JP2000118908A - Main rope exchange method for elevator and main rope hold tool used in this method - Google Patents

Main rope exchange method for elevator and main rope hold tool used in this method

Info

Publication number
JP2000118908A
JP2000118908A JP10286566A JP28656698A JP2000118908A JP 2000118908 A JP2000118908 A JP 2000118908A JP 10286566 A JP10286566 A JP 10286566A JP 28656698 A JP28656698 A JP 28656698A JP 2000118908 A JP2000118908 A JP 2000118908A
Authority
JP
Japan
Prior art keywords
main rope
car
hoistway
rope
new main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10286566A
Other languages
Japanese (ja)
Other versions
JP3464395B2 (en
Inventor
Hideji Fujitsugu
秀治 藤次
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP28656698A priority Critical patent/JP3464395B2/en
Publication of JP2000118908A publication Critical patent/JP2000118908A/en
Application granted granted Critical
Publication of JP3464395B2 publication Critical patent/JP3464395B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a main rope exchange method for elevator reducing work time by using a compact and inexpensive main rope hold tool having a simple structure. SOLUTION: In a main rope exchange method for elevator, a car and a new main rope 6a are held using a main rope hold tool 32 which increases a tightly binding force acting on the new main rope 6a as a load applied between the car and the new main rope 6a increases. This main rope hold tool 32 is a net having a hollow tubular part 32b constituted by braiding strings like a hollow tube, a hanger part 32a which is an endless ring is provided at one end of the hollow tubular part, and an inside diameter of the hollow tubular part 32b is reduced by applying a tensile force between the other end 32c of the hollow tubular part 32b and the hanger part 32a.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、エレベータの主
索交換方法に関するものであり、とくに既設の1:1ロ
ーピング・エレベータの旧主索を新主索に交換するため
のエレベータの主索交換方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of exchanging a main rope of an elevator, and more particularly to a method of exchanging an old main rope of an existing 1: 1 roping elevator with a new main rope. It is about.

【0002】[0002]

【従来の技術】近年、事務所ビル、ホテル等高層のビル
が多くなり、また火力発電所の煙突等の特殊なところに
もエレベータが設置されている。このような高い構造物
において、主索交換は必要であるが、主索の交換等によ
りエレベータが長時間停止することは、利用者に不便を
かけることになり好ましいことではない。
2. Description of the Related Art In recent years, high-rise buildings such as office buildings and hotels have increased, and elevators have been installed in special places such as chimneys of thermal power plants. In such a tall structure, replacement of the main cable is necessary, but stopping the elevator for a long time due to replacement of the main cable or the like causes inconvenience to the user and is not preferable.

【0003】このような場所に設置されるエレベータに
は、通常、巻上機の綱車に6〜10本の主索が巻掛けら
れている。また、各主索の両方の端末は、それぞれ鋼鉄
製の保持器に合金加工により結合され、それらの保持器
の先端がかごの上梁及び釣合い重りの上部にそれぞれ固
着されている。
In an elevator installed in such a place, usually, 6 to 10 main ropes are wound around a sheave of a hoist. Also, both ends of each main rope are respectively connected to steel cages by alloy processing, and the tips of the cages are fixed to the upper beams of the car and the upper portions of the counterweights, respectively.

【0004】図7は例えば特開昭63−282081号
公報及び特開昭63−282022号公報などに示され
たものと同様の従来のエレベータの主索交換中の状態を
示す断面図である。図において、1は昇降路、2は昇降
路1の上部に設けられた機械室、3は機械室2内に設置
された巻上機、4は機械室2内に設けられたそらせ車、
5は同じく機械室2に設置された制御盤である。
FIG. 7 is a cross-sectional view showing a state in which a main elevator of a conventional elevator is being replaced with a main rope similar to that shown in, for example, JP-A-63-282081 and JP-A-63-282022. In the drawing, 1 is a hoistway, 2 is a machine room provided above the hoistway 1, 3 is a hoisting machine installed in the machine room 2, 4 is a deflecting wheel provided in the machine room 2,
Reference numeral 5 denotes a control panel similarly installed in the machine room 2.

【0005】6は巻上機3の綱車及びそらせ車4に巻き
掛けられた複数本(この例では6本)の旧主索、7は昇
降路1内に設けられ、旧主索6の一端に吊り下げられて
いるかご、8は昇降路1内に設けられ、旧主索6の他端
に吊り下げられている釣合い重り、9はかご7の上梁及
び釣合い重り4の上部に固着されている保持器であり、
それぞれ旧主索6の端末を保持している。
[0005] Reference numeral 6 denotes a plurality of (in this example, six) old main ropes wound around the sheave and the deflector wheel 4 of the hoisting machine 3, and 7 is provided in the hoistway 1. A car suspended at one end, 8 is provided in the hoistway 1, and a counterweight suspended at the other end of the old main rope 6, 9 is fixed on the upper beam of the car 7 and above the counterweight 4. Is a cage that has been
Each of them holds the terminal of the old main rope 6.

【0006】10は昇降路1の天井部に取付けられたウ
インチ用滑車、11は最上階の階床に設置されたワイヤ
ウインチ、12はワイヤウインチ11から引出されたワ
イヤであり、このウインチワイヤ12は、ウインチ用滑
車10を経て、その先端部がロープ吊り治具13を介し
て旧主索6の途中に接続されている。14、15はかご
7を昇降路1の天井部から吊下げるための玉掛けワイヤ
及びチェンブロックである。
Reference numeral 10 denotes a winch pulley mounted on the ceiling of the hoistway 1, reference numeral 11 denotes a wire winch installed on the uppermost floor, and reference numeral 12 denotes a wire drawn from the wire winch 11. Is connected to the middle of the old main rope 6 via a winch pulley 10 via a rope suspending jig 13. Reference numerals 14 and 15 denote sling wires and chain blocks for suspending the car 7 from the ceiling of the hoistway 1.

【0007】16は最下階の階床に設置された主索供給
器であり、この主索供給器16には新主索6aが巻き付
けられている。17は昇降路1底部のピット1aに設置
された緩衝器、18はピット1aに設けられ、釣合い重
り8を支持する重り受け梁、19はピット1aから釣合
い重り8の上部に架けられている作業はしごである。
Reference numeral 16 denotes a main rope supplying device installed on the lowest floor, and a new main rope 6a is wound around the main rope supplying device 16. Reference numeral 17 denotes a shock absorber installed in the pit 1a at the bottom of the hoistway 1, reference numeral 18 denotes a weight support beam provided in the pit 1a, and supports the counterweight 8, and reference numeral 19 denotes a work spanned from the pit 1a to the top of the counterweight 8. It is a ladder.

【0008】次に従来の主索交換方法について説明す
る。まず、かご7を最上階に停止させ、ピット1a内に
入り、釣合い重り8の下部と重り側の緩衝器17との間
の間隙寸法を測定する。次いで、重り受け梁18が釣合
い重り8の下に入るまで釣合い重り8を上昇させ、かご
7を下降させる。そして、重り受け梁18が入る間隙と
なったら、重り受け梁18を釣合い重り8の下に配置
し、かご7を上昇させて重り受け梁18上に釣合い重り
8を設置する。
Next, a conventional main cable exchanging method will be described. First, the car 7 is stopped on the top floor, enters the pit 1a, and measures the gap size between the lower part of the counterweight 8 and the shock absorber 17 on the weight side. Next, the counterweight 8 is raised and the car 7 is lowered until the weight receiving beam 18 enters below the counterweight 8. Then, when the gap in which the weight receiving beam 18 enters is reached, the weight receiving beam 18 is arranged below the counterweight 8, and the car 7 is raised to place the counterweight 8 on the weight receiving beam 18.

