FI114458B - Method and apparatus for installing a lift during the construction phase of a building - Google Patents
Method and apparatus for installing a lift during the construction phase of a building Download PDFInfo
- Publication number
- FI114458B FI114458B FI20022122A FI20022122A FI114458B FI 114458 B FI114458 B FI 114458B FI 20022122 A FI20022122 A FI 20022122A FI 20022122 A FI20022122 A FI 20022122A FI 114458 B FI114458 B FI 114458B
- Authority
- FI
- Finland
- Prior art keywords
- elevator
- lifting
- engine room
- building
- rails
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
- Blast Furnaces (AREA)
Abstract
Description
114458114458
MENETELMÄ JA LAITTEISTO HISSIN ASENTAMISEKSI RAKENNUKSEN RAKENTAMISVAIHEESSAMETHOD AND EQUIPMENT FOR THE INSTALLATION OF A LIFT IN THE CONSTRUCTION PHASE OF THE BUILDING
Keksinnön kohteena on patenttivaatimuksen 1 johdanto-osassa määritelty menetelmä ja patenttivaatimuksen 6 5 johdanto-osassa määritelty laitteisto hissin asentamiseksi rakennuksen rakentamisvaiheessa.The invention relates to a method as defined in the preamble of claim 1 and to an apparatus as defined in the preamble of claim 6 for installing a lift during the construction phase of a building.
Rakennettaessa korkeita rakennuksia hissejä tarvitaan usein jo rakennusvaiheessa ennen rakennuksen valmistumista. Hissejä tarvitaan mm. rakennusaikaisessa käy-10 tössä, jolloin rakentajat voivat kulkea hissillä alhaalta mahdollisimman ylös rakennukseen. Vastaavasti rakennuksen alakerrosten valmistuttua yläkerroksia aikaisemmin, on hissien voitava olla valmistuneissa kerroksissa jo rakennusta käyttävien ihmisten käytössä.When constructing tall buildings, elevators are often needed during the construction phase before the building is completed. Elevators are needed eg. during construction, allowing builders to take the elevator from the bottom to the top of the building as much as possible. Similarly, when the lower floors of a building are completed earlier than the upper floors, the elevators must be able to be occupied by the people already using the building.
15 Rakennustyön edetessä tulee hissin kyetä palvelemaan mahdollisimman korkeita kerrostasoja.15 As construction progresses, the elevator must be able to serve the highest possible floor levels.
Tällaista rakennusaikaista käyttöä varten tunnetaan mm. niin sanottu hyppäysnosto (jump-lift), jossa his-,· : sin nostokorkeutta lisätään yhden tai useamman kerrok- 20 sen korkuisin portain aina, kun rakennustyö on edis-. tynyt tarpeeksi korkealle edelliseen hyppäykseen näh den. Tällöin hissin konehuone siirretään yhdellä kerralla em. korkuisen kerrosmäärän verran ylöspäin, ja kaikki nostokorkeudesta liittyvät komponentit, kuten ' · 25 korikaapelit, nopeudenrajoittajan köydet ja muut kui luun asennettavat osat, kuilun sähköistys, kuilukaape-lit, kompensaatioköydet jne. ulotetaan koko valmiin kuilun korkeudelle.For such construction-time use, e.g. the so-called jump-lift, in which the lifting height of his-, · is increased by increments of one or more floors each time the construction work is advanced. high enough since the last jump. In this case, the elevator engine room is moved at one time upwards by the number of floors mentioned above, and all components related to lifting height such as' · 25 basket cables, speed limiter ropes and other non-bone components, shaft electrification, shaft cables, compensation ropes, etc.
h. Tunnetun tekniikan mukaisesti konehuoneen nostoon on . 30 käytetty mm. rakennuksen omaa rakennusnosturia. Ongel- ·.’· mana on tällöin se, että hissin asennus on riippuvai- "· nen rakennusnosturin käytöstä. Rakennusnosturia tarvi taan ehkä samanaikaisesti muualla rakennuksella, jol- ·· loin kyseistä nosturia ei saadakaan käyttöön haluttuun 2 114458 aikaan tai tarpeeksi pitkäksi ajaksi. Samoin rakennus-nosturin käyttöapua lyhytaikaisiin käyttötarpeisiin voi olla erittäin hankala saada.h. According to the prior art, there is a. 30 used mm. the building's own building crane. The problem is that the installation of the lift is dependent on the use of a construction crane. A construction crane may be needed simultaneously in the rest of the building, whereby the crane will not be available for the desired 2 114458 hours or long enough. Similarly, construction crane operating aid for short-term operating needs can be extremely difficult to obtain.
