KR200407625Y1 - Hume pipe reinforce structure - Google Patents
Hume pipe reinforce structure Download PDFInfo
- Publication number
- KR200407625Y1 KR200407625Y1 KR2020050031081U KR20050031081U KR200407625Y1 KR 200407625 Y1 KR200407625 Y1 KR 200407625Y1 KR 2020050031081 U KR2020050031081 U KR 2020050031081U KR 20050031081 U KR20050031081 U KR 20050031081U KR 200407625 Y1 KR200407625 Y1 KR 200407625Y1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- sewer pipe
- support rod
- screwed
- sewer
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/02—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
본 고안은 복수개의 하수도관을 길이방향으로 연결 및 매립할 때 상기 하수도관이 매립된 지반의 침하로 연결부가 파손되는 것을 방지할 수 있는 침하방지용 하수도관 설치구조에 관한 것으로서, 그 특징적인 구성은 하수도관(10)의 외측 둘레면에 감싸여지고 단부에는 한 쌍의 연장판(61)이 마련된 연결링(60)과, 상기 연장판(61)의 사이에 설치되고 중앙에는 지지봉(50)이 용접 고정되며 상면에는 암나사부(41)가 형성된 지지판(40)과, 상기 지지판(40)을 지지하도록 암나사부(41)에 나사 결합되는 지지로드(30)와, 상기 지지로드(30)의 상단부가 끼워지는 통공(21)이 형성되고 하수도관(10)의 외부에 설치되며 저면은 기초 콘트리트(70)에 접촉되는 지지틀(20)과, 상기 지지틀(20)의 상부로 노출된 지지로드(30)에 나사 결합되는 고정너트(32)를 포함하여서 된 것이다.The present invention relates to a sewage pipe installation structure for preventing settlement, which can prevent the connection part from being broken by settlement of the ground where the sewer pipe is buried when the plurality of sewer pipes are connected and embedded in the longitudinal direction, and the characteristic configuration thereof is The connection ring 60 is wrapped around the outer circumferential surface of the sewer pipe 10, and a pair of extension plates 61 are provided at an end thereof, and a support rod 50 is installed between the extension plates 61 and a center thereof. A welding plate fixed to the upper surface of the support plate 40, the female screw portion 41 is formed, a support rod 30 screwed to the female screw portion 41 to support the support plate 40, and the upper end of the support rod 30 Is formed in the through-hole 21 is installed on the outside of the sewer pipe 10 and the bottom surface is in contact with the support concrete 20, the support rod exposed to the upper portion of the support frame 20 It is to include a fixing nut 32 is screwed to the (30).
하수도관, 연결링, 지지틀, 지지로드 Sewer pipe, connecting ring, support frame, support rod
Description
도 1은 종래 방법에 의한 하수도관 설치구조를 나타낸 단면도.1 is a cross-sectional view showing a sewer pipe installation structure according to the conventional method.
도 2는 본 고안에 따른 침하방지용 하수도관 설치구조를 나타낸 분해 사시도.Figure 2 is an exploded perspective view showing a sewer pipe installation structure for preventing settlement according to the present invention.
도 3은 본 고안에 따른 침하방지용 하수도관 설치구조를 나타낸 사시도.Figure 3 is a perspective view showing a sewer pipe installation structure for preventing settlement according to the present invention.
도 4는 도 3의 A-A 선 단면도.4 is a cross-sectional view taken along the line A-A of FIG.
도 5는 본 고안의 침하방지용 하수도관의 매립상태를 나타낸 단면도.Figure 5 is a cross-sectional view showing a buried state of the sewer pipe for preventing settlement of the present invention.
< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>
10 : 하수도관 20 : 지지틀10: sewer pipe 20: support frame
21 : 통공 30 : 지지로드21: through hole 30: support rod
32 : 고정너트 40 : 지지판32: fixing nut 40: support plate
41 : 암나사부 50 : 지지봉41: female thread portion 50: support rod
51 : 지지너트 60 : 연결링51: support nut 60: connecting ring
61 : 연장판 70 : 기초 콘트리트61: extension 70: foundation concrete
71 : 고정홈71: fixing groove
본 고안은 침하방지용 하수도관 설치구조에 관한 것으로서, 더욱 상세하게는 복수개의 하수도관을 길이방향으로 연결 및 매립할 때 상기 하수도관이 매립된 지반의 침하로 연결부가 파손되는 것을 방지할 수 있는 침하방지용 하수도관 설치구조에 관한 것이다.The present invention relates to a sewer pipe installation structure for preventing settlement, and more specifically, when connecting and embedding a plurality of sewer pipes in a longitudinal direction, the sedimentation can be prevented from being damaged by the settlement of the ground where the sewer pipe is buried. It relates to a sewer pipe installation structure for prevention.
일반적으로 하수도관은 지하에 매설되어 하상수의 공급을 안내하는 용도로 사용되는데, 많은 양의 하상수를 공급할 때에는 콘크리트를 원재료하여 만들어진 콘크리트 수도관(Hume pipe)(이하 "하수도관"이라 한다)이 널리 사용되고 있으며, 이러한 하수도관은 지하에 매설되는 것이며, 원거리에 하상수를 공급하기 위해서 일정한 길이로 제작된 복수개의 하수도관을 길이방향으로 연결하고 있다.In general, sewage pipes are used underground to guide the supply of sewage. When supplying a large amount of sewage, a concrete water pipe (hereinafter referred to as "sewerage pipe") made of raw materials of concrete is used. Widely used, these sewer pipes are buried underground, and are connected in a longitudinal direction to a plurality of sewer pipes made of a constant length in order to supply the sewage water in the distance.
도 1은 종래 방법에 의한 하수도관의 연결상태를 나타낸 단면도이다.1 is a cross-sectional view showing a connection state of the sewer pipe according to the conventional method.
여기에서 참조되는 바와 같이 하수도관(1)은 일정한 길이(L)와 내경(d) 및 외경(D)을 갖도록 콘크리트로 성형되어 있되, 하수도관(1)의 일단에는 연결되는 또 다른 하수도관(1)이 끼워질 수 있도록 내부의 직경이 하수도관(1)의 외경(D)과 동일하도록 확장부(2)가 형성되어 있다.As referred to here, the sewer pipe (1) is formed of concrete to have a certain length (L), an inner diameter (d) and an outer diameter (D), but another sewer pipe connected to one end of the sewer pipe ( The
이러한 구조의 하수도관(1)을 지하에 매설할 때에는 먼저 지면을 굴삭기와 같은 장비를 이용하여 하수도관이 매설될 깊이와 폭으로 일정길이를 파내어 요입부를 형성한다.When the sewer pipe (1) having such a structure is buried underground, the ground is first excavated to a depth and width to be embedded by using equipment such as an excavator to form a recess.
이후 상기 하수도관(1)이 매설될 요입부의 토사(3) 표면을 고른 다음 토사(3)의 표면에 기초 콘트리트(4)를 타설하고 복수개의 하수도관(1)이 계속적으로 서 로 연결되게 매립한다.Thereafter, the surface of the sediment (3) of the recessed portion in which the sewer pipe (1) is to be embedded is selected, and then the foundation concrete (4) is poured on the surface of the soil (3) and the plurality of sewer pipes (1) are continuously buried together. do.
즉, 서로 마주보는 두개의 하수도관(1)중 하나의 하수도관(1)의 일단에 형성된 확장부(2)에 또 다른 하수도관(1)의 타단을 근접시킨 상태에서 상기 확장부(2)의 내부로 또 다른 하수도관(1)을 끼워 삽입한다.That is, the
이후 상기 하수도관(1)의 연결부인 확장부(2)의 외측 둘레면에 모래와 시멘트가 물에 의해 혼합되어 만들어진 몰타르(5)를 타설하고, 기초 콘크리트(4)와 하수도관(1) 사이의 공간에 지지대(6)를 설치한 후 되메우기 작업을 하고 있다.Afterwards, the mortar (5) made by mixing sand and cement by water is poured on the outer circumferential surface of the expansion part (2), which is the connection part of the sewer pipe (1), and between the base concrete (4) and the sewer pipe (1). After the support (6) is installed in the space of the backfilling work.
