Prior art keywords
elements
bridge
fixed
pillars
metallic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR1770013A
Other languages
French (fr)
Inventor
Joao Antonio Crespo Fontes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR1770013A priority Critical patent/FR3061727A1/en
Publication of FR3061727A1 publication Critical patent/FR3061727A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Un des éléments (1) de la structure métallique du tablier ont deux pièces supplémentaires (2) fixé (3) a l'intérieur du élément (1) métallique. Il à une autre élément de la structure métallique du tablier avec deux pièces supplémentaires fixé a l'extérieur. De telle façon qu'il est possible d'assemble les deux éléments métallique, parce ils sont différent mais avec une configuration complémentaire. Les éléments (1) seulement ce fixe entre eux. Les autres éléments seulement ce fixe entre eux. Il a des tiges de suspension verticale fixe a les câbles de retenue seulement pour les éléments (1) et aussi il a des tiges de suspension verticale et les câbles de retenue seulement pour les autres éléments.One of the elements (1) of the metal structure of the deck have two additional pieces (2) fixed (3) inside the element (1) metal. It to another element of the metal structure of the deck with two additional pieces attached to the outside. In such a way that it is possible to assemble the two metallic elements, because they are different but with a complementary configuration. The elements (1) only fix it between them. The other elements only fix it between them. It has vertical suspension rods fixed to the restraining cables only for the elements (1) and also it has vertical suspension rods and restraining cables only for the other elements.

Description

Titulaire(s) :Holder (s):

FONTES JOAO ANTONIO CRESPO.JOAO ANTONIO CRESPO FOUNDS.

O Demande(s) d’extension :O Extension request (s):

® Mandataire(s) : FONTES JOAO ANTONIO CRESPO.® Agent (s): FONTES JOAO ANTONIO CRESPO.

® PONT SUSPENDU AVEC UNE PLUS GRANDE DISTANCE ENTRE LES PILIERS.® SUSPENDED BRIDGE WITH GREATER DISTANCE BETWEEN THE PILLARS.

FR 3 061 727 - A1 (57) Un des éléments (1) de la structure métallique du tablier ont deux pièces supplémentaires (2) fixé (3) a l'intérieur du élément (1) métallique.FR 3 061 727 - A1 (57) One of the elements (1) of the metallic structure of the deck has two additional parts (2) fixed (3) inside the metallic element (1).

Il à une autre élément de la structure métallique du tablier avec deux pièces supplémentaires fixé a l'extérieur. De telle façon qu'il est possible d'assemble les deux éléments métallique, parce ils sont différent mais avec une configuration complémentaire.It has another element of the metal structure of the deck with two additional parts attached to the outside. In such a way that it is possible to assemble the two metallic elements, because they are different but with a complementary configuration.

Les éléments (1) seulement ce fixe entre eux.The elements (1) only this fixes them.

Les autres éléments seulement ce fixe entre eux.The other elements only this fixes them.

Il a des tiges de suspension verticale fixe a les câbles de retenue seulement pour les éléments (1) et aussi il a des tiges de suspension verticale et les câbles de retenue seulement pour les autres éléments.It has vertical suspension rods fixed to the retaining cables only for the elements (1) and also it has vertical suspension rods and the retaining cables only to the other elements.

Figure FR3061727A1_D0001
Figure FR3061727A1_D0002

La présente invention concerne une nouvelle façon de construire un pont suspendu.The present invention relates to a new way of constructing a suspension bridge.

Sur le dessin 1, on peut voir un pont suspendus à trois travées suspendusOn drawing 1, we can see a hanging bridge with three hanging spans

Sur le dessin 2, on peut voir un pont suspendus de travées suspendus unique.In drawing 2, we can see a suspension bridge of single suspended spans.

Sur le dessin 1, on peut voir un pont suspendus qu' est composé de les suivant éléments; le tablier du pont ( 6 ), deux piliers ( 2 ), ( 3 ), deux câbles de retenue ( 4 ), une câble à chaque côté du tablier et les tiges de suspension vertical ( 5 ).On drawing 1, one can see a suspension bridge which is composed of the following elements; the bridge deck (6), two pillars (2), (3), two retaining cables (4), a cable on each side of the deck and the vertical suspension rods (5).

