GR3021734T3 - Method of discharging purified flue gases. - Google Patents
Method of discharging purified flue gases.Info
- Publication number
- GR3021734T3 GR3021734T3 GR960403130T GR960403130T GR3021734T3 GR 3021734 T3 GR3021734 T3 GR 3021734T3 GR 960403130 T GR960403130 T GR 960403130T GR 960403130 T GR960403130 T GR 960403130T GR 3021734 T3 GR3021734 T3 GR 3021734T3
- Authority
- GR
- Greece
- Prior art keywords
- pure
- stack
- gases
- pure gases
- enter
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J13/00—Fittings for chimneys or flues
- F23J13/02—Linings; Jackets; Casings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Treating Waste Gases (AREA)
- Chimneys And Flues (AREA)
- Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
The invention relates to a method of discharging flue gases (pure gases), purified by catalytic denitrification, dust removal and wet desulphurisation from a furnace installation, in particular a fossil fuel-operated power station, into the atmosphere, wherein the pure gases, saturated with water vapour, are fed, after they have left the flue gas desulphurisation plant (5), by a suction fan (6) to the stack (7) and are heated before they enter the stack (7). In order to reduce the cost of construction and utilities and to avoid the emission of highly corrosive coarse particles, the heating of the pure gases takes place during operation by exploiting the polytropic compression work of the suction fan (6). At the same time, the wall of the pure-gas duct (8) between the fan outlet and the stack outlet is electrically heated (9) to a temperature above the temperature of the pure gas. During the starting times and other phases with increased production of moisture, additional heating (11) of the pure gases is carried out before they enter the stack (7). <IMAGE>
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4300431A DE4300431C1 (en) | 1993-01-09 | 1993-01-09 | Process for discharging cleaned flue gases |
Publications (1)
Publication Number | Publication Date |
---|---|
GR3021734T3 true GR3021734T3 (en) | 1997-02-28 |
Family
ID=6477933
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GR960403130T GR3021734T3 (en) | 1993-01-09 | 1996-11-20 | Method of discharging purified flue gases. |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0606630B1 (en) |
AT (1) | ATE144823T1 (en) |
DE (2) | DE4300431C1 (en) |
DK (1) | DK0606630T3 (en) |
ES (1) | ES2094994T3 (en) |
GR (1) | GR3021734T3 (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2738501A1 (en) * | 1977-08-26 | 1979-03-08 | Saarberg Hoelter | Power station cooling tower - with waste gas purification section within the tower |
SE452413B (en) * | 1984-12-04 | 1987-11-30 | Flaekt Ab | MEDIUM MIXING NOZE, INTENDED TO BE USED IN A CONTACT REACTOR |
DE4000654A1 (en) * | 1990-01-11 | 1991-07-25 | Schmitz Tona Tonwerke | METHOD FOR LINING A CHIMNEY AND CUFF TO CONNECT THE PIPE SECTIONS OF AN INNER PIPE THEREFOR |
DE4008617A1 (en) * | 1990-03-17 | 1991-09-19 | Kraftanlagen Ag | Exhaust gas layout from e.g. boiler plant - has wet desulphurisation, heat exchangers, solids filters and heat carrier so that system prevents corrosion of pressurising fans |
DE4124489A1 (en) * | 1991-07-24 | 1993-01-28 | Flachglas Consult Gmbh | INDUSTRIAL CHIMNEY WITH ACID PROTECTION DEVICE |
DE4130763A1 (en) * | 1991-09-16 | 1993-03-18 | Wurz Dieter | Discharging purified smoke gas from boiler furnace of power station - comprises reheating gases, temporarily before and/or during firing and during critical operational phases, but not during steady operation |
-
1993
- 1993-01-09 DE DE4300431A patent/DE4300431C1/en not_active Expired - Fee Related
- 1993-12-22 ES ES93120660T patent/ES2094994T3/en not_active Expired - Lifetime
- 1993-12-22 DE DE59304358T patent/DE59304358D1/en not_active Expired - Fee Related
- 1993-12-22 DK DK93120660.1T patent/DK0606630T3/en active
- 1993-12-22 EP EP93120660A patent/EP0606630B1/en not_active Expired - Lifetime
- 1993-12-22 AT AT93120660T patent/ATE144823T1/en not_active IP Right Cessation
-
1996
- 1996-11-20 GR GR960403130T patent/GR3021734T3/en unknown
Also Published As
Publication number | Publication date |
---|---|
ATE144823T1 (en) | 1996-11-15 |
EP0606630A1 (en) | 1994-07-20 |
EP0606630B1 (en) | 1996-10-30 |
DK0606630T3 (en) | 1997-04-14 |
DE59304358D1 (en) | 1996-12-05 |
ES2094994T3 (en) | 1997-02-01 |
DE4300431C1 (en) | 1994-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4956162A (en) | Process for removal of particulates and SO2 from combustion gases | |
CA2596127C (en) | Integrated lime kiln process | |
CA2431460A1 (en) | Process for the removal of impurities from gas streams | |
WO1986000065A1 (en) | Process for treating flue gas with alkali injection and electron beam | |
US5078752A (en) | Coal gas productions coal-based combined cycle power production | |
GR3021734T3 (en) | Method of discharging purified flue gases. | |
DE59510526D1 (en) | heater | |
US4080219A (en) | Collateral drying process | |
AU594471B2 (en) | Process for removal of particulates and SO2 from combustion gasses | |
CN209906820U (en) | Ultra-low emission purification treatment system for flue gas diffused by one-step dry dedusting of converter | |
CN218583137U (en) | Furnace entering device for sludge coupling power generation | |
JPS5687418A (en) | Method and apparatus for treating waste gas of incinerator of urban garbage and sludge | |
RU98107258A (en) | METHOD OF OPERATION OF THE INSTALLATION FOR COMBUSTION FOR A STONE-COAL ELECTRIC POWER STATION WITH A LIQUID SLUG REMOVING FURNACE AND A PLANT OPERATING THIS METHOD | |
JPS55145127A (en) | Method and apparatus for utilizing sensible heat of sintering machine exhaust gas | |
JPS5696033A (en) | Waste heat recovering method and apparatus in sintering machine | |
JPS57128785A (en) | Device for preparing dry distillation gas from organic waste | |
Hutcheson et al. | One Button Operation Start-Up of the Alabama Electric Cooperative FGD System. | |
SE453262B (en) | Combustion installation process | |
SU1028953A1 (en) | Air heater | |
SU1035338A1 (en) | Method of decontaminating gas effluents | |
JPS57148620A (en) | Debulking apparatus of waste plastics utilizing waste heat | |
JPS5743940A (en) | Removal of malodorant generating substance from scrap | |
JPH074610A (en) | Boiler with furnace desulphurization device | |
AU2920195A (en) | Process for improving the expansion of the flue gases produced during the starting phase of a power station and given off into the atmosphere via the cooling tower | |
JP2809357B2 (en) | Exhaust gas desulfurization equipment |