JP2000087691A - Tunnel boring machine - Google Patents

Tunnel boring machine

Info

Publication number
JP2000087691A
JP2000087691A JP25710398A JP25710398A JP2000087691A JP 2000087691 A JP2000087691 A JP 2000087691A JP 25710398 A JP25710398 A JP 25710398A JP 25710398 A JP25710398 A JP 25710398A JP 2000087691 A JP2000087691 A JP 2000087691A
Authority
JP
Japan
Prior art keywords
cutter head
chamber
earth pressure
volume
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25710398A
Other languages
Japanese (ja)
Other versions
JP3312875B2 (en
Inventor
Katsuji Ikezoe
勝次 池添
Junkichi Onoe
順吉 尾上
Hiroshi Matsuo
博 松尾
Takashi Minami
敬 南
Hideo Kanbayashi
秀雄 神林
Kazunari Kawai
一成 川合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Komatsu Ltd
Original Assignee
Kajima Corp
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Komatsu Ltd filed Critical Kajima Corp
Priority to JP25710398A priority Critical patent/JP3312875B2/en
Publication of JP2000087691A publication Critical patent/JP2000087691A/en
Application granted granted Critical
Publication of JP3312875B2 publication Critical patent/JP3312875B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a boring machine capable of surely suppressing the fluctuation in the earth pressure on a facing by advancing/retracting a cylindrical body provided on a bulkhead according to the elongation/contraction of an overbreak device for facing excavation to change the volume of a part to communicate with a chamber. SOLUTION: A skin plate 2 of approximately rectangular section is provided on a tunnel boring machine 1, and a cutter head 3 is fitted in an oscillating manner. A chamber 7 is demarcated behind the cutter bead 3 between a bulkhead 6 and the cutter head. A cutter head oscillating mechanism 5 turns the cutter head 3 reciprocally in the forward/reverse direction by a specified angle. An overbreak device 15 is built in the cutter head 3, and the natural ground of an outer circumferential part is excavated by projecting an over cutter 15a. Cylindrical bodies 16, 16 are advanced/retracted to/from the bulkhead 6 by a hydraulic jack in the direction of an arrow A, and operated in the projecting/ retreading direction respectively when the overbreak device 15 is contracted/ elongated. The volume in the chamber 7 is increased/decreased to suppress the fluctuation in the earth pressure on the cutting face for stable excavation.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、カッタヘッドの回
転もしくは往復揺動とそのカッタヘッドに設けられる余
掘装置の伸縮とによって切羽を掘削し、掘削した土砂を
カッタヘッド後方のチャンバー内に取り込んで搬出する
ようにしたトンネル掘進機に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cutting head which is excavated by rotation or reciprocating swing of a cutter head and expansion and contraction of an excavating device provided in the cutter head, and the excavated earth and sand is taken into a chamber behind the cutter head. This is related to a tunnel excavator that is to be carried out by a tunnel.

【0002】[0002]

【従来の技術】一般に、シールド掘進機を用いるトンネ
ルの施工工事においては、円筒状のスキンプレートの前
方に設けられる円盤状のカッタヘッドにより地山を掘削
しつつ、機内でセグメントを組立て、このセグメントに
反力を取ってシールドジャッキを伸長させることで、前
記スキンプレートと略同径のトンネルを掘削するように
されている。
2. Description of the Related Art Generally, in the construction work of a tunnel using a shield machine, while excavating the ground by a disk-shaped cutter head provided in front of a cylindrical skin plate, segments are assembled in the machine, and the segments are assembled. The tunnel is excavated with substantially the same diameter as the skin plate by extending the shield jack by taking a reaction force to the tunnel.

【0003】ところで、最近、トンネルの利用範囲の拡
大に伴って、例えば矩形断面等の異形断面トンネルを掘
削することのできるシールド掘進機への要請が高まって
きている。このような要請に応えるシールド掘進機とし
て、本出願人らは、特開平10−140979号公報等
において、カッタヘッドを揺動式にするとともに、この
カッタヘッドにそのカッタヘッドの半径方向に伸縮可能
な複数個の余掘装置を設け、これら余掘装置を所要位置
で伸長させることで、異形断面トンネルの掘削を行うこ
とのできるシールド掘進機を既に提案している。
[0003] Recently, with the expansion of the use range of tunnels, there has been an increasing demand for a shield machine capable of excavating a tunnel having an irregular cross section such as a rectangular cross section. As a shield excavator responding to such a demand, the present applicant has disclosed in Japanese Patent Application Laid-Open No. 10-14079 and the like that a cutter head can be made to swing, and the cutter head can be extended and contracted in the radial direction of the cutter head. A shield machine capable of excavating a tunnel with an irregular cross section has been already proposed by providing a plurality of extra excavating devices and extending the extra excavating devices at required positions.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、前述の
ように余掘装置を伸縮させて地山の掘削を行う場合、掘
削された土砂を取り込むチャンバーの内空容積がそれら
余掘装置の伸長時には減少し収縮時には増加することに
よって、このチャンバー内の土圧が変動し、これによっ
てカッタヘッドトルク、シールドジャッキ推力、さらに
は掘進速度の変動を引き起こすという問題点があった。
However, as described above, when excavation of the ground is performed by expanding and contracting the excavation device, the internal volume of the chamber for taking the excavated earth and sand decreases when the excavation device is extended. There is a problem that the earth pressure in the chamber fluctuates due to the increase during shrinkage, which causes fluctuations in cutter head torque, shield jack thrust, and excavation speed.

【0005】なお、チャンバー内等の土圧を調整する関
連従来技術として、特開昭61−211499号公
報、特開昭62−248798号公報等に開示された
ものがある。このうち、のものでは、チャンバー内に
連通する土圧調整室を設けるとともに、この土圧調整室
内を進退してその土圧調整室の容積を変える土圧ジャッ
キを設けるように構成され、のものでは、チャンバー
の一部に外部より加圧された流体が供給される圧力調整
室を形成するように構成されている。
As related prior arts for adjusting the earth pressure in a chamber or the like, there are those disclosed in JP-A-61-211499 and JP-A-62-248798. Among them, the one is provided so as to provide an earth pressure adjusting chamber communicating with the inside of the chamber, and to provide an earth pressure jack for changing the volume of the earth pressure adjusting chamber by moving in and out of the earth pressure adjusting chamber. Is configured to form a pressure adjustment chamber in which a fluid pressurized from the outside is supplied to a part of the chamber.

【0006】ところが、これら関連従来技術のもので
は、チャンバー内の土圧変動があってから調整室の容積
を変化させる方式であるために、制御の応答遅れが発生
し易かったり、あるいは大きな土圧変動を伴うものには
不適合であるなどの問題点があり、本発明のように余掘
装置の伸縮に伴う土圧変動の抑制を目的とするものには
適用することができない。
However, in the related art, since the volume of the control chamber is changed after the earth pressure in the chamber fluctuates, a control response delay is likely to occur or a large earth pressure is generated. There is a problem such as incompatibility with the one with the fluctuation, and it cannot be applied to the one for the purpose of suppressing the earth pressure fluctuation due to the expansion and contraction of the overground equipment as in the present invention.

【0007】本発明は、このような問題点を解消するた
めになされたもので、余掘装置の伸縮に伴うチャンバー
内空容積の変化を防止して、切羽土圧の変動を確実に防
止することのできるトンネル掘進機を提供することを目
的とするものである。
SUMMARY OF THE INVENTION The present invention has been made to solve such a problem, and it is possible to prevent a change in the empty volume in a chamber due to the expansion and contraction of an excavation device, and to reliably prevent a change in face pressure. It is an object of the present invention to provide a tunnel excavator capable of performing a tunnel excavation.

【0008】[0008]

【課題を解決するための手段および作用・効果】前記目
的を達成するために、本発明によるトンネル掘進機は、
カッタヘッドの回転もしくは往復揺動とそのカッタヘッ
ドに設けられる余掘装置の伸縮とによって切羽を掘削
し、掘削した土砂をカッタヘッド後方のチャンバー内に
取り込んで搬出するようにしたトンネル掘進機におい
て、前記余掘装置の伸縮量に応じて前記チャンバーもし
くはそのチャンバーに連通する部分の容積を変化させて
そのチャンバー内の土圧変動を抑制する土圧変動抑制手
段を設けることを特徴とするものである。
In order to achieve the above object, a tunnel machine according to the present invention comprises:
In a tunnel excavator in which a face is excavated by rotation or reciprocating swing of the cutter head and expansion and contraction of an extra excavation device provided in the cutter head, the excavated earth and sand is taken into a chamber behind the cutter head and carried out, It is characterized in that earth pressure fluctuation suppressing means for changing the volume of the chamber or a portion communicating with the chamber in accordance with the amount of expansion and contraction of the excavation device to suppress earth pressure fluctuation in the chamber is provided. .

