FR2885548A1 - Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand - Google Patents

Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand Download PDF

Info

Publication number
FR2885548A1
FR2885548A1 FR0551191A FR0551191A FR2885548A1 FR 2885548 A1 FR2885548 A1 FR 2885548A1 FR 0551191 A FR0551191 A FR 0551191A FR 0551191 A FR0551191 A FR 0551191A FR 2885548 A1 FR2885548 A1 FR 2885548A1
Authority
FR
France
Prior art keywords
slab
lifting
concrete
handling
strands
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR0551191A
Other languages
French (fr)
Other versions
FR2885548B1 (en
Inventor
Ferdinand Jacques Guimard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ETABLISSEMENTS GUIMARD, FR
GROUPE SOPREL, FR
Original Assignee
GUIMARD ETS
SOPREL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34955204&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=FR2885548(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by GUIMARD ETS, SOPREL filed Critical GUIMARD ETS
Priority to FR0551191A priority Critical patent/FR2885548B1/en
Publication of FR2885548A1 publication Critical patent/FR2885548A1/en
Application granted granted Critical
Publication of FR2885548B1 publication Critical patent/FR2885548B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/06Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/005Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with anchoring or fastening elements for the shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0062Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects forcing the elements into the cast material, e.g. hooks into cast concrete
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • E04G21/145Means in or on the elements for connecting same to handling apparatus specific for hollow plates

Abstract

The method involves openings made in a concrete hallow slab using a shovel at four corners when the concrete is wet, and introducing a lifting and handling pin (6) in each opening, where the pin is constituted of a metal tie and comprises a middle bend defining gripping ring (7). The ring is subject to a rotation perpendicular to the slab so that positioning branches (81, 82) of the ring passes below a longitudinal reinforcement strand (2). The openings at the corners are trowel with freshly mixed concrete around the rings while filling contiguous zones of holes with the concrete. An independent claim is also included for concrete slab prestressed by iron or longitudinal reinforcement strand.

Description

30 3530 35

La présente invention concerne un procédé permettant d'incorporer des épingles de levage et de manutention dans une dalle alvéolée en béton précontraint par des fers ou torons d'armature longitudinaux mis en place entre les alvéoles à la partie inférieure de cette dalle.  The present invention relates to a method for incorporating lifting and handling pins in a prestressed concrete honeycomb slab by longitudinal iron or reinforcing strands placed between the cells at the bottom of this slab.

Les dalles alvéolées en béton précontraint qui sont apparues sur le marché dans les années 50 sont toujours très appréciées par les professionnels du bâtiment.  The prestressed concrete hollow core slabs that appeared on the market in the 1950s are still highly appreciated by building professionals.

De telles dalles présentent l'avantage d'être coulées non pas sur des chantiers mais dans des usines avant d'être transportées et livrées en règle générale par camions; par suite, leur fabrication n'est pas tributaire d'éventuelles intempéries.  Such slabs have the advantage of being cast not on sites but in factories before being transported and delivered as a rule trucks; consequently, their manufacture is not dependent on any bad weather.

Ces dalles ont habituellement une largeur standard d'environ 1,20 m et une longueur variable adaptée à la portée, pouvant atteindre jusqu'à 20 m, et comportent à leur partie interne de 5 à 11 alvéoles longitudinales.  These slabs usually have a standard width of about 1.20 m and a variable length adapted to the range, up to 20 m, and have in their inner part 5 to 11 longitudinal cells.

Elles sont classiquement fabriquées sur des bancs de pré-contrainte de grande longueur (de l'ordre de 150 m) et ayant une largeur correspondant à celle des dalles ce notamment par extrusion.  They are conventionally manufactured on pre-stress benches of great length (of the order of 150 m) and having a width corresponding to that of slabs, in particular by extrusion.

Lors de la fabrication de ces dalles on peut également avantageusement utiliser un dispositif de coulage particulier, dit à coffrages glissants, qui se déplace en continu le long du banc de précontrainte.  During the manufacture of these slabs it is also advantageous to use a particular pouring device, said sliding formwork, which moves continuously along the prestressing bench.

Un tel dispositif comprend essentiellement, dans le sens de déplacement: des guide fils assurant le maintien des torons, des organes de coulage de la couche inférieure des dal-les, cette couche étant située au-dessous des alvéoles et renfermant les torons d'armature, - des sabots vibreurs, des noyaux profilés déplaçables longitudinalement en va et vient permettant l'obtention des alvéoles longitudinales et coopérant avec des organes de coulage des bandes de béton séparant les alvéoles, des patins permettant de vibrer ces bandes de béton, - des organes de coulage de la couche supérieure des dal-les situées au-dessus des alvéoles, - une table vibrante.  Such a device essentially comprises, in the direction of movement: son guides ensuring the maintenance of the strands, casting members of the lower layer dal-les, this layer being located below the cells and enclosing the reinforcing strands vibrating shoes, profiled cores movable longitudinally back and forth making it possible to obtain longitudinal cavities and cooperating with casting members of the concrete strips separating the cells, pads for vibrating these concrete strips, organs pouring of the upper layer of dal-les located above the cells, - a vibrating table.

Pour fabriquer les dalles alvéolées en béton précontraint, on met en place les torons d'armature parallèlement les uns aux autres, on les met individuellement ou en bloc en tension en règle générale à l'aide de vérins, puis on coule le béton sur des hauteurs pouvant varier entre environ 12 et 40 cm à l'aide du dispositif de coulage à coffrages glissants qui se déplace en continu le long du banc de précontrainte, on coupe les dal- les à la longueur souhaitée, et après la prise du béton, on coupe les torons de façon à mettre ce dernier en précontrainte.  In order to manufacture the prestressed concrete hollow core slabs, the reinforcing strands are placed in parallel with each other, they are individually or generally tensioned with cylinders, and then the concrete is cast on heights varying between about 12 and 40 cm by means of the sliding form casting device which moves continuously along the prestressing bed, the dies are cut to the desired length, and after the setting of the concrete, the strands are cut so as to put the latter in prestressing.

Sur le chantier, ces dalles sont juxtaposées sur des poutres ou des murs de façon à constituer le plancher des étages de différents bâtiments.  On site, these slabs are juxtaposed on beams or walls so as to form the floor of the floors of different buildings.

Lors de leur mise en place sur les poutres ou les murs, il est nécessaire de lever les dalles au moyen de grues.  When placed on the beams or walls, it is necessary to lift the slabs by means of cranes.

On utilise actuellement à cet effet principalement deux pro-cédés de levage.  For the purpose, two main lifting devices are currently used for this purpose.

Le premier de ces procédés consiste à suspendre au crochet 15 de la grue une grosse poutre métallique dite palonnier équipée à ses extrémités de pinces permettant de saisir une dalle.  The first of these methods consists in suspending from hook 15 of the crane a large metal beam called rudder equipped at its ends with clamps for gripping a slab.

Des chaînes passant au-dessous de la dalle constituent une sécurité complémentaire.  Chains passing below the slab provide additional security.

Un tel procédé ne satisfait toutefois pas l'ensemble des 20 professionnels.  Such a process does not satisfy all 20 professionals.

Le second procédé de levage consiste à suspendre au crochet de la grue une élingue à quatre brins dont les extrémités sont respectivement introduites dans quatre perçages traversants prévus à cet effet aux quatre coins des dalles.  The second lifting method is to suspend from the crane hook a four-strand sling whose ends are respectively introduced into four through holes provided for this purpose at the four corners of the slabs.

Deux barres métalliques respectivement enfilées aux extrémités de deux brins associés, au-dessous des dalles, permettent le main-tien de cellesci.  Two metal bars respectively strung at the ends of two associated strands, below the slabs, allow the hand-hold of these.

Un tel procédé présente l'inconvénient de nécessiter le perçage sur les dalles de quatre trous traversant devant ensuite être rebou-30 chés.  Such a method has the disadvantage of requiring drilling on the slabs of four through holes to be then rebou-30.

L'objet de l'invention consiste à remédier aux inconvénients des procédés de levage connus des dalles alvéolées en béton précontraint.  The object of the invention is to overcome the disadvantages of known lifting methods of hollow core slabs prestressed concrete.

A cet effet, l'idée à la base de l'invention a consisté à incorporer à ces dalles des épingles de levage et de manutention permettant de les saisir au moyen d'une grue, ce, directement en aval de la fabrication de ces dalles par coulage du béton, lorsque le béton est encore frais.  For this purpose, the idea behind the invention was to incorporate in these slabs lifting pins and handling to grasp them by means of a crane, directly downstream of the manufacture of these slabs by pouring concrete, when the concrete is still fresh.

Dans ce contexte, l'invention concerne un procédé permet-tant d'incorporer des épingles de levage et de manutention dans une dalle alvéolée en béton précontraint par des fers ou torons d'armature longitudinaux mis en place entre les alvéoles à la partie inférieure de cette dalle selon lequel on ouvre la dalle, notamment au moyen d'une pelle à proximité de ses quatre coins, et au niveau de deux torons latéraux situés es- sentiellement symétriquement par rapport à l'axe longitudinal de la dalle de façon à dégager ces torons ainsi que les alvéoles contiguës à ce niveau et on introduit une épingle de levage et de manutention dans chacune des ouvertures ainsi réalisées, de part et d'autre du toron associé.  In this context, the invention relates to a process for incorporating lifting and handling pins into a prestressed concrete honeycomb slab with longitudinal reinforcing bars or strands placed between the cells at the bottom of the slab. this slab according to which the slab is opened, in particular by means of a shovel near its four corners, and at the level of two lateral strands situated essentially symmetrically with respect to the longitudinal axis of the slab so as to clear these strands and the adjacent cells at this level and introduced a lifting pin and handling in each of the openings thus formed, on either side of the associated strand.

Selon l'invention, ces épingles de levage et de manutention sont constituées, chacune, par une tige métallique cintrée symétrique-ment par rapport à son centre et comportant d'une part un coudage médian définissant un anneau de préhension approximativement plan pouvant faire saillie à la partie supérieure de la dalle, et d'autre part, aux extrémités respectives de cet anneau de préhension, deux coudages latéraux délimitant deux branches de positionnement essentiellement parallèles dirigées l'une vers l'autre.  According to the invention, these lifting and handling pins are each constituted by a metal rod bent symmetrically with respect to its center and comprising on the one hand a median bend defining an approximately planar gripping ring that can project from the upper part of the slab, and secondly, at the respective ends of the gripping ring, two lateral bends delimiting two essentially parallel positioning branches directed towards one another.

Ces deux branches de positionnement sont écartées d'une distance un peu supérieure au diamètre du toron associé de façon à per-mettre leur introduction de part et d'autre de ce toron essentiellement parallèlement à celui-ci.  These two positioning branches are separated by a distance slightly greater than the diameter of the associated strand so as to per-put their introduction on either side of this strand substantially parallel thereto.

Compte tenu de l'écartement des deux branches de positionnement, l'anneau de préhension n'est en fait pas rigoureusement plan mais légèrement gauche et présente une forme pouvant être assimilée à celle d'un trombone ouvert.  Given the spacing of the two positioning legs, the gripping ring is in fact not strictly flat but slightly left and has a shape that can be likened to that of an open trombone.

Selon l'invention, après l'introduction des épingles de levage dans les ouvertures, on soumet chacun des anneaux de préhension à une rotation de 90 perpendiculairement à la dalle de sorte que ses branches de positionnement passent au-dessous du toron associé et on rebouche les ouvertures avec du béton frais autour des anneaux de préhension en remplissant les zones contiguës des alvéoles.  According to the invention, after the introduction of the lifting pins into the openings, each of the gripping rings is subjected to a rotation of 90 perpendicularly to the slab so that its positioning branches pass below the associated strand and is rebouched. openings with fresh concrete around the gripping rings by filling the contiguous areas of the cells.

La mise en place des épingles de levage et de manutention peut être effectuée manuellement très facilement, en s'aidant le cas échéant d'un outil pour les enfoncer.  The establishment of the lifting and handling pins can be performed manually very easily, with the help of a tool if necessary to drive them.

A la fin du procédé, les dalles sont donc équipées à leurs quatre coins d'épingles de levage et de manutention dont l'anneau de préhension peut faire saillie par son extrémité supérieure à la surface du béton.  At the end of the process, the slabs are equipped at their four corners with lifting pins and handling which the gripping ring can project from its upper end to the surface of the concrete.

Ces dalles peuvent être saisies par un dispositif de levage comportant une élingue à quatre brins suspendue au crochet d'une grue.  These slabs can be grasped by a lifting device comprising a four-legged sling suspended from the hook of a crane.

Le procédé conforme à l'invention permet ainsi d'ancrer parfaitement les épingles de levage et de manutention dans le béton de façon à éviter tout risque de rupture qui pourrait avoir des conséquences dramatiques compte tenu du poids des dalles qui est de l'ordre de 200 à 600 kg/m2 selon leur épaisseur.  The method according to the invention thus makes it possible to perfectly anchor the lifting and handling pins in the concrete so as to avoid any risk of breakage which could have dramatic consequences given the weight of the slabs which is of the order of 200 to 600 kg / m2 depending on their thickness.

Selon l'invention, on positionne en règle générale les épingles de levage et de manutention sur les deux avant-derniers torons à 10 partir des bords latéraux de la dalle.  According to the invention, the lifting and handling pins are generally positioned on the two penultimate strands from the side edges of the slab.

Selon l'invention, les anneaux de préhension ont de préférence approximativement la forme d'un triangle isocèle ayant une hauteur comprise entre 8 et 40 cm.  According to the invention, the gripping rings preferably have the shape of an isosceles triangle having a height of between 8 and 40 cm.

Les branches de positionnement peuvent quant à elles 15 avantageusement avoir une longueur comprise entre 5 et 20 cm selon la. géométrie et le poids de la dalle.  The positioning legs can advantageously have a length of between 5 and 20 cm depending on the. geometry and the weight of the slab.

L'invention se rapporte également à une dalle alvéolée en béton précontraint par des fers ou torons d'armature longitudinaux mis en place entre les alvéoles à la partie inférieure de la dalle.  The invention also relates to a hollow concrete slab prestressed by longitudinal iron or reinforcing strands placed between the cells at the bottom of the slab.

Une telle dalle est caractérisée en ce qu'elle est équipée au niveau de ses quatre coins respectifs d'une épingle de levage et de manutention constituée par une tige métallique cintrée symétriquement par rapport à son centre et comportant d'une part un coudage médian définissant un anneau de préhension approximativement plan pouvant faire saillie à la partie supérieure de la dalle, et d'autre part aux extrémités respectives de cet anneau de préhension deux coudages latéraux délimitant deux branches de positionnement essentiellement parallèles dirigées l'une vers l'autre et se prolongeant au-delà de l'anneau de préhension.  Such a slab is characterized in that it is equipped at its four respective corners with a lifting pin and handling constituted by a metal rod bent symmetrically with respect to its center and having on the one hand a median bend defining an approximately planar gripping ring that can project from the upper part of the slab, and on the other hand at the respective ends of this gripping ring two lateral bends delimiting two essentially parallel positioning branches directed towards each other and extending beyond the grip ring.

Selon l'invention, ces deux branches de positionnement sont écartées d'une distance un peu supérieure au diamètre des torons et sont positionnées au-dessous d'un toron associé, essentiellement perpendiculairement à ce toron.  According to the invention, these two positioning branches are separated by a distance slightly greater than the diameter of the strands and are positioned below an associated strand, substantially perpendicular to this strand.

Les caractéristiques du procédé ainsi que de la dalle alvéo- lée en béton précontraint qui font l'objet de l'invention seront décrites plus en détail en se référant aux dessins non limitatifs annexés dans lesquels: la figure 1 est une vue en perspective d'une dalle alvéolée en béton précontraint; la figure 2 est une vue en perspective d'une épingle de levage et de manutention; - la figure 3 est une vue en perspective similaire à la figure 2 mais après rotation de 90 de l'épingle de levage et de manutention.  The characteristics of the method as well as of the prestressed concrete hollow slab which are the subject of the invention will be described in more detail with reference to the accompanying nonlimiting drawings in which: FIG. 1 is a perspective view of a hollow slab of prestressed concrete; Figure 2 is a perspective view of a lifting and handling pin; - Figure 3 is a perspective view similar to Figure 2 but after 90 rotation of the lifting pin and handling.

Selon la figure 1, la dalle 1 est réalisée en un béton précontraint par des torons d'armature longitudinaux 2 pouvant faire saillie à ses extrémités et est équipée d'une série d'alvéoles longitudinales 3.  According to FIG. 1, the slab 1 is made of prestressed concrete with longitudinal reinforcing strands 2 which can project at its ends and is equipped with a series of longitudinal cells 3.

Le nombre de sept alvéoles et de six torons d'armature choisi à titre d'exemple n'est bien entendu aucunement limitatif de l'invention.  The number of seven cells and six reinforcing wire selected by way of example is of course in no way limitative of the invention.

Les torons 2 sont placés entre les alvéoles 3 à la partie inférieure de la dalle 1.  The strands 2 are placed between the cells 3 at the lower part of the slab 1.

Il est à noter que chacune des bandes en béton 4 séparant deux alvéoles 3 n'est pas obligatoirement équipée d'un toron 2.  It should be noted that each of the concrete strips 4 separating two cells 3 is not necessarily equipped with a strand 2.

Selon la figure 1, la dalle 1 est équipée sur sa face supérieure 5 et au niveau de ses quatre coins de quatre épingles de levage et de manutention respectives 6 pouvant faire saillie à la surface du béton et ayant pour fonction de permettre que la dalle 1 puisse être saisie par un dispositif de levage non représenté comportant une élingue à quatre brins suspendue au crochet d'une grue.  According to FIG. 1, slab 1 is equipped on its upper surface 5 and at its four corners with four lifting and handling pins 6 that can protrude from the surface of the concrete and whose function is to allow the slab 1 can be grasped by a not shown lifting device comprising a four-legged sling suspended from the hook of a crane.

Selon la figure 2 chacune des épingles de levage et de manutention 6 est constituée par une tige métallique cintrée symétriquement par rapport à son centre C. Cette tige métallique 6 comporte au niveau de son centre C un coudage médian définissant un anneau de préhension 7 en forme de triangle isocèle et aux extrémités respectives de cet anneau de préhension 7 deux coudages latéraux Ci, C2 délimitant deux branches de positionne-ment 8i, 82.  According to Figure 2 each of the lifting and handling pins 6 is constituted by a metal rod bent symmetrically with respect to its center C. This metal rod 6 has at its center C a median bend defining a gripping ring 7 shaped of isosceles triangles and at the respective ends of this gripping ring 7 two lateral bends Ci, C2 delimiting two positioning branches 8i, 82.

L'anneau de préhension 7 est approximativement plan (en 30 fait légèrement gauche) et peut faire saillie sur la face supérieure 5 de la dalle 1 comme représenté sur la figure 1.  The gripping ring 7 is approximately plane (in fact slightly left) and can project on the upper face 5 of the slab 1 as shown in FIG.

Les deux branches de positionnement 8i, 82 s'étendent quant à elles parallèlement l'une vers l'autre à une distance e un peu supérieure au diamètre d du toron 2 associé.  The two positioning branches 8i, 82 extend in parallel parallel to one another at a distance e slightly greater than the diameter d of the associated strand 2.

Selon la figure 2, les épingles de positionnement 6 sont introduites dans des ouvertures non représentées réalisées dans le béton, lorsque celui-ci est encore frais, ce de part et d'autre du toron associé 2 de sorte que les branches de positionnement 81, 82 soient essentiellement parallèles à ce toron 2.  According to FIG. 2, the positioning pins 6 are introduced into unrepresented openings made in the concrete, when the latter is still fresh, on either side of the associated strand 2 so that the positioning branches 81, 82 are essentially parallel to this strand 2.

A partir de cette position, représentée sur la figure 2, et selon la figure 3, on soumet ensuite chacun des anneaux de préhension 7 à une rotation de 90 perpendiculairement à la dalle 1 de sorte que ses branches de positionnement 81, 82 passent au-dessous du toron 2 associé.  From this position, shown in FIG. 2, and according to FIG. 3, each of the gripping rings 7 is then rotated 90 perpendicularly to the slab 1 so that its positioning branches 81, 82 pass below the associated strand 2.

On peut ainsi ancrer les épingles de levage et de manutention dans le béton.  It is thus possible to anchor the lifting and handling pins in the concrete.

Il ne reste alors plus qu'à reboucher l'ouverture préalable-ment pratiquée dans le béton frais.  All that remains is to re-seal the opening previously made in fresh concrete.

Claims (5)

REVENDICATIONS 1 ) Procédé permettant d'incorporer des épingles de levage et de manutention (6) dans une dalle alvéolée (1) en béton précontraint par des fers ou torons d'armature longitudinaux (2) mis en place entre les alvéoles (3) à la partie inférieure de cette dalle (1), directement en aval de la fabrication de celle-ci par coulage du béton comportant les étapes suivantes: - lorsque le béton est encore frais, on ouvre la dalle (1) notamment au moyen d'une pelle à proximité de ses quatre coins et au niveau de deux torons (2) latéraux situés essentiellement symétriquement par rapport à l'axe longitudinal de la dalle (1) de façon à dégager ces torons (2) ainsi que les alvéoles (3) contiguës à ce niveau, - on introduit une épingle de levage et de manutention (6) dans chacune des ouvertures ainsi réalisées, de part et d'autre du toron (2) associé, ces épingles de levage et de manutention (6) étant constituées, cha- cune, par une tige métallique cintrée symétriquement par rapport à son centre et comportant d'une part un coudage médian (6) définissant un anneau de préhension (7) approximativement plan pouvant faire saillie à la partie supérieure de la dalle (1), et d'autre part, aux extrémités respectives de cet anneau de préhension (7), deux coudages latéraux (Ci, C2) délimitant deux branches de positionnement (81, 82) essentiellement parallèles dirigées l'une vers l'autre, ces deux branches de positionnement (81, 82) étant écartées d'une distance (e) un peu supérieure au diamètre (d) du toron (2) associé de façon à permettre leur introduction de part et d'autre de ce toron (2), essentiellement parallèlement à celui-ci, on soumet chacun des anneaux de préhension (7) à une rotation de 90 perpendiculairement à la dalle (1) de sorte que ses branches de positionnement (81, 82) passent au-dessous du toron (2) associé, et on rebouche les ouvertures avec du béton frais autour des anneaux de préhension (7), en remplissant les zones contiguës des alvéoles (3).  1) A method for incorporating lifting and handling pins (6) into a prestressed concrete honeycomb slab (1) with longitudinal reinforcing bars or strands (2) placed between the cells (3) at the lower part of this slab (1), directly downstream of the manufacture thereof by pouring concrete comprising the following steps: - when the concrete is still fresh, the slab (1) is opened by means of a shovel near its four corners and at two lateral strands (2) located substantially symmetrically with respect to the longitudinal axis of the slab (1) so as to release these strands (2) and the cells (3) contiguous to at this level, a lifting and handling pin (6) is introduced into each of the openings thus formed, on either side of the associated strand (2), these lifting and handling pins (6) being made, - one, by a symmetrically bent metal rod relative to its center and having on the one hand a median bend (6) defining an approximately planar gripping ring (7) which can project from the upper part of the slab (1), and on the other hand, at the ends respective of this gripping ring (7), two lateral bends (Ci, C2) delimiting two essentially parallel positioning branches (81, 82) directed towards one another, these two positioning branches (81, 82) being spaced apart by a distance (e) a little greater than the diameter (d) of the associated strand (2) so as to allow their introduction on either side of this strand (2), essentially parallel to it, is submitted each of the gripping rings (7) at a rotation of 90 perpendicularly to the slab (1) so that its positioning legs (81, 82) pass below the associated strand (2), and the openings are re-opened with fresh concrete around the gripping rings (7), filling the contiguous areas of the cells (3). 2 ) Procédé selon la revendication 1, caractérisé en ce que l'on positionne les épingles de levage et de manutention (6) sur les deux 35 avant derniers torons (2) à partir des bords latéraux de la dalle (1).  2) Method according to claim 1, characterized in that the lifting and handling pins (6) are positioned on the two foremost strands (2) from the side edges of the slab (1). 3 ) Procédé selon l'une quelconque des revendications 1 et 2, caractérisé en ce que les anneaux de préhension (7) ont approximativement la forme d'un triangle isocèle ayant une hauteur comprise entre 8 et 40 cm.  3) Method according to any one of claims 1 and 2, characterized in that the gripping rings (7) have the approximate shape of an isosceles triangle having a height of between 8 and 40 cm. 4 ) Procédé selon l'une quelconque des revendications 1 à 3, caractérisé en ce que les branches de positionnement (81, 82) ont une longueur comprise entre 5 et 20 cm.  4) Method according to any one of claims 1 to 3, characterized in that the positioning legs (81, 82) have a length of between 5 and 20 cm. 5 ) Dalle alvéolée (1) en béton précontraint par des fers ou torons d'armature (2) longitudinaux mis en place entre les alvéoles (3) , à la partie inférieure de la dalle, obtenue par la mise en oeuvre du procédé selon l'une quelconque des revendications 1 à 4, caractérisée en ce qu' elle est équipée au niveau de ses quatre coins respectifs d'une épingle de levage et de manutention (6) constituée par une tige métallique cintrée symétriquement par rapport à son centre et comportant d'une part un coudage médian (c) définissant un anneau de préhension (7) approximativement plan pouvant faire saillie à la partie supérieure de la dalle (1), et d'autre part aux extrémités respectives de cet anneau de préhension (7) de coudages latéraux (C1, C2) délimitant deux branches de positionnement (81, 82) essentiellement parallèles dirigées l'une vers l'autre, ces deux branches de positionnement (81, 82) étant écartées d'une distance (e) un peu supérieure au diamètre (d) des torons et étant positionnées au-dessous d'un toron (2) associé, essentiellement perpendiculairement à ce toron.  5) Cellular slab (1) prestressed concrete by irons or reinforcing wire strands (2) placed between the longitudinal cells (3), at the bottom of the slab, obtained by the implementation of the method according to l any one of claims 1 to 4, characterized in that it is equipped at its respective four corners with a lifting and handling pin (6) consisting of a metal rod bent symmetrically with respect to its center and comprising on the one hand a median bend (c) defining an approximately planar gripping ring (7) projecting from the upper part of the slab (1), and on the other hand at the respective ends of this gripping ring (7). lateral bends (C1, C2) delimiting two substantially parallel positioning branches (81, 82) directed toward each other, these two positioning branches (81, 82) being spaced apart by a distance (e) a little greater than the diameter e (d) strands and being positioned below an associated strand (2), substantially perpendicular to this strand.
FR0551191A 2005-05-10 2005-05-10 METHOD FOR INCORPORATING LIFTING AND HANDLING PINS IN PRECONTRATED CONCRETE ALUMINUM SLABS AND SLAB OBTAINED USING THE SAME Expired - Fee Related FR2885548B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR0551191A FR2885548B1 (en) 2005-05-10 2005-05-10 METHOD FOR INCORPORATING LIFTING AND HANDLING PINS IN PRECONTRATED CONCRETE ALUMINUM SLABS AND SLAB OBTAINED USING THE SAME

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0551191A FR2885548B1 (en) 2005-05-10 2005-05-10 METHOD FOR INCORPORATING LIFTING AND HANDLING PINS IN PRECONTRATED CONCRETE ALUMINUM SLABS AND SLAB OBTAINED USING THE SAME

Publications (2)

Publication Number Publication Date
FR2885548A1 true FR2885548A1 (en) 2006-11-17
FR2885548B1 FR2885548B1 (en) 2007-06-22

Family

ID=34955204

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0551191A Expired - Fee Related FR2885548B1 (en) 2005-05-10 2005-05-10 METHOD FOR INCORPORATING LIFTING AND HANDLING PINS IN PRECONTRATED CONCRETE ALUMINUM SLABS AND SLAB OBTAINED USING THE SAME

Country Status (1)

Country Link
FR (1) FR2885548B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1878854A2 (en) * 2006-07-12 2008-01-16 Elematic Oy Ab Method and apparatus for attaching a lifting lug to a concrete product
FR2905397A1 (en) * 2006-08-30 2008-03-07 Kp1 Soc Par Actions Simplifiee ALVEOLED SLAB WITH AT LEAST ONE LIFTING RING.
NL2002541C2 (en) * 2009-02-17 2010-08-18 Betonson B V PREFABRICATED CONCRETE FLOOR ELEMENT OF THE "WIDE PLATE FLOOR" TYPE.
US8875448B2 (en) 2012-03-12 2014-11-04 Elematic Oy Ab Method and apparatus for the installation of a lifting loop, and part forming a lifting loop

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3705469A (en) * 1970-12-10 1972-12-12 Superior Concrete Accessories Anchor insert and setting cone for a precast concrete body
US20030170093A1 (en) * 2000-04-27 2003-09-11 David Janeway Fastening device with adjustable fastening surface embedded in cast panel or other products
EP1344877A1 (en) * 2002-03-15 2003-09-17 Beton Son B.V. Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor
EP1555100A1 (en) * 2004-01-15 2005-07-20 Soprel Manufacturing method for prestressed concrete hollow slabs and slabs obtained by that method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3705469A (en) * 1970-12-10 1972-12-12 Superior Concrete Accessories Anchor insert and setting cone for a precast concrete body
US20030170093A1 (en) * 2000-04-27 2003-09-11 David Janeway Fastening device with adjustable fastening surface embedded in cast panel or other products
EP1344877A1 (en) * 2002-03-15 2003-09-17 Beton Son B.V. Method for providing a hoisting hook in a prefabricated concrete element such as a hollow-core slab floor
EP1555100A1 (en) * 2004-01-15 2005-07-20 Soprel Manufacturing method for prestressed concrete hollow slabs and slabs obtained by that method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1878854A2 (en) * 2006-07-12 2008-01-16 Elematic Oy Ab Method and apparatus for attaching a lifting lug to a concrete product
EP1878854A3 (en) * 2006-07-12 2014-04-02 Elematic Oy Ab Method and apparatus for attaching a lifting lug to a concrete product
FR2905397A1 (en) * 2006-08-30 2008-03-07 Kp1 Soc Par Actions Simplifiee ALVEOLED SLAB WITH AT LEAST ONE LIFTING RING.
WO2008025894A3 (en) * 2006-08-30 2008-04-17 Kp1 Cellular slab comprising at least one lifting ring
NL2002541C2 (en) * 2009-02-17 2010-08-18 Betonson B V PREFABRICATED CONCRETE FLOOR ELEMENT OF THE "WIDE PLATE FLOOR" TYPE.
US8875448B2 (en) 2012-03-12 2014-11-04 Elematic Oy Ab Method and apparatus for the installation of a lifting loop, and part forming a lifting loop

Also Published As

Publication number Publication date
FR2885548B1 (en) 2007-06-22

Similar Documents

Publication Publication Date Title
EP1555100B1 (en) Manufacturing method for prestressed concrete hollow slabs and slabs obtained by that method
CA2357919C (en) Reinforcing cage for a reinforced concrete element
FR2885548A1 (en) Lifting and handling pin incorporating method for concrete hollow slab, involves introducing pins in each opening in slab and subjecting gripping ring of pin to rotation perpendicular to slab so that branches pass below reinforcement strand
EP2628869B1 (en) Device for connecting prefabricated structures for building construction
BE491207A (en)
FR2927105A1 (en) Absorptive form wall for use during construction of building, has flexible sling comprising intermediate portion, whose length is defined so as to authorize gripping of sling by operator for connecting sling to handling equipment
EP2850259B1 (en) Improved-grip reinforcing bar and method of producing the same
EP3175057B1 (en) A pre-tensioned bearing structure
FR2903336A1 (en) Ribbed prefabricated board or plate for building industry, has carriers forming strengthening ribs of board or plate anchored in cement
BE1017284A3 (en) SUPPORTING DEVICE FOR ALVEOLED CONCRETE SLAB.
FR2833285A1 (en) Fixing system for lifting rings in pre-stressed concrete slab with cells consists of fitting rings in cells and holding in place by passive rods
FR2904348A1 (en) Connecting rod holding box for e.g. floor, has side walls extending from wall and including tabs at their ends, where tabs extend parallel to wall and are supported against holding part by covering holes
FR2848589A1 (en) Method of fabrication of precast concrete beams involves preparing prefabricated armature cages for positioning in mould prior to pouring concrete
FR2793826A1 (en) CONSTRUCTION BLOCK FOR THE REALIZATION OF A CORNER OF A BUILDING WALL
CA1189295A (en) Precast concrete slab with steel beam
FR2952666A1 (en) Hand tool for straightening suspenders folded on upper surface of preslab for integration of prefabricated floors with load-bearing walls in building, has abutments forming support on upper surface of preslab to straighten suspender
BE711502A (en)
FR2483306A1 (en) Mould for concrete rails - has long trough section moulds stripped by lifting rail end so that soffit is progressively prised from mould invert
FR2613179A1 (en) METHOD AND DEVICE FOR FILLING WITH A MASS OF CHEESE A CHEESE MOLDING BATTERY
BE678742A (en)
FR2513174A1 (en) Shuttering bar for multiline prestressing bed - supports stops dividing longitudinal moulds into lengths with wire slots
WO2003100183A1 (en) Floor comprising a concrete cast slab which is associated with an insulating material
EP1818149A1 (en) Method of manufacturing a concrete beam, moulding tool and corresponding concrete beam
EP1705306A1 (en) Hanger for a concrete slab or the same
BE659357A (en)

Legal Events

Date Code Title Description
CA Change of address

Effective date: 20140319

CD Change of name or company name

Owner name: GROUPE SOPREL, FR

Effective date: 20140319

Owner name: ETABLISSEMENTS GUIMARD, FR

Effective date: 20140319

ST Notification of lapse

Effective date: 20160129