FR2982634A1 - Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame - Google Patents

Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame Download PDF

Info

Publication number
FR2982634A1
FR2982634A1 FR1160346A FR1160346A FR2982634A1 FR 2982634 A1 FR2982634 A1 FR 2982634A1 FR 1160346 A FR1160346 A FR 1160346A FR 1160346 A FR1160346 A FR 1160346A FR 2982634 A1 FR2982634 A1 FR 2982634A1
Authority
FR
France
Prior art keywords
frame
drilling
alignment
upper plate
drill guides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
FR1160346A
Other languages
French (fr)
Inventor
Kenneth Doyle Oglesby
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Regency Technologies LLC
Original Assignee
Regency Technologies LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Regency Technologies LLC filed Critical Regency Technologies LLC
Priority to FR1160346A priority Critical patent/FR2982634A1/en
Publication of FR2982634A1 publication Critical patent/FR2982634A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/08Underwater guide bases, e.g. drilling templates; Levelling thereof

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The gauge (10) has a flat frame (12) received on a portion of ground, and a set of tubular drilling guides (14) provided on the frame. Each of the guides is placed according to an angle and extended toward outside and downwards by being separated from the frame, where the angle ranges from 10 degrees to 80 degrees. Each of the guides has an axis, so that the axes of the guides extend from a common central point above the frame. A central tubular drilling guide (16) is perpendicular to the frame. The frame is formed from metal/concrete tubes.

Description

GABARIT D'ALIGNEMENT DE PLAQUE SUPERIEURE ARRIERE-PLAN DE L'INVENTION 1. Domaine de l'invention. La présente invention concerne un dispositif de plate-forme et de gabarit d'alignement de plaque supérieure destiné à installer simplement et facilement une pluralité de tuyaux, tubes, flexibles ou barres suivant des angles multiples dans le sol à partir d'un site de petite surface. En particulier, la présente invention concerne un dispositif de plate-forme et de gabarit d'alignement de plaque supérieure qui peut être utilisé pour des applications d'installation de pompage de sources de chaleur souterraines, pour des applications d'ancrage, et pour installer des équipements géophoniques dans des applications sismiques. 2. Art antérieur. On utilise des tuyaux, tubes, flexibles ou barres souterrains dans de nombreux types d'applications. A titre d'exemple, on utilise des pompes pour sources de chaleur souterraines dans des systèmes de chauffage et de refroidissement de bâtiments. La terre est utilisée comme une source de chaleur en hiver et comme un puits de chaleur en été. Une boucle de circulation de fluide est utilisée pour échanger la chaleur entre la terre et un bâtiment. Une pompe déplace le fluide depuis un échangeur de chaleur à travers la boucle sous la surface de la terre afin d'échanger la chaleur avec le sol avant de revenir à la surface. Le tuyau formant la boucle de fluide contiendra un mélange de fluide, comme du fréon, de l'eau et de l'antigel. Une série de tuyaux ou de tubes s'étendra typiquement plus ou moins verticalement dans le sol à travers des trous forés entre cinquante (50) et cinq cents (500) pieds de profondeur. Des paires de tuyaux sont réunies par un connecteur en U afin de distribuer le fluide vers le fond du trou et de le ramener à la surface. Les tuyaux sont typiquement installés de manière espacée régulièrement les uns des autres, par exemple à vingt (20) pieds les uns des autres. Les trous de forage peuvent être remplis d'un ciment entourant les tuyaux afin d'assurer une connexion thermique avec le sol ou la roche souterrain(e). Cette installation exige le déplacement de l'équipement de forage plusieurs fois pour les multiples trous de forage et provoque des perturbations considérables en termes de temps et d'occupation du site en surface. Un autre exemple concerne les applications d'ancrage, dans lesquelles on crée un trou unique ou de multiples trous. Un tube de section pleine, ou un câble, est alors installé sous la surface et cimenté en position. En variante, on peut enfoncer des barres dans le sol. Les dispositifs d'ancrage peuvent être utilisés pour différentes applications. Un exemple non limitatif serait l'ancrage d'une installation de forage flottante, ou d'une plate-forme de forage sur un fond marin ou au fond de la mer. Encore un autre exemple d'une autre application est la détection de signaux sismiques à l'aide de capteurs dans des trous de forage sous la surface de la terre. Un certain nombre de capteurs acoustiques, comme des géophones souterrains, convertissent le mouvement du sol en tension électrique. Les géophones sont insérés dans des trous de forage allant dans des directions multiples sous la terre. Les géophones sont utilisés pour détecter une activité sismique de la terre, ou, en variante, pour détecter des signaux sismiques artificiels. Les données obtenues peuvent être utilisées pour surveiller des activités sismiques telles que des tremblements de terre. Les données peuvent aussi être utilisées pour enregistrer des conditions souterraines, par exemple pour prédire l'emplacement de nappes souterraines de pétrole et de gaz. Les ondes sismiques produites par des explosions ou des sources contrôlées de vibrations constituent une des méthodes principales d'exploration souterraine. 25 Bien qu'il soit possible de forer de multiples trous ou trous de forage avec un équipement de perçage ou de forage, il faut tenir compte du coût de l'installation de l'équipement de forage et de son démontage, pour chaque trou de forage séparé à percer. Il serait avantageux de pouvoir réaliser une 30 mobilisation plus rapide pour fournir un système impliquant moins de démontage, de déplacement et de temps d'installation et de coûts, par comparaison avec le perçage de multiples trous de forage. BACKGROUND ALIGNMENT TEMPLATE BACKGROUND OF THE INVENTION 1. Field of the Invention An upper plate alignment platform and jig device for easily and easily installing a plurality of pipes, tubes, hoses or rods at multiple angles into the ground from a small site. area. In particular, the present invention relates to a top plate aligning platform and platform device that can be used for underground heat source pumping installation applications, for anchoring applications, and for installing geophonic equipment in seismic applications. 2. Prior art. Hoses, tubes, hoses or underground bars are used in many types of applications. For example, pumps for underground heat sources are used in building heating and cooling systems. The land is used as a source of heat in winter and as a heat sink in summer. A fluid circulation loop is used to exchange heat between the earth and a building. A pump moves fluid from a heat exchanger through the loop below the earth's surface to exchange heat with the soil before returning to the surface. The tube forming the fluid loop will contain a mixture of fluid, such as freon, water and antifreeze. A series of pipes or tubes will typically extend more or less vertically into the soil through holes drilled between fifty (50) and five hundred (500) feet deep. Pairs of pipes are joined by a U-shaped connector to distribute the fluid to the bottom of the hole and bring it back to the surface. The pipes are typically installed evenly spaced from one another, for example twenty (20) feet apart. Drill holes can be filled with cement around the pipes to provide a thermal connection to the ground or underground rock. This facility requires moving drilling equipment multiple times for multiple drill holes and causes considerable disruption in time and surface occupation. Another example is anchoring applications, in which a single hole or multiple holes are created. A solid section tube, or cable, is then installed below the surface and cemented into position. Alternatively, bars can be driven into the ground. Anchoring devices can be used for different applications. A non-limiting example would be the anchoring of a floating drilling rig, or a drilling rig on a seabed or at the bottom of the sea. Yet another example of another application is the detection of signals seismic using sensors in drill holes below the surface of the earth. A number of acoustic sensors, such as underground geophones, convert ground motion into electrical voltage. The geophones are inserted into drill holes going in multiple directions under the ground. Geophones are used to detect seismic activity of the earth, or, alternatively, to detect artificial seismic signals. The data obtained can be used to monitor seismic activities such as earthquakes. The data can also be used to record underground conditions, for example to predict the location of underground oil and gas aquifers. Seismic waves produced by explosions or controlled sources of vibration are one of the main methods of underground exploration. Although it is possible to drill multiple holes or boreholes with drilling or drilling equipment, the cost of installing and dismantling drilling equipment must be taken into account for each drilling hole. separate drilling to drill. It would be advantageous to be able to perform faster mobilization to provide a system involving less disassembly, displacement and installation time and costs, as compared to drilling multiple boreholes.

Il serait aussi avantageux de fournir un système laissant l'empreinte en surface la plus petite possible pour le perçage ou le forage de multiples trous de forage souterrains. It would also be advantageous to provide a system with the smallest possible footprint for drilling or drilling multiple underground drill holes.

II serait aussi avantageux, dans des applications d'ancrage, de disposer d'une prise aussi ferme que possible à partir d'un emplacement unique. Il serait aussi avantageux de fournir un dispositif de gabarit d'alignement de plaque supérieure qui puisse être installé dans une cavité dans le sol puis cimenté en place pour former une plate-forme solide pour un équipement de perçage ou de forage de trous ou de trous de forage multiples. Il serait aussi avantageux de fournir un dispositif de gabarit d'alignement de plaque supérieure qui puisse être utilisé en tant que structure temporaire pour un équipement de perçage et de forage et qui puisse ensuite être enlevé. RESUME DE L'INVENTION La présente invention concerne un dispositif de plate-forme et de gabarit d'alignement de plaque supérieure. Le dispositif comporte un cadre pouvant être reçu sur ou dans un site dans le sol. Dans un mode de réalisation préféré, le cadre est construit à partir de plaques, poutres, tubes ou barres métalliques. Une pluralité de guides de forage tubulaires est agencée autour du cadre et fixée à celui-ci. Chacun des guides de forage est agencé suivant un angle s'étendant vers l'extérieur et/ou vers le bas depuis le cadre. Un guide de forage tubulaire central peut aussi être prévu, lequel est substantiellement perpendiculaire au cadre plan. It would also be advantageous in anchoring applications to have as firm a grip as possible from a single location. It would also be advantageous to provide an upper plate alignment jig device that can be installed in a cavity in the ground and then cemented in place to form a solid platform for drilling or drilling equipment for holes or holes. multiple drilling. It would also be advantageous to provide an upper plate aligning jig device that can be used as a temporary structure for drilling and drilling equipment and that can then be removed. SUMMARY OF THE INVENTION The present invention relates to a platform device and a top plate alignment jig. The device includes a frame that can be received on or in a site in the ground. In a preferred embodiment, the frame is constructed from plates, beams, tubes or metal bars. A plurality of tubular drill guides are arranged around and attached to the frame. Each of the drill guides is arranged at an angle extending outwardly and / or downwardly from the frame. A central tubular drill guide may also be provided, which is substantially perpendicular to the planar frame.

Le cadre forme une plate-forme servant à recevoir et aligner l'équipement de perçage ou de forage utilisé pour percer ou forer des trous souterrains en utilisant les guides de forage tubulaires comme guides. Le cadre est particulièrement adapté pour des applications de tubages enroulables. The frame forms a platform for receiving and aligning drilling or drilling equipment used to drill or drill underground holes using the tubular drill guides as guides. The frame is particularly suitable for roller casing applications.

Avantageusement, ledit cadre est substantiellement plan et chacuns desdits guides de forage est agencé suivant un angle allant de dix degrés (101 à quatre-vingt degrés (801 BREVE DESCRIPTION DES DESSINS La figure 1 illustre une vue en perspective et les figures 2a et 2b illustrent des vues en coupe alternées d'un premier mode de réalisation préféré d'un dispositif de gabarit d'alignement de plaque supérieure construit selon la présente invention ; la figure 3 illustre une vue de dessus, la figure 4 illustre une vue en coupe et la figure 5 illustre une vue en perspective d'un deuxième mode de réalisation préféré d'un dispositif de gabarit d'alignement de plaque supérieure ; la figure 6 illustre une vue en perspective d'un troisième mode de réalisation préféré d'un dispositif de gabarit d'alignement de plaque supérieure ; la figure 7 illustre une vue en perspective d'un quatrième mode de réalisation préféré d'un dispositif de gabarit d'alignement de plaque supérieure ; la figure 8 illustre une vue en perspective, la figure 9 illustre une vue de côté, la figure 10 illustre une vue de dessus et la figure 11 illustre une vue en coupe d'un cinquième mode de réalisation préféré d'un dispositif de gabarit d'alignement de plaque supérieure ; et les figures 12 à 16 illustrent un dispositif de gabarit d'alignement de plaque supérieure selon l'invention avec une tête d'injection articulée. Advantageously, said frame is substantially planar and each of said drill guides is arranged at an angle of ten degrees (101 to 80 degrees). FIG. 1 illustrates a perspective view and FIGS. 2a and 2b illustrate alternating sectional views of a first preferred embodiment of an upper plate alignment jig device constructed in accordance with the present invention; FIG. 3 illustrates a top view, FIG. 4 illustrates a sectional view and the Fig. 5 illustrates a perspective view of a second preferred embodiment of an upper plate aligning jig apparatus; Fig. 6 illustrates a perspective view of a third preferred embodiment of a jigging device. 7 is a perspective view of a fourth preferred embodiment of a plate alignment template device. Figure 8 illustrates a perspective view, Figure 9 illustrates a side view, Figure 10 illustrates a top view, and Figure 11 illustrates a sectional view of a fifth preferred embodiment of a viewer. top plate alignment template; and Figures 12 to 16 illustrate an upper plate alignment jig apparatus according to the invention with an articulated injection head.

DESCRIPTION DETAILLEE DES MODES DE REALISATION PREFERES Les modes de réalisation décrits ici sont purement illustratifs de manières spécifiques de mettre en oeuvre et d'utiliser l'invention et ne doivent pas être interprétés comme limitant le cadre de la présente invention.35 Bien que l'invention ait été décrite de manière assez spécifique, il convient de noter que de nombreuses modifications peuvent être apportées aux détails de la construction de l'invention et à l'agencement de ses composants sans sortir du cadre et de l'esprit de la présente divulgation. On comprendra que l'invention n'est pas limitée aux modes de réalisation exposés ici à titre d'exemple. Si l'on se réfère aux dessins en détail, les figures 1, 2a et 2b illustrent une vue en perspective d'un premier mode de réalisation préféré 10 d'un dispositif de gabarit d'alignement de plaque supérieure. Le dispositif 10 comporte un cadre 12 pouvant être reçu sur un site au sol. Le site au sol pour le cadre 12 peut être au niveau du sol, sous le niveau du sol, par exemple à ciel ouvert, ou sur un fond marin. Le cadre 12 est construit à partir de plaques ou de poutres métalliques. Le cadre 12 peut être soudé ou assemblé d'une autre manière. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiments described herein are merely illustrative of specific ways of practicing and using the invention and should not be construed as limiting the scope of the present invention. The invention has been described quite specifically, it should be noted that many modifications can be made to the details of the construction of the invention and the arrangement of its components without departing from the scope and spirit of the present disclosure. . It should be understood that the invention is not limited to the embodiments set forth herein by way of example. Referring to the drawings in detail, Figs. 1, 2a and 2b illustrate a perspective view of a first preferred embodiment of an upper plate alignment jig device. The device 10 comprises a frame 12 that can be received at a site on the ground. The ground site for the frame 12 may be at ground level, below ground level, for example in the open air, or on a seabed. The frame 12 is constructed from metal plates or beams. The frame 12 may be welded or otherwise assembled.

Une pluralité de guides de forage tubulaires 14 est agencée autour du cadre 12 et est fixée à celui-ci. Ces guides de forage sont illustrés droits, mais peuvent aussi être courbes ou arqués. Les guides de forage tubulaires 14 peuvent être soudés ou fixés d'une autre manière au cadre 12. Chacun des guides de forage 14 est agencé suivant un angle s'étendant vers l'extérieur et/ou vers le bas depuis le cadre 12. Le cadre 12 est substantiellement plan et les guides de forage 14 sont agencés suivant un angle préféré compris entre trente degrés (301 et soixante degrés (601 à partir du cadre 12 . D'autres angles sont possibles dans le cadre et l'esprit de la présente invention. A plurality of tubular drill guides 14 are arranged around frame 12 and attached thereto. These drill guides are shown straight but can also be curved or arched. The tubular drill guides 14 may be welded or otherwise secured to the frame 12. Each of the drill guides 14 is arranged at an angle extending outwardly and / or downwardly from the frame 12. The frame 12 is substantially planar and the drill guides 14 are arranged at a preferred angle of between thirty degrees (301 and 60 degrees from the frame 12. Other angles are possible in the frame and spirit of the present invention. invention.

Chacun des guides de forage 14 a un axe 19 de telle sorte que les axes des guides de forage 14 s'étendent depuis un point central commun au-dessus du cadre 12. Dans le mode de réalisation illustré dans les figures 1, 2a et 2b, un guide de forage tubulaire central 16 est également prévu, lequel est substantiellement perpendiculaire au cadre plan 12. L'invention peut être utilisée en tant que dispositif temporaire, auquel cas il serait enlevé après le perçage et l'insertion du tubage. En variante, le dispositif peut être installé de manière permanente et rester en place.35 Les figures 2a et 2b sont des vues en coupe alternées suivant la ligne de coupe 2-2 de la figure 1. Le mode de réalisation 10 illustré dans les figures 1 et 2a est mis en oeuvre de telle sorte que le cadre 12 forme un moule ou un réceptacle pour recevoir le béton 18 versé dedans. Le béton 18 peut être versé dans le cadre 12 et durci en place. Le dispositif 10 avec le béton forme une plate-forme pour un équipement de perçage ou de forage (non illustré). Dans la figure 2b, le dispositif est placé dans une cavité ouverte et du béton est versé autour du dispositif. Each of the drill guides 14 has an axis 19 so that the axes of the drill guides 14 extend from a common central point above the frame 12. In the embodiment illustrated in FIGS. 1, 2a and 2b a central tubular drill guide 16 is also provided, which is substantially perpendicular to the planar frame 12. The invention can be used as a temporary device, in which case it would be removed after piercing and casing insertion. Alternatively, the device may be permanently installed and remain in place. Figs. 2a and 2b are alternate sectional views taken along section line 2-2 of Fig. 1. Embodiment 10 illustrated in Figs. 1 and 2a is implemented so that the frame 12 forms a mold or a receptacle for receiving the concrete 18 poured into it. Concrete 18 can be poured into frame 12 and cured in place. Device 10 with concrete forms a platform for drilling or drilling equipment (not shown). In Figure 2b, the device is placed in an open cavity and concrete is poured around the device.

Une fois que l'équipement de perçage ou de forage est monté sur le cadre 12, un trou est percé ou foré en insérant l'outil de perçage ou de forage à travers l'un des guides de forage 14. Le processus est répété pour chaque guide de forage 14. La présente invention permet de percer de multiples trous à partir d'une position unique. Once the drilling or drilling equipment is mounted on the frame 12, a hole is drilled or drilled by inserting the drilling or drilling tool through one of the drill guides 14. The process is repeated for Each drill guide 14. The present invention allows multiple holes to be drilled from a single position.

La figure 3 illustre une vue de dessus, la figure 4 illustre une vue en coupe et la figure 5 illustre une vue en perspective d'un deuxième mode de réalisation préféré 50 du dispositif de gabarit d'alignement de plaque supérieure. Le dispositif 50 est formé en versant du béton ou un matériau pouvant initialement être mis en forme dans un moule (non illustré). Le dispositif 50 a une série de guides de forage 52 le traversant. Un guide de forage central, essentiellement perpendiculaire 54, est également prévu. Dans ce cas également, le site dans le sol pour le dispositif 50 peut être au niveau du sol, sous le niveau du sol, ou sur un fond marin. Figure 3 illustrates a top view, Figure 4 illustrates a sectional view and Figure 5 illustrates a perspective view of a second preferred embodiment 50 of the upper plate alignment template device. The device 50 is formed by pouring concrete or a material that can initially be shaped into a mold (not shown). Device 50 has a series of drill guides 52 therethrough. A substantially perpendicular central drilling guide 54 is also provided. In this case also, the site in the soil for the device 50 may be at ground level, below ground level, or on a seabed.

La figure 6 illustre une vue en perspective d'un troisième mode de réalisation préféré 20 du dispositif de gabarit d'alignement de plaque supérieure de la présente invention. Un cadre 22 est construit à partir d'une pluralité de tubes métalliques ou de barres métalliques. Le cadre 22 peut être soudé ou assemblé d'une autre manière. Le cadre 22 supporte une pluralité de guides de forage tubulaires 24 qui sont agencés autour du cadre 22. Les guides de forage tubulaires 24 peuvent être soudés ou fixés d'une autre manière au cadre 22. Chacun des guides de forage 24 est disposé suivant un angle s'étendant vers l'extérieur et vers le bas depuis le cadre 22. Le cadre 22 est substantiellement plan et les guides de forage 24 sont agencés suivant un angle compris entre trente degrés (30°) et soixante degrés (60°) à partir du cadre 22. Figure 6 illustrates a perspective view of a third preferred embodiment of the upper plate alignment jig apparatus of the present invention. A frame 22 is constructed from a plurality of metal tubes or metal bars. The frame 22 may be welded or otherwise assembled. The frame 22 supports a plurality of tubular drill guides 24 which are arranged around the frame 22. The tubular drill guides 24 may be welded or otherwise secured to the frame 22. Each of the drill guides 24 is arranged in a an angle extending outwardly and downwardly from the frame 22. The frame 22 is substantially planar and the drill guides 24 are arranged at an angle between thirty degrees (30 °) and sixty degrees (60 °) to from the frame 22.

Chacun des guides de forage 24 a un axe tel que les axes des guides de forage 24 s'étendent depuis un point central commun au-dessus du cadre 22. Le mode de réalisation illustré dans la figure 6 comporte aussi un guide de forage central 26 qui est substantiellement perpendiculaire au cadre 22. Each of the drill guides 24 has an axis such that the axes of the drill guides 24 extend from a common central point above the frame 22. The embodiment illustrated in Figure 6 also includes a central drill guide 26 which is substantially perpendicular to the frame 22.

La figure 7 illustre une vue en perspective d'un quatrième mode de réalisation préféré 30 du dispositif de gabarit d'alignement de plaque supérieure de la présente invention. Un cadre 32 est construit à partir de tubes métalliques ou de barres métalliques. Le cadre 32 peut être soudé ou assemblé d'une autre manière. Figure 7 illustrates a perspective view of a fourth preferred embodiment of the upper plate alignment jig apparatus of the present invention. A frame 32 is constructed from metal tubes or metal bars. The frame 32 may be welded or otherwise assembled.

Le cadre 32 supporte une pluralité de guides de forage tubulaires 34 qui sont fixés au cadre et espacés et agencés autour de celui-ci. Le mode de réalisation 30 illustré dans la figure 7 comporte aussi une goupille de support centrale 36 sur le cadre 32. The frame 32 supports a plurality of tubular drill guides 34 which are fixed to the frame and spaced and arranged around it. Embodiment 30 illustrated in FIG. 7 also includes a central support pin 36 on frame 32.

La goupille de support centrale 36 peut être utilisée pour transporter et aligner le dispositif de gabarit 30 et peut aussi être utilisée comme outil de support et d'alignement pour l'équipement de perçage ou de forage à placer sur celle-ci. The central support pin 36 may be used to transport and align the template device 30 and may also be used as a support and alignment tool for the drilling or drilling equipment to be placed thereon.

Chacun des guides de forage tubulaires 34 est agencé suivant un angle s'étendant vers l'extérieur et vers le bas depuis le cadre 32. La figure 8 illustre une vue en perspective, la figure 9 illustre une vue de côté, la figure 10 illustre une vue de dessus et la figure 11 illustre une vue en coupe d'un cinquième mode de réalisation préféré du dispositif de gabarit d'alignement de plaque supérieure 40 de la présente invention. Le mode de réalisation 40 illustré dans les figures 8 à 11 comporte un cadre 42 construit à partir de tubes métalliques ou de barres métalliques. Le cadre peut être soudé ou assemblé d'une autre manière. Le cadre 42 supporte une pluralité de guides de forage tubulaires 44 qui sont fixés au cadre 42 et espacés et agencés autour de celui-ci. Les guides de forage tubulaires 44 peuvent être soudés ou fixés d'une autre manière au cadre 42. Chacun des guides de forage 44 est agencé suivant un angle s'étendant vers l'extérieur et vers le bas depuis le cadre 42. Bien que chacun des guides de forage 44 ait un axe, ils ne convergent pas en un point unique comme dans les modes de réalisation précédents. Each of the tubular drill guides 34 is arranged at an angle extending outwardly and downwardly from the frame 32. Figure 8 illustrates a perspective view, Figure 9 illustrates a side view, Figure 10 illustrates a top view and FIG. 11 illustrates a sectional view of a fifth preferred embodiment of the upper plate alignment jig device 40 of the present invention. Embodiment 40 illustrated in Figures 8 to 11 includes a frame 42 constructed from metal tubes or metal bars. The frame can be welded or assembled in another way. The frame 42 supports a plurality of tubular drill guides 44 which are attached to the frame 42 and spaced and arranged around it. The tubular drill guides 44 may be welded or otherwise secured to the frame 42. Each of the drill guides 44 is arranged at an angle extending outwardly and downwardly from the frame 42. Although each drilling guides 44 have an axis, they do not converge at a single point as in the previous embodiments.

Un équipement de perçage (non illustré) peut être monté sur le dessus du cadre 42. Un certain nombre de trous ont déjà été percés avec le tubage 48 inséré à travers les guides de forage 44 et dans les trous percés. Le tubage 48 peut continuer dans le fond du trou le long du même axe que les guides de forage, ou en variante, peut s'incurver vers le bas ou dans d'autres directions, comme cela est effectué dans le cas d'un perçage directionnel. Pour utiliser le dispositif d'alignement de plaque supérieure selon le présent brevet, une tête d'injection articulée est requise de telle sorte que l'appareil de forage complet, avec la tête d'injection 111 attachée à une extrémité, puisse être déplacé sur ou à proximité du dispositif de plaque supérieure une fois seulement pour percer de multiples trous de forage à travers la plaque supérieure. L'exemple de réalisation de plaque supérieure 40 des figures 8 à 11 est illustré une fois fini sur les figures 12 à 16 avec un exemple de réalisation d'un ensemble de tête articulée. Une tête d'injection 111 a des roues ou des chaînes qui saisissent le tube de perçage 113 afin de le pousser dans ou de le tirer hors du sol. Il est aussi prévu des roues supplémentaires positionnées en alternance dans la tête d'injection 111 pour redresser le tube de perçage dans la configuration sous forme de tubage enroulé. L'ensemble de tête d'injection 110 comporte un déflecteur "Y" avec un joint 103 pour permettre le reflux de fluides de perçage jusqu'à un réservoir en surface et une pince 114 pour la connexion sur et le scellage au tube d'alignement 101. Dans ce mode de réalisation, une extrémité de l'appareil ou une butée a un axe coulissant fixée de manière à permettre à la tête d'injection 111 de glisser d'un côté à l'autre. Un bras d'extension 116 avec une fourche rotative 112 permet à la tête d'injection 111 de tourner et de glisser d'avant en arrière depuis la position de l'appareil. Ceci permet une rotation complète de la tête d'injection 111, pour permettre l'alignement avec tous les tubes d'alignement 101. Dans cette configuration de plateforme, le positionnement manuel de la tête d'injection 111 n'interfère pas avec le concept. Dans d'autres configurations, des cylindres hydrauliques ou pneumatiques ou des moteurs électriques avec des rapports pourraient être installés pour faire glisser ou tourner chaque composant, pour positionner ou aligner la tête d'injection 111 avec le tube d'alignement correct 101. Des capteurs mécaniques, électriques, optiques (non illustrés) peuvent être utilisés pour aider, ou, au moyen d'un ordinateur, pour aligner automatiquement ladite tête d'injection avec chaque tube d'alignement 101. Avec une position préétablie de tous les tubes d'alignement 101 sur le dispositif, seulement un alignement et 2 autres points sont requis pour un positionnement automatique sur chaque tube 101. Drilling equipment (not shown) may be mounted on top of the frame 42. A number of holes have already been drilled with the casing 48 inserted through the drill guides 44 and into the drilled holes. The casing 48 may continue in the bottom of the hole along the same axis as the drill guides, or alternatively, may bend down or in other directions, as is done in the case of drilling directional. To use the upper plate alignment device according to the present patent, an articulated injection head is required so that the complete drill rig, with the injection head 111 attached to one end, can be moved on or near the top plate device only once to drill multiple drill holes through the top plate. The top plate embodiment 40 of Figures 8 to 11 is illustrated when finished in Figures 12 to 16 with an exemplary embodiment of an articulated head assembly. An injection head 111 has wheels or chains that grip the piercing tube 113 to push it into or pull it out of the ground. Additional wheels are also provided alternately positioned in the injection head 111 for straightening the piercing tube in the form of coiled tubing. The injection head assembly 110 includes a "Y" baffle with a seal 103 for allowing the flow of drilling fluids to a surface reservoir and a clamp 114 for connection to and sealing to the alignment tube. 101. In this embodiment, an end of the apparatus or an abutment has a sliding axis fixed so as to allow the injection head 111 to slide from one side to the other. An extension arm 116 with a rotating fork 112 allows the injection head 111 to rotate and slide back and forth from the position of the apparatus. This allows a complete rotation of the injection head 111, to allow alignment with all the alignment tubes 101. In this platform configuration, the manual positioning of the injection head 111 does not interfere with the concept. . In other configurations, hydraulic or pneumatic cylinders or electric motors with ratios could be installed to slide or rotate each component, to position or align the injection head 111 with the correct alignment tube 101. mechanical, electrical, optical (not shown) may be used to assist, or, by means of a computer, to automatically align said injection head with each alignment tube 101. With a preset position of all the tubes of alignment 101 on the device, only one alignment and 2 other points are required for automatic positioning on each tube 101.

L'opération de forage de trous pour installer des outils (tubes d'échange de chaleur, capteurs géophoniques ou acoustiques, câbles ou lignes d'ancrage) s'effectue en déplaçant un appareil mobile avec une extrémité ou une butée 117 à proximité de la plaque supérieure déjà installée. La tête d'injection 111 est étendue en faisant coulisser 113 dans ou hors de 110, le mouvement d'un côté à l'autre étant contrôlé en faisant coulisser 110 sur 114 et la fourche 112 étant tournée pour positionner correctement la tête d'injection 111, le déflecteur avec le joint 103 et le collier 114 par rapport au premier tube d'alignement 101. La tête d'injection 111 redresse alors le tube de perçage 113 et le force dans le tube d'alignement 101 avec l'outil de coupe (non illustré) qui lui est attaché. Un nombre quelconque d'outils de coupe peut être utilisé, y compris un foret, un moteur, une buse abrasive, ou un dispositif de raclage. Le trou ou le forage est découpé à mesure que les outils de coupe sont actionnés et que la tête d'injection 111 fait avancer le tube de perçage 113 dans la terre. Lorsque la profondeur ou la longueur totale du tube de perçage a été atteinte, la tête d'injection 111 change de sens et le tube de perçage 101 est retiré du forage fraîchement percé. Des tubes en U ou des tubes concentriques d'échange de chaleur, des capteurs acoustiques ou des géophones et d'autres outils de ce type peuvent alors être installés dans le trou de forage fraîchement percé. La tête d'injection 111 est découplée de la pince 114 et ensuite positionnée ou alignée sur le tube d'alignement suivant 101 sur le dispositif d'alignement de plaque supérieure. Cette opération est répétée jusqu'à ce que tous les tubes d'alignement souhaités aient été utilisés et que les forages aient été installés. En variante, le tube de perçage peut être coupé au niveau de la surface et laissé dans le trou de forage lorsque la profondeur souhaitée est atteinte. Bien que la présente invention ait été décrite en rapport avec les dessins annexés, on comprendra que d'autres modifications supplémentaires, différentes de celles illustrées ou suggérées dans les présentes, peuvent être apportées tout en restant dans le cadre et l'esprit de la présente invention. The operation of drilling holes for installing tools (heat exchange tubes, geophonic or acoustic sensors, cables or anchor lines) is performed by moving a mobile device with an end or a stop 117 near the top plate already installed. The injection head 111 is extended by sliding 113 into or out of 110, the side-to-side movement being controlled by sliding 110 through 114 and the fork 112 rotated to properly position the injection head 111, the deflector with the seal 103 and the collar 114 relative to the first alignment tube 101. The injection head 111 then straightens the piercing tube 113 and forces it into the alignment tube 101 with the tool. cut (not shown) attached to it. Any number of cutting tools may be used, including a drill, motor, abrasive nozzle, or scraper. The hole or bore is cut as the cutting tools are actuated and the injection head 111 advances the piercing tube 113 into the ground. When the total depth or length of the piercing tube has been reached, the injection head 111 changes direction and the piercing tube 101 is removed from the freshly drilled well. U-tubes or concentric heat exchange tubes, acoustic sensors or geophones and other such tools can then be installed in the freshly drilled borehole. The injection head 111 is decoupled from the clamp 114 and then positioned or aligned with the next alignment tube 101 on the upper plate alignment device. This is repeated until all the desired alignment tubes have been used and the holes have been installed. Alternatively, the piercing tube can be cut at the surface and left in the borehole when the desired depth is reached. Although the present invention has been described in connection with the accompanying drawings, it will be understood that other additional modifications, other than those illustrated or suggested herein, may be made while remaining within the scope and spirit of this invention. invention.

Claims (1)

REVENDICATIONS1. Gabarit d'alignement (10) de plaque supérieure pour le perçage ou le forage souterrain, comprenant : un cadre (12) pouvant être reçu sur une portion de terrain ; et une pluralité de guides de forage tubulaires (14) sur ledit cadre, chacun desdits guides de forage étant disposé suivant un angle vers l'extérieur et vers le bas en s'écartant dudit cadre. Gabarit d'alignement selon la revendication 1, dans lequel chacun desdits guides de forage a un un axe (19) de telle sorte que les axes desdits guides de forage s'étendent depuis un point central commun au-dessus du cadre. Gabarit d'alignement selon la revendication 1, comprenant un guide de forage tubulaire central (16) perpendiculaire audit cadre. Gabarit d'alignement selon l'une des revendications 1 à 3, dans lequel ledit cadre est substantiellement plan et dans lequel chacun desdits guides de forage est agencé suivant un angle allant de dix degrés (101 à quatre-vingts degrés (801. Gabarit d'alignement selon l'une des revendications 1 à 4, dans lequel ledit cadre est construit soit à partir de tubes métalliques, soit en béton. Gabarit d'alignement de plaque supérieure selon l'une des revendications 1 à 4, dans lequel ledit cadre inclut une plate-forme. Gabarit d'alignement selon la revendication 6, dans lequel ladite plate-forme supporte et aligne sur elle-même un appareil de perçage ou un équipement de forage. Gabarit d'alignement selon la revendication 2, dans lequel ledit cadre a un axe de support central.9. Gabarit d'alignement selon la revendication 2, dans lequel ladite portion de terrain est au niveau du sol, sous le niveau du sol ou sur un fond marin. 10. Gabarit d'alignement selon la revendication 2, dans lequel chacun des guides de forage reçoit à travers lui soit des tubes de transfert thermique de pompage de sources de chaleur souterraines, soit un équipement d'ancrage, soit un équipement de capteur acoustique. 11. Gabarit d'alignement selon la revendication 2, dans lequel ledit cadre comporte un réceptacle formant un moule pour du béton. 12. Gabarit d'alignement de plaque supérieure selon la revendication 3, comportant un ensemble (110) de tête d'injection articulée. 3_5 13. Gabarit d'alignement selon la revendication 12, dans lequel ledit ensemble de tête d'injection est positionné soit par des cylindres hydrauliques, soit par des cylindres pneumatiques, soit par des moteurs électriques. 20 14. Gabarit d'alignement selon la revendication 12, dans lequel un tube de perçage est inséré et utilisé pour percer un trou à une profondeur souhaitée puis est coupé à la surface et laissé dans le trou percé. REVENDICATIONS1. An upper plate alignment gauge (10) for drilling or underground drilling, comprising: a frame (12) receivable on a portion of land; and a plurality of tubular drill guides (14) on said frame, each of said drill guides being disposed at an outward and downward angle away from said frame. An alignment template according to claim 1, wherein each of said drill guides has an axis (19) so that the axes of said drill guides extend from a common center point above the frame. Alignment template according to claim 1, comprising a central tubular drill guide (16) perpendicular to said frame. Alignment template according to one of claims 1 to 3, wherein said frame is substantially planar and wherein each of said drill guides is arranged at an angle of ten degrees (101 to 80 degrees). Alignment according to one of claims 1 to 4, wherein said frame is constructed from either metal tubes or concrete Upper plate alignment gauge according to one of claims 1 to 4, wherein said frame includes a platform Alignment template according to claim 6, wherein said platform supports and aligns on itself a drilling apparatus or a drilling rig Alignment template according to claim 2, wherein said rig includes frame according to claim 2, wherein said portion of land is at ground level, below ground level or on a seabed 10. Alignment template according to claim 2, in wherein each of the drill guides receives therethrough heat transfer tubes for pumping underground heat sources, anchoring equipment, or acoustic sensor equipment. An alignment template according to claim 2, wherein said frame comprises a mold-forming receptacle for concrete. An upper plate alignment jig as claimed in claim 3, including an articulated injection head assembly (110). The alignment jig of claim 12, wherein said injection head assembly is positioned by either hydraulic cylinders or pneumatic cylinders or electric motors. The alignment template according to claim 12, wherein a piercing tube is inserted and used to drill a hole to a desired depth and then cut to the surface and left in the drilled hole.
FR1160346A 2011-11-14 2011-11-14 Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame Withdrawn FR2982634A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1160346A FR2982634A1 (en) 2011-11-14 2011-11-14 Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1160346A FR2982634A1 (en) 2011-11-14 2011-11-14 Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame

Publications (1)

Publication Number Publication Date
FR2982634A1 true FR2982634A1 (en) 2013-05-17

Family

ID=46062336

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1160346A Withdrawn FR2982634A1 (en) 2011-11-14 2011-11-14 Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame

Country Status (1)

Country Link
FR (1) FR2982634A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4068729A (en) * 1976-06-14 1978-01-17 Standard Oil Company (Indiana) Apparatus for multiple wells through a single caisson
US4754817A (en) * 1982-08-25 1988-07-05 Conoco Inc. Subsea well template for directional drilling
US8056251B1 (en) * 2009-09-21 2011-11-15 Regency Technologies Llc Top plate alignment template device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4068729A (en) * 1976-06-14 1978-01-17 Standard Oil Company (Indiana) Apparatus for multiple wells through a single caisson
US4754817A (en) * 1982-08-25 1988-07-05 Conoco Inc. Subsea well template for directional drilling
US8056251B1 (en) * 2009-09-21 2011-11-15 Regency Technologies Llc Top plate alignment template device

Similar Documents

Publication Publication Date Title
EP0265344B1 (en) Method for producting a pile in the ground, drilling machine and device for carrying out such a method
FR2588297A1 (en) DEVICE FOR UNDERWATER DRILLING OF FOUNDATIONS
EP1525371B1 (en) Telescopic guide line for offshore drilling
FR2551491A1 (en) MULTI-DRAIN PETROLEUM DRILLING AND OPERATING DEVICE
EP0504008B1 (en) Method and device for the installation of a probe against the wall of a cased borehole
FR2839542A1 (en) BASE-SURFACE CONNECTION INSTALLATION OF A SUBSEA PIPE COMPRISING A BENDED PIPE ELEMENT HOLDED BY A BASE
WO2008034970A1 (en) Accessory for assisting in drilling a network of radial galleries from the same site situated close to the ground level
FR2890098A1 (en) INSTALLATION COMPRISING AT LEAST TWO FOUNDAL-SURFACE CONNECTIONS OF AT LEAST TWO SUB-MARINE DUCTS BASED ON THE BOTTOM OF THE SEA
FR3040518A1 (en)
FR3041679A1 (en)
WO2016110617A1 (en) Ballasting and/or protection devices for underwater lines
CA2641395C (en) Stand-alone drainage hole drilling system
US8056251B1 (en) Top plate alignment template device
AU2009317171B2 (en) Method and system for fixing an element in a borehole
EP2900876A1 (en) Method for producing a reinforced structure in the ground
EP0633965B1 (en) Cut expansion joint sealing device for concrete dams and method for fitting same
FR2982634A1 (en) Upper plate alignment gauge for piercing holes to install e.g. anchor cable used to anchor drilling platform on sea bad, has drilling guides placed according to angle and extended toward outside and downwards by being separated from frame
FR2972737A1 (en) DEVICE AND METHOD FOR ANCHORING IN A MULTILAYER SOIL
BE1027405B1 (en) BOREHOLE AND BOREHOLE WELL DRILLING PROCESS
EP2900875B1 (en) Method of making a foundation
FR2498674A1 (en) PARKING TOOL FOR COMPLETION SYSTEM FOR PUMPS TOOL PUMPS
US9851021B2 (en) Method for removing from a terrain a buried pipe and a cutting machine used for actuating the method
FR2995931A1 (en) Method for injection of sealing grout e.g. thick mortar, into ground, involves injecting sealing grout into drilling tube after drilling tube reaches predetermined depth, where sealing grout is injected while vibrating drilling tube
Husvag et al. A New Electric Line Downhole Jetting Tool Accomplishes Sample Collection and Screen Clean-Out to Restore Production
FR2880910A1 (en) Oil product e.g. hydrocarbon, pulling out device for oil industry, has riser pipe connected to production well by submarine pipelines, riser disposed in riser pipe, and pumping set disposed in extreme lower part of riser pipe

Legal Events

Date Code Title Description
ST Notification of lapse

Effective date: 20160729