FR2850992A1 - Identical spaces tracing device for placing tiles on framework of wood roofing, has two parts locked at determined position to gauge for placing tiles and tracing unit to print mark on framework corresponding to gauge interval - Google Patents
Identical spaces tracing device for placing tiles on framework of wood roofing, has two parts locked at determined position to gauge for placing tiles and tracing unit to print mark on framework corresponding to gauge interval Download PDFInfo
- Publication number
- FR2850992A1 FR2850992A1 FR0301507A FR0301507A FR2850992A1 FR 2850992 A1 FR2850992 A1 FR 2850992A1 FR 0301507 A FR0301507 A FR 0301507A FR 0301507 A FR0301507 A FR 0301507A FR 2850992 A1 FR2850992 A1 FR 2850992A1
- Authority
- FR
- France
- Prior art keywords
- sliding
- length
- parts
- tiles
- tracing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H7/00—Marking-out or setting-out work
- B25H7/04—Devices, e.g. scribers, for marking
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1891—Cut-marking templates for rafters; Templates used for assembling building frameworks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B3/00—Measuring instruments characterised by the use of mechanical techniques
- G01B3/02—Rulers with scales or marks for direct reading
- G01B3/04—Rulers with scales or marks for direct reading rigid
- G01B3/08—Rulers with scales or marks for direct reading rigid extensible
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Dispositif destiné au traçage d'invervalles identiques notammentDevice intended for tracing identical invervals in particular
pour la pose de liteaux sur les charpentes de toitures. for laying battens on roof framing.
La présente invention concerne un dispositif destiné au traçage d'intervalles identiques notamment pour la pose de liteaux en vue de la mise en place de tuiles mécaniques ou à emboîtement d'une toiture. The present invention relates to a device intended for tracing identical intervals in particular for laying battens for the installation of mechanical or interlocking roof tiles.
Un tel dispositif aide également à clouer les liteaux espacés d'un intervalle identique pour la pose des tuiles sur une charpente traditionnelle ou une charpente à fermettes. Such a device also helps to nail the battens spaced by an identical interval for laying the tiles on a traditional frame or a truss frame.
La technique habituelle de pose des tuiles mécaniques ou à 10 emboîtement s'effectue en commençant par un traçage manuel à l'aide d'un mètre et d'un crayon. On débute cette première opération en partant du bas d'un pan de toit. Il faut tout d'abord déterminer l'espace du premier intervalle, car celui-ci doit être plus court pour permettre aux tuiles de dépasser de la charpente pour l'égout du toit. L'opération 15 suivante consiste à tracer tous les autres intervalles jusqu'en haut du toit (le faîtage) et de manière identique de l'un et l'autre. Cet espacement régulier se nomme le pureau moyen, celui-ci étant variable selon les gammes de tuiles du commerce. The usual technique for laying mechanical or interlocking tiles is carried out by starting with manual tracing using a meter and a pencil. We start this first operation from the bottom of a roof panel. First you have to determine the space of the first interval, because it must be shorter to allow the tiles to protrude from the frame for the roof drain. The following operation 15 consists in tracing all the other intervals up to the top of the roof (the ridge) and in an identical manner to each other. This regular spacing is called the average gauge, this being variable according to the ranges of tiles of the trade.
Le traçage au mètre et au crayon doit être fait de chaque côté d'un 20 pan de toit, une fois à droite puis à gauche ou inversement; ensuite il est nécessaire de tracer un trait de couleur sur toute la largeur d'un pan de toit en partant d'un côté à l'autre à l'aide d'un cordeau traceur. Tracing with the meter and pencil must be done on each side of a roof panel, once to the right then to the left or vice versa; then it is necessary to draw a colored line over the entire width of a roof panel starting from one side to the other using a tracer line.
Ce procédé s'effectue autant de fois qu'il y a de repères de chaque côté du pan de toit. This process is carried out as many times as there are marks on each side of the roof panel.