Tunnetaan myös PCT-julkaisussa nro WO00/07923 esitetty 5 ratkaisu hissin asentamiseksi, jossa ei käytetä raken-nusnosturia apuna, vaan hissin konehuonetta nostetaan kerrosväli kerrallaan tukialustan ja tukialustaan tukeutuvien nostosylinterien tai vastaavien avulla. Ongelmana tässä ratkaisussa on se, että tukialusta ja 10 konehuone tuetaan jo rakennusaikana rakennuksen ker-rostasoihin. Usean hissin muodostaman ryhmän kokonaispaino voi olla useita tuhansia kiloja, joka on liian suuri ja riskialtis kuorma vielä kuitenkin osittain keskeneräisille kerrostasoille. Esimerkiksi neljän 15 muodostaman hissiryhmän välinen hissiaulan katto on suhteellisen heikko, eikä kestä em. kuormia. Ongelmana on myös se, että rakentaja saattaa joutua tekemään ylimääräisiä aukkoja rakenteisiin, joihin voidaan sijoittaa vahvikkeita hissin asennustyön ajaksi. Vielä 20 ongelmana tässä ratkaisussa on se, että konehuonetta i voidaan nostaa vain yksi kerrosväli kerrallaan, jol loin jokainen nosto aiheuttaa kaikki aina samat lisävalmistelut ja -työt, jotka vaativat yhteensä paljon '·' ylimääräistä asennusaikaa.Also known is PCT Publication No. WO00 / 07923, 5 solutions for installing an elevator which does not use a building crane but instead lifts the machine room of the elevator one by one by means of a support platform and lifting cylinders supported on the support platform. The problem with this solution is that the support base and the 10 engine room are already supported during the construction period in the storey floors of the building. The total weight of a group of several elevators can be several thousand kilograms, which is too high and a risky load for still partially unfinished floors. For example, the roof of the elevator lobby between the four elevator groups of 15 is relatively weak and cannot withstand the above loads. Another problem is that the builder may have to make additional openings in structures where reinforcements can be placed during the installation of the elevator. Another problem with this solution is that the machine room i can only be lifted one floor at a time, so that each lift causes all the same additional preparation and work, which requires a lot of '·' extra installation time.
.‘ · 25 Keksinnön tavoitteena on poistaa edellä mainitut epä kohdat sekä helpottaa ja nopeuttaa hissin rakennusaikaista asennusta aikaansaamalla edullinen ja helposti sekä yksinkertaisesti toteutettava ja luotettava mene-. telmä hissin rakennusaikaiseksi asentamiseksi. Lisäksi ; ’ 30 tavoitteena on aikaansaada laitteisto hissin rakennus- ’·; aikaisen asennuksen mahdollistamiseksi.It is an object of the invention to eliminate the aforesaid drawbacks and to facilitate and expedite the installation of a lift during construction by providing an inexpensive and easy to implement and reliable operation. system for installing the lift during construction. In addition; '30 aims to provide hardware for lift construction'; for early installation.
Keksinnön mukaiselle menetelmälle hissin rakennusai-. . kaiseksi asentamiseksi on tunnusomaista se, mitä pa- tenttivaatimuksen 1 tunnusmerkkiosassa on esitetty ja 3 114458 keksinnön mukaiselle laitteistolle hissin rakennusaikaiseksi asentamiseksi on tunnusomaista se, mitä patenttivaatimuksen 6 tunnusmerkkiosassa on esitetty.For the method according to the invention, the building materials for the elevator . characterized by what is stated in the characterizing part of claim 1 and 3,114,458 by the apparatus according to the invention for the erection of a lift during construction is characterized by what is stated in the characterizing part of claim 6.
Keksinnön muille sovellusmuodoille on tunnusomaista 5 se, mitä muissa patenttivaatimuksissa on esitetty.Other embodiments of the invention are characterized by what is set forth in the other claims.