【0009】本発明においては、カッタヘッドが回転も
しくは往復揺動されるとともに、このカッタヘッドに設
けられる余掘装置が伸縮操作されることにより切羽が掘
削されて、例えば余掘装置が矩形断面のコーナー部で伸
長されることで矩形断面トンネル等の掘削が行われる。
そして、この掘削により生じた土砂はカッタヘッド後方
に設けられるチャンバー内に取り込まれ、このチャンバ
ー内からトンネル後方へ向けて搬出される。この際、余
掘装置の伸縮作動時に、土圧変動抑制手段によりその余
掘装置の伸縮量に応じてチャンバーもしくはそのチャン
バーに連通する部分の容積を変化させてそのチャンバー
内の土圧変動が抑制される。こうして、余掘装置の伸縮
作動によるチャンバー内の土圧変動を未然に防ぐことが
でき、これによってカッタヘッドトルク、シールドジャ
ッキ推力および掘進速度が変動するのを防止することが
でき、地山が乱れることなく安定した掘削を行うことが
可能となる。
In the present invention, the cutter head is rotated or reciprocally oscillated, and the cutting face is excavated by the extension and retraction of the extra-digging device provided on the cutter head. Excavation such as a tunnel with a rectangular cross section is performed by being extended at the corner.
The earth and sand generated by the excavation is taken into a chamber provided behind the cutter head, and is carried out from inside the chamber toward the rear of the tunnel. At this time, at the time of the expansion and contraction operation of the excavation device, the volume of the chamber or a portion communicating with the chamber is changed by the earth pressure fluctuation suppression means according to the expansion and contraction amount of the excavation device to suppress the earth pressure fluctuation in the chamber. Is done. In this way, it is possible to prevent the fluctuation of the earth pressure in the chamber due to the expansion and contraction operation of the excavator, thereby preventing the fluctuation of the cutter head torque, the shield jack thrust and the excavation speed, and the ground is disturbed. It is possible to perform stable excavation without any trouble.

【0010】ここで、前記土圧変動抑制手段としては、
動力を有するものと動力を有しないもののいずれをも採
用することができる。また、チャンバー等の容積を変化
させる手段としては、チャンバー内に円筒状体を出し入
れするもの、土砂搬出手段としてのスクリュウコンベア
のケーシング内に円筒状体を出し入れするもの等があ
る。
Here, the earth pressure fluctuation suppressing means includes:
Either one having power or one not having power can be employed. As a means for changing the volume of the chamber or the like, there is a means for moving a cylindrical body into and out of the chamber, and a means for moving a cylindrical body into and out of a casing of a screw conveyor as earth and sand carrying means.

【0011】[0011]

【発明の実施の形態】次に、本発明によるトンネル掘進
機の具体的な実施の形態について、図面を参照しつつ説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, a specific embodiment of a tunnel machine according to the present invention will be described with reference to the drawings.

【0012】(第1実施例)図1(a)(b)には、異
形断面シールド掘進機に適用した第1実施例のトンネル
掘進機の正面図が示され、図2には同トンネル掘進機の
縦断面図が示されている。なお、図1(a)は余掘装置
の収縮時、図1(b)は余掘装置の伸長時をそれぞれ示
している。
(First Embodiment) FIGS. 1 (a) and 1 (b) are front views of a tunnel excavator of a first embodiment applied to a shield excavator having a modified cross section, and FIG. 2 shows the tunnel excavator. A longitudinal sectional view of the machine is shown. FIG. 1A shows a state in which the overground equipment is contracted, and FIG. 1B shows a state in which the overground equipment is extended.

【0013】本実施例のトンネル掘進機1においては、
略矩形断面形状のスキンプレート2が設けられ、このス
キンプレート2の前方にカッタヘッド3がカッタヘッド
揺動機構5により揺動可能に装着されている。カッタヘ
ッド3の後方には、バルクヘッド6との間にチャンバー
7が区画形成され、このチャンバー7内に先端部が開口
するように土砂搬出用のスクリュウコンベア8が設けら
れている。また、前記スキンプレート2の内壁面にはリ
ングガーダ9が固定され、このリングガーダ9に装着さ
れるフランジ部には多数本のシールドジャッキ10が固
定されている。なお、図2において符号11で示される
のはセグメント13を巻き立てるためのエレクタであ
り、符号12で示されるのはセグメント拡張装置であ
る。
In the tunnel machine 1 of this embodiment,
A skin plate 2 having a substantially rectangular cross section is provided, and a cutter head 3 is mounted in front of the skin plate 2 so as to be swingable by a cutter head swinging mechanism 5. Behind the cutter head 3, a chamber 7 is defined between the cutter head 3 and the bulkhead 6, and a screw conveyer 8 for carrying out earth and sand is provided in the chamber 7 so as to open a front end portion. A ring girder 9 is fixed to the inner wall surface of the skin plate 2, and a number of shield jacks 10 are fixed to a flange mounted on the ring girder 9. In FIG. 2, reference numeral 11 denotes an erector for winding up the segment 13, and reference numeral 12 denotes a segment expansion device.

【0014】前記カッタヘッド3はスポーク式のカッタ
ヘッドであって、4本のスポーク14,14,14,1
4が、互いに隣接するスポーク同士のなす角度が直角に
なるように配置されている。各スポーク14には余掘装
置15が内蔵され、この余掘装置15の先端部に設けら
れるオーバーカッタ15aがそのスポーク14の先端部
から外方へ突出することで、外周部の地山が掘削できる
ようにされている。なお、図には明示されていないが、
各スポーク14の外表面には、中央部に先行ビットが、
両側部にツールビットがそれぞれ装着され、これら各ビ
ットにより切羽が掘削されるようになっている。
The cutter head 3 is a spoke type cutter head, and has four spokes 14, 14, 14, 1.
4 are arranged so that the angle between the spokes adjacent to each other is a right angle. Each of the spokes 14 has a built-in excavation device 15, and an overcutter 15 a provided at the tip of the extra-drilling device 15 projects outward from the tip of the spoke 14, thereby excavating the ground at the outer peripheral portion. Have been able to. Although not explicitly shown in the figure,
The outer surface of each spoke 14 has a leading bit in the center,
Tool bits are mounted on both sides, and the cutting face is excavated by these bits.

【0015】前記カッタヘッド揺動機構5は二対の揺動
ジャッキにより構成され、一対の揺動ジャッキを伸長方
向に作動させるとともに、他の一対の揺動ジャッキを収
縮方向に作動させることによりカッタヘッド3を正逆方
向に所定角度往復回動させるように構成されている。な
お、この揺動機構については、このような機構に限ら
ず、例えばモータを正逆回転させる方法など、他のいろ
いろな手段を用いることができる。
The cutter head swinging mechanism 5 is constituted by two pairs of swinging jacks. The cutter head swinging mechanism 5 operates a pair of swinging jacks in the extending direction and operates the other pair of swinging jacks in the contracting direction. The head 3 is configured to reciprocate a predetermined angle in the forward and reverse directions. The swing mechanism is not limited to such a mechanism, and various other means such as a method of rotating a motor forward and backward can be used.

【0016】前記余掘装置15は、図1(b)に示され
るように、スポーク14の揺動半径の外側領域である矩
形断面の隅部近傍領域においてスポーク14の先端部か
ら外方へ突出され、これによって矩形断面の掘削が行わ
れるようにされている。
As shown in FIG. 1B, the overdigging device 15 protrudes outward from the tip end of the spoke 14 in a region near the corner of the rectangular cross section which is the region outside the swing radius of the spoke 14. Thus, a rectangular cross section is excavated.

【0017】本実施例においては、前記余掘装置15の
伸縮に応じて前記チャンバー7の容積を変化させるため
に、図3に模式的に示されているように、土圧変動抑制
手段としての円筒体16,16がバルクヘッド6から矢
印A方向に出し入れできるようにされている。これら円
筒体16は図示されない油圧ジャッキ(もしくは空気圧
ジャッキ)により出没操作され、余掘装置15が収縮操
作された時には突出方向に作動されてチャンバー7の容
積を減じ、逆に余掘装置15が伸長操作された時には後
退方向に作動されてチャンバー7の容積を増す。こうし
て、オーバーカッタ措置15の伸縮により引き起こされ
ようとする切羽土圧の変動が抑制され、これによって安
定した掘削を行うことが可能となる。なお、カッタヘッ
ド3の揺動周期並びに余掘装置15の伸縮時期および伸
縮量は予め既知であるので、これら情報に基づいて円筒
体16の伸縮時期および伸縮量を予め演算により求める
ことができる。したがって、この演算結果に基づいて円
筒体16,16の出没制御を実施することで、制御の応
答遅れを発生させることなく、切羽土圧の変動を効果的
に抑制することができる。
In this embodiment, in order to change the volume of the chamber 7 in accordance with the expansion and contraction of the excavator 15, as shown schematically in FIG. The cylindrical bodies 16 can be moved in and out of the bulkhead 6 in the direction of arrow A. These cylinders 16 are operated by hydraulic jacks (or pneumatic jacks) (not shown), and are operated in the projecting direction when the excavating device 15 is contracted to reduce the volume of the chamber 7 and conversely, the excavating device 15 is extended. When operated, it is operated in the backward direction to increase the volume of the chamber 7. In this manner, the fluctuation of the face earth pressure which is caused by the expansion and contraction of the over-cutting measure 15 is suppressed, thereby enabling stable excavation. Since the swing cycle of the cutter head 3 and the expansion and contraction time and amount of expansion and contraction of the excavator 15 are known in advance, the expansion and contraction time and amount of expansion and contraction of the cylindrical body 16 can be obtained in advance based on these information. Therefore, by performing the projecting / retracting control of the cylindrical bodies 16 based on the calculation result, it is possible to effectively suppress the fluctuation of the face pressure without causing a control response delay.

【0018】(第2実施例)図4には、土圧変動抑制手
段の第2実施例が模式的に示されている。第1実施例に
おいては、バルクヘッド6より円筒体16を出没させる
ものを説明したが、本第2実施例においては、カッタヘ
ッド3’の中心部から放射状に円筒体17(本実施例で
は4個)を出没させるように構成されている。なお、こ
れら円筒体17はやはり油圧ジャッキ(もしくは空気圧
ジャッキ)により駆動され、その出没制御は第1実施例
と同様、予め演算された結果に基づいて行われる。
(Second Embodiment) FIG. 4 schematically shows a second embodiment of the earth pressure fluctuation suppressing means. In the first embodiment, the case where the cylindrical body 16 is made to protrude and retract from the bulkhead 6 has been described. However, in the second embodiment, the cylindrical body 17 (4 in this embodiment) is radiated from the center of the cutter head 3 ′. ) Appear and disappear. Note that these cylinders 17 are also driven by hydraulic jacks (or pneumatic jacks), and their protrusion / retreat control is performed based on a result calculated in advance, as in the first embodiment.

【0019】(第3実施例)図5には、土圧変動抑制手
段の第3実施例が示されている。前記各実施例において
はいずれも、チャンバー7内の容積を変化させることに
より土圧変動を抑制するものとしたが、本実施例におい
ては、チャンバー7に連通されるスクリュウコンベア8
のハウジング8a内に円筒体18を出し入れさせるよう
に構成されている。すなわち、リボン式のスクリュウ羽
根8bを備えるスクリュウコンベア8において、このス
クリュウ羽根8bの中心空洞部を貫通するように円筒体
18が装着され、この円筒体18をハウジング8aの後
端部に設けられる油圧ジャッキ19にて矢印B方向に出
没操作するようにされている。なお、この場合にもその
出没制御は前記各実施例のものと同様に行われる。な
お、本実施例ではリボン式スクリュウを用いているが、
軸付きスクリュウを用いても同様の構成を採ることがで
きる。
(Third Embodiment) FIG. 5 shows a third embodiment of the earth pressure fluctuation suppressing means. In each of the above embodiments, the earth pressure fluctuation is suppressed by changing the volume in the chamber 7, but in this embodiment, the screw conveyor 8 connected to the chamber 7 is changed.
The cylindrical body 18 is moved in and out of the housing 8a. That is, in the screw conveyor 8 including the ribbon-type screw blades 8b, the cylindrical body 18 is mounted so as to penetrate the center cavity of the screw blade 8b, and the cylindrical body 18 is provided at the rear end of the housing 8a. The jack 19 is operated to appear and disappear in the direction of arrow B. In this case, the appearance control is performed in the same manner as in the above-described embodiments. In this embodiment, a ribbon screw is used.
The same configuration can be adopted by using a screw with a shaft.

【0020】(第4実施例)図6には、土圧変動抑制手
段の第4実施例が模式的に示されている。前記各実施例
では、油圧ジャッキ等の動力を用いて円筒体を出没させ
るように構成されているが、本実施例では、動力を用い
ずに円筒体を出没させるように構成されている。すなわ
ち、本実施例においては、カッタヘッド3”における各
スポーク14内が密閉空間20とされ、この密閉空間2
0が主軸21に形成されたエア通路22およびロータリ
ージョイント23、さらにはエア配管24を介して、チ
ャンバー7内に突設されるピストン式の円筒体25の内
部空間に連通するようにされている。このように構成さ
れているので、余掘装置15が収縮方向に操作された時
には、密閉空間20からの圧縮エアが円筒体25の内部
空間に供給されてその円筒体25が突出方向に作動され
てチャンバー7の容積が減じることになる。また、逆に
余掘装置15が伸長方向に操作された時には、密閉空間
20が負圧になることによって円筒体25が後退方向に
作動されてチャンバー7の容積が増すことになる。こう
して、円筒体25を操作するための動力を必要とするこ
となく、余掘装置15の伸縮により引き起こされようと
する切羽土圧の変動を抑制することができる。
(Fourth Embodiment) FIG. 6 schematically shows a fourth embodiment of the earth pressure fluctuation suppressing means. In each of the above embodiments, the cylindrical body is made to protrude and retract using the power of a hydraulic jack or the like. In this embodiment, the cylinder is made to protrude and retract without using power. That is, in the present embodiment, the inside of each spoke 14 of the cutter head 3 ″ is defined as the closed space 20,
Numeral 0 communicates with the internal space of a piston-type cylindrical body 25 protruding into the chamber 7 through an air passage 22 and a rotary joint 23 formed in the main shaft 21, and further through an air pipe 24. . With such a configuration, when the excavator 15 is operated in the contracting direction, the compressed air from the closed space 20 is supplied to the internal space of the cylindrical body 25, and the cylindrical body 25 is operated in the projecting direction. Thus, the volume of the chamber 7 is reduced. Conversely, when the excavating device 15 is operated in the extension direction, the cylinder 25 is operated in the retreating direction due to a negative pressure in the closed space 20, and the volume of the chamber 7 is increased. In this way, it is possible to suppress the fluctuation of the cutting face pressure caused by the expansion and contraction of the extra excavation device 15 without requiring the power for operating the cylindrical body 25.

【0021】以上のように、前記各実施例によれば、矩
形断面等の異形断面トンネルを掘削する際に余掘装置1
5を伸縮操作させた場合にも、チャンバー7もしくはそ
のチャンバー7に連通する部分(例えばスクリュウコン
ベア8の内部空間)の容積を円筒体16,17,18,
25の出没により変化させて切羽土圧の変動を抑制する
ことができるので、カッタヘッドトルクの変動、シール
ドジャッキ推力の変動および掘進速度の変動を未然に防
止することができる。よって、地山を乱すことなく安定
した掘削を行うことができる。
As described above, according to each of the above-described embodiments, when excavating a tunnel having an irregular cross section such as a rectangular cross section, the excavation device 1
5 is expanded or contracted, the volume of the chamber 7 or a portion communicating with the chamber 7 (for example, the internal space of the screw conveyor 8) is changed to the cylindrical bodies 16, 17, 18,
Since the fluctuation of the cutting face earth pressure can be suppressed by changing by the emergence of the 25, the fluctuation of the cutter head torque, the fluctuation of the shield jack thrust and the fluctuation of the excavation speed can be prevented beforehand. Therefore, stable excavation can be performed without disturbing the ground.

【0022】前記各実施例においては、往復揺動タイプ
のカッタヘッドについて説明したが、本発明は回転タイ
プのカッタヘッドについても適用できるのは言うまでも
ない。
In each of the above embodiments, the reciprocating swing type cutter head has been described. However, it goes without saying that the present invention can be applied to a rotary type cutter head.