Ce traçage nécessite le concours de deux personnes puisqu'il faut tendre fortement un cordeau traceur, le lever puis le lâcher de façon qu'il laisse une marque de couleur suffisamment visible, assez fine et précise sur la charpente. This tracing requires the assistance of two people since it is necessary to tighten a tracer line strongly, lift it and then release it so that it leaves a sufficiently visible, fairly fine and precise mark of color on the frame.
Cette opération terminée, il est procédé au clouage des liteaux. This operation finished, the battens are nailing.
Ceux-ci doivent être fixés le long des repères de couleurs de façon précise. Ensuite, on peut poser les tuiles sur les liteaux. These must be fixed along the color markers precisely. Then you can put the tiles on the battens.
Cette technique de repérage répétitif, à l'aide d'un mètre et d'un crayon, manque de précision. Le traçage à l'aide d'un cordeau traceur est une opération longue et fastidieuse à réaliser et il nécessite 35 généralement deux personnes. This repetitive tracking technique, using a meter and a pencil, lacks precision. Tracing using a tracer line is a long and tedious operation to perform and generally requires two people.
L'invention vise à remédier aux inconvénients de la technique classique précitée en apportant rapidité et précision à la pose des liteaux et de plus, le traçage au cordeau traceur classique n'est plus nécessaire. The invention aims to remedy the drawbacks of the aforementioned conventional technique by providing rapidity and precision in the installation of the battens and, moreover, tracing with the conventional tracer line is no longer necessary.
Il est en effet proposé selon l'invention un dispositif destiné au traçage d'intervalles identiques notamment pour la pose de liteaux en 5 vue de la mise en place de tuiles mécaniques ou à emboîtement sur une charpente de toit en bois, caractérisé en ce qu'il comporte deux parties à conformation longitudinale, dont l'une est montée coulissante sur l'autre, portant une graduation sur sa face supérieure, de sorte que la longueur de ces deux parties corresponde au pureau de pose desdites 10 tuiles, le coulissement desdites parties étant apte à être verrouillé à une position déterminée audit pureau grâce à un moyen de blocage du coulissement desdites parties, l'extrémité de la partie coulissante comportant un moyen traceur apte à imprimer une marque sur la charpente correspondant à l'intervalle de pureau des tuiles. There is in fact proposed according to the invention a device intended for tracing identical intervals in particular for laying battens in view of the installation of mechanical or interlocking tiles on a wooden roof frame, characterized in that '' It has two parts with longitudinal conformation, one of which is slidably mounted on the other, carrying a graduation on its upper face, so that the length of these two parts corresponds to the laying post of said 10 tiles, the sliding of said parts being able to be locked in a determined position at said post by means of blocking the sliding of said parts, the end of the sliding part comprising a tracer means capable of printing a mark on the frame corresponding to the interval of post of roof tiles.
La longueur de la partie recevant la partie coulissante est égale, de préférence, à la longueur minimale usuelle de pureau des tuiles du commerce, tandis que la longueur déployée de coulissement maximale des parties correspond à la longueur maximale usuelle de pureau des tuiles du commerce. The length of the part receiving the sliding part is preferably equal to the usual minimum length of the commercial tiles, while the deployed length of maximum sliding of the parts corresponds to the usual maximum length of commercial tiles.
Lesdites parties sont avantageusement tubulaires de section rectangulaire, voire carrée, la partie coulissante étant de section complémentaire au jeu de coulissement près de la partie la recevant. Said parts are advantageously tubular of rectangular or even square section, the sliding part being of section complementary to the sliding clearance near the part receiving it.