Keksinnöllä voidaan saavuttaa yksi tai useampi mm.The invention can achieve one or more mm.
seuraavista eduista: - hissin asennus voidaan aloittaa hyvin aikaisessa rakennusvaiheessa 10 - hissin konehuone ja kaikki varusteet nostetaan ylös päin hissiä varten kehitetyllä omalla nostojärjeste-lyllä - rakennuksen nosturia ei tarvita, joten ei häiritä tai hidasteta muuta rakennustyötä 15 - hissiasennus on riippumaton rakennuksen nosturin käytöstä - konehuonetta ei tarvitse tukea hissikuilun seiniin tai kerrosten välipohjiin - konehuoneen, hissikorin ja vastapainon paino voidaan 20 kokonaan tai ainakin osittain kannattaa hissijoh teilla hissiasennuksen aikana - seiniin ja välipohjiin ei aiheudu hissiasennuksesta ylimääräisiä kuormia - rakennuksen betonirakenteisiin ei tarvitse tehdä 25 ylimääräisiä aukkoja ja vahvistuksia hissiasennusta varten - mahdollistetaan ainakin nelinkertainen kuljetuskapasiteetti ja logistiikan hyväksikäyttö verrattuna tunnettuun rakennusaikaiseen hissiin : 30 - säästää rakentajien ja alihankkijoiden aikaa ja no- ’ ’ peuttaa rakennuksen valmistumista ____ - vähemmän konehuoneen nostoon tarvittavaa työtä - hissin asennusajat lyhenevät ja asennuksen kokonais- ;; kustannukset pienenevät 4 114458 - turvallisempi asennusympäristö - valmiit kerrokset hyvin nopeasti valmistumisensa jälkeen normaalissa hissikäytössä - rakennuksen julkisivu voidaan rakentaa valmiiksi 5 normaalia aikaisemmin - pienempi energiankulutus kuin tunnetuissa tekniikoissa - tarvitaan vähemmän tilaa rakennuksen ulkopuolella - helppo muodostaa vakioasennusmenetelmäksi.the following advantages: - lift installation can be started very early in the construction phase 10 - the elevator engine room and all equipment are lifted up by a lifting system developed specifically for the lift - no building crane is required so no other construction work is interrupted or delayed 15 - elevator installation independent the machine room does not need to be supported on the elevator shaft walls or floor intermediate floors - the weight of the engine room, elevator car and counterweight can be supported 20 or at least partially by the elevator cables during the elevator installation - no additional loads are imposed on the walls and floors allows at least four times the transport capacity and logistics utilization compared to a well-known elevator during construction: 30 - saves time and expense for builders and subcontractors aa the completion of the building ____ - less work required to lift the engine room - installation times for the elevator are shortened and the total installation time ;; cost reduction 4 114458 - safer installation environment - finished floors very quickly after completion in normal elevator use - building facade can be completed 5 times earlier - lower energy consumption than prior art - less space needed outside the building - easy to set up as a standard installation method.
1010
Keksintöä selostetaan seuraavassa tarkemmin erään sovellutusesimerkin avulla viittaamalla oheisiin yksinkertaistettuihin piirustuksiin, joissa kuvio 1 esittää kaaviollisesti edestä katsottuna kek- 15 sinnön mukaista hissiasennustilannetta, jossa hissikori on jo asennettuna peruskerroksessa, kuvio 2 esittää kaaviollisesti edestä katsottuna keksinnön mukaista hissiasennustilannetta, jossa hissikori on nostettu ensimmäiseen kerrok-20 seen, kuvio 3 esittää kaaviollisesti edestä katsottuna kek sinnön mukaista hissiasennustilannetta, jossa ' ' hyppäysnosto on suoritettu ja hissikori on ·'/· nostettu kuudenteen kerrokseen ja 25 kuvio 4 esittää kaaviollisesti edestä katsottuna kek sinnön mukaista hissiasennustilannetta, jossa hyppäysnosto on suoritettu ja hissin nosto-köydet sekä nopeudenrajoittajan köysi on asennettu tähän korkeuteen.The invention will now be described in more detail with reference to an exemplary embodiment, with reference to the accompanying simplified drawings, in which Fig. 1 is a schematic front elevational view of 20, Figure 3 is a schematic front view of the elevator installation of the invention, wherein the '' jumping lift is performed and the elevator car is · '/ · raised to the sixth floor; and Figure 4 is a schematic front view of the elevator installation of the ropes and the speed limiter rope are mounted at this height.
h! 30 . Hissin asennus päävaiheittaan tapahtuu keksinnön mu- kaisella menetelmällä seuraavasti. Kun rakentaja on ensin asentanut kuiluun 1 siirrettävän ja vedenpitävän » · tukitason 7, joka tukeutuu esimerkiksi viidennen ker-.. 35 roksen kerrostasoon, aloitetaan varsinainen hissin 5 114458 asennus. Aluksi tukitasoon 7 kiinnitetään työtaso 8 sekä apunostin hissin komponenttien nostoa varten. Työtasoon 8 kiinnitetään vielä liukukengät, joiden avulla työtaso saa ohjauksensa hissin johteista. Tämän 5 jälkeen asennuksen varsinaisessa ensimmäisessä vaiheessa kiinnitetään kuilun 1 alaosaan hissijohteet 2 ja vastapainon johteet, joita ei ole esitetty kuvioissa selvyyden vuoksi. Tässä vaiheessa asennetaan viisi johdetankoa päällekkäin, joista alin johdetanko 10 ja ylin johdetanko 10 ovat muita kolmea, keskenään samanmittaista tankoa lyhyempiä. Normaalilla kerroskorkeudella johteet ulottuvat tällöin lähes viidennen kerroksen korkeuteen asti.B! 30th The installation of the elevator in the main stage is carried out by the method according to the invention as follows. After the builder has first installed a movable and waterproof support platform 7 in shaft 1, which is supported, for example, on the fifth floor 35 floor level, the actual installation of elevator 5 114458 is started. Initially, a work platform 8 and an auxiliary hoist for lifting the elevator components are attached to the support platform 7. Slide shoes are also attached to the work platform 8, by means of which the work platform is controlled by the elevator guides. After this, in the actual first step of the installation, the elevator rails 2 and counterweight rails, which are not shown in the figures, are attached to the lower part of the shaft 1 for clarity. At this point, five guide bars are superimposed, of which the lowest guide bar 10 and the upper guide bar 10 are shorter than the other three bars of equal length. At normal floor height, the rails then extend up to almost the height of the fifth floor.
Asennuksen toisessa vaiheessa asennetaan vastapainon 15 11 kehys ja tasojen ovet sekä kuilun valaistus ja säh köistys niin korkealle kuin se on rakennuksen tässä vaiheessa mahdollista. Esimerkissä asennus tehdään tässä vaiheessa viidenteen kerrokseen asti.In the second phase of the installation, the counterweight 15 11 frame and level doors, as well as the shaft illumination and electrical installation, are installed as high as possible at this stage of the building. In this example, the installation is done at this stage up to the fifth floor.
Asennuksen kolmannessa vaiheessa rakennetaan hissin *· ’ 20 konehuoneelle 4 väliaikainen kehys, jonka varaan kone- *. · huone sijoitetaan hissin peruskerrokseen nostokoneis- ; ‘ töineen 5 ja ohjauspaneeleineen. Samalla konehuonee- . seen asennetaan valmiiksi nopeudenrajoittaja sekä myös konehuoneelle myöhemmin hyppäysnostot suorittava, nos- * 25 tolaitteena toimiva nostin 17, jonka nostoköyttä 18 tai vastaavaa varten olevat nostopisteet kiinnitetään hissijohteiden yläpäähän erityisellä, tätä varten suunnitellulla, helposti irrotettavalla kiinnitysra-kenteella 19. Nostin 17 itse on hyvin kiinni konehuo- ♦ 30 neessa ja sen avulla vedetään konehuonetta ylöspäin hyppäysnoston yhteydessä hissijohteiden yläpäähän tukeutuvan nostoköytensä tai vastaavan avulla. Mikäli työtaso 8 on kiinnitysrakenteen 19 tiellä, työtaso ‘ ' voidaan siirtää hyppäysnoston ajaksi johonkin sopivaan 35 paikkaan.In the third step of the installation, a temporary frame is built on the machine room 4 of the elevator * · '20, which the machine * reserves. · The room is placed on the ground floor of the lift by a hoisting machine; 'With work 5 and control panels. At the same time engine room. a speed limiter and a lateral lift 17, which performs jumping lifting to the engine room, is provided with lifting points for the hoisting rope 18 or the like, which are secured to the top of the lift rails by a special, easily removable fastening structure 19. in the engine room ♦ 30 and with the help of its hoisting rope or similar, which pulls the machine room upwards during the jump lift. If the worktop 8 is in the path of the fastening structure 19, the worktop '' may be moved to a suitable position 35 during the jump lift.
114458 6114458 6
Kuvio 1 esittää asennuksen neljättä vaihetta, jossa konehuone 4 on nostettu toisen kerroksen tasalle ja peruskerroksessa asennetaan kuiluun hissikori 3 rakentamalla korikehys sekä kiinnittämällä korin seinä-, 5 katto ja lattiaelementit toisiinsa ja korikehykseen. Tässä vaiheessa voidaan toteuttaa myös korin sähköistys. Samoin kori varustetaan ovella ja suoritetaan korin viimeistely. Tässä vaiheessa varustetaan hissi myös nostoköydellä, joka on vielä köysirummulla. Neliö jännen vaiheen yhteydessä kiinnitetään hissikori 3 myös konehuoneeseen 4 hyppäysnostoa varten esimerkiksi ketjujen 6 avulla.Fig. 1 shows a fourth stage of installation, in which the engine room 4 is raised to the second floor and the elevator car 3 is mounted in the pit by constructing a basket frame and fixing the wall, ceiling and floor elements of the basket to each other and the frame. At this stage, the body can also be electrified. Likewise, the basket is provided with a door and the basket is completed. At this stage, the elevator is also equipped with a lifting rope, which is still on the rope drum. In connection with the tension phase, the elevator car 3 is also fastened to the engine room 4 for jumping, for example by means of chains 6.
Kuvion 2 mukaisessa viidennessä vaiheessa nostetaan konehuoneen ja hissikorin yhdistelmää nostimen 17 15 avulla yksi kerrosväli ylöspäin ja tuetaan yhdistelmä jo asennettuihin hissin johteisiin 2. Samalla vaiheessa kiinnitetään myös hissijohteiden sen hetkinen ylin sidelevy tukevasti paikalleen.In the fifth step of Fig. 2, the combination of the engine room and the elevator car is lifted by one lift upwards by means of the elevator 17 15 and supported on the already installed elevator guide rails 2. At the same time, the current upper tie plate of the elevator rails is also securely fixed.
Asennuksen kuudennessa vaiheessa nostetaan vedenpitävä ‘ · 20 tukitaso 7 tulevaa hyppäysnostoa varten viisi kerrosta : * ylemmäksi ja tuetaan kerrostasolle. Asennusta jatke taan nyt ylemmäksi suorittamalla tarvittavat putkitukset ja sähköistykset sekä asentamalla seuraavaan : , viiden kerroksen jaksoon hissijohteet 2, vastapainon , ’ 25 johteet ja tason ovet.In the sixth step of the installation, the waterproof '· 20 support level 7 is raised for 5 upcoming jump lifts: * above and supported on the floor level. The installation is now further advanced by carrying out the necessary plumbing and electrification, and by installing, in a five-story section, the elevator rails 2, counterweight, '25 rails and level doors.
Kuvion 3 esittämässä seitsemännessä vaiheessa suoritetaan varsinainen hyppäysnosto. Tällöin hissin konehuone 4 vedetään ylöspäin yhdessä hissikorin 3 kanssa ,'· viiden kerrosvälin verran, jolloin hissikori nousee : 30 ensimmäiseltä kerrostasolta kuudennelle kerrostasolle.In the seventh step shown in Figure 3, the actual hop lift is performed. In this case, the elevator machine room 4 is pulled up together with the elevator car 3, by five intervals, whereby the elevator car rises: 30 from the first floor to the sixth floor.
’’ Nosto tapahtuu nostimen 17 avulla siten, että noston tukipisteet ovat hissijohteiden 2 yläpäässä. Tällöin . . nostosta aiheutuva kuorma jakaantuu tasaisesti hissin johteille 2, eikä nosto rasita rakennuksen omia raken- 1 » 1 1 4458 / 7 teitä, kuten seiniä, kerrostasojen välipohjia tai hissikuilun seiniä. Kun hyppäysnosto on suoritettu, tuetaan konehuoneen ja hissikorin yhdistelmä tasaisesti jo asennettuihin hissin johteisiin 2. Lisäksi kiin-5 nitetään taas hissijohteiden sen hetkinen ylin sidele-vy tukevasti paikalleen.'' Lifting is effected by means of a hoist 17 such that the lifting points are at the top of the elevator rails 2. Then. . the load resulting from the lifting is evenly distributed over the elevator rails 2, and the lifting does not stress the building's own structures, such as walls, floor floors, or the walls of the elevator shaft. When the jumping lift is completed, the combination of the engine room and the elevator car is evenly supported on the already installed elevator rails 2. In addition, the current top rope of the elevator rails is securely fastened.
Kuvio 4 esittää hissiasennuksen kahdeksannetta vaihetta, jossa asennetaan tarvittava köysitys. Hissiköydet 13 johdetaan koneiston 5 vetopyörältä hissikehyksessä 10 olevan taittopyörän 14 ympäri kiinnityspisteeseensä ja vastaavasti vastapainon köydet 15 johdetaan vastapainon 11 kehyksessä olevan taittopyörän 16 ympäri kiin-nityspisteeseensä. Lisäksi asennetaan nopeudenrajoit-tajan köysi 12. Tässä vaiheessa hissi myös tasapaino-15 tetaan lisäämällä vastapainon kehykseen tarvittavat painot. Lisäksi asennetaan tarvittavat kuilukomponen-tit ja kytkimet, jonka jälkeen hissi on valmis tarkastukseen ja käyttöön alimpien kuuden kerroksen osalta.Figure 4 shows the eighth step of the elevator installation where the necessary rope is installed. The elevator ropes 13 are guided from the drive wheel 5 of the machine 5 to the attachment point around the diverting pulley 14 in the elevator frame 10, and the counterweight ropes 15, respectively, are guided to the attachment point of the diverting pulley 16 in the counterweight 11. In addition, a speed limiter rope 12 is installed. At this stage, the elevator is also balanced by adding the required weights to the counterweight frame. In addition, the necessary shaft components and switches are installed, after which the elevator is ready for inspection and use for the lower six floors.
Seuraavassa vaiheessa nostetaan jälleen vedenpitävä 20 tukitaso 7 tulevaa hyppäysnostoa varten viisi kerrosta ylemmäksi ja tuetaan kerrostasolle. Asennusta jatketaan nyt seuraavat viisi kerrosta ylemmäksi vastaa-• ί valla tavalla kuin on kerrottu edellä kuvatuissa vai- : · heissä 6-8. Näin edetään hyppäyksittäin aina viisi ·’ _ 25 kerrosta kerrallaan ja saadaan hissi käyttöön yhä ylempänä sitä mukaan, kun rakennus kohoaa ylöspäin.In the next step, the waterproof support platform 7 is again raised five layers higher for future jumping lift and supported on the floor level. The installation is now continued for the next five layers, • similar to the steps described above: · in steps 6-8. This jumps five to 25 floors at a time and gives the elevator an even higher elevation as the building rises up.
Alan ammattimiehelle on selvää, että keksinnön eri so-vellutusmuodot eivät rajoitu ainoastaan edellä esitet-'· ' tyihin esimerkkeihin, vaan voivat vaihdella jäljempänä 30 esitettävien patenttivaatimusten puitteissa. Edellä ku-vattujen esimerkkien mukaisesti ammattimies voi varioi-·;·_ da keksinnön mukaista sovellusmuotoa esimerkiksi käyt tämällä hyppäysnostossa jotakin muuta kuin mainittua ;;; viiden kerroksen kerrosväliä. Olosuhteista riippuen mi- 8 114458 kä tahansa kerrosvälin korkuinen matka saattaa olla soveltuvin. Tällöin voidaan mainita kaikki kerrosvälit väliltä 1...8 ja sopivasti esimerkiksi väliltä 3...7 tai väliltä 4...6.It will be apparent to one skilled in the art that various embodiments of the invention are not limited to the Examples set forth above, but may vary within the scope of the claims set forth below. According to the examples described above, a person skilled in the art may vary the embodiment of the invention, for example, by using something other than the aforementioned jumping lift; five layers of floor space. Depending on the circumstances, any distance between the floors may be most appropriate. In this case, it is possible to mention all layers between 1 ... 8 and suitably for example between 3 ... 7 or 4 ... 6.
5 Alan ammattimiehelle on myös selvää, että asennusmenetelmän eri yksityiskohtien järjestys ja työtapa voivat vaihdella. Samoin konehuoneen nostoon käytetyn nostimen käyttö ja toimintatapa voivat poiketa edellä kerrotusta .5 It will also be appreciated by one skilled in the art that the order and manner of operation of the various details of the installation method may vary. Likewise, the use and operation of the hoist used to lift the engine room may differ from the above.
Claims (9)
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20022122A FI114458B (en) | 2002-12-02 | 2002-12-02 | Method and apparatus for installing a lift during the construction phase of a building |
ES03775427T ES2297237T3 (en) | 2002-12-02 | 2003-11-26 | METHOD AND APPLIANCE FOR INSTALLING AN ELEVATOR DURING THE CONSTRUCTION OF A BUILDING. |
PCT/FI2003/000903 WO2004050526A1 (en) | 2002-12-02 | 2003-11-26 | Method and apparatus for installing an elevator during construction of a building |
CNB200380100880XA CN1313349C (en) | 2002-12-02 | 2003-11-26 | Method and apparatus for installing an elevator during the construction of a building |
DE60319143T DE60319143T2 (en) | 2002-12-02 | 2003-11-26 | METHOD AND DEVICE FOR INSTALLING AN ELEVATOR DURING A BUILDING EQUIPMENT |
EP03775427A EP1583710B1 (en) | 2002-12-02 | 2003-11-26 | Method and apparatus for installing an elevator during construction of a building |
AU2003283459A AU2003283459B2 (en) | 2002-12-02 | 2003-11-26 | Method and apparatus for installing an elevator during contruction of a building |
AT03775427T ATE385987T1 (en) | 2002-12-02 | 2003-11-26 | METHOD AND DEVICE FOR INSTALLING A LIFT DURING BUILDING CONSTRUCTION |
US11/042,050 US7635049B2 (en) | 2002-12-02 | 2005-01-26 | Method and apparatus for installing an elevator during the construction of a building |
HK06100872A HK1080822A1 (en) | 2002-12-02 | 2006-01-19 | Method and apparatus for installing an elevator during construction of a building |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20022122A FI114458B (en) | 2002-12-02 | 2002-12-02 | Method and apparatus for installing a lift during the construction phase of a building |
FI20022122 | 2002-12-02 |
Publications (3)
Publication Number | Publication Date |
---|---|
FI20022122A0 FI20022122A0 (en) | 2002-12-02 |
FI20022122A FI20022122A (en) | 2004-06-03 |
FI114458B true FI114458B (en) | 2004-10-29 |
Family
ID=8565016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FI20022122A FI114458B (en) | 2002-12-02 | 2002-12-02 | Method and apparatus for installing a lift during the construction phase of a building |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP1583710B1 (en) |
CN (1) | CN1313349C (en) |
AT (1) | ATE385987T1 (en) |
AU (1) | AU2003283459B2 (en) |
DE (1) | DE60319143T2 (en) |
ES (1) | ES2297237T3 (en) |
FI (1) | FI114458B (en) |
HK (1) | HK1080822A1 (en) |
WO (1) | WO2004050526A1 (en) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20041044A (en) | 2004-07-30 | 2006-02-08 | Kone Corp | Elevator |
FI117335B (en) * | 2004-07-30 | 2006-09-15 | Kone Corp | Method of lift installation and lift |
FI118335B (en) | 2004-07-30 | 2007-10-15 | Kone Corp | Elevator |
SG132591A1 (en) | 2005-11-09 | 2007-06-28 | Inventio Ag | Method of constructing a lift installation, and lift installation for that purpose |
EP1785386A1 (en) * | 2005-11-09 | 2007-05-16 | Inventio Ag | Method for installing an elevator system and elevator system therefor |
FI118644B (en) * | 2006-11-17 | 2008-01-31 | Kone Corp | Elevator installing method for use during construction of tall building, involves dismounting machine room of elevator provided with room, and converting elevator into elevator without machine room by placing hoisting machine |
FI20090085L (en) * | 2009-03-06 | 2010-09-30 | Kone Corp | Elevator system and procedure |
FI20090134A (en) * | 2009-04-06 | 2010-10-07 | Kone Corp | Elevator arrangement and procedure |
FI121666B (en) | 2009-05-28 | 2011-02-28 | Kone Corp | A method of installing a lift hoisting rope |
FI20100223A0 (en) * | 2010-05-28 | 2010-05-28 | Kone Corp | Procedure and lift arrangement |
FI20106273A (en) * | 2010-12-01 | 2012-06-02 | Kone Corp | Elevator system and procedure |
CN102502378A (en) * | 2011-11-15 | 2012-06-20 | 中建三局建设工程股份有限公司 | Climbing elevator for building construction |
FI20116190L (en) * | 2011-11-28 | 2013-05-29 | Kone Corp | Lift arrangement and method |
EP2636629B1 (en) * | 2012-03-06 | 2015-05-06 | KONE Corporation | A method and an elevator arrangement |
US9388020B2 (en) | 2012-03-06 | 2016-07-12 | Kone Corporation | Method and an elevator arrangement |
CN104340813B (en) * | 2014-10-30 | 2016-09-14 | 中国建筑股份有限公司 | A kind of installation construction method for elevator |
EP3127847B1 (en) * | 2015-08-07 | 2017-12-20 | KONE Corporation | An arrangement and a method for measuring the position of an installation platform in an elevator shaft |