Aussi dans le dessin 1 on peux aussi voir les deux côtés de la rivière ( 1 ) et ( 8 ), et la rivière ( 7 ).Also in drawing 1 we can also see the two sides of the river (1) and (8), and the river (7).

Nous pouvons aussi voir dans le dessin 1, les piliers de pont ( 2 ) et ( 3 ), qui sont fixés dans la rivière ( 7 ).We can also see in drawing 1, the bridge piers (2) and (3), which are fixed in the river (7).

Sur le dessin 2, on peut voir que le pont suspendus à aussi le tablier du pont ( 6 ), deux pilier ( 10 ) et ( 11 ), deux câbles de retenue ( 4 ), une câble à chaque côté du tablier et les tiges de suspension vertical ( 5 ).In drawing 2, we can see that the bridge also suspended from the bridge deck (6), two pillars (10) and (11), two retaining cables (4), a cable on each side of the deck and the rods vertical suspension (5).

Sur le dessin 2, on peut voir que, les deux piliers ( 10 ) et ( 11 ) du pont suspendus sont fixes au sol.In drawing 2, it can be seen that the two pillars (10) and (11) of the suspension bridge are fixed to the ground.

Les ponts suspendus dans les dessins 1 ou 2, le tablier ( 6 ) est attaché par deux câbles de retenue ( 4 ) pour l'intermédiaire de tiges de suspension vertical ( 5 )The suspension bridges in drawings 1 or 2, the deck (6) is attached by two retaining cables (4) for the intermediary of vertical suspension rods (5)

Ces éléments (4)(5) de construction fonctionnent ensemble, ce qui permet le tablier du pont ( 6 ) est suspend.These construction elements (4) (5) work together, which allows the bridge deck (6) to be suspended.

Les câbles de retenue ( 4 ) sont fixes sur le massif d’ancrage ( 9 ).The retaining cables (4) are fixed to the anchor block (9).

Les piliers ( 2 ), ( 3 ), ( 10 ), ( 11 ) sont constitués par deux parties latérales ( 14 ), ( 15 ) et des parties métalliques ( 16 ) qui relient les deux pièces latérales ( 14 ), ( 15 ) et les câbles de retenue ( 4 ) sont fixés, sur le dessus, du piliers ( 2 ), ( 3 ), ( 10 ), ( 11 ) comme nous pouvons le voir dans le dessin 3.The pillars (2), (3), (10), (11) consist of two lateral parts (14), (15) and metal parts (16) which connect the two lateral parts (14), (15) and the retaining cables (4) are fixed, on the top, of the pillars (2), (3), (10), (11) as we can see in drawing 3.

-2Les deux parties latérales ( 14 ) et ( 15 ) sont à l'intérieur creux ( 17 ), seulement avec contour ( 18 ) en métal, comme nous pouvons le voir dans le dessin 4. Cela signifie que les efforts sur les piliers latérales ( 14 ), et ( 15 ) sont sur le périmètre ( 18 ) et non pas au centre ( 17 ).-2The two lateral parts (14) and (15) are inside hollow (17), only with a metal contour (18), as we can see in drawing 4. This means that the forces on the lateral pillars (14), and (15) are on the perimeter (18) and not in the center (17).

Sur le dessin 5, on peut voir en détail la structure métallique du tablier du pont ( 6 ) avec des câbles de retenue ( 4 ), et les tiges de suspension vertical (5).In drawing 5, we can see in detail the metal structure of the bridge deck (6) with retaining cables (4), and the vertical suspension rods (5).

Sur le dessin 6, on peut voir un élément ( 19 ) de la structure métallique du tablier. Et sur le dessin 7, on peut voir cette même élément ( 19 ) en autre vue.In drawing 6, one can see an element (19) of the metallic structure of the deck. And in drawing 7, we can see this same element (19) in another view.