그러나 종래에는 하수도관(1)을 설치한 후 그 하수도관(1)과 기초 콘크리트(4)의 사이에 지지대(6)를 설치하게 되므로 상기 하수도관(1)과 기초 콘크리트(4) 사이에 틈새가 발생하였음은 물론, 지지대(6)의 상부에 하수도관(1)이 접촉되어 있으므로, 연약지반에 설치된 경우 침하가 발생되면, 하수도관(1)과 지지대(6)가 분리되어 하수도관(1)이 파손되는 등의 문제점이 있었다.However, in the related art, since the
본 고안은 상기한 문제점을 해결하기 위하여 고안한 것으로서, 그 목적은 지중에 매립되는 하수도관을 설치할 때 그 하수도관의 외측 둘레면에 연결링을 설치하고, 그 연결링을 지지하는 지지틀을 하수도관의 외측에 설치하여 침하로 인한 하수도관의 파손을 미연에 방지할 수 있는 침하방지용 하수도관 설치구조를 제공함에 있다.The present invention is devised to solve the above problems, the purpose is to install a connection ring on the outer circumferential surface of the sewer pipe when installing the sewer pipe embedded in the ground, sewage support frame for supporting the connection ring It is provided on the outside of the pipe to provide a sewer pipe installation structure for preventing settlement that can prevent the damage of the sewer pipe due to settlement in advance.
상기 목적을 달성하기 위한 본 고안의 특징적인 구성을 설명하면 다음과 같 다.Referring to the characteristic configuration of the present invention for achieving the above object is as follows.
본 고안의 침하방지용 하수도관 설치구조는 하수도관의 외측 둘레면에 감싸여지고 단부에는 한 쌍의 연장판이 마련된 연결링과, 상기 연장판의 사이에 설치되고 중앙에는 지지봉이 용접 고정 되며 상면에는 암나사부가 형성된 지지판과, 상기 지지판을 지지하도록 암나사부에 나사 결합되는 지지로드와, 상기 지지로드의 상단부가 끼워지는 통공이 형성되고 하수도관의 외부에 설치되며 저면은 기초 콘크리트에 접촉되는 지지틀과, 상기 지지틀의 상부로 노출된 지지로드에 나사 결합되는 고정너트를 포함하여서 된 것이다.Settlement prevention sewer pipe installation structure of the present invention is wrapped between the outer circumferential surface of the sewage pipe and the connecting ring is provided with a pair of extension plate at the end, installed between the extension plate and the support rod is welded fixed in the center and the female screw on the upper surface An additional support plate, a support rod screwed to the female thread portion to support the support plate, a through hole into which an upper end of the support rod is fitted, and installed on the outside of the sewer pipe, the bottom of which is in contact with the base concrete; It is to include a fixing nut screwed to the support rod exposed to the upper portion of the support frame.
이와 같은 특징을 갖는 본 고안을 상세하게 설명하면 다음과 같다.Referring to the present invention having such characteristics in detail as follows.
도 2는 본 고안에 따른 침하방지용 하수도관 설치구조를 나타낸 분해 사시도이고, 도 3은 본 고안에 따른 침하방지용 하수도관 설치구조를 나타낸 사시도이며, 도 4는 도 3의 A-A 선 단면도이고, 도 5는 본 고안의 침하방지용 하수도관의 매립상태를 나타낸 단면도이다.Figure 2 is an exploded perspective view showing a sewer pipe installation structure for preventing settlement according to the present invention, Figure 3 is a perspective view showing a sewer pipe installation structure for preventing settlement according to the present invention, Figure 4 is a cross-sectional view taken along line AA of Figure 3, Figure 5 Is a cross-sectional view showing a buried state of the sewage pipe for preventing settlement of the present invention.
여기에서 참조되는 바와 같이 확장부(11)를 갖는 하수도관(10)의 외측 둘레면에 감싸여지는 연결링(60)이 마련되어 있되, 그 연결링(60)의 단부에는 한 쌍의 연장판(61)이 형성되어 있고, 그 연장판(61)의 중앙에는 끼움공(62)이 형성되어 있다.As referred to herein, a
한편, 상기 연장판(61)의 사이는 지지판(40)이 설치되어 있되, 그 지지판(40)의 중앙에는 끼움공(62)에 삽입되는 지지봉(50)이 용접 고정되어 있고, 그 지지봉(50)의 단부에는 지지너트(51)가 나사 결합되어 있으며, 지지판(40)의 상면 중 앙에는 이후에 설명할 지지로드(30)가 결합되는 암나사부(41)가 형성되어 있다.On the other hand, the
그리고, 상기 암나사부(41)에는 양 단부에 숫나사부(31)가 형성된 지지로드(30)가 나사 결합되어 있고, 그 지지로드(30)의 상단은 지지틀(20)의 중앙에 형성된 통공(21)에 삽입되어 있으며, 상기 통공(21)의 외부로 노출된 숫나사부(31)에는 고정너트(32)가 나사 결합되어 있다.In addition, the female threaded
한편, 상기 지지틀(20)은 하수도관(10)의 양 측면 및 상부에 설치되는 안착홈(22)이 형성되도록 '??'자 형상으로 형성되어 있고, 그 지지틀(20)의 하단부는 기초 콘트리트(70)의 표면에 접촉되는 것으로서, 상기 기초 콘트리트(70)에는 지지틀(20)의 하단부가 삽입되는 고정홈(71)을 형성하는 것이 바람직하다.On the other hand, the
이와 같이 구성된 본 고안을 상세히 설명하면 다음과 같다.Referring to the present invention configured as described in detail as follows.
