JP2000238972A - Hoisting device for installation of elevator - Google Patents
Hoisting device for installation of elevatorInfo
- Publication number
- JP2000238972A JP2000238972A JP11041877A JP4187799A JP2000238972A JP 2000238972 A JP2000238972 A JP 2000238972A JP 11041877 A JP11041877 A JP 11041877A JP 4187799 A JP4187799 A JP 4187799A JP 2000238972 A JP2000238972 A JP 2000238972A
- Authority
- JP
- Japan
- Prior art keywords
- landing
- floor
- pipe support
- elevator
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Jib Cranes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、昇降路の上方に機
械室を有さない油圧エレベータ等の据付過程で使用され
るエレベータの据付用揚重装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lifting device for an elevator used in an installation process of a hydraulic elevator or the like having no machine room above a hoistway.
【0002】[0002]
【従来の技術】低階床用に据え付けられるエレベータや
油圧エレベータなどのエレベータにおいては、一般に、
乗かごが昇降する昇降路の上方に機械室が備えられてい
ないので、エレベータ据付時に各種機材を上方階へ揚重
しようとするとき、揚重機等の揚重設備を機械室床で支
持するわけにはいかない。それゆえ、このようなエレベ
ータを据え付ける際には、建屋の最上階の乗場から昇降
路内へ跳ねだし足場を設置すると共に、この足場に支持
される吊点を昇降路内に設け、この吊点に取り付けた揚
重設備によって昇降路内機器等の機材を揚重するという
手法が、従来広く採用されていた。2. Description of the Related Art In elevators installed on low floors, such as elevators and hydraulic elevators, generally,
Since there is no machine room above the hoistway where the car rises and lowers, when lifting various equipment to the upper floor during elevator installation, lifting equipment such as a hoist is supported by the machine room floor. I can't go. Therefore, when such an elevator is installed, a scaffold is set out from the landing on the top floor of the building into the hoistway, and a suspension point supported by the scaffold is provided in the hoistway. Conventionally, a method of hoisting equipment such as equipment in a hoistway by a hoisting equipment attached to a vehicle has been widely adopted.
【0003】しかしながら、跳ねだし足場をエレベータ
の据付開始時に最上階まで運搬するためには、建屋の建
設に用いられている仮設リフト等が必要で、使用頻度の
高い該仮設リフトをエレベータ据付作業に借用しようと
すると長い待ち時間を余儀なくされることが多いので、
作業効率が著しく損なわれる恐れがあった。また、エレ
ベータの据付開始時には建屋の乗場の開口を養生するた
めの養生材を該乗場まで運搬する必要があるが、同様の
理由からこれら養生材の運搬を前記仮設リフトに頼るこ
とも作業効率を損なう恐れがあるので、場合によっては
作業員が養生材を持ったまま階段を上っていくという重
労働を強いられることもあった。[0003] However, in order to transport the bouncing scaffold to the top floor at the start of the elevator installation, a temporary lift or the like used for building is required, and the frequently used temporary lift is used for elevator installation work. If you try to borrow, you often have to wait a long time,
There was a risk that work efficiency would be significantly impaired. Further, at the start of the installation of the elevator, it is necessary to transport the curing material for curing the opening of the landing of the building to the landing, but for the same reason, relying on the temporary lift to transport the curing material also reduces the working efficiency. In some cases, workers were forced to go up the stairs with their curing materials because of the risk of damage.
【0004】そこで従来、かかる不具合を解消するた
め、例えば特開平4−129981号公報に開示されて
いるように、最上階の乗場にエレベータ据付用の揚重装
置を設置するという技術が提案されている。Therefore, in order to solve such a problem, a technique has been proposed in which a lifting device for installing an elevator is installed at the landing on the top floor, as disclosed in, for example, Japanese Patent Application Laid-Open No. H4-129981. I have.
