JP2000045522A - Concrete placing device for upper surface of wall body - Google Patents

Concrete placing device for upper surface of wall body

Info

Publication number
JP2000045522A
JP2000045522A JP21223598A JP21223598A JP2000045522A JP 2000045522 A JP2000045522 A JP 2000045522A JP 21223598 A JP21223598 A JP 21223598A JP 21223598 A JP21223598 A JP 21223598A JP 2000045522 A JP2000045522 A JP 2000045522A
Authority
JP
Japan
Prior art keywords
concrete
hopper
wall
formwork
ready
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP21223598A
Other languages
Japanese (ja)
Inventor
Kazumasa Ito
和正 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP21223598A priority Critical patent/JP2000045522A/en
Publication of JP2000045522A publication Critical patent/JP2000045522A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily and rapidly place and smooth concrete of the upper surface of a concrete wall body. SOLUTION: Ready-mixed concrete C in a hopper 21 is continuously placed in a form 10 while transferring the hopper on the upper surface edges 13a, 14a of the form 10 by casters 22. Since a guide member 27 inserted in the placing space of concrete of the form 10 is formed at the lower end of the hopper 21, a concrete placing implement 20 is guided so that the concrete discharge opening is always positioned above the placing space. A concrete leveling member 28 installed at the lower end of the hopper 21 smooths the ready-mixed concrete C placed in the form 10 so as to scrape the upper face CF, in accordance with the transfer of the concrete placing implement 20.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、コンクリートの現
場打ちによる手摺壁等コンクリート壁体の構築に際し
て、その壁体の天端部を形成するための技術に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for forming a top end of a concrete wall such as a handrail wall by casting concrete in place.

【0002】[0002]

【従来の技術】鉄筋コンクリート建築物におけるバルコ
ニーの手摺壁等、コンクリート壁体を生コンクリートの
現場打ちによって構築する場合、この壁体の天端面は、
ベニヤ板等によって作製した仮ホッパを使って型枠のコ
ンクリート打設空間天端部に生コンクリートを打設し、
この生コンクリートの上端を前記型枠の天端面に沿って
板材あるいは手で平滑に均すことによって形成してい
る。また、前記コンクリート均し作業によつて掻き出さ
れた余分なコンクリートは予め用意した別の容器に収容
して処理する。
2. Description of the Related Art When a concrete wall, such as a handrail wall of a balcony in a reinforced concrete building, is constructed by cast-in-place of ready-mixed concrete, the top end surface of the wall is
Using a temporary hopper made of plywood, etc., put ready-mixed concrete at the top of the concrete placement space of the formwork,
It is formed by smoothing the upper end of the ready-mixed concrete by a plate or by hand along the top end surface of the formwork. The excess concrete scraped out by the concrete leveling operation is stored in another container prepared in advance and processed.

【0003】[0003]

【発明が解決しようとする課題】上記従来技術において
は、次のような問題が指摘される。第一に、ベニヤ板等
によって作製した仮ホッパは繰り返し使用が困難である
ため、例えば高層建築物における各階の手摺壁を構築す
る都度、いちいち作製しなければならず面倒である。し
かも、前記仮ホッパによるコンクリート打設位置を移動
させたりする際にコンクリートの一部が型枠外部にこぼ
れたりしやすい。また、前記仮ホッパによる生コンクリ
ートの打設と、この生コンクリートの天端面を手作業で
均す作業が別工程になり、しかもこの均し作業により生
じた余剰コンクリートを別の容器に入れて処理するとい
った作業も必要となるため、作業効率が悪い。
The following problems are pointed out in the above prior art. First, since the temporary hopper made of a plywood or the like is difficult to use repeatedly, it must be manufactured one by one each time a handrail wall of each floor in a high-rise building is constructed. In addition, when the concrete placing position by the temporary hopper is moved, a part of the concrete is easily spilled out of the formwork. Also, the casting of the ready-mixed concrete by the temporary hopper and the work of leveling the top end face of the ready-mixed concrete by hand are separate processes, and the excess concrete generated by this leveling work is put into another container for processing. Work is also required, resulting in poor work efficiency.