【0009】一方、かご7上では、玉掛けワイヤ14及
びチェンブロック15を取付けて、かご7の上梁をチェ
ンブロック15により吊上げる。次いで、釣合い重り8
側の旧主索6をかご7の上端とほぼ同一の高さ位置で、
昇降路壁に取付けられたロープ保持治具60に固定し、
直上の中間切断点28で旧主索6を全数切断する。次い
で、かご7側の上梁に固定されている保持器9の直上の
上端切断点27で旧主索6を1本だけ切断し、切断した
旧主索6を機械室2で巻取り撤去する。このような作業
を旧主索6の本数分繰返して、6本の旧主索6全部の上
部を撤去する。そしてかご7側の保持器9をかご7の上
梁より取去る。
On the other hand, on the car 7, the slinging wire 14 and the chain block 15 are attached, and the upper beam of the car 7 is lifted by the chain block 15. Next, counterweight 8
The old main rope 6 on the side is located at almost the same height as the upper end of the car 7,
Fixed to the rope holding jig 60 attached to the hoistway wall,
At the intermediate cutting point 28 just above, all the old main ropes 6 are cut. Next, only one old main rope 6 is cut at the upper end cutting point 27 immediately above the cage 9 fixed to the upper beam on the car 7 side, and the cut old main rope 6 is wound up and removed in the machine room 2. . Such an operation is repeated by the number of the old main ropes 6, and the upper portions of all the six old main ropes 6 are removed. Then, the cage 9 on the car 7 side is removed from the upper beam of the car 7.

【0010】次いで、作業はしご19に作業者が登り、
釣合い重り8側の保持器26の直上の下端切断点29で
旧主索6を6本全部切断し、保持器26を釣合い重り8
から取去る。そして、かご7上にて、ロープ吊り治具1
3をロープ保持治具60より吊下がっている旧主索6の
1本をロープ保持治具60の下方の位置で固定し、そし
てロープ吊り治具13に固定された旧主索6と同一の旧
主索6をロープ保持治具60より固定を解除する。そし
てワイヤウインチ11を運転し旧主索6を下降させ、最
下階25の乗場で旧主索6を撤去する。このような作業
を旧主索6の本数分繰返して、旧主索6全数の残り部分
を撤去する。
Next, the worker climbs the work ladder 19,
At the lower end cutting point 29 immediately above the retainer 26 on the counterweight 8 side, all the old main ropes 6 are cut, and the retainer 26 is
Remove from Then, on the basket 7, the rope hanging jig 1
One of the old main ropes 6 hanging from the rope holding jig 60 is fixed at a position below the rope holding jig 60, and the same as the old main rope 6 fixed to the rope hanging jig 13. The old main rope 6 is released from the rope holding jig 60. Then, the wire winch 11 is driven to lower the old main rope 6, and the old main rope 6 is removed at the landing on the lowest floor 25. Such an operation is repeated for the number of the old main ropes 6, and the remaining part of all the old main ropes 6 is removed.

【0011】旧主索6の撤去後、主索供給器16に巻か
れている新主索6aを、余裕分を持たせた状態で、ウイ
ンチワイヤ12及びロープ吊り治具13に取付け、ワイ
ヤウインチ11を運転し新主索6aを引上げる。そし
て、新主索6aの上端がかご7の上端とほぼ同一の高さ
位置に来たらワイヤウインチ11を止めて新主索6aの
上端をウインチワイヤ12から取外し、機械室2から降
ろした図示しない麻ロープに新主索6aの上端を連結す
る。そして、ワイヤウインチ11を運転し新主索6aを
さらに引上げると同時に、機械室2から降ろした麻ロー
プを機械室2へ引上げて、新主索6aの上端が機械室2
に来たら引上げと同時に新主索6aを巻取る。ロープ吊
り治具13がかご7の上端とほぼ同一の高さ位置に来た
ら、ワイヤウインチ11を止めて、新主索6aを巻上機
3の綱車及びそらせ車22に巻掛け、端末を合金加工し
保持器9を取付けた後、その保持器9をかご7の上梁に
固定する。新主索6aをかご7に固定した後、釣合い重
り8の上部にて指定した寸法で新主索6aを切断し、か
ご7側と同様に端末加工し固定する。このような作業を
新主索6aの本数分繰返して、新主索6aの取付け作業
が完了する。
After the old main rope 6 is removed, the new main rope 6a wound around the main rope feeder 16 is attached to the winch wire 12 and the rope suspending jig 13 with a margin, and the wire winch is provided. 11 is driven to pull up the new main rope 6a. Then, when the upper end of the new main rope 6a is located at substantially the same height position as the upper end of the car 7, the wire winch 11 is stopped, the upper end of the new main rope 6a is removed from the winch wire 12, and it is lowered from the machine room 2 (not shown). The upper end of the new main rope 6a is connected to the hemp rope. Then, the wire winch 11 is operated to further pull up the new main rope 6a, and at the same time, the hemp rope dropped from the machine room 2 is pulled up to the machine room 2 so that the upper end of the new main rope 6a is
, The new main rope 6a is wound up at the same time as the lifting. When the rope suspending jig 13 comes to a position substantially the same as the upper end of the car 7, the wire winch 11 is stopped, the new main rope 6 a is wound around the sheave and the baffle 22 of the hoisting machine 3, and the terminal is connected. After the alloy is processed and the cage 9 is attached, the cage 9 is fixed to the upper beam of the car 7. After the new main rope 6a is fixed to the car 7, the new main rope 6a is cut at a specified size above the counterweight 8, and the terminal is processed and fixed in the same manner as the car 7 side. This operation is repeated for the number of the new main ropes 6a, and the operation of attaching the new main ropes 6a is completed.

【0012】[0012]

【発明が解決しようとする課題】このような従来のエレ
ベータの主索交換方法においては、複数本のロープから
なる旧主索6の撤去及び取付けの作業を1本ずつ行うた
め、作業時間が長く、エレベータの運休時間も長くなっ
てしまうという問題点があった。また、既設の建物で
は、ワイヤウインチ11の設置場所が限定されることが
多く、設置場所の確保が困難な場合があるという問題点
もあった。例えば煙突、吊り橋の支柱等では従来のロー
プ交換方法で必要であった途中階床あるいは最上階床が
無いことが多く適用ができないことさえあった。さら
に、最近ではホテル等の最上階はレストランや展望階で
絨毯が敷き詰められているので、工事のときに最上階を
使用できないという問題点もあった。
In such a conventional method of exchanging the main ropes of an elevator, since the work of removing and attaching the old main ropes 6 composed of a plurality of ropes is performed one by one, the work time is long. However, there is a problem that the elevator suspension time becomes longer. In addition, in an existing building, the installation place of the wire winch 11 is often limited, and there is a problem that it may be difficult to secure the installation place. For example, in the case of chimneys, suspension bridge supports, and the like, there is no middle floor or the top floor required by the conventional rope replacement method, so that this method cannot be applied in many cases. Furthermore, recently, the top floor of a hotel or the like is covered with carpets at a restaurant or an observation floor, so that there has been a problem that the top floor cannot be used at the time of construction.

【0013】この発明は、上記のような問題点を解決す
ることを課題としてなされたものであり、小型で、安価
で、かつ簡単な構造の主索保持具を用いて、作業時間を
短縮したエレベータの主索交換方法を得ることを目的と
する。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and has reduced the working time by using a small, inexpensive, and simple structure main rope holder. An object of the present invention is to obtain a method of exchanging a main rope of an elevator.

