JP2000234302A - Footstep for trail up mountain - Google Patents
Footstep for trail up mountainInfo
- Publication number
- JP2000234302A JP2000234302A JP11038036A JP3803699A JP2000234302A JP 2000234302 A JP2000234302 A JP 2000234302A JP 11038036 A JP11038036 A JP 11038036A JP 3803699 A JP3803699 A JP 3803699A JP 2000234302 A JP2000234302 A JP 2000234302A
- Authority
- JP
- Japan
- Prior art keywords
- mountain
- side wall
- top plate
- trail
- wall portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Landscapes
- Road Paving Structures (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は登山道用踏段、詳し
くは、登山道における雨水等の流下水流による歩道面の
洗堀を防止する機能を備えた登山道用踏段に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a step for a mountain trail, and more particularly to a step for a mountain trail having a function of preventing scouring of a sidewalk surface due to a flowing water such as rainwater on the mountain trail.
【0002】[0002]
【従来の技術】登山道は登山者の通行により踏み固めら
れているので、周囲の部分より一段低い地形となる。そ
のため、登山道は雨水などが流下する際の水路となり、
特に勾配が急な登山道にあっては滝のように流れ、この
流下水流により歩道面が次第に洗堀されて断面U字状に
えぐられる。その結果、岩肌が露出した凹凸の激しい或
いは泥土が滞留した歩道面となり、歩行しにくい状態と
なる。2. Description of the Related Art Since a mountain climbing road is compacted by the traffic of climbers, it has a terrain one step lower than the surrounding area. Therefore, the mountain trail becomes a waterway when rainwater flows down,
In particular, on a mountain road with a steep slope, the water flows like a waterfall, and the surface of the sidewalk is gradually scoured by this flowing water flow, and is cut into a U-shaped cross section. As a result, the rock surface is exposed and the sidewalk surface becomes severe with unevenness or muddy soil, making it difficult to walk.
【0003】そこで、従来は登山道に踏段を設置して、
登山者の歩行を容易にする工夫がなれているが、その手
段としては、複数本の杭を地盤中に打ち込み、該杭群の
地表より突出した部分に受け板を固定して土留をした構
造の踏段が多かった。Therefore, conventionally, steps have been installed on mountain trails,
There is a device that makes it easier for climbers to walk, but as a means, a structure is used in which a plurality of piles are driven into the ground, and a receiving plate is fixed to the part of the piles that protrudes from the ground surface, and the soil is retained. There were many steps.
【0004】[0004]
【発明が解決しようとする課題】しかし、上記のような
従来の踏段は、登山者が歩行し易い歩道面を構築するこ
とを主目的としており、雨水の流下に伴う歩道面の洗堀
を防止するための配慮はなされていない。したがって、
降雨が激しい場合などは前記受け板のオーバーフロー水
によってその踏段の谷側の土砂が洗堀され、歩道面は一
層深くU字状にえぐられることが多かったし、受け板に
は開口部がないため受け板の下部に回り込んだ雨水が一
気に滝のように流れ、受け板の下部が洗堀されやすい。However, the conventional steps as described above have a main purpose of constructing a sidewalk surface which is easy for climbers to walk, and prevent scouring of the sidewalk surface caused by rainwater flow. No consideration has been given to doing so. Therefore,
In case of heavy rainfall, etc., the overflow water of the receiving plate scours the soil on the valley side of the steps, and the sidewalk surface is often deeper and U-shaped, and the receiving plate has no opening. As a result, the rainwater spilling into the lower part of the receiving plate flows like a waterfall at a stretch, and the lower part of the receiving plate is easily washed.
【0005】その結果、杭周囲の地盤が緩んで土砂が流
出しやすくなり、長期間たつと踏段そのものが崩壊する
場合もあったし、杭や受け板は周囲の景観に配慮して木
製のものであることが多いため劣化が早く、耐久年数も
短い。そして、朽ちた木材はそのまま放置されるので、
かえって景観を損なう場合もある、といった諸欠点があ
った。[0005] As a result, the ground around the pile is loosened, and the earth and sand tends to flow out. In some cases, the step itself collapses after a long period of time, and the pile and the receiving plate are made of wooden material in consideration of the surrounding scenery. In many cases, the deterioration is quick and the durability is short. And the decayed wood is left as it is,
On the contrary, there were drawbacks that the landscape could be spoiled.
【0006】[0006]
【課題を解決するための手段】本発明は、上記のような
従来の諸問題点を解消するために成されたもので、踏段
に透水性及び水流速度減衰機能を付与することにより流
下水流による歩道面の洗堀を防止し、更には景観に配慮
したものを提供することを目的としたものであり、その
要旨は、矩形状の水平な天板部と、この天板部の対向す
る両側辺から垂下する登山道の山側に向け設置する側壁
部と、登山道の谷側に向け設置する前記山側の側壁部よ
り高い側壁部とからなるほゞ逆U字状のコンクリート製
ブロックであって、前記天板部及び谷側の側壁部にそれ
ぞれ複数個の開口部を形成したことを特徴とする登山道
用踏段及び前記天板部の上面には天然石を埋め込み、又
前記谷側の側壁部外側面には天然岩石或いは天然岩石を
模した模様を施こしたことを特徴とする登山道用踏段に
ある。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and the present invention provides a step with water permeability and water flow velocity damping functions to reduce the flow rate of flowing water. The purpose is to prevent scouring on the sidewalk surface and to provide a landscape-friendly one. The gist of this is that a rectangular horizontal top plate and the opposite sides of this top plate A substantially U-shaped concrete block comprising a side wall portion installed toward a mountain side of a mountain trail hanging down from a side and a side wall portion higher than the mountain side wall portion installed toward a valley side of the mountain road, A plurality of openings are respectively formed in the top plate portion and the valley side wall portion, and natural stones are buried in upper surfaces of the climbing steps and the top plate portion, and the valley side wall portion is also embedded. On the outer surface, natural rock or a pattern imitating natural rock is applied. It is in the step for climbing road, characterized in that was.
【0007】[0007]
【発明の実施の形態】以下、本発明を図面に示す実施例
により詳細に説明すると、図において、Aはプレキャス
トコンクリート製の登山道用踏段(以下、踏段という)
で、左右方向に長い長方形状の水平な天板部1と、該天
板部1の対向する前後の両長辺からそれぞれ垂下する前
側の側壁部2及びこの前側の側壁部2より高さの低い後
側の側壁部3とから主に構成され、全体としてほゞ逆U
字形状のものである。BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described below in detail with reference to the embodiments shown in the drawings. In the drawings, A is a precast concrete climbing step (hereinafter referred to as step).
A rectangular horizontal top plate 1 that is long in the left-right direction, a front side wall portion 2 hanging down from both front and rear long sides of the top plate portion 1 facing each other, and a height higher than the front side wall portion 2 It is mainly composed of the lower rear side wall 3 and is generally
It has a character shape.
【0008】前記前側の側壁部2は、傾斜する登山道R
の谷側に向け設置するもので、その高さ(H)はこれと
対峙する登山道Rの山側に向け設置する前記後側の側壁
部3の高さ(h)よりも高く(H>h)形成して、傾斜
する登山道Rに前記天板部1を水平状態に設置できるよ
うな形状としている。4は前記天板部1に形成した左右
方向に長い長方形状の開口部で、図示の実施例では互い
に離間して2個形成されている。The front side wall 2 is formed on an inclined mountain road R
And the height (H) is higher (H> h) than the height (h) of the rear side wall portion 3 installed toward the mountain side of the mountain road R facing the mountain. ) Is formed so that the top plate 1 can be installed horizontally on an inclined mountain road R. Reference numeral 4 denotes a rectangular opening formed in the top plate 1 and extending in the left-right direction. In the illustrated embodiment, two openings are formed apart from each other.
【0009】5は前記前側の側壁部2に形成した円形の
開口部で、図示の実施例では側壁部2の高さ(H)の1
/2よりやや高い位置にあって、左右方向(長手方向)
に互いに離間して5個形成されている。6は前記前側の
側壁部2の下端両隅部に形成したカット面で、U字状に
洗堀された登山道Rに設置しやすい構造としている。7
は前記天板部1の上面に設けた天然石で、下部を埋め込
んで設置したものであり、8は前記前側の側壁部2の外
側面に設けた天然岩石又は天然岩石を模した模様であ
る。これにより、歩行時の滑りを防止するとゝもに、耐
久性及び景観性に優れた踏段となる。Reference numeral 5 denotes a circular opening formed in the front side wall 2, which is 1 (H) of the height of the side wall 2 in the illustrated embodiment.
At a position slightly higher than / 2 in the horizontal direction (longitudinal direction)
Are formed apart from each other. A cut surface 6 is formed at both corners of the lower end of the front side wall portion 2 and has a structure that can be easily installed on the mountain trail R washed in a U-shape. 7
Reference numeral 8 denotes a natural stone provided on the upper surface of the top plate portion 1 and embedded in a lower portion thereof. Reference numeral 8 denotes a natural rock or a pattern imitating a natural rock provided on an outer surface of the front side wall portion 2. As a result, it is possible to prevent slippage during walking and to provide a step having excellent durability and scenic properties.
【0010】つぎに、前記構成からなる踏段Aの使用方
法を説明するに、比較的急勾配の登山道に設置する場合
にあっては、図3に示すように、登山道Rの上に所定間
隔をおいて複数個の踏段Aを敷設する。この際、前記前
側の高い側壁部2を谷側に向け、前記後ろ側の低い側壁
部3を山側に向けて配置し、前記天板部1が水平状態と
なるよう前記両側壁部2,3の下端部を地中に埋め込ん
で固定する。Next, a description will be given of a method of using the step A having the above configuration. In the case where the step A is installed on a relatively steep mountain trail, as shown in FIG. A plurality of steps A are laid at intervals. At this time, the front side high side wall portion 2 is arranged toward the valley side, and the rear side low side wall portion 3 is arranged toward the mountain side, and the side wall portions 2 and 3 are arranged such that the top plate 1 is in a horizontal state. Embed the lower end of the underground and fix it.
【0011】その後、天板部1に形成した前記開口部4
から踏段A内に砂利や砕石等S1を投入して充填すると
ゝもに、各踏段A,A間にも下段側の天板部1の上面と
ほゞ面一となるように砂利や砕石等S2を敷設する。こ
れにより、天板部1に形成した前記開口部4は上方に、
また前側の側壁部2に形成した前記開口部5は谷側に夫
々露出した状態で開口することになる。Thereafter, the opening 4 formed in the top plate 1 is formed.
Gravel, crushed stones, etc. are put into the steps A from the top and filled, and at the same time, between the steps A, A, the gravel, crushed stones, etc. are almost flush with the upper surface of the lower top plate 1. Lay S2. As a result, the opening 4 formed in the top plate 1 is moved upward.
Further, the openings 5 formed in the front side wall 2 are opened in a state of being exposed to the valleys, respectively.
【0012】そこで、降雨時において、周囲より一段低
い登山道Rに集まった雨水は各踏段A,A間に敷設した
砂利や砕石等S2の内部に浸透し、踏段Aの後側の側壁
部3下端側を通って踏段A内の砂利や砕石等S1方向へ
流れる。また降雨量が多い場合には、砂利や砕石等S2
の表面部分を流れて踏段Aの天板部1に形成した前記記
開口部4から踏段A内に入り、該踏段A内に充填した砂
利や砕石等S1内に浸透し、山側から谷側に向け流下す
る。Therefore, during rainfall, rainwater collected on the mountain trail R which is one step lower than the surroundings penetrates into the inside of the gravel or crushed stone S2 laid between the steps A, A, and the side wall 3 on the rear side of the steps A. It flows in the direction S1 such as gravel and crushed stone in the steps A through the lower end side. If the amount of rainfall is large, gravel, crushed stone, etc.
Flows into the step A from the opening 4 formed in the top plate 1 of the step A, penetrates into the gravel or crushed stone S1 filled in the step A, and flows from the mountain side to the valley side. Flow down.
【0013】この間にあって、流下水は前記砂利や砕石
等S1及びS2と衝当し、この砂利や砕石等の間隙を迂
回しながら流下するためその流速が減衰される。そし
て、流れが緩やかになった流下水の大部分は、前側の側
壁部2に形成した前記開口部5から踏段Aの外に排水さ
れ、その下段の踏段A内においても上記過程を繰り返す
ことによって流下水の流速が減衰される。以後はゆるや
かな流れとなって登山道Rを流下することになる。した
がって、流下水により登山道Rの歩行面が洗堀されるこ
ともなく、又洗堀された泥土が滞留することもない。In the meantime, the falling water collides with the above-mentioned gravel and crushed stones S1 and S2 and flows down while bypassing the gaps of the gravel and crushed stones, so that the flow velocity thereof is attenuated. Most of the flowing water whose flow has become gentle is drained out of the step A from the opening 5 formed in the front side wall 2, and the above process is repeated in the step A of the lower step. The flow velocity of the flowing water is attenuated. After that, it will flow down the mountain trail R with a gentle flow. Therefore, the walking surface of the mountain trail R is not washed by the flowing water, and the washed mud does not stay.
【0014】図4に示すものは、登山道Rの勾配が比較
的緩い場合の設置例である。この実施例の場合、上段に
設置した踏段Aにおける前側の側壁部2に形成した前記
開口部5は、下段に設置した踏段Aの天板部1の上面と
ほゞ面一となるよう敷設した砂利や砕石等S2により覆
われる。したがって、上段に設置した踏段Aの前記開口
部5は外側に露出しない状態で設置されることになる。FIG. 4 shows an installation example in which the slope of the mountain trail R is relatively gentle. In the case of this embodiment, the opening 5 formed in the front side wall 2 of the step A installed in the upper stage is laid so as to be substantially flush with the upper surface of the top plate 1 of the step A installed in the lower stage. It is covered with gravel and crushed stones S2. Therefore, the opening 5 of the step A installed on the upper stage is installed without being exposed to the outside.
【0015】而して、上段の踏段A内に流入し、その内
部で前記砂利や砕石等S1と衝当することにより流速が
減衰された流下水は、上記実施例の場合と同様に、その
大部分は側壁部2に形成した前記開口部5から踏段Aの
外に排水される。そして、以後は上記の作用が繰り返さ
れることにより流下水の流速が次第に弱められ、緩やか
な流れとなって登山道Rを流下する。したがって、流下
水によって登山道Rの歩道面が洗堀されることがなく、
歩道面に泥土が滞留することもない。The flowing water flowing into the upper step A and having its flow velocity attenuated by colliding with the gravel, crushed stones, etc. S1 therein, as in the above embodiment, Most of the water is drained out of the step A from the opening 5 formed in the side wall 2. Thereafter, by repeating the above-described operation, the flow velocity of the flowing water is gradually reduced, and the flowing water flows down the mountain trail R as a gentle flow. Therefore, the sidewalk surface of the mountain trail R is not washed by the flowing water,
Mud does not stay on the sidewalk.
【0016】[0016]
【発明の効果】本発明に係る登山道用踏段は、上記のよ
うに、矩形状の水平な天板部と、この天板部の対向する
両側辺から垂下する登山道の山側に向け設置する側壁部
と、登山道の谷側に向け設置する前記山側の側壁部より
高い側壁部とからなるほゞ逆U字状のコンクリート製ブ
ロックであって、前記天板部及び谷側の側壁部にそれぞ
れ複数個の開口部を形成した構成であるから、登山道に
沿って流下する雨水は各登山道用踏段の部分でその流速
が遅くなり、流下水による登山道の洗堀が少なくなる。
したがって、土砂の流出も少なくなり、傾斜する歩道面
が階段状に整備されることもあって歩行しやすくなる。
また、前記谷側の側壁部外側面には天然岩石或いは天然
岩石を模した模様を施こした構成とすることにより、ス
リップせず歩行しやすいとゝもに、周囲の景観にマッチ
して自然環境の破壊を防止することができる、といった
諸効果がある。As described above, the climbing steps according to the present invention are installed facing the rectangular horizontal top plate and the mountain side of the climbing road hanging down from the opposite sides of the top plate. A substantially inverted U-shaped concrete block comprising a side wall portion and a side wall portion higher than the mountain side wall portion installed toward the valley side of the mountain trail, wherein the top plate portion and the valley side wall portion are provided. Since each of the openings has a plurality of openings, the flow rate of rainwater flowing down the climbing road is reduced at the steps of the climbing road, and scouring of the climbing road by the flowing water is reduced.
Therefore, the outflow of the earth and sand is reduced, and the inclined sidewalk surface is maintained in a step-like manner, so that it becomes easy to walk.
In addition, by adopting a structure in which natural rock or a pattern imitating natural rock is applied to the outer surface of the valley side wall portion, it is easy to walk without slipping, and it matches natural scenery in the surroundings. There are various effects that the destruction of the environment can be prevented.
【図1】本発明に係る登山道用踏段の全体斜視図であ
る。FIG. 1 is an overall perspective view of a climbing step according to the present invention.
【図2】図1の縦断面図である。FIG. 2 is a longitudinal sectional view of FIG.
【図3】使用状態を示す縦断面図である。FIG. 3 is a longitudinal sectional view showing a use state.
【図4】他の使用状態を示す縦断面図である。FIG. 4 is a longitudinal sectional view showing another use state.
A 登山道用踏段 1 天板部 2 前側の側壁部 3 後側の側壁部 4 開口部 5 開口部 7 天然石 8 天然岩石又は天然岩石を模した模様 S1 砂利や砕石 S2 砂利や砕石 R 登山道 A Steps for mountain trails 1 Top plate 2 Front side wall 3 Rear side wall 4 Opening 5 Opening 7 Natural stone 8 Natural rock or natural rock pattern S1 Gravel or crushed stone S2 Gravel or crushed stone R Mountain path
Claims (2)
対向する両側辺から垂下する登山道の山側に向け設置す
る側壁部と、登山道の谷側に向け設置する前記山側の側
壁部より高い側壁部とからなるほゞ逆U字状のコンクリ
ート製ブロックであって、前記天板部及び谷側の側壁部
にそれぞれ複数個の開口部を形成したことを特徴とする
登山道用踏段。1. A rectangular horizontal top plate, side walls installed toward a mountain side of a mountain trail hanging down from opposite sides of the top plate, and a mountain side installed toward a valley side of the mountain trail. A substantially U-shaped concrete block having a side wall portion higher than the side wall portion, wherein a plurality of openings are formed in each of the top plate portion and the side wall portion on the valley side. Road steps.
谷側の側壁部外側面には天然岩石又は天然岩石を模した
模様を施こしたことを特徴とする請求項1記載の登山道
用踏段。2. The mountain climbing method according to claim 1, wherein natural stone is embedded in the upper surface of the top plate portion, and natural rock or a pattern imitating natural rock is applied to the outer surface of the side wall portion on the valley side. Road steps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11038036A JP2000234302A (en) | 1999-02-17 | 1999-02-17 | Footstep for trail up mountain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11038036A JP2000234302A (en) | 1999-02-17 | 1999-02-17 | Footstep for trail up mountain |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000234302A true JP2000234302A (en) | 2000-08-29 |
Family
ID=12514321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11038036A Ceased JP2000234302A (en) | 1999-02-17 | 1999-02-17 | Footstep for trail up mountain |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000234302A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3805479A1 (en) * | 2019-10-11 | 2021-04-14 | Franz Bürscher | Support module for the vertical section of a stage |
-
1999
- 1999-02-17 JP JP11038036A patent/JP2000234302A/en not_active Ceased
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3805479A1 (en) * | 2019-10-11 | 2021-04-14 | Franz Bürscher | Support module for the vertical section of a stage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100801017B1 (en) | Retaining wall for prefabricated channel | |
JP2000234302A (en) | Footstep for trail up mountain | |
JPH11286984A (en) | Multipurpose street gutter structure | |
JP2646507B2 (en) | Green belts and water retention equipment for green belts | |
KR101525942B1 (en) | Method for slope reinforcement construction using the ground improvement product | |
KR102051860B1 (en) | Drainage trench for pavement | |
KR102114494B1 (en) | a easily interjoin waterway making up easily walking and easily passing in earth of rainwater and a construction method using the waterway | |
JPH08205691A (en) | Planted tree zone | |
CN218713130U (en) | Prevent drainage structures on massif landslide | |
KR200299545Y1 (en) | Mounting structure of concrete reinforcement block of reinforcement soil section for road | |
KR200288888Y1 (en) | Underwater handling structure of slope of road using filter member | |
KR100398961B1 (en) | A Concrete Watershoot with and Method of a Drainageway Thereby | |
JP2002088892A (en) | Concrete product | |
CN216739449U (en) | Compound river channel system | |
KR200248399Y1 (en) | Slit hole | |
JP2000045212A (en) | Boundary block | |
JPH0336561Y2 (en) | ||
JP3175636B2 (en) | How to build an overhanging sidewalk | |
KR100768524B1 (en) | Installation structure of road facility post and construction method | |
KR200232639Y1 (en) | Structure for protecting banked area in the road | |
KR200233587Y1 (en) | A Concrete Watershoot | |
KR200305610Y1 (en) | Establishing structure for preventive net on road | |
JPH1072831A (en) | Slope protection and slope protection block used for it | |
KR100367884B1 (en) | pedestrian street construction method | |
JP2799845B2 (en) | Construction method of underground seepage type gutter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060217 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071227 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080115 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080218 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080415 |
|
A045 | Written measure of dismissal of application |
Free format text: JAPANESE INTERMEDIATE CODE: A045 Effective date: 20080826 |