Il y a des ponts suspendus avec des piliers ( 10 ), ( 11 ) fixes sur le sol, comme on peut voir dans le dessin 2 ou des piliers ( 2 ), ( 3 ) fixes dans la rivière comme on le voit sur dans le dessin 1 et cette situation est due à la largeur de la rivière.There are suspension bridges with pillars (10), (11) fixed on the ground, as we can see in drawing 2 or pillars (2), (3) fixed in the river as we see on in the drawing 1 and this situation is due to the width of the river.

Ce le rivière est très large, la distance entre les deux piliers ( 10 ) et (11 ) est très grand et il est impossible de construire un pont comme on le voit sur le dessin 2 et de ce fait il est nécessaire de construire un pont comme on le voit sur le dessin 1, avec les piliers de pont ( 2 ) et ( 3 ), qui sont fixés dans la rivière.The river is very wide, the distance between the two pillars (10) and (11) is very large and it is impossible to build a bridge as seen in drawing 2 and therefore it is necessary to build a bridge as seen in drawing 1, with the bridge piers (2) and (3), which are fixed in the river.

La fixation des piliers du pont dans la rivière coûte plus d'argent si les piliers sont placés sur le sol. Aussi la manutention est plus cher si les piliers ( 2 ) et ( 3 ) sont sont fixés dans la rivière ( 7 ).Fixing the bridge piers in the river costs more money if the piers are placed on the ground. Also handling is more expensive if the pillars (2) and (3) are fixed in the river (7).

Parce que les efforts sont très grand, il a une limitation technique de les éléments de construction du pont suspendus comme les suspension vertical ( 4 ) et les câbles de retenue ( 5 ) pour construire un pont avec une plus grande distance entre piliers ( 2 ), ( 3 ) ou entre les piliers ( 10 ), (11 ).Because the efforts are very large, it has a technical limitation of the construction elements of the suspension bridge such as the vertical suspension (4) and the retaining cables (5) to build a bridge with a greater distance between pillars (2) , (3) or between the pillars (10), (11).

La présent invention a pour but de construire un pont suspendus avec une plus grande distance entre les deux piliers ( 2 ), ( 3 ) et ( 10 ), (11 ), et se possible éviter des piliers dans la rivière.The present invention aims to build a suspension bridge with a greater distance between the two pillars (2), (3) and (10), (11), and it is possible to avoid pillars in the river.

-3La présent invention visent, lorsque la distance entre les deux côtés ( 1 ) et ( 8 ) de la rivière sont très grands et de ce fait il est nécessaire de construire un pont comme la figure 1, mais on peut construire un pont comme la figure 2 malgré la grande distance entre les deux côtés côtés ( 12 ) et ( 13 ) ou construire un pont comme la figure 1 mais avec un plus grand distance entre les piliers ( 2 ) et ( 3 ).-3The present invention aims, when the distance between the two sides (1) and (8) of the river are very large and therefore it is necessary to build a bridge as in Figure 1, but we can build a bridge like the Figure 2 despite the large distance between the two sides sides (12) and (13) or build a bridge as in Figure 1 but with a greater distance between the pillars (2) and (3).

La présente invention a aussi pour but de construire un nouveau pont suspendus où il existe déjà un pont suspendus, avec de l'intégration entre les deux ponts.The present invention also aims to build a new suspension bridge where there is already a suspension bridge, with integration between the two bridges.

Pour construire, comme mentionné ci-dessus, l'ensemble des tiges de suspensions vertical (5 ) et les câbles de retenue ( 4 ) et le tablier ( 6 ) ils auront une configuration différente.To build, as mentioned above, the set of vertical suspension rods (5) and the retaining cables (4) and the deck (6) they will have a different configuration.

Les dessins annexés illustrent l’invention.The accompanying drawings illustrate the invention.

Le dessin 1 représente un pont suspendus à trois travées suspendus.Drawing 1 represents a suspension bridge with three suspended spans.

Le dessin 2 représente un pont suspendu de travées suspendus unique.Drawing 2 represents a suspension bridge of single suspended spans.

Le dessin 3 représente un pilier du pont suspendu.Drawing 3 represents a pillar of the suspension bridge.

Le dessin 4 représente en détails un pilier du pont suspendus.Drawing 4 shows in detail a pillar of the hanging bridge.

Le dessin 5 représente la structure métallique du tablier du pont suspendus.Drawing 5 shows the metal structure of the suspension bridge deck.

Le dessin 6 représente un élément de la structure métallique du tablier.Drawing 6 shows an element of the metallic structure of the deck.

Le dessin 7 représente un outre vue de un élément de la structure métallique du tablier.Drawing 7 shows a further view of an element of the metallic structure of the deck.

Le dessin 8 représente un élément de la structure métallique avec une pièce supplémentaire.Drawing 8 shows an element of the metal structure with an additional part.

Le dessin 9 représente un élément de la structure métallique avec une pièce supplémentaire fixe a l’extérieur.Drawing 9 shows an element of the metal structure with an additional piece fixed outside.

Le dessin 10 représente les éléments du dessin 8 et 9 assemblé.Drawing 10 represents the elements of drawing 8 and 9 assembled.

Le dessin 11 représente plusieurs éléments du dessin 8 et 9 assemblé.Drawing 11 represents several elements of drawing 8 and 9 assembled.

Le dessin 12 représente plusieurs éléments du dessin 8 et 9 assemblé et les câbles.Drawing 12 shows several elements of drawing 8 and 9 assembled and the cables.

-4Pour avoir un plus grand distance entre les deux piliers ( 2 ) et ( 3 ) et aussi ( 10 ) et ( 11), le pont à un différent élément métallique.-4To have a greater distance between the two pillars (2) and (3) and also (10) and (11), the bridge has a different metallic element.

L' élément métallique ( 19 ) est différent parce que chaque un ( 20 ) et ( 23 ) ont deux pièces supplémentaires ( 22 ) et ( 25 ) comme nous pouvons voir dans les dessins 8 et 9.The metallic element (19) is different because each one (20) and (23) have two additional parts (22) and (25) as we can see in drawings 8 and 9.

Sur le dessin 8, on peut voir un élément ( 20 ) de la structure métallique, du pont ( 6 ) mais qu'il a une pièce supplémentaire ( 22 ) qu' est fixe ( 21 ) à Γ intérieur du élément ( 20 ).In drawing 8, we can see an element (20) of the metallic structure, of the bridge (6) but that it has an additional part (22) that is fixed (21) inside the element (20).

Sur le dessin 9, on peut voir un outre élément ( 23 ) de la structure métallique du pont ( 6 ), mais qu'il a une pièce supplémentaire ( 25 ) qu' est fixe ( 26 ) à le extérieur du élément ( 23 ). Il a aussi une bord perpendiculaire ( 24 ) pour fixe les câbles de retenue ( 5 ), si nécessaire.In drawing 9, we can see a further element (23) of the metallic structure of the bridge (6), but that it has an additional part (25) that is fixed (26) to the outside of the element (23) . It also has a perpendicular edge (24) to fix the retaining cables (5), if necessary.

L' élément métallique ( 20 ) va se fixe seulement a une outre élément métallique ( 20 ) et Γ élément métallique ( 23 ) va se fixe seulement a une outre élément métallique ( 23 ) et ces parties successivement.The metallic element (20) will only be fixed to one further metallic element (20) and the metallic element (23) will only be fixed to one further metallic element (23) and these parts successively.

Mais le outre élément métallique ( 20 ) n' est pas le voisin, parce qu' il est intercalaire par un élément métallique ( 23 ) et successivement.But the further metallic element (20) is not the neighbor, because it is interposed by a metallic element (23) and successively.

Aussi le outre élément métallique ( 23 ) n' est pas le voisin, parce qu' il est intercalaire par un élément métallique ( 20 ) et successivement.Also the further metallic element (23) is not the neighbor, because it is interposed by a metallic element (20) and successively.

Sur le dessin 10 on peut voir la assemblage de deux éléments métalliques ( 20 ) et ( 23 ).In drawing 10 we can see the assembly of two metallic elements (20) and (23).