CN105668472A (en) * | 2016-04-25 | 2016-06-15 | 上海爱登堡电梯(宜昌)有限公司 | Mounting device of super-high-rise building elevator |
DE102018208588A1 (en) * | 2018-05-30 | 2019-07-04 | Thyssenkrupp Ag | Installation of a lift system with linear motor |
JP6813123B2 (en) * | 2018-08-16 | 2021-01-13 | 三菱電機株式会社 | How to apply elevator lift extension technology |
WO2020081046A1 (en) * | 2018-10-15 | 2020-04-23 | Kone Corporation | Method and arrangement |
CN109436985A (en) * | 2018-11-15 | 2019-03-08 | 上海建工建集团有限公司 | A kind of mould bases and its construction method for hoisting elevator |
CN111302187B (en) * | 2018-12-11 | 2022-09-27 | 奥的斯电梯公司 | Lifting assembly, jump elevator and jump method |
CN109592545B (en) * | 2019-01-18 | 2024-10-15 | 通力电梯有限公司 | Temporary machine room for jump-up elevator and jump-up elevator |
WO2021038629A1 (en) * | 2019-08-23 | 2021-03-04 | 株式会社日立製作所 | Construction elevator device |
CN110817661A (en) * | 2019-10-22 | 2020-02-21 | 日立电梯(上海)有限公司 | Elevator system used during construction |
EP3865448A1 (en) * | 2020-02-12 | 2021-08-18 | KONE Corporation | Method for constructing elevator |
CN113620147B (en) | 2020-05-09 | 2024-07-30 | 奥的斯电梯公司 | Jump elevator system and jump method for use in building construction |
US11383959B1 (en) * | 2021-02-03 | 2022-07-12 | Otis Elevator Company | Method for expanding a rise of an elevator hoistway |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3298462A (en) * | 1966-01-17 | 1967-01-17 | Beaver Advance Corp | Traction lift for scaffolding towers |
US3519101A (en) * | 1968-01-10 | 1970-07-07 | Otis Elevator Co | Construction elevator system |
US3759349A (en) * | 1972-03-13 | 1973-09-18 | Otis Elevator Co | Elevator system with temporary hoistway structure and method for use thereof |
JPH07237847A (en) * | 1994-03-01 | 1995-09-12 | Otis Elevator Co | Installation method of elevator |
CN2236477Y (en) * | 1995-05-08 | 1996-10-02 | 大连第二建筑工程公司 | High bulk material lifting apparatus |
-
2002
- 2002-12-02 FI FI20022122A patent/FI114458B/en not_active IP Right Cessation
-
2003
- 2003-11-26 CN CNB200380100880XA patent/CN1313349C/en not_active Expired - Lifetime
- 2003-11-26 WO PCT/FI2003/000903 patent/WO2004050526A1/en active IP Right Grant
- 2003-11-26 AT AT03775427T patent/ATE385987T1/en not_active IP Right Cessation
- 2003-11-26 DE DE60319143T patent/DE60319143T2/en not_active Expired - Lifetime
- 2003-11-26 ES ES03775427T patent/ES2297237T3/en not_active Expired - Lifetime
- 2003-11-26 AU AU2003283459A patent/AU2003283459B2/en not_active Ceased
- 2003-11-26 EP EP03775427A patent/EP1583710B1/en not_active Expired - Lifetime
-
2006
- 2006-01-19 HK HK06100872A patent/HK1080822A1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
HK1080822A1 (en) | 2006-05-04 |
EP1583710A1 (en) | 2005-10-12 |
FI20022122A0 (en) | 2002-12-02 |
ES2297237T3 (en) | 2008-05-01 |
EP1583710B1 (en) | 2008-02-13 |
AU2003283459A1 (en) | 2004-06-23 |
WO2004050526A1 (en) | 2004-06-17 |
DE60319143T2 (en) | 2008-05-21 |
ATE385987T1 (en) | 2008-03-15 |
AU2003283459B2 (en) | 2009-11-05 |
DE60319143D1 (en) | 2008-03-27 |
CN1313349C (en) | 2007-05-02 |
CN1703367A (en) | 2005-11-30 |
FI20022122A (en) | 2004-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FI114458B (en) | Method and apparatus for installing a lift during the construction phase of a building | |
US7635049B2 (en) | Method and apparatus for installing an elevator during the construction of a building | |
AU2010309661B2 (en) | Method in the manufacture of an elevator | |
AU2019409113B2 (en) | Building site device having a climbing formwork and an elevator system | |
KR101245570B1 (en) | Method for installing an elevator, and elevator | |
AU2007321143B2 (en) | Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine | |
EP2247522B1 (en) | Method for installing an elevator and method for installing the guide rails of an elevator | |
US8720032B2 (en) | Method for installing the hoisting roping of an elevator | |
US9415974B2 (en) | Method and arrangement for moving a heavy load | |
WO1998040305A1 (en) | Procedure and apparatus for the installation of an elevator | |
KR102250228B1 (en) | Lower drive type inclined elevator including modular hoistway | |
US20240017964A1 (en) | Construction elevator arrangement and a method for producing the same | |
JPH10101272A (en) | Installing method of elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Patent granted |
Ref document number: 114458 Country of ref document: FI |
|
MM | Patent lapsed |