【0023】前記各実施例においては、異形断面トンネ
ル掘削用のトンネル掘進機について説明したが、本発明
は、余掘装置を伸縮操作する形式のものであれば、円形
断面トンネル掘削用のトンネル掘進機に対しても適用す
ることができる。
In each of the embodiments described above, the tunnel excavator for excavating a tunnel with an irregular cross section has been described. It can also be applied to machines.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、第1実施例のトンネル掘進機の正面図
であり、(a)は余掘装置の収縮時、(b)は余掘装置
の伸長時を示す図である。
FIGS. 1A and 1B are front views of a tunnel machine according to a first embodiment, wherein FIG. 1A is a view showing a state where an over-digging apparatus is contracted, and FIG.

【図2】図2は、第1実施例のトンネル掘進機の縦断面
図である。
FIG. 2 is a longitudinal sectional view of the tunnel machine according to the first embodiment.

【図3】図3は、第1実施例の土圧変動抑制手段を示す
図である。
FIG. 3 is a diagram illustrating an earth pressure fluctuation suppressing unit according to the first embodiment.

【図4】図4は、第2実施例の土圧変動抑制手段を示す
図である。
FIG. 4 is a diagram illustrating an earth pressure fluctuation suppressing unit according to a second embodiment.

【図5】図5は、第3実施例の土圧変動抑制手段を示す
図である。
FIG. 5 is a diagram illustrating an earth pressure fluctuation suppressing unit according to a third embodiment.

【図6】図6は、第4実施例の土圧変動抑制手段を示す
図である。
FIG. 6 is a diagram illustrating an earth pressure fluctuation suppressing unit according to a fourth embodiment.

【符号の説明】[Explanation of symbols]

1 トンネル掘進機 2 スキンプレート 3,3’,3” カッタヘッド 6 バルクヘッド 7 チャンバー 8 スクリュウコンベア 14 スポーク 15 余掘装置 16,17,18,25 円筒体 20 密閉空間 22 エア通路 24 エア配管 DESCRIPTION OF SYMBOLS 1 Tunnel machine 2 Skin plate 3, 3 ', 3 "Cutter head 6 Bulk head 7 Chamber 8 Screw conveyor 14 Spoke 15 Excavation device 16, 17, 18, 25 Cylindrical body 20 Sealed space 22 Air passage 24 Air piping

───────────────────────────────────────────────────── フロントページの続き (72)発明者 尾上 順吉 福岡県福岡市博多区博多駅前三丁目12番10 号 鹿島建設株式会社九州支店内 (72)発明者 松尾 博 福岡県福岡市博多区博多駅前三丁目12番10 号 鹿島建設株式会社九州支店内 (72)発明者 南 敬 石川県小松市八日市町地方5 株式会社小 松製作所小松工場内 (72)発明者 神林 秀雄 石川県小松市八日市町地方5 株式会社小 松製作所小松工場内 (72)発明者 川合 一成 石川県小松市八日市町地方5 株式会社小 松製作所小松工場内 Fターム(参考) 2D054 AA05 AB05 AC04 BA25 CA08 DA03 GA10 GA34 GA52 GA58 ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Junkichi Onoe 3-12-10 Hakata-ekimae, Hakata-ku, Fukuoka City Kashima Construction Co., Ltd.Kyushu Branch (72) Inventor Hiroshi Matsuo Hakata-ekimae, Hakata-ku, Fukuoka City, Fukuoka Prefecture 3-12-10 Kashima Corporation Kyushu Branch (72) Inventor Takashi Minami 5 Yokaichi Town, Komatsu City, Ishikawa Prefecture Inside Komatsu Plant, Komatsu Plant (72) Inventor Hideo Kambayashi Yokaichi Town, Komatsu City, Ishikawa Prefecture 5 Komatsu Manufacturing Co., Ltd. Komatsu Factory (72) Inventor Kazunari Kawai Yokaichi-cho, Komatsu City, Ishikawa Prefecture 5 Komatsu Manufacturing Co., Ltd. Komatsu Factory F-term (reference) 2D054 AA05 AB05 AC04 BA25 CA08 DA03 GA10 GA34 GA52 GA58 GA58

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 カッタヘッドの回転もしくは往復揺動と
そのカッタヘッドに設けられる余掘装置の伸縮とによっ
て切羽を掘削し、掘削した土砂をカッタヘッド後方のチ
ャンバー内に取り込んで搬出するようにしたトンネル掘
進機において、前記余掘装置の伸縮量に応じて前記チャ
ンバーもしくはそのチャンバーに連通する部分の容積を
変化させてそのチャンバー内の土圧変動を抑制する土圧
変動抑制手段を設けることを特徴とするトンネル掘進
機。
A cutting face is excavated by rotation or reciprocating swing of a cutter head and expansion and contraction of an extra-digging device provided on the cutter head, and excavated earth and sand is taken into a chamber behind the cutter head and carried out. In the tunnel machine, earth pressure fluctuation suppressing means for changing the volume of the chamber or a portion communicating with the chamber according to the amount of expansion and contraction of the extra excavation device to suppress the earth pressure fluctuation in the chamber is provided. And a tunnel machine.
JP25710398A 1998-09-10 1998-09-10 Tunnel machine Expired - Fee Related JP3312875B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25710398A JP3312875B2 (en) 1998-09-10 1998-09-10 Tunnel machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25710398A JP3312875B2 (en) 1998-09-10 1998-09-10 Tunnel machine

Publications (2)

Publication Number Publication Date
JP2000087691A true JP2000087691A (en) 2000-03-28
JP3312875B2 JP3312875B2 (en) 2002-08-12

Family

ID=17301783

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25710398A Expired - Fee Related JP3312875B2 (en) 1998-09-10 1998-09-10 Tunnel machine

Country Status (1)

Country Link
JP (1) JP3312875B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587880A (en) * 2017-10-17 2018-01-16 上海城建市政工程(集团)有限公司 A kind of large section earth pressure balance box culvert development machine
CN108643931A (en) * 2018-04-25 2018-10-12 中国铁建重工集团有限公司 A kind of development machine is backbreak knife control mechanism and development machine

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5198371B2 (en) * 2009-06-25 2013-05-15 ジャパントンネルシステムズ株式会社 Modified cross section tunnel excavator and modified cross section tunnel excavation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587880A (en) * 2017-10-17 2018-01-16 上海城建市政工程(集团)有限公司 A kind of large section earth pressure balance box culvert development machine
CN108643931A (en) * 2018-04-25 2018-10-12 中国铁建重工集团有限公司 A kind of development machine is backbreak knife control mechanism and development machine
CN108643931B (en) * 2018-04-25 2024-04-09 中国铁建重工集团股份有限公司 Super-cutter control mechanism of heading machine and heading machine

Also Published As

Publication number Publication date
JP3312875B2 (en) 2002-08-12

Similar Documents

Publication Publication Date Title
US4655493A (en) Shield tunneling machine
JP2001342794A (en) Tunnel excavator and excavating method
JPH0444073B2 (en)
JP3312875B2 (en) Tunnel machine
JP2000186492A (en) Excavator for tunnel
JP3600379B2 (en) Tunnel excavator and excavation method
JP3821632B2 (en) Excavator for shield machine and parent-child shield machine
JPH08246787A (en) Expansion shield device
JP3499990B2 (en) Tunnel excavator and excavation method
JP3202557B2 (en) Tunnel excavator
CN116517568B (en) Variable diameter device for full-section hard-rock tunnel boring machine, boring machine and using method
JP2637160B2 (en) Shield method
JP3468934B2 (en) Tunnel excavator and tunnel excavation method
SU937725A1 (en) Hydraulic copying device of entry-driving shield
JP2989592B1 (en) Tunnel excavator and excavation method
JPH10331593A (en) Leading cutter for back-filling material injection pipe of shield excavator
JP3690855B2 (en) Tunnel excavation method
JP4780425B2 (en) Shield machine
JP4434503B2 (en) Shield machine
JP2023106012A (en) Tunnel excavator and tunnel excavation method
JP2005232850A (en) Shield tunneling machine
JP2000008779A (en) Shield machine for rectangular tunnel
JP2550408Y2 (en) Cutter bit exchange structure of shield machine
JPH042240Y2 (en)
JP2000064769A (en) Expanding shield machine

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020514

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090531

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090531

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100531

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100531

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110531

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130531

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130531

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140531

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees