FR3062407A1 - METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER - Google Patents

METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER Download PDF

Info

Publication number
FR3062407A1
FR3062407A1 FR1750856A FR1750856A FR3062407A1 FR 3062407 A1 FR3062407 A1 FR 3062407A1 FR 1750856 A FR1750856 A FR 1750856A FR 1750856 A FR1750856 A FR 1750856A FR 3062407 A1 FR3062407 A1 FR 3062407A1
Authority
FR
France
Prior art keywords
base
module
guide rails
supports
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1750856A
Other languages
French (fr)
Other versions
FR3062407B1 (en
Inventor
Loic Ferron
Eric Luquiau
Philippe Weber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technip Energies France SAS
Original Assignee
Technip France SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to FR1750856A priority Critical patent/FR3062407B1/en
Application filed by Technip France SAS filed Critical Technip France SAS
Priority to MYPI2019004450A priority patent/MY202399A/en
Priority to BR112019015892-8A priority patent/BR112019015892B1/en
Priority to PCT/EP2018/052233 priority patent/WO2018141725A1/en
Priority to KR1020197022874A priority patent/KR102503139B1/en
Priority to SG11201907136WA priority patent/SG11201907136WA/en
Priority to CN201880018685.9A priority patent/CN111448353B/en
Publication of FR3062407A1 publication Critical patent/FR3062407A1/en
Application granted granted Critical
Publication of FR3062407B1 publication Critical patent/FR3062407B1/en
Priority to NO20190944A priority patent/NO20190944A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/30Moving or transporting modules or hull blocks to assembly sites, e.g. by rolling, lifting or floating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Automatic Assembly (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Dental Tools And Instruments Or Auxiliary Dental Instruments (AREA)
  • Foundations (AREA)
  • Machine Tool Units (AREA)

Abstract

Le procédé comporte les étapes suivantes : - fourniture de la base (14), comportant une surface supérieure (22) et des supports (16) faisant saillie au-dessus de la surface supérieure (22) ; - montage de rails de guidage (36) sur les supports (16) ; - placement du module (18) destiné à être installé sur la base (14) sur une surface supérieure située à côté de la base (14) ; - translation du module (18) sur les rails de guidage (36) pour l'amener sur la base (14); - pose du module (18) sur les supports (16) pour que les supports (16) reprennent le poids du module (18) ; - libération des rails de guidage (36) par rapport aux supports (16) ; - retrait des rails de guidage (36) par déplacement horizontal en regard de la surface supérieure (22) de la base (14).The method comprises the following steps: - providing the base (14), having an upper surface (22) and supports (16) projecting above the upper surface (22); - Mounting guide rails (36) on the supports (16); - placing the module (18) to be installed on the base (14) on an upper surface located next to the base (14); - translation of the module (18) on the guide rails (36) to bring it to the base (14); placing the module (18) on the supports (16) so that the supports (16) take up the weight of the module (18); releasing the guide rails (36) relative to the supports (16); - Removal of the guide rails (36) by horizontal displacement facing the upper surface (22) of the base (14).

Description

Titulaire(s) : simplifiée.Holder (s): simplified.

TECHNIP FRANCE Société par actionsTECHNIP FRANCE Joint stock company

Mandataire(s) : simplifiée.Agent (s): simplified.

CABINET LAVOIX Société par actionsCABINET LAVOIX Business corporation

PROCEDE DE MONTAGE D'UNE INSTALLATION DESTINEE A ETRE PLACEE DANS UNE ETENDUE D'EAUMETHOD FOR ASSEMBLING A SYSTEM INTENDED TO BE PLACED IN A BODY OF WATER

FR 3 062 407 - A1FR 3 062 407 - A1

@) Le procédé comporte les étapes suivantes:@) The process includes the following steps:

- fourniture de la base (14), comportant une surface supérieure (22) et des supports (16) faisant saillie au-dessus de la surface supérieure (22);- supply of the base (14), comprising an upper surface (22) and supports (16) projecting above the upper surface (22);

- montage de rails de guidage (36) sur les supports (16) ;- mounting of guide rails (36) on the supports (16);

- placement du module (18) destiné à être installé sur la base (14) sur une surface supérieure située à côté de la base (14);- placement of the module (18) intended to be installed on the base (14) on an upper surface located next to the base (14);

- translation du module (18) sur les rails de guidage (36) pour l'amener sur la base (14);- Translation of the module (18) on the guide rails (36) to bring it onto the base (14);

- pose du module (18) sur les supports (16) pour que les supports (16) reprennent le poids du module (18);- Installation of the module (18) on the supports (16) so that the supports (16) take up the weight of the module (18);

- libération des rails de guidage (36) par rapport aux supports (16);- release of the guide rails (36) relative to the supports (16);

- retrait des rails de guidage (36) par déplacement horizontal en regard de la surface supérieure (22) de la base (14).- Removal of the guide rails (36) by horizontal movement opposite the upper surface (22) of the base (14).

Figure FR3062407A1_D0001
Figure FR3062407A1_D0002

Procédé de montage d’une installation destinée à être placée dans une étendue d’eauMethod for mounting an installation intended to be placed in a body of water

La présente invention concerne un procédé de montage d’une installation destinée à être placée dans une étendue d’eau, l’installation comportant une base et au moins un module posé sur la base.The present invention relates to a method of mounting an installation intended to be placed in a body of water, the installation comprising a base and at least one module placed on the base.

L’installation est par exemple une unité flottante de production, de stockage et de déchargement (désignée par l’acronyme anglais « FPSO », pour « Floating Production Storage and Offloading >>), une unité flottante de gaz naturel liquéfié (désignée par l’acronyme anglais « FLNG >> pour « Floating Liquefied Natural Gas >>) ou plus généralement une unité offshore telle qu’une plate-forme semi-submersible, pouvant être par exemple une TLP (« Tension Leg Platform >> en langue anglaise), une bouée de déchargement, une colonne verticale flottante ou un navire. En variante, l’installation est une structure rigide fixe de type « gravitaire >>, par exemple une GBS (« Gravity Based Structure >>).The installation is for example a floating production, storage and unloading unit (designated by the English acronym "FPSO", for "Floating Production Storage and Offloading"), a floating liquefied natural gas unit (designated by l 'English acronym' FLNG 'for' Floating Liquefied Natural Gas') or more generally an offshore unit such as a semi-submersible platform, which can for example be a TLP ('Tension Leg Platform' in English) , an unloading buoy, a floating vertical column or a ship. As a variant, the installation is a fixed rigid structure of the "gravity" type, for example a GBS ("Gravity Based Structure").

Les unités flottantes du type précité comportent généralement une coque flottante portant un grand nombre d’équipements interconnectés les uns aux autres. Ces équipements sont par exemple connectés entre eux par des conduites, des lignes fonctionnelles, tels que des lignes électriques, des lignes de transfert hydraulique, et/ou des lignes de transfert d’informations.Floating units of the aforementioned type generally include a floating hull carrying a large number of items of equipment interconnected with one another. This equipment is, for example, connected to each other by pipes, functional lines, such as power lines, hydraulic transfer lines, and / or information transfer lines.

Pour fabriquer une telle unité, il est connu d’assembler la coque, et de déposer sur la coque différents modules préfabriqués séparément. Une fois déposés sur la coque, les modules sont interconnectés les uns aux autres pour réaliser les différents systèmes de l’installation.To manufacture such a unit, it is known to assemble the shell, and to deposit different prefabricated modules on the shell. Once placed on the hull, the modules are interconnected to each other to make the different systems of the installation.

Les modules sont généralement déposés sur la coque par l’intermédiaire de grues. Compte tenu de la capacité des grues actuelles, ceci implique une limitation en taille et en poids des modules.The modules are generally placed on the hull using cranes. Given the capacity of current cranes, this implies a limitation in size and weight of the modules.

Ainsi, un système complet d’exploitation de fluide nécessite parfois d’être séparé en plusieurs modules qui doivent être connectés et testés après leur assemblage sur la coque. Une telle solution n’est donc pas satisfaisante, puisque l’accès à chaque module est plus compliqué qu’à terre, et les défauts éventuels sur un module peuvent retarder l’assemblage d’autres systèmes et/ou la mise en service de l’installation.Thus, a complete fluid operating system sometimes requires being separated into several modules which must be connected and tested after their assembly on the hull. Such a solution is therefore not satisfactory, since access to each module is more complicated than on land, and possible faults on a module can delay the assembly of other systems and / or the commissioning of the 'installation.