먼저, 하수도관(10)을 지하에 매설할 때에는 먼저 지면을 굴삭기와 같은 장비를 이용하여 하수도관(10)이 매설될 깊이와 폭으로 일정길이를 파내어 요입부를 형성한다.First, when embedding the
이후 상기 하수도관(10)이 매설될 요입부의 토사(80) 표면을 고른 다음 토사(80)의 표면에 기초 콘트리트(70)를 타설하되, 그 기초 콘트리트(70)에는 복수개의 고정홈(71)을 등간격으로 형성한다.Thereafter, the
그리고, 상기 기초 콘트리트(70)의 상면에 복수개의 하수도관(10)이 계속적으로 서로 연결되게 매립하되, 각 하수도관(10)의 외측 둘레면에는 연결링(60)을 설치하고, 그 연결링(60)의 단부에 형성된 연장판(61)의 사이에 지지판(40)을 끼우되, 상기 지지판(40)에 용접 고정된 지지봉(50)을 연장판(61)에 형성된 끼움공(62) 에 삽입시킨 후 상기 지지봉(50)이 분리되지 않도록 그 지지봉(50)의 양단부에 지지너트(51)를 결합한다.And, the plurality of
한편, 상기 지지판(40)의 상면에 형성된 암나사부(41)에는 지지로드(30)의 단부에 형성된 숫나사부(31)를 나사결합한다.On the other hand, the
이러한 상태에서 상기 하수도관(10)의 상부에 위치되게 지지틀(20)을 안착시키되, 그 지지틀(20)에 형성된 안착홈(22)의 내부에 하수도관(10)이 수용되게 설치하는 것이며, 이때 상기 지지틀(20)의 하단부는 기초 콘크리트(70)에 형성된 고정홈(71)에 끼워지도록 하는 것이다.The
이와 같이, 상기 지지틀(20)을 설치하면 그 지지틀(20)의 중앙에 형성된 통공(21)을 통하여 지지로드(30)의 상단이 노출되므로, 상기 지지로드(30)의 단부에 형성된 숫나사부(31)에 고정너트(32)를 나사 결합하면 하수도관(10)을 지지하게 되는 것이며, 이때 고정너트(32)의 결합 위치에 따라서 하수도관(10)의 고정위치가 조절되므로 상기 하수도관(10)의 수평상태를 간편하게 조절할 수 있게되는 것이다.As such, when the
상술한 바와 같이 하수도관(10)의 설치 및 연결작업이 완료된 후 하수도관(10)의 연결부인 확장부(11)의 외측 둘레면에 모래와 시멘트가 물에 의해 혼합되어 만들어진 몰타르(12)를 타설하고, 되메우기 작업을 수행하는 것이다.As described above, after the installation and connection work of the
이와 같이 본 고안은 지중에 매립되는 하수도관에 연결링을 설치하고 그 연결링에 설치된 지지로드를 지지틀의 상측에서 고정시키게 되므로 하수도관의 설치위치(수평 또는 경사각도)을 간편하게 조절할 수 있게되는 특유의 효과가 있다.As such, the present invention installs a connection ring on the sewer pipe embedded in the ground and fixes the support rod installed on the connection ring at the upper side of the support frame, thereby easily adjusting the installation position (horizontal or inclination angle) of the sewer pipe. Has a unique effect.
또한 본 고안은 지지로드에 의해서 하수도관이 지지되므로 연약지반의 침하로 인한 하수도관의 매설위치 변경을 미연에 방지할 수 있게되는 특유의 효과가 있다.In addition, the present invention has a peculiar effect that the sewer pipe is supported by the support rod to prevent the change of the buried position of the sewer pipe due to settlement of the soft ground.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020050031081U KR200407625Y1 (en) | 2005-11-02 | 2005-11-02 | Hume pipe reinforce structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020050031081U KR200407625Y1 (en) | 2005-11-02 | 2005-11-02 | Hume pipe reinforce structure |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050100491A Division KR100676680B1 (en) | 2005-10-25 | 2005-10-25 | Hume pipe reinforce structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200407625Y1 true KR200407625Y1 (en) | 2006-02-02 |
Family
ID=44480985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020050031081U KR200407625Y1 (en) | 2005-11-02 | 2005-11-02 | Hume pipe reinforce structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200407625Y1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100623930B1 (en) | 2005-12-19 | 2006-09-13 | 주식회사동일기술공사 | Connect structure of drain pipe |
KR100801007B1 (en) | 2007-02-09 | 2008-02-04 | 자연엔지니어링 주식회사 | Foundation construction of upper water supply pipe for subsidence prevention |
KR100975388B1 (en) | 2010-01-28 | 2010-08-11 | (주)효원엔지니어링 | Separation prevention structure of water pipe with under the ground |
KR100975387B1 (en) | 2010-01-28 | 2010-08-11 | (주)효원엔지니어링 | Breakage prevention structure of water pipe |
CN116658683A (en) * | 2023-07-24 | 2023-08-29 | 国方建设有限公司 | Soil and stone excavation supporting device for pre-buried building pipeline |
-
2005
- 2005-11-02 KR KR2020050031081U patent/KR200407625Y1/en not_active IP Right Cessation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100623930B1 (en) | 2005-12-19 | 2006-09-13 | 주식회사동일기술공사 | Connect structure of drain pipe |
KR100801007B1 (en) | 2007-02-09 | 2008-02-04 | 자연엔지니어링 주식회사 | Foundation construction of upper water supply pipe for subsidence prevention |
KR100975388B1 (en) | 2010-01-28 | 2010-08-11 | (주)효원엔지니어링 | Separation prevention structure of water pipe with under the ground |
KR100975387B1 (en) | 2010-01-28 | 2010-08-11 | (주)효원엔지니어링 | Breakage prevention structure of water pipe |
CN116658683A (en) * | 2023-07-24 | 2023-08-29 | 国方建设有限公司 | Soil and stone excavation supporting device for pre-buried building pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200407625Y1 (en) | Hume pipe reinforce structure | |
KR100676680B1 (en) | Hume pipe reinforce structure | |
KR101481817B1 (en) | Hume pipe reinforce structure for supporting | |
KR101674117B1 (en) | Apparatus for preventing sewerage pipe subsidence of smooth ground | |
KR100676681B1 (en) | Supprot apparatus of drainage | |
KR100672009B1 (en) | Supporting structure for water supply | |
KR200409783Y1 (en) | Supprot apparatus of drainage | |
KR100751573B1 (en) | Reinforcement apparatus of water pipe in weakness ground | |
KR200318113Y1 (en) | Pedestal member for hume pipe | |
JP6542587B2 (en) | Manhole levitation prevention method | |
KR102180213B1 (en) | Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same | |
KR101633729B1 (en) | Structure of retaining wall | |
KR100827009B1 (en) | Earth retaining for lay supply pipe and drain pipe | |
KR100681843B1 (en) | Structure for laying hume pipe under the ground for road | |
KR20070076560A (en) | Sectional manhole | |
KR100680247B1 (en) | Device for adjusting the height of underground pipe and preventing it from inequablly sinking | |
KR200318079Y1 (en) | Supporter for hume pipe | |
KR200275363Y1 (en) | The mold establishment necessit do not exist assembly road water pipe | |
KR100598769B1 (en) | Drain line of hume pipe for smooth area | |
KR100726755B1 (en) | Construction member for support of drainage | |
KR100619403B1 (en) | Installing structure of water pipes for preventing from sinking the ground | |
CN105888035A (en) | Integral assembly reinforced concrete prefabricated draining inspection well | |
KR100688617B1 (en) | Drainpipe with a flat bottom | |
KR101175907B1 (en) | Supporting construct for hume pipe | |
KR20090061868A (en) | Assembling structure of arch-type precast culvert and method constructing the culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
EXTG | Extinguishment |