FR2488310A1 - PROCESS FOR MANUFACTURING TOOL FORMWORK - Google Patents
PROCESS FOR MANUFACTURING TOOL FORMWORK Download PDFInfo
- Publication number
- FR2488310A1 FR2488310A1 FR8017337A FR8017337A FR2488310A1 FR 2488310 A1 FR2488310 A1 FR 2488310A1 FR 8017337 A FR8017337 A FR 8017337A FR 8017337 A FR8017337 A FR 8017337A FR 2488310 A1 FR2488310 A1 FR 2488310A1
- Authority
- FR
- France
- Prior art keywords
- formwork
- arm
- tool
- arms
- floors
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
L'INVENTION CONCERNE UN PROCEDE DE FABRICATION DE COFFRAGE OUTIL TELS QUE: BANCHES ET COFFRAGES TUNNEL, UTILES DANS LE BATIMENT. CES COFFRAGES SONT COMPOSES PAR DES TUBES PROFILES RECTANGULAIRES OU CARRES FORMANT UNE CHARPENTE DESTINEE A RECEVOIR UNE FACE COFFRANTE ORIENTABLE ET TRANSFORMABLE. LES APPLICATIONS LES PLUS INTERESSANTES DE CE COFFRAGE SONT UN COFFRAGE TUNNEL, ADAPTABLE AISEMENT AUX DIFFERENTES PORTEES DE PLANCHER ET UN PRINCIPE DE STABILISATION DES BANCHES.THE INVENTION CONCERNS A PROCESS FOR MANUFACTURING TOOL FORMWORK SUCH AS: TUNNEL FORMWORK AND FORMWORK, USEFUL IN THE BUILDING. THESE FORMWORKS ARE COMPOSED BY RECTANGULAR OR SQUARE PROFILE TUBES FORMING A FRAME DESIGNED TO RECEIVE AN ADJUSTABLE AND TRANSFORMABLE COFFRETING FACE. THE MOST INTERESTING APPLICATIONS OF THIS FORMWORK ARE TUNNEL FORMWORK, EASY ADAPTABLE TO VARIOUS FLOOR SPACES AND A PRINCIPLE OF STABILIZATION OF BENCHES.
Description
- 1 - 24883 1 0- 1 - 24883 1 0
La présente invention concerne un procédé de fabrication et de construc- The present invention relates to a method of manufacturing and
tion de coffrage outil utile dans le bâtiment et les travaux publics.Il formwork tool useful in the building and public works.
s'applique en général à tous les coffrages et en particulier, à la fabrica- generally applies to all forms and in particular to the manufacture of
tion d'un outil de coffrage pour le procédé de construction cu type cof- a formwork tool for the construction process of type cof-
frage tunnel, permettant rappelons le ici, de coffrer en même temps les murs tunnel frage, allowing let us remember here, to form the walls at the same time
et les planchers d'une construction.Elle s'applique également pour cons- and the floors of a building.It also applies to
truire des banches qui servent à coffrer les murs ou tout autre ouvrage d'une construction. trenching boards that serve to form the walls or any other structure of a building.
Dans les procédés de coffrage tunnel connus, le panneau coffrant verti- In known tunnel formwork processes, the vertical formwork panel
cal est assemblé à 900 avec le panneau coffrant horizontal.Un tel dispositif limite l'emploi du coffrage tunnel à l'exécution d'ouvrage, planchers et murs formant à leur intersection un angle droit.En général les peaux coffrantes cal is assembled at 900 with the horizontal shuttering panel. Such a device limits the use of the tunnel formwork to the execution of work, floors and walls forming at their intersection a right angle. In general the formwork skins
sont en tôle, donc ils sont fabriqués en usine avec des cotes précises for- sheet metal, so they are manufactured in the factory with precise dimensions
mant ainsi des panneaux standards qu'il faut combiner pour construire des ouvrages donnés.Si l'ouvrage comporte des particularités, il est nécessaire de fabriquer des panneaux spéciaux propres à l'ouvrage, panneaux qui ne seront plus employables du fait de leurs dimensions particulières.Les peaux coffrantes en tôle sont fragiles, en cas de détonation, il est nécessaire de changer le panneau complet.Pour les coffrages tunnel connus à ce jour, Thus, standard panels must be combined to construct given works. If the work has special features, it is necessary to manufacture special panels specific to the work, panels which will no longer be usable because of their particular dimensions. .The sheet metal skins are fragile, in case of detonation, it is necessary to change the complete panel. For tunnel formwork known to date,
il est obligatoire en cas de transfert d'un chantier à un autres de démon- it is obligatory in the event of transfer from one site to another of demons-
ter et de remonter le coffrage.Il faut également, si les portées du plan- ture and reassemble the formwork.It is also necessary, if the
cher sont différentes, et c'est souvent le cas, changer les panneaux ho- are different, and this is often the case, changing the ho-
rizontaux.Ces différentes opérations entraînent des frais importants qui These different operations entail significant costs which
ne peuvent être amortis que sur des chantiers conséquents.L'emploi des fa- can only be written off on a large scale.The use of
ces coffrantes en tôlep exige que l'ouvrage à construire ne comporte au- these sheet metal shutters require that the structure to be built
cune saillie.L'entretien des coffrages métalliques nécessite un personnel qualifié de formation différente que celle des boiseurs qui l'utilisent, This maintenance of the metal formwork requires qualified training personnel different from that of the woodworkers who use it.
d'o des frais de gestion élevés.hence high management fees.
Le système de coffrage selon l'invention permet d'éviter certains The formwork system according to the invention makes it possible to avoid certain
de ces inconvénients.Ce coffrage outil du type tunnel conforme à la pré- of these disadvantages.This formwork tool tunnel type conforms to the pre-
sente invention peut-être transporté d'un chantier à un autre sans être démonté.En effet, la largeur d'encombrement d'une demi coquille au repos est de 1,50 mètre.Le bras articulé permet avec le même outil c;e coffrer This invention can be transported from one construction site to another without being dismantled. In fact, the overall width of a half shell at rest is 1.50 meters. The articulated arm makes it possible with the same tool busted
des planchers de différentes portées, en adaptant seulement la face cof- floors of different litters, adapting only the side facing
frante en contreplaqué et son support situé au dessus du bras de liaison. plywood and its support located above the link arm.