Ladite graduation sur la face supérieure de la partie coulissante est déterminée naturellement pour permettre de lire la longueur totale des 25 parties déployées en coulissement, c'est à dire qu'elle débute à partir de la longueur de la partie recevant la partie coulissante, à savoir la longueur minimale de pureau, 25 cm par exemple, et qu'elle est croissante jusqu'à une longueur maximale de pureau, à savoir 45 cm Said graduation on the upper face of the sliding part is naturally determined to make it possible to read the total length of the 25 parts deployed in sliding, that is to say that it begins from the length of the part receiving the sliding part, know the minimum length of post, 25 cm for example, and that it increases until a maximum length of post, namely 45 cm
par exemple.for example.
Il résulte de cette disposition que l'utilisateur peut régler seul l'intervalle de pureau pour le positionnement des liteaux, l'un par rapport à un liteau inférieur, en positionnant l'extrémité inférieure de la partie recevant la partie coulissante du dispositif sur la marque imprimée de charpente correspondant au liteau inférieur, et à imprimer 35 une marque grâce au moyen traceur de l'extrémité de la partie coulissante correspondant au positionnement du liteau supérieur, ceci régulièrement le long de la largeur du pan de toit à traiter. It follows from this arrangement that the user can adjust the gap interval alone for the positioning of the battens, one with respect to a lower batten, by positioning the lower end of the part receiving the sliding part of the device on the printed frame mark corresponding to the lower batten, and to print a mark by tracer means of the end of the sliding part corresponding to the positioning of the upper batten, this regularly along the width of the roof panel to be treated.
Un moyen de repérage éventuellement traceur peut être fixé à l'extrémité inférieure de la partie recevant la partie coulissante en sorte qu'il facilite le positionnement concidant de repérage de cette partie (avec un autre repère) à l'utilisation. A possibly tracer marking means can be fixed to the lower end of the part receiving the sliding part so that it facilitates the concident positioning of marking this part (with another mark) in use.
Cette même partie peut recevoir une autre graduation formée à partir de son extrémité inférieure et correspondant à la longueur de mise à l'égout des tuiles de premier rang hors de la charpente, ce qui permet après avoir disposé le dispositif à une graduation de longueur déterminée d'égout des tuiles au droit de l'extrémité inférieure de la 10 charpente, de former la marque de positionnement du premier liteau inférieur de charpente au moyen du moyen traceur de la partie coulissante. This same part can receive another graduation formed from its lower end and corresponding to the length of sewerage of the first row tiles outside the frame, which allows after having arranged the device at a graduation of determined length sewer tiles to the right of the lower end of the frame, to form the positioning mark of the first lower frame batten by means of the tracer of the sliding part.
Cette graduation peut être formée latéralement à droite et à gauche, de manière à permettre sa lecture indifféremment en partant de 15 la gauche ou de la droite, respectivement, du pan de charpente. This graduation can be formed laterally to the right and to the left, so as to allow it to be read indifferently from the left or the right, respectively, of the frame.
Ledit moyen de blocage du coulissement desdites parties du dispositif peut être formé par une lumière longitudinale découpée dans la partie recevant la partie coulissante, et par une vis à croisillon en prise dans un écrou solidaire de la partie coulissante, cette vis 20 coulissant dans la lumière et pouvant être serrée au blocage solidairement à la lumière et desserée pour permettre le libre coulissement sur ladite longueur maximale de pureau. Said means for blocking the sliding of said parts of the device can be formed by a longitudinal light cut out in the part receiving the sliding part, and by a cross screw engaged in a nut integral with the sliding part, this screw sliding in the light and being able to be tightened to the blocking integrally in the light and released to allow free sliding over said maximum length of post.
En outre, des languettes de repos peuvent être disposées sur les faces supérieures d'extrémité opposées des parties du dispositif, en 25 sorte qu'il puisse être appliqué directement sur deux liteaux inférieur et supérieur successifs, formant pige de mise à longueur d'un liteau à l'autre. In addition, rest tabs can be arranged on the opposite upper end faces of the parts of the device, so that it can be applied directly to two successive lower and upper battens, forming a length-setting rod of a batten to another.