Sur le dessin 11, on peu voir la assemblage de plusieurs éléments métallique ( 20 ) et ( 23 ) de façon avoir un tablier ( 6 ) de un pont suspendu.In drawing 11, we can see the assembly of several metallic elements (20) and (23) so as to have an apron (6) of a suspension bridge.

Sur le dessin 11 à droit on peu voir le numéro ( 20 ) et ( 23 ) successivement et intercalaire et sa signifie l'assemblage intercalé des éléments métallique ( 20 ) et ( 23 ). Le premier élément métallique ( 20 ) est fixe ( 27 ) a le suivant élément métallique ( 20 ) avec la pièce supplémentaire ( 22 ) pour soude, rivet ( 27 ), etc . La pièce supplémentaire ( 22 ) allé dans le voisin élément métallique ( 23 ) et la pièce supplémentaire ( 22 ) a une longueur que atteint au milieu de I' élément métallique suivante ( 20 ).On drawing 11 on the right we can see the number (20) and (23) successively and in between and its signifies the interposed assembly of the metallic elements (20) and (23). The first metallic element (20) is fixed (27) to the following metallic element (20) with the additional part (22) for soda, rivet (27), etc. The additional piece (22) goes into the neighboring metallic element (23) and the additional piece (22) has a length that reaches in the middle of the next metallic element (20).

-5De la même façon le premier élément métallique ( 23 ) est fixe ( 28 ) a la suivant élément métallique ( 23 ) avec la pièce supplémentaire ( 25 ) pour soude, rivet, ( 28 ), etc . La pièce supplémentaire ( 25 ) contourne le voisin élément métallique ( 20 ) pour l’extérieur et la pièce supplémentaire ( 25 ) a une longueur que atteint au milieu de 1' élément métallique suivante ( 23 ).-5Likewise the first metallic element (23) is fixed (28) to the following metallic element (23) with the additional part (25) for soda, rivet, (28), etc. The additional part (25) bypasses the neighboring metal element (20) for the exterior and the additional part (25) has a length that reaches in the middle of the next metal element (23).

Cette assemblage du dessin 11 se répété successivement, pour avoir un tablier de pont ( 6 ).This assembly of the drawing 11 is repeated successively, to have a bridge deck (6).

Les éléments métallique ( 20 ) et ( 23 ) sont un exemple, la configuration peut être différent, mais avec les même concepts fonctionnels. Aussi le matériel de construction peut être du béton, bois, aluminium, fibre de verre, fibre de carbone, etc.The metallic elements (20) and (23) are an example, the configuration can be different, but with the same functional concepts. Also the construction material can be concrete, wood, aluminum, fiberglass, carbon fiber, etc.

La pont suspendu de cette invention à des éléments métallique ( 20 ) et ( 23 ) qui sont en rapport avec de une façon différent avec les tiges suspension vertical ( 4 ) et les câbles de retenue ( 5 ).The suspension bridge of this invention has metallic elements (20) and (23) which are differently related to the vertical suspension rods (4) and the retaining cables (5).

Sur le dessin 12 on peu voir le tablier du pont avec des plusieurs éléments métallique ( 20 ) et ( 23 ) successivement et intercalaire et que I' élément métallique ( 20 ) est fixe ( 27 ) a un outre élément métallique ( 20 ) seulement. Aussi l'élément métallique ( 23 ) est fixe ( 28 ) a un outre élément métallique ( 23 ) seulement.In drawing 12 we can see the bridge deck with several metallic elements (20) and (23) successively and in between and that the metallic element (20) is fixed (27) has a further metallic element (20) only. Also the metallic element (23) is fixed (28) to a further metallic element (23) only.

Aussi dans le dessin 12 on peu voir deux câbles de retenue ( 29 ) et ( 30 ). Le câble de retenue ( 29 ) et seulement fixe au le tige suspension verticale (31 ) et le câble de retenue ( 30 ) et seulement fixe au le tige suspension verticale ( 33 ).Also in drawing 12 we can see two retaining cables (29) and (30). The retaining cable (29) and only fixed to the vertical suspension rod (31) and the retaining cable (30) and only fixed to the vertical suspension rod (33).

Les câbles de retenue ( 29 ) et ( 30 ) sont parallèle ( 24 ) et / ou altitude différent et le câble de retenue ( 30 ) ne se touche pas ( 32 ) avec le tige suspension verticale ( 31 ).The retaining cables (29) and (30) are parallel (24) and / or different altitude and the retaining cable (30) does not touch (32) with the vertical suspension rod (31).

Les tiges suspension vertical ( 31 ) sont seulement fixe a des éléments métallique ( 20 ) et les tiges suspension vertical ( 33 ) sont seulement fixe a des éléments métallique ( 23 ).The vertical suspension rods (31) are only fixed to metallic elements (20) and the vertical suspension rods (33) are only fixed to metallic elements (23).

Ça fait que les efforts sur les câbles de retenue ( 29 ) et ( 30 ) et les éléments métallique ( 20 ) et ( 23 ) sont beaucoup mois, presque la moitié duSo the efforts on the retaining cables (29) and (30) and the metallic elements (20) and (23) are much less, almost half the

- 6câble de retenue( 4 ), le tige suspension verticale ( 5 ) et 1' élément métallique ( 19 ) et de cette façon les limitations techniques de les éléments et câbles du pont ( 4 ), ( 5 ), ( 19 ) sont résolus avec la solution de la présente invention.- 6 retaining cable (4), the vertical suspension rod (5) and the metal element (19) and in this way the technical limitations of the bridge elements and cables (4), (5), (19) are resolved with the solution of the present invention.

Les effort du pont sont la moitié pour les éléments ( 20 ) et ces respective câbles ( 29 ) et ( 31) et la outre moitié de les effort du pont pour les autres éléments ( 23 ) et ces respective câbles ( 30 ) et ( 33 ).The efforts of the bridge are half for the elements (20) and these respective cables (29) and (31) and the other half of the efforts of the bridge for the other elements (23) and these respective cables (30) and (33 ).

Le pont peut avoir une plus grande distance entre les deux piliers ( 10 ) et ( 11 ) ou ( 2 ) et ( 3 ), avec la solution de la présente invention.The bridge can have a greater distance between the two pillars (10) and (11) or (2) and (3), with the solution of the present invention.

Aussi avec la solution de la présente invention donne la possibilité de placer les nouveaux piliers loin des piliers existants ( 2 ) et ( 3 ) parce qu'il est possible de réalise un pont avec une plus grande distance entre les nouveaux piliers.Also with the solution of the present invention gives the possibility of placing the new pillars away from the existing pillars (2) and (3) because it is possible to make a bridge with a greater distance between the new pillars.

Ça donne la possibilité de construire un nouveau pont côté a côté de une outre pont déjà existent.This gives the possibility of building a new bridge side by side next to an existing bridge.

Dans le dessin 12, il n'est pas représenté à la droit du dessin la pièce supplémentaire ( 22 ) du élément métallique ( 20 ), pour la conception d'être plus clarification.In drawing 12, the additional part (22) of the metallic element (20) is not represented at the right of the drawing, for the design to be more clarification.

Il a aussi deux câbles de retenue ( 29 ) et ( 30 ) de chaque côté de la pont.It also has two retaining cables (29) and (30) on each side of the bridge.

Dans quelque emplacement de la pont, il peut arrive que un suspension vertical (31 ) va fixe un élément métallique ( 23 ) et vice-versa, mais c'est une exception.In some location of the bridge, it can happen that a vertical suspension (31) is going to fix a metallic element (23) and vice versa, but it is an exception.

Le pont peut avoir les piliers ( 2 ) et ( 3 ) ou ( 10 ) et ( 11 ), avec un autre pilier a côté ou avec un pilier dans l'autre pilier ( 2 ), ( 3 ), ( 10 ), ( 11 ) parce que les piliers ( 2 ), ( 3 ), ( 10 ), ( 11 ) sont à l'intérieur creux ( 17 ).The bridge can have pillars (2) and (3) or (10) and (11), with another pillar next to it or with a pillar in the other pillar (2), (3), (10), ( 11) because the pillars (2), (3), (10), (11) are inside hollow (17).

La façon de construire cette pont est la même que du dessin 1 ou 2, la seule différence ce que l'assemblage doive intercalaire les éléments métallique ( 20 ) et ( 23 ) et de faire la fixation de un élément métallique ( 20 ) seulement avec un autre élément métallique ( 20 ) et un élément métallique ( 23 ) avec seulement un autre élément métallique ( 23 ).The way to build this bridge is the same as in drawing 1 or 2, the only difference is that the assembly must insert the metallic elements (20) and (23) and to fix a metallic element (20) only with another metallic element (20) and a metallic element (23) with only one other metallic element (23).

Claims (3)

REVENDICATIONS 1 ) Pont suspendu comprenant:1) Suspension bridge comprising: - des câbles de retenue ( 4, 29, 30 ) ;- retaining cables (4, 29, 30); - des tiges de suspension verticale ( 5, 32, 33 ) ;- vertical suspension rods (5, 32, 33); - des piliers ( 2, 3, 10, 11 ) fixés sur le sol ou dans l'eau ;- pillars (2, 3, 10, 11) fixed to the ground or in the water; - et un tablier ( 6 ) constitué d'éléments métalliques ( 19, 20, 23 ) caractérisé en ce que des premiers éléments constitutifs du tablier ( 20 ) présentent une première pièce supplémentaire ( 22 ) qui leur est fixée et des seconds éléments constitutifs du tablier ( 23 ) présentent une seconde pièce supplémentaire ( 25 ) qui leur est fixée, les premiers éléments ( 20 ) et les seconds éléments ( 23 ) étant intercalés, et les premiers éléments ( 20 ) se fixant les uns aux autres, et les seconds éléments ( 23 ) se fixant les uns aux autres.- And an apron (6) made of metallic elements (19, 20, 23) characterized in that first constituent elements of the apron (20) have a first additional part (22) which is fixed to them and second constituent elements of the apron (23) have a second additional part (25) attached to them, the first elements (20) and the second elements (23) being interposed, and the first elements (20) fixing to each other, and the second elements (23) attaching to each other. 2) Pont suspendu selon la revendication 1 caractérisé en ce que la première pièce supplémentaire ( 22 ) est fixée à l’intérieur de l’élément correspondant (20), et en ce que la second pièce supplémentaire ( 25 ) est fixée à l’extérieur de l’élément correspondant ( 23).2) Suspension bridge according to claim 1 characterized in that the first additional part (22) is fixed inside the corresponding element (20), and in that the second additional part (25) is fixed to the outside of the corresponding element (23). 3) Pont suspendu selon la revendication 1 caractérisé en ce que des premières tiges de suspension verticale ( 31 ) sont fixées uniquement aux premiers éléments ( 20 ) et à des premiers câbles de retenue ( 29 ), et des seconds tiges de suspension verticale ( 33 ) sont fixées uniquement aux seconds éléments ( 23 ) et à des seconds câbles de retenue ( 30 ).3) Suspension bridge according to claim 1 characterized in that first vertical suspension rods (31) are fixed only to the first elements (20) and to first retaining cables (29), and second vertical suspension rods (33 ) are fixed only to the second elements (23) and to second retaining cables (30).
FR1770013A 2017-01-06 2017-01-06 SUSPENDED BRIDGE WITH LARGER DISTANCE BETWEEN THE PILLARS Pending FR3061727A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1770013A FR3061727A1 (en) 2017-01-06 2017-01-06 SUSPENDED BRIDGE WITH LARGER DISTANCE BETWEEN THE PILLARS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1770013A FR3061727A1 (en) 2017-01-06 2017-01-06 SUSPENDED BRIDGE WITH LARGER DISTANCE BETWEEN THE PILLARS

Publications (1)

Publication Number Publication Date
FR3061727A1 true FR3061727A1 (en) 2018-07-13

Family

ID=60020226

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1770013A Pending FR3061727A1 (en) 2017-01-06 2017-01-06 SUSPENDED BRIDGE WITH LARGER DISTANCE BETWEEN THE PILLARS

Country Status (1)

Country Link
FR (1) FR3061727A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989335A (en) * 2019-04-26 2019-07-09 重庆大学 A kind of wind resistance damping bridge boom being suitable for multi-direction wind load

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR560131A (en) * 1921-12-27 1923-09-28 Long span bridge
US2380183A (en) * 1941-03-06 1945-07-10 George A Maney Bridge and hanger system
GB2097044A (en) * 1981-04-10 1982-10-27 Habegger Willy Ag Suspension bridges

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR560131A (en) * 1921-12-27 1923-09-28 Long span bridge
US2380183A (en) * 1941-03-06 1945-07-10 George A Maney Bridge and hanger system
GB2097044A (en) * 1981-04-10 1982-10-27 Habegger Willy Ag Suspension bridges

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989335A (en) * 2019-04-26 2019-07-09 重庆大学 A kind of wind resistance damping bridge boom being suitable for multi-direction wind load

Similar Documents

Publication Publication Date Title
EP0402197A1 (en) Prefabricated moulding elements for constructing walls
CA2547928C (en) Device for the earthquake-resistant mounting of a partition
FR2629111A1 (en) APRON FOR BRIDGE OF LARGE LENGTH
FR3061727A1 (en) SUSPENDED BRIDGE WITH LARGER DISTANCE BETWEEN THE PILLARS
EP1630075B1 (en) Vehicle body having improved dynamic behaviour
EP0425364A1 (en) Station on a railway or other line, situated on a viaduct
FR2864566A1 (en) FALSE TENDERED CANVAS WALLS MEET BY AN INCLINED SEPARATOR
EP0003087A1 (en) Device for connecting elongated elements of a reinforced concrete framework and framework comprising elements connected by such a device.
FR2858338A1 (en) PROCESS FOR MAKING A METAL BRIDGE BEAM AND BEAM OR WORK SO REALIZED
FR2660676A1 (en) SLIDE WITH DOUBLE SLIDING ELEMENT FOR RETAINING VEHICLES ON A ROAD.
FR2991518A3 (en) Support for guiding wires or electrical cables in ceilings and in floors of buildings, has multiple longitudinal rods and two parallel transverse rods, where each transverse rod has lower section and two lateral sections
EP1826327A1 (en) Building structure
FR2704507A1 (en) Rail-vehicle body formed by modular assembly
BE1017449A3 (en) BOX FOR SHUTTER.
FR3076687B1 (en) REMOVABLE AND TRANSPORTABLE MIRADOR
EP0126011A1 (en) Process for obtaining hollow structures such as ducts, silos or shelters
FR2873727A1 (en) Thermal bridges limiting process for e.g. slab and outer wall junction, involves erecting wall by forming positioning abutments for insulating units for localized concreting zones of another erected wall, and installing units between zones
FR3003286A1 (en) MODIFIABLE SHAPE TRAY TRAY
EP1818469A1 (en) Wall panel and construction system
FR2900672A1 (en) Dwelling module for forming e.g. prefabricated single-family house, has base constituted of reinforced concrete slab, where slab has lower surface including connection beams extending from one side to another side of retaining beam
FR2909694A1 (en) Interjoists e.g. building tile, assembling element, has units with notches for fixing bases to interjoists, where units are integrated to zones defined by flanges and fix interjoists on all longitudinal surfaces of corresponding bases
EP2872706B1 (en) Bridge bearing element for fixing a concrete beam and a support for a slab including the element
FR3011864A1 (en) HARDWOOD MATRIX COMPOSITE BEAM IN ALUMINUM EXTRUDE ARMORED WITH FULLY COATED CARBON FIBER PROFILES
EP0014131A1 (en) Prefabricated-element construction using dry-superposed columns
FR2557648A1 (en) Concreting formwork frames wedge lock

Legal Events

Date Code Title Description
PLSC Publication of the preliminary search report

Effective date: 20180713