Le principe de coffrage conforme à l'invention est une ossature de The formwork principle according to the invention is a framework of
contreventement assemblée en elle-même à angle croit, soutenant des sup- bracing assembled in itself at an angle increases, supporting
ports amovibles de face coffrante.Ce système permet de régler la verticali- This system allows you to adjust the vertical
té et l'horizontalité des faces coffrantes.Ce principe laisse envisager 2- and the horizontality of the formwork faces. This principle suggests
sn emrfni plus vaste du mat;re e- donc, un meilleur assortiment. As a result, there is a wider range of materials and therefore a better assortment.
Le coffrage outil de l'iniention prévoit une peau coffrante en contre- The formwork tool of the iniention envisages a skin formante against
plaqué fixée sur une ossature en bois, elle-même fixée sur un support métal- plated on a wooden frame, itself fixed on a metal support-
2ique.Cgtte solution oPfre plusimurs avantages appréciables.Le bois est le iatériau noble =u bdiseur.Il 'n connaît les caractèrisuiques et la mise en :euvre.En cas de dtorietion de la peau coffrante, son utilisateur peut 2. This solution offers more valuable advantages.The wood is the noble material = u bdiseur.Il know the characteristics and implementation.In case dtorietion skin formante, its user can
i mdiatement faire la réparationvoire sre changer la plaque endommagée. i immediately make the repairer sre change the damaged plate.
Elle permet également de s'adapter à l'ouvrage à construire. It also makes it possible to adapt to the structure to be built.
Ce coffrage outil est constitué de tubes structuraux profilés, assem- This formwork tool consists of structural tubes profiled, assem-
blés entre eux par boulons et écrous.A tout moment, une pièce peut-être changée aisèment par son utilisateur.Il est à signaler que ce coffrage démonté est t'un volume réduit, ce qui est appréciable, en particulier pour l'exportation. La souplesse de ce système de coffrage tant pour le coffrage tunnel que peur les bancneset en général pour tous les coffrages, contribuera Whenever possible, a part can be easily changed by its user. It is to be noted that this dismounted formwork is a reduced volume, which is appreciable, especially for the export. The flexibility of this formwork system, both for tunnel formwork and for the use of the bench and in general for all forms, will contribute
à ininuer le prix de revient d'une construction. to ininute the cost price of a construction.
Pour bien faire co:-prendre l'invention, on donnera à titre d'exemple, To do well co: -to take the invention, we will give by way of example,
une Description des types de coffrage outil conforme à l'invention au cours a description of the types of formwork tool according to the invention during
de laquelle apparaîtront d'autres caractéristiques.Les dimensions ne sont données qu'à titre indicatif pour mieux fixer les idées.On se reportera aux desins annexés dans lesquels: La figure 1, montre un de:i tunnel droit, composé de plusieurs éléments of which will appear other characteristics. The dimensions are given only as an indication to better fix the ideas. Reference is made to the annexed drawings in which: Figure 1 shows one of: i straight tunnel, composed of several elements
formant une charpente et G'jn complexe d'habillage.Chaque élément de charpen- forming a framework and G'jn complex dressing.Each element of carpentry
te est composé de deux poteaux 6 de contreventement formé par des tubes struc- consists of two posts 6 bracing formed by structural tubes
turaux profilés carrés de 60 X 60 X 3,20 mm.Entre ces deux poteaux vient square profiles 60 X 60 X 3.20 mm. Between these two posts comes
s'insérer une poutre de contreventement horizontal 7 formée d'un tube profi- insert a horizontal bracing beam 7 formed of a tube profi-
lé carré de 80 X G0 X.,20 mm.Ce bras est assemblé à angle droit avec les poteaux 6 par l'intermédiaire d'une plaque de renfort 9.Le bras 7 est assemblé aux poteaux de support vertical 2 par un goujon 82.Les supports verticaux 2 sont des tubes structuraux profilés rectangulaires de 100 X 80 X 5. Le support horizontal 3 formé par un tube profilé rectangulaire de 180 X 80 X5 m est assemblé avec les deux poteaux de support vertical 2 par un goujon The arm is assembled at right angles to the posts 6 by means of a reinforcing plate 9. The arm 7 is assembled to the vertical support posts 2 by a stud 82 The vertical supports 2 are rectangular profiled structural tubes of 100 X 80 X 5. The horizontal support 3 formed by a rectangular shaped pipe of 180 X 80 X 5 m is assembled with the two vertical support columns 2 by a dowel
82 filté à chaque extrémité.Il est fixé sur les deux poteaux de contre- 82 threaded at each end.It is attached to the two posts of counter-
ventement 6 par deux boulons et écrous.Cette poutre horizontale 3 reçoit à son extrémité un bras de liaison horizontal droite 4, constitué par un tube profilé rectangulaire de 1 C X 8C X 5 mm.Ils sont liàs entre eux par ur, Plujon %32.Ainsi est formé '!lé:ent de charpente constituant la base du coffrage outil.Des accessoires viennent le compléter.Pour la manoeuvre du bras de liaison hor-zcntalil a été conçu soit un système par treuil 15 -3- avec poulie 17, dont le cable 16, actionne un tube 14 de diamètre 40 X 49 dont la base coulisse sur un guide 13, soit le tube 14 est remplacé par un 6 This horizontal beam 3 receives at its end a right horizontal connecting arm 4, consisting of a rectangular profiled tube of 1 CX 8C X 5 mm.They are connected to each other by ur, Plujon% 32. Thus, the frame is formed forming the base of the formwork tool. Accessories are added to it. For the operation of the linkage arm hor-zcntalil was designed either a winch system 15 -3- with pulley 17, of which the cable 16 actuates a tube 14 of diameter 40 X 49 whose base slides on a guide 13, the tube 14 is replaced by a
vérin hydraulique à double effet à commande manuelle ou à commande électri- double-acting hydraulic cylinder with manual or electrically operated
que.Le tube 14 peut également être remplacé par un étai métallique tirant ou poussant afin d'affiner le réglage des bras.On peut remplacer le treuil 159 16, 17 par un vérin à double effet qui commandera le bras 14. Ce vérin sera The tube 14 can also be replaced by a metal stay pulling or pushing to refine the adjustment of the bras.On can replace the winch 159 16, 17 by a double-acting cylinder that will control the arm 14. This cylinder will be
parallèle au tube 13.Les différents poteaux 2 sont reliés entre eux, en par- parallel to the tube 13. The various posts 2 are interconnected, in part
tie basse par un fer 1 UPN de 100 X 50 X 6 servant de raidisseur bas.En par- lower part by a 1 UPN iron of 100 X 50 X 6 serving as low stiffener.
tie haute ils le sont par un fer 12 UPN de 80 X 45 X 6 faisant office de raidisseur haut.Les poteaux de contreventement 6 sont reliés entre eux par des planches de 200 X 40 mm formant ainsi un caisson à outils renforcé par They are made with a 12 X UP X 80 X 45 X 6 high stiffening. The bracing posts 6 are interconnected by boards of 200 X 40 mm forming a tool box reinforced by
un potelet 8.Sur le raidisseur bras 1 et au pied des poteaux de contreven- 8. On the stiffener arm 1 and at the foot of the posts of contravention
tement 6 sont disposés des boulons 10 de diamètre 26- X 34 faisant office 6 are arranged bolts 10 of diameter 26- X 34 making office
de vérin à vis pour permettre le réglage en altitude et en aplomb de l'en- screw jack to allow adjustment at altitude and in line with the
semble coffrant.Un fer cornière 11 de 150 X 150 X 15mm de 100 de largeur looks formant.An angle iron 11 of 150 X 150 X 15mm of 100 width
permet ltassemblage du poteau de support vertical 2 sur le raidisseur bas1. allows the assembly of the vertical support post 2 on the bottom stiffener1.
Le bras de liaison horizontal 4 est percé de trou 21 afin de permettre l'as- The horizontal link arm 4 is pierced with a hole 21 in order to allow the attachment
semblage entre les demi tunnels droite et gauche.Ces éléments de charpente une fois montés reçoivent des bois 19 de section 80 X80 mm de support de face coffrante.Ensuite l'ensemble est habillé par un contreplaqué ou latté plastifié de 15 à 20 mm d'épaisseur 20.Les bois 19 et la peau 20 peuvent between the right and left half-tunnels.These frame elements, once assembled, receive woods 19 with 80 x 80 mm section of formwork face support.Then the assembly is covered by a plastic plywood or plywood 15 to 20 mm thick. 20. The woods 19 and the skin 20 can
être remplacés par une tAle de 3 mm d'épaisseur et des fers omégas en ren- be replaced by a 3 mm thick plate and omega irons
fort.A l'angle de la peau verticale et de la peau horizontale, la peau verticale s'arrête au nu fini du plancher et le panneau horizontal vient s'arrêter contre 22.Sur le dessus on posera un fer plat filant de 50 X 2mm strong.At the angle of the vertical skin and the horizontal skin, the vertical skin stops at the finished naked floor and the horizontal panel comes to stop against 22.On the top we put a flat iron running 50 X 2mm
laissant un léger défoncé dans le béton.Ce défoncé est facilement reboucha - leaving a light smashed in the concrete. This smashed is easily reboucha -
ble après décoffrage.Le demi tunnel ainsi formé sera assemblé avec l'autre paroi coffrante de l'autre côté du mur à construire par des tiges filetées After the demoulding, the half-tunnel thus formed will be assembled with the other formwork wall on the other side of the wall to be built by threaded rods.
23.Au droit de ces tiges de serrage on mettra en place sur plaque de ren- 23.On the right of these clamping rods it will be placed on a plate of
fort 24.Il est à noter que le bras 4 sera habillé jusqu'à son extrémité par les bois 19 et plus 5 cm par la face coffrante 20.Le bras 5 sera habillé depuis l'habillage du bras 4 jusqu'au demi tunnel.Au coffrage on met 24. It should be noted that the arm 4 will be dressed up to its end by the woods 19 and over 5 cm by the formwork face 20. The arm 5 will be dressed from the arm of the arm 4 to the half tunnel. At the formwork we put
d'abord le bras 4 en place.Le bras 5 vient s'emboiter sur le 4. first the arm 4 in place.The arm 5 comes to fit on the 4.
La figure II est une coupe horizontale de dessus de la partie infé- Figure II is a horizontal section from above of the lower part of
rieure d'un élément de charpente pour demi tunnel.0n remarquera le système of a frame element for half tunnel.
d'ossature constitué par les deux poteaux de contreventement 6, les deux po- frame consisting of the two bracing posts 6, the two
teaux de support vertical 2.On peut voir ainsi les vérins de réglage 10, les roues pivotantes 48 et en particulier une aile de la cornière égale 2.On can see the adjustment cylinders 10, the swivel wheels 48 and in particular a wing of the same angle
11 d'asser'blage entre le support vertical 2 et le raidisseur bas1. 11 asser'blage between the vertical support 2 and the stiffener bas1.
-4 - La figure III est une coupe horizontale, vue de dessus du m9me élément de charpente montrant le principe du treuil.Un tube soudé sur la pièce FIG. III is a horizontal section, viewed from above of the same structural member showing the principle of the winch. A tube welded to the part.
tenant le bras 14 coulisse de bas en haut ou de haut en bas sur le guide 13. holding the arm 14 slides from bottom to top or top to bottom on the guide 13.
La figure IV est une coupe horizontale vue de dessous d'un élément de charpente habillée. La figure V montre la réunion du bras de liaison horizontale droite 4 Figure IV is a horizontal section seen from below of a dressed structural element. Figure V shows the meeting of the right horizontal link arm 4
et du bras le liaison horizontale gauche 5. and the left horizontal link arm 5.
La figure VI montre une vue de dessus d'un bras de liaison horizontale droite 4 avec à son extrémité droite le système permettant l'assemblage sur le support horizontal 3.Ce sont deux fers cornières de 180 X 80 X 6 FIG. VI shows a view from above of a right horizontal linkage arm 4 with at its right end the system allowing assembly on the horizontal support 3.These are two angle irons of 180 X 80 X 6
soudés sur le bras de liaison 4 et venant de chaque côté de la poutre 3. welded on the connecting arm 4 and coming from each side of the beam 3.
Sur la Figure VII sont dessinés deux demi tunnels assemblés en posi- Figure VII shows two half-tunnels assembled in a posi-
tion de coffrage avant bétonnage.On remarquera le mariage des bras de formwork before concreting.We will notice the marriage of
liaison horizontaux droite 4 et gauche 5 avec le trou 21 dans lequel un gou- right horizontal 4 and left 5 connections with the hole 21 in which a gou-
jon assurera le maintien des deux bras.Pour fixer les idées, sur le dessin la portée du plancher est de 4,00mètres et la hauteur du mur de 2, 50mètre Il est à noter que les trous 21 au nombre de deux dans le bras 4 et deux dans le bras 5 ont des diamètres différents par ordre décroissant afin de mettre en place un goujon ayant une forme conique qui assurera le blocage I will maintain the two arms. To fix the ideas, on the drawing the reach of the floor is 4.00 meters and the height of the wall of 2, 50meter. It should be noted that there are two holes 21 in the arm 4 and two in the arm 5 have different diameters in decreasing order in order to set up a stud having a conical shape which will ensure the blocking
ou le déblocage automatique des deux bras. or the automatic unlocking of both arms.