Par ailleurs, il est connu dans certains cas de charger des modules sur une base flottante sans utiliser de grues. La base flottante est ballastée pour affleurer la surface supérieure d’un quai sur lequel est disposé le module. Puis, le module est transféré sur la base, en le faisant glisser sur des guides qui sont installés à demeure sur la base flottante.Furthermore, it is known in some cases to load modules on a floating base without using cranes. The floating base is ballasted to be flush with the upper surface of a platform on which the module is placed. Then, the module is transferred to the base, sliding it onto guides which are permanently installed on the floating base.

Lorsque le module repose sur les guides, il y est solidarisé à la base, les guides étant maintenus en place.When the module rests on the guides, it is secured to the base, the guides being held in place.

Cette dernière méthode implique que la profondeur d’eau devant le quai soit suffisante pour permettre, après ballastage, l’affleurement évoqué ci-dessus. Y compris dans cette hypothèse, cette dernière méthode ne donne pas entière satisfaction. En effet, la présence de guides permanents sur la base alourdit inutilement l’installation et occupe un espace significatif sur la coque, limitant le nombre et/ou la taille des équipements pouvant être embarqués sur la coque.This last method implies that the depth of water in front of the quay is sufficient to allow, after ballasting, the outcrop mentioned above. Including in this hypothesis, the latter method is not entirely satisfactory. Indeed, the presence of permanent guides on the base unnecessarily weighs down the installation and occupies a significant space on the hull, limiting the number and / or the size of the equipment that can be embarked on the hull.

Un but de l’invention est donc de disposer d’un procédé d’assemblage d’une installation comportant une base et au moins un module posé sur la base, le procédé ne nécessitant pas de grues de grande capacité, tout en étant mis en œuvre par des moyens non invasifs sur l’installation.An object of the invention is therefore to have a method of assembling an installation comprising a base and at least one module placed on the base, the method not requiring large capacity cranes, while being implemented works by non-invasive means on the installation.

A cet effet, l’invention a pour objet un procédé du type précité, caractérisé par les étapes suivantes :To this end, the invention relates to a process of the aforementioned type, characterized by the following steps:

- fourniture de la base, comportant une surface supérieure et des supports faisant saillie au-dessus de la surface supérieure ;- supply of the base, comprising an upper surface and supports projecting above the upper surface;

- montage de rails de guidage sur les supports;- mounting of guide rails on the supports;

- placement du module destiné à être installé sur la base sur une surface supérieure située à côté de la base;- placement of the module intended to be installed on the base on an upper surface located next to the base;

- translation du module sur les rails de guidage pour l’amener sur la base ;- translation of the module on the guide rails to bring it onto the base;

- pose du module sur les supports pour que les supports reprennent le poids du module ;- placing the module on the supports so that the supports take up the weight of the module;

- libération des rails de guidage par rapport aux supports ;- release of the guide rails relative to the supports;

- retrait des rails de guidage par déplacement horizontal en regard de la surface supérieure de la base.- removal of the guide rails by horizontal movement opposite the upper surface of the base.

Le procédé selon l’invention peut comprendre l’une ou plusieurs des caractéristiques suivantes, prise(s) isolément ou suivant toute combinaison techniquement possible :The method according to the invention may include one or more of the following characteristics, taken alone or in any technically possible combination:

-avant l’étape de translation, le soulèvement du module par sa surface inférieure en utilisant une structure de levage disposée en appui entre la surface supérieure et la surface inférieure du module, pour amener la surface inférieure à la hauteur des rails de guidage ;-before the translational step, the lifting of the module by its lower surface using a lifting structure disposed in abutment between the upper surface and the lower surface of the module, to bring the lower surface to the height of the guide rails;

- la structure de levage comporte des poutres de soulèvement placées sous la surface inférieure du module, le procédé comportant une étape de raccordement des poutres de soulèvement aux rails de guidage par des poutres de liaison lorsque la surface inférieure est à la hauteur des rails de guidage ;the lifting structure comprises lifting beams placed under the lower surface of the module, the method comprising a step of connecting the lifting beams to the guide rails by connecting beams when the lower surface is at the height of the guide rails ;

- l’étape de retrait des rails de guidage comprend la traction horizontale de chaque rail de guidage depuis l’extérieur de la base ;- the step of removing the guide rails comprises the horizontal pulling of each guide rail from outside the base;

- chaque rail de guidage comprend une pluralité de tronçons successifs, l’étape de retrait comprenant la traction horizontale d’au moins un tronçon de chaque rail de guidage à l’extérieur de la base, puis le démontage du tronçon situé à l’extérieur de la base ;each guide rail comprises a plurality of successive sections, the removal step comprising the horizontal pulling of at least one section of each guide rail outside the base, then the dismantling of the section located outside from the base;

- l’étape de retrait comporte le déplacement horizontal des rails de guidage à l’écart du module, en maintenant une partie des rails de guidage en regard d’une région de la surface supérieure située à l’écart du module, la translation d’un module additionnel sur les rails de guidage jusqu’à la région de la surface supérieure située à l’écart du module, puis la pose du module additionnel sur les supports ;- The removal step involves the horizontal displacement of the guide rails away from the module, keeping part of the guide rails facing a region of the upper surface located away from the module, the translation d 'an additional module on the guide rails to the region of the upper surface located away from the module, then the installation of the additional module on the supports;

- la base porte des équipements sur la surface supérieure, les rails de guidage après montage étant disposés au-dessus des équipements, les équipements comportant avantageusement un rack de lignes fonctionnelles et/ou de conduites, les rails de guidage passant au-dessus du rack ;the base carries equipment on the upper surface, the guide rails after mounting being arranged above the equipment, the equipment advantageously comprising a rack of functional lines and / or pipes, the guide rails passing over the rack ;

- les rails de guidage présentent une section transversale en U s’ouvrant vers le haut ;- the guide rails have a U-shaped cross section opening upwards;

- la base présente un axe longitudinal, les rails de guidage étant montés transversalement par rapport à l’axe longitudinal ;- The base has a longitudinal axis, the guide rails being mounted transversely to the longitudinal axis;

- les rails de guidage s’étendent sur sensiblement toute la largeur de la base, le module présentant une largeur supérieure à 90 % de la largeur de la base, prise au niveau des rails de guidage ;- the guide rails extend over substantially the entire width of the base, the module having a width greater than 90% of the width of the base, taken at the level of the guide rails;

- la base présente un axe longitudinal, les rails de guidage étant montés parallèlement à l’axe longitudinal ;- The base has a longitudinal axis, the guide rails being mounted parallel to the longitudinal axis;

- la base est partiellement immergée dans une masse d’eau le long d’un quai, le module étant porté par le quai lors de l’étape de placement ;- the base is partially immersed in a body of water along a quay, the module being carried by the quay during the placement step;

- la base comporte une coque, la coque flottant sur la masse d’eau lors de l’étape de translation du module ;- the base has a hull, the hull floating on the body of water during the module translation stage;

- la base est posée sur le fond d’une masse d’eau ou sur le sol d’une forme lors de l’étape de translation du module, le procédé comportant ensuite une mise en flottaison de la base par déballastage de la base ou/et par remplissage de la forme pour faire flotter l’installation comportant la base et le module posé sur la base ;the base is placed on the bottom of a body of water or on the ground of a form during the module translation stage, the method then comprising floating the base by deballasting the base, or / and by filling the form to float the installation comprising the base and the module placed on the base;

- la masse d’au moins un module est supérieure à 3500 tonnes ;- the mass of at least one module is greater than 3500 tonnes;

- l’étape de soulèvement comporte le montage progressif d’une structure démontable de levage du module sous la surface inférieure du module.- the lifting stage comprises the progressive mounting of a removable module lifting structure under the lower surface of the module.

