KR200299545Y1 - Mounting structure of concrete reinforcement block of reinforcement soil section for road - Google Patents

Mounting structure of concrete reinforcement block of reinforcement soil section for road Download PDF

Info

Publication number
KR200299545Y1
KR200299545Y1 KR2020020028641U KR20020028641U KR200299545Y1 KR 200299545 Y1 KR200299545 Y1 KR 200299545Y1 KR 2020020028641 U KR2020020028641 U KR 2020020028641U KR 20020028641 U KR20020028641 U KR 20020028641U KR 200299545 Y1 KR200299545 Y1 KR 200299545Y1
Authority
KR
South Korea
Prior art keywords
reinforcement
concrete
block
groove
drainage treatment
Prior art date
Application number
KR2020020028641U
Other languages
Korean (ko)
Inventor
장재균
Original Assignee
(주)토형이엔지건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)토형이엔지건축사사무소 filed Critical (주)토형이엔지건축사사무소
Priority to KR2020020028641U priority Critical patent/KR200299545Y1/en
Application granted granted Critical
Publication of KR200299545Y1 publication Critical patent/KR200299545Y1/en

Links

Abstract

본 고안은, 콘크리트 보강블록은 블록 몸체에 폐쇄된 사각 홈부와 일측이 오픈된 사각 홈부가 형성된 사이에 중간벽이 형성되고, 폐쇄된 사각 홈부에 인접하게 사각돌부가 형성되며, 길이방향의 후방의 오픈된 사각홈부가 형성된 그 외부 모서리에 우레탄 코팅로프 설치홈이 형성되고, 블록 몸체의 길이방향의 측면에 각각 서로 대향되도록 ㄷ자홈부가 형성되며, 우레탄 코팅로프 설치홈에는 우레탄 코팅로프의 일측이 안착된 상태에서 블록 체결핀이 체결되어 콘크리트 보강블록을 수직하게 다층 적층시키고, 콘크리트 보강블록의 사각 홈부에는 폴리에틸렌 그물망을 사각박스 형태로 제작한 후 내측에 빗물 처리를 원활하게 할 수 있도록 잡석이 적재된 배수 박스가 삽입밀착되어 형성되며, 콘크리트 보강블록이 적층되는 경우 제일하부에 기초 콘크리트가 설치되는 한편, 기초 콘크리트에는 상부 중앙에 종방향으로 배수 처리홈이 형성되고 그 배수 처리홈에 배수처리용 골재가 삽입되어 적재되며, 상기의 배수 처리홈에 배수처리 파이프가 설치되고 상기의 기초 콘크리트에는 그 일측면에 연접되게 유공 배수관이 설치되어 배수 박스, 배수 처리홈, 배수처리 파이프 및 유공 배수관을 통하여 도로의 종배수관과 연결되어 배수처리가 가능하다.The present invention, the concrete reinforcement block has a middle wall is formed between the closed rectangular groove portion and one side open square groove portion formed in the block body, the square protrusion is formed adjacent to the closed square groove portion, the rear of the longitudinal direction Urethane coated rope installation grooves are formed at the outer edges of the open square grooves, and the U-shaped grooves are formed to face each other on the longitudinal side of the block body, and one side of the urethane coated rope is seated on the urethane coated rope installation grooves. When the block fastening pin is fastened, the concrete reinforcement block is vertically laminated in multiple layers, and the rectangular groove of the concrete reinforcement block is made of polyethylene mesh in the form of a rectangular box, and rubble is loaded to smooth the rainwater inside. Drain box is formed by close contact, when the concrete reinforcement block is laminated base foundation at the bottom On the other hand, the base concrete is formed in the drainage treatment groove in the longitudinal direction in the upper center, the drainage treatment groove is inserted and loaded in the drainage treatment groove, the drainage treatment pipe is installed in the drainage treatment groove and The foundation concrete is provided with a perforated drain pipe connected to one side thereof, and is connected to the longitudinal drain pipe of the road through a drain box, a drainage treatment groove, a drainage pipe, and a perforated drain pipe to allow drainage treatment.

Description

도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조{MOUNTING STRUCTURE OF CONCRETE REINFORCEMENT BLOCK OF REINFORCEMENT SOIL SECTION FOR ROAD}Concrete reinforcement block installation structure to prevent leakage of road reinforcement soil section {MOUNTING STRUCTURE OF CONCRETE REINFORCEMENT BLOCK OF REINFORCEMENT SOIL SECTION FOR ROAD}

본 고안은 콘크리트 보강블록에 관한 것으로서, 도로 상에서 지반으로 유입되는 빗물을 콘크리트 보강블록에 설치된 배수박스를 통하여 배수 처리되고, 아래로 배수된 빗물은 기초 콘크리트 배수홈과 파이프를 통하여 기초 측면에 있는 유공관을 거쳐 도로의 종배수관으로 연결되어 외각처리할 수 있도록 하는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조에 관한 것이다.The present invention relates to a concrete reinforcement block, the rainwater flowing into the ground on the road is drained through the drain box installed in the concrete reinforcement block, the rainwater drained down through the foundation concrete drainage grooves and pipes It relates to a concrete reinforcement block installation structure for preventing the leakage of the road reinforcement soil section that is connected to the longitudinal drainage pipe of the road through the outside.

도 1a는 일반적인 콘크리트 보강블록을 나타내는 사시도이고, 도 1b는 일반적인 콘크리트 보강블록이 설치된 상태를 나타내는 도면이다.Figure 1a is a perspective view showing a general concrete reinforcement block, Figure 1b is a view showing a state in which a general concrete reinforcement block is installed.

도 1a에서 알 수 있는 바와 같이, 콘크리트 보강블록(10)에는 블록 몸체(12)의 중앙을 관통하는 사각홈부(14)가 형성되고, 상기의 사각홈부(14)가 형성된 전면, 즉 일측에 상부로 돌출되어 수직하게 다른 콘크리트 보강블록을 적층할 수 있도록 사각돌부(16)가 형성되며, 또한, 상기의 콘크리트 보강블록(10)에는 후면, 즉 타측에 사각돌부 연결부(18)가 형성된다.As can be seen in Figure 1a, the concrete reinforcement block 10 is formed with a square groove portion 14 penetrating the center of the block body 12, the square groove portion 14 is formed on the front, that is, the upper side on one side Square protrusions 16 are formed to protrude into the vertically reinforced concrete reinforcement block, and the concrete reinforcement block 10 is also formed in the rear, that is, the square protrusions 18 on the other side.

도 1b에서 알 수 있는 바와 같이, 상기의 콘크리트 보강블록(10)이 성토부에 설치된 상태에서 상부에 도로(20)가 상,하부로 분리되어 설치되는데, 상기의 도로(20)에는 콘크리트 보강블록(10)의 후방에 지오 그리드(40)가 설치되고, 상기의 콘크리트 보강블록(10)은 하방의 기초 콘크리트(30)의 상부에 안착되며, 이때 도로(20)상에서 발생되는 빗물은 화살표와 같이 침투된다.As can be seen in Figure 1b, the concrete reinforcement block 10 is installed in the upper part in the state in which the road 20 is separated into the upper, lower parts, the concrete reinforcement block on the road 20 The geogrid 40 is installed at the rear of the 10, the concrete reinforcement block 10 is seated on the upper portion of the underlying concrete 30, the rainwater generated on the road 20, as shown by the arrow Infiltrate

상술한 바와 같이, 기존 보강토 구간에 설치된 도로는, 빗물이 콘크리트 보강블록의 외부로 누수되어 심각한 백태 현상이 발생되고 있고, 동절기에는 염화칼슘이 빗물과 함께 누수되어 콘크리트 보강블록의 표면이 부식되어 파손되는 현상이 나타나며, 특히 차량과 충돌시에는 쉽게 부서지는 문제점이 있다.As described above, in the roads installed in the existing reinforcement soil section, rainwater leaks to the outside of the concrete reinforcement block, causing serious white phenomena, and in the winter, calcium chloride leaks together with the rainwater to corrode and damage the surface of the concrete reinforcement block. The phenomenon appears, in particular, there is a problem that is easily broken when colliding with the vehicle.

또한, 상기의 보강토 구간에 설치된 콘크리트 보강블록에 장마철과 같이 폭우가 쏟아지는 경우 지중으로 스며드는 빗물 처리가 원활하게 이루어지지 않게되어 콘크리트 보강블록이 빗물에 의하여 이음매에서 슬립 현상이 발생되고 그로인해 토사와 함께 콘크리트 보강블록이 도로로 전복되는 사고가 빈번하게 발생되어 차량 파손의 사고 및 인명 피해가 매년 발생되는 문제점이 있다.In addition, when heavy rain is poured into the concrete reinforcement block installed in the reinforcement soil section, rainwater seeping into the ground is not smoothly performed, so the concrete reinforcement block slips from the seams due to the rainwater, and thus with the soil sand The accident that the concrete reinforcement block is overturned to the road frequently occurs, there is a problem that accidents and vehicle damage of the vehicle occurs every year.

본 고안은 상술한 문제점을 해결하기 위하여, 본 고안은, 도로에 설치되는 보강토 구간의 콘크리트 보강블록에서 발생되는 백태 현상을 방지할 수 있도록 콘크리트 보강블록의 후방면에 밀착되는 배수박스를 설치하여 지층으로 유입된 빗물을 원활하게 외부로 배수처리할 수 있고, 배수처리의 원활화에 따른 보강토 시설물의 안전을 최대한 확보하여 장마철과 같은 하절기때 주로 발생되는 도로 전복의 문제를 미연에 방지할 수 있도록 하며, 특히 토사와 콘크리트 보강블록의 전복에 의한 인명사고를 미연에 방지할 수 있는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조를 제공함을 그 목적으로 한다.The present invention in order to solve the above problems, the present invention, by installing a drain box that is in close contact with the rear surface of the concrete reinforcement block so as to prevent the baektae phenomenon occurring in the concrete reinforcement block of the reinforcement section is installed on the road Rainwater can be smoothly drained to the outside, and the safety of reinforcement soil facilities due to the smooth drainage can be secured to the maximum to prevent the problems of road rollover that occur mainly during the rainy season. In particular, the object of the present invention is to provide a concrete reinforcement block installation structure for preventing leakage of road reinforcement soil sections that can prevent human accidents due to overturning of soil and concrete reinforcement blocks.

도 1a는 일반적인 콘크리트 보강블록을 나타내는 사시도, 도 1b는 일반적인 콘크리트 보강블록이 설치된 상태를 나타내는 도면.Figure 1a is a perspective view showing a general concrete reinforcement block, Figure 1b is a view showing a state in which a general concrete reinforcement block is installed.

도 2는 본 고안의 콘크리트 보강블록과 배수박스의 상세 개념을 나타내는 도면.Figure 2 is a view showing a detailed concept of the concrete reinforcement block and the drain box of the present invention.

도 3은 본 고안의 콘크리트 보강블록, 배수박스 및 우레탄 코팅로프의 결합 상태를 나타내는 도면.Figure 3 is a view showing a combined state of the concrete reinforcement block, drain box and urethane coating rope of the present invention.

도 4는 본 고안의 콘크리트 보강블록이 설치된 도로의 구조를 나타내는 도면.Figure 4 is a view showing the structure of the road is installed concrete reinforcement block of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

50 : 콘크리트 보강블록 52 : 블록 몸체50: concrete reinforcement block 52: block body

54,56 : 사각홈부 58 : ㄷ자홈부54,56: square groove 58: U-shaped groove

60 : 우레탄 코팅로프 설치홈 62 : 중간벽60: urethane coating rope installation groove 62: middle wall

64 : 사각돌부 70 : 배수 박스64: square protrusion 70: drain box

72 : 폴리에틸렌 그물망 74 : 잡석72: polyethylene mesh 74: rubble

80 : 우레탄 코팅로프 82 : 체결핀 설치홈80: Urethane coating rope 82: Fastening pin installation groove

84 : 보강핀 설치홈 90 : 블록 체결핀84: reinforcement pin installation groove 90: block fastening pin

92 : 전단 보강핀 94 : 삽입 밀착부92: shear reinforcement pin 94: insert close contact

96 : 원형봉부 98 : 원형판부96: round rod 98: round plate

100: 도로 110: 기초 콘크리트100: road 110: foundation concrete

112: 배수 처리홈 120: 배수처리용 골재112: drainage treatment groove 120: aggregate for drainage treatment

130: 배수처리 파이프 140: 유공 배수관130: drainage pipe 140: hole drain pipe

본 고안은 상술한 목적을 달성하기 위하여, 본 고안은, 콘크리트 기성제품으로 제작되어 보강토 구간의 전면에 기초 콘크리트의 상부에 다층구조로 적층되는 한편, 블록 몸체에 사각홈부가 형성되고, 상기의 블록 몸체의 사각홈부에 인접하게 사각돌부가 돌출되게 형성되며, 보강토 구간에 설치되는 콘크리트 보강블록에 있어서, 콘크리트 보강블록은 블록 몸체에 폐쇄된 사각 홈부와 일측이 오픈된 사각 홈부가 형성된 사이에 중간벽이 형성되고, 폐쇄된 사각 홈부에 인접하게 사각돌부가 형성되며, 길이방향의 후방의 오픈된 사각홈부가 형성된 그 외부 모서리에 우레탄 코팅로프 설치홈이 형성되고, 블록 몸체의 길이방향의 측면에 각각 서로 대향되도록 ㄷ자홈부가 형성되며, 우레탄 코팅로프 설치홈에는 우레탄 코팅로프의 일측이 안착된 상태에서 블록 체결핀이 체결되어 콘크리트 보강블록을 수직하게 다층 적층시키고, 콘크리트 보강블록의 사각 홈부에는 폴리에틸렌 그물망을 사각박스 형태로 제작한 후 내측에 빗물 처리를 원활하게 할 수 있도록 잡석이 적재된 배수 박스가 삽입밀착되어 형성되며, 콘크리트 보강블록이 적층되는 경우 제일하부에 기초 콘크리트가 설치되는 한편, 기초 콘크리트에는 상부 중앙에 종방향으로 배수 처리홈이형성되고 그 배수 처리홈에 배수처리용 골재가 삽입되어 적재되며, 상기의 배수 처리홈에 배수처리 파이프가 설치되고 상기의 기초 콘크리트에는 그 일측면에 연접되게 유공 배수관이 설치되어 배수 박스, 배수 처리홈, 배수처리 파이프 및 유공 배수관을 통하여 도로의 종배수관(도면에 미도시됨)과 연결되어 배수처리가 되는 것을 특징으로 하는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조를 제공한다.In order to achieve the above object, the present invention is made of a concrete ready-made product is laminated in a multi-layer structure on the top of the base concrete on the front of the reinforcement earth section, while the square body is formed in the block body, the block The rectangular protrusion is formed to protrude adjacent to the rectangular groove of the body, and in the concrete reinforcement block installed in the reinforcement soil section, the concrete reinforcement block has an intermediate wall between the rectangular groove portion closed on the block body and an open square groove portion on one side thereof. Is formed, and a rectangular protrusion is formed adjacent to the closed rectangular groove, and a urethane coated rope installation groove is formed at an outer edge thereof formed with an open rectangular groove at the rear in the longitudinal direction, respectively on the side of the longitudinal direction of the block body. The U-shaped groove is formed to face each other, and one side of the urethane coated rope is seated in the urethane coated rope installation groove. Block fastening pins are fastened to vertically stack the concrete reinforcement blocks, and the rectangular grooves of the concrete reinforcement blocks are made of polyethylene mesh in the form of a rectangular box, and a drain box with rubble is loaded to facilitate rainwater treatment inside. When the concrete reinforcement blocks are stacked, the foundation concrete is installed at the bottom, while the drainage groove is formed in the longitudinal direction at the center of the upper part, and the aggregate for drainage treatment is inserted into the drainage groove. The drainage pipe is installed in the drainage treatment groove, and the foundation concrete has a perforated drainage pipe installed to be connected to one side thereof, and the longitudinal drainage pipe of the road through the drainage box, the drainage treatment groove, the drainage treatment pipe and the perforated drainage pipe. Road characterized in that the drainage treatment is connected to (not shown in the figure) It provides the installation of concrete block reinforced structure for preventing leakage of water Granite interval.

이하, 첨부 도면을 참조하여 본 고안의 구성과 작동 상태를 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operating state of the present invention.

도 2는 본 고안의 콘크리트 보강블록과 배수박스의 상세 개념을 나타내는 도면으로서, 콘크리트 보강블록(50)은 블록 몸체(52)에 폐쇄된 사각 홈부(54)와 일측이 오픈된 사각 홈부(56)가 각각 형성되고 그 블록 몸체(52)의 길이방향의 측면에 각각 서로 대향되도록 ㄷ자홈부(58)가 형성되며, 상기의 콘크리트 보강블록(50)은 후방 모서리부에 우레탄 코팅로프 설치홈(60)이 형성된다.2 is a view showing a detailed concept of the concrete reinforcement block and the drain box of the present invention, the concrete reinforcement block 50 is a rectangular groove portion 54 and one side of the open rectangular groove portion 56 closed on the block body 52 Are each formed and the U-shaped groove portion 58 is formed so as to face each other in the longitudinal side of the block body 52, the concrete reinforcement block 50 is a urethane coated rope installation groove 60 in the rear corner portion Is formed.

상기의 콘크리트 보강블록(50)에는 블록 몸체(52)의 중앙에 중간벽(62)이 형성되고, 블록 몸체(52)의 폐쇄된 사각 홈부(54)에 인접하게 사각돌부(64)가 형성되어 다층 구조로 수직하게 적층시 체결이 원활한 구조를 가진다.In the concrete reinforcement block 50, an intermediate wall 62 is formed at the center of the block body 52, and a square protrusion 64 is formed adjacent to the closed square groove 54 of the block body 52. When stacked vertically in a multi-layer structure has a fastening structure.

상기의 콘크리트 보강블록(50)의 사각 홈부(54)(56)에는 폴리에틸렌 그물망(72)을 사각박스 형태로 제작한 후 내측에 빗물 처리를 원활하게 할 수 있도록 잡석(74)이 적재되어 있는 배수 박스(70)가 삽입밀착된다.The square grooves 54 and 56 of the concrete reinforcement block 50 are made of polyethylene nets 72 in the form of a rectangular box, and the rubble 74 is loaded to facilitate rainwater treatment inside. The box 70 is inserted tight.

상기의 배수 박스(70)는 폴리에틸렌 그물망(72)을 주로 사용하는데, 이때 설치 단가를 고려하여 기존의 철망을 이용하여 사용할 수 있고, 상기의 잡석(74)은크기가 동일하거나 크기가 다른 사석 등을 이용하여 사용할 수 있다.The drain box 70 mainly uses a polyethylene mesh 72, at this time can be used using the existing wire mesh in consideration of the installation cost, the rubble 74 is the same size or different size of the sandstone, etc. It can be used by using.

상기의 콘크리트 보강블록(50)의 우레탄 코팅로프 설치홈(60)에는 우레탄 코팅로프(80)가 결합되는데, 이때 우레탄 코팅로프 설치홈(60)에 우레탄 코팅로프(80)의 일측이 안착된 상태에서 블록 체결핀(90)이 체결되어 콘크리트 보강블록(50)을 수직하게 다층 적층할 수 있게 된다.The urethane coating rope installation groove 60 of the concrete reinforcement block 50 is coupled to the urethane coating rope 80, at which time the one side of the urethane coating rope 80 is seated on the urethane coating rope installation groove 60 In the block fastening pin 90 is fastened so that the concrete reinforcement block 50 can be stacked vertically in multiple layers.

상기의 우레탄 코팅로프(80)는 토사면과 지지력을 향상하고 밀착력을 강화하기 위해 전방에서 부터 체결핀 설치홈(82)과 다수개의 보강핀 설치홈(84)이 원형( 타형도 가능) 형태로 형성되고, 상기의 우레탄 코팅로프(80)의 보강핀 설치홈(84)에는 전단 보강핀(92)이 체결된다.The urethane coating rope 80 has a fastening pin installation groove 82 and a plurality of reinforcement pin installation grooves 84 from the front in order to improve the soil surface and the support force and enhance the adhesion force (in the form of other shapes) It is formed, the shear reinforcing pin 92 is fastened to the reinforcing pin installation groove 84 of the urethane coating rope (80).

상기의 전단 보강핀(92)은, 하부에 삽입 밀착부(94)가 화살표 형태로 형성되고, 삽입 밀착부(94)의 상부 중앙에 원형봉부(96)가 수직하게 형성되며, 상기의 원형봉부(96)의 상부에 원형판부(98)가 일체로 형성되어 우레탄 코팅로프(80)의 보강핀 설치홈(84)에 삽입된다.In the shear reinforcement pin 92, the insert contact portion 94 is formed in the shape of an arrow at the bottom, the circular rod portion 96 is formed vertically in the upper center of the insert contact portion 94, the circular rod portion The circular plate portion 98 is integrally formed on the upper portion of the 96 and is inserted into the reinforcing pin installation groove 84 of the urethane coating rope 80.

도 3은 본 고안의 콘크리트 보강블록, 배수박스 및 우레탄 코팅로프의 결합 상태를 나타내는 도면으로서, 상기의 콘크리트 보강블록(50)에는 사각 홈부에 배수 박스(70)가 삽입밀착되고, 상기의 콘크리트 보강블록(50)의 우레탄 코팅로프 설치홈에 우레탄 코팅로프(80)의 체결핀 설치홈에 안착된 상태에서 블록 체결핀(90)이 체결되며, 이때 상기의 콘크리트 보강블록(50)과 결합된 우레탄 코팅로프(80)의 보강핀 설치홈(84)에는 전단 보강핀(92)이 체결되어 장마철과 같은 때에 폭우가 쏟아지는 경우 콘크리트 보강블록(50)의 이탈을 방지하게 된다.3 is a view showing a combined state of the concrete reinforcement block, drain box and the urethane coating rope of the present invention, the concrete reinforcement block 50 is inserted into close contact with the drain box 70 in the square groove, the concrete reinforcement The block fastening pin 90 is fastened to the urethane coating rope installation groove of the block 50 in a state in which the fastening pin installation groove of the urethane coating rope 80 is seated, and the urethane combined with the concrete reinforcement block 50 is Shear reinforcing pin installation groove 84 of the coating rope 80 is fastened to the reinforcement pin 92 is fastened to prevent the departure of the concrete reinforcement block 50 when the heavy rain pouring in the rainy season.

도 4는 본 고안의 콘크리트 보강블록이 설치된 도로의 구조를 나타내는 도면으로서, 상기의 콘크리트 보강블록(50)은 도로(100)가 단차를 두고 건설되는 경우 그 사이에 설치되는데, 상기의 콘크리트 보강블록(50)은 제일 하부에 설치된 기초 콘크리트(110)의 상부에 다층 적층구조로 설치되는데, 상기의 기초 콘크리트(110)에는 배수 처리홈(112)과 배수처리 파이프(130)를 이용하여 외부로 배출되어 도로의 종배수관으로 연결되어 원활한 배수 처리 구조를 형성하게 된다.Figure 4 is a view showing the structure of the road is installed concrete reinforcement block of the present invention, the concrete reinforcement block 50 is installed between the road 100 is constructed with a step, the concrete reinforcement block above 50 is installed in a multi-layer laminated structure on the top of the base concrete 110 is installed at the bottom, the base concrete 110 is discharged to the outside using the drainage treatment groove 112 and the drainage treatment pipe 130. It is connected to the longitudinal drainage pipe of the road to form a smooth drainage treatment structure.

상기의 우레탄 코팅로프(80)는 하부와 상부에 설치되는 형태에 차이를 보이는데, 이는 우레탄 코팅로프(80)의 후방에 형성되는 보강핀 설치홈의 갯수에 차이를 두어 상부에 설치되는 우레탄 코팅로프의 보강핀 설치홈이 하부에 설치되는 보강핀 설치홈보다 갯수가 많게 설치되며, 이러한 차이는 보강토 구간에 따라 보강핀 설치홈의 갯수를 달리하여 보강토 구간을 원활하게 보강할 수 있게 하기 위함이다.The urethane coating rope 80 shows a difference in the form installed in the lower and upper, which is the urethane coating rope installed on the upper side with a difference in the number of reinforcing pin installation grooves formed in the rear of the urethane coating rope (80) The reinforcing pin installation grooves of the reinforcement pins are installed in a larger number than the reinforcing pin installation grooves, this difference is to make the reinforcement soil section smoothly by varying the number of reinforcing pin installation grooves according to the reinforcement soil section.

한편, 상기의 기초 콘크리트(110)에는 상부 중앙에 기초 콘크리트가 설치되는 종방향으로 배수 처리홈(112)이 형성되고, 상기의 배수 처리홈(112)에 배수처리용 골재(120)가 삽입되어 적재되며, 상기의 배수 처리홈(112)의 일측에 배수처리 파이프(130)가 설치되고, 상기의 기초 콘크리트(110)에는 그 측면에 연접되게 유공 배수관(140)이 설치되며, 상기의 배수처리 파이프(130)는 배수 처리홈(112)과 유공 배수관(140)의 사이에 설치되어 상호 연결하게 된다.On the other hand, in the base concrete 110, the drainage treatment groove 112 is formed in the longitudinal direction in which the foundation concrete is installed in the upper center, and the aggregate 120 for drainage treatment is inserted into the drainage treatment groove 112. Loaded, the drainage pipe 130 is installed on one side of the drainage treatment groove 112, the foundation concrete 110 is installed in the hole drain pipe 140 to be connected to the side, the wastewater treatment Pipe 130 is installed between the drainage treatment groove 112 and the hole drain pipe 140 is to be interconnected.

상술한 바와 구성에서 알 수 있는 바와 같이, 본 고안의 배수처리 구조는 도로(100)의 하방으로 형성된 보강토 구간에서 발생된 빗물은 콘크리트 보강블록(50)의 오픈된 사각 홈부(56)의 배수 박스(70)를 통하여 하부로 처리되고, 상기의 콘크리트 보강블록(50)의 제일 하부에 형성된 기초 콘크리트(110)의 배수 처리홈(112), 배수처리 파이프(130) 및 유공 배수관(140)을 통한 빗물은 도로의 종배수관과 연결되어 외곽처리되게 된다.As can be seen in the configuration as described above, the drainage structure of the present invention is the rainwater generated in the reinforcement soil section formed below the road 100 is the drain box of the open square groove 56 of the concrete reinforcement block 50 Through the 70 through the bottom, through the drainage treatment groove 112, the wastewater treatment pipe 130 and the perforated drain pipe 140 of the foundation concrete 110 formed at the bottom of the concrete reinforcement block 50 The rainwater is connected to the longitudinal drainage pipe of the road and is processed outside.

한편, 상기의 콘크리트 보강블록(50)은 사각돌부(64)와 블록 체결핀(90)에 의해서 하부에서 부터 상부로 순차적으로 적층이 가능한 한편, 상기의 콘크리트 보강블록(50)의 의 오픈된 사각 홈부(56)에 삽입되는 배수 박스(70)의 구조를 사각박스 형태로 제작된 폴리에틸렌 그물망(72)의 내측에 빗물 처리를 원활하게 할 수 있도록 잡석(74)이 적재되어 있도록 배수 박스(70)가 삽입밀착되는 형태로 형성되는 관계로 보강토 구간에서 발생되는 빗물을 배수 박스(70)를 통하여 외부로 배출할 수 있는 관계로 장마철과 같은 폭우시에도 보강토 구간의 토사층이 침하되어 도로가 붕괴되는 등 종래와 같은 도로상에서 발생되는 사고를 미연에 방지할 수 있게 된다.On the other hand, the concrete reinforcement block 50 can be sequentially stacked from the bottom to the top by the square protrusion 64 and the block fastening pin 90, while the open square of the concrete reinforcement block 50 The drain box 70 has a structure of the drain box 70 inserted into the groove 56 so that the rubble 74 is loaded on the inside of the polyethylene mesh 72 formed in the form of a rectangular box so as to facilitate rainwater treatment. Since the rainwater generated in the reinforcement soil section can be discharged to the outside through the drainage box 70, the soil layer of the reinforcement soil section is settled even during heavy rains such as the rainy season during the rainy season. The accident occurring on the road as in the prior art can be prevented in advance.

또한, 상기의 콘크리트 보강블록(50)의 후방에 형성된 우레탄 코팅로프 설치홈(60)에 우레탄 코팅로프(80)가 결합된 상태에서 블록 체결핀(90)이 체결되고 상기의 우레탄 코팅로프(80)의 보강핀 설치홈(84)에 전단 보강핀(92)이 체결되어 장마철과 같은 때에 폭우가 쏟아지는 경우 콘크리트 보강블록(50)의 이탈을 방지하게 함은 물론 보강토 구간의 토사층과 전단 보강핀(92)이 원활한 밀착이 가능한 구조를 제공할 수 있게 된다.In addition, the block fastening pin 90 is fastened in the state in which the urethane coating rope 80 is coupled to the urethane coating rope installation groove 60 formed at the rear of the concrete reinforcement block 50, and the urethane coating rope 80. Shear reinforcement pins 92 are fastened to the reinforcement pin installation grooves 84 of the concrete to prevent the concrete reinforcement block 50 from falling out in case of heavy rain, such as during the rainy season, as well as the soil layer and shear reinforcement pins of the reinforcement soil section ( 92) it is possible to provide a structure capable of a smooth close contact.

상술한 본 고안의 구성과 작동 상태에 따른 효과를 설명한다.The effect of the configuration and operation of the present invention described above will be described.

본 고안의 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조는, 콘크리트 보강블록에 사각 홈부를 형성시 일측에 오픈된 사각 홈부를 형성하고 그 사각 홈부에 배수 박스를 삽입하고 있는 관계로 도로 상에서 발생되는 빗물을 오픈된 사각 홈부에 삽입된 배수 박스를 통하여 기초 콘크리트에 송급할 수 있으며, 이로 인하여 콘크리트 보강블록이 빗물에 의하여 이탈되는 종래와 같은 문제점을 최대한 방지할 수 있는 효과를 얻을 수 있다.The concrete reinforcement block installation structure for preventing leakage of road reinforcement soil section of the present invention has a square groove formed at one side when the square groove is formed in the concrete reinforcement block, and the drain box is inserted into the square groove so that the drain box is inserted on the road. The generated rainwater can be supplied to the basic concrete through the drain box inserted into the open square groove, thereby obtaining the effect of preventing the problem as in the prior art that the concrete reinforcement block is separated by the rainwater.

또한, 본 고안의 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조는, 콘크리트 보강블록의 사각 홈부에 삽입되는 배수 박스의 구조를 사각박스 형태로 제작된 폴리에틸렌 그물망의 내측에 빗물 처리를 원활하게 할 수 있도록 잡석이 적재되어 있도록 배수 박스가 형성되는 관계로 보강토 구간에서 발생되는 빗물을 배수 박스를 통하여 외부로 배출할 수 있는 관계로 장마철과 같은 폭우시에도 보강토 구간의 토사층이 침하되어 도로가 붕괴되는 등 종래와 같은 도로상에서 발생되는 사고를 미연에 방지할 수 있는 효과를 얻을 수 있다.In addition, the concrete reinforcement block installation structure for preventing leakage of the road reinforcement soil section of the present invention, the rain water treatment to the inside of the polyethylene mesh made of a rectangular box structure of the drain box inserted into the square groove of the concrete reinforcement block smoothly Since the drain box is formed so that rubble is loaded so that the rainwater generated in the reinforcement soil section can be discharged to the outside through the drain box, the sediment layer of the reinforcement soil section sinks even during heavy rains such as the rainy season. It is possible to obtain an effect of preventing accidents occurring on the road as in the prior art.

또한, 본 고안의 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조는, 콘크리트 보강블록의 우레탄 코팅로프 설치홈에 우레탄 코팅로프가 결합된 상태에서 블록 체결핀이 체결되어 콘크리트 보강블록을 수직하게 다층 적층할 수 있는 구조로 형성된 관계로 콘크리트 보강블록이 수직하게 적층시 원활한 결합이 가능한 구조를 제공할 수 있는 효과를 얻을 수 있다.In addition, the concrete reinforcement block installation structure for preventing the leakage of road reinforcement soil section of the present invention, the block fastening pin is fastened in the state in which the urethane coating rope is coupled to the urethane coating rope installation groove of the concrete reinforcement block vertically Due to the structure formed of a multi-layer stackable structure, when the concrete reinforcement blocks are vertically stacked, a structure capable of providing a smooth coupling can be obtained.

뿐만 아니라, 상기의 우레탄 코팅로프가 체결핀 설치홈과 다수개의 보강핀 설치홈이 원형 및 타형 형태로 형성되고 보강핀 설치홈에 전단 보강핀이 체결되는관계로 보강토 구간의 전면에 설치되는 콘크리트 보강블록을 보강토 구간에 밀착되게 고정할 수 있어 근본적인 콘크리트 보강블록과 보강토 구간의 밀착력이 강화되어 외부의 응력에 의하여 콘크리트 보강블록 및 우레탄 코팅로프가 적절하게 대응할 수 있는 관계로 보강토 구간이 붕괴되는 사고를 미연에 방지할 수 있는 효과를 얻을 수 있다.In addition, the urethane-coated rope is installed in the front of the reinforcement soil section because the fastening pin installation grooves and the plurality of reinforcement pin installation grooves are formed in circular and other shapes and the shear reinforcement pins are fastened to the reinforcement pin installation grooves. The block can be fixed in close contact with the reinforcement soil section, so the adhesion between the fundamental concrete reinforcement block and the reinforcement soil section is strengthened, so that the reinforcement soil section collapses because the concrete reinforcement block and the urethane coating rope can be coped with by external stress. The effect can be prevented beforehand.

Claims (3)

콘크리트 기성제품으로 제작되어 보강토 구간의 전면에 기초 콘크리트의 상부에 다층구조로 적층되는 한편, 블록 몸체에 사각홈부가 형성되고, 상기의 블록 몸체의 사각홈부에 인접하게 사각돌부가 돌출되게 형성되며, 보강토 구간에 설치되는 콘크리트 보강블록에 있어서,It is made of a concrete ready-made product is laminated in a multi-layer structure on the top of the base concrete on the front of the reinforcement soil section, while the square groove is formed in the block body, the square protrusion is formed to protrude adjacent to the square groove of the block body, In the concrete reinforcement block is installed in the reinforcement section, 콘크리트 보강블록(50)은 블록 몸체(52)에 폐쇄된 사각 홈부(54)와 일측이 오픈된 사각 홈부(56)가 형성된 사이에 중간벽(62)이 형성되고, 폐쇄된 사각 홈부(54)에 인접하게 사각돌부(64)가 형성되며,The concrete reinforcement block 50 has an intermediate wall 62 formed between the square groove 54 closed on the block body 52 and the square groove 56 open at one side, and the closed square groove 54. Square protrusion 64 is formed adjacent to, 길이방향의 후방의 오픈된 사각홈부(56)가 형성된 그 외부 모서리에 우레탄 코팅로프 설치홈(60)이 형성되고, 블록 몸체(52)의 길이방향의 측면에 각각 서로 대향되도록 ㄷ자홈부(58)가 형성되며,Urethane coated rope installation grooves 60 are formed at the outer edges of the rear open square grooves 56 in the longitudinal direction, and c-grooves 58 so as to face each other on the longitudinal side of the block body 52. Is formed, 우레탄 코팅로프 설치홈(60)에는 우레탄 코팅로프(80)의 일측이 안착된 상태에서 블록 체결핀(90)이 체결되어 콘크리트 보강블록을 수직하게 다층 적층시키고,The urethane coating rope installation groove 60 is fastened to the block fastening pin 90 in a state in which one side of the urethane coating rope 80 is seated to vertically stack the concrete reinforcement block, 콘크리트 보강블록(50)의 사각 홈부(54)(56)에는 폴리에틸렌 그물망(72)을 사각박스 형태로 제작한 후 내측에 빗물 처리를 원활하게 할 수 있도록 잡석(74)이 적재된 배수 박스(70)가 각각 삽입밀착되어 형성되며,The rectangular grooves 54 and 56 of the concrete reinforcement block 50 are made of polyethylene mesh 72 in a rectangular box shape, and then the rubble 74 is loaded with a rubble 74 to smoothly process rainwater on the inside. ) Are inserted into close contact with each other, 콘크리트 보강블록(50)이 적층되는 경우 제일하부에 기초 콘크리트(110)가 설치되는 한편, 기초 콘크리트(110)에는 상부 중앙에 종방향으로 배수 처리홈(112)이 형성되고 그 배수 처리홈(112)에 배수처리용 골재(120)가 삽입되어 적재되며,상기의 배수 처리홈(112)에 배수처리 파이프(130)가 설치되고 상기의 기초 콘크리트(110)에는 그 일측면에 연접되게 유공 배수관(140)이 설치되어 배수 박스(70), 배수 처리홈(112), 배수처리 파이프(130) 및 유공 배수관(140)을 통하여 도로의 종배수관(도면에 미도시됨)과 연결되어 배수처리가 되는 것을 특징으로 하는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조.When the concrete reinforcement block 50 is stacked, the base concrete 110 is installed at the bottom of the base, while the base concrete 110 has a drainage treatment groove 112 formed in the longitudinal direction at the upper center thereof, and the drainage treatment groove 112. The drainage treatment aggregate 120 is inserted into the drainage pipe, and the drainage treatment pipe 130 is installed in the drainage treatment groove 112, and the foundation concrete 110 is connected to one side of the perforated drainage pipe ( 140 is installed is connected to the longitudinal drainage pipe (not shown in the drawing) of the road through the drain box 70, the drainage treatment groove 112, the drainage pipe 130 and the perforated drainage pipe 140 to be drained Concrete reinforcement block installation structure for preventing leakage of road reinforcement soil section. 제 1 항에 있어서,The method of claim 1, 상기의 우레탄 코팅로프(80)는 토사면과 지지력을 향상하고 밀착력을 강화하기 위해 전방에서 부터 체결핀 설치홈(82)과 다수개의 보강핀 설치홈(84)이 원형(타형도 가능) 형태로 형성되고, 상기의 우레탄 코팅로프(80)의 보강핀 설치홈(84)에는 전단 보강핀(92)이 체결되어 보강토 구간에서 밀착력을 강화시키는 구조인 것을 특징으로 하는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조.The urethane coating rope 80 is a fastening pin installation groove 82 and a plurality of reinforcement pin installation grooves 84 from the front in order to improve the soil surface and the support force and to strengthen the adhesion in the form of round (possible other shapes) Is formed, the reinforcement pin installation groove 84 of the urethane coating rope 80 is a shear reinforcement pin 92 is fastened to prevent the leakage of the road reinforcement soil section, characterized in that the structure to strengthen the adhesion in the reinforcement soil section Concrete reinforcement block installation structure. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기의 전단 보강핀(92)은, 하부에 삽입 밀착부(94)가 화살표 형태로 형성되고, 삽입 밀착부(94)의 상부 중앙에 원형봉부(96)가 형성되며, 상기의 원형봉부(96)의 상부에 원형판부(98)가 일체로 형성되어 우레탄 코팅로프(80)의 보강핀 설치홈(84)에 삽입되는 한편, 상기의 우레탄 코팅로프(80)의 보강핀 설치홈(84)은 보강토 구간의 높이에 따라 갯수에 차이를 가지는 것을 특징으로 하는 도로 보강토 구간의 누수방지를 위한 콘크리트 보강블록 설치구조.In the shear reinforcement pin 92, the insertion contact portion 94 is formed in the shape of an arrow at the bottom, the circular rod portion 96 is formed in the upper center of the insertion contact portion 94, the circular rod portion 96 Circular plate portion 98 is formed integrally on the top of the) is inserted into the reinforcement pin installation groove 84 of the urethane coating rope 80, while the reinforcement pin installation groove 84 of the urethane coating rope 80 is Concrete reinforcement block installation structure for preventing the leakage of road reinforcement soil section, characterized in that the number of the difference according to the height of the reinforcement soil section.
KR2020020028641U 2002-09-25 2002-09-25 Mounting structure of concrete reinforcement block of reinforcement soil section for road KR200299545Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020028641U KR200299545Y1 (en) 2002-09-25 2002-09-25 Mounting structure of concrete reinforcement block of reinforcement soil section for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020028641U KR200299545Y1 (en) 2002-09-25 2002-09-25 Mounting structure of concrete reinforcement block of reinforcement soil section for road

Publications (1)

Publication Number Publication Date
KR200299545Y1 true KR200299545Y1 (en) 2002-12-31

Family

ID=73128949

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020028641U KR200299545Y1 (en) 2002-09-25 2002-09-25 Mounting structure of concrete reinforcement block of reinforcement soil section for road

Country Status (1)

Country Link
KR (1) KR200299545Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100577846B1 (en) 2005-09-26 2006-05-10 주식회사 남원건설엔지니어링 It is as a parent environment-basis breast installation structure
KR101725346B1 (en) * 2016-11-15 2017-04-10 조성래 Method for making retaining wall having enhanced bearing capacity
KR102605191B1 (en) * 2023-09-18 2023-11-23 브사렐건설 주식회사 Upper part reinforcement type retaining wall structure and retaining wall construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100577846B1 (en) 2005-09-26 2006-05-10 주식회사 남원건설엔지니어링 It is as a parent environment-basis breast installation structure
KR101725346B1 (en) * 2016-11-15 2017-04-10 조성래 Method for making retaining wall having enhanced bearing capacity
KR102605191B1 (en) * 2023-09-18 2023-11-23 브사렐건설 주식회사 Upper part reinforcement type retaining wall structure and retaining wall construction method

Similar Documents

Publication Publication Date Title
US7798747B1 (en) Stormwater capture module
KR20120065375A (en) Module and assembly for managing the flow of water
JPH02229303A (en) Vent type cell structure and manufacture thereof
AU2006275809B2 (en) Water retention system
KR101672712B1 (en) Precast Concrete Cassion constructure of shimmering film unit
KR101495997B1 (en) Upright type rainwater storaging structure and Rainwater storaging facility having the structure and Method for building the facility
KR200299545Y1 (en) Mounting structure of concrete reinforcement block of reinforcement soil section for road
KR100731773B1 (en) The water-storage tank worthy an undercurrent a block of loss in weight structure
JPH09296486A (en) Underground water storage tank
KR102095581B1 (en) Rainwater storage block, rainwater storage structure using the block and its construction method
KR101388870B1 (en) Rainwater storaging facility and method for building the facility
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
US20030223824A1 (en) Wall system
KR20080005134U (en) Precast panel for construction of retaining wall
JP2632661B2 (en) Underground Reservoir Structure
JP2000008312A (en) Underground infiltration water storing structure for road surface
KR100458354B1 (en) Underground laying construction of road
CN214460528U (en) Protective structure is administered to anti-skidding slope
KR102055217B1 (en) A construction method of groundwater drainage material and how to block groundwater entering the drainage using foundation slab
KR200331474Y1 (en) assembly block for retaining wall
KR101859056B1 (en) Detention unit block and reservoir water tank structure for infiltration and detention of rainwater, and construction method for the same
JP2539758B2 (en) Rainwater storage. Penetration method
KR200248399Y1 (en) Slit hole
WO2008090392A1 (en) Crossings, especially home driveway crossings
JP3047285U (en) Precast concrete culvert and drainage structure using it

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20110110

Year of fee payment: 10

EXPY Expiration of term