GB2330859A - A method of constructing a multi-storey building - Google Patents
A method of constructing a multi-storey building Download PDFInfo
- Publication number
- GB2330859A GB2330859A GB9823866A GB9823866A GB2330859A GB 2330859 A GB2330859 A GB 2330859A GB 9823866 A GB9823866 A GB 9823866A GB 9823866 A GB9823866 A GB 9823866A GB 2330859 A GB2330859 A GB 2330859A
- Authority
- GB
- United Kingdom
- Prior art keywords
- further characterized
- wall
- building
- storey
- wing portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3505—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A method of constructing a multi-storey building comprising a central core (12) and at least one wing portion (14) includes the use of a working platform (26) which can be moved vertically to produce wall members (18) on adjacent storeys of the wing portion in an integral fashion. The working platform (26) comprises an outer frame (34), an upper frame (36) and a lower frame (38) joined together and sits on top of the core portion and any wing portions. A wall (40) is formed from concrete cast around metal reinforcement (45). The wall is formed between a pair of steel modular forms (42) which are supported on hangers (43), which may be moved horizontally along a rail (44). A through bolt (46) holds the forms together and the whole platform may be raised vertically by means of a synchronous electric motor (48), a screw jack (50) and a pinion jack rod (52).
Description
A Method of Constructing a Building
This invention relates to a method of constructing a building and, in particular, a multi-storey building. The invention relates in particular, though not exclusively, to a method of constructing high-rise apartment blocks.
According to the conventional method of constructing a multi-storey building, for each storey of the building, a concrete floor member is first put in place. The floor member may be formed as a precast concrete slab and may thus be placed directly on the upper ends of the walls of the storey below. Alternatively the floor member may not be precast, but instead may be constructed in situ using formwork laid on the upper ends of the walls of the storey below. After construction of the floor, the wall of the building, which may be precast or again which may be formed in situ, are then erected on the floor. The construction is thus in a wall-floor-wall-floor sequence.
A major disadvantage associated with such a working sequence is that at any given time, either only the floor or only the wall(s) of the same storey is being worked on. In addition, although construction workers are usually capable of working on both floors and walls, the frequent changes between working on floors and working on walls mean that specialization of skills cannot be achieved. These disadvantages increase the time that is required to construct a high-rise building, and this extra-time is very disadvantageous, in particular for example, when constructing public housing units to meet a pressing social demand.
High-rise buildings are often formed with a central core portion and surrounding wing-portions. The core portion generally houses common facilities such as liftshafts, fire escapes, and refuse disposal facilities, while the wing-portions are designed as apartments or office space depending on the intended function of the building. With very tall buildings it is common practice to construct the core portion first so that the facilities of the core portion, in particular the lift-shafts, can be used to aid in the construction of the wing-portions. However, the need to construct the core portion before the wing-portions adds further delays to the construction process.
It is therefore an object of the present invention to provide an improved method of constructing a multi-storey building in which the aforesaid shortcomings are mitigated, or at least to provide a useful alternative to the construction industry.
According to the present invention, there is provided a method of constructing a multi-storey building comprising a central core portion joined with at least one wing portion, wherein the wing portion has at least one substantially upright wall member, characterized in that the wall member of the wing portion extends for at least two storeys and is integrally formed.
With this arrangement the wall member is integrally formed over several storeys in the sense that the wall member of one storey may be formed directly on the wall member of a lower storey without any intervening floor member. This means that the conventional wall-floor-wall-floor sequence can be eliminated and by thus "delinking" the construction of the wall members from the floor members, the building can be constructed much more quickly than in the prior art.
The integrally formed wall member may extend over several storeys of the building, for example over at least five or even at least ten storeys.
In many cases the wing portion will comprise a plurality of wall members, and all the wall members may be constructed in this way so as to be integrally formed and to extend over several storeys. There may be a plurality of wing portions connected to the core portion, and when the building is a residential building the wing portions may comprise the habitable areas of the building.
In a preferred embodiment a movable platform member is used in the construction of the wall member. The platform may be movable vertically, for example by a motor, and may comprise at least one pair of plate members movable relative to each other, preferably substantially horizontally. The plate members may define a space or cavity for receiving the concrete to form the wall member. Where a plurality of wall members are to be formed, the platform member may comprise a plurality of pairs of horizontally movable plate members.
An embodiment of the invention will now be described by way of example and with reference to the accompanying drawings in which:
Fig. 1 shows a multi-storey building with a number of working platforms and
being constructed by a method according to the present invention;
Fig. 2 shows the building shown in Fig. 1 in which the working platforms are
removed for clarity purposes;
Fig. 3 shows a partial sectional view of a working platform shown in Fig. 1;
Figs. 4A to 4C show the stages of operation of the working platform shown in
Fig. 1;
Fig. 5 shows the plan view of a central core portion of the building shown in Fig.
1; and
Fig. 6 shows the plan view of a wing portion of the building shown in Fig. 1.
As shown in Fig. 1, a multi-storey residential building being constructed by a method according to an embodiment of the present invention is generally designated as 10. The building 10 includes a central core portion 12 joined with four wing portions 14. The central portion 12 is for accommodating common public features, e.g. lift shafts, refuse disposal facilities, emergency exits etc, while the wing portions 14 are divided into a number of habitable flats 16. Each such habitable flat 16 includes a number of upright walls 18, a floor 20, a ceiling 22 and a facade 24. As can be seen in Fig. 1, the central portionl2 and the wing portions 14 are constructed concurrently, although on different storeys. In this case, the central portion 12 is being constructed at a higher level than the wing portions 14. At the respective top part of the central core portion 12 and the wing portions 14 is a working platform 26.
It will be appreciated that the core is constructed at a higher storey (say 5 floors higher) in order that the working platform 26 of the core portion does not interfere with the corresponding working platforms 26 of the wing portions. For clarity purposes, certain upper parts of the working platforms 26 are removed from Fig. 1.
Further details of the working platforms 26 will be discussed below.
Turning to Fig. 2, the working platforms are removed entirely for clarity purposes. It should also be noted that in Figs. 1 & 2 certain facade elements are removed for clarity. It can be seen that while the central core portion 12 has reached the fourteenth level, the four wing portions 14 have only reached the twelfth level. It can also be seen that in one wing portion that walls 28 up to the twelfth storey have been erected, while floors 30 have only been constructed up to the tenth storey. In a conventional construction method, the walls 28 for the twelfth storey cannot be erected until a floor for the same storey has been constructed since the walls must be placed directly on the floor of the same storey. However, according to a method in accordance with an embodiment of the present invention, some workers can now start to erect the walls for the thirteenth storey, while other workers can construct a floor member which is joined to the lower end of the walls of the eleventh storey. This is possible as a consequence of the fact that the conventional wall-floor-wall-floor sequence is no longer necessary. In this connection, the floor may be cast on formwork and secured to the walls 28. According to this method, it is also possible to precast a facade 24, which comprises integrally formed wall portion 32 and window/door component 33, and to subsequently lift and set the facade 24 into its proper position in the flat of the building. The facade of one storey can be located directly on the facade of another storey in such a way that no intervening floor member is required and the facades can be seen as being part of the wall which is constructed completely independently of the floor members without having to follow the conventional wall-floor-wall-floor sequence. Thus integrally formed walls - including facade elements - can be formed extending over several storeys with a wall member or faCade of one storey being formed directly on the corresponding part of an immediately adjacent lower storey.
Within any individual storey, however, a faCade element must be put in place before at least those wall members laterally adjacent the faCade since the facade will be formed with reinforcing members which extend outwardly therefrom and which are incorporated in the wall members to either side of the facade when the wall members are formed. It can be seen that, by way of such a method, it is possible to construct integral walls extending over a number of storeys.
Fig. 3 shows a partial sectional view of the working platform 26 shown in Fig. 1.
The working platform 26 includes an outer frame 34, an upper frame 36 and a lower frame 38 joined together in a single unit. A wall 40 is shown as being constructed by using the working platform 26. A pair of steel modular forms 42 are supported by hangers 43, which may be moved horizontally along a rail 44, thus causing the steel modular forms 42 to move in the directions shown by the arrows. As shown in Fig. 3, the modular forms 42 may be moved towards each other and thereby to form a cavity into which a metal reinforcement component 45 is received and concrete may be poured, to form the wall 40. A through-bolt 46 is fixed to the wall 40 and the platform 26 to secure them together. The working platform 26 includes a synchronous electric motor 48 which, in operation, moves a screw jack 50 of the working platform 26 along a pinion jack rod 52, so that the whole working platform 26 can move vertically along the pinion jack rod 52 upwardly during the construction process. The pinion jack rod 52 is supported to the metal reinforcement component 45 of the wall 40, to allow upward movement of the platform 26.
As shown in Fig. 4A, the working platform 26 is shown in use in the construction of two upright walls 54a and 54b for a level of a building. Two pairs of modular forms 42a and 42b are provided. As shown in Fig. 4A, concrete from a container 56 is poured into the cavity formed by the pair of modular forms 42b and allowed to set. After the setting of the concrete between the modular forms 42a and 42b, the modular forms 42a and 42b are moved away from each other, as shown in
Fig. 4B, so that the whole working platform 26 may then be released from the walls 54a and 54b and moved up one level by the co-operation of the motor 48, the screw jack 50 and the pinion jack rod 52, as shown in Fig. 4B. The working platform 26 is then secured to the walls 54a and 54b. The modular forms 42a and 42b may now be cleaned, and then moved towards each other to form a cavity for further erection of the walls 54a and 54b. The metal reinforcement component 45 is then built into the cavity formed by the modular forms 42a and 42b, and the whole process may then repeat again. By means of this arrangement, as the platform moves up one storey the wall member of one storey is formed directly on the corresponding wall member of the storey below without any intervening floor slab member. Thus there is formed a wall member that is integrally formed extending over several storeys. As shown in
Fig. 4C, while walls of the upper level may now be erected, other workers can start to construct the floor(s) of the level(s) one, two or even three storeys below. The construction of walls and floors is therefore delinked. This means that the walls and floors can be constructed simultaneously, and since generally all the walls of one storey and the floor of one storey take approximately equaI times to construct, the construction rate is effectively doubled by the present invention.
A further advantage of a construction method in accordance with an embodiment of the invention can be seen by the fact that the working platforms effectively surround their respective wing portions and the core portions. This means that as the walls are constructed the chances of misalignment is significantly reduced by the fact that the working platforms function as means for guiding the walls during construction and for preventing any serious misalignment from occurring.
Subject to the qualification that the core portion must be started first so that subsequently the core portion is worked on a few storeys above the wing portions, in order to avoid the working platforms getting in the way of each other as described above, it will also be appreciated that in the present invention construction can be carried out on the core portion and the wing portions concurrently even for buildings as high as 20 or 30 storeys. This means that it is not necessary to first construct the core portion and the construction time is therefore still further reduced.
As shown in Fig. 5, a working platform 26 as used in the construction of walls of the central core portion 12 is in a generally octagonal shape. The working platform 26 includes a two-tier steel outer frame 34 and a number of screw jacks 50 which, as discussed above, may be caused to move the working platform 26 upward.
Fig. 6 shows the use of the working platform 26 in the construction of walls 60 of the wing portion 14, which constitutes the habitable area of the building 10. Again, the working platform includes a number of steel outer frames 34 and screw jacks 50.
Areas 62 marked by dashed-lines represent locations where precast integrally formed facades may be placed.
