FR2988770A1 - Systeme et procede d'amortissement de la convergence d'un terrain - Google Patents
Systeme et procede d'amortissement de la convergence d'un terrain Download PDFInfo
- Publication number
- FR2988770A1 FR2988770A1 FR1200989A FR1200989A FR2988770A1 FR 2988770 A1 FR2988770 A1 FR 2988770A1 FR 1200989 A FR1200989 A FR 1200989A FR 1200989 A FR1200989 A FR 1200989A FR 2988770 A1 FR2988770 A1 FR 2988770A1
- Authority
- FR
- France
- Prior art keywords
- tunnel
- devices
- ground
- coating
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011248 coating agent Substances 0.000 title claims abstract description 41
- 238000000576 coating method Methods 0.000 title claims abstract description 41
- 238000013016 damping Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 claims abstract description 5
- 230000005641 tunneling Effects 0.000 claims description 10
- 238000011084 recovery Methods 0.000 claims description 4
- 238000002347 injection Methods 0.000 description 9
- 239000007924 injection Substances 0.000 description 9
- 239000007788 liquid Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000003307 slaughter Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005554 pickling Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/05—Lining with building materials using compressible insertions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (13)
- REVENDICATIONS1. Système d'amortissement de la convergence d'un terrain (2), comprenant un revêtement (3) recouvrant en partie une paroi externe (4) d'un tunnel (5) formé par des voussoirs (6) et situé à l'intérieur d'une cavité (7) creusée dans le terrain (2), caractérisé en ce que le revêtement (3) comporte une pluralité de dispositifs (8) munis chacun d'un trou débouchant (10).
- 2. Système selon la revendication 1, dans lequel le tunnel (5) a une forme globalement tubulaire.
- 3. Système selon la revendication 1 ou 2, dans lequel le revêtement (3) recouvre entièrement la paroi externe (4) du tunnel (5).
- 4. Système selon l'une des revendications 1 à 3, dans lequel le revêtement (3) comprend un volume de recouvrement égal à la somme entre un volume occupé par les dispositifs (8) et un volume résiduel, le rapport entre le volume résiduel et le volume de recouvrement étant supérieur à 50%.
- 5. Système selon l'une des revendications 1 à 4, dans lequel les dispositifs (8) sont placés au sein du revêtement (3) de manière aléatoire.
- 6. Système selon l'une des revendications 1 à 5, dans lequel le revêtement 25 (3) comprend une épaisseur (E) sensiblement constante.
- 7. Système l'une des revendications 1 à 6, dans lequel le terrain (2) est meuble et les dispositifs (8) sont partiellement noyés dans une partie du terrain meuble ayant fluée en direction de la paroi externe (4) du tunnel (5). 20 30
- 8. Système l'une des revendications 1 à 6, dans lequel le terrain (2) est meuble et les dispositifs (8) sont entièrement noyés dans une partie du terrain meuble ayant fluée en direction de la paroi externe (4) du tunnel (5).
- 9. Système selon l'une des revendications 1 à 6, dans lequel le terrain (2) est rocheux et la résistance à la rupture des dispositifs (8) est inférieure à une pression de convergence initiale du terrain rocheux exercée lorsque la cavité (7) est formée, de façon à permettre l'écrasement des dispositifs (8).
- 10. Système selon l'une des revendications 1 à 8, dans lequel chaque dispositif (8) a une forme globalement tubulaire.
- 11. Système selon l'une des revendications 1 à 8, dans lequel chaque dispositif (8) a une forme globalement annulaire.
- 12. Système selon l'une des revendications 1 à 10, dans lequel les dispositifs (8) sont tous sensiblement identiques.
- 13. Procédé d'amortissement de la convergence d'un terrain comprenant les étapes suivantes : former une cavité (7) dans le terrain à l'aide d'un tunnelier (13) ; former un tunnel (5) dans la cavité (7) à l'aide de voussoirs (6) au fur et à mesure de l'avancement du tunnelier (13) de façon à conserver un espace délimité entre une paroi externe (4) du tunnel (5) et une paroi interne (11) de la cavité (7) ; et injecter des dispositifs (8) munis chacun d'un trou débouchant (10) dans ledit espace délimité.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1200989A FR2988770B1 (fr) | 2012-04-03 | 2012-04-03 | Systeme et procede d'amortissement de la convergence d'un terrain |
PCT/FR2013/000087 WO2013150191A2 (fr) | 2012-04-03 | 2013-04-03 | Système et procédé d'amortissement de la convergence d'un terrain, procédé de fabrication d'un tel système |
EP13722477.0A EP2834462B1 (fr) | 2012-04-03 | 2013-04-03 | Système et procédé d'amortissement de la convergence d'un terrain, procédé de fabrication d'un tel système |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1200989A FR2988770B1 (fr) | 2012-04-03 | 2012-04-03 | Systeme et procede d'amortissement de la convergence d'un terrain |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2988770A1 true FR2988770A1 (fr) | 2013-10-04 |
FR2988770B1 FR2988770B1 (fr) | 2014-04-25 |
Family
ID=46514438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1200989A Active FR2988770B1 (fr) | 2012-04-03 | 2012-04-03 | Systeme et procede d'amortissement de la convergence d'un terrain |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2988770B1 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3021346A1 (fr) * | 2014-05-21 | 2015-11-27 | Const Mecaniques Consultants | Element de construction pour la realisation d'un tunnel, tunnel comprenant un tel element et procedes de fabrication d'un tel element et d'un tel tunnel |
CN109505621A (zh) * | 2019-01-27 | 2019-03-22 | 郭德平 | 一种地震区铁路隧道洞口段抗震减震结构 |
US10519772B2 (en) * | 2015-04-03 | 2019-12-31 | Agence Nationale Pour La Gestion Des Dechets Radioactifs | Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437757B (zh) * | 2016-10-10 | 2019-03-12 | 三峡大学 | 用于隧道与盾构衬砌管片之间的胎式衬砌结构及方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR593877A (fr) * | 1923-12-17 | 1925-09-01 | Revêtement flexible de mines | |
GB2013757A (en) * | 1978-02-07 | 1979-08-15 | Mowlem & Co Ltd J | Improvements relating to tunnelling |
JPS60126499A (ja) * | 1983-12-13 | 1985-07-05 | 西松建設株式会社 | セグメント裏込め方法 |
JP2009002027A (ja) * | 2007-06-21 | 2009-01-08 | Kato Construction Co Ltd | 気泡混合軽量土の造成方法 |
EP2042686A1 (fr) * | 2007-09-27 | 2009-04-01 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Elément de flexibilité |
DE102009057521A1 (de) * | 2009-12-10 | 2011-06-16 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Tübbing-Ausbau mit integriertem Nachgiebigkeitselement |
JP2012122198A (ja) * | 2010-12-06 | 2012-06-28 | Hayashi Bussan Hatsumei Kenkyusho:Kk | 空洞部を閉塞させる方法 |
-
2012
- 2012-04-03 FR FR1200989A patent/FR2988770B1/fr active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR593877A (fr) * | 1923-12-17 | 1925-09-01 | Revêtement flexible de mines | |
GB2013757A (en) * | 1978-02-07 | 1979-08-15 | Mowlem & Co Ltd J | Improvements relating to tunnelling |
JPS60126499A (ja) * | 1983-12-13 | 1985-07-05 | 西松建設株式会社 | セグメント裏込め方法 |
JP2009002027A (ja) * | 2007-06-21 | 2009-01-08 | Kato Construction Co Ltd | 気泡混合軽量土の造成方法 |
EP2042686A1 (fr) * | 2007-09-27 | 2009-04-01 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Elément de flexibilité |
DE102009057521A1 (de) * | 2009-12-10 | 2011-06-16 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Tübbing-Ausbau mit integriertem Nachgiebigkeitselement |
JP2012122198A (ja) * | 2010-12-06 | 2012-06-28 | Hayashi Bussan Hatsumei Kenkyusho:Kk | 空洞部を閉塞させる方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3021346A1 (fr) * | 2014-05-21 | 2015-11-27 | Const Mecaniques Consultants | Element de construction pour la realisation d'un tunnel, tunnel comprenant un tel element et procedes de fabrication d'un tel element et d'un tel tunnel |
WO2015177463A3 (fr) * | 2014-05-21 | 2016-02-04 | Constructions Mecaniques Consultants | Élément de construction pour la réalisation d'un tunnel, tunnel comprenant un tel élément et procédés de fabrication d'un tel élément et d'un tel tunnel |
CN106460510A (zh) * | 2014-05-21 | 2017-02-22 | 建筑机械咨询公司 | 构建隧道的建造元件和包括其的隧道及其构建方法 |
RU2689964C2 (ru) * | 2014-05-21 | 2019-05-29 | Констрюксьон Меканик Консюльтан | Строительный элемент для создания туннеля, туннель, содержащий такой элемент, и способы конструирования такого элемента и такого туннеля |
US10774640B2 (en) | 2014-05-21 | 2020-09-15 | Agence Nationale Pour La Gestion Des Dechets Radioactifs | Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel |
CN106460510B (zh) * | 2014-05-21 | 2020-09-15 | 建筑机械咨询公司 | 构建隧道的建造元件和包括其的隧道及其构建方法 |
AU2019283806B2 (en) * | 2014-05-21 | 2021-04-01 | Agence Nationale Pour La Gestion Des Dechets Radioactifs | Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel |
US10519772B2 (en) * | 2015-04-03 | 2019-12-31 | Agence Nationale Pour La Gestion Des Dechets Radioactifs | Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel |
CN109505621A (zh) * | 2019-01-27 | 2019-03-22 | 郭德平 | 一种地震区铁路隧道洞口段抗震减震结构 |
Also Published As
Publication number | Publication date |
---|---|
FR2988770B1 (fr) | 2014-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1525371B1 (fr) | Conduite de guidage telescopique de forage en mer | |
EP2049388B1 (fr) | Pile de succion adaptee aux faibles profondeurs | |
FR2988770A1 (fr) | Systeme et procede d'amortissement de la convergence d'un terrain | |
EP3146155B1 (fr) | Élément de construction pour la réalisation d'un tunnel, tunnel comprenant un tel élément et procédés de fabrication d'un tel élément et d'un tel tunnel | |
CH642416A5 (fr) | Procede de construction d'ouvrages souterrains a parois verticales, dispositif pour l'execution du procede et ouvrage souterrain. | |
FR3012513A1 (fr) | Dispositif et systeme d'amortissement de la convergence d'un terrain, procedes de fabrication de tels dispositif et systeme | |
EP1360392B1 (fr) | Vanne de securite pour puits petrolier | |
WO2010007305A2 (fr) | Procede de construction d'une galerie souterraine ou d'un puits permettant de realiser un bouchon etanche pour un stockage de dechets dangereux et notamment radioactifs | |
EP2834462B1 (fr) | Système et procédé d'amortissement de la convergence d'un terrain, procédé de fabrication d'un tel système | |
FR2502688A1 (fr) | Procede et dispositif de consolidation de couches de terrain pour les exploitations minieres et les chantiers souterrains | |
CA2064429C (fr) | Dispositif d'etancheite pour joints d'expansion coupes dans les barrages | |
FR2989412A1 (fr) | Conduite pourvue d'un element metallique serti | |
FR2629515A1 (fr) | Boitier stabilisateur pour outil monte dans un puits souterrain cuvele et procede de stabilisation d'un tel outil | |
FR2791733A1 (fr) | Procede et dispositif pour la completion de puits pour la production d'hydrocarbures ou analogues | |
EP0692606B1 (fr) | Procédé de réalisation d'un tunnel revêtu | |
EP0413676A1 (fr) | Procédé de fixation d'ancrages | |
EP3172383B1 (fr) | Dispositif d'ancrage dans un sol multicouches comprenant une bague de liaison | |
EP2925935B1 (fr) | Procede de mise en place et de scellement d'un element tubulaire dans un sol sous charge d'eau | |
CA2037048C (fr) | Ensemble comportant un tube prolongateur et un conduit de chemisage interne de ce tube | |
FR2831204A1 (fr) | Dispositif de guidage dans une installation de forage en mer et procede de realisation | |
JP4133898B2 (ja) | 掘進機の到達方法 | |
FR2851316A1 (fr) | Procede de pose d'lelements tubulaires enterres et preparation de mortier pour sa mise en oeuvre | |
WO2006123045A2 (fr) | Installation de pompage de liquide en fond de puits | |
FR3031565A1 (fr) | Procede de foncage sans tranchee | |
WO2015170044A1 (fr) | Ensemble de connexion sous-marin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TP | Transmission of property |
Owner name: CONSTRUCTIONS MECANIQUES CONSULTANTS "CMC", FR Effective date: 20131127 |
|
PLFP | Fee payment |
Year of fee payment: 4 |
|
TQ | Partial transmission of property |
Owner name: AGENCE NATIONALE POUR LA GESTION DES DECHETS R, FR Effective date: 20151214 Owner name: CONSTRUCTIONS MECANIQUES CONSULTANTS "CMC", FR Effective date: 20151214 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
PLFP | Fee payment |
Year of fee payment: 9 |
|
PLFP | Fee payment |
Year of fee payment: 10 |
|
PLFP | Fee payment |
Year of fee payment: 11 |
|
PLFP | Fee payment |
Year of fee payment: 12 |
|
PLFP | Fee payment |
Year of fee payment: 13 |