【0004】本発明は、上記のような事情のもとになさ
れたもので、その技術的課題とするところは、コンクリ
ート壁体の天端部へのコンクリート打設及びその均し作
業を容易・迅速に行うことを可能とすることにある。
The present invention has been made in view of the above circumstances, and a technical problem of the present invention is to make it easy to cast concrete on the top end of a concrete wall and to level the concrete. The object is to enable quick operations.

【0005】[0005]

【課題を解決するための手段】上述した技術的課題を有
効に解決するための手段として、本発明に係る壁体天端
用コンクリート打設器は、所要量のコンクリートを収容
可能であって下端部に開閉可能なコンクリート排出口を
有するホッパと、このホッパを壁体構築用型枠の天端縁
に沿って移動可能に支持する走行支持部材と、前記ホッ
パの下端部に設けられ前記壁体構築用型枠内のコンクリ
ートの上面を前記ホッパの移動に伴って所定の高さに均
すコンクリート均し部材とを具備する。
Means for Solving the Problems As means for effectively solving the above-mentioned technical problems, a concrete placing machine for a top end of a wall according to the present invention can accommodate a required amount of concrete and has a lower end. A hopper having an openable / closable concrete discharge port at a portion thereof, a traveling support member for movably supporting the hopper along a top edge of a wall body forming formwork, and the wall body provided at a lower end of the hopper A concrete leveling member for leveling the upper surface of the concrete in the construction form to a predetermined height as the hopper moves.

【0006】この壁体天端用コンクリート打設器は、走
行支持部材によって壁体構築用型枠の天端縁上を移動し
ながら、ホッパ内のコンクリートをコンクリート排出口
を通じて前記型枠内へ供給するものである。この場合、
前記ホッパの下端部に前記型枠によるコンクリート打設
空間に挿入されてこの打設空間の幅方向に対する走行支
持部材の走行を規制する案内部材を形成しておくことに
よって、当該コンクリート打設器の移動方向が前記型枠
の天端縁の延長方向に案内され、前記コンクリート排出
口が常に前記打設空間上にあるので、コンクリートが型
枠外部にこぼれることがない。
[0006] This concrete placing machine for the top of the wall body supplies the concrete in the hopper to the inside of the form frame through the concrete discharge port while moving on the top edge of the forming frame for the wall body by the traveling support member. Is what you do. in this case,
By forming a guide member at the lower end of the hopper, which is inserted into the concrete casting space by the formwork and regulates the traveling of the traveling support member in the width direction of the casting space, Since the moving direction is guided in the extension direction of the top edge of the formwork and the concrete discharge port is always on the casting space, concrete does not spill out of the formwork.

【0007】ホッパの下端部に設けられたコンクリート
均し部材は、走行支持部材による当該コンクリート打設
器の移動に伴って、前記天端縁の延長方向と平行な軌跡
を描きながら、型枠内へ打設されたコンクリートの上面
を摩り切るようにして均す。このため、壁体天端部のコ
ンクリート打設とその上面の均し作業とが同時に行われ
る。
[0007] The concrete leveling member provided at the lower end of the hopper draws a trajectory parallel to the extension direction of the top edge along with the movement of the concrete setting device by the traveling support member. Level the top of the concrete poured into For this reason, the concrete placement at the top end of the wall body and the leveling work of the upper surface are performed simultaneously.

【0008】[0008]

【発明の実施の形態】図1乃至図3は、本発明に係る壁
体天端用コンクリート打設器の好ましい一実施形態を示
すもので、まず図1及び図2において、参照符号10は
集合住宅等の鉄筋コンクリート建築物におけるベランダ
の手摺壁等、コンクリート壁体を構築するための型枠で
ある。この型枠10は、互いに平行にかつ鉛直に建て込
まれてコンクリート打設空間10Sを仕切る一対の型枠
板11,12と、この型枠板11,12をその外側から
支持・補強する支保工13,14と、前記型枠板11,
12同士を互いに一定の間隔をもって連結する多数のセ
パレータ(図示省略)等からなる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIGS. 1 to 3 show a preferred embodiment of a concrete placing machine for a ceiling of a wall according to the present invention. First, in FIGS. It is a formwork for constructing a concrete wall such as a veranda handrail wall in a reinforced concrete building such as a house. The formwork 10 includes a pair of formwork plates 11 and 12 that are erected in parallel and vertically to partition the concrete casting space 10S, and a supporting structure that supports and reinforces the formwork plates 11 and 12 from outside. 13, 14 and the formwork plate 11,
It is composed of a number of separators (not shown) and the like connecting the 12 with each other at a fixed interval.

【0009】この実施形態によるコンクリート打設器2
0は、鋼板で製作され下端部にコンクリート排出口20
Aが形成されたホッパ21と、このホッパ21を上述の
型枠10における支保工13,14の天端縁13a,1
4a上に支持する走行支持部材としてのキャスタ22と
を有する。ホッパ21は、上端を底辺とする略二等辺三
角形状の一対の端壁21a,21bと、この端壁21
a,21bの互いに対応する斜辺同士間を延びる略長方
形状の傾斜した一対の側壁21c,21dからなるもの
であって、前記両端壁21a,21bの外側面にはそれ
ぞれ把手23が取り付けられ、前記両側壁21c,21
dの上端縁にはそれぞれ把手24が取り付けられてい
る。
A concrete placing machine 2 according to this embodiment
0 is made of steel plate and has a concrete outlet 20 at the lower end.
A is formed on the hopper 21 and the top edges 13a, 1 of the supports 13, 14 in the above-described formwork 10.
And a caster 22 as a running support member supported on the top 4a. The hopper 21 includes a pair of substantially isosceles triangular end walls 21 a and 21 b each having an upper end as a base.
a, 21b comprising a pair of substantially rectangular inclined side walls 21c, 21d extending between mutually corresponding oblique sides, and a handle 23 is attached to an outer surface of each of the end walls 21a, 21b. Side walls 21c, 21
A handle 24 is attached to each upper edge of d.

【0010】ホッパ21の左右両側壁21c,21dに
は前後一対ずつ(計四個)、鋼板からなる台座部25が
溶接されており、その底壁部には図2における左右方向
へ延びる長孔(図示省略)が開設されており、キャスタ
22は、この長孔に挿通されたボルト26及びこれに螺
合されたナット26aを介して前記各台座部25の底壁
部に固定されている。キャスタ22は、その略水平な中
心軸がホッパ21における両端壁21a,21bと平行
となるように取り付けられており、すなわち前記端壁2
1a,21bが前後方向、側壁21c,21dが左右方
向となるように走行するものである。
A pair of front and rear (four in total) pedestals 25 made of a steel plate are welded to the left and right side walls 21c and 21d of the hopper 21, and a long hole extending in the left and right direction in FIG. A caster 22 is fixed to the bottom wall of each pedestal 25 via a bolt 26 inserted into the elongated hole and a nut 26a screwed to the bolt 26. The caster 22 is attached so that its substantially horizontal center axis is parallel to both end walls 21a and 21b of the hopper 21, that is, the end wall 2 is provided.
The vehicle travels so that 1a and 21b are in the front-rear direction and the side walls 21c and 21d are in the left-right direction.

【0011】ホッパ21の両側壁21c,21dの下端
部には、コンクリート排出口20Aの左右両側部におい
て、図2に示すように型枠10におけるコンクリート打
設空間10Sの上部開口に挿入されてその開口縁部材1
3b,14bの内側面と近接した状態となる案内部材2
7がそれぞれ形成されている。また、ホッパ21の前後
両端壁21a,21bの下端部には、前記案内部材2
7,27の前後両端間に位置して板状のコンクリート均
し部材28が形成されている。このコンクリート均し部
材28の下端縁は、当該コンクリート打設器20を型枠
10上に載せた図1又は図2の状態において前記開口縁
部材13b,14b間に位置し、一方の開口縁部材13
b側が低くなるように傾斜した形状となっている。
At the lower ends of both side walls 21c and 21d of the hopper 21, the right and left sides of the concrete discharge port 20A are inserted into the upper opening of the concrete casting space 10S of the formwork 10 as shown in FIG. Opening edge member 1
Guide member 2 brought into a state close to inner surfaces of 3b and 14b
7 are formed respectively. The guide members 2 are provided at the lower end portions of the front and rear end walls 21a and 21b of the hopper 21.
A plate-shaped concrete leveling member 28 is formed between the front and rear ends of the first and the seventh and the second 27. The lower edge of the concrete leveling member 28 is located between the opening edge members 13b and 14b in the state of FIG. 1 or FIG. 2 in which the concrete setting device 20 is placed on the formwork 10, and one of the opening edge members is provided. 13
The shape is inclined so that the b side becomes lower.

【0012】ホッパ21における一方の端壁21aの下
部には略水平なスリット21eが形成されており、この
スリット21eからホッパ21内に鋼板からなる差し込
み蓋29を差し込むことができる。この差し込み蓋29
は、図2又は図3に示す差し込み状態では、その幅方向
両縁が、ホッパ21における傾斜した両側壁21c,2
1dの下端近傍の内側面間に横架されるように支持さ
れ、これによって、前記ホッパ21の下端の前後方向に
細長いコンクリート排出口20Aを閉塞することができ
るものである。なお、図3における参照符号29aは前
記差し込み蓋29の外端に設けられこの差し込み蓋29
を抜き差しするための把手である。
A substantially horizontal slit 21e is formed below one end wall 21a of the hopper 21, and an insertion cover 29 made of a steel plate can be inserted into the hopper 21 from the slit 21e. This insertion lid 29
In the insertion state shown in FIG. 2 or FIG. 3, both edges in the width direction have inclined side walls 21 c, 2 in the hopper 21.
1d, it is supported so as to be laid horizontally between the inner side surfaces near the lower end, whereby the concrete discharge port 20A which is elongated in the front-rear direction of the lower end of the hopper 21 can be closed. Reference numeral 29a in FIG. 3 is provided at the outer end of the insertion lid 29.
This is a handle for inserting and removing the.

【0013】以上のように構成された本実施形態のコン
クリート打設器20は、図1に示すように、コンクリー
ト排出口20Aの両側の案内部材27をコンクリート打
設空間10Sの上部開口に挿入した状態で、型枠10の
両天端縁13a,14a上に載せる。また、各キャスタ
22が確実に前記両天端縁13a,14a上に載るよう
に、各台座部25に対する前記キャスタ22の取付位置
を、ボルト26が挿通された長孔の長さの範囲内で左右
に調整することができる。
As shown in FIG. 1, in the concrete placing machine 20 of the present embodiment constructed as described above, the guide members 27 on both sides of the concrete outlet 20A are inserted into the upper opening of the concrete placing space 10S. In this state, the mold 10 is placed on both top edges 13a and 14a. Also, the mounting position of the caster 22 with respect to each pedestal portion 25 is set within the range of the length of the long hole through which the bolt 26 is inserted so that each caster 22 is reliably placed on the both top edges 13a and 14a. Can be adjusted left and right.

【0014】ホッパ21内には図示されていないコンク
リートポンプ車からホースを介して適量の生コンクリー
トCを投入する。このとき、投入した生コンクリートC
がコンクリート排出口20Aから不用意に落下すること
がないように、差し込み蓋29を差し込んで前記コンク
リート排出口20Aを閉塞しておく。なお、型枠10上
へのコンクリート打設器20の設置は、ホッパ21内へ
の生コンクリートCの投入後に行っても良い。
An appropriate amount of ready-mixed concrete C is put into the hopper 21 from a concrete pump truck (not shown) via a hose. At this time, the ready-mixed concrete C
In order to prevent accidental dropping from the concrete discharge port 20A, the insertion cover 29 is inserted and the concrete discharge port 20A is closed. The setting of the concrete placing machine 20 on the formwork 10 may be performed after the ready-mixed concrete C is put into the hopper 21.

【0015】次に、差し込み蓋29を抜き取ってコンク
リート排出口20Aを開放すると共に、当該コンクリー
ト打設器20を、型枠10における支保工13,14の
天端縁13a,14a上を移動させる。この移動は、例
えば把手23を引く(又は押す)ことによつて、あるい
はコンクリートポンプ車から延びるホースをホッパ21
に入れ、この状態で前記コンクリートポンプ車を移動さ
せるといった方法で行うことができる。
Next, the insertion lid 29 is pulled out to open the concrete discharge port 20A, and the concrete placing machine 20 is moved on the top edges 13a and 14a of the supports 13 and 14 in the formwork 10. This movement can be effected, for example, by pulling (or pushing) the handle 23 or by connecting a hose extending from the concrete pump truck to the hopper 21.
And moving the concrete pump truck in this state.

【0016】コンクリート打設器20の移動に際して
は、例えばホッパ21の上端縁に設けられた各把手24
をクレーン等のワイヤロープに玉掛けしておくといった
方法によって、型枠10からの墜落といった危険を防止
することができる。各キャスタ22は、その中心軸が型
枠10における支保工13,14の天端縁13a,14
aの延長方向に対して直交していること、及びコンクリ
ート排出口20Aの両側の案内部材27が前記型枠10
における開口縁部材13b,14bの内側面と近接した
状態にあることによって、確実に前記天端縁13a,1
4a上を走行するように、かつコンクリート排出口20
Aが型枠10における打設空間10Sの上端開口に確実
に位置するように案内される。
When the concrete placing machine 20 is moved, for example, each handle 24 provided on the upper edge of the hopper 21 is used.
In such a method, the danger of falling from the formwork 10 can be prevented by slinging the form 10 on a wire rope such as a crane. The center axis of each caster 22 is the top edge 13a, 14 of the support 13, 14 in the formwork 10.
a, and the guide members 27 on both sides of the concrete discharge port 20A are
Are in close proximity to the inner side surfaces of the opening edge members 13b, 14b, so that the top edge 13a, 1
4a and the concrete outlet 20
A is guided so as to be surely positioned at the upper end opening of the casting space 10S in the formwork 10.

【0017】上述のようにしてコンクリート打設器20
が型枠10の天端縁13a,14a上を移動するのに伴
って、ホッパ21内の生コンクリートCが前記コンクリ
ート排出口20Aから型枠10における打設空間10S
に連続的に落下供給される。前記打設空間10Sには、
すでにその上端開口の近傍高さまでコンクリートポンプ
等によってコンクリートC’が打設されているので、前
記コンクリート打設器20から供給される生コンクリー
トCは、前記先打ちされたコンクリートC’の上に打ち
継がれる。
As described above, the concrete placing machine 20
Moves along the top edges 13a and 14a of the formwork 10, the ready-mixed concrete C in the hopper 21 is discharged from the concrete discharge port 20A into the casting space 10S in the formwork 10.
Is continuously supplied. In the casting space 10S,
Since the concrete C 'has already been cast by a concrete pump or the like to a height near the upper end opening, the ready-mixed concrete C supplied from the concrete casting machine 20 is cast on the previously cast concrete C'. Is inherited.

【0018】ホッパ21の下端部に設けられたコンクリ
ート均し部材28は、コンクリート打設器20の移動に
伴って、そのコンクリート排出口20Aから型枠10内
へ供給された生コンクリートCを前記型枠10の開口縁
部材13b,14b間で摩り切るものである。このた
め、生コンクリートCの打設と並行して、この生コンク
リートCの上面CFが前記コンクリート均し部材28の
移動軌跡に対応して前記開口縁部材13b側が低くなる
勾配をなすように均される。
The concrete leveling member 28 provided at the lower end of the hopper 21 is used to remove the ready-mixed concrete C supplied from the concrete discharge port 20A into the formwork 10 as the concrete placing device 20 moves. It wears off between the opening edge members 13b and 14b of the frame 10. Therefore, in parallel with the placement of the ready-mixed concrete C, the upper surface CF of the ready-mixed concrete C is leveled so that the opening edge member 13b side becomes lower in accordance with the movement locus of the concrete leveling member 28. You.

【0019】生コンクリートCの打設を終了する際に
は、ホッパ21における端壁21aのスリット21eか
ら差し込み蓋29を差し込むことによって、コンクリー
ト排出口20Aからのコンクリート供給を遮断し、コン
クリート打設器20を型枠10上から降ろす。ホッパ2
1に残った余剰コンクリートは、このコンクリート打設
器20によって搬出し、処分する。
When the placing of the ready-mixed concrete C is finished, the concrete supply from the concrete discharge port 20A is cut off by inserting the insertion lid 29 from the slit 21e of the end wall 21a of the hopper 21 to thereby stop the concrete placing device. 20 is lowered from the mold 10. Hopper 2
The surplus concrete remaining in 1 is carried out by this concrete placing machine 20 and disposed.

【0020】コンクリート打設器20を型枠10上にお
ける移動終了位置まで移動させてから、差し込み蓋29
によってホッパ21からの生コンクリートCの落下を遮
断した場合は、差し込み蓋29の下側の、案内部材27
及びコンクリート均し部材28で囲まれた空間(コンク
リート排出口20A)の容積に相当する量の生コンクリ
ートが型枠10上に残留するので、コンクリート打設器
20を型枠10から降ろした後で、残留コンクリートの
除去作業が必要となるが、差し込み蓋29の差し込み
を、コンクリート打設器20が移動終了位置に到達する
直前の適当な位置で行うようにすれば、それから移動終
了位置に到達するまでの間に、前記差し込み蓋29の下
側のコンクリート排出口20Aにある生コンクリートが
型枠10内に落下供給されるので、残留コンクリートが
殆ど生じないようにすることができる。
After the concrete placing machine 20 is moved to the movement end position on the form 10, the insertion cover 29 is moved.
When the fall of the ready-mixed concrete C from the hopper 21 is interrupted by the
And since the amount of ready-mixed concrete corresponding to the volume of the space (concrete discharge port 20A) surrounded by the concrete leveling member 28 remains on the formwork 10, after the concrete placing machine 20 is lowered from the formwork 10, The remaining concrete must be removed, but if the insertion cover 29 is inserted at an appropriate position immediately before the concrete placement machine 20 reaches the movement end position, then the movement reaches the movement end position. In the meantime, the ready-mixed concrete at the concrete discharge port 20A below the insertion cover 29 is dropped and supplied into the formwork 10, so that almost no residual concrete is generated.

【0021】なお、本発明は、図示の実施形態によって
限定的に解釈されるものではない。例えば、コンクリー
ト均し部材28の下端縁の形状は、形成しようとするコ
ンクリート壁体の天端面の形状に応じて決められるもの
である。また、ホッパ21の容量は、構築対象のコンク
リート壁体の長さ等に応じて適切に決定される。
The present invention is not construed as being limited to the illustrated embodiment. For example, the shape of the lower edge of the concrete leveling member 28 is determined according to the shape of the top end surface of the concrete wall to be formed. The capacity of the hopper 21 is appropriately determined according to the length of the concrete wall to be constructed.

【0022】[0022]

【発明の効果】本発明に係る壁体天端用コンクリート打
設器によれば、走行支持部材によって壁体構築用型枠の
天端縁上を移動しながら、前記型枠内へコンクリートが
連続的に打設され、コンクリートが型枠外部にこぼれる
ことがない。しかも、ホッパの下端に設けられた均し部
材によるコンクリート上面の均し作業が前記コンクリー
ト打設と並行して行われるため、コンクリート打設及び
その均し仕上げ作業を容易・迅速に行うことができる。
また、余剰コンクリートを処理するための別の容器を用
意する必要もないので、作業が煩雑にならない。
According to the concrete pouring device for the top of a wall according to the present invention, while the traveling support member moves on the top edge of the form for forming a wall, the concrete is continuously introduced into the form. The concrete is poured and concrete does not spill outside the formwork. In addition, since the leveling work of the concrete upper surface by the leveling member provided at the lower end of the hopper is performed in parallel with the concrete placing, the concrete placing and leveling finishing can be performed easily and quickly. .
In addition, since there is no need to prepare another container for treating excess concrete, the operation is not complicated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る壁体天端用コンクリート打設器の
好ましい一実施形態を示す使用状態の斜視図である。
FIG. 1 is a perspective view showing a preferred embodiment of a concrete placing machine for a wall top according to the present invention in a used state.

【図2】上記実施形態のコンクリート打設器をその移動
方向と直交する鉛直面で切断した断面図である。
FIG. 2 is a cross-sectional view of the concrete placing machine of the embodiment cut along a vertical plane perpendicular to the moving direction.

【図3】上記実施形態のコンクリート打設器をその移動
方向と平行な鉛直面で切断した断面図である。
FIG. 3 is a cross-sectional view of the concrete placing machine of the embodiment cut along a vertical plane parallel to the moving direction.

【符号の説明】[Explanation of symbols]

10 型枠 10S コンクリート打設空間 13a,14a 天端縁 20 コンクリート打設器 20A コンクリート排出口 21 ホッパ 22 キャスタ(走行支持部材) 27 案内部材 28 コンクリート均し部材 C 生コンクリート Reference Signs List 10 formwork 10S concrete placing space 13a, 14a top edge 20 concrete placing device 20A concrete discharge port 21 hopper 22 caster (running support member) 27 guide member 28 concrete leveling member C ready-mixed concrete

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 所要量のコンクリートを収容可能であっ
て下端部に開閉可能なコンクリート排出口を有するホッ
パと、 このホッパを壁体構築用型枠の天端縁に沿って移動可能
に支持する走行支持部材と、 前記ホッパの下端部に設けられ前記壁体構築用型枠内の
コンクリートの上面を前記ホッパの移動に伴って所定の
高さに均すコンクリート均し部材と、を具備することを
特徴とする壁体天端用コンクリート打設器。
1. A hopper capable of accommodating a required amount of concrete and having an openable / closable concrete discharge port at a lower end, and movably supported along the top edge of a wall construction form. A traveling support member; and a concrete leveling member provided at a lower end of the hopper and leveling a top surface of concrete in the wall construction form to a predetermined height as the hopper moves. A concrete placing machine for a wall top.
【請求項2】 請求項1の記載において、 ホッパの下端部に壁体構築用型枠によるコンクリート打
設空間に挿入されてこの打設空間の幅方向に対する走行
支持部材の走行を規制する案内部材が形成されたことを
特徴とする壁体天端用コンクリート打設器。
2. The guide member according to claim 1, wherein the guide member is inserted into a concrete casting space formed by a wall-building form at a lower end of the hopper and regulates travel of the traveling support member in a width direction of the casting space. A concrete placement machine for a wall top, characterized in that a wall is formed.
JP21223598A 1998-07-28 1998-07-28 Concrete placing device for upper surface of wall body Withdrawn JP2000045522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21223598A JP2000045522A (en) 1998-07-28 1998-07-28 Concrete placing device for upper surface of wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21223598A JP2000045522A (en) 1998-07-28 1998-07-28 Concrete placing device for upper surface of wall body

Publications (1)

Publication Number Publication Date
JP2000045522A true JP2000045522A (en) 2000-02-15

Family

ID=16619210

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21223598A Withdrawn JP2000045522A (en) 1998-07-28 1998-07-28 Concrete placing device for upper surface of wall body

Country Status (1)

Country Link
JP (1) JP2000045522A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040008615A (en) * 2002-07-19 2004-01-31 궤도공영 주식회사 method for shoting ready mixed concrete to a mold for construct concrete roadbed in a railway tunnel
JP2012193986A (en) * 2011-03-15 2012-10-11 Taisei Corp Marginal depth disposal intra-pit filler installation system and installation method
KR101429063B1 (en) * 2012-06-19 2014-08-13 한국건설기술연구원 Apparatus and method for pouring concrete
JP2015101911A (en) * 2013-11-27 2015-06-04 岡部株式会社 Grout material injection frame for column base member
CN114102800A (en) * 2021-11-26 2022-03-01 中铁十局集团青岛工程有限公司 Box concrete pours device fast
CN116356828A (en) * 2023-05-24 2023-06-30 江苏力引建材科技股份有限公司 Concrete placement equipment of water conservancy support crown beam

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040008615A (en) * 2002-07-19 2004-01-31 궤도공영 주식회사 method for shoting ready mixed concrete to a mold for construct concrete roadbed in a railway tunnel
JP2012193986A (en) * 2011-03-15 2012-10-11 Taisei Corp Marginal depth disposal intra-pit filler installation system and installation method
KR101429063B1 (en) * 2012-06-19 2014-08-13 한국건설기술연구원 Apparatus and method for pouring concrete
JP2015101911A (en) * 2013-11-27 2015-06-04 岡部株式会社 Grout material injection frame for column base member
CN114102800A (en) * 2021-11-26 2022-03-01 中铁十局集团青岛工程有限公司 Box concrete pours device fast
CN116356828A (en) * 2023-05-24 2023-06-30 江苏力引建材科技股份有限公司 Concrete placement equipment of water conservancy support crown beam
CN116356828B (en) * 2023-05-24 2023-11-10 江苏力引建材科技股份有限公司 Concrete placement equipment of water conservancy support crown beam

Similar Documents

Publication Publication Date Title
JP2000045522A (en) Concrete placing device for upper surface of wall body
JP7214469B2 (en) Concrete compaction device and concrete compaction method
CA1278671C (en) Apparatus and method for making pre-cast concrete products
RU2620826C2 (en) Method and device for treatment of article in form of precast concrete
EP0385980B1 (en) Method and apparatus for constructing rammed earth walls with integral render
US4178338A (en) Method of casting thin-walled, hollow concrete posts
CN106968398A (en) A kind of process that support column is poured below balcony
GB2379902A (en) Hollow core floor slabs
JP2020015271A (en) Release agent spray device for concrete product flask
US2954596A (en) Apparatus for forming concrete structures
CN208202357U (en) Form the component of floor
JP3074256B2 (en) Concrete casting tool and method of unloading opening
JPH08311885A (en) Concrete placing mold
JP3429576B2 (en) Hopper for putting concrete and method for producing concrete product using the same
JPH0577448U (en) Construction equipment for concrete construction
CN106703297A (en) Structure and method for controlling thickness of floor slab and steel bar protective layer
JPH0716406Y2 (en) Form for L-shaped block molding
TWI818860B (en) Safety railing for building structure, building structure with safety railing and construction method thereof
RU2766462C1 (en) Method of erecting walls from blocks and installation for its implementation
JPH064928Y2 (en) Anti-oxidant coating device for refractory bricks
CA1305850C (en) Apparatus and method for making pre-cast concrete products
JPH0539154Y2 (en)
CN207484514U (en) Plus side wall construction after on piping lane Bars In Poured Concrete Slab
JP2003116410A (en) Evenly distribution device for oyster
CA1312438C (en) Method and apparatus for manufacturing rammed earth walls with integral render

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20051004