It is clear from the foregoing discussion that the following improvements are achieved by the construction method according to the present invention (a) previously the progress of construction of buildings is to a very large extent
restricted not so much by the number of workers, but by the sequence of
construction, namely the wall-floor-wall-floor sequence. By means of the
present invention, it is possible to have walls and floors constructed
concurrently, thus allowing buildings to be constructed much quicker; (b) as the walls are erected continuously and integrally, and since the working
platforms function as a self-guiding means for the walls, the problem of
misalignment of walls is significantly reduced; (c) such a method eliminates to a very large extent the honeycombing problem
associated with the ingress of water into the walls; (d) the use of sealants can be avoided; (e) crane handling is minimized, since a self-lifting working platform system is
used; (f) pre-formed integral building units, e.g. facades, can be put in place after
construction of the integral walls; and (g) the existence of the outer frame significantly reduces the chance of workers
accidentally falling over the building.
It should be noted that the above only illustrates an example by which the present invention may be carried out, and further modifications and alterations may be made thereto without departing from the spirit of the invention.
Claims (14)
- Claims: 1. A method of constructing a multi-storey building comprising a central core portion joined with at least one wing portion, wherein said wing portion has at least one substantially upright wall member, characterized in that said wall member of said wing portion extends for at least two storeys and is integrally formed.
- 2. A method according to claim 1 further characterized in that said wall member of said wing portion extends for at least five storeys of said building.
- 3. A method according to claim 2 further characterized in that said wall member of said wing portion extends for at least ten storeys of said building.
- 4. A method according to any of the preceding claims further characterized in that said wing portion comprises a plurality of said wall members.
- 5. A method according to any of the preceding claims further characterized in that said central core portion is joined with a plurality of said wing portions.
- 6. A method according to any of the preceding claims further characterized in that said building is a residential building.
- 7. A method according to claim 6 further characterized in that said wing portion is a habitable area.
- 8. A method according to any of the preceding claims further characterized in that a movable platform member is used in the construction of said wall member
- 9. A method according to claim 8 further characterized in that said platform member is movable substantially vertically.
- 10. A method according to Claim 8 or 9 further characterized in that said platform member is movable by a motor
- 11. A method according to any one of Claims 8 to 10 further characterized in that said platform member comprises at least one pair of plate members movable relative to each other.
- 12. A method according to Claim 11 further characterized in that said pair of plate members are movable relative to each other substantially horizontally.
- 13. A method according to Claim 11 or 12 further characterized in that said pair of plate members are movable to form a cavity for receiving concrete to form said wall member.
- 14. A method according to any one of Claims 11 to 13 further characterized in that said platform member comprises a plurality of pairs of plate members.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB9723096.5A GB9723096D0 (en) | 1997-10-31 | 1997-10-31 | A method od constructing a building |
Publications (3)
Publication Number | Publication Date |
---|---|
GB9823866D0 GB9823866D0 (en) | 1998-12-23 |
GB2330859A true GB2330859A (en) | 1999-05-05 |
GB2330859B GB2330859B (en) | 2002-03-20 |
Family
ID=10821432
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GBGB9723096.5A Ceased GB9723096D0 (en) | 1997-10-31 | 1997-10-31 | A method od constructing a building |
GB9823866A Expired - Fee Related GB2330859B (en) | 1997-10-31 | 1998-10-30 | A method of constructing a building |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GBGB9723096.5A Ceased GB9723096D0 (en) | 1997-10-31 | 1997-10-31 | A method od constructing a building |
Country Status (2)
Country | Link |
---|---|
GB (2) | GB9723096D0 (en) |
HK (1) | HK1020592A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7951271B2 (en) * | 2006-06-12 | 2011-05-31 | David Brent Thompson | System for recovering oil from used automobile tires |
CN102661039A (en) * | 2012-05-11 | 2012-09-12 | 上海建工集团股份有限公司 | Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method |
CN107355005A (en) * | 2017-07-14 | 2017-11-17 | 四川华西集团有限公司 | The control method of integral jacking and the jacking steel platform locally jacked can be achieved |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1316010A (en) * | 1970-06-30 | 1973-05-09 | Mitsubishi Heavy Ind Ltd | Method of contructing elongate upright structures |
GB1349499A (en) * | 1971-04-03 | 1974-04-03 | Tamburini M | Method of and apparatus for producing multi-storey buildings with reinforced concrete frames |
-
1997
- 1997-10-31 GB GBGB9723096.5A patent/GB9723096D0/en not_active Ceased
-
1998
- 1998-10-30 GB GB9823866A patent/GB2330859B/en not_active Expired - Fee Related
-
1999
- 1999-11-03 HK HK99105016A patent/HK1020592A1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1316010A (en) * | 1970-06-30 | 1973-05-09 | Mitsubishi Heavy Ind Ltd | Method of contructing elongate upright structures |
GB1349499A (en) * | 1971-04-03 | 1974-04-03 | Tamburini M | Method of and apparatus for producing multi-storey buildings with reinforced concrete frames |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7951271B2 (en) * | 2006-06-12 | 2011-05-31 | David Brent Thompson | System for recovering oil from used automobile tires |
CN102661039A (en) * | 2012-05-11 | 2012-09-12 | 上海建工集团股份有限公司 | Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method |
CN102661039B (en) * | 2012-05-11 | 2014-05-14 | 上海建工集团股份有限公司 | Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method |
CN107355005A (en) * | 2017-07-14 | 2017-11-17 | 四川华西集团有限公司 | The control method of integral jacking and the jacking steel platform locally jacked can be achieved |
Also Published As
Publication number | Publication date |
---|---|
HK1020592A1 (en) | 2000-05-12 |
GB9723096D0 (en) | 1998-01-07 |
GB9823866D0 (en) | 1998-12-23 |
GB2330859B (en) | 2002-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3239990A (en) | Multi-storey buildings | |
JP7542522B2 (en) | Method for constructing a multi-storey structure, facade and building | |
KR20220154087A (en) | construction method | |
KR20200124073A (en) | Vertical core structure horizontally assembled and construction method therewith | |
JP3196043B2 (en) | Construction method of stairs and staircase, construction method of stairs, and stair members | |
US4408434A (en) | Multi-storey building and a prefabricated panel for such a building | |
JP3179045B2 (en) | Wall construction method with work scaffold | |
US3920780A (en) | Method of erecting a multi-story building and apparatus | |
US3831902A (en) | Method of erecting a multi-story building and apparatus therefor | |
GB2330859A (en) | A method of constructing a multi-storey building | |
GB2330862A (en) | A method of constructing a multi-storey building | |
GB2330860A (en) | A method of constructing a multi-storey building | |
GB2330861A (en) | A method of constructing a multi-storey building | |
JP3078931B2 (en) | Climbing stage method and chimney construction method for tubular structures | |
GB2330863A (en) | A method of constructing a multi-storey building | |
KR200169528Y1 (en) | Prefabricated blick type elevating duct for an elevator | |
JP2906196B2 (en) | Construction method of elevator shaft in steel frame building | |
AU2003269072B2 (en) | In-situ construction of concrete building | |
AU2019316713B2 (en) | Method of erecting a multi-storey structure and facade | |
KR100539829B1 (en) | Method of pulling-up gang form for a flash board using a shaped steel | |
RU1790653C (en) | Method for erecting monolithic and sectional-monolithic buildings | |
JP3187618B2 (en) | How to assemble beam reinforcement | |
GB1293689A (en) | Improvements in or relating to methods of building | |
RU2087650C1 (en) | House-building combine | |
JPH0642184A (en) | Construction of skeleton using half precast floor board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PCNP | Patent ceased through non-payment of renewal fee |
Effective date: 20031030 |