L’invention sera mieux comprise à la lecture de la description qui va suivre, donnée uniquement à titre d’exemple, et faite en se référant aux dessins annexés, sur lesquels :The invention will be better understood on reading the description which follows, given solely by way of example, and made with reference to the appended drawings, in which:

- la figure 1 est une vue de face de la base d’une première installation réalisée par un procédé selon l’invention ;- Figure 1 is a front view of the base of a first installation produced by a method according to the invention;

- la figure 2 est une vue de dessus de l’installation de la figure 1 ;- Figure 2 is a top view of the installation of Figure 1;

- la figure 3 est une vue en élévation d’un ensemble de montage destiné à la mise en œuvre du procédé selon l’invention ;- Figure 3 is an elevational view of a mounting assembly for implementing the method according to the invention;

- la figure 4 est une vue de dessus de l’ensemble de montage de la figure 3 ;- Figure 4 is a top view of the mounting assembly of Figure 3;

- les figures 5 à 9 illustrent des étapes successives de mise en œuvre d’un premier procédé selon l’invention ;- Figures 5 to 9 illustrate successive stages of implementation of a first method according to the invention;

- la figure 10 est une vue de dessus illustrant le positionnement des rails de guidage, avant la mise en place d’un module sur la base d’une installation ;- Figure 10 is a top view illustrating the positioning of the guide rails, before the introduction of a module on the basis of an installation;

- la figure 11 est une vue en coupe partielle de l’installation, avant le retrait des rails de guidage ;- Figure 11 is a partial sectional view of the installation, before removing the guide rails;

- la figure 12 illustre un support monté sur la base, destiné à porter les rails de guidage, puis le module après dépose ;- Figure 12 illustrates a support mounted on the base, intended to carry the guide rails, then the module after removal;

- les figures 13 et 14 sont des vues de dessus illustrant des étapes de montage d’une deuxième installation réalisée par un procédé selon l’invention ;- Figures 13 and 14 are top views illustrating steps of mounting a second installation produced by a method according to the invention;

- la figure 15 est une vue schématique d’une colonne d’une structure de levage utilisée dans le procédé selon l’invention ;- Figure 15 is a schematic view of a column of a lifting structure used in the method according to the invention;

- la figure 16 est une vue schématique de dessus de la colonne de la figure 15.- Figure 16 is a schematic top view of the column of Figure 15.

Une première installation 10, destinée à être placée dans une étendue d’eau 12, est illustrée schématiquement par les figures 1 et 2.A first installation 10, intended to be placed in a body of water 12, is illustrated diagrammatically by FIGS. 1 and 2.

L’installation 10 est destinée notamment à l’exploitation de fluide, notamment d’hydrocarbures comme du pétrole ou/et du gaz naturel, le fluide étant recueilli au fond de l’étendue d’eau 12 et remonté à la surface de l’étendue d’eau 12.The installation 10 is intended in particular for the exploitation of fluid, in particular of hydrocarbons such as petroleum and / or natural gas, the fluid being collected at the bottom of the body of water 12 and brought up to the surface of the body of water 12.

L’installation 10 est par exemple une unité flottante de production, de stockage et de déchargement appelée FPSO (« Floating Production, Storage and Offloading >> en langue anglaise) ou une unité flottante dédiée au gaz naturel liquéfié appelée FLNG (« Floating Liquified Natural Gas >> en langue anglaise), une plate-forme semi-submersible, pouvant être par exemple un TLP (« Tension Leg Platform >> en langue anglaise), une bouée de déchargement, une colonne verticale flottante ou un navire. En variante, l’installation 10 est une structure rigide fixe de type « gravitaire >> par exemple une GBS (« Gravity Based Structure >>).The installation 10 is for example a floating production, storage and unloading unit called FPSO ("Floating Production, Storage and Offloading" in English) or a floating unit dedicated to liquefied natural gas called FLNG ("Floating Liquified Natural Gas >> in English), a semi-submersible platform, which can be for example a TLP ("Tension Leg Platform" in English), an unloading buoy, a floating vertical column or a ship. As a variant, the installation 10 is a fixed rigid structure of the "gravity" type, for example a GBS ("Gravity Based Structure").

L’étendue d’eau 12 est par exemple un lac, une mer ou un océan. La profondeur de l’étendue d’eau 12 au droit de l’installation 10 est par exemple comprise entre 50 m et 3000 m, voire 4000 m.The water body 12 is for example a lake, a sea or an ocean. The depth of the body of water 12 at the level of the installation 10 is for example between 50 m and 3000 m, or even 4000 m.

En référence à la figure 1, l’installation 10 comporte une base 14 partiellement immergée dans l’étendue d’eau, la base 14 présentant des supports 16. L’installation 10 comprend au moins un module 18 posé et fixé sur les supports 16 de la base 14.Referring to FIG. 1, the installation 10 comprises a base 14 partially immersed in the body of water, the base 14 having supports 16. The installation 10 comprises at least one module 18 placed and fixed on the supports 16 from base 14.

Dans l’exemple représenté sur les figures 1 et 2, la base 14 s’étend le long d’un axe longitudinal A-A’ entre un bord amont 13 et un bord aval 15. Elle définit un bord latéral bâbord 17 et un bord latéral tribord 19.In the example shown in Figures 1 and 2, the base 14 extends along a longitudinal axis A-A 'between an upstream edge 13 and a downstream edge 15. It defines a port side edge 17 and an edge starboard side 19.

Elle comporte une coque 20 flottant dans l’étendue d’eau 12. La base 14 présente en outre une surface supérieure 22 formant ici un pont, et des équipements 24 portés par la surface supérieure 22.It comprises a hull 20 floating in the body of water 12. The base 14 also has an upper surface 22 here forming a bridge, and equipment 24 carried by the upper surface 22.

La base 14 comprend un système 26 de ballastage sélectif, propre à régler la hauteur de la surface supérieure 22 par rapport à la surface de l’étendue d’eau 12, et propre à maintenir la surface supérieure 22 sensiblement horizontale, même si la charge appliquée sur la surface supérieure 22 est inhomogène et quelle que soit la variation de marée.The base 14 comprises a selective ballasting system 26 capable of adjusting the height of the upper surface 22 relative to the surface of the body of water 12, and capable of keeping the upper surface 22 substantially horizontal, even if the load applied to the upper surface 22 is inhomogeneous and whatever the variation of the tide.

Les équipements 24 comprennent par exemple des systèmes fonctionnels tels que des équipements mécaniques (pompes, ponts roulants, monorails, chariots). Les équipements 24 comprennent en outre des conduites de transport de fluide, ou encore des lignes fonctionnelles, telles que des lignes de transport de puissance électrique, des lignes de transport de fluide hydraulique, ou/et des lignes de transport d’information.The equipment 24 includes, for example, functional systems such as mechanical equipment (pumps, overhead traveling cranes, monorails, carriages). The equipment 24 further comprises fluid transport lines, or even functional lines, such as electric power transport lines, hydraulic fluid transport lines, and / or information transport lines.

Dans l’exemple représenté sur les figures 1, 2, et 11, les équipements 24 comprennent au moins un rack 27 longitudinal, s’étendant le long de la base 14 en passant en dessous de chaque module 18.In the example shown in Figures 1, 2, and 11, the equipment 24 comprises at least one longitudinal rack 27, extending along the base 14 passing below each module 18.

Le rack 27 contient une pluralité de conduites de transport de fluide et/ou de lignes fonctionnelles destinées à raccorder des modules 18 entre eux, ou un module 18 avec des équipements situés sur la base 14.The rack 27 contains a plurality of fluid transport lines and / or functional lines intended to connect modules 18 to one another, or a module 18 with equipment located on the base 14.

Les supports 16 font saillie sur la surface supérieure 22. Ils présentent une hauteur, prise par rapport à la surface supérieure 22, supérieure à celle des équipements 24 présents sur la surface 22.The supports 16 protrude from the upper surface 22. They have a height, taken with respect to the upper surface 22, greater than that of the equipment 24 present on the surface 22.

En référence à la figure 12, chaque support 16 comporte une embase 30, et une tête 32 de montage du module 18. Dans l’exemple représenté sur la figure 12, chaque support 16 comporte en outre des bras 34 destinés à porter des rails 36 de guidage du module 18, lors de sa mise en place.With reference to FIG. 12, each support 16 comprises a base 30, and a head 32 for mounting the module 18. In the example shown in FIG. 12, each support 16 also comprises arms 34 intended to carry rails 36 for guiding the module 18, during its installation.

L’embase 30 est ici de forme polyédrique ou tronconique convergente vers le haut.The base 30 is here of polyhedral or frustoconical shape converging upwards.

La tête 32 présente une platine supérieure 38 d’appui pour le module 18, et avantageusement, un passage 40 d’insertion d’un appareil d’appui 41 du module 18 posé sur la platine 38.The head 32 has an upper support plate 38 for the module 18, and advantageously, a passage 40 for inserting a support device 41 for the module 18 placed on the plate 38.

Chaque bras 34 fait saillie latéralement par rapport à l’embase 30. Dans l’exemple représenté sur la figure 12, le support 16 est muni de deux bras latéraux 34 s’étendant de part et d’autre de l’embase 30.Each arm 34 projects laterally with respect to the base 30. In the example shown in FIG. 12, the support 16 is provided with two lateral arms 34 extending on either side of the base 30.

Chaque bras 34 est par exemple démontable par rapport à l’embase 30, pour minimiser l’encombrement sur l’installation 10, une fois le module 18 installé.Each arm 34 is for example removable with respect to the base 30, in order to minimize the space requirement on the installation 10, once the module 18 has been installed.

Dans l’exemple représenté sur la figure 2, l’installation 10 comporte une pluralité de modules 18 disposés de manière adjacente le long de l’axe A-A’.In the example shown in Figure 2, the installation 10 comprises a plurality of modules 18 arranged adjacent along the axis A-A ’.

Dans cet exemple, au moins un module 18 s’étend sur sensiblement toute la largeur de la base 14, notamment sur plus de 90 % de la largeur de la base 14, prise entre le bord latéral bâbord 17 et le bord latéral tribord 19.In this example, at least one module 18 extends over substantially the entire width of the base 14, in particular over more than 90% of the width of the base 14, taken between the port side edge 17 and the starboard side edge 19.

Chaque module 18 comporte une pluralité d’équipements préassemblés avant l’installation du module 18 sur la base 14. Les équipements sont par exemple des réservoirs, des réacteurs, des compresseurs, des turbines, des colonnes en sus des systèmes analogues à ceux définis plus haut. Les modules 18 sont chacun propres à remplir au moins une fonction dans l’installation 10, par exemple séparer le gaz, l’eau et l’huile et liquéfier le gaz naturel.Each module 18 comprises a plurality of devices preassembled before the installation of the module 18 on the base 14. The devices are for example tanks, reactors, compressors, turbines, columns in addition to systems similar to those defined more high. The modules 18 are each suitable for fulfilling at least one function in the installation 10, for example separating the gas, water and oil and liquefying the natural gas.

Au moins un module 18 présente une masse supérieure à 3500 tonnes, empêchant le module 18 d’être mis en place par une grue.At least one module 18 has a mass greater than 3500 tonnes, preventing the module 18 from being put in place by a crane.

Comme illustré par la figure 11, chaque module 18 présente une surface inférieure 50 destinée à être placée en regard de la surface supérieure 22 de la base 14, en appui sur les supports 16. Chaque module 18 comporte en outre une pluralité de plots de calage 52 faisant saillie vers le bas par rapport à la surface inférieure 50 pour reposer sur l’appareil d’appui 41 posé sur la platine 38.As illustrated in FIG. 11, each module 18 has a lower surface 50 intended to be placed opposite the upper surface 22 of the base 14, bearing on the supports 16. Each module 18 also comprises a plurality of wedging pads 52 projecting downwards with respect to the lower surface 50 to rest on the bearing 41 placed on the plate 38.

Le procédé de montage selon l’invention est mis en œuvre à l’aide d’un ensemble de mise en place 60, illustré schématiquement sur la figure 3.The assembly method according to the invention is implemented using a positioning assembly 60, illustrated schematically in FIG. 3.

L’ensemble de mise en place 60 comprend un chantier 62 d’assemblage du module 18, et un quai de chargement 64 situé entre le chantier 62 et une masse d’eau 66 recevant la base 14. La masse d’eau 66 est raccordée à l’étendue d’eau 12, pour permettre à l’installation 10 d’être convoyée par flottaison jusqu’à l’étendue d’eau 12.The positioning assembly 60 comprises a site 62 for assembling the module 18, and a loading dock 64 located between the site 62 and a body of water 66 receiving the base 14. The body of water 66 is connected to the body of water 12, to allow the installation 10 to be conveyed by flotation to the body of water 12.

L’ensemble de mise en place 60 comporte en outre une structure démontable de levage 68 du module 18 par sa surface inférieure 50, les rails de guidage 36 destinés à être placés au-dessus de la base 14 et des poutres de liaison 70 entre la structure de levage 68 et les rails de guidage 36.The positioning assembly 60 further comprises a removable lifting structure 68 of the module 18 by its lower surface 50, the guide rails 36 intended to be placed above the base 14 and connecting beams 70 between the lifting structure 68 and guide rails 36.

En référence aux figures 7 à 9, l’ensemble de mise en place 60 comporte en outre une pluralité de patins 72 de déplacement horizontal du module 18 sur les poutres de soulèvement 76, sur les poutres de liaison 70 et sur les rails 36, ainsi qu’un système de traction 74 des rails de guidage 36 à l’écart de la base 14.Referring to Figures 7 to 9, the positioning assembly 60 further comprises a plurality of pads 72 for horizontal displacement of the module 18 on the lifting beams 76, on the connecting beams 70 and on the rails 36, as well that a traction system 74 of the guide rails 36 away from the base 14.

Comme illustré par la figure 3, la structure démontable de levage 68 est un pont élévateur propre à soulever la surface inférieure 50 du module 18 entre une position basse située au niveau d’une surface supérieure 75 du quai 64, et des positions hautes dans lesquelles le module 18 est disposé au-dessus et à l’écart du bord du quai 64, sans utiliser de grue au-dessus du module 18.As illustrated in FIG. 3, the removable lifting structure 68 is a lift capable of lifting the lower surface 50 of the module 18 between a low position situated at the level of an upper surface 75 of the platform 64, and high positions in which the module 18 is arranged above and away from the edge of the quay 64, without using a crane above the module 18.

La structure démontable de levage 68 comprend des poutres de soulèvement 76 portant le module 18, des colonnes déployables 78, de hauteur progressivement croissante lors de leur assemblage, les colonnes 78 portant les poutres de soulèvement 76, et des vérins 79 et 81 de soulèvement progressif de chaque colonne 78 (visibles sur les figures 15 et 16).The demountable lifting structure 68 comprises lifting beams 76 carrying the module 18, deployable columns 78, of progressively increasing height during their assembly, the columns 78 carrying the lifting beams 76, and cylinders 79 and 81 of progressive lifting of each column 78 (visible in FIGS. 15 and 16).

Dans un exemple de réalisation, illustré par la figure 15, chaque colonne 78 est formée d’une succession de paires de barres 80 et de paires de traverses 82, chaque paire de barres 80 étant disposée perpendiculairement à une paire de traverses 82 et portant la paire de traverses 82.In an exemplary embodiment, illustrated by FIG. 15, each column 78 is formed of a succession of pairs of bars 80 and pairs of crosspieces 82, each pair of bars 80 being arranged perpendicular to a pair of crosspieces 82 and carrying the pair of sleepers 82.

Les vérins 79, 81 sont disposés à base de la colonne 78. Au moins deux vérins 79 sont propres à soulever des barres 80 pour permettre d’intercaler des traverses 82 sous les barres 80.The jacks 79, 81 are arranged at the base of the column 78. At least two jacks 79 are suitable for lifting bars 80 in order to allow the sleepers 82 to be inserted under the bars 80.

Au moins deux vérins 81 sont propres à soulever des traverses 82 pour permettre d’intercaler des barres 80 sous les traverses 82. Ainsi, chaque colonne 78 est assemblée progressivement par étages pour soulever progressivement les poutres de soulèvement 76 et le module 18.At least two jacks 81 are suitable for lifting crosspieces 82 to allow bars 80 to be inserted under the crosspieces 82. Thus, each column 78 is gradually assembled in stages to gradually raise the lifting beams 76 and the module 18.

Des diagonales croisées 83 (visibles sur la figure 3) raccordent les colonnes 78 entre elles pour éviter l’instabilité latérale de l’ensemble sous le poids du module 18 et le rigidifier.Crossed diagonals 83 (visible in FIG. 3) connect the columns 78 to each other to avoid lateral instability of the assembly under the weight of the module 18 and to stiffen it.

Dans l’exemple représenté sur les figures 3 à 10, les rails de guidage 36 sont propres à s’étendre transversalement sur toute la largeur de la base 14. Chaque rail de guidage 36 est réalisé ici d’un seul tenant. Comme illustré par la figure 10, l’ensemble de mise en place 60 comporte une pluralité de rails de guidage parallèles 36, ici une paire de rails 36, puis un triplet de rails 36, puis une autre paire de rails 36.In the example shown in Figures 3 to 10, the guide rails 36 are adapted to extend transversely over the entire width of the base 14. Each guide rail 36 is produced here in one piece. As illustrated in FIG. 10, the positioning assembly 60 comprises a plurality of parallel guide rails 36, here a pair of rails 36, then a triplet of rails 36, then another pair of rails 36.

Chaque rail 36 est porté par des bras latéraux 34 de supports 16 successifs. Chaque rail 36 est ici creux et présente une forme en U ouvert vers le haut. Il définit une rainure centrale 84 de coulissement des patins 72. La rainure 84 réduit l’encombrement en hauteur du rail 36 et n’altère pas la présence des équipements 24 et du rack 27.Each rail 36 is carried by lateral arms 34 of successive supports 16. Each rail 36 is here hollow and has a U-shape open upwards. It defines a central groove 84 for sliding the pads 72. The groove 84 reduces the overall height of the rail 36 and does not alter the presence of the equipment 24 and the rack 27.

De plus, la rainure 84 définit deux parois verticales qui rigidifient le fond du rail du guidage 36. Ceci limite la flexion du rail 36 entre deux supports 16, notamment lorsque la distance séparant les supports 16 est supérieure à 10 m. Ceci permet au rail 36 d’être relativement peu épais, pour réduire son encombrement.In addition, the groove 84 defines two vertical walls which stiffen the bottom of the guide rail 36. This limits the bending of the rail 36 between two supports 16, in particular when the distance separating the supports 16 is greater than 10 m. This allows the rail 36 to be relatively thin, to reduce its size.

La rainure centrale 84 est avantageusement munie d’un revêtement glissant, par exemple en polytétrafluorure d’éthylène et de butées internes (non représentées) espacées longitudinalement pour permettre l’accrochage et la poussée ou le tirage des patins 72.The central groove 84 is advantageously provided with a sliding coating, for example made of polyethylene tetrafluoride and internal stops (not shown) spaced apart longitudinally to allow the hooking and the pushing or pulling of the pads 72.

Sur les figures 7 et 8, chaque patin 72 comporte une semelle 86, un vérin 88 de soulèvement du module 18, porté par la semelle 86 et un bras déployable 90 de poussée/tirage de la semelle 86, propre à saisir une butée interne dans le rail de guidage 36 pour pousser/tirer la semelle 86 et déplacer longitudinalement le vérin 88 et le moduleIn FIGS. 7 and 8, each shoe 72 comprises a sole 86, a jack 88 for lifting the module 18, carried by the sole 86 and a deployable arm 90 for pushing / pulling the sole 86, suitable for gripping an internal stop in the guide rail 36 for pushing / pulling the sole 86 and longitudinally moving the jack 88 and the module

18.18.

Chaque rail de guidage 36 est fixé de manière amovible sur les supports successifs 16. Lorsque le rail de guidage 36 est libéré du support 16, il est propre à être tracté sensiblement horizontalement, parallèlement à la surface supérieure 22 pour être retiré de l’installation 10.Each guide rail 36 is removably attached to the successive supports 16. When the guide rail 36 is released from the support 16, it is capable of being towed substantially horizontally, parallel to the upper surface 22 to be removed from the installation. 10.

En référence à la figure 9, le système de traction 74 est propre à tirer horizontalement chaque rail 36 pour l’extraire à l’écart latéralement de la base 14 et du module 18, pour libérer l’espace intermédiaire entre le module 18 et la surface supérieureWith reference to FIG. 9, the traction system 74 is capable of pulling each rail 36 horizontally to extract it laterally away from the base 14 and from the module 18, to free the intermediate space between the module 18 and the upper surface

22. Le système de traction 74 est par exemple fixé sur la structure de levage 68, après le transfert du module 18 sur la base 14. Il comprend par exemple au moins un treuil.22. The traction system 74 is for example fixed on the lifting structure 68, after the transfer of the module 18 to the base 14. It comprises for example at least one winch.

Un premier procédé de montage de l’installation 10 selon l’invention va maintenant être décrit.A first method of mounting the installation 10 according to the invention will now be described.

Initialement, chaque module 18 est assemblé sur un chantier 62 de manière indépendante de la base 14. La base 14 est amenée dans une masse d’eau 66 au voisinage du quai 64, et est amarrée au quai 64, comme illustré sur la figure 4.Initially, each module 18 is assembled on a building site 62 independently of the base 14. The base 14 is brought into a body of water 66 in the vicinity of the platform 64, and is moored to the platform 64, as illustrated in FIG. 4 .

Les rails de guidage 36 sont installés sur les supports 16 au moyen d’une grue. Ils sont posés sur les bras 34 des supports 16 successifs.The guide rails 36 are installed on the supports 16 by means of a crane. They are placed on the arms 34 of the successive supports 16.

Dans cet exemple, ils s’étendent transversalement sur toute la largeur de la base 14, entre le bord latéral bâbord 17 et le bord latéral tribord 19.In this example, they extend transversely over the entire width of the base 14, between the port side edge 17 and the starboard side edge 19.

La structure de levage 68 occupe une position basse dans laquelle les colonnes déployables 78 sont démontées et dans laquelle les poutres de soulèvement 76 sont disposées au niveau de la surface supérieure 75 du quai 64.The lifting structure 68 occupies a low position in which the deployable columns 78 are dismounted and in which the lifting beams 76 are arranged at the level of the upper surface 75 of the platform 64.

Les patins de déplacement 72 sont installés sous la surface inférieure 50 du module 18. Les vérins 88 des patins de déplacement 72 sont alors déployés pour libérer le module 18 de ses étais de construction. Puis, les patins de déplacement 72 sont activés, grâce aux bras 90, pour déplacer en translation le module 18, afin de l’amener sur les poutres de soulèvement 76.The displacement pads 72 are installed under the lower surface 50 of the module 18. The jacks 88 of the displacement pads 72 are then deployed to release the module 18 from its construction struts. Then, the displacement pads 72 are activated, thanks to the arms 90, to move the module 18 in translation, in order to bring it onto the lifting beams 76.

Lorsque le module 18 est placé sur les poutres de soulèvement 76, la structure de levage 68 est passée dans sa position haute, pour amener les poutres de soulèvement 76 au même niveau horizontal que les rails de guidage 36.When the module 18 is placed on the lifting beams 76, the lifting structure 68 is moved to its high position, to bring the lifting beams 76 to the same horizontal level as the guide rails 36.

Dans cet exemple, les colonnes déployables 78 sont assemblées progressivement à partir de la surface supérieure 75 pour soulever les poutres de soulèvement 76 et le module 18 à l’écart de la surface supérieure 75.In this example, the deployable columns 78 are gradually assembled from the upper surface 75 to lift the lifting beams 76 and the module 18 away from the upper surface 75.

Dans l’exemple représenté sur les figures 15 et 16, les vérins 81 sont tout d’abord activés pour soulever deux traverses 82 situées sous la poutre de soulèvement 76 d’une hauteur sensiblement égale à celle d’une barre 80. Les barres 80 sont mises en place de manière perpendiculaire aux traverses 82, au-dessus des vérins 79 et des appuis rigides 83B. Les appuis rigides 83B situés juste au-dessous des barres 80 permettent de reposer l’ensemble sur les barres 80, si besoin.In the example shown in FIGS. 15 and 16, the jacks 81 are first activated to lift two sleepers 82 located under the lifting beam 76 from a height substantially equal to that of a bar 80. The bars 80 are placed perpendicular to the crosspieces 82, above the jacks 79 and the rigid supports 83B. The rigid supports 83B located just below the bars 80 allow the assembly to rest on the bars 80, if necessary.

Les vérins 81 sont alors rétractés, les traverses 82 venant en appui sur les barres 80, et les vérins 79 sont déployés d’une hauteur sensiblement égale à celle d’une traverse 82.The jacks 81 are then retracted, the cross members 82 coming to bear on the bars 80, and the jacks 79 are deployed at a height substantially equal to that of a cross member 82.

Les traverses 82 sont alors mises en place au-dessus des vérins 81 et des appuis rigides 83A de manière perpendiculaire aux barres 80. Les appuis rigides 83A situés juste au-dessous des traverses 82 permettent de reposer l’ensemble sur les traverses 82, si besoin.The cross members 82 are then placed above the cylinders 81 and the rigid supports 83A perpendicular to the bars 80. The rigid supports 83A located just below the cross members 82 allow the assembly to rest on the cross members 82, if need.

Ces opérations sont répétées jusqu’à ce que les poutres de soulèvement 76 atteignent une hauteur égale à celle des rails de guidage 36 sur la base 14.These operations are repeated until the lifting beams 76 reach a height equal to that of the guide rails 36 on the base 14.

Ensuite, comme illustré par la figure 4, des poutres de liaison 70 sont interposées dans l’espace intermédiaire entre la structure de levage 68 et la base 14 placée dans une masse d’eau 66. Chaque poutre de liaison 70 raccorde une poutre de soulèvement 76 à un rail de guidage 36.Then, as illustrated in FIG. 4, connecting beams 70 are interposed in the intermediate space between the lifting structure 68 and the base 14 placed in a body of water 66. Each connecting beam 70 connects a lifting beam 76 to a guide rail 36.

Ceci étant fait, les patins 72 sont activés pour déplacer en translation horizontale le module 18 sur les rails 36 depuis la structure de levage 68 vers la base 14.This being done, the pads 72 are activated to move the module 18 on the rails 36 in horizontal translation from the lifting structure 68 towards the base 14.

Dans l’exemple représenté sur les figures, les bras 90 de chaque patin 72 sont déployés à l’écart de la semelle 86 dans le sens allant du quai 64 vers la base 14, pour s’agripper à une butée. Puis, les bras 90 sont rétractés dans la semelle 86, provoquant le glissement de la semelle 86 vers la butée, et le déplacement du module 18 le long de l’axe défini par chaque rail de guidage 36.In the example shown in the figures, the arms 90 of each shoe 72 are deployed away from the sole 86 in the direction from the platform 64 towards the base 14, to grip a stop. Then, the arms 90 are retracted into the sole 86, causing the sole 86 to slide towards the stop, and the module 18 to move along the axis defined by each guide rail 36.

Le système de ballastage sélectif 26 est activé pour maintenir la base 14 à un niveau constant par rapport au quai 64 lors de la progression du module 18 et ainsi maintenir chaque rail de guidage 36 aligné avec la poutre de liaison 70 et la poutre de soulèvement 76. Ceci doit être assuré quelle que soit le niveau de la marée qui fait monter ou descendre la base 14, et la position du module 18 lors de son transfert sur la base 14.The selective ballasting system 26 is activated to maintain the base 14 at a constant level relative to the platform 64 during the progression of the module 18 and thus maintain each guide rail 36 aligned with the connecting beam 70 and the lifting beam 76 This must be ensured whatever the level of the tide which causes base 14 to rise or fall, and the position of module 18 when it is transferred to base 14.

Les vérins 88 étant actifs, la surface inférieure 50 du module 18 reste au-dessus de tous les équipements 24 présents sur la surface supérieure 22. De plus, les plots de calage 52 passent au-dessus des supports 30, sans buter sur les supports 30.The cylinders 88 being active, the lower surface 50 of the module 18 remains above all of the equipment 24 present on the upper surface 22. In addition, the wedging pads 52 pass over the supports 30, without abutting on the supports 30.

Lorsque le module 18 atteint la position souhaitée, par exemple s’étendant sur la largeur de la base 14 depuis le bord latéral bâbord 17 vers le bord latéral tribord 19, et que les plots 52 sont disposés en regard des supports 16, les vérins 88 sont désactivés pour rapprocher la surface inférieure 52 de la platine supérieure 38 des supports 16, via un appareil d’appui 41 le cas échéant.When the module 18 reaches the desired position, for example extending over the width of the base 14 from the port side edge 17 to the starboard side edge 19, and the studs 52 are arranged opposite the supports 16, the jacks 88 are deactivated to bring the lower surface 52 of the upper plate 38 closer to the supports 16, via a bearing 41 if necessary.

Lors de ce déplacement, les supports 16 reprennent progressivement le poids du module 18.During this movement, the supports 16 gradually take up the weight of the module 18.

Le système de traction 74 des rails de guidage 36 est alors activé depuis l’extérieur de la base 14 pour faire coulisser horizontalement les rails 36, contenant les patins 72, sous la surface inférieure 50, et les déplacer à l’écart de la base 14, avantageusement sur la structure de levage 68. Préalablement, la poutre de liaison 70 est retirée et le ballastage 26 de la coque 20 est activé pour mettre à niveau le dessous du rail de guidage 36 avec le dessus de la poutre de soulèvement 76.The traction system 74 of the guide rails 36 is then activated from outside the base 14 to make the rails 36, containing the pads 72, slide horizontally under the lower surface 50, and move them away from the base. 14, advantageously on the lifting structure 68. Beforehand, the connecting beam 70 is removed and the ballasting 26 of the shell 20 is activated in order to level the underside of the guide rail 36 with the top of the lifting beam 76.

L’espace intermédiaire entre le module 18 et la surface supérieure 22 de la base 14 est libéré des rails de guidage 36, ce qui supprime un poids inutile de l’installation 10 et augmente l’espace disponible dans l’installation 10.The intermediate space between the module 18 and the upper surface 22 of the base 14 is freed from the guide rails 36, which eliminates an unnecessary weight of the installation 10 and increases the space available in the installation 10.

Le montage du module 18 par le procédé selon l’invention est donc particulièrement simple et versatile, puisqu’il ne nécessite pas de grues de grande capacité. II est ainsi possible d’assembler sur une base 14 des modules 18, préfabriqués et pré-testés sur un chantier 62, disposée dans une masse d’eau 66, même si le chantier 62 ne dispose pas de grues de capacité suffisante pour lever un module 18 présentant un poids excessif.The assembly of the module 18 by the method according to the invention is therefore particularly simple and versatile, since it does not require large capacity cranes. It is thus possible to assemble on a base 14 modules 18, prefabricated and pre-tested on a site 62, placed in a body of water 66, even if the site 62 does not have cranes of sufficient capacity to lift a module 18 having excessive weight.

Grâce à la disposition des rails de guidage 36 au-dessus des équipements 24 présents sur la base 14, le module 18 est apte à balayer toute la largeur de la base 14 lors de son installation, ce qui permet, le cas échéant, de construire des modules 18 de grande largeur, et de limiter le temps d’installation.Thanks to the arrangement of the guide rails 36 above the equipment 24 present on the base 14, the module 18 is capable of sweeping the entire width of the base 14 during its installation, which makes it possible, if necessary, to build modules 18 of large width, and to limit the installation time.

Les rails de guidage 36 étant démontables, ils ne contribuent pas au poids de l’installation 10 une fois le montage terminé, et ils peuvent être utilisés à nouveau pour la mise en place d’un autre module 18, ou pour le montage d’une autre installation 10.The guide rails 36 being removable, they do not contribute to the weight of the installation 10 once the assembly is complete, and they can be used again for the installation of another module 18, or for the assembly of another installation 10.

Dans la variante illustrée sur les figures 13 et 14, chaque rail de guidage 36 est constitué de plusieurs tronçons successifs 100 assemblés bout à bout. Chaque tronçon 100 présente avantageusement une longueur supérieure ou égale à la longueur d’un module 18.In the variant illustrated in Figures 13 and 14, each guide rail 36 consists of several successive sections 100 assembled end to end. Each section 100 advantageously has a length greater than or equal to the length of a module 18.

Dans cet exemple, les rails de guidage 36 sont placés parallèlement à l’axe longitudinal de la base 14. Le bord amont 13 de la base 14 est disposé en regard du quai 64.In this example, the guide rails 36 are placed parallel to the longitudinal axis of the base 14. The upstream edge 13 of the base 14 is arranged opposite the platform 64.

Lors du montage de l’installation 10, un premier module 18 est translaté sur les rails de guidage 36, comme décrit précédemment, jusqu’à sa position de mise en place. Puis, le module 18 est posé sur les supports 16 par abaissement des vérins 88.During installation of the installation 10, a first module 18 is translated on the guide rails 36, as described above, to its position of installation. Then, the module 18 is placed on the supports 16 by lowering the jacks 88.

Ensuite, les tronçons 100 de rails de guidage 36 disposés sous le module 18 sont extraits par translation horizontale sous le module 18 à l’aide du système de traction 74. Les tronçons 100 des rails de guidage 36 ayant été extraits à l’écart de la base 14 sont séparés des tronçons 100 restant sur la base 14, comme illustré sur la figure 14.Then, the sections 100 of guide rails 36 disposed under the module 18 are extracted by horizontal translation under the module 18 using the traction system 74. The sections 100 of the guide rails 36 having been extracted away from the base 14 are separated from the sections 100 remaining on the base 14, as illustrated in FIG. 14.

Au moins un tronçon 102 de chaque rail de guidage 36 reste en regard d’une région de la surface supérieure 22 adjacente au module 18. Puis, un module 18 additionnel est translaté sur les rails de guidage 36 jusqu’à la région de la surface supérieure 22 située à l’écart du module 18. Le module 18 additionnel est posé sur les supports 16.At least one section 102 of each guide rail 36 remains opposite a region of the upper surface 22 adjacent to the module 18. Then, an additional module 18 is translated on the guide rails 36 to the region of the surface upper 22 located away from the module 18. The additional module 18 is placed on the supports 16.

Les tronçons 102 de rail situés sous le module additionnel 18 sont alors extraits horizontalement, comme décrit précédemment.The rail sections 102 located under the additional module 18 are then extracted horizontally, as described above.

Dans une variante, la base 14 est posée sur le fond de la masse d’eau 66, ou bien dans une forme 67 à sec lors de l’étape de translation du module 18 (voir figure 13). Le 5 procédé comporte ensuite une mise en flottaison de la base 14 par déballastage ou/et remplissage de la forme 67.Alternatively, the base 14 is placed on the bottom of the body of water 66, or in a dry form 67 during the translation step of the module 18 (see FIG. 13). The method then comprises a floating of the base 14 by deballasting or / and filling of the form 67.

Claims (14)

REVENDICATIONS 1. - Procédé de montage d’une installation (10) destinée à être placée dans une étendue d’eau (12), l’installation (10) comportant une base (14) et au moins un module (18) posé sur la base (14), le procédé étant caractérisé par les étapes suivantes :1. - Method for mounting an installation (10) intended to be placed in a body of water (12), the installation (10) comprising a base (14) and at least one module (18) placed on the base (14), the method being characterized by the following steps: - fourniture de la base (14), comportant une surface supérieure (22) et des supports (16) faisant saillie au-dessus de la surface supérieure (22) ;- supply of the base (14), comprising an upper surface (22) and supports (16) projecting above the upper surface (22); - montage de rails de guidage (36) sur les supports (16) ;- mounting of guide rails (36) on the supports (16); - placement du module (18) destiné à être installé sur la base (14) sur une surface supérieure (75) située à côté de la base (14) ;- placement of the module (18) intended to be installed on the base (14) on an upper surface (75) located next to the base (14); - translation du module (18) sur les rails de guidage (36) pour l’amener sur la base (14);- Translation of the module (18) on the guide rails (36) to bring it onto the base (14); - pose du module (18) sur les supports (16) pour que les supports (16) reprennent le poids du module (18) ;- Installation of the module (18) on the supports (16) so that the supports (16) take up the weight of the module (18); - libération des rails de guidage (36) par rapport aux supports (16) ;- release of the guide rails (36) relative to the supports (16); - retrait des rails de guidage (36) par déplacement horizontal en regard de la surface supérieure (22) de la base (14).- Removal of the guide rails (36) by horizontal movement opposite the upper surface (22) of the base (14). 2. - Procédé selon la revendication 1, comprenant, avant l’étape de translation, le soulèvement du module (18) par sa surface inférieure (50) en utilisant une structure de levage (68) disposée en appui entre la surface supérieure (75) et la surface inférieure (50) du module (18), pour amener la surface inférieure (50) à la hauteur des rails de guidage (36).2. - Method according to claim 1, comprising, before the translation step, the lifting of the module (18) by its lower surface (50) using a lifting structure (68) disposed in abutment between the upper surface (75 ) and the lower surface (50) of the module (18), to bring the lower surface (50) to the height of the guide rails (36). 3. - Procédé selon la revendication 2, dans lequel la structure de levage (68) comporte des poutres de soulèvement (76) placées sous la surface inférieure (50) du module (18), le procédé comportant une étape de raccordement des poutres de soulèvement (76) aux rails de guidage (36) par des poutres de liaison (70) lorsque la surface inférieure (50) est à la hauteur des rails de guidage (36).3. - Method according to claim 2, wherein the lifting structure (68) comprises lifting beams (76) placed under the lower surface (50) of the module (18), the method comprising a step of connecting the beams lifting (76) to the guide rails (36) by connecting beams (70) when the lower surface (50) is at the height of the guide rails (36). 4. - Procédé selon l’une quelconque des revendications précédentes, dans lequel l’étape de retrait des rails de guidage (36) comprend la traction horizontale de chaque rail de guidage (36) depuis l’extérieur de la base (14).4. - Method according to any one of the preceding claims, in which the step of removing the guide rails (36) comprises horizontal pulling of each guide rail (36) from outside the base (14). 5. - Procédé selon la revendication 4, dans lequel chaque rail de guidage (36) comprend une pluralité de tronçons (100) successifs, l’étape de retrait comprenant la traction horizontale d’au moins un tronçon (100) de chaque rail de guidage (36) à l’extérieur de la base (14), puis le démontage du tronçon (100) situé à l’extérieur de la base (14).5. - Method according to claim 4, wherein each guide rail (36) comprises a plurality of successive sections (100), the removal step comprising the horizontal traction of at least one section (100) of each rail guide (36) outside the base (14), then the disassembly of the section (100) located outside the base (14). 6. - Procédé selon l’une quelconque des revendications précédentes, dans lequel l’étape de retrait comporte le déplacement horizontal des rails de guidage (36) à l’écart du module (18), en maintenant une partie des rails de guidage (36) en regard d’une région de la surface supérieure (22) située à l’écart du module (18), la translation d’un module (18) additionnel sur les rails de guidage (36) jusqu’à la région de la surface supérieure (22) située à l’écart du module (18), puis la pose du module (18) additionnel sur les supports (16).6. - Method according to any one of the preceding claims, in which the removal step comprises the horizontal displacement of the guide rails (36) away from the module (18), while maintaining part of the guide rails ( 36) opposite a region of the upper surface (22) located away from the module (18), the translation of an additional module (18) on the guide rails (36) to the region of the upper surface (22) located away from the module (18), then placing the additional module (18) on the supports (16). 7. - Procédé selon l’une quelconque des revendications précédentes, dans lequel la base (14) porte des équipements (24) sur la surface supérieure (22), les rails de guidage (36) après montage étant disposés au-dessus des équipements (24), les équipements (24) comportant avantageusement un rack (27) de lignes fonctionnelles et/ou de conduites, les rails de guidage (36) passant au-dessus du rack (27).7. - Method according to any one of the preceding claims, in which the base (14) carries equipment (24) on the upper surface (22), the guide rails (36) after mounting being arranged above the equipment. (24), the equipment (24) advantageously comprising a rack (27) of functional lines and / or pipes, the guide rails (36) passing over the rack (27). 8. - Procédé selon la revendication 7, dans lequel les rails de guidage (36) présentent une section transversale en U s’ouvrant vers le haut.8. - Method according to claim 7, wherein the guide rails (36) have a U-shaped cross section opening upwards. 9. - Procédé selon l’une quelconque des revendications précédentes, dans lequel la base (14) présente un axe longitudinal (A-Aj, les rails de guidage (36) étant montés transversalement par rapport à l’axe longitudinal (A-Aj.9. - Method according to any one of the preceding claims, wherein the base (14) has a longitudinal axis (A-Aj, the guide rails (36) being mounted transversely to the longitudinal axis (A-Aj . 10. - Procédé selon la revendication 9, dans lequel les rails de guidage (36) s’étendent sur sensiblement toute la largeur de la base (14), le module (18) présentant une largeur supérieure à 90 % de la largeur de la base (14), prise au niveau des rails de guidage (36).10. - Method according to claim 9, wherein the guide rails (36) extend over substantially the entire width of the base (14), the module (18) having a width greater than 90% of the width of the base (14), taken at the level of the guide rails (36). 11. - Procédé selon l’une quelconque des revendications 1 à 8, dans lequel la base (14) présente un axe longitudinal (A-Aj, les rails de guidage (36) étant montés parallèlement à l’axe longitudinal (A-Aj.11. - Method according to any one of claims 1 to 8, wherein the base (14) has a longitudinal axis (A-Aj, the guide rails (36) being mounted parallel to the longitudinal axis (A-Aj . 12. - Procédé selon l’une quelconque des revendications précédentes, dans lequel la base (14) est partiellement immergée dans une masse d’eau (66) le long d’un quai (64), le module (18) étant porté par le quai (64) lors de l’étape de placement.12. - Method according to any one of the preceding claims, in which the base (14) is partially immersed in a body of water (66) along a quay (64), the module (18) being carried by the platform (64) during the placement step. 13. - Procédé selon la revendication 12, dans lequel la base (14) comporte une coque (20), la coque (20) flottant sur la masse d’eau (66) lors de l’étape de translation du module (18).13. - Method according to claim 12, wherein the base (14) comprises a shell (20), the shell (20) floating on the body of water (66) during the step of translation of the module (18) . 14. - Procédé selon l’une quelconque des revendications 1 à 12, dans lequel la base (14) est posée sur le fond d’une masse d’eau (66) ou sur le sol d’une forme (67) lors de l’étape de translation du module (18), le procédé comportant ensuite une mise en flottaison de la base (14) par déballastage de la base (14) ou/et par remplissage de la forme (67) pour faire flotter l’installation (10) comportant la base (14) et le module (18) posé sur la base (14).14. - Method according to any one of claims 1 to 12, wherein the base (14) is placed on the bottom of a body of water (66) or on the ground of a form (67) during the module translating step (18), the method then comprising floating the base (14) by deballasting the base (14) or / and by filling the form (67) to float the installation (10) comprising the base (14) and the module (18) placed on the base (14).
FR1750856A 2017-02-02 2017-02-02 METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER Active FR3062407B1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
FR1750856A FR3062407B1 (en) 2017-02-02 2017-02-02 METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER
BR112019015892-8A BR112019015892B1 (en) 2017-02-02 2018-01-30 METHOD FOR ASSEMBLY OF APPARATUS INTENDED TO BE PLACED IN A BODY OF WATER AND HYDROCARBON EXPLORATION APPARATUS INTENDED TO BE PLACED IN A BODY OF WATER
PCT/EP2018/052233 WO2018141725A1 (en) 2017-02-02 2018-01-30 Method for assembling an apparatus intended for being placed in a body of water
KR1020197022874A KR102503139B1 (en) 2017-02-02 2018-01-30 How to assemble a device placed in a water area
MYPI2019004450A MY202399A (en) 2017-02-02 2018-01-30 Method for assembling an apparatus intended for being placed in a body of water
SG11201907136WA SG11201907136WA (en) 2017-02-02 2018-01-30 Method for assembling an apparatus intended for being placed in a body of water
CN201880018685.9A CN111448353B (en) 2017-02-02 2018-01-30 Method for assembling an apparatus placed in a body of water
NO20190944A NO20190944A1 (en) 2017-02-02 2019-08-01 Method for assembling an apparatus intended for being placed in a body of water

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1750856 2017-02-02
FR1750856A FR3062407B1 (en) 2017-02-02 2017-02-02 METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER

Publications (2)

Publication Number Publication Date
FR3062407A1 true FR3062407A1 (en) 2018-08-03
FR3062407B1 FR3062407B1 (en) 2019-04-05

Family

ID=58632457

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1750856A Active FR3062407B1 (en) 2017-02-02 2017-02-02 METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER

Country Status (7)

Country Link
KR (1) KR102503139B1 (en)
CN (1) CN111448353B (en)
FR (1) FR3062407B1 (en)
MY (1) MY202399A (en)
NO (1) NO20190944A1 (en)
SG (1) SG11201907136WA (en)
WO (1) WO2018141725A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114716042A (en) * 2022-03-22 2022-07-08 浙江同济科技职业学院 Installation method of modular domestic sewage treatment equipment
WO2023009032A1 (en) * 2021-07-30 2023-02-02 Публичное акционерное общество "НОВАТЭК" Method for preparing an integrated production complex on a gravity-based structure

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11952870B2 (en) 2018-12-21 2024-04-09 Technip France Method for constructing and exploiting a hydrocarbons production facility, notably on an expanse of water, and associated exploitation facility
CN112498614B (en) * 2020-12-03 2024-03-26 中船第九设计研究院工程有限公司 Planar sectional lifting and transporting system
CN113602445B (en) * 2021-07-13 2023-12-12 海洋石油工程(青岛)有限公司 Module bottom structural sheet positioning and folding process based on axis vehicle

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337736A (en) * 2011-07-06 2012-02-01 中国海洋石油总公司 Installation process of upper module on offshore oil platform

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3078680A (en) 1958-12-15 1963-02-26 Jersey Prod Res Co Floating rig mover
US3217681A (en) * 1963-07-10 1965-11-16 Reading & Bates Offshore Drill Catamaran offshore drilling vessel
US3323478A (en) * 1965-09-20 1967-06-06 William A Hunsucker Floating support
JPS61268589A (en) * 1985-05-23 1986-11-28 Mitsui Eng & Shipbuild Co Ltd Transportation of plant unit
US7101118B2 (en) * 2002-02-01 2006-09-05 Ihc Gusto Engineering B.V. Multi hull barge
CN102477733B (en) * 2010-11-26 2014-12-31 大连船舶重工集团有限公司 Installation method for integrally dragging cantilever beam onto platform
CN102587342B (en) * 2012-03-02 2014-08-13 中国水电顾问集团华东勘测设计研究院 Buoyancy type mounting method for offshore boosting station

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337736A (en) * 2011-07-06 2012-02-01 中国海洋石油总公司 Installation process of upper module on offshore oil platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023009032A1 (en) * 2021-07-30 2023-02-02 Публичное акционерное общество "НОВАТЭК" Method for preparing an integrated production complex on a gravity-based structure
US12103649B2 (en) 2021-07-30 2024-10-01 Publichnoe Aktsionernoe Obshchestvo “NOVATEK” Method for fabrication of an integrated production complex on a gravity-based structure (GBS)
CN114716042A (en) * 2022-03-22 2022-07-08 浙江同济科技职业学院 Installation method of modular domestic sewage treatment equipment
CN114716042B (en) * 2022-03-22 2023-07-25 浙江同济科技职业学院 Method for installing modularized domestic sewage treatment equipment

Also Published As

Publication number Publication date
MY202399A (en) 2024-04-25
BR112019015892A2 (en) 2020-03-17
NO20190944A1 (en) 2019-08-01
FR3062407B1 (en) 2019-04-05
SG11201907136WA (en) 2019-09-27
CN111448353A (en) 2020-07-24
WO2018141725A1 (en) 2018-08-09
KR20190111972A (en) 2019-10-02
KR102503139B1 (en) 2023-02-22
CN111448353B (en) 2022-03-08

Similar Documents

Publication Publication Date Title
FR3062407A1 (en) METHOD FOR MOUNTING AN INSTALLATION INTENDED TO BE PLACED IN A WATER EXTENDER
EP2342488B1 (en) Method for assembling a marine riser for a fluid in a body of water and associated marine riser
FR3051823A1 (en)
EP1046006A1 (en) Device and method for installing conduits at very great depths
EP2495162A1 (en) Transport vessel of a wind turbine to an offshore site and method for its implementation
EP3635180A1 (en) Launching method
WO2009090321A2 (en) Method for installing a drilling apparatus on a rig and for preparing drilling operations
FR2932215A1 (en) FLUID OPERATING INSTALLATION IN A WATER EXTEND, AND ASSOCIATED METHOD
FR2911173A1 (en) Sub-marine pipe rising/lowering device for use with lay barge, has locking device for locking chain in lower part of tower and another locking device is in open position when mobile carriage is raised
FR2938001A1 (en) METHOD OF MOUNTING A FLUID OPERATING TOWER IN A WATER EXTEND AND ASSOCIATED TOWER.
EP1204806B1 (en) Floating support comprising a central cavity including a plurality of sections
EP1458609B1 (en) Method for mounting a heavy equipment on a ship's hull
WO2013150079A1 (en) Method for positioning a sea‑bed assembly at the bottom of a stretch of water, and associated device
WO2014108631A1 (en) Submersible floating barge
EP2640923B1 (en) Tower for exploiting fluid in an expanse of water and associated installation method
EP0097069B1 (en) Method for the installation of a platform in the sea, platform superstructure for carrying out this method
FR2934663A1 (en) METHOD OF INSTALLING A TUBULAR CONDUIT ON THE MARINE BOTTOM
BR112019015892B1 (en) METHOD FOR ASSEMBLY OF APPARATUS INTENDED TO BE PLACED IN A BODY OF WATER AND HYDROCARBON EXPLORATION APPARATUS INTENDED TO BE PLACED IN A BODY OF WATER
FR3040726A1 (en) DEVICE FOR FORMING AN UPPER COLUMN FOR TRANSPORTING PETROLEUM PRODUCTS FROM A MARINE BASE TO A COLLECTOR STRUCTURE
FR3134794A1 (en) installation for launching a floating structure from a position adjacent to a navigable body of water
FR2929911A1 (en) SUPPORT DEVICE FOR A CARRIER CABLE OF A TELEPHERIC INSTALLATION AND METHOD FOR CONTROLLING A CARRIER CABLE IN SUPPORT ON A SUPPORT DEVICE
FR3129133A1 (en) Heavy load launching facility
OA16429A (en) Fluid operating tower in a body of water and associated installation method.
GB2580187A (en) Decommissioning of offshore structures
NO20130758A1 (en) Method and system for transport and installation of teens.

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20180803

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLFP Fee payment

Year of fee payment: 8