【0005】[0005]
【発明が解決しようとする課題】上述した従来の据付用
揚重装置は、プラットフォームに取り付けた作業床を移
動させるための吊点としても使用するという強固な構造
体なので、かなりの重量物であり、運搬性が悪いという
問題点があった。また、かかる従来の据付用揚重装置は
乗場床にアンカーボルトで固定しなければならないの
で、建屋の床仕上げの都合上アンカーボルトが打設でき
ない場合には、最上階乗場への設置が困難になるという
問題点があった。さらにまた、かかる従来の据付用揚重
装置で揚重した吊り荷(各種機材)の位置は最上階乗場
の床面よりも下になってしまうので、昇降路内の離れた
位置にある吊り荷を最上階乗場へと引き寄せる引き込み
作業に危険が伴うという問題点があった。The above-described conventional lifting device for installation is a heavy structure because it has a strong structure that is also used as a hanging point for moving a work floor attached to a platform. However, there is a problem that the transportability is poor. In addition, since such a conventional lifting device must be fixed to the landing floor with anchor bolts, if the anchor bolts cannot be driven due to the finishing of the floor of the building, it is difficult to install the anchor bolts on the top floor landing. There was a problem of becoming. Furthermore, the position of the suspended load (various equipment) lifted by such a conventional installation lifting device is lower than the floor of the top floor landing, so that the suspended load at a remote position in the hoistway. There is a problem that there is a danger in the pulling in work for drawing the vehicle to the top floor landing.
【0006】本発明はこのような従来技術の問題点に鑑
みてなされたもので、その目的は、軽量で運搬しやすく
乗場への設置も簡単であり、かつ吊り荷の引き込み作業
を安全に行うことができる、エレベータの据付用揚重装
置を提供することにある。The present invention has been made in view of such problems of the prior art, and has as its object to be light in weight, easy to carry, easy to install in a landing, and to safely carry out a work of pulling a suspended load. It is an object of the present invention to provide a lifting device for installing an elevator.
【0007】[0007]
【課題を解決するための手段】上述した目的を達成する
ため、本発明は、乗かごが昇降する昇降路の上方に機械
室を有さないエレベータの据付過程で各種機材の揚重に
使用される据付用揚重装置において、前記昇降路に臨出
している建屋の乗場の床と天井との間に押し圧力を加え
て該乗場に設置されるパイプサポートと、先端部に吊点
を設けて基端部が前記パイプサポートに回動可能に取着
されている腕体と、この腕体の前記吊点に支持されて前
記機材が吊り上げ可能な揚重設備とを備える構成とし
た。SUMMARY OF THE INVENTION In order to achieve the above-mentioned object, the present invention is used for lifting various equipment in the process of installing an elevator having no machine room above a hoistway on which a car is lifted. In the lifting equipment for installation, a pipe support installed at the landing by applying a pressing force between the floor and the ceiling of the landing of the building that faces the hoistway, and a hanging point at the tip end is provided. The arm has a base end rotatably attached to the pipe support, and a lifting device supported by the hanging point of the arm so that the equipment can be lifted.
【0008】このような据付用揚重装置は、構成が簡素
で軽量化が図りやすく、また、パイプサポートを押し圧
力で最上階等の乗場の床と天井間に介設・固定すればよ
いので、乗場床にアンカーボルトを打設する必要がな
い。さらにまた、パイプサポートに回動可能に取着され
ている腕体を乗場側へ回転させることにより、吊り荷を
安全に乗場へ引き寄せることができる。[0008] Such a lifting device for installation has a simple structure and can be easily reduced in weight, and the pipe support can be interposed and fixed between the floor and the ceiling of the landing such as the top floor by pressing the pipe support. There is no need to install anchor bolts on the landing floor. Furthermore, the suspended load can be safely drawn to the landing by rotating the arm rotatably attached to the pipe support toward the landing.
【0009】[0009]
【発明の実施の形態】以下、本発明の一実施形態例を図
面を参照しつつ説明すると、図1は本実施形態例に係る
据付用揚重装置で吊り荷を揚重している状態を示す側面
図、図2は該揚重装置による吊り荷の引き込み作業を説
明するための平面図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 shows a state where a suspended load is being lifted by an installation lifting device according to the embodiment. FIG. 2 is a plan view for explaining a work of pulling a suspended load by the lifting device.
【0010】これらの図に示すエレベータの据付用揚重
装置は、昇降路1に臨出している建屋の最上階乗場10
の床3と天井2との間に押し圧力を加えることによって
該乗場10に設置されているパイプサポート4と、先端
部に吊点9を設けて基端部がパイプサポート4に回動可
能に取着されている腕体5と、この腕体5の吊点9に取
着されて吊り荷8(各種機材)の吊り上げを行う揚重設
備7とを備えた構成になっている。The elevator installation lifting device shown in these figures is a top floor landing 10 of a building that faces the hoistway 1.
By applying a pressing force between the floor 3 and the ceiling 2, a pipe support 4 installed at the landing 10, and a hanging point 9 at the tip end so that the base end can rotate on the pipe support 4. The arm body 5 is attached, and a lifting equipment 7 attached to a hanging point 9 of the arm body 5 to lift a suspended load 8 (various equipment) is provided.
【0011】前記パイプサポート4は、上端にずれ止め
プレート6aを有する上パイプ4aと、下端にずれ止め
プレート6bを有して上端部を雄ねじ部4dとなした下
パイプ4bと、雄ねじ部4dに螺合し係止ピン4fを介
して上パイプ4aが押し上げ可能な座4eとによって概
略構成されており、上パイプ4aの外径が下パイプ4b
の内径よりも若干小さく設計されているため、この上パ
イプ4aの下端部は下パイプ4b内に挿入されている。
また、下パイプ4bの雄ねじ部4dには長手方向に延び
る長孔4cが穿設されていて、上パイプ4aにも図示は
していないが長孔4cと対向可能なピン挿入孔が長手方
向に沿って複数穿設されている。すなわち、このパイプ
サポート4は、長孔4cを介して前記ピン挿入孔に係止
ピン4fを挿入して上下のパイプ4a,4bを連結状態
となした後、雄ねじ部4dに螺合している座4eを上方
へ螺進させることにより、係止ピン4fを介して上パイ
プ4aを押し上げることができるので、乗場の床3と天
井2との間に起立させて座4eの螺進に伴う押し圧力を
ずれ止めプレート6a,6bを介して天井2と床3に加
えていけば、このパイプサポート4を該乗場に簡単かつ
確実に設置することができる。なお、図1に示すよう
に、パイプサポート4を最上階乗場10に設置しておけ
ば、吊り荷8をすべての乗場へ揚重することができる。
また、乗場の床3と天井2の間隔は現場により異なる
が、上パイプ4aには前記ピン挿入孔が複数個所に設け
てあり、どのピン挿入孔に係止ピン4fを挿入するかに
よってパイプサポート4の全長は大きく変化するので、
床3と天井2間の高さ寸法のばらつきにもパイプサポー
ト4は容易に対応させることができる。The pipe support 4 includes an upper pipe 4a having a stopper plate 6a at an upper end, a lower pipe 4b having a stopper plate 6b at a lower end and a male screw part 4d at an upper end, and a male screw part 4d. The upper pipe 4a is roughly constituted by a seat 4e which can be pushed up via a screwing engagement pin 4f, and the outer diameter of the upper pipe 4a is lower pipe 4b.
The lower end of the upper pipe 4a is inserted into the lower pipe 4b.
A long hole 4c extending in the longitudinal direction is formed in the male screw portion 4d of the lower pipe 4b. A pin insertion hole (not shown) that can face the long hole 4c is formed in the upper pipe 4a in the longitudinal direction. A plurality is drilled along. That is, the pipe support 4 is screwed into the male screw portion 4d after inserting the locking pin 4f into the pin insertion hole via the elongated hole 4c to connect the upper and lower pipes 4a and 4b. By screwing the seat 4e upward, the upper pipe 4a can be pushed up via the locking pin 4f, so that the upper pipe 4a is raised between the floor 3 and the ceiling 2 of the landing to push with the screwing of the seat 4e. If the pressure is applied to the ceiling 2 and the floor 3 via the non-slip plates 6a and 6b, the pipe support 4 can be easily and reliably installed at the landing. In addition, if the pipe support 4 is installed in the top floor landing 10 as shown in FIG. 1, the suspended load 8 can be lifted to all landings.
Although the distance between the floor 3 and the ceiling 2 of the landing varies depending on the site, the upper pipe 4a is provided with the above-mentioned pin insertion holes at a plurality of positions, and the pipe support depends on which pin insertion hole the locking pin 4f is inserted. Since the total length of 4 changes greatly,
The pipe support 4 can easily cope with variations in the height dimension between the floor 3 and the ceiling 2.
【0012】一方、前記腕体5は、親ビーム5aとスラ
イドビーム5bとブレス5cと支柱5dとによって概略
構成されており、パイプサポート4の上パイプ4aに回
動可能に遊嵌されている筒状の支柱5dに親ビーム5a
の一端部が連結されていて、この親ビーム5a内にスラ
イドビーム5bがスライド可能に挿入されていると共
に、両端部が支柱5dと親ビーム5aに連結されている
ブレス5cが該親ビーム5aを支えている。すなわち、
支柱5dの内径は、上パイプ4aの外径よりも大きくて
下パイプ4bの外径よりも小さい寸法に設計されている
ので、この支柱5dに上パイプ4aを挿通してからパイ
プサポート4を所望の乗場に設置することにより、図2
に示すように、パイプサポート4の軸まわりに親ビーム
5aを円弧状に移動させることができる。また、親ビー
ム5aには図示せぬ位置決め孔が複数個所に穿設してあ
り、これらの位置決め孔に挿通した固定ボルト5eでス
ライドビーム5bを固定できるようになっているので、
スライド量を適宜選択することによりスライドビーム5
bを親ビーム5aから所望の長さだけ突出させた状態に
保つことができる。そして、親ビーム5aから突出して
いるスライドビーム5bの先端部に設けられた吊点9
に、揚重設備7が取り付けられている。On the other hand, the arm 5 is roughly constituted by a main beam 5a, a slide beam 5b, a breath 5c, and a column 5d, and is a tube rotatably loosely fitted to the upper pipe 4a of the pipe support 4. The main beam 5a on the pillar 5d
Is connected to the main beam 5a, a slide beam 5b is slidably inserted into the main beam 5a, and a breath 5c having both ends connected to the support 5d and the main beam 5a is connected to the main beam 5a. Supporting. That is,
Since the inner diameter of the support 5d is designed to be larger than the outer diameter of the upper pipe 4a and smaller than the outer diameter of the lower pipe 4b, the pipe support 4 is desired after the upper pipe 4a is inserted through the support 5d. Figure 2
As shown in (1), the parent beam 5a can be moved in an arc around the axis of the pipe support 4. Also, positioning holes (not shown) are formed in the main beam 5a at a plurality of locations, and the slide beam 5b can be fixed by the fixing bolts 5e inserted into these positioning holes.
By appropriately selecting the slide amount, the slide beam 5 can be adjusted.
b can be kept in a state of protruding from the parent beam 5a by a desired length. A suspension point 9 provided at the tip of the slide beam 5b projecting from the parent beam 5a.
, A lifting equipment 7 is attached.
【0013】次に、このように構成される据付用揚重装
置を最上階乗場10に設置して吊り荷8を揚重する際の
作業手順について説明する。Next, a description will be given of an operation procedure for lifting the suspended load 8 by installing the thus-installed lifting device on the top floor landing 10.
【0014】まず、揚重作業を開始する前に、図2に示
すように腕体5の親ビーム5aの先端部に案内ロープ1
1を取り付けておく。そして、パイプサポート4の軸ま
わりに腕体5を昇降路1内へ向けて回転させることによ
り、スライドビーム5bの先端部に吊持されている揚重
設備7を適宜位置に配置させるが、このとき、案内ロー
プ11の一端部は最上階乗場10に残しておく。なお、
親ビーム5aに対するスライドビーム5bの突出量を変
更させれば腕体5は伸縮可能なので、吊り荷8の形状等
に応じて、揚重設備7が所望に位置に配置されるように
スライドビーム5bの突出量は予め設定しておく。次い
で、1階乗場等で吊り荷8を揚重設備7のワイヤ7aに
連結した後、この揚重設備7を操作することにより、吊
り荷8を昇降路1内で最上階あるいは他の任意階まで吊
り上げていく。First, before starting the lifting operation, the guide rope 1 is attached to the distal end of the main beam 5a of the arm 5 as shown in FIG.
1 is attached. By rotating the arm 5 around the axis of the pipe support 4 toward the inside of the hoistway 1, the lifting equipment 7 suspended at the tip of the slide beam 5b is arranged at an appropriate position. At this time, one end of the guide rope 11 is left at the landing 10 on the top floor. In addition,
The arm 5 can be extended and contracted by changing the amount of protrusion of the slide beam 5b with respect to the parent beam 5a, so that the lifting equipment 7 is arranged at a desired position according to the shape of the suspended load 8 and the like. Is set in advance. Next, after the suspended load 8 is connected to the wire 7a of the lifting equipment 7 at the landing on the first floor or the like, by operating the lifting equipment 7, the suspended load 8 is moved to the top floor or another arbitrary floor in the hoistway 1. And lift it up.
【0015】こうして吊り荷8を所望の高さ位置まで吊
り上げたなら、最上階乗場10で作業員が案内ロープ1
1を引き寄せることにより、パイプサポート4の軸まわ
りに腕体5を該乗場10側へ回転させる。これにより、
図2に破線で示すように、揚重設備7に吊持されている
吊り荷8を所望の階の乗場へと安全に引き込むことがで
きる。When the suspended load 8 has been lifted to a desired height position in this manner, the worker can use the guide rope 1 at the landing 10 on the top floor.
By pulling the arm 1, the arm 5 is rotated around the axis of the pipe support 4 toward the landing 10. This allows
As shown by the broken line in FIG. 2, the suspended load 8 suspended by the lifting equipment 7 can be safely drawn into the landing on a desired floor.
【0016】上述した据付用揚重装置は、パイプサポー
ト4を押し圧力で乗場の床3と天井2との間に介設・固
定するという取付構造を採用しているため、乗場床にア
ンカーボルトを打設する必要がない。また、この据付用
揚重装置は軽量であるのみならず、パイプサポート4や
腕体5が伸縮可能なので、運搬性が良好である。したが
って、作業員は最初に、この据付用揚重装置を階段を使
って最上階乗場10まで運搬し、その床3と天井2との
間にパイプサポート4を介設・固定して該揚重装置を最
上階乗場10に設置しておきさえすれば、以後、エレベ
ータの据付に必要な昇降路内機器や養生材等の各種機材
を、この据付用揚重装置を利用して所望の階の乗場まで
容易に、しかも安全に運搬することができ、建屋建設用
の仮設リフトに頼る必要がなくなる。The above-described lifting device for installation employs a mounting structure in which the pipe support 4 is interposed and fixed between the floor 3 and the ceiling 2 of the landing with a pressing force, so that the anchor bolt is mounted on the landing floor. There is no need to cast. In addition, the lifting device for installation is not only lightweight, but also has good transportability because the pipe support 4 and the arm body 5 can expand and contract. Accordingly, the worker first transports the lifting device for installation to the top floor landing 10 using stairs, and interposes and fixes a pipe support 4 between the floor 3 and the ceiling 2 to lift the lifting device. As long as the device is installed at the landing 10 on the top floor, various equipment such as equipment in the hoistway and curing materials necessary for the installation of the elevator will be installed on the desired floor using the lifting device for installation. It can be easily and safely transported to the landing, eliminating the need to rely on temporary lifts for building construction.
【0017】[0017]
【発明の効果】本発明は以上説明したような形態で実施
され、以下に記載されるような効果を奏する。The present invention is embodied in the form described above, and has the following effects.
【0018】昇降路に臨出している建屋の乗場の床と天
井との間に押し圧力を加えて該乗場に設置されるパイプ
サポートと、先端部に吊点を設けて基端部が前記パイプ
サポートに回動可能に取着されている腕体と、この腕体
の前記吊点に支持されて各種機材(吊り荷)が吊り上げ
可能な揚重設備とを備えた据付用揚重装置なので、構成
が簡素で軽量化が図りやすく、運搬性に優れている。ま
た、前記パイプサポートを押し圧力で乗場に固定できる
ことから、乗場床にアンカーボルトを打設する必要がな
く、よってアンカーボルトが打設できない乗場にも簡単
に設置できる。また、吊り荷を乗場へ引き寄せる際に
は、前記パイプサポートに回動可能に取着されている前
記腕体を乗場側へ回転させればよいので、例えばパイプ
サポートを最上階乗場に設置しておくことにより、任意
階の乗場への吊り荷の引き込み作業を安全に行うことが
できる。A pipe support is provided at the landing by applying a pressing force between the floor and the ceiling of the landing of the building that faces the hoistway. Since it is a lifting device for installation comprising an arm body rotatably attached to the support and a lifting device supported by the hanging point of the arm body and capable of lifting various equipment (hanging load), The structure is simple, lightweight and easy to carry, and excellent in transportability. In addition, since the pipe support can be fixed to the landing by the pressing force, it is not necessary to install an anchor bolt on the landing floor, and therefore, the pipe support can be easily installed in a landing where an anchor bolt cannot be installed. Further, when pulling the suspended load to the landing, the arm body rotatably attached to the pipe support may be rotated to the landing side, for example, by installing the pipe support at the top floor landing. By doing so, the work of pulling the suspended load into the landing on any floor can be performed safely.
【0019】また、前記腕体を伸縮可能な構成にしてお
けば、吊り荷の形状等に応じて、前記揚重設備を昇降路
内の所望に位置に配置させることができる。If the arm is configured to be extendable, the lifting equipment can be arranged at a desired position in the hoistway according to the shape of the suspended load.
【図1】本発明の一実施形態例に係る据付用揚重装置で
吊り荷を揚重している状態を示す側面図である。FIG. 1 is a side view showing a state where a suspended load is being lifted by an installation lifting device according to an embodiment of the present invention.
【図2】該揚重装置による吊り荷の引き込み作業を説明
するための平面図である。FIG. 2 is a plan view for explaining a work of pulling a suspended load by the lifting device.
1 昇降路 2 天井 3 床 4 パイプサポート 4a 上パイプ 4b 下パイプ 4c 長孔 4d 雄ねじ部 4e 座 4f 係止ピン 5 腕体 5a 親ビーム 5b スライドビーム 5c ブレス 5d 支柱 5e 固定ボルト 6a,6b ずれ止めプレート 7 揚重設備(揚重機) 8 吊り荷(各種機材) 9 吊点 10 最上階乗場 11 案内ロープ DESCRIPTION OF SYMBOLS 1 Hoistway 2 Ceiling 3 Floor 4 Pipe support 4a Upper pipe 4b Lower pipe 4c Long hole 4d Male screw part 4e Seat 4f Locking pin 5 Arm 5a Parent beam 5b Slide beam 5c Breath 5d Strut 5e Fixing bolt 6a, 6b 7 Lifting equipment (lifting machine) 8 Suspended load (various equipment) 9 Hanging point 10 Top floor landing 11 Guide rope
Claims (3)
を有さないエレベータの据付過程で各種機材の揚重に使
用される据付用揚重装置において、 前記昇降路に臨出している建屋の乗場の床と天井との間
に押し圧力を加えて該乗場に設置されるパイプサポート
と、先端部に吊点を設けて基端部が前記パイプサポート
に回動可能に取着されている腕体と、この腕体の前記吊
点に支持されて前記機材が吊り上げ可能な揚重設備とを
備えていることを特徴とするエレベータの据付用揚重装
置。1. An installation lifting device used for lifting various equipment in the process of installing an elevator that does not have a machine room above a hoistway on which a car ascends and descends, wherein the elevator is exposed to the hoistway. A pipe support installed at the landing by applying a pressing force between the floor and the ceiling of the landing of the building, and a hanging point is provided at the distal end so that the base end is rotatably attached to the pipe support. A lifting device for installing an elevator, comprising: an arm which is lifted; and a lifting device supported by the hanging point of the arm and capable of lifting the equipment.
縮可能に構成したことを特徴とするエレベータの据付用
揚重装置。2. An elevator lifting device according to claim 1, wherein said arm body is configured to be extendable and contractible.
パイプサポートを建屋の最上階の乗場に設置可能とした
ことを特徴とするエレベータの据付用揚重装置。3. An elevator lifting apparatus according to claim 1, wherein said pipe support can be installed in a landing on a top floor of a building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11041877A JP2000238972A (en) | 1999-02-19 | 1999-02-19 | Hoisting device for installation of elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11041877A JP2000238972A (en) | 1999-02-19 | 1999-02-19 | Hoisting device for installation of elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000238972A true JP2000238972A (en) | 2000-09-05 |
Family
ID=12620512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11041877A Pending JP2000238972A (en) | 1999-02-19 | 1999-02-19 | Hoisting device for installation of elevator |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000238972A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101090186B1 (en) * | 2011-05-27 | 2011-12-06 | 한신전기주식회사 | A distributing switch box having lifting machine for changing heavy equipments |
KR101092322B1 (en) | 2009-07-31 | 2011-12-09 | 동국대학교 산학협력단 | Crane |
CN115417266A (en) * | 2022-08-15 | 2022-12-02 | 美迪斯智能装备有限公司 | Intelligent alarm system of elevator car gravity response |
-
1999
- 1999-02-19 JP JP11041877A patent/JP2000238972A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101092322B1 (en) | 2009-07-31 | 2011-12-09 | 동국대학교 산학협력단 | Crane |
KR101090186B1 (en) * | 2011-05-27 | 2011-12-06 | 한신전기주식회사 | A distributing switch box having lifting machine for changing heavy equipments |
CN115417266A (en) * | 2022-08-15 | 2022-12-02 | 美迪斯智能装备有限公司 | Intelligent alarm system of elevator car gravity response |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FI118644B (en) | Elevator installing method for use during construction of tall building, involves dismounting machine room of elevator provided with room, and converting elevator into elevator without machine room by placing hoisting machine | |
JPH0585681A (en) | Elevator hoist way work platform and installation method for elevator system structual part | |
US20110147329A1 (en) | Load transportation system | |
JPWO2020035933A1 (en) | How to apply elevator head extension technology | |
WO2020142001A1 (en) | A moveable platform | |
JP2000238972A (en) | Hoisting device for installation of elevator | |
CN212388380U (en) | Support type mounting system of steel cable tower | |
JPH09151053A (en) | Fixing device for car of elevator | |
JP2001039652A (en) | Self climbing lift | |
CN111636311A (en) | Support type mounting system of steel cable tower | |
JP2010037085A (en) | Installation work floor device of elevator and assembling method therefor | |
JP2001335255A (en) | Elevator installation construction method, and elevator installation unit | |
JP3920527B2 (en) | Elevator for construction | |
JP2001354374A (en) | Lifting device in hoistway of elevator | |
JP2006001739A (en) | Installation method of rise-up elevator | |
JPH082850A (en) | Work method in elevator shaft | |
JPH05201648A (en) | Installation of elevator | |
JPH02305785A (en) | Elevator installation process and working floor device for elevator installation | |
CN215107202U (en) | A operation platform that rises that slides for elevartor shaft construction | |
CN110077952B (en) | Building template cross-floor transportation equipment and transportation method | |
US8480060B2 (en) | Crane cable roller assembly | |
JP2872886B2 (en) | Construction lift equipment | |
JPH11117523A (en) | Lifting work platform for elevator parking and method using the same | |
JPH0442296Y2 (en) | ||
JPH0585478B2 (en) |