【0014】[0014]

【課題を解決しようとする手段】上述の目的を達成する
ために、この発明に係るエレベータの主索交換方法によ
れば、昇降路下端部にかごを停止させ、新主索を昇降路
下部近傍に置いて、その一端部をかごに、このかごと新
主索との間にかかる負荷が増大するにつれ新主索に作用
する緊縛力が増大する主索保持具を用いて保持し、その
保持部と先端との間にかごが昇降路上端近傍に位置した
ときに新主索の先端が機械室の巻上機を通ってかごに連
結され得るような充分な余裕部分を形成し、余裕部分を
かごに保持し、かごを新主索と共に昇降路上端部まで上
昇させ、同時に釣合い重りを昇降路下端部にまで下降さ
せ、かご及び釣合い重りをそれぞれの位置に保持し、旧
主索を昇降路上端部で保持して固定し、旧主索を固定位
置上方で切断すると共にかごから切り離して除去し、新
主索の余裕部分を、巻上機を通してからかごに接続し、
かごに保持された新主索の主索保持具を取り去り、旧主
索の他端部を釣合い重りから分離させ、新主索の他端部
を釣合い重りに連結し、昇降路上端部に固定されている
残りの旧主索の一端部をかごに接続し、昇降路上端部で
の固定から解放し、かごを下降させつつかごに連結され
た旧主索を下端から昇降路下端部にて回収するものであ
る。
In order to achieve the above-mentioned object, according to the method for exchanging a main rope of an elevator according to the present invention, a car is stopped at a lower end of a hoistway and a new main rope is moved near a lower part of the hoistway. , And one end thereof is held in a car by using a main rope holding device in which the binding force acting on the new main rope increases as the load applied between the cage and the new main rope increases. A sufficient margin is formed between the car part and the tip so that the tip of the new main rope can be connected to the car through the hoist in the machine room when the car is located near the upper end of the hoistway; , And raise the car to the upper end of the hoistway with the new main rope, and simultaneously lower the counterweight to the lower end of the hoistway, hold the car and the counterweight in their respective positions, and raise and lower the old main rope. Hold and fix at the top of the road and cut the old main rope above the fixed position Both were removed separately from the basket, the margin part of the new main rope, connecting from through the hoist to the basket,
Remove the main rope holder of the new main rope held in the cage, separate the other end of the old main rope from the counterweight, connect the other end of the new main rope to the counterweight, and fix it to the upper end of the hoistway Connect one end of the remaining old main rope to the car, release it from fixing at the upper end of the hoistway, lower the car and lower the old main rope connected to the car at the lower end of the hoistway from the lower end. It is to be collected.

【0015】また、この発明に係るエレベータの主索交
換方法によれば、主索保持具は、中空管状に紐を編み組
みした中空管状部を有する網であって、一端に、無端の
リングであって、かごに連結される吊り手部を備えてい
ることを特徴とするものである。
Further, according to the method for exchanging main ropes of an elevator according to the present invention, the main rope holder is a net having a hollow tubular portion in which a cord is braided in a hollow tubular shape, and has an endless ring at one end. In addition, the present invention is characterized in that it is provided with a hanging part connected to the car.

【0016】また、この発明に係るエレベータの主索交
換方法に使用する主索保持具よれば、中空管状に紐を編
み組みした中空管状部を有する網であって、中空管状部
の一端に、無端のリングである吊り手部を備え、中空管
状部の他端と、吊り手部との間を引張力を加えることに
より、中空管状部の内径が小さくなることを特徴とする
ものである。
Further, according to the main rope holder used in the method for exchanging the main rope of an elevator according to the present invention, a net having a hollow tubular portion in which a cord is braided in a hollow tubular shape is provided at one end of the hollow tubular portion. An endless ring as a hanging portion is provided, and the inner diameter of the hollow tubular portion is reduced by applying a tensile force between the other end of the hollow tubular portion and the hanging portion.

【0017】[0017]

【発明の実施の形態】実施の形態1.図1はこの発明の
実施の形態であるエレベータの主索交換方法を示す断面
図である。図2はこの発明の実施の形態1によるエレベ
ータの主索交換方法の詳細を示し、図2(a)乃至図2
(j)は各工程を示す概略図である。また、図3は、図
1に示す主索保持具周辺の構成図であり、図4は、図1
に示す主索保持具の拡大平面図である。図5は昇降路釣
合い重り側の旧主索を保持するアイクランプの斜視図で
ある。図6は、図1のロープ保持治具を示す図であっ
て、図6(a)は分解斜視図、図6(b)は一部拡大図
である。図1乃至6において、図7と同一または相当部
分には同一符号を付し、その説明を省略する。図1にお
いて、32はかご7の上梁に吊られた主索保持具、31
はかご7の天井に置いて新主索の余裕分を保持するロー
プ収納具、36は最下階25に設置されている主索供給
器16と同一の主索供給器であり、複数台設置されてい
る。これらの主索供給器36には、それぞれ新主索6a
が巻かれている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 FIG. 1 is a sectional view showing a method of exchanging a main rope of an elevator according to an embodiment of the present invention. FIG. 2 shows the details of the method of exchanging the main rope of the elevator according to the first embodiment of the present invention, and FIGS.
(J) is a schematic diagram showing each step. FIG. 3 is a configuration diagram around the main rope holder shown in FIG. 1, and FIG.
It is an enlarged plan view of the main rope holder shown in FIG. FIG. 5 is a perspective view of an eye clamp that holds an old main rope on the hoistway counterbalance weight side. FIG. 6 is a view showing the rope holding jig of FIG. 1, wherein FIG. 6 (a) is an exploded perspective view and FIG. 6 (b) is a partially enlarged view. 1 to 6, the same or corresponding parts as those in FIG. 7 are denoted by the same reference numerals, and description thereof will be omitted. In FIG. 1, reference numeral 32 denotes a main rope holder hung on the upper beam of the car 7;
A rope storage device that is placed on the ceiling of the basket 7 to keep a margin for the new main rope, 36 is the same main rope supplier as the main rope supplier 16 installed on the lowest floor 25, Have been. Each of these main rope feeders 36 has a new main rope 6a.
Is wound.

【0018】図4は図1の主索保持具32を示す拡大図
である。図に示すように主索保持具32は、紐を編み組
みした中空管状に編み組みした中空管状部32bを備え
た網である。中空管状部32bの一方の端に無端のリン
グを形成した吊り手部32aを備えている。新主索6a
の端部に、主索保持具32の吊り手部32aが上部に位
置するように吊り手部32a側より主索保持具32を挿
入し、保持位置まで主索保持具32を移動させる。主索
保持具32の伸び分を予測し、中空管状部32bの他端
32cをバインド線40にて新主索6aに巻回締結させ
る。吊り手部32aを矢印fの方向へ引っ張ると、管状
に編組された主索保持具32は、矢印の方向に伸びてそ
の内径が小さくなって新主索6aの周囲に密着し、新主
索6aを締付けるようになり、新主索6aを保持する。
すなわち、主索保持具32は、中空管状に紐を編み組み
した網であって、網の一端に、無端のリングである吊り
手部32aを備え、バインド線で40で固定された中空
管状部32bの他端32cと、吊り手部との間を引張力
を加えることにより、中空管状の網の内径が小さくな
り、新主索6aを保持する。
FIG. 4 is an enlarged view showing the main rope holder 32 of FIG. As shown in the figure, the main rope holder 32 is a net including a hollow tubular portion 32b braided into a hollow tubular braid. At one end of the hollow tubular portion 32b, there is provided a hanging portion 32a having an endless ring. New main rope 6a
The main rope holder 32 is inserted from the side of the lifting part 32a so that the lifting part 32a of the main rope holder 32 is positioned at the upper end, and the main rope holder 32 is moved to the holding position. The extension of the main rope holder 32 is predicted, and the other end 32c of the hollow tubular portion 32b is wound around the new main rope 6a by the bind wire 40. When the hanging hand portion 32a is pulled in the direction of the arrow f, the tubular main braid holder 32 extends in the direction of the arrow and has a smaller inner diameter, and is closely attached to the periphery of the new main rope 6a. 6a, and the new main rope 6a is held.
That is, the main rope holding device 32 is a net formed by braiding a cord into a hollow tube, and includes a hanging portion 32a which is an endless ring at one end of the net, and a hollow tubular portion fixed at 40 by a bind wire. By applying a tensile force between the other end 32c of the 32b and the hanging portion, the inner diameter of the hollow tubular net is reduced, and the new main rope 6a is held.

【0019】図3は図1に示す主索保持具32周辺の構
成図である。図において、内部に新主索6aが貫通して
いる主索保持具32の吊り手部32aには、両端にフッ
ク72aが取り付けられた両端フック付ワイヤ72の一
端のフック72aが取り付けられている。両端フック付
ワイヤ72の他端のフック72bは、かご7の上梁に両
端を固定されたワイヤ71に取り付けられている。した
がって、新主索6aは、主索保持具32の吊り手部32
aにより、両端フック付ワイヤ72およびワイヤ71を
介して、かご7の上梁に保持される。主索保持具32お
よび新主索6aがかご7の角部7aに損傷を受けないよ
うにするため、かご7と主索保持具32との間に当て布
が設けられている。
FIG. 3 is a diagram showing the configuration around the main rope holder 32 shown in FIG. In the figure, a hook 72a at one end of a wire 72 with hooks at both ends having hooks 72a attached at both ends is attached to a hanging portion 32a of a main rope holder 32 through which a new main rope 6a penetrates. . A hook 72b at the other end of the wire 72 with both ends hooks is attached to a wire 71 having both ends fixed to the upper beam of the car 7. Therefore, the new main rope 6a is connected to the hanging part 32 of the main rope holder 32.
By means of “a”, the car 7 is held by the upper beam of the car 7 via the wire 72 and the wire 71 with hooks at both ends. In order to prevent the main rope holder 32 and the new main rope 6a from being damaged at the corners 7a of the car 7, a patch cloth is provided between the car 7 and the main rope holder 32.

【0020】図5は昇降路釣合い重り8側のガイドレー
ル部の斜視図である。図に示すように、両端が輪状部5
7aを有するワイヤであるアイクランプ57が、ガイド
レール35に垂直に固定された取付金51上にガイドレ
ール35を巻いて取り付けられている。
FIG. 5 is a perspective view of a guide rail portion on the hoistway counterweight 8 side. As shown in FIG.
An eye clamp 57, which is a wire having a wire 7 a, is attached by winding the guide rail 35 on a mounting metal 51 fixed vertically to the guide rail 35.

【0021】図6はロープ保持治具60を示す構成図で
(a)は斜視図で、(b)はその一部の拡大図である。
ロープ保持治具60は、長方形の板状の取付板63と、
取付板63に特殊ボルト61およびナット62により取
り付けられたU形吊り具70と、U形吊り具65、ボル
ト66、ナット67、ワイヤ68により取付板63に取
付られたロープチャック69とを備えている。ロープ保
持治具60はガイドレール35を巻いて取り付けられた
アイクランプ57の下方にU形吊り具70を介して吊り
下がり、対向するガイドレール35の内側に配置され
る。ロープチャック69は主索の着脱が容易で迅速にし
かも確実に行えるので有用であるが、主索に損傷を与え
る恐れがあるため旧主索6の保持だけに用い、新主索6
aには用いない方が望ましい。
FIG. 6 is a structural view showing the rope holding jig 60. FIG. 6A is a perspective view, and FIG. 6B is an enlarged view of a part thereof.
The rope holding jig 60 includes a rectangular plate-shaped mounting plate 63,
A U-shaped hanging device 70 attached to the mounting plate 63 with special bolts 61 and nuts 62, and a rope chuck 69 attached to the mounting plate 63 with U-shaped hanging devices 65, bolts 66, nuts 67, and wires 68 are provided. I have. The rope holding jig 60 is hung below the eye clamp 57 attached around the guide rail 35 via a U-shaped hanger 70, and is disposed inside the opposing guide rail 35. The rope chuck 69 is useful because the main cable can be easily attached and detached quickly, reliably, and is useful. However, since the main cable may be damaged, it is used only for holding the old main cable 6 and the new main cable 6 is used.
It is desirable not to use it for a.

【0022】次いで、この発明の実施の形態1の主索交
換方法について図1の施工中断面図及び図2の施工手順
の主要断面図を用いて説明する。まず、作業準備とし
て、かご7を上端部である最上階に停止させ、その状態
でピット1aに入り、釣合い重り8の下部と緩衝器17
の先端部との間の間隙寸法を測定し記録する。この間隙
寸法は、建築基準法の検査基準に合致させるため、新主
索6aの長さの設定値の算定基準となる。間隙寸法の測
定後、作業者はピット1aから出る。次いで、かご7上
でかご7の上梁よりワイヤ71を介して両端フック付ワ
イヤ72を設置する。そして最下階25の乗場扉の錠ス
イッチ33を短絡線で短絡し、エレベータの扉が開いて
いてもエレベータが動くようにする。図2(a)が相当
図である。
Next, the main rope replacement method according to the first embodiment of the present invention will be described with reference to a sectional view during construction of FIG. 1 and a main sectional view of the construction procedure of FIG. First, as a work preparation, the car 7 is stopped on the uppermost floor, which is the upper end, and enters the pit 1a in that state, and the lower part of the counterweight 8 and the shock absorber 17
Measure and record the gap size with the tip of the. This gap size is used as a standard for calculating the set value of the length of the new main rope 6a in order to match the inspection standard of the Building Standard Law. After measuring the gap size, the worker exits the pit 1a. Next, a wire 72 with hooks at both ends is placed on the car 7 from the upper beam of the car 7 via the wire 71. Then, the lock switch 33 of the landing door on the lowest floor 25 is short-circuited by a short-circuit line so that the elevator can be operated even when the elevator door is open. FIG. 2A is an equivalent diagram.

【0023】次いで、交換する新主索6aが巻付けられ
た主索供給器36を、新主索6aの交換本数分(この例
では6本)用意し、これらを最下階に置く。そして、新
主索6aを主索供給器36から新主索の余裕部分の長さ
に主索保持具32の設置分の長さを加えた長さだけ引き
出し、新主索6aの端部より主索保持具32を挿入し
て、余裕分の長さを残して主索保持具32を新主索6a
に締付け保持する。ここで、新主索の余裕部分とは、主
索保持具32による固定部分と新主索6aの先端との間
の主索部分であって、かご7が昇降路上端近傍に位置し
たときに新主索6aの先端が機械室の巻き上げ機を通っ
てかご7に連結され得るような充分な長さを持った部分
である。新主索6aの引上げに妨げとならぬようにかご
7を最下階床より2m程上昇させて止め、かご7上より
図示しない麻ロープを昇降路1のピット1aに一端を降
ろす。次いで、最下階乗場の扉を開いて扉を閉まらない
ように扉を固定し、麻ロープを乗場へ引き出す。引き出
した麻ロープで新主索6aの先端部を結び、麻ロープを
かご7上で引き上げ、新主索6aをかご7上に余裕分の
長さ分引き上げ、両端フック付ワイヤ72の一端のフッ
ク72aに新主索6aを保持している主索保持具32の
吊り手部32aを懸け、新主索6aを保持する。次い
で、新主索6aの余裕分は主索収納具31に収納する。
主索収納具31に収納しなくても、かご7上の作業の邪
魔にならない場所に置いたり、かご7の室内に置いても
かまわない。このような作業を新主索6aの本数分繰り
返して、全数を両端フック付ワイヤ72に保持し、余裕
分は主索収納具31に収納する。図2(b)が相当図で
ある。
Next, the main rope feeders 36 around which the new main ropes 6a to be replaced are wound are prepared for the number of replacements of the new main ropes 6a (six in this example), and these are placed on the lowest floor. Then, the new main rope 6a is pulled out from the main rope supply device 36 by a length obtained by adding the length of the margin of the new main rope to the installation length of the main rope holding tool 32, and from the end of the new main rope 6a. The main rope holder 32 is inserted and the main rope holder 32 is changed to the new main rope 6a while leaving a sufficient length.
And keep it tight. Here, the spare portion of the new main rope is the main rope portion between the fixed portion by the main rope holding tool 32 and the tip of the new main rope 6a, and when the car 7 is located near the upper end of the hoistway. This is a portion having a sufficient length so that the tip of the new main rope 6a can be connected to the car 7 through the hoist in the machine room. The car 7 is raised by about 2 m from the lowest floor so as not to hinder the pulling of the new main rope 6a, and the car 7 is stopped. A hemp rope (not shown) is dropped from the car 7 to the pit 1a of the hoistway 1 at one end. Next, the door of the lowest floor landing is opened, the door is fixed so that the door is not closed, and the hemp rope is pulled out to the landing. Connect the tip of the new main rope 6a with the drawn hemp rope, pull up the hemp rope on the car 7, raise the new main rope 6a on the car 7 by an extra length, and hook one end of the wire 72 with both ends hooks. The new main rope 6a is held by suspending the hanging portion 32a of the main rope holder 32 holding the new main rope 6a on the 72a. Next, the margin of the new main rope 6 a is stored in the main rope storage tool 31.
Even if it is not stored in the main rope storage device 31, it may be placed in a place on the car 7 that does not hinder the work, or may be placed in the room of the car 7. Such a work is repeated for the number of the new main ropes 6a, and the entire number is held by the wires 72 with hooks at both ends, and the margin is stored in the main rope storage tool 31. FIG. 2B is an equivalent diagram.

【0024】最下階25にて、主索供給器36より新主
索6aをくりだしながら、かご7を最上階に上昇させて
行く。最上階に着たら、作業者はピット1aに入り、重
り受け梁18を乗場より受け取る。次いでピット1aか
らかご7に合図して、重り受け梁18が釣合い重り8の
下に入るまでかご7を下降させ、釣合い重り8を上昇さ
せる。そして、重り受け梁18が入る間隙となったら、
重り受け梁18を釣合い重り8の下に配置し、かご7を
上昇させて重り受け梁18上に釣合い重り8を設置して
釣合い重り8を保持する。図2(c)が相当図である。
At the lowest floor 25, the car 7 is raised to the top floor while the new main rope 6a is drawn from the main rope supply device 36. When the worker arrives at the top floor, the worker enters the pit 1a and receives the weight receiving beam 18 from the landing. Next, the car 7 is signaled from the pit 1a, and the car 7 is lowered until the weight receiving beam 18 enters below the counterweight 8, and the counterweight 8 is raised. And if it becomes a gap into which the weight receiving beam 18 enters,
The weight receiving beam 18 is arranged below the counterweight 8, the car 7 is raised, and the counterweight 8 is set on the weight receiving beam 18 to hold the counterweight 8. FIG. 2C is an equivalent diagram.

【0025】次いで、かご7の現在の位置をガイドレー
ルに印を付け、その後、ピット1aで測定した間隙寸法
から算定した主索交換後の新しい間隙寸法に基づいて、
かご7の釣上げ代の位置をガイドレールに印を付けお
き、機械室2の機械台より降ろされた玉掛けワイヤ1
4、かご7の上梁にかける玉掛けワイヤ14及びチェン
ブロック15を取り付けて、かご7の上梁をチェンブロ
ック15により上記の印の位置まで吊り上げてその位置
に保持する。これにより全部の旧主索6はぶらぶらに遊
んだ状態になる。このとき、かご7は、所定の条件でエ
レベータのかご7をレールに停止させる非常止め装置を
作動させてかご7を停止させておくのが望ましい。図2
(d)が相当図である。
Next, the current position of the car 7 is marked on the guide rail, and then based on the new gap size after the main rope replacement calculated from the gap size measured at the pit 1a.
The position of the catch allowance of the car 7 is marked on the guide rail, and the slinging wire 1 lowered from the machine base of the machine room 2
4. A slinging wire 14 and a chain block 15 are attached to the upper beam of the car 7, and the upper beam of the car 7 is lifted by the chain block 15 to the position indicated by the mark and held at that position. As a result, all the old main ropes 6 are in a state of hanging around. At this time, it is preferable that the car 7 is stopped by operating an emergency stop device for stopping the elevator car 7 on the rail under predetermined conditions. FIG.
(D) is an equivalent figure.

【0026】次いで、釣合い重り8側のガイドレール3
5にかご7の上端とほぼ同一の高さ位置にロープ保持治
具60を取付ける。そして、釣合い重り8側の旧主索6
をロープ保持治具60にて全数保持し、その保持された
旧主索6をロープ保持治具60のすぐ直上の中間切断点
28で旧主索6を全数切断する。図2(e)が相当図で
ある。
Next, the guide rail 3 on the counterweight 8 side
At 5, the rope holding jig 60 is attached at a position substantially equal to the upper end of the car 7. And the old main rope 6 on the counterweight 8 side
Is entirely held by the rope holding jig 60, and the entire old main rope 6 is cut at the intermediate cutting point 28 immediately above the rope holding jig 60. FIG. 2E is an equivalent diagram.

【0027】そして、かご7側の上梁に取付けられてい
る保持器9を1本取外し、かご7上にある主索収納具3
1より主索の余裕部分6bを1本取出し、取外した同旧
主索6の釣合い重り8側の中間切断点28上方の同旧主
索6a端部と、新主索6aの端部とを図示しないクリッ
プで連結する。次いで、機械室2で連結された釣合い重
り8側の旧主索6を引上げる。旧主索6に連結された新
主索6aが機械室2まで引き上がったら、更に新主索6
aの余裕分を機械室2へ引上げ、そしてクリップを外
す。次いで、かご7側の取外した保持器9の旧主索6を
引上げて撤去する。そして、機械室2にて、引上げた新
主索6aの余裕部分6bを巻上機3の綱車及びそらせ車
22に巻き掛け、端末を加工し新主索6aに保持器9を
固着し、保持器9の付いた新主索6aをかご7上に降ろ
し、かご7の上梁に接続する。このような作業を本数分
繰返して行い、旧主索6上部の全数撤去及び新主索6a
をかご7の上梁に接続する。次に、こうしてかご7に接
続した新主索6aは、主索保持具32を両端フック付ワ
イヤ72より全数外し保持を解除する。主索保持具32
を巻回締結しているバインド線40を取り外し、主索保
持具32を新主索6aの保持を解放して、主索保持具3
2を新主索6aに沿ってピットヘ落下させて下部端末よ
り撤去して、新主索6aを両端フック付ワイヤ72より
保持を全数解除する。図2(f)が相当図である。
Then, one retainer 9 attached to the upper beam of the car 7 is removed, and the main rope storage device 3 on the car 7 is removed.
1, one spare portion 6b of the main rope is taken out, and the end of the old main rope 6a above the middle cutting point 28 on the counterweight 8 side of the removed old main rope 6 and the end of the new main rope 6a are removed. Connect with clips not shown. Next, the old main rope 6 on the counterweight 8 side connected in the machine room 2 is pulled up. When the new main rope 6a connected to the old main rope 6 is pulled up to the machine room 2, the new main rope 6 is further moved.
Pull the margin of a into the machine room 2 and remove the clip. Next, the old main rope 6 of the cage 9 removed on the car 7 side is pulled up and removed. Then, in the machine room 2, the spare portion 6b of the raised new main rope 6a is wound around the sheave and the deflector wheel 22 of the hoisting machine 3, the terminal is processed, and the retainer 9 is fixed to the new main rope 6a. The new main rope 6 a with the retainer 9 is lowered onto the car 7 and connected to the upper beam of the car 7. This operation is repeated for the number of the main ropes 6, and all of the upper part of the old rope 6 is removed and the new rope 6a is removed.
To the upper beam of car 7. Next, the new main rope 6a thus connected to the car 7 releases the holding by removing all the main rope holders 32 from the wires 72 with hooks at both ends. Main rope holder 32
Is removed, the main rope holder 32 is released from holding the new main rope 6a, and the main rope holder 3 is released.
2 is dropped to the pit along the new main rope 6a and removed from the lower end, and the holding of all the new main ropes 6a by the wires 72 with both ends hooks is released. FIG. 2F is an equivalent diagram.

【0028】次いで、作業者はピット1aに入り、作業
はしご19を釣合い重り8の上端に架けて、作業はしご
19を登り、釣合い重り8上部に固着されている保持器
26のすぐ上の旧主索6の下端切断点29で、旧主索6
を全数切断し、保持器26も全数釣合い重り8上部から
撤去する。釣合い重り8上部で、新主索6aの長さを設
定し、新主索6aを設定値に全数切断する。そして、か
ご7側と同様に、切断した端末を加工して保持器26を
固着し、釣合い重り8上部に前と同じ配列で全数固定す
る。この後、非常止め装置を解除し、チェンブロック1
5を下げて、かご7に新主索6aの張力を均等になるよ
うに架け、チェンブロック15等のかご7の吊り治具を
撤去する。その後、かご7を下降させて釣合い重り8を
上昇させ、重り受け梁18を解除し撤去し、併せてピッ
ト1aの各工具や治具を撤去し、作業者もピット1aよ
り退出する。次いで、かご7上にて、釣合い重り8側の
ロープ保持治具60に保持されている旧主索6全数を、
フック付ワイヤ68上部の穴部68aに、図示しないワ
イヤを貫通して図示しないクリップにてワイヤの両端を
締結してリンクを作り、そのリンクを図3に示す両端フ
ック付ワイヤ72の吊り手部32aを外し空いたフック
72aに取りつけて保持し、かご7を上昇させ釣合い重
り8側の旧主索6を全数かご7に移設保持する。これに
よりアイクランプ57の負荷が無くなり、U形吊り具6
5を簡単に取り除くごとができ、取付板63と旧主索6
は切り離されてかご7に旧主索6は保持される。図2
(g)が相当図である。
Next, the worker enters the pit 1a, places the work ladder 19 on the upper end of the counterweight 8, climbs the work ladder 19, and places the old master directly above the retainer 26 fixed to the upper part of the counterweight 8. At the lower end cutting point 29 of the rope 6, the old main rope 6
, And the cage 26 is also removed from the upper part of the counterweight 8. At the upper part of the counterweight 8, the length of the new main rope 6a is set, and the entire length of the new main rope 6a is cut to the set value. Then, similarly to the car 7 side, the cut ends are processed and the retainers 26 are fixed, and all of them are fixed on the counterweight 8 in the same arrangement as before. After that, release the safety gear and chain block 1
5 is lowered so that the tension of the new main rope 6a is evenly applied to the car 7 and the hanging jig of the car 7 such as the chain block 15 is removed. Thereafter, the car 7 is lowered to raise the counterweight 8, and the weight receiving beam 18 is released and removed, and at the same time, the tools and jigs of the pit 1a are removed, and the worker also exits from the pit 1a. Next, on the car 7, all the old main ropes 6 held by the rope holding jig 60 on the counterweight 8 side are
A link is formed by passing a wire (not shown) through the hole 68a above the hooked wire 68 and fastening both ends of the wire with a clip (not shown) to form a link. 32a is detached and attached and held on the empty hook 72a, the car 7 is raised, and the old main ropes 6 on the counterweight 8 side are moved to all the cars 7 and held. As a result, the load on the eye clamp 57 is eliminated, and the U-shaped hanging member 6 is removed.
5 can be easily removed, and the mounting plate 63 and the old main rope 6 can be removed.
And the old main rope 6 is held in the car 7. FIG.
(G) is an equivalent figure.

【0029】かご7上(ワイヤ71、両端フック付ワイ
ヤ72を除く)、昇降路上端部のロープ保持治具60の
残り部材、機械室2の各工具や治具を撤去し、かご7に
連絡し、かご7を下降させながら、旧主索6の下方の端
末がピット1aの床付近に来たらかご7を止める。そし
て、旧主索6の下方の端末を全数最下階25の床に取出
し、更にかご7を下降させながら旧主索6を全数巻きと
る。図2(h)が相当図である。
The remaining members of the rope holding jig 60 at the upper end of the hoistway, the tools and jigs in the machine room 2 are removed from the car 7 (excluding the wires 71 and the wires 72 with hooks at both ends), and the car 7 is connected. Then, while lowering the car 7, when the terminal below the old main rope 6 comes near the floor of the pit 1a, the car 7 is stopped. Then, all the terminals below the old main rope 6 are taken out to the floor of the lowest floor 25, and the entire main rope 6 is wound while the car 7 is further lowered. FIG. 2H is an equivalent diagram.

【0030】そしてかご7が中間階手前でかご7を停止
させ、ロープチャック69と釣合い重り8が当たらない
ことを確認しながら更に下降し、かご7が最下階25の
2m程手前でかご7を止める。次いで、かご7上にてロ
ープチャック69により保持されている旧主索6の保持
を全数解除し、旧主索6を全数ピット1aに落とす。そ
の後、旧主索6を再び巻き取り全数撤去する。図2
(i)が相当図である。
Then, the car 7 stops the car 7 in front of the middle floor, descends further while confirming that the counterweight 8 does not hit the rope chuck 69, and the car 7 is moved about 2 m before the lowest floor 25. Stop. Next, all the old main ropes 6 held by the rope chuck 69 on the car 7 are released, and all the old main ropes 6 are dropped into the pits 1a. After that, the old main rope 6 is taken up again and all the cords are removed. FIG.
(I) is an equivalent figure.

【0031】次いで、かご7上のワイヤ71、両端フッ
ク付ワイヤ72、その他を撤去して、最下階25の錠ス
イッチ33の短絡線を外し、試運転及び新主索6aの張
力の点検調整を行う。図2(j)が相当図である。以上
により主索交換作業が完了する。
Next, the wire 71 on the car 7, the wire 72 with hooks at both ends, and the like are removed, the short-circuit wire of the lock switch 33 on the lowest floor 25 is removed, and test operation and inspection and adjustment of the tension of the new main rope 6a are performed. Do. FIG. 2 (j) is an equivalent diagram. Thus, the main cable replacement work is completed.