Sur la Figure VIII, sont représentés les deux demi tunnels après béton- Figure VIII shows the two half-tunnels after concrete-
nage des murs 26 et planchers 25.L'outil est en position de décoffrage. Les 26 walls and floors 25.The tool is in formwork position. The
bras de liaison horizontaux droite 4 et gauche 5 sont désaccouplés. horizontal link arms right 4 and left 5 are uncoupled.
La figure IX est une coupe sur le bras de liaison horizontale gauche5 Figure IX is a section on the left horizontal link arm5
formé de deux fers cornières inégaux 180 X 80 X 6 mm. formed of two unequal angle irons 180 X 80 X 6 mm.
La figure X est une vue de dessous d'un bras de liaison horizontale Figure X is a bottom view of a horizontal link arm
gauche 5 avec les fers plats liaisonnant par soudure les deux fers cornières. left 5 with the flat irons bonding by welding the two angle irons.
Sur la Figure XI est représenté les mêmes demi tunnels que sur les fi- Figure XI shows the same half-tunnels as on the
gures 7 et 8 mais avec des murs inclinés.Les pièces de charpente sont les mêmes, avec seulement déplacement de l'assemblage de la poutre 3 sur le gures 7 and 8 but with sloped walls. The framing members are the same, with only displacement of the beam assembly 3 on the
poteau 6 et un seul bras de liaison 5. post 6 and a single link arm 5.
Sur la figure XII, c'est toujours le même matériel pour exécuter un plancher à.ouble pente avec des murs verticaux.On a cependant ajouté au matériel une rehausse sur les pieds de contreventement 6.Les bois 19 sont entaillés 28 pour permettre le passage des bras de liaison horizontal 4 et In figure XII, it is always the same material to execute a floor with double slope with vertical walls. However, a material has been added to the material on the bracing feet 6. The woods 19 are notched 28 to allow the passage horizontal link arms 4 and
5.Deux trous seront percés afin d'assurer le maintien en position des bras. 5.Two holes will be drilled to maintain the position of the arms.
La figure XIII montre le dispositif retenu pour mettre en place une rehausse 27 sur un piec de contreventement 6 par des cornières 27 égales FIG. XIII shows the device chosen to set up a riser 27 on a bracing piece 6 by equal angles 27.
6P X 60 X 10 mm.6P X 60 X 10 mm.
La figure XIV est une coupe sur une rehau-se 27 mise en place sur Figure XIV is a section on a rehau-se 27 set up on
un pied de contreventement 6.a bracing foot 6.
Les figures XV et XVI montrent toujours le même coffrage outil pour exécuter deux murs de hauteur différentes avec un plancher avec une seule pente.Pour obtenir ce résultat, on mettra en place une rehausse 29 sur les Figures XV and XVI always show the same formwork tool to run two walls of different height with a floor with a single slope.To achieve this result, we put in place a riser 29 on the
poteaux de support vertical 2 et une rehausse 27 sur le poteau de contreven- vertical support posts 2 and a riser 27 on the violating post
tement 6.On remarquera sur la figure XVI la jonction à 900 du poteau de contreventement 6 avec le bras de contreventement horizontal 7.On notera également l'angle variable entre les poteaux de support vertical 2 et les 6. The junction at 900 of the bracing post 6 with the horizontal bracing arm 7 will be noted in FIG. XVI. The variable angle between the vertical support posts 2 and the vertical support posts 2 will also be noted.
poutres horizontales 3.horizontal beams 3.
La figure XVII nous définit la fixation des bois 1- sur les poteaux de support vertical 2.Cette fixation est assurée par un boulon 30 à tête Figure XVII defines the fixing of the wood 1- on the vertical support posts 2.This fixation is provided by a bolt 30 head
fraisée de 25 mm de longueur et de diamètre 10 mm. milled 25 mm long and 10 mm in diameter.
La figure XVIII nous montre la fixation du bois 19 sur une poutre Figure XVIII shows the attachment of wood 19 to a beam
de support horizontal 3.C'est un boulon 31 à tAte fraisée de 300 mm de lon- horizontal support 3.This is a bolt 31 with milled head 300 mm long.
gueur et de diamètre 10mm qui assure le maintient du bois. heel and diameter 10mm which ensures the maintenance of the wood.
La figure XIX nous montre l'assemblage vu de dessus d'un demi tunnel Figure XIX shows the assembly seen from above of a half tunnel
droit et d'une demi coquille gauche, non habillée par la peau coffrante. right and half shell left, not dressed by the skin formante.
Portée du plancher 4,00 mètres, longueur des demi coquilles 3,00 mètres. Floor span 4.00 meters, length of half shells 3.00 meters.
On remarque l'axe 34, de positionnement des éléments de charpente tous les Note the axis 34, positioning of the frame elements all
1,25mètre.0n voit clairement l'assemblage des bras de liaison horizon- 1.25meter. The assembly of the horizontal link arms is clearly visible.
taux 4 et 5.rates 4 and 5.
La figure XX est une vue schématique de dessus des différents types d'assemblages des éléments de charpente entre eux suivant les portées FIG. XX is a diagrammatic view from above of the different types of assemblies of the frame members between them according to the staves
de plancher.floor.
En lisant de bas en haut: a) deux poutres 3 = portée minimum 2,80 b) deux poutres 3, plus un bras 5 = portée variable de 2,80 à 3,40 mètres c) deux poutres 3, plus un bras 4 et 5 = portée minimum 3,80 mètres d) deux poutres 3 plus un bras 4 et 5 = portée variable de 3,80 à 4,30 m e) deux poutres 3 plus un bras 32 et un 33 = portée minimum de 4,80mètres f) deux poutres 3 'lus un bras 32 et un 33 = portée variable de 4,80 b 6,00 Nous rappelons que la poutre 3 est un tube profilé rectangulaire de Reading from bottom to top: a) two beams 3 = minimum span 2.80 b) two beams 3, plus one arm 5 = variable span from 2.80 to 3.40 meters c) two beams 3 plus one arm 4 and 5 = minimum range 3.80 meters d) two beams 3 plus one arm 4 and 5 = variable range from 3.80 to 4.30 me) two beams 3 plus one arm 32 and a 33 = minimum range of 4.80 meters f) two beams 3 'read an arm 32 and a 33 = variable span of 4.80 b 6.00 We recall that the beam 3 is a rectangular profiled tube of
X 80 X 5 de 1,30 de longueur.Le bras de liaison 4 ou 5 est d'une lon- X 80 X 5 of 1.30 in length. The connecting arm 4 or 5 is of one
gueur de 1,00 mètre.meter of 1,00 meters.
