業音が発生し、廃コンクリート等の塵埃が発生し、廃機
器の搬出等を行う改修工事の期間が短くなるのでエレベ
ーターの設置建物の使用者の環境低下期間を短縮するこ
とができる。
In the first step, an elevator can be used depending on the time zone, and the period of the second step in which work is performed all day can be shortened. As a result, it is possible to reduce the cost of the repair work of the elevator, and also to shorten the entire elevator downtime in the repair work. For this reason, the inconvenience of the user of the elevator can be reduced. In addition, work noise is generated, dust such as waste concrete is generated, and the period of the repair work for carrying out the waste equipment is shortened. Therefore, the period during which the environment of the building in which the elevator is installed is reduced can be reduced.

【0037】また、前期工程において更新移動ケーブル
30の先端側が一旦下垂して静止状態に配置されて巻き
癖が除去される。これによって、更新移動ケーブル30
の動特性が安定化するので、エレベーターの運転再開時
のかご11の昇降によって、更新移動ケーブル30が複
雑に揺動して、昇降路1の機器に接触する不具合の発生
を短い改修工事期間において容易に解消することができ
る。
Further, in the first step, the tip side of the update moving cable 30 is once suspended and arranged in a stationary state to remove the curl. Thereby, the update moving cable 30
The stabilization of the dynamic characteristic of the elevator causes the update moving cable 30 to swing in a complicated manner due to the elevation of the car 11 when the operation of the elevator is resumed, and the occurrence of a problem of contact with the equipment on the hoistway 1 during a short repair period. It can be easily eliminated.

【0038】[0038]

【発明の効果】この発明は以上説明したように、終日の
所定時間においてエレベーターの運転を休止し更新機器
を既設機器の近似位置に装着する前期工程と、終日にお
いて上記前期工程作業よりも長時間にわたって上記エレ
ベーターの運転を休止し、既設機器を撤去してその既設
機器位置に更新機器を装着する後期工程とを実施するも
のである。
As described above, according to the present invention, the first step of suspending the operation of the elevator at a predetermined time all day and mounting the renewal equipment at an approximate position of the existing equipment, And the latter step of suspending the operation of the elevator, removing the existing equipment, and installing the update equipment at the existing equipment position.

【0039】これによって、終日の所定時間においてエ
レベーターの運転を休止して、更新機器を既設機器の近
似位置に装着する前期工程の作業が行われる。このた
め、朝夕の通勤、通学時にはエレベーターが使用できて
エレベーター利用者の便益が確保される。次いで、終日
において前述の前期工程の作業よりも長時間にわたって
エレベーターの運転を休止して、既設機器を撤去してそ
の既設機器位置に更新機器を装着する後期工程の作業が
行われる。そして、前期工程において時間帯によっては
エレベーターが使用でき、また全日的な作業を行う後期
工程の期間を短縮することができる。これにより、エレ
ベーターの改修工事の費用を低減することができると共
に、改修工事における全体としてのエレベーターの休止
期間を短縮することができ、エレベーターの利用者の不
便を少なくする効果がある。
As a result, the operation of the first step of suspending the operation of the elevator at a predetermined time all day and mounting the renewal device at an approximate position of the existing device is performed. For this reason, the elevator can be used when commuting to work in the morning and evening, and the benefits of the elevator user can be secured. Next, on the entire day, the operation of the elevator is suspended for a longer time than the work of the above-described first step, the existing apparatus is removed, and the work of the second step of installing the update apparatus at the existing apparatus position is performed. Then, the elevator can be used depending on the time of day in the first-stage process, and the period of the second-stage process for performing all-day work can be shortened. As a result, it is possible to reduce the cost of the repair work of the elevator, and to shorten the rest period of the elevator in the repair work as a whole, thereby reducing the inconvenience of the user of the elevator.

【0040】また、この発明は以上説明したように、前
期工程において、エレベーター機械室の既設配線ダクト
の近似位置に更新配線ダクトを装着するものである。
Further, as described above, the present invention mounts an updated wiring duct at an approximate position of an existing wiring duct in an elevator machine room in the first step.

【0041】これによって、終日の所定時間においてエ
レベーターの運転を休止し、既設配線ダクトの近似位置
に更新配線ダクトを装着する作業を含めて、更新機器を
既設機器の近似位置に装着する前期工程の作業が行われ
る。このため、朝夕の通勤、通学時にはエレベーターが
使用できてエレベーター利用者の便益が確保される。次
いで、終日において前述の前期工程の作業よりも長時間
にわたってエレベーターの運転を休止して、既設機器を
撤去してその既設機器位置に更新機器を装着する後期工
程の作業が行われる。そして、前期工程において時間帯
によってはエレベーターが使用でき、また全日的な作業
を行う後期工程の期間を短縮することができる。これに
より、エレベーターの改修工事の費用を低減することが
できると共に、改修工事における全体としてのエレベー
ターの休止期間を短縮することができ、エレベーターの
利用者の不便を少なくする効果がある。
In this way, the operation of the elevator is suspended at a predetermined time all day, including the work of installing the updated wiring duct at an approximate position of the existing wiring duct. Work is performed. For this reason, the elevator can be used when commuting to work in the morning and evening, and the benefits of the elevator user can be secured. Next, on the entire day, the operation of the elevator is suspended for a longer time than the work of the above-described first step, the existing apparatus is removed, and the work of the second step of installing the update apparatus at the existing apparatus position is performed. Then, the elevator can be used depending on the time of day in the first-stage process, and the period of the second-stage process for performing all-day work can be shortened. As a result, it is possible to reduce the cost of the repair work of the elevator, and to shorten the rest period of the elevator in the repair work as a whole, thereby reducing the inconvenience of the user of the elevator.

【0042】また、この発明は以上説明したように、前
期工程において、エレベーターの機械室から下垂された
既設移動ケーブルの近似位置に更新移動ケーブルを配置
し、エレベーターのかごの昇降行程の1/2位置よりも
上方位置で更新固定具によって更新移動ケーブルをエレ
ベーターの昇降路壁に固定して下端側を所定時間懸垂す
るものである。
As described above, according to the present invention, in the first step, the renewed moving cable is arranged at an approximate position of the existing moving cable suspended from the machine room of the elevator, and the half of the elevator car's up-and-down stroke is reduced. The update moving cable is fixed to the hoistway wall of the elevator by the update fixture at a position above the position, and the lower end is suspended for a predetermined time.

【0043】これによって、終日の所定時間においてエ
レベーターの運転を休止し、エレベーターの機械室から
下垂された既設移動ケーブルの近似位置に更新移動ケー
ブルを配置し、エレベーターのかごの昇降行程の1/2
位置よりも上方位置で更新固定具によってエレベーター
の昇降路壁に固定し下端側を懸垂する作業を含めて、更
新機器を既設機器の近似位置に装着する定時的作業を行
う前期工程の作業が行われる。このため、朝夕の通勤、
通学時にはエレベーターが使用できてエレベーター利用
者の便益が確保される。次いで、終日において前述の前
期工程の作業よりも長時間にわたってエレベーターの運
転を休止して、既設機器を撤去してその既設機器位置に
更新機器を装着する後期工程の作業が行われる。そし
て、前期工程において時間帯によってはエレベーターが
使用でき、また全日的な作業を行う後期工程の期間を短
縮することができる。これにより、エレベーターの改修
工事の費用を低減することができると共に、改修工事に
おける全体としてのエレベーターの休止期間を短縮する
ことができ、エレベーターの利用者の不便を少なくする
効果がある。
Thus, the operation of the elevator is suspended at a predetermined time throughout the day, the renewed moving cable is arranged at a position approximate to the existing moving cable suspended from the machine room of the elevator, and a half of the elevator car up-and-down travel is performed.
The work in the first half of the previous period, which involves the periodic work of installing the renewal equipment at an approximate position of the existing equipment, including the work of fixing it to the elevator hoistway wall with the update fixture above the position and hanging the lower end side, Will be For this reason, morning and evening commuting,
When commuting to school, the elevator can be used, and the benefits of the elevator user are secured. Next, on the entire day, the operation of the elevator is suspended for a longer time than the work of the above-described first step, the existing apparatus is removed, and the work of the second step of installing the update apparatus at the existing apparatus position is performed. Then, the elevator can be used depending on the time of day in the first-stage process, and the period of the second-stage process for performing all-day work can be shortened. As a result, it is possible to reduce the cost of the repair work of the elevator, and to shorten the rest period of the elevator in the repair work as a whole, thereby reducing the inconvenience of the user of the elevator.

【0044】また、この発明は以上説明したように、前
期工程において、エレベーターの機械室から昇降路に配
線された既設昇降路配線の近似位置に更新昇降路配線を
装着するものである。
Further, as described above, the present invention mounts the updated hoistway wiring at an approximate position of the existing hoistway wiring wired from the machine room of the elevator to the hoistway in the first step.

【0045】これによって、終日の所定時間においてエ
レベーターの運転を休止し、エレベーターの機械室から
昇降路に配線された既設昇降路配線の近似位置に更新昇
降路配線を装着する作業を含めて、更新機器を既設機器
の近似位置に装着する前期工程の作業が行われる。この
ため、朝夕の通勤、通学時にはエレベーターが使用でき
てエレベーター利用者の便益が確保される。次いで、終
日において前述の前期工程の作業よりも長時間にわたっ
てエレベーターの運転を休止して、既設機器を撤去して
その既設機器位置に更新機器を装着する後期工程の作業
が行われる。そして、前期工程において時間帯によって
はエレベーターが使用でき、また全日的な作業を行う後
期工程の期間を短縮することができる。これにより、エ
レベーターの改修工事の費用を低減することができると
共に、改修工事における全体としてのエレベーターの休
止期間を短縮することができ、エレベーターの利用者の
不便を少なくする効果がある。
Thus, the operation of the elevator is suspended at a predetermined time throughout the day, and the updating including the work of installing the updated hoistway wiring at the approximate position of the existing hoistway wiring wired from the elevator machine room to the hoistway is performed. The work of the first step of mounting the device at an approximate position of the existing device is performed. For this reason, the elevator can be used when commuting to work in the morning and evening, and the benefits of the elevator user can be secured. Next, on the entire day, the operation of the elevator is suspended for a longer time than the work of the above-described first step, the existing apparatus is removed, and the work of the second step of installing the update apparatus at the existing apparatus position is performed. Then, the elevator can be used depending on the time of day in the first-stage process, and the period of the second-stage process for performing all-day work can be shortened. As a result, it is possible to reduce the cost of the repair work of the elevator, and to shorten the rest period of the elevator in the repair work as a whole, thereby reducing the inconvenience of the user of the elevator.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1を示す図で、改修工
事の前期状況を示すエレベーターの概念的立面図。
FIG. 1 is a view showing a first embodiment of the present invention, and is a conceptual elevation view of an elevator showing a situation in a first half of repair work.

【図2】 改修工事の終了状況を示す図1相当図。FIG. 2 is a diagram corresponding to FIG. 1 showing a state of completion of the repair work.

【図3】 エレベーターの構成を概念的に示す立面図。FIG. 3 is an elevation view conceptually showing the configuration of an elevator.

【符号の説明】[Explanation of symbols]

1 昇降路、2 機械室、11 かご、17 既設配線
ダクト、18 既設昇降路配線、20 既設移動ケーブ
ル 既設機器に対する近似位置に装着される更新機器: 2
5 更新制御盤、26更新配線ダクト、30 更新移動
ケーブル、32 更新固定具、34 更新昇降路配線、
37 更新駆動配線 既設機器を撤去した位置に装着される更新機器: 27
更新巻上機、33更新操作盤、39 更新着床スイッ
チ、40 更新乗場釦
1 hoistway, 2 machine room, 11 cars, 17 existing wiring duct, 18 existing hoistway wiring, 20 existing moving cable Updated equipment installed at an approximate position to existing equipment: 2
5 Update control panel, 26 update wiring duct, 30 update moving cable, 32 update fixture, 34 update hoistway wiring,
37 Update drive wiring Update equipment to be installed at the position where existing equipment is removed: 27
Update hoist, 33 update operation panel, 39 update landing switch, 40 update landing button

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 終日の所定時間においてエレベーターの
運転を休止し更新機器を既設機器の近似位置に装着する
前期工程と、終日において上記前期工程作業よりも長時
間にわたって上記エレベーターの運転を休止し、既設機
器を撤去してその既設機器位置に更新機器を装着する後
期工程とを実施するエレベーターの改修工法。
A first step of suspending the operation of the elevator at a predetermined time throughout the day and mounting the renewal equipment at an approximate position of the existing equipment; and suspending the operation of the elevator for a longer time than the work of the first step on the entire day. An elevator refurbishment method in which the existing equipment is removed and a later process of installing the updated equipment at the existing equipment position is performed.
【請求項2】 前期工程において、エレベーター機械室
の既設配線ダクトの近似位置に更新配線ダクトを装着す
ることを特徴とする請求項1記載のエレベーターの改修
工法。
2. The method of repairing an elevator according to claim 1, wherein in the first step, the updated wiring duct is mounted at a position approximate to the existing wiring duct in the elevator machine room.
【請求項3】 前期工程において、エレベーターの機械
室から下垂された既設移動ケーブルの近似位置に更新移
動ケーブルを配置し、上記エレベーターのかごの昇降行
程の1/2位置よりも上方位置で更新固定具によって上
記更新移動ケーブルを上記エレベーターの昇降路壁に固
定し下端側を所定時間懸垂させることを特徴とする請求
項1記載のエレベーターの改修工法。
3. In the first step, the renewal moving cable is arranged at an approximate position of the existing moving cable suspended from the machine room of the elevator, and the renewal moving cable is renewed and fixed at a position higher than a half position of the elevator ascent / descent process. 2. The elevator repair method according to claim 1, wherein the renewal moving cable is fixed to a hoistway wall of the elevator by means of a tool, and a lower end thereof is suspended for a predetermined time.
【請求項4】 前期工程において、エレベーターの機械
室から昇降路に配線された既設昇降路配線の近似位置に
更新昇降路配線を装着することを特徴とする請求項1記
載のエレベーターの改修工法。
4. The method of repairing an elevator according to claim 1, wherein in the first step, the updated hoistway wiring is mounted at a position approximate to the existing hoistway wiring wired from the machine room of the elevator to the hoistway.
JP11042315A 1999-02-19 1999-02-19 Method for repairing elevator Pending JP2000238973A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11042315A JP2000238973A (en) 1999-02-19 1999-02-19 Method for repairing elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11042315A JP2000238973A (en) 1999-02-19 1999-02-19 Method for repairing elevator

Publications (1)

Publication Number Publication Date
JP2000238973A true JP2000238973A (en) 2000-09-05

Family

ID=12632595

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11042315A Pending JP2000238973A (en) 1999-02-19 1999-02-19 Method for repairing elevator

Country Status (1)

Country Link
JP (1) JP2000238973A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010179998A (en) * 2009-02-04 2010-08-19 Mitsubishi Electric Corp Renewal construction method for elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010179998A (en) * 2009-02-04 2010-08-19 Mitsubishi Electric Corp Renewal construction method for elevator

Similar Documents

Publication Publication Date Title
JP2006348691A (en) System for working on exterior wall part of building
KR101416795B1 (en) Apparatus for lifting lotus Lantern
WO2002079067A1 (en) Method for installing hoist
JP2000238973A (en) Method for repairing elevator
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP2000313576A (en) Repairing method of elevator
JP2002003126A (en) Repairing method of elevator
JP2513072B2 (en) Wiring method in new construction of elevator
JP2877593B2 (en) Elevator installation method
JP2549171B2 (en) Elevator installation method
CN117208713A (en) Travelling cable device and elevator thereof
JPH08246680A (en) Automatic carrier for external wall member, and control apparatus therefor
JPH0725484B2 (en) Connection device for temporary control panel in temporary elevator
JPH1087225A (en) Installation method for elevator
JPH11322224A (en) Elevator control device
JP2004175496A (en) Heavy hoist for construction work
JP2002068637A (en) Replacing method of elevator control cable
JP2939064B2 (en) Elevator installation template
JP6902970B2 (en) Guide rail installation method
JP4454744B2 (en) Temporary elevator device
JPH02300081A (en) Installation work method for elevator
JPS63258385A (en) Method of renewal construction of elevator
JPH0672663A (en) Construction method for linking main rope of elevator
JPH0776473A (en) Apparatus and method for installing elevator
JP2001002343A (en) Elevator main rope replacing method