JP2000095478A - Crane with crab and operation thereof - Google Patents

Crane with crab and operation thereof

Info

Publication number
JP2000095478A
JP2000095478A JP10270305A JP27030598A JP2000095478A JP 2000095478 A JP2000095478 A JP 2000095478A JP 10270305 A JP10270305 A JP 10270305A JP 27030598 A JP27030598 A JP 27030598A JP 2000095478 A JP2000095478 A JP 2000095478A
Authority
JP
Japan
Prior art keywords
bucket
crane
club
rails
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10270305A
Other languages
Japanese (ja)
Inventor
Tadashi Takakura
忠 高倉
Tomio Kawasaki
富生 川崎
Hiroshi Ito
拓 伊東
Kazumasa Miura
一政 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yoshikawa Kogyo Co Ltd
Original Assignee
Yoshikawa Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yoshikawa Kogyo Co Ltd filed Critical Yoshikawa Kogyo Co Ltd
Priority to JP10270305A priority Critical patent/JP2000095478A/en
Publication of JP2000095478A publication Critical patent/JP2000095478A/en
Pending legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a crane and an operating method therefor capable of shortening loading time and improving work efficiency and productivity. SOLUTION: A plurality of sets of rails 3, 4 are installed on the same girder 2 of a crane 1, and a plurality of crabs 5, 6 are mounted on the rails 3, 4 independently so as to be traversable. One crab 5 is formed with a lifting tool for loading such as a lifting magnet 7 or a grab bucket, and the other crab 6 is formed with a bucket 8 for carrying loads in it. Using the crane, the bucket 8 is positioned near a vehicle loaded with loads to be unloaded, and steel scrap loaded on the vehicle is transferred into the bucket 8 with the lifting magnet 7. Concurrently with retreat of the vehicle, the bucket 8 is carried to an unloading position for titling or bottom opening for discharging.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、スクラップ等の荷
役作業に際して使用されるクラブ付きクレーン及びその
運転方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane with a club used for loading and unloading scraps and the like and a method of operating the same.

【0002】[0002]

【従来の技術】電気炉あるいは転炉等の製鋼設備のスク
ラップヤードは、スクラップを電気炉あるいは転炉等へ
供給するスクラップバスケットヘ積み込みむためのスク
ラップヤード(以下、供給ヤードという)と、スクラッ
プ価格が安価な時機に大量購入して備蓄または供給ヤー
ドへの補充のために一時貯蔵しておくスクラップヤード
(以下、貯蔵ヤードという)とに大別できる。
2. Description of the Related Art Scrap yards for steelmaking equipment such as electric furnaces or converters are inexpensive in terms of scrap yards (hereinafter referred to as supply yards) for loading scraps into scrap baskets for supplying electric furnaces or converters. It can be broadly divided into scrap yards (hereinafter referred to as storage yards) which are purchased in large quantities at an appropriate time and temporarily stored for stockpiling or replenishment in a supply yard.

【0003】供給ヤードは、スクラップバスケットの移
動時間短縮のため製鋼設備の一部として隣接して設けら
れ、貯蔵ヤードは、土地スペースを充分確保できる場所
に設けられるのが一般的である。
[0003] A supply yard is generally provided adjacent to a part of a steel making facility in order to reduce the moving time of the scrap basket, and a storage yard is generally provided in a place where a sufficient land space can be secured.

【0004】供給ヤードには、特開平8−209254
号公報に開示されているようなトラック搬入レーンを中
心に集中的に配置して、スクラップ搬送用クレーンの運
転を一部自動化したものや、特公平2−44884号公
報に開示されているようなダンプ機能を備えた車輌を用
いて、スクラップバスケット(装入シュートバック)に
直接供給するためのプラットホームを供給ヤードに併設
したものがある。
In the supply yard, Japanese Patent Laid-Open No. 8-209254
Japanese Patent Application Laid-Open No. 2-44884 discloses a method in which the operation of a scrap transporting crane is partially automated by arranging the truck loading lanes in a concentrated manner as disclosed in Japanese Patent Publication No. In some vehicles, a platform for directly supplying a scrap basket (loading chute bag) to a supply yard is provided by using a vehicle having a dump function.

【0005】一方、貯蔵ヤードには、特開平9−250
85号公報に開示されているような仕切り壁で囲繞した
貯蔵・保管レーンを複数平行配置し、それぞれの貯蔵・
保管レーンの間を車輌の通路及び任意の1つの貯蔵・保
管レーンを跨いで走行可能なスクラップ搬送用クレーン
(門型移動クレーン)の走行路としたものがある。
On the other hand, in the storage yard, Japanese Patent Laid-Open No. 9-250
No. 85, a plurality of storage / storage lanes surrounded by a partition wall are arranged in parallel, and the respective storage / storage lanes are arranged in parallel.
There is a traveling route of a scrap transporting crane (portable traveling crane) that can travel across a vehicle path and any one storage / storage lane between the storage lanes.

【0006】なお、供給ヤードでは、スクラップ搬送用
クレーンの作業範囲内に、当日払い出し予定量の主要銘
柄等のスクラップを区分して貯蔵しておく仮置ヤード
と、これに補充または予定変更に対応する予備在庫品を
貯蔵するスクラップヤードが併設され、スクラップバス
ケットへの円滑な払い出しとその払い出し時間の短縮を
図っている。
[0006] In the supply yard, a temporary storage yard for storing scraps such as major brands of the expected amount to be paid out on the same day within the working range of the scrap transporting crane, and corresponding to replenishment or schedule change. A scrap yard for storing spare stocks is also provided to facilitate smooth delivery to scrap baskets and shorten the delivery time.

【0007】前述した特開平8−209254号公報に
記載の技術は、スクラップを積載したトラックも、スク
ラップ払い出し工程中はスクラップ仮置ヤードの1つと
見なして、そのスクラップを直接払い出し用ホッパーへ
供給するものであるため、求められるスクラップの銘柄
等によっては、先着のトラックが後回しとなることもあ
り、その結果、トラックの運行計画が乱れる要因ともな
る。
According to the technique described in Japanese Patent Application Laid-Open No. 8-209254, a truck loaded with scrap is regarded as one of the scrap temporary storage yards during the scrap dispensing process, and the scrap is directly supplied to a dispensing hopper. Therefore, depending on the required brand of scrap and the like, the first truck may be delayed, and as a result, the operation plan of the truck may be disturbed.

【0008】また、トラックに積載されたスクラップの
荷卸し等の効率を上げるために独立して運転できる2台
のリフティングマグネットを用いるが、その運転手順は
次のようなものである。 (1)1台目のリフティングマグネットでスクラップを
吸着させる。 (2)その吸着されたスクラップの下端がトラックの荷
箱の天辺と接触しない高さまで上昇(巻上げ)させて停
止させる。 (3)スクラップ搬送用クレーンを2台目のリフティン
グマグネットがトラックの荷箱上へ来るようトラックの
幅方向へ移動させる。 (4)同様に2台目のリフティングマグネットでスクラ
ップを吸着後、上昇、停止させる。 (5)スクラップ搬送用クレーンをそのスクラップの受
入れ位置まで移動させ、リフティングマグネットを釈放
し、再び、そのトラックの位置へ戻る。 以上の(1)〜(5)の作業を、積載スクラップ終了ま
で繰り返すもので、リフティングマグネット1台と比
べ、作業時間が半減する程短縮できるものではない。
In order to increase the efficiency of unloading scrap loaded on a truck, two lifting magnets which can be operated independently are used. The operation procedure is as follows. (1) Scrap is adsorbed by the first lifting magnet. (2) The scrap is lifted (winded up) to a height at which the lower end of the sucked scrap does not contact the top side of the packing box of the truck and is stopped. (3) The scrap transporting crane is moved in the width direction of the truck such that the second lifting magnet comes over the cargo box of the truck. (4) Similarly, after the scrap is sucked by the second lifting magnet, it is raised and stopped. (5) Move the scrap conveying crane to the position for receiving the scrap, release the lifting magnet, and return to the position of the truck again. The above operations (1) to (5) are repeated until the loading scrap ends, and the operation time cannot be shortened by half as compared with one lifting magnet.

【0009】一方、前掲の特公平2−44884号公報
に記載の技術は、ダンプ機能を備えた車輌のプラットホ
ーム上での待機時間を無くすために、中間受取機を配置
したものであるが、その不一致の要因の多くは、その車
輌への貯蔵ヤードでの積み込み作業に起因している。こ
れは、貯蔵ヤードでのリフティングマグネットを備えた
クローラークレーン等の荷役機械によるスクラップ積み
込み時間が一定でない、または、荷役機械の稼動状況か
ら車輌に待ち時間が生じる等、その運行計画に乱れが生
じることが多いためであり、貯蔵ヤードでの円滑なスク
ラップの積み込み作業が望まれている。
On the other hand, the technique described in Japanese Patent Publication No. 2-44884 mentioned above arranges an intermediate receiver in order to eliminate waiting time on a platform of a vehicle having a dump function. Many of the discrepancies are due to loading the vehicle into storage yards. This is due to irregularities in the operation plan of the storage yard, such as uneven loading time of the scrap by the loading machine such as a crawler crane equipped with a lifting magnet, or waiting time for the vehicle due to the operation status of the loading machine. Therefore, a smooth scrap loading operation in the storage yard is desired.

【0010】貯蔵ヤードでの円滑なスクラップの積み込
み(払い出し)作業を図ったものとして、特開平9−2
5085号公報に記載のシステムがある。そのシステム
での積み込み作業は、払い出し専用としたスクラップ搬
送用クレーンの横行可能なトロリの移動両端部下方に払
い出し用ホッパーを設け、そのトロリに備えたリフティ
ングマグネットを用いて、所用のスクラップを一時貯
留、必要であれば計量後、その払い出し用ホッパーの下
方に待機中の車輌(横持ち用ダンプカー)に払い出す作
業を所定量に達するまで繰り返すものである。所定量が
比較的少ないときは1回の払い出しで積み込み作業を完
了させることもできる。
[0010] Japanese Unexamined Patent Publication No. Hei 9-2 discloses a method of loading (dispensing) scraps smoothly in a storage yard.
There is a system described in Japanese Patent No. 5085. In the loading operation with this system, a dispensing hopper is provided below both ends of the trolley that can traverse the scrap crane that is dedicated to dispensing, and the required scrap is temporarily stored using the lifting magnet provided on the trolley. If necessary, after weighing, the operation of dispensing to a waiting vehicle (lateral dump truck) below the dispensing hopper is repeated until a predetermined amount is reached. When the predetermined amount is relatively small, the loading operation can be completed with one payout.

【0011】ところで、貯蔵ヤードに入荷するスクラッ
プは、建設、建築廃材として発生する型鋼(H鋼、鋼矢
板等)、鋼管、鋼板、鉄筋、線材等や、工場で発生する
プレス廃材等の加工残材、廃車や軽量屑等のプレス品、
シュレッダー屑、製鉄所で発生する欠陥等によって成品
とならないスラブ、鋼板、コイル材その他形状、性状の
大きく異なるものである。
[0011] By the way, scraps that arrive in the storage yard are processed steel such as mold steel (H steel, steel sheet pile, etc.), steel pipe, steel plate, reinforcing steel, wire rod, etc. generated as construction and building waste, and press waste generated at factories. Pressed products such as materials, scrap cars and lightweight scraps,
Slabs, steel plates, coil materials and other shapes and properties that do not become products due to shredder scraps, defects generated at steelworks, etc.

【0012】そのため、払い出し用ホッパーでは相互に
絡み合うなど払い出せないものも多く、大容量、重量の
プレス品等は直接払い出す方が効率が良いものもあり、
両側に払い出し用ホッパーを装備した払い出し専用のス
クラップ搬送用クレーンでは対応できないものも少なく
ない。
For this reason, many dispensing hoppers cannot be dispensed because they are entangled with each other, and it is more efficient to directly dispense large-capacity, heavy pressed products.
There are many things that cannot be handled by a scraper crane dedicated to payout equipped with payout hoppers on both sides.

【0013】更に、その貯蔵ヤードは、1つの貯蔵・保
管レーンに1台の門型移動クレーンを配置して、受入れ
または払い出し作業を行うもので、その1台の門型移動
クレーンが複数の貯蔵・保管レーンを受けもつものであ
るから、車輌に積載されたスクラップの種別に対応した
貯蔵・保管レーンと門型移動クレーンが稼動中の貯蔵・
保管レーンとが一致しない場合、その車輌が待機または
待機予定の貯蔵・保管レーンまでレーン替えエリアを経
由して移動することになるが、貯蔵・保管レーンは短辺
が門型移動クレーン脚部の間隔で決まるため、貯蔵量を
増やすには長辺を長くする外ないことから、隣の貯蔵・
保管レーンへの移動にも時間が掛り、移動中は受入れま
たは払い出し作業はできないため作業効率が悪くなる。
Further, the storage yard is provided with one portal mobile crane in one storage / storage lane for receiving or paying out, and the single portal mobile crane includes a plurality of storage lanes.・ Because it is assigned to the storage lane, storage corresponding to the type of scrap loaded on the vehicle ・ Storage while the storage lane and the portal mobile crane are operating
If the storage lane does not match, the vehicle moves to the standby or planned storage / storage lane via the lane change area. Since it is determined by the interval, it is not necessary to increase the long side to increase the storage amount, so the next storage / storage
It takes time to move to the storage lane, and the receiving or paying out work cannot be performed during the movement, so that the working efficiency is deteriorated.

【0014】また、一般に自走式荷役機械は走行量が大
きい程、保守、整備に掛る費用が高くなる。
In general, the greater the traveling amount of the self-propelled cargo handling machine, the higher the maintenance and maintenance costs.

【0015】なお、貯蔵・保管レーンの間の通路は貯蔵
ヤード運用上、不可欠であるが貯蔵・保管レーンを多数
構築する程、通路用スペースが増加し、土地スペースの
有効活用の点で貯蔵・保管のできないデッドスペースが
増える。
The passage between the storage / storage lanes is indispensable for the operation of the storage yard, but as the number of storage / storage lanes is increased, the space for the passage increases, and the storage / storage lanes are effectively used for storage / storage. Dead space that cannot be stored increases.

【0016】[0016]

【発明が解決しようとする課題】上述したように、従来
のスクラップ搬送システムにおいては、次のような問題
があった。
As described above, the conventional scrap transport system has the following problems.

【0017】(1)運搬車輌からの鉄屑の荷卸し貯蔵、
及び貯蔵場から車輌への鉄屑の積み込みはリフティング
マグネットやグラブバケット等で、吸着または掴み、一
回ずつ貯蔵場所まで運搬するという動作を繰り返して行
っていたため、クレーンによる運搬行程が長い場合は時
間が掛り非能率である。
(1) Unloading and storage of iron scraps from transport vehicles,
The loading of iron scraps from the storage to the vehicle was repeatedly performed by lifting magnets, grab buckets, etc., and was repeatedly carried out by suction or grasping, and once transported to the storage location. Is inefficient.

【0018】(2)ダンプ式車輌によって運搬された場
合も、荷卸し作業は省略されるが、クレーンにより所定
の貯蔵場所まで運搬する山繰り作業が必要なため、クレ
ーンの荷役時間は緩和されない。
(2) When the vehicle is transported by a dumping vehicle, the unloading operation is omitted. However, the crawl operation for transporting the vehicle to a predetermined storage location by a crane is required, so that the crane handling time is not reduced.

【0019】(3)傾転や底を開閉して鉄屑を排出する
ことのできる容器がトレーラー等の車輌で運搬されてき
た場合でも容器の特徴を生かすことができず、(1),
(2)のような手順で荷役していたので時間を要してい
た。
(3) Even when a container capable of tilting and opening and closing the bottom to discharge iron waste is transported by a vehicle such as a trailer, the characteristics of the container cannot be utilized.
It took time because the cargo was handled in the procedure as in (2).

【0020】(4)貯蔵されている鉄屑を運搬車輌に積
み込む場合も、(1)と同様に同一動作を繰り返して少
量ずつ積み込みするために時間を要していた。
(4) When loading stored iron scraps into a transport vehicle, it takes time to repeat the same operation as in (1) and load the scraps little by little.

【0021】そこで本発明が解決しようとする課題は、
荷役時間の短縮を図り、作業の能率、生産性を高めるこ
とのできるクレーン及びその運転方法を提供することに
ある。
The problem to be solved by the present invention is as follows.
An object of the present invention is to provide a crane and a method of operating the crane, which can shorten the cargo handling time and can increase the work efficiency and productivity.

【0022】[0022]

【課題を解決するための手段】前記課題を解決するた
め、本発明のクラブ付きクレーンは、クレーンの同一の
桁上に複数組のレールを付設するとともに、前記複数組
のレールのそれぞれに独立して横行可能に複数のクラブ
を上架し、一方のクラブにはリフティングマグネットや
グラブバケット等の荷役用吊り具を備え、もう一方のク
ラブには、荷を入れて運ぶためのバケットを装着したも
のである。
In order to solve the above-mentioned problems, a crane with a club according to the present invention has a plurality of rails attached on the same girder of the crane, and independently of each of the plurality of rails. One club is equipped with lifting equipment such as lifting magnets and grab buckets, and the other club is equipped with buckets for loading and carrying loads. is there.

【0023】また、本発明のクラブ付きクレーンの運転
方法は、クレーンの同一の桁上に複数組のレールを付設
するとともに、前記複数組のレールのそれぞれに独立し
て横行可能に複数のクラブを上架し、一方のクラブには
リフティングマグネットやグラブバケット等の荷役用吊
り具を備え、もう一方のクラブには、荷を入れて運ぶた
めのバケットを装着したクラブ付きクレーンの運転方法
であって、車輌の近辺に前記バケットを位置させ、荷役
用吊り具で車輌に積まれた鉄屑をバケットに移し替え、
車輌の荷箱が空荷になったら、その車輌は次の作業のた
めに速やかに移動する。移載終了後、バケットを指定区
割りの荷卸し場まで運び、傾転または底を開き排出する
ものである。
The method of operating a crane with clubs according to the present invention is characterized in that a plurality of sets of rails are provided on the same girder of the crane, and a plurality of clubs can be independently traversed for each of the plurality of sets of rails. It is an operation method of a crane with a club equipped with a lifting magnet, a grab bucket, etc. for loading and unloading, and the other club is equipped with a bucket for loading and carrying, Position the bucket near the vehicle, transfer iron scraps loaded on the vehicle to the bucket with hanging equipment for cargo handling,
When the carton is empty, the car moves quickly for the next task. After the transfer is completed, the bucket is transported to the unloading place in the designated division, and the bucket is tilted or the bottom is opened and discharged.

【0024】ダンプ式車輌の場合はダンプの荷卸し場所
にバケットを位置させ、その中に積み荷をダンプさせ、
ダンプ後、車輌は速やかに移動する。移載終了後、バケ
ットを指定区割りの荷卸し場まで運び、傾転または底を
開き排出する。
In the case of a dump type vehicle, a bucket is located at a dumping unloading place, and a load is dumped therein.
After the dump, the vehicle moves quickly. After the transfer is completed, the bucket is transported to the unloading place in the designated section, and the bucket is tilted or the bottom is opened and discharged.

【0025】傾転や底を開閉して鉄屑を排出することの
できる容器がトレーラーのような車輌で運搬されてきた
場合は、常時吊っていたバケットを運転室からの遠隔操
作で外し、トレーラー等が積んできた容器を吊り上げ、
指定区割りの荷卸し場まで運び、傾転または底を開き排
出する。
When a container such as a trailer is used to transport a container capable of tilting and opening and closing the bottom to discharge the iron swarf, a constantly suspended bucket is removed by remote control from a cab and the trailer is removed. Lift the container that has been loaded,
Carry to the designated unloading area, and tilt or open the bottom to discharge.

【0026】[0026]

【発明の実施の形態】以下、本発明の実施の形態を、図
面に示す実施例を参照しながら具体的に説明する。図1
は本発明の第1実施例を示す正面図、図2はその平面図
である。この第1実施例では、天井走行クレーン1の桁
2上に2組のレール3,4を付設し、これらのレール
3,4に、独立して横行できる第1クラブ5及び第2ク
ラブ6を上架し、第1クラブ5にはリフティングマグネ
ット7、第2クラブ6には桁2の両外方から延在垂下す
る吊りワイヤーロープに運搬用のバケット8を吊った構
成である。図中9は運転室、10は桁2の走行用レール
である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be specifically described below with reference to embodiments shown in the drawings. FIG.
1 is a front view showing a first embodiment of the present invention, and FIG. 2 is a plan view thereof. In the first embodiment, two sets of rails 3 and 4 are provided on the girder 2 of the overhead traveling crane 1, and the first and second clubs 5 and 6 that can traverse independently are mounted on these rails 3 and 4. The first club 5 has a lifting magnet 7, and the second club 6 has a transporting bucket 8 suspended from a hanging wire rope extending from both outsides of the beam 2. In the figure, reference numeral 9 denotes a cab, and reference numeral 10 denotes a traveling rail of the girder 2.

【0027】本実施例において、運搬車輌の近傍にバケ
ット8を位置させて、リフティングマグネット7で運搬
車輌からバケット8に鉄屑を移し、一度に大量の鉄屑を
所定の荷卸し場所に移動させバケット8を傾転または底
を開くことによって荷卸しする。積み込みは、運搬車輌
と荷卸し場所が逆になるだけで、手順は同様である。
In this embodiment, the bucket 8 is positioned near the transport vehicle, the iron scrap is transferred from the transport vehicle to the bucket 8 by the lifting magnet 7, and a large amount of iron scrap is moved to a predetermined unloading location at one time. Unload the bucket 8 by tilting or opening the bottom. The loading procedure is the same except that the transport vehicle and the unloading location are reversed.

【0028】また、ダンプ式車輌に対しては、積み荷を
直接吊り下げたバケット8に荷卸しさせて一度に運搬す
ることによって山繰り作業を省略できる。
Further, for a dump type vehicle, the unloading operation can be omitted by unloading the cargo directly to the suspended bucket 8 and transporting it at once.

【0029】更にトレーラー等により箱状の容器に入れ
られて運搬されてきた屑は、常時吊っているバケット8
を遠方操作で切り離し、トレーラー上の箱を吊り上げて
一度に運搬荷卸しできるため荷卸しを効率的に実施でき
る。
Further, the debris that has been transported in a box-like container by a trailer or the like is constantly suspended in a bucket 8.
Can be separated by a remote operation, and the boxes on the trailer can be lifted and transported and unloaded at one time, so that the unloading can be performed efficiently.

【0030】図3は本発明の第2実施例を示す正面図、
図4はその側面図である。本第2実施例では、クレーン
21は、桁22の基端が主柱23上部の旋回ベアリング
24により旋回自在に設置されており、桁22の他端に
は旋回脚25が移動台車26により旋回レール33に沿
って旋回駆動されるようになっている。桁22には、桁
22をそれぞれ干渉なしに独立して横行できる第1クラ
ブ27と第2クラブ28が上架されており、第1クラブ
27にはリフティングマグネット29、第2クラブ28
には運搬用のバケット30が吊られている。図中31は
運転室、32は運搬車輌である。
FIG. 3 is a front view showing a second embodiment of the present invention.
FIG. 4 is a side view thereof. In the second embodiment, the crane 21 has the base end of the girder 22 rotatably installed by a swivel bearing 24 above the main column 23, and a swivel leg 25 at the other end of the girder 22 by a movable carriage 26. The swing driving is performed along the rail 33. A first club 27 and a second club 28 that can independently traverse the beam 22 without interference are mounted on the beam 22, and the first club 27 has a lifting magnet 29 and a second club 28.
, A transport bucket 30 is suspended. In the figure, 31 is a cab, and 32 is a transport vehicle.

【0031】本第2実施例において、運搬車輌32の近
傍にバケット30を位置させて、リフティングマグネッ
ト29で運搬車輌32からバケット30に鉄屑を移し、
一度に大量の鉄屑を所定の荷卸し場所に移動させバケッ
ト30を傾転または底を開くことによって荷卸しする。
なお、図3において、29a、30aは運搬車輌32か
ら鉄屑を移している状態、29b、30bは上昇させた
状態、29c、30cは待機状態のそれぞれリフティン
グマグネット29とバケット30の位置を示している。
また、図4中30dは、傾転による荷卸し中のバケット
30の状態を示している。その他の動作は、第1実施例
と同様であるので説明を省略する。
In the second embodiment, the bucket 30 is located in the vicinity of the transport vehicle 32, and iron scraps are transferred from the transport vehicle 32 to the bucket 30 by the lifting magnet 29.
At the same time, a large amount of iron scrap is moved to a predetermined unloading place, and the bucket 30 is unloaded by tilting or opening the bottom.
In FIG. 3, 29a and 30a indicate positions where iron scraps are being transferred from the transport vehicle 32, 29b and 30b indicate raised positions, and 29c and 30c indicate positions of the lifting magnet 29 and the bucket 30 in a standby state. I have.
In addition, 30d in FIG. 4 shows the state of the bucket 30 during unloading due to tilting. The other operations are the same as those of the first embodiment, and the description is omitted.

【0032】[0032]

【発明の効果】上述したように、本発明によれば下記の
効果を奏する。
As described above, according to the present invention, the following effects can be obtained.

【0033】(1)鉄屑の陸送は主として大型の車輌や
貨車で行われるが、市中屑のように軽量屑である場合に
は荷卸しする貯蔵ヤードが広大になり、クレーンによる
荷卸し移送距離が長くなるために、従来のようなリフテ
ィングマグネットとバケットまたはグラブバケット等の
荷役吊り具による少量ずつの多数回運搬は非能率であ
る。本発明のクレーンでは、一方のクラブに吊った荷役
吊り具で積み荷を一旦もう一方のクラブに吊った大型バ
ケットに移した後、所定の場所まで運搬し、バケットを
傾転するか底を開くことによって排出することで荷卸し
の生産性を格段に高めることができる。工程を逆にすれ
ば積み込みも同様である。
(1) Land transport of iron waste is mainly carried out by large vehicles and wagons. However, when the waste is lightweight waste such as city waste, the storage yard for unloading becomes large, and the waste is unloaded and transported by a crane. Since the distance is long, it is inefficient to carry the small number of times by the lifting magnet and the cargo handling hanger such as the bucket or the grab bucket. In the crane according to the present invention, the cargo is temporarily transferred to a large bucket suspended from the other club by a cargo lifting device suspended from one club, then transported to a predetermined place, and the bucket is tilted or the bottom is opened. By unloading, the productivity of unloading can be significantly increased. Loading is the same if the process is reversed.

【0034】(2)従来から1つのクラブにリフティン
グマグネットとバケットまたはグラブバケット等の2種
の吊り具を装着したものはあるが、各々の吊り具の働き
は、独立して動くことができないので補完性はあっても
関連性がなく、生産性向上効果はそれほど大きくない。
本発明では2種の吊り具が協同でも単独でも作業が可能
であり、それぞれの特徴が生かしやすく能率が向上す
る。
(2) Conventionally, there is a club in which two types of hanging members such as a lifting magnet and a bucket or a grab bucket are attached to one club. However, the function of each hanging member cannot be moved independently. Although there is complementarity, there is no relevance, and the effect of improving productivity is not so large.
In the present invention, work can be performed by using two types of hanging tools in cooperation or alone, and each feature is easily utilized and efficiency is improved.

【0035】(3)クレーンによる荷役の効率化のため
に、リフティングマグネット等の荷役吊り具の大型化が
行われてきたが、車輌の荷箱の幅寸法が法律上制約され
ていることから大型化にも限界があり、余り大きくする
ことができないため、何回も運ぶことを余儀なくされて
いる。本発明では車輌に対して最適寸法の吊り具を使用
しながら、最大の荷卸し能力を発揮できる。
(3) In order to increase the efficiency of cargo handling by cranes, cargo handling and hanging equipment such as lifting magnets have been increased in size. However, since the width of the cargo box of the vehicle is restricted by law, the size of the cargo box is large. There is a limit to the conversion and it cannot be made too large, so it has to be transported many times. According to the present invention, the maximum unloading ability can be exhibited while using the hanger of the optimal size for the vehicle.

【0036】(4)ダンプ荷卸しができる車輌に対して
は、本発明ではクレーンに吊り下げたバケットの中にダ
ンプ荷卸しさせ、一括運搬・荷卸しができ、従来のよう
に一旦地上にダンプされた積み荷を、山繰り移動する必
要がなくなるのでクレーンの稼動時間を大幅に短縮でき
る。
(4) For vehicles capable of dumping and unloading, according to the present invention, dumping and unloading can be carried out in a bucket suspended by a crane, and collective transportation and unloading can be performed. It is no longer necessary to carry the piled load over the pile, so that the operating time of the crane can be greatly reduced.

【0037】(5)吊り下ろしのできる荷箱を運ぶ車輌
に対しては、本発明では常時吊っているバケットを遠隔
操作で切離した後、車輌の運んできた荷箱を吊って一括
運搬・荷卸しができるため、荷卸し作業(工程を逆にす
れば積み込み作業も同様)は大幅に能率的になる。
(5) In the present invention, for a vehicle carrying a cargo box which can be suspended, the bucket constantly suspended by remote control is detached, and then the cargo box carried by the vehicle is suspended and collectively transported / unloaded. Therefore, the unloading work (and the loading work if the process is reversed) is significantly more efficient.

【0038】(6)車輌から所定の場所までの荷役が不
要となり、車輌に隣接して仮置きしたバケットとの間で
の荷役となって、車輌の待機時間を極めて短縮できるこ
とで、車輌の運行効率を大幅に向上できる。
(6) Cargo handling from the vehicle to a predetermined place is not required, and the cargo becomes a cargo handling between a temporarily placed bucket adjacent to the vehicle. Efficiency can be greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の第1実施例を示す正面図である。FIG. 1 is a front view showing a first embodiment of the present invention.

【図2】 第1実施例の平面図である。FIG. 2 is a plan view of the first embodiment.

【図3】 本発明の第2実施例を示す正面図である。FIG. 3 is a front view showing a second embodiment of the present invention.

【図4】 第2実施例の平面図である。 1 天井走行クレーン、2 桁、3,4 レール、5
第1クラブ、6 第2クラブ、7 リフティングマグネ
ット、8 バケット、9 運転室、10 走行用レー
ル、21 クレーン、22 桁、23 主柱、24 旋
回ベアリング、25旋回脚、26 移動台車、27 第
1クラブ、28 第2クラブ、29 リフティングマグ
ネット、30 バケット、31 運転室、32 運搬車
輌、33旋回レール
FIG. 4 is a plan view of a second embodiment. 1 overhead traveling crane, 2 digits, 3, 4 rails, 5
1st club, 6 2nd club, 7 lifting magnet, 8 bucket, 9 cab, 10 running rail, 21 crane, 22 girder, 23 main pillar, 24 swivel bearing, 25 swivel leg, 26 moving trolley, 27 first Club, 28 Second Club, 29 Lifting Magnet, 30 Bucket, 31 Driver's Cab, 32 Transport Vehicle, 33 Swing Rail

【手続補正書】[Procedure amendment]

【提出日】平成10年9月28日(1998.9.2
8)
[Submission date] September 28, 1998 (1998.9.2)
8)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図3[Correction target item name] Figure 3

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図3】 FIG. 3

───────────────────────────────────────────────────── フロントページの続き (72)発明者 三浦 一政 北九州市小倉南区中曽根東3−2−24 Fターム(参考) 3F203 AA10 BA07 CA02 CC01 DA03 DA09 FA01  ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Kazumasa Miura 3-2-24 Nakasone Higashi, Nakagane-ku, Kitakyushu-shi F-term (reference) 3F203 AA10 BA07 CA02 CC01 DA03 DA09 FA01

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 クレーンの同一の桁上に複数組のレール
を付設するとともに、前記複数組のレールのそれぞれに
独立して横行可能に複数のクラブを上架し、 一方のクラブにはリフティングマグネットやグラブバケ
ット等の荷役用吊り具を備え、もう一方のクラブには、
荷を入れて運ぶためのバケットを装着したことを特徴と
するクラブ付きクレーン。
1. A plurality of sets of rails are provided on the same girder of a crane, and a plurality of clubs are mounted on each of the plurality of sets of rails so as to be able to traverse independently of each other. Equipped with lifting equipment such as grab buckets, and the other club has
A crane with a club, which is equipped with a bucket for carrying a load.
【請求項2】 クレーンの同一の桁上に複数組のレール
を付設するとともに、前記複数組のレールのそれぞれに
独立して横行可能に複数のクラブを上架し、 一方のクラブにはリフティングマグネットやグラブバケ
ット等の荷役用吊り具を備え、もう一方のクラブには、
荷を入れて運ぶためのバケットを装着したクラブ付きク
レーンの運転方法であって、 荷卸しすべき荷を積載した車輌の近辺に前記バケットを
位置させ、荷役用吊り具で車輌に積まれた鉄屑をバケッ
トに移し替え、 バケットが一杯になったら、バケットを荷卸し場まで運
び、傾転または底を開き排出することを特徴とするクラ
ブ付きクレーンの運転方法。
2. A plurality of sets of rails are attached to the same girder of a crane, and a plurality of clubs are mounted on each of the plurality of sets of rails so as to be independently traversable. Equipped with lifting equipment such as grab buckets, and the other club has
A method of operating a crane with a club equipped with a bucket for loading and carrying a load, wherein the bucket is located near a vehicle loaded with a load to be unloaded, and iron loaded on the vehicle by a lifting device for cargo handling. A method of operating a crane with a club, comprising transferring refuse to a bucket and, when the bucket is full, transporting the bucket to an unloading place and tilting or opening the bottom to discharge.
【請求項3】 クレーンの同一の桁上に複数組のレール
を付設するとともに、前記複数組のレールのそれぞれに
独立して横行可能に複数のクラブを上架し、 一方のクラブにはリフティングマグネットやグラブバケ
ット等の荷役用吊り具を備え、もう一方のクラブには、
荷を入れて運ぶためのバケットを装着したクラブ付きク
レーンの運転方法であって、 荷卸しすべき荷を積載した車輌がダンプ式車輌の場合は
ダンプの荷卸し場所にバケットを位置させ、その中に積
み荷をダンプさせ、バケットを荷卸し場まで運び、傾転
または底を開き排出することを特徴とするクラブ付きク
レーンの運転方法。
3. A plurality of rails are provided on the same girder of a crane, and a plurality of clubs are mounted on each of the plurality of rails so as to be able to traverse independently of each other. Equipped with lifting equipment such as grab buckets, and the other club has
A method of operating a crane with a club equipped with a bucket for loading and carrying a load, wherein when a vehicle loaded with a load to be unloaded is a dump type vehicle, the bucket is located at a dumping unloading place, and Operating a crane with a club, wherein the cargo is dumped, the bucket is carried to an unloading place, and the bucket is tilted or opened to discharge.
【請求項4】 クレーンの同一の桁上に複数組のレール
を付設するとともに、前記複数組のレールのそれぞれに
独立して横行可能に複数のクラブを上架し、 一方のクラブにはリフティングマグネットやグラブバケ
ット等の荷役用吊り具を備え、もう一方のクラブには、
荷を入れて運ぶためのバケットを装着したクラブ付きク
レーンの運転方法であって、 傾転や底を開閉して鉄屑を排出することのできる容器が
トレーラーのような車輌で運搬されてきた場合は、常時
吊っていたバケットを運転室からの遠隔操作で外し、ト
レーラー等が積んできた容器を吊り上げ、荷卸し場まで
運び、傾転または底を開き排出することを特徴とするク
ラブ付きクレーンの運転方法。
4. A plurality of rails are provided on the same girder of the crane, and a plurality of clubs are mounted on each of the plurality of rails so as to be able to traverse independently of each other. Equipped with lifting equipment such as grab buckets, and the other club has
This is an operation method of a crane with a club equipped with a bucket for loading and transporting, where a container capable of tilting, opening and closing the bottom and discharging iron scraps has been transported by a vehicle such as a trailer. A crane equipped with a club, which removes a bucket that is always suspended by remote control from the cab, lifts a container loaded with a trailer, transports it to an unloading place, tilts or opens the bottom and discharges it. how to drive.
JP10270305A 1998-09-24 1998-09-24 Crane with crab and operation thereof Pending JP2000095478A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10270305A JP2000095478A (en) 1998-09-24 1998-09-24 Crane with crab and operation thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10270305A JP2000095478A (en) 1998-09-24 1998-09-24 Crane with crab and operation thereof

Publications (1)

Publication Number Publication Date
JP2000095478A true JP2000095478A (en) 2000-04-04

Family

ID=17484433

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10270305A Pending JP2000095478A (en) 1998-09-24 1998-09-24 Crane with crab and operation thereof

Country Status (1)

Country Link
JP (1) JP2000095478A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005272055A (en) * 2004-03-24 2005-10-06 Hitachi Kiden Kogyo Ltd Ceiling crane with temporarily installed hopper carrier
KR100519473B1 (en) * 2000-12-22 2005-10-07 주식회사 포스코 coil type scrap disposal system
KR101873546B1 (en) 2017-04-20 2018-07-02 삼성중공업 주식회사 Cart for transferring heavy weight

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100519473B1 (en) * 2000-12-22 2005-10-07 주식회사 포스코 coil type scrap disposal system
JP2005272055A (en) * 2004-03-24 2005-10-06 Hitachi Kiden Kogyo Ltd Ceiling crane with temporarily installed hopper carrier
JP4619672B2 (en) * 2004-03-24 2011-01-26 株式会社日立プラントテクノロジー Overhead crane with temporary hopper cart
KR101873546B1 (en) 2017-04-20 2018-07-02 삼성중공업 주식회사 Cart for transferring heavy weight

Similar Documents

Publication Publication Date Title
RU2093447C1 (en) Device for reloading the unit loads in form of shipment packages
JPS6137148B2 (en)
CA2103798C (en) Continuous gondola car
JP2000095478A (en) Crane with crab and operation thereof
US4135631A (en) Freight train
JP2004175568A (en) Storage conveyance method in vein physical distribution, and transfer equipment used for the same
JP2000095348A (en) Circular scrap yard
JP2991156B2 (en) Cargo handling equipment using cranes
CN210001202U (en) type grain moving system
WO1999046195A1 (en) Method and loading device for loading and unloading cargo space
US20080298941A1 (en) Charge Bucket Loading for Electric ARC Furnace Production
CN105502024B (en) Method for the platform that car dumper system is transformed
JP3060402B2 (en) Scrap storage system
JP3079351B2 (en) Scrap transport system
JP2006151595A (en) Bulk material loading vehicle
CN215158473U (en) Low-layer feeding and track dismounting vehicle of geomembrane laying system
CN215100787U (en) Loading and unloading transport device
JPH0818698B2 (en) Automatic scrap loading and receiving method and equipment
US6371718B1 (en) Materials handling device
JPH05179633A (en) Method for carrying concrete of dam
JP2759875B2 (en) Scrap transport system
JPH0244884B2 (en)
JP2556043Y2 (en) Bulk cargo handling equipment
JP3549965B2 (en) Waste transport method and waste transfer device
US3474915A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050826

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071005

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080307