Le bras de liaison horizontale droite 32 est constitue par un tube profilé The right horizontal link arm 32 is constituted by a profiled tube
rectangulaire 180 X 80 X 5 de 2,02 mètres de longueur. rectangular 180 X 80 X 5 of 2.02 meters in length.
Le bras de liaison horizontal gauche 33 est constitué par deux fers cor- The left horizontal link arm 33 is constituted by two irons cor-
nières de 180 X 80 X 6 de 2,00O mètres de longueur. of 180 X 80 X 6 of 2,00O meters in length.
-6 - -es schémas de principe mettent en évidence la souplesse de cet outil -6 - -principle schemes highlight the flexibility of this tool
de cnffrage.On peut en utilisant le même matériel de base, coffrer des plan- by using the same basic material, form planing
chers de portées variables de 2,80 mètres ' 6,0C mètres, en changeant sim- expensive, with variable spans of 2.80 meters' 6.0 C meters, changing sim-
plement les bras de liaison horizontale 4 et 5, ou 32 et 33, et évidemment le peau coffrante disposée sur ces bras.Ce travail peut être exécuté par the horizontal connecting arms 4 and 5, or 32 and 33, and obviously the formwork skin disposed on these arms. This work can be performed by
des boiseurs sans l'aide de spécialistes et avec le minimum de frais. woodworkers without the help of specialists and with the minimum of expenses.
La figure XXI nous montre le même principe de bras adapté sur un cof- Figure XXI shows us the same principle of arm adapted to a cof-
frage outil de conception différente de la présente invention constituée frage different design tool of the present invention constituted
par des omégas 36 et un côté en face coffrante 35.0n mettra d'abord en pla- by omegas 36 and a formwork side 35.0n will first place
ce un fer cornière à ailes inégales 37 de 100 X 80 mm en bout de la peau coffrante.Le bras de liaison horizontale droite 38 est constitué par un tube de 100 X 1U0O X 3,2.Ce bras est fixé sur la partie coffrante par un support 44 et par un fer plat 39 en renfort soudé sur les omégas.Pour le bras de liaison horizontale gauche 42 constitué par deux fers cornière à aile égale de 100 X 100 X 12 mm, on retrouve un support 43 soudé sur un fer plat en renfort 39, lui même soudé sur les omégas 36.Sur ces deux bras on disposera des bois 41, de 80 mm de largeur par 100 imm de hauteur, sur lesquels on clouera la peau coffrante 40, c'est à dire un contreplaqué de 20 mm d'épaisseur.Ce dispositif peut être mis en place quelque soit this an angle iron with unequal wings 37 of 100 X 80 mm at the end of the formante skin.The right horizontal linkage arm 38 is constituted by a tube of 100 X 1U0O X 3.2.This arm is fixed on the formwork part by a support 44 and a flat iron 39 welded reinforcement on the omegas.For the left horizontal link arm 42 consists of two angle irons wing equal 100 X 100 X 12 mm, there is a support 43 welded to a flat iron reinforcement 39, itself welded on omegas 36. On these two arms will be available wood 41, 80 mm wide by 100 imm high, on which we nail the skin formwork 40, ie a plywood of 20 mm thick.This device can be set up whatever
la D.isposition des omégas.Les renforts à disposer sur le coffrage exis- omega.position.The reinforcements to be placed on the existing formwork
tant ne sont pas limitatifs.they are not limiting.
La figure XXII est une coupe vue de face des deux bras de liaison horizontale, assemblés entre eux, adaptés sur un principe de coffrage FIG. XXII is a cross-sectional view of the two horizontal connecting arms, assembled together, adapted on a formwork principle
différent de celui de la présente invention. different from that of the present invention.
La figure XXIII est une vue de côté du bras de liaison gauche adapté sur un coffrage métallique Différent du coffrage de la présente invention. La figure XXIV est une vue de côte du bras de liaison horizontal Figure XXIII is a side view of the left link arm fitted to a metal formwork different from the formwork of the present invention. Figure XXIV is a side view of the horizontal link arm
droite adapté sur un coffrage métallique différent du principe de coffra- right fitted on a metal formwork different from the principle of
ge de la présente invention.of the present invention.
La figure XXV est une vue de dessus des supports 43 pour le bras de Figure XXV is a top view of the supports 43 for the arm of
liaison 42 avec le fer en renfort 39 à souder sur les omégas. link 42 with iron reinforcement 39 to weld on omegas.
La figure XXVI est une vue de dessus des supports 44 pour le bras Figure XXVI is a top view of the brackets 44 for the arm
de liaison 38 avec le fer plat 39 en renfort à souder sur les omégas. link 38 with the flat iron 39 reinforcement to weld on omegas.
La figure XXVII nous montre vu de dessus le principe de coffrage Figure XXVII shows us from above the formwork principle
de la présente invention, avec les deux demi tunnels droit et gauche. of the present invention, with the two half tunnels right and left.
Le demi tunnel de droite présente un décrochement dans la partie cof- The half tunnel on the right has a setback in the cof-
frante du plancher et un décrochement dans le mur en fond de tunnel. floor and a recess in the wall at the end of the tunnel.
-7 - Ces deux demi coquilles sont équipées pour coffrer en plus des murs latéraux, -7 - These two half shells are equipped to form in addition to the side walls,
un mur transversal.a transverse wall.
La figure XXVIII présente une possibilité de modifier la face coffrante horizontale pour obtenir un motif décoratif en plafond.Le platelage en bois 46 supportera la face coffrante 20.Une pièce en bois 45 complètera l'ensemble. Figure XXVIII presents a possibility of modifying the horizontal formwork face to obtain a decorative ceiling pattern. The wooden decking 46 will support the formwork face 20.A wooden piece 45 will complete the assembly.
La figure XXIX représente la même possibilité de modifier la face cof- Figure XXIX represents the same possibility of modifying the cof-
frante mais pour une face coffrante verticale, avec un bois en renfort 47. frante but for a vertical formwork side, with a wood in reinforcement 47.
La figure XXX nous montre la position des roues pivotantes 48 adapté sur un élément de charpente 6 et 2 du coffrage outil.Les roues pivotantes offrent l'avantage de pouvoir déplacer un demi tunnel dans tous les sens, en particulier pour échapper aux trous laissés en réservation dans les planchers. La figure XXX1 représente la même banche que la figure 339 mais au repos sur une aire de stockage.La banche est stabilisée par une inclinaison à 60 .Cette stabilisation est rendue possible du fait que le pied 83 est amovible.La mise en place du pied 83, soit en position de stabilisation, soit en position de travail se fait par l'intermédiaire d'un vérin 52 à double effet.Sur les banches connues à ce jour, la stabilisation se fait par la mise en place d'étais ou de lest.Le fer plat 58 boulonné sur les Figure XXX shows the position of the swivel wheels 48 fitted to a frame member 6 and 2 of the tool form. The swivel wheels have the advantage of being able to move half a tunnel in all directions, in particular to escape the holes left in reservation in the floors. Figure XXX1 shows the same shape as Figure 339 but at rest on a storage area.La banche is stabilized by an inclination to 60.This stabilization is made possible by the fact that the foot 83 is removable.La setting foot 83, either in the stabilization position or in the working position is via a cylinder 52 double effect.On known banquettes to date, the stabilization is done by the establishment of struts or The flat iron 58 bolted on the
deux poteaux de contreventement 49 limite la course du pied 83. two bracing posts 49 limit the foot stroke 83.
La figure XXXII représente la m9me banche que sur la figure 33, mais Figure XXXII represents the same box as in Figure 33, but
avec une face coffrante inclinée.Pour obtenir cette performance, on a sim- with a tilted formwork side.To obtain this performance, we sim-
plement remplacé la poutre horizontale 49 par la poutre 53.La poutre 53 replaced the horizontal beam 49 by the beam 53. The beam 53
permet de régler l'inclinaison de la face coffrante. adjusts the inclination of the formwork face.
La figure XXXIII nous montre toujours le même principe pour créer un coffrage.Il s'agit ici d'une banche de 2,50 mètres de hauteur pour coffrer des murs en béton.Nous retrouvons le fer raidisseur 1 au bas, sur lequel viennent s'assembler les poteaux support vertical 2.Ces supports recevront le bois 19 et l'habillage 20.A l'arrière, à 625 mm nous retrouvons deux Figure XXXIII always shows us the same principle to create a formwork.Il is a case of 2.50 meters high to form concrete walls.We find the stiffening iron 1 at the bottom, on which come s assemble vertical support posts 2.These supports will receive wood 19 and upholstery 20.At the back, 625 mm we find two
poteaux de contreventement 49.Ces poteaux sont des tubes structuraux pro- 49. These posts are structural tubes for
filés carrés de 80 X 80 X 3,20 mm.Ils sont assemblés à angle droit avec la poutre de contreventement horizontal 50, section 100 X 80 X 5, et la poutre 49 de d;imension 80 X 80 X 3,2 mm.La charpente de cette banche est raidie 80 x 80 x 3.20 mm square spun yarns. They are assembled at right angles to the horizontal bracing beam 50, section 100 X 80 X 5, and the stacking beam 49 of 80 X 80 X 3.2 mm. The framework of this form is stiffened
au pied par le fer UPN 1 et à son sommet par un fer plat 51.Suivant la hau- at the foot by the UPN 1 iron and at the top by a flat iron 51.Following
teur de banche, on pourra ajouter d'autres raidisseurs complémentaires. Banche, we can add other complementary stiffeners.
Remarquons les vérins 10, permettant de régler l'altitude et l'aplomb de Note the cylinders 10, to adjust the altitude and the plumb of
la banche.Ces banches sont équipées sur toute leur longueur d'un plate- These panels are equipped throughout their length with a platform.
lage 55, formé par des planches d'1chaffaudage de 40 mm d'épaisseur et 8- des planches 54 de 27 mm d'épaisseur formant le garde-corps de protection et raidisseur.La poutre de contreventement 50 est a semblée au poteau 2, par un goujon et au poteau de contreventement 49 par un boulon et écrou et deux lage 55, formed by planks of 40 mm thick plaster and 8- 27 mm thick planks 54 forming the guardrail and stiffener.The bracing beam 50 is similar to the post 2, by a stud and at the bracing pole 49 by a bolt and nut and two
fers plats 57 donnant exactement un angle à 900 .Le sommet de la face coffran- flat irons 57 giving an exact angle of 900.The top of the face
S te est coiffé sur toute sa longueur par un triangle rectangle 56, permettant de mettre en oeuvre le béton plus rapidement.Sur les banches connues à ce jour, le sommet de la banche s'arrête de niveau, pour mettre le béton en It is capped on its entire length by a right triangle 56, to implement the concrete faster.On the banches known to date, the top of the banche stops level, to put the concrete in
oeuvre, on doit verser celui ci entre les faces coffrantes des deux banches. work, we must pour it between the formwork faces of the two panels.
Le système de la présente invention permet un coulage plus rapide du béton puisque les triangles rectangles forment un avaloir au sommet du mur construire. The system of the present invention allows a faster casting of the concrete since the right triangles form a drain at the top of the wall to build.
Sur la figure XXXIV est dessiné l'avaloir placé au sommet d'une banche. In figure XXXIV is drawn the drain placed at the top of a banche.
Cet avaloir est composé de trois parties réalisées en tôle de 4 mm d'épais- This drain is composed of three parts made of sheet metal 4 mm thick.
seur environ, filantes sur la longueur de la banche.Pour le montage de cet avaloir, on pose la première partie 62 sur le bois 19.Ensuite on pose le deuxième élément 63.Ces deux éléments sont fixés par une vis 61 dans le bois 19.Avant de poser le troisième élément 64, on dispose un tasseau filant en bois 65, dans l'élément 63.Ce troisième élément 64 et le deuxième 63 sont fixés ensemble par une vis 61 sur le bois 65.Les trous 59 et 60 sont des The assembly of this throat, the first part 62 is placed on the wood 19. Then the second element 63 is installed. These two elements are fixed by a screw 61 in the wood. Before placing the third element 64, a wooden spider 65 is placed in the element 63. This third element 64 and the second 63 are fastened together by a screw 61 on the wood 65. The holes 59 and 60 are of the
trous oblonds.oblong holes.
