JPH0577448U - Construction equipment for concrete construction - Google Patents

Construction equipment for concrete construction

Info

Publication number
JPH0577448U
JPH0577448U JP1484792U JP1484792U JPH0577448U JP H0577448 U JPH0577448 U JP H0577448U JP 1484792 U JP1484792 U JP 1484792U JP 1484792 U JP1484792 U JP 1484792U JP H0577448 U JPH0577448 U JP H0577448U
Authority
JP
Japan
Prior art keywords
concrete
machine
leveling
finishing
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1484792U
Other languages
Japanese (ja)
Inventor
五郎 森口
晋 谷沢
建治 木村
Original Assignee
株式会社淺沼組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社淺沼組 filed Critical 株式会社淺沼組
Priority to JP1484792U priority Critical patent/JPH0577448U/en
Publication of JPH0577448U publication Critical patent/JPH0577448U/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】 【目的】 建築物の躯体のコンクリートの打込み、均
し、仕上げをシステム化し、設備コストの削減と工期の
短縮を図る。 【構成】 コンクリート打込み部分の両側に設けたレー
ル3、3間に、このレール3、3に沿ってコンクリート
打込み部分の長さ方向へ個々に走行自在となる所要数の
移動梁5、6、7を架設し、第1の移動梁5にコンクリ
ート打込み機8と、第2の移動梁6にコンクリート均し
機10と、第3の移動梁7にコンクリート仕上機11を
装着し、各移動梁5、6、7の走行により、コンクリー
トの打込み、均し、仕上げを連続して行ない、工期の短
縮を図ると共に、各移動梁がレール3、3を共用するこ
とにより、設備コストの低減を実現できる。
(57) [Summary] [Purpose] Systematize the filling, leveling, and finishing of concrete on the skeleton of a building to reduce equipment costs and construction period. [Structure] Between the rails 3 and 3 provided on both sides of the concrete driving portion, a required number of movable beams 5, 6 and 7 that can individually travel along the rails 3 and 3 in the length direction of the concrete driving portion. The concrete moving machine 5 is installed on the first moving beam 5, the concrete leveling machine 10 is installed on the second moving beam 6, and the concrete finishing machine 11 is installed on the third moving beam 7. , 6 and 7 are used to continuously perform concrete pouring, leveling and finishing to shorten the construction period, and the moving beams share the rails 3 and 3, thereby reducing the equipment cost. .

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、構築しようとする建築物のコンクリートの打込みと均し及び仕上 を連続して行なえるようにしたコンクリート工事における施工装置に関する。 The present invention relates to a construction device for concrete construction capable of continuously performing concrete leveling, leveling and finishing of a building to be constructed.

【0002】[0002]

【従来の技術】[Prior Art]

建築物のコンクリート工事は、コンクリートミキサー車からポンプで圧送され たコンクリートを床面に対して打設する打込み工程と、打設されたコンクリート を所定の高さにレベルを決める均し工程と、均したコンクリート面を平滑面にす る仕上げ工程とを経て行なわれている。 Concrete construction work for a building consists of a driving process in which concrete pumped from a concrete mixer truck is placed on the floor surface, and a leveling process in which the level of the placed concrete is set to a predetermined height. It is carried out through a finishing process that makes the concrete surface smooth.

【0003】 従来、上記のような方法でコンクリートの打込みが行なわれてきたが、最近床 面上に打込み機を旋回と移動が自在となるよう配置し、ポンプで圧送されたコン クリートを打込み機の先端ホースで打設するような方法も開発されている。Conventionally, concrete has been driven by the above-mentioned method, but recently, a driving machine is arranged on the floor so that it can be swung and moved freely, and a concrete pumped by a pump is driven. A method of driving with a tip hose has also been developed.

【0004】 次に均し工程は、コンクリートを打ち込んだあと、定規を使って所定の高さに コンクリート表面を平らにする作業であり、経験と勘と腕をたよりに左官工が行 なってきたが、近年、均し作業の省力化を図るため、コンクリート打込み場所の 両側に架台を設け、この架台間に走行可能な移動梁を架設し、移動梁に均し部分 を移動梁に沿って移動できるように搭載し、コンクリートの表面を定められたレ ベルに均す自動均し機が提案されている。Next, the leveling process is a work in which concrete is driven and then the surface of the concrete is flattened to a predetermined height by using a ruler, and a plasterer has performed based on his experience, intuition and skill. However, in recent years, in order to save labor in leveling work, we installed pedestals on both sides of the concrete pouring place, installed movable beams that can run between these pedestals, and moved the leveled parts along the movable beams to the movable beams. An automatic leveling machine has been proposed, which is mounted as much as possible to level the surface of concrete to a specified level.

【0005】 更に、仕上げ工程は、左官工が金コテで行なうか、又は、均し後のコンクリー ト面に仕上げ用の自走式ロボットを設置し、コテの回転と走行によりコンクリー ト面を連続的に平滑面に仕上げるものである。Further, the finishing process is carried out by a plasterer with a gold trowel, or a finishing self-propelled robot is installed on the concrete surface after leveling, and the concrete surface is continuously formed by rotation and running of the iron. Is a smooth surface.

【0006】 また、上記の作業の他に、ブリージング水の除去作業がある。これはコンクリ ートを打ち込んだあと、しばらくするとコンクリート表面に余剰水が浮き上がっ てくる(ブリージング現象)が、この水がひかないと直か押さえによる仕上げ作 業ができない。このため、できるだけ早く仕上げ作業にかかれるように、左官工 はこの水をスポンジや布きれで除去している。In addition to the above work, there is work for removing breathing water. Excess water floats up on the concrete surface (breathing phenomenon) after a short time after the concrete is driven in, but if this water is not drawn, the finishing work cannot be done by pressing directly. For this reason, plasterers remove this water with a sponge or a piece of cloth so that they can finish it as soon as possible.

【0007】[0007]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところで、従来のコンクリート施工の各工程を人力によって行なうと作業能率 が悪いだけでなく、重労働となり、労務人員の確保も困難である。 By the way, if each process of conventional concrete construction is performed manually, not only the work efficiency is poor, but also heavy labor is required and it is difficult to secure labor personnel.

【0008】 また、各工程を機械的に行なう従来の装置は、それぞれ独立して関連性がなく 、互に共用する部分がないため設備コストが高くつくという問題がある。Further, the conventional apparatus that mechanically performs each process has a problem that the equipment cost is high because there is no relation independently and there is no shared portion.

【0009】 そこでこの考案は、上記のような従来の問題点を解決するため、コンクリート 施工の各工程を機械的に行なうと共に、これらの機構を一つにシステム化し、作 業能率の向上と共に、仮設部分の共用化により設備コストの大幅な低減を図るこ とができるコンクリート工事の施工装置を提供することを課題としている。Therefore, in order to solve the above-mentioned conventional problems, the present invention mechanically performs each step of concrete construction and systematizes these mechanisms into one to improve the work efficiency. It is an object of the present invention to provide a construction device for concrete work that can significantly reduce the equipment cost by sharing the temporary part.

【0010】[0010]

【課題を解決するための手段】[Means for Solving the Problems]

上記のような課題を解決するため、この考案は、コンクリート打込み部分の両 側に設けたレール間に、レールに沿ってコンクリート打込み部分上を個々に走行 自在となる所要数の移動梁を架設し、移動梁にコンクリート打込み機と、コンク リート均し機と、コンクリート仕上機とを装着し、各移動梁の走行により、コン クリートの打込みと均し及び仕上げが共通のレールを利用して行なえるようにし た構成を採用したものである。 In order to solve the above-mentioned problems, the present invention installs a required number of moving beams between rails provided on both sides of a concrete driving portion so that the movable beams can be individually moved along the rails on the concrete driving portion. The moving beam is equipped with a concrete driving machine, a concrete leveling machine, and a concrete finishing machine. By moving each moving beam, concrete can be driven, leveled and finished using a common rail. This is the structure adopted.

【0011】[0011]

【作用】[Action]

コンクリート打込み部分に対し、一つの移動梁のレールに沿う走行と打込み機 の回動によりコンクリートの打込みを行ない、次に他の一つの移動梁をレールに 沿って走行させ、かつこの移動梁に沿ってコンクリート均し機を往復移動させ、 打設したコンクリート面を所定レベル高さの水平面に均して行く。 For the concrete driving part, the concrete is driven by traveling along the rail of one moving beam and the rotation of the driving machine, and then the other moving beam is driven along the rail and along this moving beam. The concrete leveling machine is moved back and forth so that the placed concrete surface is leveled on a horizontal surface of a predetermined level.

【0012】 この後更に別の移動梁をレールに沿って走行させ、かつこの移動梁に沿ってコ ンクリート仕上機を移動させ、均されたコンクリート面を平滑に仕上げる。Thereafter, another moving beam is run along the rail, and the concrete finisher is moved along the moving beam to finish the smoothed concrete surface smoothly.

【0013】[0013]

【実施例】【Example】

以下、この考案の実施例を添付図面に基づいて説明する。 An embodiment of the present invention will be described below with reference to the accompanying drawings.

【0014】 図1乃至図4のように、コンクリートを打込もうとする躯体1の上部両側に、 躯体1の長さ方向に沿う架台2、2を設け、両架台2、2上にレール3、3が敷 設されている。As shown in FIGS. 1 to 4, pedestals 2 and 2 are provided along the length direction of the skeleton 1 on both upper sides of the skeleton 1 into which concrete is to be poured, and rails 3 are provided on both pedestals 2 and 2. 3 are laid.

【0015】 両架台2、2は図示のように、躯体1の両側外部に一定の間隔で立設した支柱 4で支えてもよいが、すでにでき上った下階の躯体から支柱を立て、それで支え てもよい。As shown in the figure, both pedestals 2 and 2 may be supported by struts 4 which are erected at regular intervals on both outsides of the skeleton 1, but struts are erected from the already completed lower skeleton skeleton. You may support it.

【0016】 躯体1上で両側の架台2間には、レール3、3上に両端の車輪が載り、モータ による駆動によってレール3、3に沿う走行が自在となる第1の移動梁5と第2 の移動梁6及び第3の移動梁7が架設されている。Between the pedestals 2 on both sides of the skeleton 1, wheels at both ends are mounted on rails 3 and 3, and the first movable beam 5 and the first movable beam 5 that can freely travel along the rails 3 and 3 by being driven by a motor. The second movable beam 6 and the third movable beam 7 are installed.

【0017】 第1の移動梁5には図1と2に示すように、コンクリート打込み機8と電動ホ イスト9が第1の移動梁5の長さ方向に移動自在となるよう装着され、第2の移 動梁6には図3の如く、コンクリート均し機10がこの移動梁6の長さ方向に移 動自在となるよう装着されている。As shown in FIGS. 1 and 2, a concrete driving machine 8 and an electric hoist 9 are mounted on the first movable beam 5 so as to be movable in the longitudinal direction of the first movable beam 5. As shown in FIG. 3, a concrete leveling machine 10 is attached to the second movable beam 6 so as to be movable in the longitudinal direction of the movable beam 6.

【0018】 また、第3の移動梁7には図4に示すように、コンクリート仕上機11とブリ ージング水除去機12とが移動梁7の長さ方向に移動自在となるよう装着されて いる。As shown in FIG. 4, a concrete finishing machine 11 and a blazing water removing machine 12 are mounted on the third movable beam 7 so as to be movable in the length direction of the movable beam 7. ..

【0019】 第1乃至第3の移動梁5、6、7に対して、コンクリート打込み機8、均し機 10、仕上機11、ブリージング水除去機12は各々の下面部へ吊下げ状に取付 けたが、上面側に搭載するようにしてもよく、また、各々の移動梁に対して着脱 自在とし、移動梁を共用することにより架設する移動梁の数を減らすようにして もよい。The concrete driving machine 8, the leveling machine 10, the finishing machine 11, and the breathing water removing machine 12 are attached to the lower surface of each of the first to third moving beams 5, 6, 7 in a suspended manner. The beam may be mounted on the upper surface side, or may be detachably attached to each moving beam and the number of moving beams to be installed may be reduced by sharing the moving beams.