Enfin, lesdits moyens traceurs, ou de repérage et éventuellement traceurs, peuvent être constitués par une partie saillante et biseautée, 30 en saillie de l'extrémité des parties du dispositif et enfoncée en marquage par pression ou choc dans le bois de charpente, cette partie pouvant en outre être formée en une seule pièce de tôle, convenablement pliée à angle droit, avec ladite languette de repos. Finally, said tracer means, or of marking and optionally tracers, can be constituted by a projecting and bevelled part, projecting from the end of the parts of the device and pressed into pressure or impact marking in the timber, this part can also be formed in a single piece of sheet metal, suitably bent at right angles, with said rest tab.
L'invention est illustrée ci-après à l'aide d'un exemple de 35 réalisation et en référence aux dessins annexés, sur lesquels: - La figure 1 est une vue de dessus du dispositif selon l'invention, - La figure 2 est une vue de côté du dispositif, - Les figures 3 et 4 représentent respectivement une vue de l'extrémité supérieure et de l'extrémité inférieure du dispositif, - La figure 5 est une vue en coupe transversale du dispositif, au niveau de la vis de blocage des parties, - La figure 6 est une vue de dessous du dispositif, - La figure 7 montre l'utilisation du dispositif pour la pose de liteaux successifs, - La figure 8 montre l'utilisation de la graduation inférieure pour établir la cote à l'égout des tuiles, - La figure 9 représente une vue en perspective du dispositif montrant son positionnement lors de la mise en place des liteaux, et - La figure 10 montre le dispositif lors de son placement pour la cote à l'égout. The invention is illustrated below with the aid of an exemplary embodiment and with reference to the appended drawings, in which: - Figure 1 is a top view of the device according to the invention, - Figure 2 is a side view of the device, - Figures 3 and 4 respectively represent a view of the upper end and the lower end of the device, - Figure 5 is a cross-sectional view of the device, at the level of the screw blocking of the parts, - Figure 6 is a bottom view of the device, - Figure 7 shows the use of the device for the installation of successive battens, - Figure 8 shows the use of the lower graduation to establish the dimension to the sewer of the tiles, - Figure 9 shows a perspective view of the device showing its positioning when the battens are in place, and - Figure 10 shows the device when it is placed for the dimension in the sewer.
Avec référence aux dessins, le dispositif selon l'invention est 15 constitué essentiellement de deux parties tubulaires, une formant corps 1 (fig. 2) et l'autre 2 montée coulissante sur la première. La partie 2 peut être déployée depuis une position complètement enfermée dans la partie 1, au pureau minimal, à une position déployée maximale correspondant à la longueur maximale usuelle de pureau des tuiles 20 mécaniques ou à emboîtement sur les charpentes en bois. With reference to the drawings, the device according to the invention consists essentially of two tubular parts, one forming a body 1 (FIG. 2) and the other 2 slidingly mounted on the first. Part 2 can be deployed from a position completely enclosed in part 1, at the minimum post, at a maximum deployed position corresponding to the usual maximum length of post for mechanical tiles or for interlocking on wooden frames.
Ces parties sont de section carrée, issues de tôle métallique. La partie 2, dont la section s'inscrit au jeu de coulissement près dans la partie 1, peut être conformée en U. La partie 1 comporte une lumière longitudinale 5 découpée 25 latéralement, cette lumière recevant une vis à croisillon 3 à prise dans un écrou serti 12 dans la pièce 2. Cette vis 3 coulisse dans la lumière 5 sur la longueur de pureau pouvant se bloquer en serrage sur celle-ci pour verrouiller le coulissement de la partie 2 sur la partie 1. These parts are of square section, from sheet metal. Part 2, the cross section of which fits within the sliding clearance in part 1, can be shaped like a U. Part 1 comprises a longitudinal lumen 5 cut laterally, this lumen receiving a cross screw 3 engaged in a crimped nut 12 in the part 2. This screw 3 slides in the slot 5 over the length of the post which can be locked in tightening on the latter to lock the sliding of the part 2 on the part 1.
Sur le dessus de la partie 2 (fig. 1) est formée une graduation de 30 longueur 9 mesurée en centimètres, débutant du nombre 25 (25 cm) correspondant à la longueur de la partie 1 au pureau minimal, et développée de façon croissante jusqu'au nombre 45 (45 cm) correspondant à la longueur maximale déployée de la partie 2 sur la partie 1, au pureau maximal. On the top of part 2 (fig. 1) is formed a graduation of 30 length 9 measured in centimeters, starting from the number 25 (25 cm) corresponding to the length of part 1 at the minimum gauge, and increasing in size until 'to the number 45 (45 cm) corresponding to the maximum length deployed from part 2 on part 1, at maximum post.
A l'extrémité inférieure de la partie 1 et de chaque côté de celle-ci est formée une graduation: 10 de longueur (fig. 2, 8 et 9), également mesurée en cm et de 1 à 10 par exemple. Cette graduation est utilisée, comme précité, pour le réglage de la cote d'égout des tuiles de rangée inférieure sur le pan de toit, sans avoir à changer la longueur de coulissement des parties ou pièces 1 et 2, laquelle peut demeurer inchangée sur tout le pan de toit traité. At the lower end of part 1 and on each side of it is formed a graduation: 10 in length (fig. 2, 8 and 9), also measured in cm and from 1 to 10 for example. This graduation is used, as mentioned above, for adjusting the sewer rating of the lower row tiles on the roof panel, without having to change the sliding length of parts or parts 1 and 2, which can remain unchanged throughout the treated roof panel.
La découpe en lumière longitudinale 5 est interrompue à une faible longueur avant chaque extrémité de la pièce 1. Les interruptions sont utilisées comme butée d'arrêt de coulissement de la partie 2. The longitudinal light cutting 5 is interrupted at a short length before each end of the part 1. The interruptions are used as a sliding stop for the part 2.
Au dessous de la pièce 1, deux encoches 14 (fig. 6) sont formées, chacune à une extrémité de la pièce, l'une recevant le placement de la 10 pièce de marquage 7 (fig. 3) et l'autre permet lors du repli total de la pièce 2 le logement d'une autre pièce de marquage 7 (fig. 4). Below the piece 1, two notches 14 (fig. 6) are formed, each at one end of the piece, one receiving the placement of the marking piece 7 (fig. 3) and the other allowing during of the complete withdrawal of the part 2 the housing of another marking part 7 (fig. 4).
A chaque extrémité du dispositif est donc insérée une pièce 7, laquelle est fixée à l'aide de vis 8 (fig. 2), situées de chaque côté de l'extrémité du dispositif, ces vis 8 se vissant à l'intérieur d'écrous sertis 15 1 1 (fig. 5). A piece 7 is therefore inserted at each end of the device, which is fixed with screws 8 (fig. 2), located on each side of the end of the device, these screws 8 being screwed inside. crimped nuts 15 1 1 (fig. 5).
Les pièces 7 (fig. 2, 3 et 4) sont formées pliées en équerre avec une languette de repos 4 permettant la mise en place du dispositif sur deux liteaux inférieur et supérieur successifs 15 (fig. 7). Les deux languettes de repos 4 évitent au dispositif de chuter (fig.9) lors de cette mise en 20 place. The pieces 7 (fig. 2, 3 and 4) are formed folded at right angles with a rest tab 4 allowing the device to be placed on two successive lower and upper battens 15 (fig. 7). The two rest tabs 4 prevent the device from falling (fig. 9) during this positioning.
Les pièces 7 possèdent également chacune une partie biseautée et saillante 6 du dispositif appelée traceur (fig. 2). Elles sont utilisées pour le repérage des rangs de tuiles ou pour effectuer un calpinage afin de déterminer le pureau de pose des tuiles à mettre en oeuvre suivant le 25 chantier ou bien pour le traçage définitif des repères utilisés pour la mise en place de liteaux. The parts 7 also each have a bevelled and projecting part 6 of the device called a tracer (fig. 2). They are used for locating the rows of tiles or for performing a layout in order to determine the setting tile for laying the tiles to be implemented according to the site or else for the definitive tracing of the benchmarks used for the installation of battens.
La pièce (7) de la partie (1) est interchangeable en cas d'usure ou de chute du dispositif et l'extrémité de la partie (2) peut être formée également d'une pièce (7) insérée et maintenue fixe par les vis (8) de 30 chaque côté de l'extrémité de la pièce (2), permettant ainsi son remplacement éventuel. The part (7) of the part (1) is interchangeable in the event of wear or fall of the device and the end of the part (2) can also be formed of a part (7) inserted and kept fixed by the screws (8) on each side of the end of the part (2), thus allowing its possible replacement.
Le fonctionnement du dispositif est à présent décrit. The operation of the device is now described.
Celui-ci est simple.This one is simple.
Il suffit à l'utilisateur de placer l'outil sur un chevron 16 de 35 charpente (fig. 8), une fois celui-ci réglé à longueur selon le pureau mesuré à l'aide de la graduation 9. Ensuite, l'utilisateur avance l'outil au bas du toit en plaçant la graduation 10 sur le chiffre désiré correspondant à la côte à l'égout des tuiles préalablement déterminée. The user just has to place the tool on a rafter 16 of 35 framework (fig. 8), once it is adjusted to length according to the gauge measured using the graduation 9. Next, the user advance the tool at the bottom of the roof by placing the graduation 10 on the desired number corresponding to the coast in the sewer of the tiles previously determined.
Une fois que le dispositif est mis en position, l'utilisateur n'a plus qu'à effectuer un premier repère dans le bois à l'aide du traceur 6 situé à l'autre extrémité du dispositif, par exemple au moyen d'un coup de 5 marteau à l'extrémité de la partie 2. Ce repérage est effectué régulièrement sur la largeur de pan de toit. Once the device is placed in position, the user only has to make a first mark in the wood using the tracer 6 located at the other end of the device, for example by means of a 5 hammer blow at the end of part 2. This location is carried out regularly over the width of the roof panel.
La graduation 10 étant formée des deux côtés de l'extrémité de la pièce 1, ceci permet une utilisation aisée, que se soit du côté gauche ou droit d'un pan de toit. The graduation 10 being formed on both sides of the end of the part 1, this allows easy use, whether on the left or right side of a roof panel.
Le repérage est effectué sur la largeur du toit, puis le premier liteau inférieur, positionné au droit de ce repérage, est cloué à la charpente. The marking is carried out on the width of the roof, then the first lower batten, positioned at the right of this marking, is nailed to the frame.
Auparavant, le repérage de pose des autres liteaux aura été effectué à partir de cette première ligne de repérage. Pour ce faire, le repère inférieur 6 de la partie 1 de l'outil est appliqué au droit de cette ligne de 15 repérage et on imprime la ligne de repérage correspondant au liteau supérieur successif à l'aide du marquage du traceur supérieur 6 de la partie 2. Ce repérage est effectué de part en part sur la largeur du pan de toiture comme précédemment pour déterminer la seconde ligne de répérage de liteau et l'opération est effectuée successivement et de la 20 même façon pour les autres lignes de repérage supérieures. Previously, the location marking of the other battens will have been carried out from this first marking line. To do this, the lower mark 6 of part 1 of the tool is applied to the right of this marking line and the marking line corresponding to the successive upper strip is printed using the marking of the upper marker 6 of the part 2. This marking is carried out right through the width of the roofing panel as previously to determine the second strip marking line and the operation is carried out successively and in the same way for the other upper marking lines.
Eventuellement, on peut utiliser le dispositif comme pige de mise à longueur appliquée sur le premier liteau, pour mettre en place un liteau supérieur successif. Cette utilisation comme pige de mise à longueur peut également servir pour la mise en place des chevrons de toiture. Optionally, the device can be used as a length setting rod applied to the first batten, to set up a successive upper batten. This use as a length-setting rod can also be used for the installation of roof rafters.
Naturellement, la longueur du dispositif selon l'invention peut être modifiée en fonction des différents pureaux de pose des tuiles mécaniques ou à emboîtement ou bien selon les matériaux à mettre en oeuvre. Naturally, the length of the device according to the invention can be modified as a function of the different setting tiles for mechanical or interlocking tiles or according to the materials to be used.
Ce dispositif peut également être utilisé pour tous les travaux 30 nécessitant un repérage ou une fixation à intervalles réguliers identiques. This device can also be used for all work 30 requiring identification or fixing at identical regular intervals.
Le dispositif selon l'invention est néanmoins particulièrement destiné au traçage d'intervalles identiques et à la pose de liteaux sur les charpentes traditionnelles ou à fermettes en vue de la pose de tuiles 35 dites mécaniques ou à emboîtement. The device according to the invention is nevertheless particularly intended for tracing identical intervals and for laying battens on traditional or truss structures for the purpose of laying so-called mechanical or interlocking tiles.
Claims (10)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0301507A FR2850992B1 (en) | 2003-02-06 | 2003-02-06 | DEVICE FOR THE TRACING OF IDENTICAL INTERVALS, IN PARTICULAR FOR THE INSTALLATION OF LITEAUX ON ROOFS |
PCT/FR2004/000271 WO2004071716A1 (en) | 2003-02-06 | 2004-02-04 | Device for marking out identical intervals, i.e. for placing battens on roof frames |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0301507A FR2850992B1 (en) | 2003-02-06 | 2003-02-06 | DEVICE FOR THE TRACING OF IDENTICAL INTERVALS, IN PARTICULAR FOR THE INSTALLATION OF LITEAUX ON ROOFS |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2850992A1 true FR2850992A1 (en) | 2004-08-13 |
FR2850992B1 FR2850992B1 (en) | 2006-04-28 |
Family
ID=32731889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR0301507A Expired - Fee Related FR2850992B1 (en) | 2003-02-06 | 2003-02-06 | DEVICE FOR THE TRACING OF IDENTICAL INTERVALS, IN PARTICULAR FOR THE INSTALLATION OF LITEAUX ON ROOFS |
Country Status (2)
Country | Link |
---|---|
FR (1) | FR2850992B1 (en) |
WO (1) | WO2004071716A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2911158A1 (en) * | 2007-01-04 | 2008-07-11 | Velasquez Gustavo Galindo | Jig for assisting installation of roof batten, has aluminum beams placed between battens to define parallelism and to define spacing between beams, and regulating unit placed between beams to regulate parallelism and spacing |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2428297A (en) * | 2005-07-08 | 2007-01-24 | Colin Glenn Ogden | Scaffolding erection aid |
GB2446855A (en) * | 2007-02-14 | 2008-08-27 | Kenneth Michael Chamberlain | Telescopic Ruler |
US11865693B2 (en) | 2021-11-02 | 2024-01-09 | William Phelps | Alignment attachment for screw gun |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US695661A (en) * | 1902-01-02 | 1902-03-18 | Albert K Theibault | Caliper-gage. |
US3197874A (en) * | 1963-07-24 | 1965-08-03 | Harold J Fox | Marking gauge |
BE884665A (en) * | 1979-08-08 | 1980-12-01 | Thingstad Hans K | RULE OR MEASURING ROD |
US6393715B1 (en) * | 2000-01-07 | 2002-05-28 | Emil Ihle | Log length measuring device |
WO2002070832A1 (en) * | 2001-03-08 | 2002-09-12 | Sofiedal Snedker & Tømrerforretning | Batten positioning device |
FR2827951A1 (en) * | 2001-07-27 | 2003-01-31 | Jacob S A | Carpenter's rule combines telescopic distance measurement and level |
-
2003
- 2003-02-06 FR FR0301507A patent/FR2850992B1/en not_active Expired - Fee Related
-
2004
- 2004-02-04 WO PCT/FR2004/000271 patent/WO2004071716A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US695661A (en) * | 1902-01-02 | 1902-03-18 | Albert K Theibault | Caliper-gage. |
US3197874A (en) * | 1963-07-24 | 1965-08-03 | Harold J Fox | Marking gauge |
BE884665A (en) * | 1979-08-08 | 1980-12-01 | Thingstad Hans K | RULE OR MEASURING ROD |
US6393715B1 (en) * | 2000-01-07 | 2002-05-28 | Emil Ihle | Log length measuring device |
WO2002070832A1 (en) * | 2001-03-08 | 2002-09-12 | Sofiedal Snedker & Tømrerforretning | Batten positioning device |
FR2827951A1 (en) * | 2001-07-27 | 2003-01-31 | Jacob S A | Carpenter's rule combines telescopic distance measurement and level |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2911158A1 (en) * | 2007-01-04 | 2008-07-11 | Velasquez Gustavo Galindo | Jig for assisting installation of roof batten, has aluminum beams placed between battens to define parallelism and to define spacing between beams, and regulating unit placed between beams to regulate parallelism and spacing |
Also Published As
Publication number | Publication date |
---|---|
FR2850992B1 (en) | 2006-04-28 |
WO2004071716A1 (en) | 2004-08-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6536737B1 (en) | Concrete form brace | |
EP1855848B1 (en) | Cutting tool for cutting a plate | |
US20030033724A1 (en) | Tile placement measurement tool with adjustable reference edges | |
FR2850992A1 (en) | Identical spaces tracing device for placing tiles on framework of wood roofing, has two parts locked at determined position to gauge for placing tiles and tracing unit to print mark on framework corresponding to gauge interval | |
US5855358A (en) | Framework removal tool | |
US20080256813A1 (en) | Roof shingle alignment system | |
US20120102876A1 (en) | Interlocking tiles employing adjustable rain lock | |
EP2430244A2 (en) | Anchoring post | |
FR3077023A1 (en) | TOOL FOR POSITIONING THE LOCATIONS OF DRILLING WOOD BLADES BASED ON LAMBOURDES | |
FR2935450A1 (en) | CALIPER FOR FIXING A BAR ON AN AMOUNT | |
FR2763977A1 (en) | PERMANENT ANCHORAGE DEVICE FOR A SAFETY HOOK TO A FRAMEWORK ELEMENT | |
EP4060143A1 (en) | Device for securing a construction accessory to a beam, associated attachment method and construction element | |
DE50111432D1 (en) | Device for supporting a post, in particular a wooden beam | |
US5794485A (en) | Tool for crimping a tee or main | |
FR2643846A1 (en) | Improved hammer facilitating the installation of nails or tacks | |
JP6975931B2 (en) | Permeable hole cover | |
NO315505B1 (en) | Manual dismantling tool | |
EP4056784B1 (en) | Device for installing decking boards | |
BE1011011A3 (en) | Stair with door-markets and assembly method thereof. | |
LU85006A1 (en) | SUPPORT BODY FOR ROOF COVER PLATES | |
FR2827895A1 (en) | Tool for keeping gap between formwork planks comprises square having long side with perforations and short side and plate welded to short side and collar with welded flat part | |
FR2911158A1 (en) | Jig for assisting installation of roof batten, has aluminum beams placed between battens to define parallelism and to define spacing between beams, and regulating unit placed between beams to regulate parallelism and spacing | |
DK2079887T3 (en) | Pipe holder with an eccentric | |
WO2018115327A1 (en) | Method for cutting and laying roofing tiles | |
JPH09207123A (en) | Rule for cutting siding board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |
Effective date: 20111102 |