La figure 35 est une vue en élévation d'une banche, côté pied de con- Figure 35 is an elevational view of a box, foot side of
treventement vertival 49.0n reconnait les planches 54 formant le gardecorps vertigo 49.0 recognizes the boards 54 forming the bodyguard
sur la passerelle de travail.Le fer plat 58 limiteur de course ou pied sta- on the work gangway.The flat iron 58 stroke limiter or standard foot
bilisateur 83 est fixé par boulons sur les deux poteaux de contreventement biliser 83 is bolted to both bracing posts
49.Remarquons le goujon 66 permettant la manoeuvre du pied stabilisateur 83. 49.Note the stud 66 allowing the maneuvering of the stabilizing foot 83.
La figure XXXVI est une vue en =lévation de la face intérieure d'une banche, mettant en valeur un principe de charpente.On remarquera la face Figure XXXVI is an elevation view of the inside face of a banche, highlighting a principle of framing. We will notice the face
coffrante 20 clouée sur les bois de support 19.La poutre de contrevente- formwork 20 nailed to the support woods 19.The counter-beam
ment 50 est placée entre les deux poteaux 2 et les deux poteaux 49, tandis 50 is placed between the two posts 2 and the two posts 49, while
que la poutre 49 est placée entre les deux poteaux 2 et se fixe sur le co- that the beam 49 is placed between the two posts 2 and is fixed on the
té intérieur des poteaux de contreventement 49, par un fer plat soudé à son extrémité, laissant ainsi un vide pour le pied stabilisateur 83 lorsque la inner tee of the bracing posts 49, by a flat iron welded at its end, thus leaving a gap for the stabilizing foot 83 when the
banche est verticale.banche is vertical.
La figure XXXVII nous montre une vue de dessus, en coupe, du princi- Figure XXXVII shows a top view, in section, of the principal
pe d'assemblage de deux coffrages banche ou coffrage tunnel.Nous avons à chaque extrémité d'un coffrage un fer plat 67 allant de bas en haut sur toute la longueur.Entre ce fer plat 67 et le poteau support vertical 2, on mettra en place un tube carré de 100 X 100 X3,2 mm, servant de renfort du fer 67.Entre ce poteau de jonction 68 et la face coffrante 20, on mettra un bois de 80 X 80, 69 servant également de renfort.Les deux banches seront liaisonnées entre elles par un boulon et écrou mis en place dans les trous prévus à cet effet.1l est à re arquer sur le dessin que les fers plats, sur le dessin du bas passe devant la face coffrante, alors que sur le dessin eg assembly of two shuttering forms or tunnel formwork.We have at each end of a formwork a flat iron 67 going from bottom to top along the whole length. Between this flat iron 67 and the vertical support post 2, we will put place a square tube of 100 X 100 X3.2 mm, serving as reinforcement of the iron 67. Between this junction post 68 and the formwork side 20, we will put a wood of 80 X 80, 69 also serving as reinforcement. will be connected to each other by a bolt and nut set up in the holes provided for this purpose.1l is to be arched on the drawing that the flat irons, on the bottom drawing passes in front of the formwork face, while on the drawing
du haut, il sarrAete contre la face coffrante. from the top, it sarrAete against the face formante.
La figure XXXVIII est une vue en élévation d'un cté o'une banche.Cn remarquera les trous 70, permettant par boulonnage d'assembler deux banches Figure XXXVIII is an elevation view of a side where a banche.Cn will notice the holes 70, allowing by bolting to assemble two dams
entre elles.Le repère 71 est un guide d'assemblage. 71 is an assembly guide.
Sur la figure XXXIX est dessiné un guide d'assemblage, à gauche la par- In figure XXXIX is drawn an assembly guide, on the left the part
tie femelle 72, à droite la partie mâle 73.Ces deux pièces sont usinées. La pibce mâle 73 est un cône à tête arrondie, fixé sur la tôle 47 et 58 par un boulon.L'intérieur de la pièce femelle 72, épouse le volume du cône 73.Elle n'est pas fermée à son extrémité gauche, laissant un trou.La base 84 de 72 female, right male 73.These two parts are machined. The male piece 73 is a cone with a rounded head, fixed on the sheet 47 and 58 by a bolt. The inside of the female piece 72, matches the volume of the cone 73. It is not closed at its left end, leaving a hole.The base 84 of
cette pièce est carrée.L'espace libre à chaque angle du carré permet la fi- this room is square. The free space at each corner of the square makes it possible to
xation de la pièce sur les fers 67 et 68.Ce dispositif facilite l'assemblage the piece on the irons 67 and 68. This device facilitates the assembly
de deux banches par auto guidage.two boards by self guidance.
Sur la figure XXXX sont dessinées les différentes possibilités de cof- In figure XXXX are drawn the different possibilities of cof-
frage avec l1 matériel de la présente invention.Les coffrages repérés 74 à 77, sont des!.lments standards de 2,50 mètres de hauteur et largeur dans The forms 74 to 77 are standard elements of 2.50 meters in height and width in width.
l'ordre croissant desdits repères: 1,25 mg 1, 50 m, 2, 50 m et 5 mètres. the ascending order of said landmarks: 1.25 mg 1, 50 m, 2, 50 m and 5 meters.
Liste non limitative.ces banches trouveront principalement leur emploi dans le b9timent.La banche 78 est de 5,00 m ou 6,00 mètres de hauteur, avec les mêmes cotes de largeur que les précédentes dessinées.Ces coffrages 78 seront Non-restrictive list. These stanchions will find mainly their use in the building. The block 78 is of 5.00 m or 6.00 meters of height, with the same dimensions of width as the preceding drawn ones. These formwork 78 will be
principalement employés dans les Travaux Publics.Avec le principe de fa- mainly employed in Public Works. With the principle of
brication de coffrage de la présente invention, on peut réaliser des coffrages avec le sommet incliné 79 et 80.I1 est à noter que le matériel ayunt servi à fabriquer une de ces bancheo est r6cupérable après usage, pour construire In the formwork of the present invention, forms can be made with the inclined top 79 and 80. It should be noted that the material used to make one of these bancheo is recoverable after use, to construct
d'autres coffrages.C'est une économie importante que les coffrages actuelle- other forms. It is an important economy that formwork
ment connus ne permettent pas.known do not allow.
La figure XXXXI est une coupe sur un coffrage des voiles extérieurs. Figure XXXXI is a section on a formwork of the outer sails.
Les poteaux de support vertical 2 sont doublés par un poteau 81, constitué d'un tube profilé rectangulaire 10O X 80 X5.Ce système permet d'exécuter des ouvrages décoratifs en béton, au sommet d'un mur, en même temps que l'on coule le dit mur.Dans les coffrages de banches connues à ce jour The vertical support posts 2 are doubled by a post 81, consisting of a rectangular profiled tube 10O X 80 X5.This system makes it possible to execute concrete decorative works, at the top of a wall, at the same time as the the so-called wall is cast. In the formwork of banches known to date
il faut exécuter premièrement le mur, euxièmement l'élément dcoratif. the wall must first be executed, and the decorative element must be done first.
Pour fixer les idées la figure 41 représente un coffrage permettant d'exé- To fix ideas, FIG. 41 represents a formwork allowing to perform
cuter un mur, avec en saillie,,une corniche.Il -st à noter que le même to cut a wall, with projecting, a cornice.Il -st to note that the same
- 10 -- 10 -
nateriel permet gaelament de coffrer un mur droit sur toute sa hauteurs en nateriel allows gaelament to form a straight wall on all its heights in
rcdifiarit seul!mnt la peau coffrante. Only remove the formant skin.
la figre XXXXII représente le coffrage d'un muret avec une partie figre XXXXII represents the formwork of a wall with a part
saillante pa' exemple, garúe corps avec en partie supérieure une jardiniè- salient pa 'example, garúe body with in the upper part a jardiniè-
re ou n acrobtère.Ce dessin montre principalement la souplesse du système This drawing shows mainly the flexibility of the system
de coffrage décrit ci-avant.Les poteaux et les poutres composant la char- formwork described above.The columns and beams composing the
pente pour coffrage, conformément à la présente invention, permettent de formwork slope, in accordance with the present invention,
réaliser une multitude de types de coffrages.Ce matériel étant récupé- to carry out a multitude of types of formwork. This material being recovered
rable, transformable à volonté, apporte à ces utilisateurs du B6timent ou Travaux Publics, une rentabilité certaine du matériel.En particulier, le can be transformed at will, provides these users of the building or public works with a certain profitability of the equipment.
coffrage du type tunnel du fait de sa mobilité et de sa propriété de pou- tunnel-type formwork due to its mobility and
voir s'adapter rapidement à différentes portées de planchers, apportera see adapting quickly to different floor ranges, will bring
un gain de temps, également une importante économie dans le prix de revi- save time, also a significant saving in the price of revi-
ent des ouvrages de Bâtiment ou de Travaux Publics. building or public works.
2 24883 102 24883 10
- 11 -- 11 -
Claims (7)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8017337A FR2488310A1 (en) | 1980-08-06 | 1980-08-06 | PROCESS FOR MANUFACTURING TOOL FORMWORK |
EP19810401270 EP0045702A1 (en) | 1980-08-06 | 1981-08-06 | Shuttering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8017337A FR2488310A1 (en) | 1980-08-06 | 1980-08-06 | PROCESS FOR MANUFACTURING TOOL FORMWORK |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2488310A1 true FR2488310A1 (en) | 1982-02-12 |
FR2488310B1 FR2488310B1 (en) | 1984-09-07 |
Family
ID=9244935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8017337A Granted FR2488310A1 (en) | 1980-08-06 | 1980-08-06 | PROCESS FOR MANUFACTURING TOOL FORMWORK |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0045702A1 (en) |
FR (1) | FR2488310A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184188B (en) * | 2018-10-22 | 2024-06-25 | 上海绿地建设(集团)有限公司 | Reinforced structure of shear wall template |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4127254A (en) * | 1976-09-08 | 1978-11-28 | Kahan Ghetel P | Concrete building construction forms |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2031378A1 (en) * | 1969-02-19 | 1970-11-20 | Blaw Knox Cie Fse | |
FR2061987A5 (en) * | 1969-10-07 | 1971-06-25 | Delos Et Fils Ets | |
FR2079546A6 (en) * | 1970-02-04 | 1971-11-12 | Batimetal | |
US3742102A (en) * | 1971-11-18 | 1973-06-26 | Gray Tech Ind Inc | Method of making a cast concrete house having integral walls and roof using mobile interior forms |
US4142705A (en) * | 1977-07-11 | 1979-03-06 | Miller C B | Means of construction of concrete culverts |
-
1980
- 1980-08-06 FR FR8017337A patent/FR2488310A1/en active Granted
-
1981
- 1981-08-06 EP EP19810401270 patent/EP0045702A1/en not_active Ceased
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4127254A (en) * | 1976-09-08 | 1978-11-28 | Kahan Ghetel P | Concrete building construction forms |
Also Published As
Publication number | Publication date |
---|---|
FR2488310B1 (en) | 1984-09-07 |
EP0045702A1 (en) | 1982-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2850415A1 (en) | Refinement to construction system for structures to reinforced concrete, involves constructing foundation raft by joining modular members of form by inserting self-centering clamps in oblong holes assisted by stabilizer and anchorage | |
US4142705A (en) | Means of construction of concrete culverts | |
US3490729A (en) | Form assembly for molding monolithic concrete building | |
CN105971306A (en) | Unilateral formwork structure of external shearing wall of basement and construction method of unilateral formwork structure | |
EP0440594A1 (en) | Framework for multistory building and building comprising such a framework | |
FR2488310A1 (en) | PROCESS FOR MANUFACTURING TOOL FORMWORK | |
FR2584461A1 (en) | Dismantleable three-dimensional modular assembly method intended for any type of construction | |
KR100969826B1 (en) | The deckrod system | |
CN100537906C (en) | Modular construction system | |
EP3351705B1 (en) | A swimming pool provided with a stand and a method for building same | |
EP0093030B1 (en) | Sublevel space, in particular a cellar and method of creating the same | |
CN114775979A (en) | Assembly operation frame device for safety production training | |
CN212154367U (en) | Assembled light steel structure fence | |
NO841232L (en) | FORMAT FOR MAKING CONCRETE PARTS | |
EP0210116A1 (en) | Prefabricated-construction system, element and mould for carrying it out | |
FR2924455A1 (en) | REUSABLE FORMWORK SYSTEM | |
JP2905625B2 (en) | Half Pca plate method for underground outer wall | |
JP3595070B2 (en) | Basic structure of simple building | |
FR2614052A1 (en) | Precast reinforced concrete construction elements, method for manufacturing the latter and walls obtained | |
CH491267A (en) | Formwork device for concrete wall | |
JPH10280545A (en) | Folding type structure and its assembling structure | |
JPS6013863Y2 (en) | building foundations | |
BE458504A (en) | ||
FR2533109A1 (en) | Method of constructing a metal framework for an amateur's greenhouse | |
FR2725746A1 (en) | Self-supporting jack for reinforcing timber framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |