FR2656650B1
(fr)
*
|
1989-12-29 |
1995-09-01 |
Inst Francais Du Petrole |
Methode et dispositif pour stimuler une zone souterraine par injection controlee de fluide provenant d'une zone voisine que l'on relie a la premiere par un drain traversant une couche intermediaire peu permeable.
|
FR2656651B1
(fr)
*
|
1989-12-29 |
1995-09-08 |
Inst Francais Du Petrole |
Methode et dispositif pour stimuler une zone souterraine par injection differee de fluide provenant d'une zone voisine, le long de fractures faites depuis un drain fore dans une couche intermediaire peu permeable.
|
US5450902A
(en)
*
|
1993-05-14 |
1995-09-19 |
Matthews; Cameron M. |
Method and apparatus for producing and drilling a well
|
US5655605A
(en)
*
|
1993-05-14 |
1997-08-12 |
Matthews; Cameron M. |
Method and apparatus for producing and drilling a well
|
US5431482A
(en)
*
|
1993-10-13 |
1995-07-11 |
Sandia Corporation |
Horizontal natural gas storage caverns and methods for producing same
|
EA000057B1
(ru)
*
|
1995-04-07 |
1998-04-30 |
Шелл Интернэшнл Рисерч Маатсхаппий Б.В. |
Система скважин для добычи вязкой нефти
|
NO305719B1
(no)
*
|
1997-06-11 |
1999-07-12 |
Gr Sfjell Invent As |
FremgangsmÕte og system for Õ °ke utvinningstakt i en av to eksisterende, nµrliggende petroleumsbr°nner
|
US6263965B1
(en)
|
1998-05-27 |
2001-07-24 |
Tecmark International |
Multiple drain method for recovering oil from tar sand
|
US6167966B1
(en)
*
|
1998-09-04 |
2001-01-02 |
Alberta Research Council, Inc. |
Toe-to-heel oil recovery process
|
US7048049B2
(en)
|
2001-10-30 |
2006-05-23 |
Cdx Gas, Llc |
Slant entry well system and method
|
US6280000B1
(en)
*
|
1998-11-20 |
2001-08-28 |
Joseph A. Zupanick |
Method for production of gas from a coal seam using intersecting well bores
|
US6708764B2
(en)
|
2002-07-12 |
2004-03-23 |
Cdx Gas, L.L.C. |
Undulating well bore
|
US8297377B2
(en)
|
1998-11-20 |
2012-10-30 |
Vitruvian Exploration, Llc |
Method and system for accessing subterranean deposits from the surface and tools therefor
|
US8376052B2
(en)
|
1998-11-20 |
2013-02-19 |
Vitruvian Exploration, Llc |
Method and system for surface production of gas from a subterranean zone
|
US7025154B2
(en)
*
|
1998-11-20 |
2006-04-11 |
Cdx Gas, Llc |
Method and system for circulating fluid in a well system
|
US6681855B2
(en)
|
2001-10-19 |
2004-01-27 |
Cdx Gas, L.L.C. |
Method and system for management of by-products from subterranean zones
|
US6662870B1
(en)
|
2001-01-30 |
2003-12-16 |
Cdx Gas, L.L.C. |
Method and system for accessing subterranean deposits from a limited surface area
|
US6598686B1
(en)
|
1998-11-20 |
2003-07-29 |
Cdx Gas, Llc |
Method and system for enhanced access to a subterranean zone
|
US6454000B1
(en)
|
1999-11-19 |
2002-09-24 |
Cdx Gas, Llc |
Cavity well positioning system and method
|
US7073595B2
(en)
*
|
2002-09-12 |
2006-07-11 |
Cdx Gas, Llc |
Method and system for controlling pressure in a dual well system
|
US6425448B1
(en)
|
2001-01-30 |
2002-07-30 |
Cdx Gas, L.L.P. |
Method and system for accessing subterranean zones from a limited surface area
|
US6250391B1
(en)
|
1999-01-29 |
2001-06-26 |
Glenn C. Proudfoot |
Producing hydrocarbons from well with underground reservoir
|
US6412556B1
(en)
|
2000-08-03 |
2002-07-02 |
Cdx Gas, Inc. |
Cavity positioning tool and method
|
US6591903B2
(en)
|
2001-12-06 |
2003-07-15 |
Eog Resources Inc. |
Method of recovery of hydrocarbons from low pressure formations
|
US6679326B2
(en)
*
|
2002-01-15 |
2004-01-20 |
Bohdan Zakiewicz |
Pro-ecological mining system
|
US6725922B2
(en)
|
2002-07-12 |
2004-04-27 |
Cdx Gas, Llc |
Ramping well bores
|
US7025137B2
(en)
*
|
2002-09-12 |
2006-04-11 |
Cdx Gas, Llc |
Three-dimensional well system for accessing subterranean zones
|
US8333245B2
(en)
|
2002-09-17 |
2012-12-18 |
Vitruvian Exploration, Llc |
Accelerated production of gas from a subterranean zone
|
US7264048B2
(en)
*
|
2003-04-21 |
2007-09-04 |
Cdx Gas, Llc |
Slot cavity
|
US7419005B2
(en)
*
|
2003-07-30 |
2008-09-02 |
Saudi Arabian Oil Company |
Method of stimulating long horizontal wells to improve well productivity
|
US20060201715A1
(en)
*
|
2003-11-26 |
2006-09-14 |
Seams Douglas P |
Drilling normally to sub-normally pressured formations
|
US7419223B2
(en)
*
|
2003-11-26 |
2008-09-02 |
Cdx Gas, Llc |
System and method for enhancing permeability of a subterranean zone at a horizontal well bore
|
US20060201714A1
(en)
*
|
2003-11-26 |
2006-09-14 |
Seams Douglas P |
Well bore cleaning
|
US7409999B2
(en)
*
|
2004-07-30 |
2008-08-12 |
Baker Hughes Incorporated |
Downhole inflow control device with shut-off feature
|
US20050051326A1
(en)
*
|
2004-09-29 |
2005-03-10 |
Toothman Richard L. |
Method for making wells for removing fluid from a desired subterranean
|
CA2760495C
(en)
*
|
2004-11-19 |
2016-01-05 |
Halliburton Energy Services, Inc. |
Methods and apparatus for drilling, completing and configuring u-tube boreholes
|
US7353877B2
(en)
*
|
2004-12-21 |
2008-04-08 |
Cdx Gas, Llc |
Accessing subterranean resources by formation collapse
|
US20070044957A1
(en)
*
|
2005-05-27 |
2007-03-01 |
Oil Sands Underground Mining, Inc. |
Method for underground recovery of hydrocarbons
|
US8287050B2
(en)
*
|
2005-07-18 |
2012-10-16 |
Osum Oil Sands Corp. |
Method of increasing reservoir permeability
|
US7809538B2
(en)
|
2006-01-13 |
2010-10-05 |
Halliburton Energy Services, Inc. |
Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
|
US7621326B2
(en)
*
|
2006-02-01 |
2009-11-24 |
Henry B Crichlow |
Petroleum extraction from hydrocarbon formations
|
CA2649850A1
(en)
*
|
2006-04-21 |
2007-11-01 |
Osum Oil Sands Corp. |
Method of drilling from a shaft for underground recovery of hydrocarbons
|
US20080078552A1
(en)
*
|
2006-09-29 |
2008-04-03 |
Osum Oil Sands Corp. |
Method of heating hydrocarbons
|
US7770643B2
(en)
|
2006-10-10 |
2010-08-10 |
Halliburton Energy Services, Inc. |
Hydrocarbon recovery using fluids
|
US7832482B2
(en)
|
2006-10-10 |
2010-11-16 |
Halliburton Energy Services, Inc. |
Producing resources using steam injection
|
WO2008048966A2
(en)
*
|
2006-10-16 |
2008-04-24 |
Osum Oil Sands Corp. |
Method of collecting hydrocarbons using a barrier tunnel
|
WO2008064305A2
(en)
|
2006-11-22 |
2008-05-29 |
Osum Oil Sands Corp. |
Recovery of bitumen by hydraulic excavation
|
US20090084707A1
(en)
*
|
2007-09-28 |
2009-04-02 |
Osum Oil Sands Corp. |
Method of upgrading bitumen and heavy oil
|
US8096351B2
(en)
*
|
2007-10-19 |
2012-01-17 |
Baker Hughes Incorporated |
Water sensing adaptable in-flow control device and method of use
|
US7942206B2
(en)
*
|
2007-10-12 |
2011-05-17 |
Baker Hughes Incorporated |
In-flow control device utilizing a water sensitive media
|
US8312931B2
(en)
|
2007-10-12 |
2012-11-20 |
Baker Hughes Incorporated |
Flow restriction device
|
US20090301726A1
(en)
*
|
2007-10-12 |
2009-12-10 |
Baker Hughes Incorporated |
Apparatus and Method for Controlling Water In-Flow Into Wellbores
|
US7784543B2
(en)
*
|
2007-10-19 |
2010-08-31 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US7789139B2
(en)
*
|
2007-10-19 |
2010-09-07 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US20090101354A1
(en)
*
|
2007-10-19 |
2009-04-23 |
Baker Hughes Incorporated |
Water Sensing Devices and Methods Utilizing Same to Control Flow of Subsurface Fluids
|
US7775271B2
(en)
*
|
2007-10-19 |
2010-08-17 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US7913765B2
(en)
*
|
2007-10-19 |
2011-03-29 |
Baker Hughes Incorporated |
Water absorbing or dissolving materials used as an in-flow control device and method of use
|
US8544548B2
(en)
*
|
2007-10-19 |
2013-10-01 |
Baker Hughes Incorporated |
Water dissolvable materials for activating inflow control devices that control flow of subsurface fluids
|
US7918272B2
(en)
*
|
2007-10-19 |
2011-04-05 |
Baker Hughes Incorporated |
Permeable medium flow control devices for use in hydrocarbon production
|
US7775277B2
(en)
*
|
2007-10-19 |
2010-08-17 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US7793714B2
(en)
*
|
2007-10-19 |
2010-09-14 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US8069921B2
(en)
|
2007-10-19 |
2011-12-06 |
Baker Hughes Incorporated |
Adjustable flow control devices for use in hydrocarbon production
|
US7891430B2
(en)
|
2007-10-19 |
2011-02-22 |
Baker Hughes Incorporated |
Water control device using electromagnetics
|
US7913755B2
(en)
*
|
2007-10-19 |
2011-03-29 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US20090101336A1
(en)
*
|
2007-10-19 |
2009-04-23 |
Baker Hughes Incorporated |
Device and system for well completion and control and method for completing and controlling a well
|
US8167960B2
(en)
*
|
2007-10-22 |
2012-05-01 |
Osum Oil Sands Corp. |
Method of removing carbon dioxide emissions from in-situ recovery of bitumen and heavy oil
|
US20090101344A1
(en)
*
|
2007-10-22 |
2009-04-23 |
Baker Hughes Incorporated |
Water Dissolvable Released Material Used as Inflow Control Device
|
US7918275B2
(en)
|
2007-11-27 |
2011-04-05 |
Baker Hughes Incorporated |
Water sensitive adaptive inflow control using couette flow to actuate a valve
|
WO2009073727A1
(en)
*
|
2007-12-03 |
2009-06-11 |
Osum Oil Sands Corp. |
Method of recovering bitumen from a tunnel or shaft with heating elements and recovery wells
|
US8176982B2
(en)
*
|
2008-02-06 |
2012-05-15 |
Osum Oil Sands Corp. |
Method of controlling a recovery and upgrading operation in a reservoir
|
US8839849B2
(en)
|
2008-03-18 |
2014-09-23 |
Baker Hughes Incorporated |
Water sensitive variable counterweight device driven by osmosis
|
US7992637B2
(en)
*
|
2008-04-02 |
2011-08-09 |
Baker Hughes Incorporated |
Reverse flow in-flow control device
|
US8931570B2
(en)
*
|
2008-05-08 |
2015-01-13 |
Baker Hughes Incorporated |
Reactive in-flow control device for subterranean wellbores
|
US8171999B2
(en)
|
2008-05-13 |
2012-05-08 |
Baker Huges Incorporated |
Downhole flow control device and method
|
US8555958B2
(en)
|
2008-05-13 |
2013-10-15 |
Baker Hughes Incorporated |
Pipeless steam assisted gravity drainage system and method
|
US8113292B2
(en)
*
|
2008-05-13 |
2012-02-14 |
Baker Hughes Incorporated |
Strokable liner hanger and method
|
WO2009141733A1
(en)
|
2008-05-20 |
2009-11-26 |
Osum Oil Sands Corp. |
Method of managing carbon reduction for hydrocarbon producers
|
US20100170672A1
(en)
*
|
2008-07-14 |
2010-07-08 |
Schwoebel Jeffrey J |
Method of and system for hydrocarbon recovery
|
US8056627B2
(en)
|
2009-06-02 |
2011-11-15 |
Baker Hughes Incorporated |
Permeability flow balancing within integral screen joints and method
|
US8132624B2
(en)
|
2009-06-02 |
2012-03-13 |
Baker Hughes Incorporated |
Permeability flow balancing within integral screen joints and method
|
US8151881B2
(en)
|
2009-06-02 |
2012-04-10 |
Baker Hughes Incorporated |
Permeability flow balancing within integral screen joints
|
US8893809B2
(en)
*
|
2009-07-02 |
2014-11-25 |
Baker Hughes Incorporated |
Flow control device with one or more retrievable elements and related methods
|
BRPI0902366B1
(pt)
*
|
2009-07-06 |
2018-10-16 |
Petroleo Brasileiro S.A. - Petrobras |
poço lateral receptor e método para sua implantação
|
US8550166B2
(en)
*
|
2009-07-21 |
2013-10-08 |
Baker Hughes Incorporated |
Self-adjusting in-flow control device
|
US9016371B2
(en)
*
|
2009-09-04 |
2015-04-28 |
Baker Hughes Incorporated |
Flow rate dependent flow control device and methods for using same in a wellbore
|
EA201290503A1
(ru)
*
|
2009-12-15 |
2012-12-28 |
Шеврон Ю.Эс.Эй. Инк. |
Система, способ и компоновка для техобслуживания и эксплуатации стволов скважин
|
CO6310134A1
(es)
*
|
2010-08-31 |
2011-08-22 |
Pacific Rubiales Energy Corp |
Sistema sincronizado de produccion de crudo por combustion in situ
|
CA2972203C
(en)
|
2017-06-29 |
2018-07-17 |
Exxonmobil Upstream Research Company |
Chasing solvent for enhanced recovery processes
|
CA2974712C
(en)
|
2017-07-27 |
2018-09-25 |
Imperial Oil Resources Limited |
Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
|
CA2978157C
(en)
|
2017-08-31 |
2018-10-16 |
Exxonmobil Upstream Research Company |
Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
|
CA2983541C
(en)
|
2017-10-24 |
2019-01-22 |
Exxonmobil Upstream Research Company |
Systems and methods for dynamic liquid level monitoring and control
|
US10612355B1
(en)
|
2019-02-11 |
2020-04-07 |
Saudi Arabian Oil Company |
Stimulating u-shape wellbores
|
US11035212B2
(en)
*
|
2019-02-11 |
2021-06-15 |
Saudi Arabian Oil Company |
Stimulating U-shape wellbores
|
US11460330B2
(en)
|
2020-07-06 |
2022-10-04 |
Saudi Arabian Oil Company |
Reducing noise in a vortex flow meter
|
US11542815B2
(en)
|
2020-11-30 |
2023-01-03 |
Saudi Arabian Oil Company |
Determining effect of oxidative hydraulic fracturing
|
US11649702B2
(en)
|
2020-12-03 |
2023-05-16 |
Saudi Arabian Oil Company |
Wellbore shaped perforation assembly
|
US12071814B2
(en)
|
2020-12-07 |
2024-08-27 |
Saudi Arabian Oil Company |
Wellbore notching assembly
|
US11619127B1
(en)
|
2021-12-06 |
2023-04-04 |
Saudi Arabian Oil Company |
Wellhead acoustic insulation to monitor hydraulic fracturing
|