【0020】 第1の移動梁5に装着するコンクリート打込み機8は、移動梁5に装着する可 動台13にコンクリート吐出管14を旋回動自在に取付け、ホース15を介して ポンプで圧送されてくるコンクリートAを吐出管14で躯体1上へ打込むように なっている。The concrete driving machine 8 mounted on the first movable beam 5 has a concrete discharge pipe 14 rotatably mounted on a movable table 13 mounted on the movable beam 5, and is pumped by a pump via a hose 15. The coming concrete A is driven onto the skeleton 1 by the discharge pipe 14.

【0021】 第2の移動梁6に装着するコンクリート均し機10は図3のように、移動梁6 に沿って移動する可動台16の下部に、均しスクリュー17と均しロール18を 取付け、可動台16により均しスクリュー17と均しロール18の上下高さ位置 を調整自在とし、第2移動梁6の間歇的な走行と移動梁6に沿う可動台16の移 動、均しスクリュー17と均しロール18の回転及びレーザ等を利用した可動台 16の上下高さ制御とによって、コンクリートAの表面を定められたレベルに均 し施工するものである。As shown in FIG. 3, the concrete leveling machine 10 mounted on the second moving beam 6 has a leveling screw 17 and a leveling roll 18 attached to a lower portion of a movable table 16 which moves along the moving beam 6. The movable table 16 makes it possible to adjust the vertical height positions of the leveling screw 17 and the leveling roll 18, and the intermittent movement of the second moving beam 6 and the movement and leveling screw of the movable table 16 along the moving beam 6. The surface of the concrete A is leveled to a predetermined level by the rotation of the leveling roll 17 and the leveling roll 18 and the vertical height control of the movable table 16 using a laser or the like.

【0022】 第3の移動梁7に取付けるコンクリート仕上機11は、図5と図6に一例を示 すように、移動梁7に取付ける上下動可能な本体21の下部にモータ22で駆動 される回転軸23を設け、この回転軸23の下端に複数のコテ24を取付け、コ テ24に回転と重量を加えながら第3の移動梁7に沿う本体21の移動と、移動 梁7の走行とによってコンクリートAの表面を平滑面に仕上げるようになってい る。The concrete finishing machine 11 attached to the third movable beam 7 is driven by a motor 22 below the main body 21 which is attached to the movable beam 7 and is vertically movable, as shown in FIGS. 5 and 6. A rotary shaft 23 is provided, and a plurality of trowels 24 are attached to the lower end of the rotary shaft 23. Movement of the main body 21 along the third movable beam 7 while traveling and movement of the movable beam 7 are performed while adding rotation and weight to the trowel 24. By doing so, the surface of concrete A is made smooth.

【0023】 第3の移動梁7に取付けたブリージング水除去機12は、移動梁7に沿って移 動することにより、吸引具25でコンクリートA上のブリージング水を吸引除去 し、仕上げ工程が速やかに行なえるようにする。The breathing water remover 12 attached to the third moving beam 7 is moved along the moving beam 7 to suck and remove the breathing water on the concrete A by the suction tool 25, so that the finishing process can be performed quickly. To be able to do.

【0024】 なお、第1の移動梁5に装着したホイスト9は、コンクリート工事にかかる前 の型枠工事や鉄筋工事における揚重作業において、ホイストクレーンとして利用 することができる。The hoist 9 attached to the first movable beam 5 can be used as a hoist crane in formwork work before concrete work and in lifting work in reinforcing bar work.

【0025】 この考案の施工装置は上記のような構成であり、躯体1の両側に立設した支柱 4に架台2を取付け、両側架台2のレール3間上に第1乃至第3の移動梁5、6 、7をクレーンで吊込んで架設し、各移動梁5、6、7に、コンクリート打込み 機8、ホイスト9、均し機10、仕上機11、ブリージング水除去機12をクレ ーンで吊込んで取付ける。The construction apparatus of the present invention is configured as described above, and the pedestal 2 is attached to the stanchions 4 erected on both sides of the skeleton 1, and the first to third moving beams are mounted between the rails 3 of the pedestal 2 on both sides. 5, 6 and 7 are hung by a crane and erected, and each moving beam 5, 6 and 7 is craned with a concrete driving machine 8, a hoist 9, a leveling machine 10, a finishing machine 11 and a breathing water removing machine 12. Mount by hanging with.

【0026】 躯体1にコンクリートを打設して仕上げるには、レール3、3間の一方端部に 各移動梁5、6、7を寄せた状態で、先ず第1の移動梁5をレール3、3に沿っ て走行させ、コンクリート打込み機8の旋回と移動梁5に沿う移動を制御し、ポ ンプで圧送されてきたコンクリートを一方の端部から他方の端部へと全面に打込 んで行く。In order to cast concrete onto the skeleton 1 for finishing, the first movable beam 5 is first placed on the rail 3 while the movable beams 5, 6, 7 are brought close to one end between the rails 3, 3. 3 to control the turning of the concrete driving machine 8 and the movement along the movable beam 5, and the concrete pumped by the pump is driven from one end to the other end on the entire surface. go.

【0027】 次に、第2の移動梁6に取付けたコンクリート均し機10を移動梁6に沿って 躯体1の幅方向へ移動させ、この均し機10が一方側に達すると移動梁6をレー ル3、3に沿って、少し移動させ、均し機10を元の位置に戻し、再び移動梁6 に沿って移動させる。これを繰返すことによってコンクリートAの表面を所定レ ベル高さに均して行く。Next, the concrete leveling machine 10 attached to the second moving beam 6 is moved along the moving beam 6 in the width direction of the skeleton 1, and when the leveling machine 10 reaches one side, the moving beam 6 is moved. Is slightly moved along the rails 3 and 3, the leveling machine 10 is returned to its original position, and then moved again along the moving beam 6. By repeating this, the surface of the concrete A is leveled to a predetermined level.

【0028】 次に、ブリージング水の浮上が終了した時点で第3の移動梁7に取付けたブリ ージング水除去機12を移動梁7に沿って移動させ、コンクリートAの表面に発 生したブリージング水をバキューム力によって吸引除去する。Next, when the floating of the breathing water is completed, the breathing water remover 12 attached to the third moving beam 7 is moved along the moving beam 7 so that the breathing water generated on the surface of the concrete A is removed. Is removed by suction with a vacuum force.

【0029】 続いて、コンクリートAが所定の硬度に達した時点で、コンクリート仕上機1 1を移動梁7に沿って移動させ、コンクリートAの表面をコテ24によって平滑 面に仕上げる。Subsequently, when the concrete A reaches a predetermined hardness, the concrete finisher 11 is moved along the movable beam 7 to finish the surface of the concrete A with a trowel 24 to a smooth surface.

【0030】 コンクリート仕上機11は、移動梁7に沿う移動及び移動梁7自身の移動によ り、コテ24の成形範囲がラップするように進み、コンクリートAの表面全面を 平滑面に仕上げることになる。The concrete finisher 11 moves along the movable beam 7 and the movable beam 7 itself so that the molding range of the iron 24 is wrapped so that the entire surface of the concrete A is finished to be a smooth surface. Become.

【0031】 上記のように、コンクリートの打込みから仕上までが、両側の架台2、2とレ ール3、3を共用して連続的に施工できる。As described above, from the concrete pouring to the finishing, the pedestals 2 and 2 on both sides and the rails 3 and 3 can be shared for continuous construction.

【0032】 床面に対するコンクリートの打設と仕上げが完了した後の上階への盛り替えは 、クレーンを利用して各移動梁5、6、7を架台2、2から外し、これを躯体1 上に仮置きし、各支柱4を継ぎ足した後、架台2、2を支柱4の上部にセットし 直し、改めて各移動梁5、6、7を架台2、2間に架設するようにする。After pouring concrete on the floor surface and finishing the refilling to the upper floor, the moving beams 5, 6, and 7 are removed from the mounts 2 and 2 by using a crane, and this is moved to the frame 1 After temporarily placing it on top of each of the columns 4 and adding the columns 4, the pedestals 2 and 2 are reset to the upper portions of the columns 4, and the moving beams 5, 6 and 7 are erected between the columns 2 and 2 again.

【0033】 また、各移動梁5、6、7の上階への盛り替えは、上記とは別に、油圧や電動 モータなどを利用して架台2、2全体が支柱4に沿って自分でせり上って行く、 クライミング方式を採用してもよい。The relocation of the movable beams 5, 6, 7 to the upper floor is independent of the above, and the pedestals 2 and 2 as a whole are slid along the columns 4 by using hydraulic pressure or an electric motor. You may go up and use a climbing method.

【0034】 更に、図示実施例で示したように、架台2、2を支える両側の支柱4を利用し 、支柱4間の上部に、仮設屋根31を取付けるようにすると、雨天でも躯体1の 工事が行なえ、工期の短縮と作業環境の改善を図ることができる。Further, as shown in the illustrated embodiment, by using the pillars 4 on both sides for supporting the pedestals 2 and 2, and installing the temporary roof 31 on the upper part between the pillars 4, the construction of the skeleton 1 can be performed even in rainy weather. The work period can be shortened and the working environment can be improved.

【0035】 なお、仮設屋根31は複数の屋根部材31a、31bに分割して上下に配置し 、躯体1の施工が進むにつれ、クレーンBの吊上げによって上昇させると共に下 位屋根部材31bを開閉自在とし、躯体1に対する資材の搬入を上部から行なえ るようにする。The temporary roof 31 is divided into a plurality of roof members 31a and 31b and arranged vertically, and as the construction of the skeleton 1 proceeds, the crane B is lifted and the lower roof member 31b is opened and closed. , The material can be carried into the body 1 from above.

【0036】[0036]

【効果】【effect】

以上のように、この考案によると、コンクリート打込み部分の両側に設けたレ ール間に所要数の移動梁を架設し、各移動梁にコンクリート打込み機と、コンク リート均し機と、コンクリート仕上機とを装着し、移動梁の移動によりコンクリ ートの打込みと均し及び仕上げを連続して行なうようにしたので、コンクリート 打込み部分の両側に設けたレールを共用してコンクリート工事を施工でき、設備 の一部共用化により設備コストの削減が図れる。 As described above, according to the present invention, the required number of moving beams are erected between the rails provided on both sides of the concrete driving part, and each moving beam has a concrete driving device, a concrete leveling device, and a concrete finishing device. Since the machine is installed and the moving beam moves, the concrete is continuously driven, the concrete is leveled, and the finishing is performed continuously, so that the rails provided on both sides of the concrete driving part can be shared to perform the concrete construction. Equipment costs can be reduced by sharing some equipment.

【0037】 また、一連のコンクリート工事をシステム化でき、作業能率の向上によって工 期の短縮が可能になる。Further, a series of concrete works can be systematized, and the work efficiency can be improved to shorten the work period.

【図面の簡単な説明】[Brief description of drawings]

【図1】施工装置の使用状態を示す平面図FIG. 1 is a plan view showing a usage state of a construction device.

【図2】同上におけるコンクリート打込機部分の縦断面
FIG. 2 is a vertical cross-sectional view of the concrete driving machine part in the same as above.

【図3】同じくコンクリート均し機部分の縦断面図[Figure 3] Similarly, a vertical cross-sectional view of the concrete leveler

【図4】同コンクリート仕上機部分の縦断面図[Fig. 4] Vertical sectional view of the concrete finishing machine part

【図5】コンクリート仕上機の一例を示す縦断面図FIG. 5 is a vertical sectional view showing an example of a concrete finishing machine.

【図6】同上の横断平面図FIG. 6 is a transverse plan view of the same as above.

【図7】仮設屋根を取付けた状態を示す斜視図FIG. 7 is a perspective view showing a state in which a temporary roof is attached.

【符号の説明】[Explanation of symbols]

1 躯体 2 架台 3 レール 4 支柱 5 第1の移動梁 6 第2の移動梁 7 第3の移動梁 8 コンクリート打込機 9 電動ホイスト 10 コンクリート均し機 11 コンクリート仕上機 12 ブリージング水除去機 1 frame 2 frame 3 rails 4 columns 5 first moving beam 6 second moving beam 7 third moving beam 8 concrete driving machine 9 electric hoist 10 concrete leveling machine 11 concrete finishing machine 12 breathing water remover

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 コンクリート打込み部分の両側に設けた
レール間に、レールに沿ってコンクリート打込み部分上
を個々に走行自在となる所要数の移動梁を架設し、移動
梁にコンクリート打込み機と、コンクリート均し機と、
コンクリート仕上機とを装着し、各移動梁の走行によ
り、コンクリートの打込みと均し及び仕上げが共通のレ
ールを利用して行なえるようにしたコンクリート工事の
施工装置。
1. A required number of movable beams are erected between rails provided on both sides of the concrete driving portion so that the movable beams can individually travel along the rail, and the concrete driving machine and the concrete are attached to the movable beams. With a leveling machine,
A concrete finishing machine that is equipped with a concrete finishing machine and allows each moving beam to run using a common rail for concrete loading, leveling, and finishing.
JP1484792U 1992-03-19 1992-03-19 Construction equipment for concrete construction Pending JPH0577448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1484792U JPH0577448U (en) 1992-03-19 1992-03-19 Construction equipment for concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1484792U JPH0577448U (en) 1992-03-19 1992-03-19 Construction equipment for concrete construction

Publications (1)

Publication Number Publication Date
JPH0577448U true JPH0577448U (en) 1993-10-22

Family

ID=11872434

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1484792U Pending JPH0577448U (en) 1992-03-19 1992-03-19 Construction equipment for concrete construction

Country Status (1)

Country Link
JP (1) JPH0577448U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10204833A (en) * 1997-01-24 1998-08-04 Takanosu Kogyo Kk Concrete flattener and rainproof and heat insulating umbrella
JP2018062778A (en) * 2016-10-13 2018-04-19 ジャパンパイル株式会社 Receiving stand of construction equipment
CN110952783A (en) * 2019-11-19 2020-04-03 广州圣安环保科技有限公司 Cement mortar spreading system and control method thereof
JP2021021201A (en) * 2019-07-25 2021-02-18 株式会社大林組 Linear structure construction work system and construction method of linear structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10204833A (en) * 1997-01-24 1998-08-04 Takanosu Kogyo Kk Concrete flattener and rainproof and heat insulating umbrella
JP2018062778A (en) * 2016-10-13 2018-04-19 ジャパンパイル株式会社 Receiving stand of construction equipment
JP2021021201A (en) * 2019-07-25 2021-02-18 株式会社大林組 Linear structure construction work system and construction method of linear structure
CN110952783A (en) * 2019-11-19 2020-04-03 广州圣安环保科技有限公司 Cement mortar spreading system and control method thereof

Similar Documents

Publication Publication Date Title
JP3211755U (en) Mobile work vehicle with concrete finishing equipment
CN105736016A (en) Tunnel secondary lining steel bar framework construction equipment and application thereof
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
KR0171420B1 (en) Device for leveling concreted surface
US3689019A (en) Apparatus for shuttering poured concrete structures
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
CN111075480A (en) Self-inclining type side wall formwork trolley, device and using method thereof
JPH0577448U (en) Construction equipment for concrete construction
JP6669524B2 (en) Invert concrete construction equipment
JP4139536B2 (en) Concrete placement equipment using invert formwork
CN212507548U (en) Bracket supporting robot
CN107792802A (en) A kind of small members movement and mounting system and method
JPH102199A (en) Placing device of concrete in tunnel bottom
JP2001159240A (en) Concrete direct finishing method and jig
CN111979991A (en) Special large-gradient sliding form device with arc lining bottom plate and construction method
JP4748755B2 (en) Concrete formwork construction method
JPH0355679Y2 (en)
JPH0390777A (en) Concrete placement method and device
CN211777474U (en) Self-inclining type side wall formwork trolley and device thereof
CN214785732U (en) Auxiliary tile sticking machine
CN211817955U (en) Trolley for molding and building side wall without pull rod
JPH0446433Y2 (en)
CN216740765U (en) Mobile masonry platform for building construction
JP7227836B2 (en) Formwork system and construction method of concrete structure using this formwork system
CN212656601U (en) Building support robot