【0032】この主索交換方法では主索保持具32を新
主索6aより取り除く方法を記述したが、その他の方法
として以下のことも可能である。その方法は、主索保持
具32を新主索6aに取り付けたまま、釣合い重り8上
部に固着されている保持器26のすぐ上の旧主索6の下
端切断点29で、旧主索6を全数切断し、保持器26も
全数釣合い重り8より撤去する。釣合い重り8の上部
で、新主索6aの長さを設定し、新主索6aを設定値に
全数切断する。そして、切断した端末を加工して保持器
26を固着し、釣合い重り8上部に前と同じ配列で全数
固定する。その後、新主索6aと主索保持具32を巻回
締結しているバインド線40を全数取り外し、新主索6
aと主索保持具32の締付けを解除し、主索保持具32
を釣合い重り8上部に全数落下させる。そして、かご7
を下降させて釣合い重り8上部とかご7上部が同位置付
近でかご7を停止させ、釣合い重り8上部の保持器26
付近に落下している主索保持具32を新主索6aにビニ
ールテープ等にて固着する。この主索保持具32は次回
の主索交換時に旧主索の保持に利用することができる。
In this method of exchanging the main rope, a method of removing the main rope holder 32 from the new main rope 6a has been described. However, other methods are also possible. The method is as follows. With the main rope holder 32 attached to the new main rope 6a, the lower end cutting point 29 of the old main rope 6 immediately above the retainer 26 fixed to the upper part of the counterweight 8 is used. , And the cage 26 is also removed from the counterweight 8. Above the counterweight 8, the length of the new main rope 6a is set, and the entire length of the new main rope 6a is cut to the set value. Then, the cut ends are processed and the retainers 26 are fixed, and all of them are fixed on the counterweight 8 in the same arrangement as before. Thereafter, all of the bind wires 40 that wind and fasten the new main rope 6a and the main rope holder 32 are removed, and the new main rope 6a is removed.
a, the tightening of the main rope holder 32 is released, and the main rope holder 32 is released.
Are dropped onto the counterweight 8. And basket 7
Is lowered to stop the car 7 near the same position where the upper part of the counterweight 8 and the upper part of the car 7 are at the same position.
The main rope holder 32 that has fallen in the vicinity is fixed to the new main rope 6a with vinyl tape or the like. This main rope holding tool 32 can be used for holding the old main rope at the next main rope replacement.

【0033】このような主索交換方法によれば、小型
で、安価で、かつ簡単な構造の主索保持具を用いて、旧
主索6及び新主索6aの撤去及び取付けをまとめて行う
ため、作業時間が大幅に短縮され、最も一般的なエレベ
ータの場合には従来の約30%程度削減できる。また、
作業場所が最下階25の乗場、昇降路1、機械室2と少
なく、最上階や中間階の乗場が使用できない場合あるい
は構造的に無いような限定された建物での作業が可能で
ある。とくに煙突用のエレベータには有効であるのをは
じめ、あらゆる既設のビルに適用できる。
According to such a method of exchanging main ropes, the old main ropes 6 and the new main ropes 6a are collectively removed and attached using a small, inexpensive, and simple main rope holder. Therefore, the working time is greatly reduced, and in the case of the most common elevator, it can be reduced by about 30% compared with the conventional case. Also,
There are few working places, such as the landing on the lowest floor 25, the hoistway 1, and the machine room 2, and it is possible to work in a limited building where the landing on the top floor or the middle floor cannot be used or there is no structure. It can be applied to any existing building, especially effective for chimney elevators.

【0034】[0034]

【発明の効果】以上説明したように、この発明のエレベ
ータの主索交換方法によれば、昇降路下端部にかごを停
止させ、新主索を昇降路下部近傍に置いて、その一端部
をかごに、このかごと新主索との間にかかる負荷が増大
するにつれ新主索に作用する緊縛力が増大する主索保持
具を用いて保持し、その保持部と先端との間にかごが昇
降路上端近傍に位置したときに新主索の先端が機械室の
巻上機を通ってかごに連結され得るような充分な余裕部
分を形成し、余裕部分をかごに保持し、かごを新主索と
共に昇降路上端部まで上昇させ、同時に釣合い重りを昇
降路下端部にまで下降させ、かご及び釣合い重りをそれ
ぞれの位置に保持し、旧主索を昇降路上端部で保持して
固定し、旧主索を固定位置上方で切断すると共にかごか
ら切り離して除去し、新主索の余裕部分を、巻上機を通
してからかごに接続し、かごに保持された新主索の主索
保持具を取り去り、旧主索の他端部を釣合い重りから分
離させ、新主索の他端部を釣合い重りに連結し、昇降路
上端部に固定されている残りの旧主索の一端部をかごに
接続し、昇降路上端部での固定から解放し、かごを下降
させつつかごに連結された旧主索を下端から昇降路下端
部にて回収する。したがって、小型で、安価で、かつ簡
単な構造の主索保持具により、あらゆる既設ビルに対
し、複数本の主索の交換をまとめて容易にでき、作業を
安全に短時間で行うことができ、エレベータの運休時間
を短縮することができる。また、作業中に最下階以外の
乗場を使用しないので、停止条件の厳しいエレベータに
も主索の交換ができるなどの効果を奏する。
As described above, according to the elevator main rope replacement method of the present invention, the car is stopped at the lower end of the hoistway, a new main rope is placed near the lower part of the hoistway, and one end of the new main rope is placed near the hoistway. The car is held by using a main rope holding tool in which the binding force acting on the new main rope increases as the load applied between the cage and the new main rope increases, and the cage is held between the holding portion and the tip. Is formed near the upper end of the hoistway so that the tip of the new main rope can be connected to the car through the hoist in the machine room. Raise to the upper end of the hoistway with the new main rope, at the same time lower the counterweight to the lower end of the hoistway, hold the car and the counterweight in their respective positions, and hold and fix the old main rope at the upper end of the hoistway. And cut the old main rope above the fixed position and remove it from the car , Connect the spare part of the new main rope to the car through the hoist, remove the main rope holder of the new main rope held by the car, separate the other end of the old main rope from the counterweight, Connect the other end of the main rope to the counterweight, connect one end of the remaining old main rope fixed to the upper end of the hoistway to the car, release from fixing at the upper end of the hoistway, and lower the car The old main rope connected to the car is collected from the lower end at the lower end of the hoistway. Therefore, a small, inexpensive, and simple structure of the main rope holder makes it possible to easily replace multiple main ropes in all existing buildings, and to perform work safely and quickly. In addition, the suspension time of the elevator can be reduced. In addition, since the landing other than the lowest floor is not used during the operation, there is an effect that the main rope can be replaced even in an elevator having severe stopping conditions.

【0035】また、この発明に係るエレベータの主索交
換方法によれば、主索保持具は、主索保持具は、中空管
状に紐を編み組みした中空管状部を有する網であって、
一端に、無端のリングであって、かごに連結される吊り
手部を備えているので、小型で、安価で、かつ簡単な構
造で主索保持具により主索交換を容易にできる。
According to the method for exchanging main ropes of an elevator according to the present invention, the main rope holding tool is a net having a hollow tubular portion formed by braiding a cord into a hollow pipe.
Since one end is provided with an endless ring and a hanging portion connected to the car, the main rope can be easily replaced by the main rope holder with a small, inexpensive, and simple structure.

【0036】また、この発明に係るエレベータの主索交
換方法に使用する主索保持具よれば、中空管状に紐を編
み組みした中空管状部を有する網であって、中空管状部
の一端に、無端のリングである吊り手部を備え、中空管
状部の他端と、吊り手部との間を引張力を加えることに
より、中空管状部の内径が小さくなるので、小型で、安
価で、かつ簡単な構造な主索保持具を提供できる。
According to the main rope holder used in the method for exchanging main ropes of an elevator according to the present invention, a net having a hollow tubular portion in which a cord is braided in a hollow tubular shape is provided at one end of the hollow tubular portion. It is provided with a hanging part which is an endless ring, and the other end of the hollow tubular part, and by applying a tensile force between the hanging part, the inner diameter of the hollow tubular part is reduced, so it is small, inexpensive, and It is possible to provide a main rope holder having a simple structure.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の実施の形態1によるエレベータの主
索交換方法を示す断面図である。
FIG. 1 is a sectional view showing a method for exchanging a main rope of an elevator according to a first embodiment of the present invention.

【図2】この発明の実施の形態1によるエレベータの主
索交換方法の詳細を示し、図2(a)乃至2(j)は各
工程を示す概略図である。
FIG. 2 shows details of an elevator main rope replacement method according to Embodiment 1 of the present invention, and FIGS. 2 (a) to 2 (j) are schematic views showing respective steps.

【図3】図1に示す主索保持具周辺の構成図である。FIG. 3 is a configuration diagram around a main rope holder shown in FIG. 1;

【図4】図1に示す主索保持具の拡大平面図である。FIG. 4 is an enlarged plan view of the main rope holder shown in FIG.

【図5】図1に示す昇降路釣合い重り側の旧主索を保持
するアイクランプの斜視図である。
FIG. 5 is a perspective view of an eye clamp for holding an old main rope on the hoistway counterweight side shown in FIG. 1;

【図6】図1のロープ保持治具を示す図であって、図6
(a)は分解斜視図、図6(b)は一部拡大図である。
FIG. 6 is a view showing the rope holding jig of FIG. 1;
6A is an exploded perspective view, and FIG. 6B is a partially enlarged view.

【図7】従来のエレベータの主索交換方法を示す断面図
でふる。
FIG. 7 is a sectional view showing a conventional method of exchanging a main rope of an elevator.

【符号の説明】[Explanation of symbols]

1 昇降路、2 機械室、3 巻上機、6 旧主索、6
a 新主索、6b 余裕部分、7 かご、8 釣合い重
り、32 主索保持具、32a 吊り手部、32b 中
空管状部。
1 hoistway, 2 machine room, 3 hoisting machine, 6 old main rope, 6
a New main rope, 6b extra part, 7 cages, 8 counterweights, 32 main rope holders, 32a hanging parts, 32b hollow tubular part.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 昇降路下端部にかごを停止させ、 新主索を昇降路下部近傍に置いて、その一端部を上記か
ごに、上記かごと上記新主索との間にかかる負荷が増大
するにつれ上記新主索に作用する緊縛力が増大する主索
保持具を用いて保持し、 その保持部と先端との間に上記かごが昇降路上端近傍に
位置したときに上記新主索の先端が機械室の巻上機を通
って上記かごに連結され得るような充分な余裕部分を形
成し、 上記余裕部分を上記かごに保持し、 上記かごを新主索と共に昇降路上端部まで上昇させ、同
時に釣合い重りを昇降路下端部にまで下降させ、 上記かご及び釣合い重りをそれぞれの位置に保持し、 旧主索を上記昇降路上端部で保持して固定し、 上記旧主索を固定位置上方で切断すると共に上記かごか
ら切り離して除去し、 上記新主索の上記余裕部分を、巻上機を通してから上記
かごに接続し、 上記かごに保持された新主索の主索保持具を取り去り、
旧主索の他端部を上記釣合い重りから分離させ、上記新
主索の他端部を上記釣合い重りに連結し、 昇降路上端部に固定されている残りの旧主索の一端部を
上記かごに接続し、 昇降路上端部での固定から解放し、上記かごを下降させ
つつ上記かごに連結された上記旧主索を下端から上記昇
降路下端部にて回収することを特徴とするエレベータの
主索交換方法。
1. A car is stopped at a lower end of a hoistway, a new main rope is placed near a lower portion of the hoistway, and one end of the new main rope is connected to the lower end of the hoistway.
The load between the above car and the new main rope increases
Main ropes with increasing binding force acting on the new main ropes
Hold using a holder,  The above-mentioned car is located near the upper end of the hoistway between the holding part and the tip.
When positioned, the tip of the new main rope passes through the hoist in the machine room.
Form a sufficient margin so that it can be connected to the above basket.
Holding the spare part in the car, raising the car together with the new main rope to the upper end of the hoistway,
Sometimes the counterweight is lowered to the lower end of the hoistway. With the above basket
Cut off the new main rope, pass the extra part through the hoist
Connect to the car, remove the main rope holder of the new main rope held by the above cage,
Separate the other end of the old main rope from the counterweight and
Connect the other end of the main rope to the counterweight and connect one end of the remaining old main rope fixed to the upper end of the hoistway.
Connect to the above car, release from fixing at the top of the hoistway, lower the car
While lifting the old main rope connected to the car from the lower end
The elevator is characterized in that it is collected at the lower end of the downcomer.
Main rope replacement method.
【請求項2】 上記主索保持具は、中空管状に紐を編み
組みした中空管状部を有する網であって、 一端に、無端のリングであって、上記かごに連結される
吊り手部を備えていることを特徴とする請求項1記載の
エレベータの主索交換方法。
2. The main rope holding device is a net having a hollow tubular portion in which a cord is braided in a hollow tubular shape, and has an endless ring at one end and a hanging hand portion connected to the car. The method according to claim 1, further comprising the step of:
【請求項3】 中空管状に紐を編み組みした中空管状部
を有する網であって、 上記中空管状部の一端に、無端のリングである吊り手部
を備え、 上記中空管状部の他端と、上記吊り手部との間を引張力
を加えることにより、上記中空管状部の内径が小さくな
ることを特徴とする主索保持具。
3. A net having a hollow tubular portion formed by braiding a string into a hollow tubular portion, comprising a hanging portion, which is an endless ring, at one end of the hollow tubular portion; A main rope holder, wherein the inner diameter of the hollow tubular portion is reduced by applying a tensile force to the hanging portion.
JP28656698A 1998-10-08 1998-10-08 Elevator main cable replacement method Expired - Fee Related JP3464395B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28656698A JP3464395B2 (en) 1998-10-08 1998-10-08 Elevator main cable replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28656698A JP3464395B2 (en) 1998-10-08 1998-10-08 Elevator main cable replacement method

Publications (2)

Publication Number Publication Date
JP2000118908A true JP2000118908A (en) 2000-04-25
JP3464395B2 JP3464395B2 (en) 2003-11-10

Family

ID=17706078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28656698A Expired - Fee Related JP3464395B2 (en) 1998-10-08 1998-10-08 Elevator main cable replacement method

Country Status (1)

Country Link
JP (1) JP3464395B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003104651A (en) * 2001-09-28 2003-04-09 Toshiba Elevator Co Ltd Fixing method and holding device for main rope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003104651A (en) * 2001-09-28 2003-04-09 Toshiba Elevator Co Ltd Fixing method and holding device for main rope

Also Published As

Publication number Publication date
JP3464395B2 (en) 2003-11-10

Similar Documents

Publication Publication Date Title
JPH10338437A (en) Method for replacing main rope of elevator, main rope housing device used in the method and rope fixing device for car
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP3277486B2 (en) Existing main rope winding device of the elevator
JP3464395B2 (en) Elevator main cable replacement method
JPH07133085A (en) Replacement of main rope of elevator
JP2839970B2 (en) Elevator main cable replacement method
JP3340322B2 (en) Elevator main cable entanglement prevention device
JP4841171B2 (en) Rise-up elevator installation method
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JPH082850A (en) Work method in elevator shaft
JPS63282079A (en) Method of main cable replacing construction of elevator
JPH054784A (en) Elevator main cable replacing method
JPH11189378A (en) Main rope mounting jig for 2:1-roping elevator
JP3020325B2 (en) Elevator main cable replacement method
JP2654409B2 (en) Elevator main cable replacement method
JP2007186274A (en) Method for installing elevator hoistway top part equipment
JP2912989B2 (en) Main rope hanging method of elevator
JP2849281B2 (en) Elevator main cable replacement method
JPH11236175A (en) Method for changing main rope of elevator, and main rope connecting apparatus
JP3020337B2 (en) Elevator main cable replacement method
JP2601921B2 (en) Method and apparatus for supporting a counterweight
JP3035099B2 (en) Elevator main cable replacement method
JPH0755778B2 (en) Elevator rope replacement method
JPH05294581A (en) Method of replacing main cable for elevator
JP3471257B2 (en) Elevator main cable replacement method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070822

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080822

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090822

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100822

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100822

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110822

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120822

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees