- JP2000144775A JP2000144775A JP10338536A JP33853698A JP2000144775A JP 2000144775 A JP2000144775 A JP 2000144775A JP 10338536 A JP10338536 A JP 10338536A JP 33853698 A JP33853698 A JP 33853698A JP 2000144775 A JP2000144775 A JP 2000144775A
- Authority
- JP
- Japan
- Prior art keywords
- lid
- receiving frame
- manhole
- pedestal
- protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、下水道用硬質塩化
ビニル製等の小型マンホ−ル、すなわちプラスチックマ
ンホ−ルの保護蓋嵩上げ装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for raising a protective cover of a small manhole made of hard vinyl chloride for sewage, that is, a plastic manhole.
【0002】[0002]
【従来の技術】この種の下水道硬質塩化ビニル製等(以
下、単にプラスチック製ともいう)の小型マンホ−ルに
関し、本出願人は多数提案し、多数の実用新案権等を取
得している(例えば実用新案登録第2524755号、
2524756号、2554322号、2544132
号参照)。2. Description of the Related Art The applicant of the present invention has proposed a large number of small manholes of this kind made of sewer hard vinyl chloride or the like (hereinafter also simply referred to as plastic) and has obtained many utility model rights. For example, Utility Model Registration No. 2524755,
2524756, 2554322, 2544132
No.).
【0003】また、かかる小型マンホ−ルに関し、日本
下水道協会は品質向上のため製品およびその施工法につ
いて標準化を行っている。これについて述べる。[0003] Regarding such small manholes, the Japan Sewerage Association has standardized products and construction methods to improve quality. This will be described.
【0004】図7において、小型マンホ−ル1はインバ
−ト部(マンホ−ル本体)2と、例えば、口径300〜
350mmφの立上り部3と、内蓋4および外蓋(保護
蓋ともいう)5Aと、から大略構成されている。In FIG. 7, a small manhole 1 has an invert portion (manhole main body) 2 and, for example, a diameter of 300 to 300 mm.
It is roughly composed of a rising portion 3 of 350 mmφ, an inner lid 4 and an outer lid (also referred to as a protective lid) 5A.
【0005】このインバ−ト部2は起点、屈曲点、合流
点、中間点および落差点に区分されて各種のものが用い
られている。The inverter 2 is divided into a starting point, a bending point, a confluence point, an intermediate point and a head point, and various types are used.
【0006】また、インバ−ト部2と立上り部(点検筒
ともいう)3との接合形状は、主として図示のゴム輪受
口形6と、図示しない差し口形とが用いられている。The joint between the inverter 2 and the rising portion (also referred to as an inspection tube) 3 is mainly formed of a rubber ring socket 6 shown in the drawing and a socket not shown in the drawing.
【0007】そして、埋設する小型マンホ−ル1の基礎
は、良質地盤の場合、10〜20cmの厚さの砂基礎7
とし、十分突き固め、所定の高さに仕上げる。勿論、軟
弱な地盤では、砕石や栗石等を敷いてから砂基礎7とす
る。The foundation of the small manhole 1 to be buried is a sand foundation 7 having a thickness of 10 to 20 cm in the case of high-quality ground.
And squeeze it sufficiently to finish it to the specified height. Of course, if the ground is soft, crushed stone or chestnut stone or the like is laid, and then the sand foundation 7 is formed.
【0008】ここで、保護蓋5Aの埋戻し作業は、沈下
を防止するため十分な締め固めた埋戻し良質土11上
に、十分に締め固めた粒度調整砕石等の基礎12を形成
する。その基礎12の厚さ(例えば17cm)は、道路
構造を考慮して決める。そして、台座8Aに対する据付
け面は、地表面の勾配に合わせる。Here, the backfilling operation of the protective lid 5A forms a sufficiently compacted foundation 12 such as a crushed crushed stone on the compacted backfilled high quality soil 11 sufficient to prevent settlement. The thickness (for example, 17 cm) of the foundation 12 is determined in consideration of the road structure. Then, the installation surface for the pedestal 8A is adjusted to the slope of the ground surface.
【0009】次いで、台座8Aと蓋体10付蓋受枠9A
とを、立上り部3と同芯に据付ける。また、台座8Aの
上面には、蓋受枠9Aの下端面が嵌合する浅凹部が形成
されているが、それでも埋戻しの際、蓋受枠9Aと台座
8Aとがずれないように、粒度調整石13A等を用いて
周囲を均等に埋戻し、更に、蓋受枠9Aの周囲は、特に
入念に転圧する。例えば、加熱アスファルト混合物14
を敷設する場合はこれを入念に転圧する。Next, a base 8A and a lid receiving frame 9A with a lid 10 are provided.
Are installed concentrically with the rising portion 3. Further, a shallow concave portion is formed on the upper surface of the pedestal 8A so that the lower end surface of the lid receiving frame 9A fits therein. The surroundings are evenly backfilled using 13A or the like, and the surroundings of the lid receiving frame 9A are particularly carefully rolled. For example, heated asphalt mixture 14
When laying, carefully roll it.
【0010】以上のように、小型マンホ−ル1を車両等
の路面荷重から防ぐため、立上り部3と保護蓋5Aと
を、空間(例えば約10cm)を介して、分離してお
り、路面荷重は蓋体(鉄蓋ともいう)10、蓋受枠9A
および台座8Aを介して十分締め固められた地盤(1
1,12)で受ける構造にしている。As described above, in order to prevent the small manhole 1 from the road surface load of a vehicle or the like, the rising portion 3 and the protective cover 5A are separated from each other via a space (for example, about 10 cm). Is a lid (also referred to as an iron lid) 10, a lid receiving frame 9A
And the ground (1) sufficiently compacted via the base 8A
1, 12).
【0011】ところで、以上のような標準化した施工法
(前記掲示の実用新案公報にも示されている施工法)に
より埋設した小型マンホ−ルでは、通常時における大型
車輛等の繰り返し荷重には耐えられるよう構成されてい
るものの、経年による地盤沈下および変動や、地震や豪
雨等の不測の事態により、保護蓋5Aが路面より下がっ
て保護蓋5Aと内蓋4との間の空間が無くなり、路面荷
重が直接内蓋4にかかる、ということが、例えば点検時
に発見される。また、車輛の通行時の騒音により、この
沈下が発見される。By the way, a small manhole buried by the above-mentioned standardized construction method (construction method disclosed in the above-mentioned utility model gazette) can withstand the repetitive load of a large vehicle or the like under normal conditions. However, due to land subsidence and fluctuation due to aging, an unexpected event such as an earthquake or heavy rain, etc., the protective cover 5A is lowered below the road surface, and the space between the protective cover 5A and the inner cover 4 is lost. The fact that the load is directly applied to the inner lid 4 is found, for example, during inspection. The subsidence is also found by the noise of the vehicle during traffic.
【0012】勿論、この空間を保ちながら保護蓋5Aと
内蓋4とが一所になって沈下する場合もある。Of course, the protective cover 5A and the inner cover 4 may sink in one place while maintaining this space.
【0013】そこで、かかる事態、特に前者の事態が発
見されると、従来においては、少なくとも保護蓋5Aの
近傍を掘削し、これを取出し、改めて前記のような入念
な埋戻しを行っている。Therefore, when such a situation, especially the former situation, is discovered, conventionally, at least the vicinity of the protective cover 5A is excavated, taken out, and then carefully backfilled as described above.
【0014】しかしながら、これでは補修工事のため相
当広範囲な掘削を必要とし、小型プラスチックマンホ−
ルが道路幅員の小なる場合に好都合に適用されるだけに
(新設工事のときは自由度があって、それ程難航しない
が)、その補修工事の掘削作業が難航する、という問題
があった。However, this requires a considerably large-scale excavation for repair work, and a small plastic manhole is required.
However, there is a problem that the excavation work for the repair work is difficult, because it is conveniently applied when the road width is small (although there is a degree of freedom at the time of new construction and it is not so difficult).
【0015】また、衝撃に弱いプラスチック製立上り部
3の近傍を掘削するには、バックホ−等の土木機械が使
えないので手掘りにする、という問題があった。In addition, in order to excavate the vicinity of the rising portion 3 made of plastic, which is vulnerable to impact, there is a problem that the earth-moving equipment such as a backhoe cannot be used, so that the excavation must be performed manually.
【0016】一方、人の出入可能なコンクリ−ト製マン
ホ−ルにあって,地盤の沈下および変動や、地震によっ
て、路面の方が下がり、マンホ−ルの蓋が浮上がる状態
になって両者に段差が生じることは、しばしば見受けら
れる。On the other hand, in a concrete manhole that can be accessed by humans, the road surface is lowered due to the subsidence and fluctuation of the ground or an earthquake, and the manhole cover is brought into a state of being lifted up. It is often observed that there is a step in the surface.
【0017】また、道路の補修工事、例えば上塗りのア
スファルトによって、マンホ−ルの蓋が沈んだ状態にな
ることも、しばしば発生する。更には、水平状のマンホ
−ルを傾斜した道路に埋設し、マンホ−ルの蓋の一部が
路面から突出することもしばしば発生する。[0017] In addition, it often occurs that the manhole cover is sunk due to road repair work, for example, asphalt coated. Further, a horizontal manhole is buried on an inclined road, and a part of the manhole cover often protrudes from the road surface.
【0018】そのため、コンクリ−ト製マンホ−ルに
は、例えば、次のような蓋の高さ調整装置が予め設けら
れている。For this purpose, for example, the following cover height adjusting device is provided in advance on the concrete manhole.
【0019】すなわち、マンホ−ルの側塊上に蓋受枠を
載置し、この側塊と、蓋受枠の下端側に設けた外フラン
ジとをジャッキボルト(アジャスタボルト、インサ−ト
ボルトまたは植込みボルトという)で結合しておき、マ
ンホ−ルの蓋と路面とに段差が生じると、蓋受枠近傍の
コンクリ−ト等を破砕除去してジャッキボルトの螺進に
より、蓋受枠の嵩上げ・下げを行い、この側塊と蓋受枠
との間にスペ−サやセメントモルタルを介在させる補修
工事が行われている(例えば、実開昭61−14135
0号公報、実開平3−108039号公報、特開平6−
228981号公報、特開平8−27821号公報、特
開平8−209724号公報等参照)。That is, a lid receiving frame is placed on a side block of a manhole, and this side block and an outer flange provided on the lower end side of the lid receiving frame are called jack bolts (adjuster bolts, insert bolts or stud bolts). If there is a step between the manhole cover and the road surface, concrete and the like near the cover receiving frame are crushed and removed, and the jack receiving bolt is screwed up to raise and lower the lid receiving frame. Repair work is being carried out in which a spacer or cement mortar is interposed between the side block and the lid receiving frame (for example, Japanese Utility Model Application Laid-Open No. 61-14135).
No. 0, Japanese Utility Model Laid-Open No. 3-108039, and
No. 2,28981, JP-A-8-27821, JP-A-8-209724, etc.).
【0020】また、マンホ−ルの側塊上に蓋受枠を載置
し、この側塊の上端側と蓋受枠の下端側にそれぞれ設け
た内フランジをアジャスタボルトで結合しておき、マン
ホ−ルまたは路面が沈下すると、このマンホ−ル内に作
業者が入り、アジャスタボルトを螺進させて蓋受枠を嵩
上げ・下げしてから側塊と蓋受枠との間にスペ−サを介
在させる補修工事が提案されている(例えば、特開平7
−317092号公報、特開平9−203065号公報
参照)。Further, the lid receiving frame is placed on the side block of the manhole, and the inner flanges provided on the upper end side of the side block and the lower end side of the lid receiving frame are connected to each other with adjuster bolts. Or, when the road surface sinks, a worker enters this manhole, raises and lowers the lid receiving frame by screwing the adjuster bolt, and then repairs the space between the side block and the lid receiving frame. Have been proposed (for example, see
3-17092, JP-A-9-2030065).
【0021】そこで、プラスチックマンホ−ルにおける
前記問題点を解決するため、例えば前記2種の一般コン
クリ−ト製マンホ−ルの補修工法を適用したところ、次
のような問題があって採用できないことが判明した。Therefore, in order to solve the above-mentioned problems in the plastic manhole, for example, when the above-mentioned two types of repair methods of the general concrete manhole are applied, they cannot be adopted due to the following problems. There was found.
【0022】[0022]
【発明が解決しようとする課題】前者のコンクリ−ト製
マンホ−ルの道路補修工法では、蓋受枠の近傍のコンク
リ−ト等を切り取り、この切断したコンクリ−ト等を破
砕・除去する工法を含んでいるので、小型マンホ−ル1
の台座8Aの地盤沈下したときの従来対策法と変わりな
く採用できない。In the former method of repairing a concrete manhole, a method of cutting concrete or the like in the vicinity of a lid receiving frame and crushing and removing the cut concrete or the like is used. Includes a small manhole 1
And the conventional countermeasures when the ground of the pedestal 8A subsides cannot be adopted.
【0023】殊に、小型マンホ−ル1における保護蓋5
Aは、その周辺をコンクリ−トで固めておれば、仮に台
座8Aを支える地盤(11,12)が沈下しても、蓋受
枠9Aは沈下しない(すなわち、外観上は沈下しな
い)、という特殊な事情もあって、この理由でもこれを
採用できない(勿論、この場合は、蓋体10を開き、台
座8Aの下面に粒度調整砕石等を詰め込むようにしても
よい)。In particular, the protective cover 5 of the small manhole 1
A has a special feature that if the surroundings are hardened by concrete, even if the ground (11, 12) supporting the pedestal 8A sinks, the lid receiving frame 9A does not sink (that is, does not sink in appearance). For this reason, this cannot be adopted for this reason. (Of course, in this case, the lid 10 may be opened, and crushed stones or the like may be packed in the lower surface of the pedestal 8A).
【0024】また、後者のコンクリ−ト製マンホ−ルの
道路補修工法では、マンホ−ル内に作業者が入り、アジ
ャスタボルトの螺進を行うので、人の出入不可能の小型
マンホ−ル1には適用できない。In the latter method of repairing a concrete manhole, a worker enters the manhole and screw-adjusts the adjuster bolts. Not applicable to
【0025】要するに、小型マンホ−ル1では、そこに
保護蓋5Aが用いられており、この保護蓋5Aを支持す
る基礎12と、インバ−ト部(マンホ−ル本体)2を支
持する砂基礎7との2つの地盤があり、しかも、保護蓋
5Aと内蓋4との間に空間があるという特殊事情があっ
て、一般のコンクリ−トマンホ−ルの蓋の高さ調節装置
は、そのまま適用できないことが判明した。In short, in the small manhole 1, the protective cover 5A is used therein, and the foundation 12 for supporting the protective cover 5A and the sand foundation for supporting the invert portion (manhole body) 2 are provided. 7 and the space between the protective cover 5A and the inner cover 4 has special circumstances. Therefore, the cover height adjusting device of a general concrete manhole can be applied as it is. It turned out to be impossible.
【0026】そこで本発明は、プラスチックマンホ−ル
(小型マンホ−ル)の地盤沈下後の対策として、始めて
嵩上げ装置を適用して、プラスチックマンホ−ルに特有
の事情に則して改善を図ることを主たる目的とし、その
改善策の取扱いを容易にし(作業性の向上)、かつ、プ
ラスチックマンホ−ルらしく安価にすること(生産費の
節減)を副たる目的とするものである。Therefore, the present invention aims to improve the plastic manhole (small manhole) in accordance with the circumstances peculiar to the plastic manhole by applying a raising device for the first time as a countermeasure after land subsidence. The main object is to make it easier to handle the improvement measures (improve workability) and to make it cheaper like a plastic manhole (reduction of production cost).
【0027】[0027]
【課題を解決するための手段】かかる目的を達成するた
め、本発明は、1)マンホ−ル本体と、立上り部と、該
立上り部の上端を覆蓋した内蓋と、該内蓋を、空間を介
して覆蓋し、かつ、路面荷重を受ける保護蓋と、からな
り、前記マンホ−ル本体を支持する地盤より上方の地盤
で前記保護蓋を支持するようにしたプラスチックマンホ
−ルにあって、前記保護蓋を、前記立上り部に遊嵌した
台座と、路面荷重を直接受ける鉄蓋を支え、かつ、前記
台座に載置した蓋受枠とに分割し、該蓋受枠に設けた複
数のアジャスタボルトを、前記鉄蓋を開き、そこより差
し込んだ棒状工具によって螺進させることにより、保護
蓋を支持する地盤の沈下に対処したことを特徴とするプ
ラスチックマンホ−ルの保護蓋嵩上げ装置にあり、ま
た、2)マンホ−ル本体と、立上り部と、該立上り部の
上端を覆蓋した内蓋と、該内蓋を、空間を介して覆蓋
し、かつ、路面荷重を受ける保護蓋と、からなるプラス
チックマンホ−ルにあって、前記保護蓋を、前記立上り
部に遊嵌したメネジ付台座と、該台座に載置した蓋受枠
と、該蓋受枠に覆蓋した鉄蓋と、から構成し、前記メネ
ジ付台座と蓋受枠とを、メネジ付台座に螺合して立設し
たアジャスタボルトで結合し、該アジャスタボルトを、
前記鉄蓋を開き、そこより差し込んだ棒状工具によって
螺進させることにより、メネジ付台座に対し蓋受枠を軽
快に上昇させて、保護蓋の嵩上げをするようにしたこと
を特徴とするプラスチックマンホ−ルの保護蓋嵩上げ装
置にあり、また、3)マンホ−ル本体と、立上り部と、
該立上り部の上端を覆蓋した内蓋と、該内蓋を、空間を
介して覆蓋し、かつ、路面荷重を受ける保護蓋と、から
なり、前記マンホ−ル本体を支持する地盤より上方の地
盤で前記保護蓋を支持するようにしたプラスチックマン
ホ−ルにあって、前記保護蓋を、前記立上り部に遊嵌し
た台座と、路面荷重を直接受ける鉄蓋を支え、かつ、前
記台座に載置した蓋受枠とで構成し、更に、該蓋受枠を
上下に2分割した後、複数のアジャスタボルトで結合
し、該アジャスタボルトを、前記鉄蓋を開き、そこより
差込んだ棒状工具によって螺進させることにより、上部
蓋受枠を上昇させて、保護蓋を支持する地盤の沈下に対
処したことを特徴とするプラスチックマンホ−ルの保護
蓋嵩上げ装置を要旨とするものである。In order to achieve the above object, the present invention provides: 1) a manhole body, a rising portion, an inner lid covering an upper end of the rising portion, and a space formed by the inner lid. And a protective cover for receiving a road surface load, wherein the protective cover is supported on the ground above the ground for supporting the manhole body. The protective cover is divided into a pedestal loosely fitted to the rising portion and an iron lid that directly receives a road surface load, and is further divided into a lid receiving frame placed on the pedestal, and a plurality of adjuster bolts provided on the lid receiving frame. Is opened by the iron cover and screwed by a rod-shaped tool inserted therefrom to cope with the settlement of the ground supporting the protection cover. 2) Manhole A plastic manhole comprising a body, a rising part, an inner lid covering an upper end of the rising part, and a protective lid covering the inner lid through a space and receiving a road surface load. , The protective lid is composed of a female-threaded pedestal loosely fitted to the rising portion, a lid receiving frame placed on the pedestal, and an iron lid covered by the lid receiving frame, and the female-threaded pedestal and the lid receiving frame are provided. Are connected to each other with an adjuster bolt which is screwed to a female-threaded pedestal, and the adjuster bolt is
A plastic manhole, wherein the iron cover is opened and screwed by a rod-shaped tool inserted therefrom to lightly raise the cover receiving frame with respect to the female-threaded pedestal to increase the height of the protective cover. 3) Manhole body, rising part,
A ground above the ground supporting the manhole body, comprising: an inner lid covering an upper end of the rising portion; and a protective lid covering the inner lid via a space and receiving a road surface load. In the plastic manhole which supports the protective cover, the protective cover supports a pedestal loosely fitted to the rising portion and an iron lid which directly receives a road surface load, and is mounted on the pedestal. Further, after the lid receiving frame is divided into upper and lower parts, the upper and lower parts are joined by a plurality of adjuster bolts, and the adjuster bolts are opened by opening the iron lid and screwed by a rod-shaped tool inserted therefrom. The gist of the present invention provides a protective cover raising device for a plastic manhole, in which the upper cover receiving frame is raised to cope with the subsidence of the ground supporting the protective cover.
【0028】[0028]
【発明の実施の形態】本発明を、添付図面に示す実施の
形態例により詳細に述べる。図1は本発明の実施の形態
例であって、(A)は調節前の状態図、(B)は約5°
調節した状態図、(C)は約10°調節した状態図、図
2は、図1の要部実施例図、図3は図2の一部省略平面
図、図4は図1の他の要部実施例図で、(A)はナット
の平面図、(B)はナットの側面図、(C)はナットの
底面図、(D)はボルトの平面図、(E)はボルトの側
面図、(F)はボルトナットの螺合図、図5は図4の第
2の実施例図、図6は本発明の他の実施の形態例図であ
る。なお、図7と同一または共通部分は、その説明およ
び図示を省略するので、図7のものがそのまま適用され
る。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail with reference to embodiments shown in the accompanying drawings. 1A and 1B show an embodiment of the present invention, in which FIG. 1A is a state diagram before adjustment, and FIG.
FIG. 2C is a view showing an embodiment of the main part of FIG. 1, FIG. 3 is a partially omitted plan view of FIG. 2, and FIG. 4 is another view of FIG. (A) is a plan view of a nut, (B) is a side view of a nut, (C) is a bottom view of a nut, (D) is a plan view of a bolt, and (E) is a side view of a bolt. FIG. 5 (F) is a threaded view of the bolt and nut, FIG. 5 is a view of the second embodiment of FIG. 4, and FIG. 6 is a view of another embodiment of the present invention. Note that the description and illustration of the same or common parts as those in FIG. 7 are omitted, and those in FIG. 7 are applied as they are.
【0029】本発明の実施の形態例の保護蓋5は、小型
マンホ−ル(プラスチックマンホ−ル)1(図7参照、
以下同じ)を路面荷重から保護するものであって、殊
に、小型マンホ−ル1の立上り部2の上端に覆蓋した内
蓋4に対し、空間を介して分離してカバ−しているもの
である。なお、この小型マンホ−ル1は従来例で示した
ものと同様の構造および施工法になっている。The protective cover 5 according to the embodiment of the present invention comprises a small manhole (plastic manhole) 1 (see FIG. 7).
The same shall apply hereinafter) from road surface loads, and in particular, those which are separated from the inner lid 4 covered on the upper end of the rising portion 2 of the small manhole 1 via a space and separated. It is. This small manhole 1 has the same structure and construction method as those shown in the conventional example.
【0030】この保護蓋5について概説する。図1にお
いて、この保護蓋5の台座は、図7で示した保護蓋5A
における台座8Aと違い、鋳鉄製のメネジ付台座8に構
成している。The protective cover 5 will be outlined. In FIG. 1, the pedestal of this protective lid 5 is the protective lid 5A shown in FIG.
Unlike the pedestal 8A, the pedestal 8 has a female thread made of cast iron.
【0031】すなわち、このメネジ付台座8は、ド−ナ
ツ状の台座部15と、この台座部15の内孔16側に沿
って立上った円筒状のメネジ穿設部17と、から大略構
成されている。That is, the female threaded pedestal 8 is roughly composed of a donut-shaped pedestal portion 15 and a cylindrical female threaded portion 17 rising along the inner hole 16 side of the pedestal portion 15. It is configured.
【0032】そして、このメネジ付台座8のメネジ穿設
部17に、鉄蓋を支える蓋受枠9が載置され、両者を、
メネジに螺合立設した複数(例えば3個)のアジャスタ
ボルト18で結合する。Then, the lid receiving frame 9 for supporting the iron lid is placed on the female threaded portion 17 of the female threaded base 8, and
A plurality of (for example, three) adjuster bolts 18 screwed to the female screw are connected.
【0033】そこで、この蓋受枠9の上端と面一で、か
つ、これに覆蓋した鋳鉄製蓋体10の上面が、前記のよ
うな不測の事態等により沈下すると、この蓋体10を開
き、アジャスタボルト18を、6角棒スパナ(不図示で
あるが、6角嵌合穴付ボルトや6角嵌合穴付ナットに嵌
合して廻すL型棒状スパナをいう。勿論、4角嵌合付の
ものでもよい)を使用して螺進させると、例えば、図1
(A)の蓋受枠9の上端が水平状の埋設当初の状態か
ら、図1(B)のようなメネジ付台座8が約5°の傾斜
で沈下した場合、別言すると、蓋受枠9の上端を約5°
の傾斜で嵩上げする。When the upper surface of the cast iron cover 10 which is flush with the upper end of the cover receiving frame 9 and covers the cover frame 10 sinks due to an unexpected situation as described above, the cover 10 is opened. An L-shaped bar-shaped spanner in which the adjuster bolt 18 is fitted and turned to a hexagonal bar wrench (not shown, but a hexagonal fitting bolt or a hexagonal fitting nut). When the screw is screwed using, for example, FIG.
When the female threaded pedestal 8 as shown in FIG. 1B sinks at an inclination of about 5 ° as shown in FIG. 1B from the initial state in which the lid receiving frame 9 of FIG. About 5 ° at the top
To raise the slope.
【0034】その傾斜可能の最大値は、図1(C)のよ
うに蓋受枠9の上端を約10°迄傾けることができる。As for the maximum value of the inclination, the upper end of the lid receiving frame 9 can be inclined up to about 10 ° as shown in FIG.
【0035】すなわち、本発明の保護蓋5の嵩上げ量
は、最大約10°傾斜するものであって、それ以上傾斜
させる場合は従来どおりの掘削による補修となる。勿
論、蓋受枠9の全体を、そのまま嵩上げして内蓋4との
空間を改めて形成することができるが、その逆で、この
空間を形成しようとして、メネジ付台座8を沈めること
は、沈下後の対策であるので、採用できない。That is, the raised amount of the protective cover 5 of the present invention is inclined at a maximum of about 10 °, and when the protective lid 5 is inclined more than that, the repair is performed by the conventional excavation. Of course, the entire lid receiving frame 9 can be raised as it is to form a space with the inner lid 4 again. On the contrary, sinking the female threaded pedestal 8 in an attempt to form this space requires Cannot be adopted.
【0036】すなわち、メネジ付台座8を支える地盤が
沈下したとき、それだけ蓋受枠9を嵩上げするもので、
保護蓋5がそのままで、路面のみの沈下には対応できな
い。もっとも、埋設当初の嵩上げ・下げによる蓋受枠9
の傾斜角度の調節はできる。That is, when the ground supporting the female threaded pedestal 8 sinks, the lid receiving frame 9 is raised accordingly.
It is not possible to cope with the settlement of only the road surface with the protection lid 5 as it is. However, the lid receiving frame 9 by raising or lowering the burial at the beginning
You can adjust the angle of inclination.
【0037】そして、蓋受枠9の嵩上げによって、メネ
ジ付台座8との間に間隙19が形成されると、早強ポル
トランドセメントまたは超早強ポルトランドセメント
(JISR5210参照)を注入・充填し、このセメン
トによって蓋受枠9を支持するようにする。勿論、アジ
ャスタボルト18の本数を多くすれば、セメントなしに
小型マンホ−ル1に作用する路面荷重は支持できる。When the gap 19 is formed between the cover receiving frame 9 and the female threaded pedestal 8 by raising the height of the lid receiving frame 9, the high-strength Portland cement or the ultra-high-strength Portland cement (see JISR5210) is injected and filled. To support the lid receiving frame 9. Of course, if the number of adjuster bolts 18 is increased, the road surface load acting on the small manhole 1 without cement can be supported.
【0038】したがって、蓋の嵩上げ作業が、特に、内
蓋4との空間を形成させるための蓋受枠9の嵩上げ専用
の作業が、蓋体10を開き、作業者の腕を入れて6角棒
スパナを差し込み、アジャスタボルト18を廻すだけで
すみ、蓋受枠9の周辺を掘削して改めて埋戻しをしない
のは勿論、自然に締め固めできた程度の沈下の場合、そ
の沈下したメネジ付台座8をそのままにして、比較的軽
量な蓋受枠9のみを嵩上げし、しかも、作業者がマンホ
−ル内に腕を入れて棒スパナを廻すだけでよいので、き
わめて簡易な作業となって、小なる道路幅員に使用する
小型マンホ−ル1にとって好都合となり、立上り部3を
掘削によって損傷するような作業を行わない。Therefore, the work of raising the lid, especially the work dedicated to raising the lid receiving frame 9 for forming a space with the inner lid 4, is performed by opening the lid body 10 and inserting the worker's arm into the hexagonal rod. All that is required is to insert a wrench and turn the adjuster bolt 18, so that the surroundings of the lid receiving frame 9 are not excavated and re-filled. , And only the relatively lightweight lid receiving frame 9 is raised, and the operator only has to put his arm in the manhole and turn the bar wrench, so that the operation becomes extremely simple and small. This is convenient for the small manhole 1 used for the width of the road, and does not perform an operation that damages the rising portion 3 by excavation.
【0039】次に、本実施の形態例の保護蓋5について
詳説する。まず、蓋受枠9およびメネジ付台座8につい
て述べる。図2および図3において、略円筒状の鋳鉄製
蓋受枠9は、例えば外径440mmφ、高さ110mm
の大きさで、その内側上方に鋳鉄製蓋体10を覆蓋する
嵌合面20が形成され、その内側下端に内フランジ21
が形成されている。なお図3中、22は蝶番に対抗した
フック係止部を示す。Next, the protective cover 5 of this embodiment will be described in detail. First, the lid receiving frame 9 and the female threaded pedestal 8 will be described. 2 and 3, a substantially cylindrical cast iron lid receiving frame 9 has, for example, an outer diameter of 440 mmφ and a height of 110 mm.
A fitting surface 20 for covering the cast iron lid 10 is formed on the upper side inside thereof, and an inner flange 21 is formed on the inner lower end thereof.
Are formed. In FIG. 3, reference numeral 22 denotes a hook engaging portion opposing the hinge.
【0040】この内フランジ21は、約45mmの巾で
内側に突出しており、この内フランジ21に等間隔で複
数(3つ)のボルト挿通用長孔23,23,…を穿設す
ると共に、複数(3つ)のセメント注入孔24,24,
…を穿設している。このボルト挿通用長孔23は放射状
に長孔に形成して、アジャスタボルト18が挿通されて
いても前記のように蓋受枠9が約10°迄傾斜できる。The inner flange 21 protrudes inward with a width of about 45 mm, and a plurality (three) of elongated bolt insertion holes 23 are formed in the inner flange 21 at regular intervals. A plurality (three) of cement injection holes 24, 24,
... is drilled. The bolt insertion slot 23 is formed in a radially elongated hole so that the lid receiving frame 9 can be inclined up to about 10 ° as described above even when the adjuster bolt 18 is inserted.
【0041】メネジ付台座8は、前記のように略ド−ナ
ツ状の台座部15と、この台座部15の内孔16側に沿
って立上った円筒状のメネジ穿設部17とを、高分子コ
ンクリ−ト(セメントを用いずに熱可塑性樹脂等の高分
子材料で骨材を結合したレジンコンクリ−トをいう)に
よって一体に成形している。The female threaded pedestal 8 has the substantially donut-shaped pedestal portion 15 and the cylindrical female threaded portion 17 standing up along the inner hole 16 side of the pedestal portion 15 as described above. And a polymer concrete (referred to as a resin concrete in which an aggregate is bonded with a polymer material such as a thermoplastic resin without using cement).
【0042】この円筒状のメネジ穿設部17の上端側に
厚肉内フランジ27を設け、この厚肉内フランジ27
に、貫通した複数(3つの)のメネジ孔(金属製ナッ
ト)28,28,…をインサ−ト成形している。なお、
この厚肉内フランジ27の裏面にナットを廻り止め状に
嵌合すれば、インサ−ト成形する必要はない。A thick inner flange 27 is provided on the upper end side of the cylindrical female screw perforated portion 17.
, A plurality of (three) female screw holes (metal nuts) 28, 28,. In addition,
If the nut is fitted on the back surface of the thick inner flange 27 in a detent shape, it is not necessary to perform insert molding.
【0043】このメネジ孔28の上端には、円板状支持
ナット29が嵌合する浅皿凹部30が形成され、メネジ
孔28の下端方には、アジャスタボルト18の下方部が
挿通する切欠部31が形成されて、アジャスタボルト1
8の昇降を容易にしている。また、このメネジ孔28の
外側方には、膨出部32を形成し強度を持たせている。At the upper end of the female screw hole 28, there is formed a shallow recess 30 into which a disc-shaped support nut 29 is fitted. At the lower end of the female screw hole 28, a notch portion through which the lower part of the adjuster bolt 18 is inserted. 31 is formed, and the adjuster bolt 1 is formed.
8 is easy to ascend and descend. A bulging portion 32 is formed outside the female screw hole 28 to provide strength.
【0044】したがって、メネジ付台座8に蓋受枠9を
載置してアジャスタボルト18で結合しいるが、蓋受枠
9を嵩上げしようとすれば、アジャスタボルト18を螺
進させるだけでよい。すなわち、アジャスタボルト18
がメネジ孔28で螺合されて上昇し、蓋受枠9を円板状
支持ナット29により持上げ、蓋体10付の蓋受枠9の
みを嵩上げすることができる。Therefore, although the lid receiving frame 9 is placed on the female threaded pedestal 8 and connected with the adjuster bolts 18, if the lid receiving frame 9 is to be raised, it is only necessary to screw the adjuster bolts 18. That is, the adjuster bolt 18
Is raised by being screwed into the female screw hole 28, the lid receiving frame 9 is lifted by the disc-shaped support nut 29, and only the lid receiving frame 9 with the lid 10 can be raised.
【0045】次に、このSUS製のアジャスタボルト1
8について述べる。図4において、このアジャスタボル
ト18は、ボルト33と、円板状支持ナット29と、セ
ミ袋押えナット34と、から構成されている。Next, this SUS adjuster bolt 1
8 will be described. In FIG. 4, the adjuster bolt 18 includes a bolt 33, a disc-shaped support nut 29, and a semi-bag holding nut 34.
【0046】このボルト33は、いわゆる6角(4角で
も可)ソケットヘッドボルトであって、その軸方向全長
に亘りオネジ(M16)を切っている。このボルト33
の頭に6角深穴35を穿設しており、この6角は対面間
隔を10mmとしている。このボルト33の螺進は、6
角深穴35に6角棒スパナ(不図示)を差し込んで廻す
ことによって行われる。The bolt 33 is a so-called hexagonal (or square) socket head bolt, and has an external thread (M16) cut over its entire length in the axial direction. This bolt 33
Is formed with a hexagonal deep hole 35 at the head thereof, and this hexagon has a facing distance of 10 mm. The screw 33 is driven by 6
This is performed by inserting and turning a hexagonal bar wrench (not shown) into the deep hole 35.
【0047】このボルト33には、円板状支持ナット2
9が螺合しており、この円板状支持ナット29は外径2
4mmφ、厚さ7mmになっていて、前記浅皿凹部30
に内嵌できる大きさになっている。The bolt 33 has a disk-shaped support nut 2
9 is screwed, and the disk-shaped support nut 29 has an outer diameter of 2 mm.
4 mmφ, 7 mm thick, and the shallow dish recess 30
It is large enough to fit inside.
【0048】また、円板状支持ナット29の上縁にRを
形成して逆椀状とし、蓋受枠9が約10°傾いても支障
のないようにし、また、前記内フランジ21との、螺進
回転による摩擦を軽減している。An R is formed on the upper edge of the disc-shaped support nut 29 to form an inverted bowl shape so that there is no problem even if the lid receiving frame 9 is tilted by about 10 °. Friction caused by screw rotation is reduced.
【0049】また、このボルト33には、小パイプ状の
セミ袋押えナット34が螺合しており(ボルト33の頭
部を覆うナットで、かつ、貫通しているのでセミ袋ナッ
トと呼ぶ)、このセミ袋押えナット34の小パイプ内面
の略上半分には、前記6角深穴35より大きい、対面間
隔14mmの6角(4角でも可)貫通孔36が形成さ
れ、やや大型の6角棒スパナ(不図示)が密接嵌合でき
るようにし、その下半分には、ボルト33に螺合するメ
ネジ(M16)37を切っている。A small pipe-shaped semi cap nut 34 is screwed to the bolt 33 (a nut that covers the head of the bolt 33 and is penetrated and is called a semi cap nut). In a substantially upper half of the inner surface of the small pipe of the semi-bag presser nut 34, a hexagonal (or square) through hole 36 having a facing distance of 14 mm larger than the hexagonal deep hole 35 is formed. A square wrench (not shown) can be fitted closely, and a female screw (M16) 37 screwed to the bolt 33 is cut in the lower half thereof.
【0050】このセミ袋押えナット34の小パイプ外面
下端にはツバ38が形成され、このツバ38の下縁にR
を形成して椀状とし、蓋受枠9が約10°傾いても支障
のないようにし、また、前記内フランジ21との、螺進
回転による摩擦を軽減している。A collar 38 is formed at the lower end of the outer surface of the small pipe of the semi-bag holding nut 34, and a lower edge of the collar 38 is
Is formed so that there is no problem even if the lid receiving frame 9 is inclined by about 10 °, and the friction with the inner flange 21 due to the screwing rotation is reduced.
【0051】したがって、このボルト33に螺合した円
板状支持ナット29を内フランジ21の厚さに合せて位
置決めする。この円板状支持ナット29付のボルト33
をメネジ孔28に螺合して立設する。次いで、このボル
ト33の円板状支持ナット29より上方に突出した部分
を蓋受枠9の内フランジ21のボルト挿通用長孔23に
挿通して内フランジ21上に更に突出させる。このボル
ト33の上方部分に、セミ袋押えナット34を、やや大
型の6角棒スパナ(不図示)により螺合して、円板状支
持ナット29と共に内フランジ21を強固に挟持する。Accordingly, the disk-shaped support nut 29 screwed to the bolt 33 is positioned according to the thickness of the inner flange 21. Bolt 33 with this disk-shaped support nut 29
Is screwed into the female screw hole 28 to be erected. Next, a portion of the bolt 33 projecting above the disk-shaped support nut 29 is inserted into the bolt insertion slot 23 of the inner flange 21 of the lid receiving frame 9 to further project on the inner flange 21. A semi-bag holding nut 34 is screwed onto the upper portion of the bolt 33 with a slightly large hexagonal wrench (not shown), and the inner flange 21 is firmly held together with the disk-shaped support nut 29.
【0052】以上のようにして蓋受枠9とメネジ付台座
8とをアジャスタボルト18によって強固に結合でき
る。As described above, the lid receiving frame 9 and the pedestal 8 with the female thread can be firmly connected by the adjuster bolt 18.
【0053】そこで、蓋受枠9をメネジ付台座8に対し
嵩上げするには、6角棒スパナ(不図示)をセミ袋押え
ナット34の6角貫通孔36を素通りさせ、ボルト33
の6角深穴35に密接嵌合するよう差し込む。次いで、
この6角棒スパナ(不図示)を反時計方向に廻せば、ボ
ルト33がメネジ孔28に螺合されて上昇し、円板状支
持ナット29も一体となって廻りながら上昇するので、
内フランジ21を持上げ、蓋体10付の蓋受枠9のみを
軽く嵩上げすることができる。In order to raise the lid receiving frame 9 with respect to the female threaded pedestal 8, a hexagonal bar wrench (not shown) is passed through the hexagonal through hole 36 of the semi-bag holding nut 34, and the bolt 33
Into the hexagonal deep hole 35 so as to fit closely. Then
If this hexagonal bar wrench (not shown) is turned in a counterclockwise direction, the bolt 33 is screwed into the female screw hole 28 and rises, and the disc-shaped support nut 29 also rises while turning integrally.
By lifting the inner flange 21, only the lid receiving frame 9 with the lid 10 can be lightly raised.
【0054】このアジャスタボルト18によると、小型
の6角棒スパナが使用できるので、狭い保護蓋5内の嵩
上げ作業が軽くかつ容易になる。According to the adjuster bolt 18, a small hexagonal wrench can be used, so that the work of raising the inside of the narrow protective cover 5 is light and easy.
【0055】次いで、蓋体10を開いたまま、セメント
注入孔24から超早強ポルトランドセメントを注入し、
メネジ付台座8と蓋受枠9との嵩上げによる間隙19を
埋める。この場合、セメントが立上り部3に接着しなけ
れば、コンクリ−ト製マンホ−ルトと違い、内側にはみ
出してもよい。Next, with the lid 10 open, ultra-high strength Portland cement is injected from the cement injection hole 24,
The gap 19 between the female threaded pedestal 8 and the lid receiving frame 9 is filled up. In this case, if the cement does not adhere to the rising portion 3, unlike the concrete manhole, the cement may protrude inside.
【0056】次に、アジャスタボルト18Aの他の実施
例について述べる。図5において、このSUS製のアジ
ャスタボルト18Aは、6角頭付ボルト39と、このボ
ルト39に螺合する、頂面を球面状にした6角支持ナッ
ト40と、頂面を球面にした6角押えナット41と、か
ら構成されている。そして、この6角頭付ボルト39の
先端側には、オネジ(M16)42を切ってない小径挿
入部43を形成している。Next, another embodiment of the adjuster bolt 18A will be described. In FIG. 5, the SUS adjuster bolt 18A includes a hexagonal head bolt 39, a hexagonal support nut 40 screwed to the bolt 39, and a hexagonal support nut 40 having a spherical top surface, and a hexagonal support nut 40 having a spherical top surface. And a square holding nut 41. A small-diameter insertion portion 43 in which the male screw (M16) 42 is not cut is formed on the tip end side of the hexagonal head bolt 39.
【0057】したがって、この6角頭付ボルト39に6
角押えナット41を螺合して内フランジ21のボルト挿
通用長孔23に挿通し、次いで、このボルト39に6角
支持ナット40を螺合して、両ナット40,41で内フ
ランジ21を強固に挟持しておく。Therefore, this hexagonal head bolt 39
A square holding nut 41 is screwed into the bolt insertion slot 23 of the inner flange 21, and then a hexagonal support nut 40 is screwed into the bolt 39, and the inner flange 21 is fastened with both nuts 40 and 41. Hold firmly.
【0058】そこで、このボルト39付の蓋受枠9をメ
ネジ付台座8に載置するが、そのとき、ボルト39の小
径挿入部43をメネジ孔28に挿入して、ボルト39の
6角頭をスパナ(またはレンチ)(不図示)により回転
させると、ボルト39はメネジ孔28に螺合して、蓋受
枠9とメネジ付台座8とは密接結合する。Then, the lid receiving frame 9 with the bolt 39 is placed on the female threaded pedestal 8. At this time, the small-diameter insertion portion 43 of the bolt 39 is inserted into the female screw hole 28, and the hexagonal head of the bolt 39 is inserted. When rotated by a wrench (or wrench) (not shown), the bolt 39 is screwed into the female screw hole 28, and the lid receiving frame 9 and the female screw pedestal 8 are tightly coupled.
【0059】そこで、蓋受枠9を嵩上げしようとする場
合は、ボックス形スパナによってボルト39の6角頭を
逆に回転させればよい。なお、本明細書ではドライバ−
やスパナやレンチ等を含めて棒状工具と呼ぶことにす
る。Therefore, when trying to raise the lid receiving frame 9, the hexagonal head of the bolt 39 may be rotated reversely by a box-shaped wrench. In this specification, a driver
And a bar-shaped tool including a spanner and a wrench.
【0060】次に、本発明の他の実施の形態例の保護蓋
5Bについて述べる。図6において、この保護蓋5B
は、複合樹脂製ド−ナツ状台座8Aと、鉄蓋を支える鋳
鉄製円錐台状蓋受枠とから構成され、この蓋受枠は、更
に上下方向に略等分に2分割されて、上部蓋受枠9Bと
下部蓋受枠8Bとを、前記したアジャスタボルト18で
結合して、保護蓋5Bの嵩上げの際には、このアジャス
タボルト18を上方に螺進させて、上部蓋受枠9Bを下
部蓋受枠8Bおよび台座8Aに対し、水平状の埋設当初
の状態から約5°〜10°の傾斜状態にまたは全体を水
平状に持上げて嵩上げする。Next, a protective cover 5B according to another embodiment of the present invention will be described. In FIG. 6, this protective lid 5B
Is composed of a doughnut-shaped pedestal 8A made of a composite resin and a frustoconical frustum-shaped lid made of cast iron that supports an iron lid. 9B and the lower lid receiving frame 8B are connected by the adjuster bolts 18 described above, and when the protective lid 5B is raised, the adjuster bolts 18 are screwed upward to move the upper lid receiving frame 9B to the lower lid receiving frame 8B. In addition, the pedestal 8A is lifted from the initial state of the horizontal embedding to an inclined state of about 5 ° to 10 ° or by lifting the whole horizontally.
【0061】この上部蓋受枠9Bには、図2のものと同
様、その下端に内フランジ21Bを形成し、この内フラ
ンジ21Bに等間隔で複数(3つ)のボルト挿通用長孔
23B,23B,…を穿設すると共に、複数(3つ)の
セメント注入孔(不図示)を穿設している。As shown in FIG. 2, an inner flange 21B is formed at the lower end of the upper lid receiving frame 9B, and a plurality of (three) elongated holes 23B, 23B for bolt insertion are formed in the inner flange 21B at regular intervals. , And a plurality (three) of cement injection holes (not shown) are formed.
【0062】また、下部蓋受枠8Bには、その下端には
図7のものと同様、外フランジを設けて、台座8A上の
浅凹部に嵌合しており、その上端には内フランジ21C
を形成し、前記上部蓋受枠9Bの内フランジ21Bと接
合させると共に、この内フランジ21Cで、かつ、前記
ボルト挿通用長孔23B,23B,…の位置と一致する
部位に複数(3つ)のナット用ポケット32Bを形成し
ている。The lower lid receiving frame 8B is provided with an outer flange at its lower end similarly to that of FIG. 7, and is fitted into a shallow recess on the pedestal 8A.
Are formed and joined to the inner flange 21B of the upper lid receiving frame 9B, and a plurality (three) of the inner flange 21C is provided at a position coinciding with the positions of the bolt insertion slots 23B, 23B,. A nut pocket 32B is formed.
【0063】このナット用ポケット32Bには、前記し
たアジャスタボルト18が螺合して昇降させるSUS製
6角ナット28Bが回止めされて収容されている。した
がって、このナット用ポケット32Bは上方開口状に、
アジャスタボルト18が立設できるようにし、かつ、そ
の底部にアジャスタボルト18が自由に昇降する挿通孔
を形成している。A hexagonal nut 28B made of SUS, which is screwed up and down by the adjuster bolt 18 described above, is accommodated in the nut pocket 32B in a stopped state. Therefore, the nut pocket 32B has an upper opening shape,
The adjuster bolt 18 can be erected, and an insertion hole through which the adjuster bolt 18 can freely move up and down is formed.
【0064】また、このナット用ポケット32Bの深さ
は、少なくとも6角ナット28Bと円板状支持ナット2
9との各高さに等しくしているが、勿論、これらの高さ
より深く構成してもよい。The depth of the nut pocket 32B is at least the hexagonal nut 28B and the disc-shaped support nut 2B.
9 are equal to each other, but of course, they may be deeper than these heights.
【0065】このように構成した保護蓋5Bでは、蓋受
枠(9B,8B)は鋳鉄製で、従来慣用され、信頼性の
ある蓋受枠となって好都合であるばかりでなく、市販の
6角ナット28Bが利用でき、したがって、所定の噛み
合せネジ山が得られ、アジャスタボルト18の螺進退を
安定化し、かつ、安価に構成することができる。In the protective lid 5B constructed as described above, the lid receiving frames (9B, 8B) are made of cast iron, which is not only convenient and reliable as a conventionally used and reliable lid receiving frame, but also a commercially available hexagon nut. 28B can be used, so that a predetermined engagement screw thread can be obtained, and the screw advance / retreat of the adjuster bolt 18 can be stabilized, and the configuration can be made at low cost.
【0066】そして、このアジャスタボルト18の構造
および6角棒スパナを使っての作用は、前記のとおりで
あるので省略する。The structure of the adjuster bolt 18 and the operation using the hexagonal wrench are the same as described above, and will not be described.
【0067】なお、この6角ナット28Bをナット用ポ
ケット32Bに回止め状に収容するには、ナット用ポケ
ット32Bの内面を6角形にして、ポケット上方から6
角ナット28Bを単に落込み収容してもよく、また、ナ
ット用ポケット32Bを図6で示すように内側面にも開
口部を設け、つまり、ポケットを上向きコ字状段部に構
成して、ここから挿入した6角ナット28Bを接着剤等
で固着してもよい。この場合はナット用ポケット32B
をコンパクトに構成できる。In order to accommodate the hexagonal nut 28B in the nut pocket 32B in a detent-like manner, the inner surface of the nut pocket 32B is made hexagonal, and the hexagonal nut 28B is positioned from the top of the pocket.
The square nut 28B may be simply dropped and accommodated, and the nut pocket 32B is also provided with an opening on the inner surface as shown in FIG. 6, that is, the pocket is formed in an upward U-shaped step, The hexagon nut 28B inserted from here may be fixed with an adhesive or the like. In this case, nut pocket 32B
Can be made compact.
【0068】なお、本明細書におけるプラスチックマン
ホ−ル1は塩ビ製公共ますを含むものである。Incidentally, the plastic manhole 1 in the present specification includes a public squeegee made of PVC.
【0069】[0069]
【発明の効果】本発明によれば、プラスチックマンホ−
ルの保護蓋が沈下したときに嵩上げするのに、蓋受枠に
設けた複数のアジャスタボルトを、鉄蓋を開いて手を入
れて差込んだ棒状工具により螺進させて嵩上げするの
で、周辺掘削による嵩上げ作業とならず、ひいては、立
上り部を損傷することがない等の、本発明の前記課題を
解決することができる。According to the present invention, a plastic man-housing
When the protective cover of the wrench rises, the adjuster bolts provided on the lid receiving frame are screwed up with a stick-shaped tool with the iron lid open and the hands inserted. Therefore, it is possible to solve the above-described problems of the present invention, such as not raising the work due to the above, and not damaging the rising portion.
【0070】特に、マンホ−ル本体とは全く無関係の嵩
上げ作業であるので、プラスチックマンホ−ル特有の嵩
上工法となり、簡素構造安価なのもとなるのは勿論、軽
快な嵩上げ装置にすることができる。In particular, since the lifting operation is completely unrelated to the manhole body, the lifting method is peculiar to the plastic manhole, and it is possible to provide a simple lifting device with a simple structure and low cost. it can.
【0071】また、沈下した地盤を締め固め地盤とみな
してこれを利用し、しかも、沈下した分だけ嵩上げする
ので、その作業を特段に簡易化することができる。Further, since the subsided ground is regarded as the compacted ground and used, and the ground is raised by the amount of the subsidence, the operation can be particularly simplified.
【0072】また、小口径の蓋受枠ないし上部蓋受枠の
みをアジャスタボルトで嵩上げするので、棒状工具が使
用でき、狭隘な蓋受枠内の作業ができる。Further, since only the small-diameter lid receiving frame or the upper lid receiving frame is raised by the adjuster bolts, a bar-shaped tool can be used, and the work in the narrow lid receiving frame can be performed.
【0073】殊に、プラスチックマンホ−ルの場合、イ
ンバ−ト部(2)と、台座(8A)との間の地盤は、十
分に締め固められているとはいえ、一度掘削した後、埋
戻しした地盤であるだけに、また、会所ますとは違い、
所定の深さ(例えば約1m以上)を必要とするだけに、
この部分は、地盤沈下(特殊な事情による沈下でなく、
経年による自然沈下)のおそれを内蔵しているが、かか
るプラスチックマンホ−ルの特殊事情に対し、その嵩上
げ手段もその量も好個となり、総じて本発明はプラスチ
ックマンホ−ルに好個に対応させることができる。In particular, in the case of a plastic manhole, although the ground between the invert portion (2) and the pedestal (8A) is sufficiently compacted, it is excavated once and then buried. Just because it is the ground that has been returned, unlike the meeting place,
Just because you need a certain depth (for example, about 1 m or more)
This part is land subsidence (not subsidence due to special circumstances,
Although there is a risk of natural subsidence due to aging), the means for raising and the amount of plastic manholes are good for the special circumstances of such plastic manholes, and in general, the present invention is suitable for plastic manholes. be able to.
【図1】本発明の実施の形態例である。FIG. 1 is an embodiment of the present invention.
【図2】図1の要部実施例図である。FIG. 2 is a diagram showing an embodiment of a main part of FIG.
【図3】図2の一部省略平面図である。FIG. 3 is a partially omitted plan view of FIG. 2;
【図4】図1の他の要部実施例図である。FIG. 4 is another embodiment of the main part of FIG. 1;
【図5】図4の第2の実施例図である。FIG. 5 is a view of a second embodiment of FIG. 4;
【図6】本発明の他の実施の形態例図である。FIG. 6 is a view showing another embodiment of the present invention.
【図7】従来例である。FIG. 7 is a conventional example.
1…プラスチックマンホ−ル、2…マンホ−ル本体、3
…立上り部、4…内蓋、5…保護蓋、8…メネジ付台
座、7,12…基礎、9…蓋受枠、10…蓋体、18…
アジャスタボルト1 ... Plastic manhole, 2 ... Manhole body, 3
... Rising part, 4 ... Inner lid, 5 ... Protective lid, 8 ... Base with female thread, 7,12 ... Basic, 9 ... Lid receiving frame, 10 ... Lid, 18 ...
Adjuster bolt
Claims (3)
り部の上端を覆蓋した内蓋と、該内蓋を、空間を介して
覆蓋し、かつ、路面荷重を受ける保護蓋と、からなり、
前記マンホ−ル本体を支持する地盤より上方の地盤で前
記保護蓋を支持するようにしたプラスチックマンホ−ル
にあって、 前記保護蓋を、前記立上り部に遊嵌した台座と、路面荷
重を直接受ける鉄蓋を支え、かつ、前記台座に載置した
蓋受枠とに分割し、該蓋受枠に設けた複数のアジャスタ
ボルトを、前記鉄蓋を開き、そこより差し込んだ棒状工
具によって螺進させることにより、保護蓋を支持する地
盤の沈下に対処したことを特徴とするプラスチックマン
ホ−ルの保護蓋嵩上げ装置。1. A manhole main body, a rising portion, an inner lid covering an upper end of the rising portion, and a protective lid covering the inner lid through a space and receiving a road surface load. Become
In a plastic manhole in which the protective lid is supported on the ground above the ground supporting the manhole body, the pedestal in which the protective lid is loosely fitted to the rising portion and a road surface load are directly applied. Opening the iron cover and screwing a plurality of adjuster bolts provided on the cover receiving frame with a rod-shaped tool inserted therefrom, supporting the receiving iron cover and dividing it into a cover receiving frame placed on the pedestal. The protection lid raising device for a plastic manhole, which addresses the settlement of the ground supporting the protection lid.
り部の上端を覆蓋した内蓋と、該内蓋を、空間を介して
覆蓋し、かつ、路面荷重を受ける保護蓋と、からなるプ
ラスチックマンホ−ルにあって、 前記保護蓋を、前記立上り部に遊嵌したメネジ付台座
と、該台座に載置した蓋受枠と、該蓋受枠に覆蓋した鉄
蓋と、から構成し、 前記メネジ付台座と蓋受枠とを、メネジ付台座に螺合し
て立設したアジャスタボルトで結合し、該アジャスタボ
ルトを、前記鉄蓋を開き、そこより差し込んだ棒状工具
によって螺進させることにより、メネジ付台座に対し蓋
受枠を軽快に上昇させて、保護蓋の嵩上げをするように
したことを特徴とするプラスチックマンホ−ルの保護蓋
嵩上げ装置。2. A manhole body, a rising portion, an inner lid covering an upper end of the rising portion, and a protective lid covering the inner lid through a space and receiving a road surface load. Wherein the protective lid comprises: a female threaded pedestal loosely fitted to the rising portion; a lid receiving frame placed on the pedestal; and an iron lid covered by the lid receiving frame. The female-threaded pedestal and the lid receiving frame are joined by an adjuster bolt that is screwed to the female-threaded pedestal and erected, and the adjuster bolt is opened by opening the iron lid and screwed by a rod-shaped tool inserted therefrom. An apparatus for raising a protective cover of a plastic manhole, wherein the protective cover is raised by lightly raising a cover receiving frame with respect to a female-threaded pedestal.
り部の上端を覆蓋した内蓋と、該内蓋を、空間を介して
覆蓋し、かつ、路面荷重を受ける保護蓋と、からなり、
前記マンホ−ル本体を支持する地盤より上方の地盤で前
記保護蓋を支持するようにしたプラスチックマンホ−ル
にあって、 前記保護蓋を、前記立上り部に遊嵌した台座と、路面荷
重を直接受ける鉄蓋を支え、かつ、前記台座に載置した
蓋受枠とで構成し、更に、該蓋受枠を上下に2分割した
後、複数のアジャスタボルトで結合し、該アジャスタボ
ルトを、前記鉄蓋を開き、そこより差込んだ棒状工具に
よって螺進させることにより、上部蓋受枠を上昇させ
て、保護蓋を支持する地盤の沈下に対処したことを特徴
とするプラスチックマンホ−ルの保護蓋嵩上げ装置。3. A manhole body, a rising portion, an inner lid covering an upper end of the rising portion, and a protective lid covering the inner lid through a space and receiving a road surface load. Become
In a plastic manhole in which the protective lid is supported on the ground above the ground supporting the manhole body, the pedestal in which the protective lid is loosely fitted to the rising portion and a road surface load are directly applied. And a lid receiving frame placed on the pedestal and supporting the receiving iron lid, and further dividing the lid receiving frame into upper and lower parts and connecting them with a plurality of adjuster bolts. The protective cover raising device for a plastic manhole, characterized in that the upper cover receiving frame is raised by screwing with a rod-shaped tool inserted therefrom, thereby coping with the settlement of the ground supporting the protective cover. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10338536A JP2000144775A (en) | 1998-11-11 | 1998-11-11 | Protection lid raising device for plastic manhole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10338536A JP2000144775A (en) | 1998-11-11 | 1998-11-11 | Protection lid raising device for plastic manhole |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000144775A true JP2000144775A (en) | 2000-05-26 |
Family
ID=18319101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10338536A Pending JP2000144775A (en) | 1998-11-11 | 1998-11-11 | Protection lid raising device for plastic manhole |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000144775A (en) |
-
1998
- 1998-11-11 JP JP10338536A patent/JP2000144775A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100661049B1 (en) | Manhole height adjustment device and manhole repair construction method utilizing manhole height adjustment method | |
US20090217607A1 (en) | Tower foundation system | |
US5318376A (en) | Manhole frame | |
KR101674435B1 (en) | the establishment installation support for poor ground | |
KR101125089B1 (en) | Construction of manholes method | |
JP2000144775A (en) | Protection lid raising device for plastic manhole | |
JP3171675U (en) | Anti-sinking floor slab with maneuvering prevention function | |
JP4698661B2 (en) | Concrete block for standing upright | |
KR100374540B1 (en) | Method of Manhole Repair and Used the Method of Equipment | |
KR102180213B1 (en) | Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same | |
HU227272B1 (en) | Cover with adjustable level and with high load bearing capacity for manhole | |
WO2015036963A1 (en) | Installation means and method for installing and adjusting a cover of an inspection manhole | |
KR100578554B1 (en) | Manhole maintenance method and suppoting device for the method | |
JP2011219960A (en) | Side ditch repairing method | |
JP2002371633A (en) | Foundation anchor bolt of building and settlement correcting method of the building | |
JP2722245B2 (en) | Manhole cover height adjustment device | |
JP2000345506A (en) | Pavement method for road having manhole | |
JPH09256450A (en) | Concrete structure | |
JPH04194230A (en) | Execution method for uprightly fixing pedestal on ground and pedstal therefor | |
KR102177466B1 (en) | Valve cover mount type water control valve protecting case | |
CN210562321U (en) | Anti-settling well lid | |
JP3171670U (en) | Preventing subsidence around the manhole | |
JPH08277536A (en) | Constructing method for concrete manufacture, concrete manufacture, and insert to be buried therein | |
AU2004248079B2 (en) | A utility portal | |
JP3396812B2 (en) | Underground foundation construction material, underground foundation and its construction method |