IL128350A - Scheduling system and method for re-entering process lines - Google Patents
Scheduling system and method for re-entering process linesInfo
- Publication number
- IL128350A IL128350A IL12835097A IL12835097A IL128350A IL 128350 A IL128350 A IL 128350A IL 12835097 A IL12835097 A IL 12835097A IL 12835097 A IL12835097 A IL 12835097A IL 128350 A IL128350 A IL 128350A
- Authority
- IL
- Israel
- Prior art keywords
- incomplete products
- slack
- variable
- product type
- workstation
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US08/698,150 US5706200A (en) | 1996-08-15 | 1996-08-15 | Scheduling system and scheduling method for reentrant line processes |
| PCT/US1997/014435 WO1998007109A1 (en) | 1996-08-15 | 1997-08-15 | Scheduling system and scheduling method for reentrant line processes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| IL128350A0 IL128350A0 (en) | 2000-01-31 |
| IL128350A true IL128350A (en) | 2004-09-27 |
Family
ID=24804117
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| IL12835097A IL128350A (en) | 1996-08-15 | 1997-08-15 | Scheduling system and method for re-entering process lines |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US5706200A (de) |
| EP (1) | EP1019859A4 (de) |
| JP (1) | JP2001505678A (de) |
| KR (1) | KR100452913B1 (de) |
| CN (1) | CN1230267A (de) |
| CA (1) | CA2263386C (de) |
| IL (1) | IL128350A (de) |
| WO (1) | WO1998007109A1 (de) |
Families Citing this family (29)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR970066969A (ko) * | 1996-03-19 | 1997-10-13 | 모리시다 요이치 | 제조계획 입안방법 및 제조계획 입안장치 |
| US5818716A (en) * | 1996-10-18 | 1998-10-06 | Taiwan Semiconductor Manufacturing Company Ltd. | Dynamic lot dispatching required turn rate factory control system and method of operation thereof |
| US6185469B1 (en) * | 1997-05-28 | 2001-02-06 | Board Of Regents, The University Of Texas System | Method and apparatus for testing and controlling a flexible manufacturing system |
| US6144942A (en) * | 1998-04-28 | 2000-11-07 | Micron Electronics, Inc. | Method for notifying an individual of a previously scheduled event |
| US6256550B1 (en) * | 1998-08-07 | 2001-07-03 | Taiwan Semiconductor Manufacturing Company | Overall equipment effectiveness on-line categories system and method |
| JP3487774B2 (ja) * | 1998-11-19 | 2004-01-19 | 沖電気工業株式会社 | 半導体装置製造工程の搬送方法 |
| US6584369B2 (en) * | 2000-02-02 | 2003-06-24 | Texas Instruments Incorporated | Method and system for dispatching semiconductor lots to manufacturing equipment for fabrication |
| US6714830B2 (en) | 2000-02-28 | 2004-03-30 | Canon Kabushiki Kaisha | Push-type scheduling for semiconductor fabrication |
| JP2001345241A (ja) * | 2000-05-31 | 2001-12-14 | Tokyo Electron Ltd | 基板処理システム及び基板処理方法 |
| US6868298B2 (en) * | 2001-12-28 | 2005-03-15 | Texas Instruments Incorporated | Method and apparatus for bottleneck feed factor based scheduling |
| JP3866143B2 (ja) * | 2002-04-26 | 2007-01-10 | 株式会社ルネサステクノロジ | 半導体装置の製造方法 |
| US6640148B1 (en) * | 2002-06-03 | 2003-10-28 | Advanced Micro Devices, Inc. | Method and apparatus for scheduled controller execution based upon impending lot arrival at a processing tool in an APC framework |
| CN100394417C (zh) * | 2003-10-05 | 2008-06-11 | 华中科技大学 | 一种带状态性能反馈的规则调度方法及其调度系统 |
| CN100386702C (zh) * | 2005-06-10 | 2008-05-07 | 同济大学 | 基于信息素的用于半导体生产线的动态调度方法 |
| CN102566560B (zh) * | 2012-03-11 | 2015-07-29 | 成都信息工程学院 | 一种基于构造型启发式算法的生产线调度方法 |
| CN103034215B (zh) * | 2012-12-21 | 2015-08-19 | 上海交通大学 | 基于封闭环的可重入多机批处理调度装置及方法 |
| CN103116809B (zh) * | 2013-01-22 | 2016-03-02 | 安徽工程大学 | 面向产品族排序的批处理机的调度装置及方法 |
| CN103136631B (zh) * | 2013-01-22 | 2015-11-11 | 安徽工程大学 | 基于产品族排序实现最小总完工时间的批调度方法 |
| US9824318B1 (en) * | 2013-09-25 | 2017-11-21 | Amazon Technologies, Inc. | Generating labor requirements |
| US11076705B2 (en) | 2014-05-30 | 2021-08-03 | Sealy Technology, Llc | Spring core with integrated cushioning layer |
| BR112017008895B1 (pt) * | 2014-10-30 | 2022-05-24 | Gebo Cermex Canada Inc | Método de monitoramento em tempo real de uma linha de processamento e dispositivo para o monitoramento de uma linha de processamento |
| US10295979B2 (en) * | 2015-09-15 | 2019-05-21 | Applied Materials, Inc. | Scheduling in manufacturing environments |
| ES2977948T3 (es) | 2015-12-17 | 2024-09-03 | Sealy Technology Llc | Resorte helicoidal en espiral con respuesta de carga variable y colchones que incluyen el mismo |
| EP3841921B1 (de) | 2016-01-21 | 2024-12-25 | Sealy Technology, LLC | Spirale-in-spirale-federn mit nichtlinearem belastungsverhalten und matratzen damit |
| KR102822256B1 (ko) | 2017-10-31 | 2025-06-17 | 실리 테크놀로지 엘엘씨 | 연질 폼을 포함하는 포켓 코일 스프링 조립체 |
| CN112204588B (zh) * | 2018-05-31 | 2024-10-15 | 利乐拉瓦尔集团及财务有限公司 | 通过模拟在现有生产工厂中对包装乳制品的生产的调度 |
| FR3081740B1 (fr) * | 2018-06-05 | 2021-03-12 | Psa Automobiles Sa | Procede d’assemblage de pieces sur une ligne d’assemblage |
| CN109767118A (zh) * | 2019-01-11 | 2019-05-17 | 沈阳建筑大学 | 一种在具有可重入工序的客车涂装车间中有限缓冲区动态容量预留方法 |
| CN118313602B (zh) * | 2024-04-10 | 2025-06-20 | 东莞理工学院 | 一种考虑紧急件优先加工的多品种生产线订单投放优化方法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5233533A (en) * | 1989-12-19 | 1993-08-03 | Symmetrix, Inc. | Scheduling method and apparatus |
| US5291397A (en) * | 1991-12-20 | 1994-03-01 | Powell Roger A | Method for resource allocation and project control for the production of a product |
| US5546326A (en) * | 1995-04-04 | 1996-08-13 | Taiwan Semiconductor Manufacturing Company Ltd | Dynamic dispatching rule that uses long term due date and short term queue time to improve delivery performance |
-
1996
- 1996-08-15 US US08/698,150 patent/US5706200A/en not_active Expired - Lifetime
-
1997
- 1997-08-15 WO PCT/US1997/014435 patent/WO1998007109A1/en not_active Ceased
- 1997-08-15 CN CN97197881A patent/CN1230267A/zh active Pending
- 1997-08-15 EP EP97938353A patent/EP1019859A4/de not_active Withdrawn
- 1997-08-15 KR KR10-1999-7001236A patent/KR100452913B1/ko not_active Expired - Fee Related
- 1997-08-15 IL IL12835097A patent/IL128350A/en not_active IP Right Cessation
- 1997-08-15 JP JP51007798A patent/JP2001505678A/ja not_active Ceased
- 1997-08-15 CA CA002263386A patent/CA2263386C/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN1230267A (zh) | 1999-09-29 |
| US5706200A (en) | 1998-01-06 |
| CA2263386A1 (en) | 1998-02-19 |
| EP1019859A4 (de) | 2005-03-16 |
| IL128350A0 (en) | 2000-01-31 |
| KR100452913B1 (ko) | 2004-10-14 |
| JP2001505678A (ja) | 2001-04-24 |
| CA2263386C (en) | 2005-03-29 |
| EP1019859A1 (de) | 2000-07-19 |
| KR20000029980A (ko) | 2000-05-25 |
| WO1998007109A1 (en) | 1998-02-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5706200A (en) | Scheduling system and scheduling method for reentrant line processes | |
| Homem-de-Mello et al. | Finding optimal material release times using simulation-based optimization | |
| Sarin et al. | A survey of dispatching rules for operational control in wafer fabrication | |
| US6259959B1 (en) | Method for determining the performance components of a manufacturing line | |
| CN103439886B (zh) | 一种半导体生产线自适应动态调度装置 | |
| US6564113B1 (en) | Lot start agent that calculates virtual WIP time in a multi-product and multi-bottleneck manufacturing environment | |
| JP2023120168A (ja) | 半導体工場における待ち時間予測のための方法 | |
| US6868298B2 (en) | Method and apparatus for bottleneck feed factor based scheduling | |
| Min et al. | Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system | |
| Das et al. | Investigations into the impact of flexibility on manufacturing performance | |
| JP2000176799A (ja) | 生産製造計画システム | |
| Chang et al. | A case-based reasoning approach for due-date assignment in a wafer fabrication factory | |
| US7072731B1 (en) | Starvation avoidance lot start agent (SALSA) | |
| Monch et al. | Simulation-based assessment of batching heuristics in semiconductor manufacturing | |
| US20250124527A1 (en) | System and method for supporting execution of batch production using reinforcement learning | |
| Duenyas et al. | Base-stock control for single-product tandem make-to-stock systems | |
| Ramírez-Hernández et al. | A simulation-based approximate dynamic programming approach for the control of the intel mini-fab benchmark model | |
| Dabbas | A new scheduling approach using combined dispatching criteria in semiconductor manufacturing systems | |
| Wang et al. | Simulation-based real-time production control with different classes of residence time constraints | |
| US20050261921A1 (en) | System and method for lot priority adjustment | |
| Armbruster et al. | Continuum models for interacting machines | |
| JPH02224954A (ja) | 生産管理システム | |
| Hochreiter | A comparative simulation study of Kanban, CONWIP, and MRP manufacturing control systems in a flowshop | |
| Yu et al. | On-line learning delivery decision support system for highly product mixed semiconductor foundry | |
| CN119721997B (zh) | 基于bim的建筑施工进度管理方法及系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FF | Patent granted | ||
| KB | Patent renewed | ||
| KB | Patent renewed | ||
| MM9K | Patent not in force due to non-payment of renewal fees |