KR102180213B1 - Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same - Google Patents

Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same Download PDF

Info

Publication number
KR102180213B1
KR102180213B1 KR1020200047876A KR20200047876A KR102180213B1 KR 102180213 B1 KR102180213 B1 KR 102180213B1 KR 1020200047876 A KR1020200047876 A KR 1020200047876A KR 20200047876 A KR20200047876 A KR 20200047876A KR 102180213 B1 KR102180213 B1 KR 102180213B1
Authority
KR
South Korea
Prior art keywords
water
concrete
formwork
predetermined
sewage
Prior art date
Application number
KR1020200047876A
Other languages
Korean (ko)
Inventor
오헌영
Original Assignee
오헌영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 오헌영 filed Critical 오헌영
Priority to KR1020200047876A priority Critical patent/KR102180213B1/en
Application granted granted Critical
Publication of KR102180213B1 publication Critical patent/KR102180213B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/02Public or like main pipe systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/06Gully gratings
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • E03F7/02Shut-off devices
    • E03F7/04Valves for preventing return flow

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to a concrete form for installing water and sewer pipes and a construction method of water and sewer pipes using the same, which can facilitate construction by eliminating the need for separately removing a form for installing water and sewer pipes after depositing concrete to quickly perform underground burying construction of the water and sewer pipes. To achieve the objective, according to the present invention, the concrete form for installing water and sewer pipes comprises: a bottom unit having a prescribed width and length in a horizontal direction; a pair of side units formed to have a prescribed height in a vertical direction while one end thereof is connected to both sides of the bottom unit; a plurality of height adjustment parts installed at prescribed intervals along a middle portion of the upper surface of the bottom unit; and a pipe floating prevention part installed on sides of the pair of side units facing each other to protrude by a prescribed length.

Description

상하수도관 설치용 콘크리트재 거푸집 및 이를 이용한 상하수도관 시공방법{Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same}Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same}

본 발명은 상하수도관 설치용 콘크리트재 거푸집 및 이를 이용한 상하수도관 시공방법에 관한 것으로, 더욱 상세하게는 상하수도관을 지중에 매립하여 시공할 때 거푸집을 따로 탈거하지 않고 신속하게 콘크리트를 타설하여 매립할 수 있도록 하는 상하수도관 설치용 콘크리트재 거푸집 및 이를 이용한 상하수도관 시공방법에 관한 것이다.The present invention relates to a concrete formwork for installation of water and sewage pipes and a method of constructing water and sewage pipes using the same, and more particularly, when the water and sewage pipes are buried in the ground and constructed, concrete can be quickly poured and buried without removing the form separately. It relates to a concrete formwork for installation of water and sewage pipes and a water and sewage pipe construction method using the same.

일반적으로 상하수도관을 설치할 때에는 땅을 소정 깊이로 굴착한 다음, 길이를 따라 거푸집을 조립하고, 거푸집을 따라 상하수도관을 연결한 다음, 콘크리트를 타설하여 양생시키고, 이후 설치된 거푸집을 제거한후 굴착된 땅을 되메워 시공을 완료하게 된다.In general, when installing water and sewage pipes, excavate the ground to a predetermined depth, assemble the formwork along the length, connect the water and sewage pipes along the formwork, pour concrete to cure, and remove the installed formwork and then excavate the ground. To complete the construction.

그러나 상기와 같은 기존의 상하수도관 설치방법은 소모성 거푸집을 사용하므로 자원의 낭비와 건설폐자재의 발생으로 환경오염이 발생하는 문제가 있고, 콘크리트가 기초와 벽체의 분리 시공으로 인해 발생되는 시공조인트로 품질이 저하되고, 거푸집의 설치 및 해체가 기초 타설후 벽체 시공을 거치는 단계별 시공으로 인해 콘크리트 양생에 충분한 시간이 요구되며, 또한 콘크리트가 양생되고 나면 설치된 거푸집을 탈거해야 하므로 흙을 되메워 시공을 완료하기까지 오랜 시간이 소요되고, 따라서 상하수도관의 파손 및 지반 침하 등으로 인해 긴급 복구가 요구되는 경우에는 적합하지 않은 문제가 있다.However, since the existing water and sewage pipe installation method as described above uses a consumable formwork, there is a problem of environmental pollution due to waste of resources and generation of construction waste materials, and concrete is a construction joint that occurs due to the separation of the foundation and the wall. Due to the step-by-step construction in which the quality deteriorates and the installation and dismantling of the formwork goes through the wall construction after the foundation is placed, sufficient time is required for the concrete curing, and the installed formwork must be removed after the concrete is cured, so the construction is completed by backfilling the soil. It takes a long time to do so, and therefore, there is an unsuitable problem when emergency recovery is required due to damage to water and sewage pipes and ground subsidence.

또한, 최근에는 상하수도관의 누수로 인해 지반이 침하되는 문제가 빈번하게 발생하는 문제가 있고, 따라서 상하수도관의 지중 매립시 누수 등에 따른 지반 침하를 방지하기 위한 다양한 방안이 마련되고 있다.In addition, in recent years, there is a problem that the ground subsidence occurs frequently due to leakage of water and sewer pipes, and therefore, various measures have been prepared to prevent ground subsidence due to leakage of water and sewage pipes during underground reclamation.

상기와 같은 목적의 종래기술로는 등록특허공보 제1954105호의 상하수도관로 침하방지구조(이하 '특허문헌'이라 한다)가 개시되어 있다.As a prior art for the above purpose, a structure for preventing subsidence of water and sewage pipes (hereinafter referred to as'patent document') of Korean Patent Publication No. 1954105 is disclosed.

상기 특허문헌에 개시된 상하수도관로 침하방지구조는, 상하수도관로의 연결부위를 지지할 수 있도록 연결부위의 하부에 설치되는 반원형의 제1안착부, 상기 제1안착부의 양단으로부터 횡 방향으로 연장된 제1플랜지, 상기 제1안착부의 내측에 형성되어 상하수도관로의 삽입부가 안착되는 제1수용부, 상기 제1수용부를 기준으로 상호 대향되게 제1안착부의 내측에 형성되는 스토퍼수용부, 상기 제1안착부 및 제1플랜지의 하부로 흙 채움할 수 있게 제1플랜지에 상하관통되게 형성된 채움부, 상기 채움부를 기준으로 상호 대향되게 제1플랜지의 상면에 형성되는 연결바수용부, 일단이 상기 스토퍼수용부와 연통되고 타단이 채움부와 연통되며 내부가 사각 형상인 제1가이드부, 상기 제1가이드부와 상호 연통되며 내부가 원형인 제2가이드부로 구성된 본체; 상기 제1플랜지의 하면으로부터 하방으로 돌출되어 지층에 박히는 제1고정팩; 상기 스토퍼수용부에 삽탈 가능하게 끼워지며 상하수도관로에 의해 횡 방향으로 이동되는 스토퍼, 상기 스토퍼로부터 연장되어 제1가이드부에 이동가능하게 끼워지는 사각바, 상기 사각바로부터 연장되어 제2가이드부에 이동가능하게 끼워져 지층에 박히는 삽입봉으로 구성된 제2고정팩으로 이루어진 받침대유닛; 상기 받침대유닛의 연결바수용부에 끼워져 받침대유닛을 상호 연결하는 연결부재; 상하수도관로의 연결부위 상부에 배치되어 제1안착부와 함께 상하수도관로의 연결부위를 감싸는 반원형의 제2안착부; 상기 제2안착부의 양단으로부터 횡 방향으로 연장되고 제1플랜지의 상면에 얹혀져 체결수단을 매개로 고정되며, 연결부재의 이탈을 제한하는 제2플랜지; 및 상기 제2안착부의 내측에 형성되어 제1수용부와 함께 상하수도관로의 삽입부를 감싸는 제2수용부로 이루어진 커버를 포함하여 이루어진다.The structure for preventing subsidence of water and sewage pipes disclosed in the patent document includes a semicircular first seating portion installed below the connection portion so as to support the connection portion of the water and sewage pipes, and a first seat extending in the transverse direction from both ends of the first seating portion. Flange, a first receiving portion formed on the inside of the first receiving portion to seat the insertion portion of the water and sewage pipe, a stopper receiving portion formed inside the first receiving portion to face each other relative to the first receiving portion, the first receiving portion And a filling portion formed vertically through the first flange so as to fill the soil under the first flange, a connecting bar receiving portion formed on the upper surface of the first flange facing each other based on the filling portion, and one end of the stopper receiving portion. A main body configured with a first guide part in communication with and the other end in communication with the filling part and having a rectangular shape inside, and a second guide part in communication with the first guide part and having a circular inside; A first fixing pack protruding downward from the lower surface of the first flange and being stuck in the stratum; A stopper that is removably fitted to the stopper receiving portion and is moved in a transverse direction by a water and sewage pipe, a square bar extending from the stopper and movably fitted to the first guide portion, and a second guide portion extending from the square bar. A support unit made of a second fixing pack composed of an insertion rod that is movably fitted and embedded in the stratum; A connecting member inserted into the connecting bar receiving portion of the pedestal unit to interconnect the pedestal units; A semicircular second seating portion disposed above the connection portion of the water and sewage pipes and surrounding the connection portion of the water and sewage pipes together with the first seating portion; A second flange extending in the transverse direction from both ends of the second seating portion, mounted on an upper surface of the first flange, fixed through a fastening means, and limiting separation of the connecting member; And a cover made of a second receiving portion formed inside the second receiving portion and surrounding the insertion portion of the water and sewage pipe together with the first receiving portion.

그러나 상기 특허문헌에 개시된 상하수도관로 침하방지구조는 상하수도관로를 따라 복잡한 구조의 침하방지구조물을 복수 개 설치해야 하므로 시공이 매우 복잡하고, 이 때문에 상하수도관로 시공에 소요되는 시간이 길어지는 문제가 있다.However, the water and sewage pipe settling prevention structure disclosed in the above patent document is very complicated to construct because a plurality of complex structures of the settlement prevention structure must be installed along the water and sewer pipe, and therefore, there is a problem that the time required for the construction of the water and sewer pipe is lengthened.

따라서 상하수도관 설치용 거푸집의 설치 구조를 개선하여 상하수도관을 시공하는 시간을 단축시킬 수 있고, 부등침하와 같은 지반침하에도 매립된 상하수도관의 설치 상태가 그대로 유지될 수 있도록 하는 상하수도관 설치용 거푸집 및 그 시공방법의 개발이 요구된다.Therefore, by improving the installation structure of the water and sewage pipe installation formwork, it is possible to shorten the time to construct the water and sewage pipes, and to maintain the installation state of the buried water and sewage pipes even under ground subsidence such as differential settlement. Development of construction methods is required.

KR 20-0429447 Y1 (2006. 10. 17.)KR 20-0429447 Y1 (2006. 10. 17.) KR 10-0924701 B1 (2009. 10. 27.)KR 10-0924701 B1 (2009. 10. 27.) KR 10-1954105 B1 (2019. 02. 26.)KR 10-1954105 B1 (2019.02.26.) KR 10-0588189 B1 (2006. 06. 01.)KR 10-0588189 B1 (2006. 06. 01.)

본 발명은 상기와 같은 종래의 상하수도관 설치용 거푸집이 가지는 문제점을 해결하기 위해 안출된 것으로, 본 발명이 해결하고자 하는 과제는 상하수도관을 설치하기 위한 거푸집을 콘크리트 타설후 따로 탈거할 필요가 없어 시공이 간편하고, 콘크리트재 거푸집을 사용하여 목적 구조물에 일체화함으로써 사용되는 자원을 절약할 수 있으며, 이를 통해 하수도관의 지중 매립시공을 신속하게 할 수 있는 상하수도관 설치용 콘크리트재 거푸집 및 이를 이용한 상하수도관 시공방법을 제공하는 것이다.The present invention was conceived to solve the problem of the conventional water and sewage pipe installation formwork as described above, and the problem to be solved by the present invention is that there is no need to separate the formwork for installing water and sewage pipes after placing concrete. It is simple, and it is possible to save resources by integrating it into the target structure by using a concrete formwork, and through this, a concrete formwork for installing water and sewage pipes that can quickly perform underground reclamation construction of sewer pipes, and a water and sewage pipe construction method using the same Is to provide.

상기의 과제를 해결하기 위한 본 발명에 따른 상하수도관 설치용 콘크리트재 거푸집은, 수평으로 소정 폭과 길이를 가지는 바닥부; 일단이 상기 바닥부의 양측면에 연결되면서 수직으로 소정 높이를 가지도록 형성되는 한 쌍의 측면부; 상기 바닥부의 상면 가운데 부분을 따라 소정 간격을 두고 설치되는 복수 개의 높이조절구; 및 상기 한 쌍의 측면부의 마주보는 일측면에 소정 길이 돌출되도록 각각 설치되는 관부상방지구를 포함하는 것을 특징으로 한다.The concrete formwork for installing water and sewage pipes according to the present invention for solving the above problems comprises: a floor having a predetermined width and length horizontally; A pair of side portions having one end connected to both side surfaces of the bottom portion and formed to have a predetermined height vertically; A plurality of height adjusters installed at predetermined intervals along the center of the upper surface of the bottom portion; And it characterized in that it comprises a tube injury prevention device each installed so as to protrude a predetermined length on one side facing the side portion of the pair.

그리고 본 발명의 상기 바닥부에는 내측면에 나사산이 형성되는 소켓이 소정 간격을 두고 복수 개 설치되고, 상기 높이조절구는, 상기 소켓에 나사 결합되면서 상하로 소정 길이를 가지는 나사결합부; 및 상기 나사결합부의 상단에 설치되면서 단면 모양이 소정 지름을 가지는 호 형상으로 형성되는 소정 폭의 안착판을 포함하는 것을 또 다른 특징으로 한다.In addition, a plurality of sockets having threads formed on an inner surface of the bottom portion of the present invention are installed at predetermined intervals, and the height adjustment mechanism includes a screw coupling portion having a predetermined length vertically while being screwed to the socket; And a mounting plate having a predetermined width while being installed on an upper end of the screw coupling portion and having an arc shape having a predetermined diameter in cross-sectional shape.

또한, 본 발명은 상기 관부상방지구가 "ㄱ"자 및 역"ㄱ"자 모양의 고정쇠인 것을 또 다른 특징으로 한다.In addition, the present invention is another feature in that the pipe injuries prevention device is a "a"-shaped and reversed "a"-shaped fixture.

이에 더해 본 발명에 따른 상하수도관 설치용 콘크리트재 거푸집을 이용한 상하수도관 시공방법은, 상하수도관이 설치되도록 소정 깊이로 땅을 굴착하는 굴착 단계; 굴착된 땅에 미리 제작된 콘크리트재 거푸집을 길이를 따라 삽입하여 설치하는 거푸집 설치 단계; 상기 콘크리트재 거푸집의 높이조절구를 이용하여 상기 상하수도관의 기울기를 조절하는 기울기 조절 단계; 상기 기울기 조절 단계를 통해 기울기 조절된 상기 높이조절구를 따라 상기 상하수도관을 안착시키는 상하수도관 안착 단계; 상기 상하수도관 안착 단계를 통해 상기 콘크리트재 거푸집 내부에 안착된 상기 상하수도관을 관부상방지구를 통해 고정시키는 상하수도관 고정 단계; 상기 콘크리트재 거푸집과 상기 상하수도관 사이의 공간에 콘크리트를 타설하는 콘크리트 타설 단계; 상기 콘크리트 타설 단계를 통해 상기 콘크리트재 거푸집 내부에 타설된 콘크리트를 소정 기간 양생시키는 콘크리트 양생 단계; 및 상기 콘크리트 양생 단계를 통해 콘크리트가 양생된 후 굴착된 땅을 되메움하여 마무리하는 되메움 단계를 포함하는 것을 또 다른 특징으로 한다.In addition to this, a water and sewage pipe construction method using a concrete formwork for installing water and sewage pipes according to the present invention comprises: an excavation step of excavating the ground to a predetermined depth so that the water and sewage pipes are installed; Formwork installation step of inserting and installing a concrete formwork prepared in advance in the excavated ground along the length  ; A slope adjustment step of adjusting the slope of the water supply and sewer pipes using the height adjustment tool of the concrete formwork; A water and sewage pipe seating step of seating the water and sewage pipes along the height adjustment hole which is tilted through the slope adjustment step; A water and sewage pipe fixing step of fixing the water and sewage pipes seated in the concrete formwork through the water and sewage pipe seating step; Concrete placing step of placing concrete in the space between the concrete formwork and the water and sewage pipes; A concrete curing step of curing the concrete poured into the concrete formwork for a predetermined period of time through the concrete placing step; And a backfilling step of backfilling and finishing the excavated ground after the concrete is cured through the concrete curing step.

그리고 본 발명은 상기 콘크리트 양생 단계와 상기 되메움 단계 사이에 상기 콘크리트재 거푸집의 길이를 따라 덮개를 마감하는 덮개 설치 단계를 더 포함하는 것을 또 다른 특징으로 한다.In addition, the present invention further comprises a cover installation step of closing the cover along the length of the concrete formwork between the concrete curing step and the backfilling step.

본 발명에 따르면, 상하수도관을 신규로 설치하거나 또는 기존 설치된 상하수도관을 보수 시공할 때 콘크리트 타설을 위해 설치되는 콘크리트재 거푸집이 탈거되지 않고 그대로 지중에 매설되기 때문에 거푸집을 탈거하는 데에 소요되는 시간이 단축되는 장점이 있으며, 소모성 자재인 거푸집을 사용하지 않으므로 자원의 낭비와 건설 폐자재의 발생을 없애 환경오염을 방지할 수 있고, 공사비용을 절감할 수 있으며, 콘크리트재 거푸집을 목적구조물과 일체화함으로써 구조물 완성에 사용되는 자원을 절약할 수 있는 장점이 있다.According to the present invention, when a new water supply and sewage pipe is newly installed or an existing water and sewage pipe is repaired, the concrete mold installed for concrete pouring is not removed but is buried in the ground as it is, so the time it takes to remove the formwork This has the advantage of being shortened, and because it does not use a consumable material formwork, it is possible to prevent environmental pollution by eliminating waste of resources and generation of construction waste materials, reducing construction costs, and integrating concrete formwork with the target structure. By doing so, there is an advantage of saving resources used for completing the structure.

또한, 콘크리트재 거푸집이 타설되는 콘크리트와 구조적으로 강건하게 일체화되므로 상하수도관을 지지 및 보호하는 강성이 더욱 향상되는 장점이 있다.In addition, since the concrete formwork is structurally robustly integrated with the concrete to be poured, there is an advantage in that the rigidity for supporting and protecting the water and sewage pipes is further improved.

그리고 인접하여 조립되는 한 쌍의 콘크리트재 거푸집이 침하방지 결합홈과 침하방지 결합돌기에 의해 수평이 유지되도록 상호 강건하게 조립되고, 이에 의해 부등침하 등으로 인한 상하수도관의 파손이 구조적으로 방지된다.In addition, a pair of concrete formwork assembled adjacent to each other is rigidly assembled so that the level is maintained by the anti-settling coupling groove and the anti-settling coupling protrusion, thereby structurally preventing the water and sewage pipes from being damaged due to differential settlement.

이에 더해 콘크리트재 거푸집의 바닥부에 설치되는 복수 개의 높이조절구를 통해 상하수도관의 배수성능을 위한 기울기를 쉽게 맞출 수 있고, 별도의 스페이서를 사용하지 않고도 매설되는 관을 바닥으로부터 일정간격 이격시켜 유지시킬 수 있는 장점이 있다.In addition, it is possible to easily adjust the slope for drainage performance of water and sewage pipes through a plurality of height adjustment holes installed on the bottom of the concrete formwork, and keep the buried pipes at a certain interval from the floor without using a separate spacer. There is an advantage that can be made.

도 1은 본 발명에 따른 상하수도관 설치용 콘크리트재 거푸집의 예를 보인 사시도.
도 2는 도 1의 평면도.
도 3은 도 1의 측면도.
도 4는 본 발명에 따른 높이조절구의 예를 보인 도면.
도 5는 본 발명에 따른 높이조절구의 다른 실시예를 보인 도면.
도 6은 본 발명에 따른 관부상방지구의 예를 보인 사시도.
도 7은 본 발명에 따른 상하수도관 설치용 콘크리트재 거푸집을 이용한 상하수도관 시공방법의 예를 보인 공정 순서도.
도 8은 본 발명에 따른 거푸집 설치 단계의 예를 보인 도면.
도 9는 본 발명에 따른 거푸집이 조립되는 예를 보인 도면.
도 10은 본 발명에 따른 상하수도관 고정 단계의 예를 보인 도면.
도 11은 본 발명에 따른 콘크리트 타설 단계의 예를 보인 도면.
도 12는 본 발명에 따른 되메움 단계의 예를 보인 도면.
도 13은 본 발명에 따른 덮개 설치 단계의 예를 보인 도면.
도 14는 도 13에 따른 되메움 단계의 예를 보인 도면.
1 is a perspective view showing an example of a concrete formwork for installing water and sewage pipes according to the present invention.
Figure 2 is a plan view of Figure 1;
Figure 3 is a side view of Figure 1;
Figure 4 is a view showing an example of the height adjustment device according to the present invention.
Figure 5 is a view showing another embodiment of the height adjustment device according to the present invention.
Figure 6 is a perspective view showing an example of a tube injury prevention device according to the present invention.
7 is a process flow chart showing an example of a water and sewage pipe construction method using a concrete formwork for water and sewage pipe installation according to the present invention.
8 is a view showing an example of a formwork installation step according to the present invention.
9 is a view showing an example in which the formwork according to the present invention is assembled.
10 is a view showing an example of a step of fixing a water and sewage pipe according to the present invention.
11 is a view showing an example of a concrete pouring step according to the present invention.
12 is a view showing an example of a backfill step according to the present invention.
13 is a view showing an example of the cover installation step according to the present invention.
14 is a view showing an example of the backfill step according to FIG. 13;

이하에서는 본 발명의 바람직한 실시예를 도시한 첨부도면에 따라 상세하게 설명한다.Hereinafter, a preferred embodiment of the present invention will be described in detail according to the accompanying drawings.

본 발명은 상하수도관을 설치하기 위한 거푸집을 콘크리트 타설후 따로 탈거할 필요가 없어 시공이 간편하고, 이를 통해 하수도관의 지중 매립시공을 신속하게 할 수 있는 상하수도관 설치용 콘크리트재 거푸집 및 이를 이용한 상하수도관 시공방법을 제공하고자 하는 것으로, 이러한 본 발명의 상하수도관 설치용 콘크리트재 거푸집은 도 1 및 도 2에 도시된 바와 같이 바닥부(10), 측면부(20A, 20B), 높이조절구(30) 및 관부상방지구(40)를 포함한다.According to the present invention, the formwork for installing the water supply and sewage pipes does not need to be removed separately after pouring concrete, so the construction is simple, and through this, the concrete formwork for installing the water supply and sewage pipes that can quickly perform the underground reclamation construction of the sewer pipes and water and sewage pipes using the same In order to provide a construction method, the concrete formwork for installing water and sewage pipes of the present invention is a floor part 10, a side part (20A, 20B), a height adjuster 30 and a pipe part as shown in FIGS. 1 and 2 It includes an upper prevention port 40.

이하에서는 설명의 편의를 위해 도 1을 기준으로 후술되는 침하방지 결합돌기(21)가 형성되는 방향을 '전방'으로 지칭하여 설명하고, 이와 반대로 침하방지 결합홈(22)이 형성되는 방향을 '후방'으로 지칭하여 설명한다.Hereinafter, for convenience of explanation, the direction in which the anti-settling coupling protrusion 21, which will be described later on the basis of FIG. 1, is formed is referred to as'front', and the direction in which the anti-settling coupling groove 22 is formed is referred to as' It will be described by referring to'rear'.

바닥부(10)는 소정 깊이로 굴착된 땅 바닥에 대략 수평이 되도록 설치되어 상하수도관(1)의 저면 쪽을 커버하는 구성으로, 이러한 바닥부(10)는 도 1 및 도 2에 도시된 바와 같이 수평으로 소정 폭과 길이를 가지는 사각 또는 직사각형 모양의 콘크리트 블록으로 이루어진다.The bottom part 10 is installed to be approximately horizontally on the ground excavated to a predetermined depth to cover the bottom side of the water and sewage pipe 1, and the bottom part 10 is as shown in FIGS. 1 and 2 Likewise, it is made of a square or rectangular concrete block having a predetermined width and length horizontally.

그리고 상기 바닥부(10)에는 내측면에 나사산이 형성되면서 상하로 소정 길이를 가지는 소켓(11)이 설치되는데, 이러한 소켓(11)을 통해 후술되는 높이조절구(30)가 나사 결합되어 높이가 조절되게 된다.In addition, a socket 11 having a predetermined length vertically while a thread is formed on the inner surface of the bottom 10 is installed, and a height adjustment tool 30 to be described later is screwed through the socket 11 to increase the height. Will be adjusted.

측면부(20A, 20B)는 소정 깊이로 굴착된 땅바닥에 수직이 되도록 설치되어 상하수도관(1)의 양측면을 커버하는 구성으로, 이러한 측면부(20A, 20B)의 길이(L)는 도 1 내지 도 3에 도시된 바와 같이 바닥부(10)에 대응되는 길이를 가지도록 형성되고, 측면부(20A, 20B)의 상하 높이(H)는 상하수도관(1)의 지름(D) 대비 1.5~3배가 되도록 형성된다. 이때 높이(H)의 기준이 되는 상하수도관(1)의 지름(D)은 상하수도관 규격 중 최소 지름과 최대 지름 사이의 중간 지름을 기준으로 하고, 이를 통해 콘크리트재 거푸집(2)을 통해 최소 지름 및 최대 지름 사이의 다양한 지름을 가지는 상하수도관(1)이 수용될 수 있도록 한다.The side parts 20A and 20B are installed to be perpendicular to the ground excavated to a predetermined depth to cover both sides of the water and sewage pipe 1, and the length L of the side parts 20A and 20B is shown in FIGS. 1 to 3 As shown in, it is formed to have a length corresponding to the bottom part 10, and the vertical height (H) of the side parts (20A, 20B) is formed to be 1.5 to 3 times the diameter (D) of the water and sewage pipe (1). do. At this time, the diameter (D) of the water and sewage pipe (1), which is the standard of the height (H), is based on the intermediate diameter between the minimum and maximum diameters of the water and sewage pipe standards, through which the minimum diameter through the concrete formwork (2). And it allows water and sewage pipes 1 having various diameters between the maximum diameters to be accommodated.

여기서 상기 측면부(20A, 20B)의 상하 높이(H)가 상하수도관(1)의 지름(D) 대비 1.5배 미만이면, 후술되는 높이조절구(30)를 통해 콘크리트재 커푸집(2) 내부에 안착되는 상하수도관(1)의 상면에 타설되는 콘크리트의 커버 두께가 얇게 되어 외부 충격 등으로 인해 하부의 상하수도관(1)이 파손될 우려가 있고, 또한 다양한 지름의 상하수도관(1)을 수용하지 못하기 때문에 상하수도관(1)의 지름(D)에 따라 콘크리트재 거푸집(2)을 따로 제작해야 하므로 바람직하지 못하다.Here, if the vertical height (H) of the side parts (20A, 20B) is less than 1.5 times the diameter (D) of the water and sewer pipe (1), the inside of the concrete cover (2) through the height adjustment device (30) described later There is a risk of damage to the water and sewage pipes (1) in the lower part due to external impact due to the thin cover of the concrete placed on the upper surface of the water and sewage pipes (1) to be seated, and also cannot accommodate the water and sewage pipes (1) of various diameters. Therefore, it is not preferable because the concrete formwork (2) must be separately manufactured according to the diameter (D) of the water and sewage pipe (1).

이와 반대로 상기 측면부(20A, 20B)의 상하 높이(H)가 상하수도관(1)의 지름(D)을 3배 초과하여 형성되는 경우에는, 콘크리트재 거푸집(2)의 전체 크기가 커지기 때문에 운반 및 설치가 상대적으로 어렵고, 또한 매설을 위해 굴착되는 깊이가 더욱 깊어지기 때문에 시공시간이 길어지게 되어 바람직하지 못하다.Conversely, when the vertical height (H) of the side parts (20A, 20B) exceeds the diameter (D) of the water and sewage pipe (1) by 3 times, the overall size of the concrete formwork (2) is increased, and thus transport and Installation is relatively difficult, and since the depth of excavation for burial becomes deeper, the construction time becomes longer, which is undesirable.

한편, 측면부(20A, 20B)의 전방 쪽에는 도 1 및 도 2에 도시된 바와 같이 소정 크기의 침하방지 결합돌기(21)가 돌출 형성되고, 후방 쪽에는 상기 침하방지 결합돌기(21)에 대응되는 크기의 침하방지 결합홈(22)이 형성된다.On the other hand, the front side of the side portions (20A, 20B), as shown in Figs. 1 and 2, a predetermined size of the anti-settling coupling protrusion 21 is formed to protrude, and the rear side corresponds to the anti-settling coupling protrusion 21 The anti-settling coupling groove 22 of the size is formed.

상기와 같은 침하방지 결합돌기(21)와 침하방지 결합홈(22)을 통해 복수 개의 콘크리트재 거푸집(2)이 수평으로 연결되도록 조립될 때, 침하방지 결합홈(22)에 침하방지 결합돌기(21)가 끼워지게 되면서 자연스럽게 인접하여 설치되는 콘크리트재 거푸집(2)의 수평이 맞춰지게 되고, 이와 동시에 부등침하와 같이 지면이 불규칙적으로 침하되더라도 콘크리트재 거푸집(2)이 서로 연결된 상태가 그대로 유지될 수 있게 된다.When assembling a plurality of concrete formwork (2) to be horizontally connected through the anti-settling coupling protrusion 21 and the anti-settling coupling groove 22 as described above, the anti-settling coupling protrusion in the anti-settling coupling groove 22 ( As 21) is inserted, the level of the concrete formwork (2), which is naturally adjacent to each other, is aligned, and at the same time, the concrete formwork (2) is connected to each other even if the ground is irregularly settled, such as differential settlement. You will be able to.

높이조절구(30)는 바닥부(10)에 설치되는 소켓(11)에 나사 결합되어 상하수도관(1)의 기울기를 조절하고, 이와 동시에 바닥부(10)와 상하수도관(1) 사이에 일정 공간을 확보하는 스페이서의 기능을 하는 구성이다.The height adjuster 30 is screwed to the socket 11 installed on the floor 10 to adjust the slope of the water and sewage pipe 1, and at the same time, a constant between the floor 10 and the water and sewage pipe 1 It is a configuration that functions as a spacer to secure space.

이러한 높이조절구(30)는 도 4에 도시된 바와 같이 상하로 소정 길이를 가지면서 외측면을 따라 나사산이 형성되는 나사결합부(31)와, 상기 나사결합부(31)의 상단에 설치되는 소정 폭의 안착판(32)으로 이루어진다.This height adjustment device 30 has a predetermined length up and down as shown in Figure 4, while having a screw thread is formed along the outer surface 31, which is installed on the upper end of the screw coupling part 31 It consists of a mounting plate 32 of a predetermined width.

이때 안착판(32)은 양단 부분이 가운데 부분에 비해 상대적으로 위쪽에 위치되도록 소정 지름을 가지는 호 형상으로 형성되고, 이를 통해 상하수도관(1)이 상기 안착판(32)에 안착된 다음 양측 방향으로 쉽게 위치 이탈되지 않도록 한다.At this time, the seating plate 32 is formed in an arc shape having a predetermined diameter so that both ends are positioned relatively higher than the center portion, through which the water and sewage pipes 1 are seated on the seating plate 32 and then in both directions So that it is not easily displaced.

이러한 높이조절구(30)를 통해 상하수도관(1)의 기울기를 조절할 때에는, 상하수도관(1)을 안착시키기에 앞서 인접하여 위치되는 2개 이상의 높이조절구(30)의 안착판(32)에 소정 길이를 가지는 각목이나 금속 프레임을 안착시켜 기울기를 사전에 조절하고, 이후 상하수도관(1)을 높이조절구(30)의 안착판(32)에 안착시키는 것으로 상하수도관(1)의 기울기를 쉽게 맞출 수 있게 된다.When adjusting the inclination of the water and sewage pipes (1) through the height adjustment device 30, the seating plate 32 of two or more height adjustment devices 30 located adjacent to each other prior to seating the water and sewage pipes (1) The slope of the water supply and sewer pipes 1 is easily adjusted by seating a wooden or metal frame having a predetermined length to adjust the inclination in advance, and then by placing the water and sewage pipes 1 on the seating plate 32 of the height adjustment port 30. You will be able to fit.

한편, 위에서는 나사결합부(31)의 상단에 안착판(32)이 일체로 고정되어 형성되는 것으로 도시되고 설명되었으나, 이와 달리 도 5에 도시된 바와 같이 안착판(32)의 가운데 부분에는 상하로 관통되는 소정 지름의 구멍(도면부호 없음)이 형성되고, 이러한 구멍의 상부 둘레에는 상기 구멍보다 상대적으로 지름이 큰 삽입홈(32A)이 형성되며, 상단 부분이 상기 삽입홈(32A)에 걸림 고정되면서 하단이 구멍을 하향 관통하여 나사결합부(31)의 상단 부분에 나사 조립되는 소정 길이의 체결부재(31A)가 조립되도록 구성될 수 있다.On the other hand, in the above, the mounting plate 32 is shown and described as being integrally fixed to the upper end of the screw coupling part 31, but unlike this, as shown in FIG. 5, the center portion of the mounting plate 32 A hole of a predetermined diameter (no drawing symbol) is formed through the hole, and an insertion groove 32A having a diameter larger than that of the hole is formed around the upper circumference of the hole, and the upper part is caught in the insertion groove 32A. While being fixed, the lower end may be configured to pass downward through the hole so that the fastening member 31A of a predetermined length screwed to the upper end of the screwing portion 31 is assembled.

상기와 같은 구성을 통해 나사결합부(31)를 적절하게 회전시켜 높이를 조절하더라도 안착판(32)이 나사결합부(31)와 별개로 회전되게 되면서 상하수도관(1)의 외측면에 맞추어 호 형상의 굴곡면이 위치되도록 쉽게 조절될 수 있게 된다.Even if the height is adjusted by appropriately rotating the screw coupling part 31 through the above configuration, the seating plate 32 is rotated separately from the screw coupling part 31 to fit the outer surface of the water and sewage pipe (1). It can be easily adjusted so that the curved surface of the shape is positioned.

이때 나사결합부(31)를 회전시키기 위한 렌치 등의 공구를 사용할 수 있도록 나사결합부(31)의 상부 또는 가운데 부분에는 사각 또는 육각 모양의 돌출부가 형성된다.At this time, a square or hexagonal protrusion is formed in the upper or middle portion of the screw coupling part 31 so that a tool such as a wrench for rotating the screw coupling part 31 can be used.

여기서 돌출부의 아래쪽에는 상대적으로 지름이 큰 지지판이 구비되고, 이러한 지지판을 통해 렌치 등의 공구를 돌출부에 끼워 나사결합부(31)를 회전시킬 때, 렌치가 지지판에 의해 지지된 상태로 회전되도록 하여 렌치가 돌출부로부터 하향 이탈되는 것이 방지되도록 한다.Here, a support plate having a relatively large diameter is provided below the protrusion, and when rotating the screw coupling part 31 by inserting a tool such as a wrench into the protrusion through this support plate, the wrench is rotated in a state supported by the support plate. Ensure that the wrench is prevented from falling downward from the protrusion.

관부상방지구(40)는 높이조절구(30)에 안착되는 상하수도관(1)이 바닥부(10)와 한 쌍의 측면부(20A, 20B) 사이의 공간으로 타설되는 콘크리트에 의해 부상(浮上)되는 것이 방지되도록 상하수도관(1)을 고정시키는 구성이다.The pipe injury prevention device 40 is floated by the concrete poured into the space between the floor part 10 and the pair of side parts 20A, 20B in which the water and sewage pipes 1 seated in the height adjustment device 30 are placed. It is a configuration to fix the water and sewage pipes (1) so as to be prevented.

이러한 관부상방지구(40)는 도 6에 도시된 바와 같이 "ㄱ"자 및 역"ㄱ"자 모양의 고정쇠(41)와, 상기 고정쇠(41)의 일단에 일체로 형성되면서 수평 방향 또는 수직 방향으로 소정 길이를 가지는 걸림쇠(42)를 포함한다.Such a tube injury prevention device 40 is formed integrally with the “a” and inverted “a” shaped fasteners 41 and one end of the fasteners 41 as shown in FIG. 6 in a horizontal or vertical direction It includes a catch 42 having a predetermined length.

그리고 고정쇠(41)는 한 쌍의 측면부(20A, 20B) 중 서로 마주보는 일측면에 소정 길이 돌출되도록 설치되고, 걸림쇠(42)는 한 쌍의 측면부(20A, 20B)가 성형될 때 내부에 삽입되도록 하여 관부상방지구(40)가 외력에도 쉽게 이탈되지 않도록 한다.And the bracket 41 is installed so as to protrude a predetermined length on one side of the pair of side portions (20A, 20B) facing each other, and the bracket 42 is inserted into the inside when the pair of side portions (20A, 20B) are molded. So that the tube injury prevention device 40 is not easily separated by external force.

상기와 같은 구성을 통해 양측의 고정쇠(41)를 연결하도록 고정와이어(43)가 설치되는 것으로, 그 사이에 위치되는 상하수도관(1)의 상면이 고정와이어(43)를 통해 지지되게 되면서 상하수도관(1)의 부상이 방지되게 된다.Through the configuration as described above, the fixing wire 43 is installed to connect the fixing brackets 41 on both sides, and the upper surface of the water and sewage pipe 1 positioned therebetween is supported through the fixing wire 43 (1) injuries are prevented.

한편, 바닥부(10)와 한 쌍의 측면부(20A, 20B)의 일단(전방 쪽)에는 가운데 부분을 따라 소정 폭과 두께의 끼움돌기(B)가 돌출 형성되고, 타단(후방 쪽)에는 끼움돌기(B)에 대응되는 소정 폭과 두께의 끼움홈(S)이 형성되며, 이러한 끼움돌기(B)와 끼움홈(S)을 통해 인접하여 설치되는 콘크리트재 거푸집(2)이 서로 소정 폭 중첩된 상태로 조립되게 되면서 콘크리트재 거푸집(2)의 내부에 타설되는 콘크리트가 외부로 누출되지 않게 된다.On the other hand, a fitting protrusion (B) of a predetermined width and thickness is protruded along the middle part at one end (front side) of the bottom part 10 and the pair of side parts 20A, 20B, and the other end (rear side) is fitted. A fitting groove (S) of a predetermined width and thickness corresponding to the protrusion (B) is formed, and the concrete formwork (2) installed adjacent through the fitting protrusion (B) and the fitting groove (S) overlaps each other by a predetermined width. As it is assembled in a state of being assembled, the concrete poured into the concrete formwork (2) does not leak to the outside.

이상과 같이 구성되는 본 발명의 상하수도관 설치용 콘크리트재 거푸집은, 도 7에 도시된 바와 같이 굴착 단계(S10), 거푸집 설치 단계(S20), 기울기 조절 단계(S30), 상하수도관 안착 단계(S40), 상하수도관 고정 단계(S50), 콘크리트 타설 단계(S60), 콘크리트 양생 단계(S70) 및 되메움 단계(S80)를 통해 시공되고, 따라서 이하에서는 위 시공 순서에 따라 설명한다.The concrete formwork for installation of water and sewage pipes of the present invention constructed as described above is an excavation step (S10), a formwork installation step (S20), a slope adjustment step (S30), and a water and sewage pipe seating step (S40) as shown in FIG. , Water and sewage pipe fixing step (S50), concrete pouring step (S60), concrete curing step (S70) and is constructed through the backfill step (S80), and therefore will be described in accordance with the above construction sequence.

(1) 굴착 단계(S10)(1) Excavation step (S10)

이 단계는 상하수도관(1)이 설치될 위치에 맞추어 굴삭기 등의 중장비를 사용하여 소정 깊이로 땅을 굴착하는 것으로, 이때 굴착되는 깊이와 폭은 시공될 콘크리트재 거푸집(2)의 규격과 상하수도관(1)의 매립 규정을 따른다.This step is to excavate the ground to a predetermined depth using heavy equipment such as an excavator according to the location where the water supply and sewage pipes (1) will be installed, and the depth and width to be excavated are the dimensions of the concrete form (2) to be constructed and the water and sewage pipes. Follow the landfill regulations in (1).

(2) 거푸집 설치 단계(S20)(2) Formwork installation step (S20)

이 단계는 굴착 단계(S10)를 통해 굴착된 땅 속에 도 8에 도시된 바와 같이 미리 제작된 콘크리트재 거푸집(2)을 삽입하는 것으로, 이때 콘크리트재 거푸집(2)은 도 9에 도시된바 바와 같이 복수 개의 콘크리트재 거푸집(2)이 수평 방향으로 연결되도록 조립되는 것만으로 일측 콘크리트재 거푸집(2)의 침하방지 결합돌기(21)가 또 다른 콘크리트재 거푸집(2)의 침하방지 결합홈(22)에 삽입되고, 이와 동시에 일측 콘크리트재 거푸집(2)의 끼움돌기(B)가 또 다른 콘크리트재 거푸집(2)의 끼움홈(S)에 삽입되면서 수평이 되도록 쉽게 조립되게 된다.This step is to insert a pre-fabricated concrete formwork 2 as shown in FIG. 8 into the ground excavated through the excavation step (S10), wherein the concrete formwork 2 is as shown in FIG. Likewise, just assembling a plurality of concrete formwork (2) to be connected in the horizontal direction, one side of the concrete formwork (2) of the anti-settling coupling protrusion (21) of another concrete formwork (2) to prevent the settling coupling groove (22) ), and at the same time, the fitting protrusion (B) of one concrete formwork (2) is inserted into the fitting groove (S) of another concrete formwork (2) and is easily assembled to be horizontal.

(3) 기울기 조절 단계(S30)(3) Tilt adjustment step (S30)

이 단계는 복수 개의 콘크리트재 거푸집(2)이 굴착된 땅속에 수평으로 설치되고 나면, 바닥부(10)에 설치되는 복수 개의 높이조절구(30)의 높이를 조절하여 상하수도관(1)이 설치될 기울기를 조절하는 것이다.In this step, after the plurality of concrete formwork (2) is installed horizontally in the excavated ground, the water and sewage pipes (1) are installed by adjusting the height of the plurality of height adjustment devices (30) installed on the floor (10). It is to adjust the slope to be made.

이러한 기울기 조절 단계(S30)에서는 소정 길이를 가지는 각목 또는 금속 프레임을 2개 이상의 안착판(32) 위에 올려놓은 다음, 나사결합부(31)를 적절하게 회전시키는 것으로 높이가 조절되게 된다.In this tilt adjustment step (S30), the height is adjusted by placing a timber or metal frame having a predetermined length on two or more seating plates 32 and then appropriately rotating the screw coupling portion 31.

이때 각목 또는 금속 프레임을 사용하는 대신, 소정 길이를 가지는 끈이 사용될 수 있고, 이 경우에는 2개 이상의 높이조절구(30)에 끈이 팽팽하게 연결된 다음 나사결합부(31)의 높이가 조절되어 기울기가 조절되게 된다.At this time, instead of using a timber or metal frame, a string having a predetermined length may be used, and in this case, the string is tightly connected to two or more height adjustment devices 30 and then the height of the screw connection portion 31 is adjusted. The tilt is adjusted.

(4) 상하수도관 안착 단계(S40)(4) Water and sewage pipe installation step (S40)

이 단계는 상기 기울기 조절 단계(S30)를 통해 높이조절구(30)의 높이가 조절되고 나면, 상기 높이조절구(30)를 따라 상하수도관(1)을 안착시키는 단계이다.In this step, after the height of the height adjustment unit 30 is adjusted through the slope adjustment step (S30), the water and sewage pipes 1 are seated along the height adjustment unit 30.

(5) 상하수도관 고정 단계(S50)(5) Water and sewage pipe fixing step (S50)

이 단계는 상기 상하수도관 안착 단계(S40)를 통해 콘크리트재 거푸집(2) 내부에 상하수도관(1)이 설치되고 나면, 도 10에 도시된 바와 같이 한 쌍의 측면부(20A, 20B)에 설치되는 관부상방지구(40)에 고정와이어(43)를 연결하여 상하수도관(1)이 콘크리트에 의해 부상되지 않도록 고정하는 단계이다.In this step, after the water and sewage pipes 1 are installed in the concrete formwork 2 through the water and sewage pipes seating step (S40), as shown in FIG. 10, it is installed on a pair of side parts 20A and 20B. This is a step of fixing the water and sewage pipes (1) so that they are not injured by concrete by connecting the fixing wires 43 to the pipe injury prevention holes 40.

(6) 콘크리트 타설 단계(S60)(6) Concrete pouring step (S60)

이 단계는 상기 상하수도관 고정 단계(S50)를 통해 상하수도관(1)이 고정와이어(43)를 통해 고정되고 나면, 도 11에 도시된 바와 같이 콘크리트재 거푸집(2)과 상기 상하수도관(1) 사이의 내부 공간에 콘크리트를 타설하는 것으로, 이때 콘크리트는 측면부(20A, 20B)의 상단 높이에 맞추어 타설되거나 또는 측면부(20A, 20B)의 상단 보다 10~20㎝정도 높이가 낮게 타설되게 된다.In this step, after the water and sewage pipes 1 are fixed through the fixing wire 43 through the water and sewage pipe fixing step (S50), as shown in FIG. 11, the concrete formwork 2 and the water and sewage pipes 1 Concrete is to be poured into the inner space between, and at this time, the concrete is poured according to the height of the top of the side portions 20A, 20B, or about 10 to 20 cm lower than the top of the side portions 20A, 20B.

(7) 콘크리트 양생 단계(S70)(7) Concrete curing step (S70)

이 단계는 상기 콘크리트 타설 단계(S60)를 통해 콘크리트재 거푸집(2) 내부에 콘크리트가 타설되고 나면, 소정 기간 동안 콘크리트를 충분히 양생시키는 단계이다.This step is a step of sufficiently curing the concrete for a predetermined period after the concrete is poured into the concrete formwork 2 through the concrete placing step (S60).

(8) 되메움 단계(S80)(8) Backfill step (S80)

이 단계는 상기 콘크리트 양생 단계(S70)를 통해 타설된 콘크리트가 충분히 양생되고 나면, 도 12에 도시된 바와 같이 콘크리트재 거푸집(2) 위로 흙을 덮어 굴착된 땅을 평평하게 되메움하는 것으로, 이렇게 굴착된 땅이 전체적으로 되메움되고 나면 상하수도관 설치 공사가 완료되게 된다.In this step, after the concrete poured through the concrete curing step (S70) is sufficiently cured, as shown in FIG. 12, the soil is covered over the concrete formwork (2) and the excavated ground is flatly backfilled. After the excavated land is completely backfilled, the water and sewage pipe installation work is completed.

한편, 위에서는 콘크리트 양생 단계(S70)를 통해 타설된 콘크리트가 충분히 양생된 다음, 되메움 단계(S80)가 진행되는 것으로 도시되고 설명되었으나, 이와 달리 콘크리트 양생 단계(S70)를 통해 콘크리트가 충분히 양생되지 않은 상태라 하더라도 도 13에 도시된 바와 같이 콘크리트재 거푸집(2) 위에 소정 크기의 덮개(50)를 덮은 다음, 도 14에 도시된 바와 같이 되메움 단계(S80)가 곧바로 진행될 수 있도록 콘크리트 양생 단계(S70)와 되메움 단계(S80) 사이에 덮개 설치 단계(S75)가 더 포함될 수 있다.On the other hand, in the above, it has been shown and described that the concrete poured through the concrete curing step (S70) is sufficiently cured, and then the backfilling step (S80) is in progress, but unlike this, the concrete is sufficiently cured through the concrete curing step (S70). Even if it is not in a state, as shown in FIG. 13, after covering the cover 50 of a predetermined size on the concrete formwork 2, as shown in FIG. 14, curing the concrete so that the backfilling step (S80) can proceed immediately. A cover installation step (S75) may be further included between the step (S70) and the backfill step (S80).

이때 덮개(50)는 콘크리트재로 이루어지면서 공장에서 콘크리트재 거푸집(2)의 크기에 맞추어 미리 제작되고, 이러한 덮개(50)는 한 쌍의 측면부(20A, 20B)에 의해 지지되는 소정 폭의 지지부(51)와, 상기 지지부(51) 사이에 소정 두께로 하향 돌출되어 한 쌍의 측면부(20A, 20B) 사이에 삽입되는 걸림부(52)를 포함한다.At this time, the cover 50 is made of concrete and is manufactured in advance according to the size of the concrete formwork 2 in the factory, and this cover 50 is a support part of a predetermined width supported by a pair of side parts 20A, 20B 51 and a locking portion 52 protruding downward to a predetermined thickness between the support portions 51 and inserted between the pair of side portions 20A and 20B.

이상 설명한 바와 같이 본 발명은 상하수도관을 신규로 설치하거나 또는 기존 설치된 상하수도관을 보수 시공할 때 콘크리트 타설을 위해 설치되는 콘크리트재 거푸집이 탈거되지 않고 그대로 지중에 매설되기 때문에 거푸집을 탈거하는 데에 소요되는 시간이 단축되고, 또한 인접하여 조립되는 한 쌍의 콘크리트재 거푸집이 침하방지 결합홈과 침하방지 결합돌기에 의해 수평이 유지되도록 상호 강건하게 조립되므로 부등침하 등으로 인한 상하수도관의 파손이 구조적으로 방지된다.As described above, the present invention is required to remove the formwork because the concrete formwork installed for concrete pouring is not removed when installing a new water supply and sewage pipe or repairing an existing water supply and sewage pipe. It shortens the time required and the pair of concrete molds that are assembled adjacent to each other are rigidly assembled so that the level is maintained by the anti-settling coupling groove and the anti-settling coupling protrusion, so that damage to the water and sewage pipes due to differential settlement is structurally prevented. Is prevented.

위에서는 설명의 편의를 위해 바람직한 실시예를 도시한 도면과 도면에 나타난 구성에 도면부호와 명칭을 부여하여 설명하였으나, 이는 본 발명에 따른 하나의 실시예로서 도면상에 나타난 형상과 부여된 명칭에 국한되어 그 권리범위가 해석되어서는 안 될 것이며, 발명의 설명으로부터 예측 가능한 다양한 형상으로의 변경과 동일한 작용을 하는 구성으로의 단순 치환은 통상의 기술자가 용이하게 실시하기 위해 변경 가능한 범위 내에 있음은 지극히 자명하다고 볼 것이다.In the above, for the convenience of explanation, the drawings showing the preferred embodiments and the configurations shown in the drawings have been described with reference numerals and names, but this is an embodiment according to the present invention and is It is limited and the scope of the rights should not be interpreted, and the simple substitution with a configuration that has the same effect as a change to a variety of predictable shapes from the description of the invention is within the range that can be changed for easy implementation by a skilled person. You will see it extremely self-evident.

1: 상하수도관 2: 콘크리트재 거푸집
10: 바닥부 11: 소켓
20A, 20B: 측면부 21: 침하방지 결합돌기
22: 침하방지 결합홈 30: 높이조절구
31: 나사결합부 31A: 체결부재
32: 안착판 32A: 삽입홈
40: 관부상방지구 41: 고정쇠
42: 걸림쇠 43: 고정와이어
50: 덮개 51: 지지부
52: 걸림부 B: 끼움돌기
D: 상하수도관의 지름 H: 측면부의 높이
L: 측면부의 길이 S: 끼움홈
1: Water and sewage pipes 2: Concrete formwork
10: bottom part 11: socket
20A, 20B: side part 21: anti-settling coupling protrusion
22: sinking prevention coupling groove 30: height adjustment
31: screw coupling portion 31A: fastening member
32: mounting plate 32A: insertion groove
40: pipe injury prevention port 41: fixture
42: brace 43: fixing wire
50: cover 51: support
52: locking part B: fitting projection
D: Diameter of water and sewer pipes H: Height of side part
L: Length of side part S: Fitting groove

Claims (5)

수평으로 소정 폭과 길이를 가지는 바닥부(10);
일단이 상기 바닥부(10)의 양측면에 연결되면서 수직으로 소정 높이를 가지도록 형성되는 한 쌍의 측면부(20A, 20B);
상기 바닥부(10)의 상면 가운데 부분을 따라 소정 간격을 두고 설치되는 복수 개의 높이조절구(30); 및
상기 한 쌍의 측면부(20A, 20B)의 마주보는 일측면에 소정 길이 돌출되도록 각각 설치되는 관부상방지구(40);
를 포함하고,
상기 바닥부(10)에는,
내측면에 나사산이 형성되는 소켓(11)이 소정 간격을 두고 복수 개 설치되고,
상기 높이조절구(30)는,
상기 소켓(11)에 나사 결합되면서 상하로 소정 길이를 가지는 나사결합부(31); 및
상기 나사결합부(31)의 상단에 설치되면서 단면 모양이 소정 지름을 가지는 호 형상으로 형성되는 소정 폭의 안착판(32);
을 포함하며,
상기 안착판(32)에는,
가운데 부분이 상하로 관통되는 소정 지름의 구멍이 형성되고, 상기 구멍의 상부 둘레에는 상기 구멍보다 상대적으로 지름이 큰 삽입홈(32A)이 형성되며, 상단 부분이 상기 삽입홈(32A)에 걸림 고정되면서 하단이 상기 구멍을 하향 관통하여 상기 나사결합부(31)에 나사 조립되는 소정 길이의 체결부재(31A)가 구비되고,
상기 나사결합부(31)의 상부 또는 가운데 부분에는,
사각 또는 육각 모양의 돌출부가 형성되고,
상기 돌출부의 아래쪽에는,
상대적으로 지름이 큰 지지판이 구비되며,
상기 바닥부(10)와 한 쌍의 측면부(20A, 20B)의 일단에는,
가운데 부분을 따라 소정 폭과 두께의 끼움돌기(B)가 돌출 형성되고,
상기 바닥부(10)와 한 쌍의 측면부(20A, 20B)의 타단에는,
상기 끼움돌기(B)에 대응되는 소정 폭과 두께의 끼움홈(S)이 형성되며,
상기 끼움돌기(B)와 상기 끼움홈(S)을 통해 내부에 타설되는 콘크리트가 외부로 누출되지 않도록 구성되는 것을 특징으로 하는 상하수도관 설치용 콘크리트재 거푸집.
A bottom portion 10 having a predetermined width and length horizontally;
A pair of side portions 20A and 20B having one end connected to both side surfaces of the bottom portion 10 and formed to have a predetermined height vertically;
A plurality of height adjusters 30 installed at predetermined intervals along the middle of the upper surface of the bottom 10; And
A pipe injury prevention device 40 which is respectively installed to protrude a predetermined length on one side facing each side of the pair of side portions 20A and 20B;
Including,
In the bottom part 10,
A plurality of sockets 11 having threads formed on the inner surface are installed at predetermined intervals,
The height adjustment device 30,
A screw coupling portion 31 having a predetermined length vertically while being screwed to the socket 11; And
A mounting plate 32 having a predetermined width while being installed on the upper end of the screw coupling portion 31 and having an arc shape having a predetermined diameter in cross section;
Including,
On the mounting plate 32,
A hole having a predetermined diameter through which the middle part is penetrated vertically is formed, an insertion groove 32A having a diameter larger than that of the hole is formed on the upper circumference of the hole, and the upper part is locked and fixed in the insertion groove 32A. While the lower end is provided with a fastening member (31A) of a predetermined length that is screwed to the screwing portion 31 by penetrating downward through the hole,
In the upper or middle portion of the screwing portion 31,
A square or hexagonal protrusion is formed,
Below the protrusion,
A support plate with a relatively large diameter is provided,
At one end of the bottom portion 10 and the pair of side portions 20A, 20B,
A fitting protrusion (B) of a predetermined width and thickness is protruded along the middle part,
At the other end of the bottom portion 10 and the pair of side portions 20A, 20B,
A fitting groove (S) having a predetermined width and thickness corresponding to the fitting protrusion (B) is formed,
Concrete formwork for installation of water and sewage pipes, characterized in that the concrete poured inside through the fitting protrusion (B) and the fitting groove (S) is configured to not leak to the outside.
삭제delete 청구항 1에 있어서,
상기 관부상방지구(40)는,
"ㄱ"자 및 역"ㄱ"자 모양의 고정쇠(41)인 것을 특징으로 하는 상하수도관 설치용 콘크리트재 거푸집.
The method according to claim 1,
The tube injury preventing device 40,
Concrete formwork for installation of water and sewage pipes, characterized in that "a" and inverse "a" shaped fasteners (41).
청구항 1에 따른 콘크리트재 거푸집을 이용한 상하수도관 시공방법에 있어서,
상하수도관(1)이 설치되도록 소정 깊이로 땅을 굴착하는 굴착 단계(S10);
굴착된 땅에 미리 제작된 콘크리트재 거푸집(2)을 길이를 따라 삽입하여 설치하는 거푸집 설치 단계(S20);
상기 콘크리트재 거푸집(2)의 높이조절구(30)를 이용하여 상기 상하수도관(1)의 기울기를 조절하는 기울기 조절 단계(S30);
상기 기울기 조절 단계(S30)를 통해 기울기 조절된 상기 높이조절구(30)를 따라 상기 상하수도관(1)을 안착시키는 상하수도관 안착 단계(S40);
상기 상하수도관 안착 단계(S40)를 통해 상기 콘크리트재 거푸집(2) 내부에 안착된 상기 상하수도관(1)을 관부상방지구(40)를 통해 고정시키는 상하수도관 고정 단계(S50);
상기 콘크리트재 거푸집(2)과 상기 상하수도관(1) 사이의 공간에 콘크리트를 타설하는 콘크리트 타설 단계(S60);
상기 콘크리트 타설 단계(S60)를 통해 상기 콘크리트재 거푸집(2) 내부에 타설된 콘크리트를 소정 기간 양생시키는 콘크리트 양생 단계(S70); 및
상기 콘크리트 양생 단계(S70)를 통해 콘크리트가 양생된 후 굴착된 땅을 되메움하여 마무리하는 되메움 단계(S80);
를 포함하는 것을 특징으로 하는 상하수도관 설치용 콘크리트재 거푸집을 이용한 상하수도관 시공방법.
In the water and sewage pipe construction method using the concrete formwork according to claim 1,
Excavation step (S10) of excavating the ground to a predetermined depth so that the water and sewage pipes 1 are installed;
Formwork installation step (S20) of inserting and installing a concrete formwork (2) prepared in advance into the excavated ground along the length;
A slope adjustment step (S30) of adjusting the slope of the water and sewage pipe (1) by using the height adjustment tool (30) of the concrete formwork (2);
A water and sewage pipe seating step (S40) of seating the water and sewage pipes (1) along the height adjustment port (30), which is tilt-adjusted through the slope adjustment step (S30);
A water and sewage pipe fixing step (S50) of fixing the water and sewage pipes (1) seated in the concrete formwork (2) through the water and sewage pipe seating step (S40) through a pipe injury prevention port (40);
Concrete placing step (S60) of placing concrete in the space between the concrete formwork (2) and the water and sewage pipe (1);
A concrete curing step (S70) of curing the concrete poured into the concrete formwork (2) for a predetermined period through the concrete placing step (S60); And
A backfill step (S80) of finishing by backfilling the excavated ground after the concrete is cured through the concrete curing step (S70);
Water and sewage pipe construction method using a concrete formwork for water and sewage pipe installation comprising a.
청구항 4에 있어서,
상기 콘크리트 양생 단계(S70)와 상기 되메움 단계(S80) 사이에는,
상기 콘크리트재 거푸집(2)의 길이를 따라 덮개(50)를 마감하는 덮개 설치 단계(S75)를 더 포함하는 것을 특징으로 하는 상하수도관 설치용 콘크리트재 거푸집을 이용한 상하수도관 시공방법.
The method of claim 4,
Between the concrete curing step (S70) and the backfilling step (S80),
Water and sewage pipe construction method using a concrete form for installation of water and sewage pipes, characterized in that it further comprises a cover installation step (S75) of closing the cover 50 along the length of the concrete formwork (2).
KR1020200047876A 2020-04-21 2020-04-21 Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same KR102180213B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200047876A KR102180213B1 (en) 2020-04-21 2020-04-21 Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200047876A KR102180213B1 (en) 2020-04-21 2020-04-21 Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same

Publications (1)

Publication Number Publication Date
KR102180213B1 true KR102180213B1 (en) 2020-11-18

Family

ID=73697878

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200047876A KR102180213B1 (en) 2020-04-21 2020-04-21 Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same

Country Status (1)

Country Link
KR (1) KR102180213B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102268810B1 (en) * 2021-04-06 2021-06-24 동양특수콘크리트 (주) Apparatus for pipe's protect block, and the method for building of apparatus

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100584661B1 (en) * 2005-11-26 2006-05-29 (주)정도엔지니어링 Upper water supply pipe reclaiming device
KR100588189B1 (en) 2004-10-19 2006-06-08 삼성물산 주식회사 The construction method of the joint of common duct and upper-slab
KR200429447Y1 (en) 2006-05-19 2006-10-23 강원길엔지니어링(주) A sheet mold for the pipe protective process
KR100924701B1 (en) 2006-05-30 2009-11-03 삼성엔지니어링 주식회사 Construction method for Utility-pipe conduit
KR20130004811A (en) * 2011-07-04 2013-01-14 주식회사 녹지원 Supporting means for hume pipe and forming means for waterway and the construction method
KR200484804Y1 (en) * 2017-02-16 2017-11-20 주식회사 넥스코 Protective case for water control valve
KR101954105B1 (en) 2018-08-31 2019-03-06 (주)서광건설엔지니어링 Water and sewage pipelines to prevent subsidence structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100588189B1 (en) 2004-10-19 2006-06-08 삼성물산 주식회사 The construction method of the joint of common duct and upper-slab
KR100584661B1 (en) * 2005-11-26 2006-05-29 (주)정도엔지니어링 Upper water supply pipe reclaiming device
KR200429447Y1 (en) 2006-05-19 2006-10-23 강원길엔지니어링(주) A sheet mold for the pipe protective process
KR100924701B1 (en) 2006-05-30 2009-11-03 삼성엔지니어링 주식회사 Construction method for Utility-pipe conduit
KR20130004811A (en) * 2011-07-04 2013-01-14 주식회사 녹지원 Supporting means for hume pipe and forming means for waterway and the construction method
KR200484804Y1 (en) * 2017-02-16 2017-11-20 주식회사 넥스코 Protective case for water control valve
KR101954105B1 (en) 2018-08-31 2019-03-06 (주)서광건설엔지니어링 Water and sewage pipelines to prevent subsidence structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102268810B1 (en) * 2021-04-06 2021-06-24 동양특수콘크리트 (주) Apparatus for pipe's protect block, and the method for building of apparatus

Similar Documents

Publication Publication Date Title
KR20130081971A (en) Precast concrete wall and method for constructing underground permanent wall using the precast concrete wall
KR102180213B1 (en) Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same
KR100808676B1 (en) Method of constructing for hume pipe underground
KR100672009B1 (en) Supporting structure for water supply
KR100982819B1 (en) A prefabricated drain-road
KR100676681B1 (en) Supprot apparatus of drainage
KR200407625Y1 (en) Hume pipe reinforce structure
KR100676680B1 (en) Hume pipe reinforce structure
KR101157643B1 (en) Manhole height adjustment implement and manhole construction method
KR101436119B1 (en) Holding apparatus for CFT column and the construction method of the CFT column using it
KR102021059B1 (en) Construction method of fume pipe with buried structure
KR101975862B1 (en) Drainage conduit having inclined gradient control structure
KR100751573B1 (en) Reinforcement apparatus of water pipe in weakness ground
KR200409783Y1 (en) Supprot apparatus of drainage
KR100650147B1 (en) Block construction of high voltage cable for underground
KR102221209B1 (en) apparatus for protecting gate valve capable of connecting to manhole pipes having various sizes easily
KR100487838B1 (en) Prefabricated retaining wall and it's construction method
KR100680247B1 (en) Device for adjusting the height of underground pipe and preventing it from inequablly sinking
KR20130104810A (en) Retaining wall using precast concrete panel and construction method of the same
JP6792239B2 (en) Scuttling prevention device for steel pipe piles and scuttling prevention method
KR102177466B1 (en) Valve cover mount type water control valve protecting case
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
KR101978908B1 (en) Drainage conduit having inclined gradient control structure
KR200357962Y1 (en) Prefabricated concrete retaining wall
KR20200005841A (en) Rainwater storage tank construction method using top-down method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant