ES2316873T3 - PROCEDURE FOR THE CONSTRUCTION OF A CORRESPONDING FIXED AND FOOTWEAR ROAD. - Google Patents

PROCEDURE FOR THE CONSTRUCTION OF A CORRESPONDING FIXED AND FOOTWEAR ROAD. Download PDF

Info

Publication number
ES2316873T3
ES2316873T3 ES03813884T ES03813884T ES2316873T3 ES 2316873 T3 ES2316873 T3 ES 2316873T3 ES 03813884 T ES03813884 T ES 03813884T ES 03813884 T ES03813884 T ES 03813884T ES 2316873 T3 ES2316873 T3 ES 2316873T3
Authority
ES
Spain
Prior art keywords
ballast
binder
bed
support layer
ballast bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
ES03813884T
Other languages
Spanish (es)
Inventor
Dieter Reichel
Stefan Bogl
Erich Lindner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Max Boegl Bauunternehmung GmbH and Co KG
Original Assignee
Max Boegl Bauunternehmung GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Max Boegl Bauunternehmung GmbH and Co KG filed Critical Max Boegl Bauunternehmung GmbH and Co KG
Application granted granted Critical
Publication of ES2316873T3 publication Critical patent/ES2316873T3/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Railway Tracks (AREA)
  • Detection And Prevention Of Errors In Transmission (AREA)
  • Radio Relay Systems (AREA)
  • Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)

Abstract

The invention relates to a method for constructing a rigid track for high-speed rail traffic. According to said method, the inventive rigid track is either constructed from precast concrete components (7) arranged on a track bed structure (2,4;16), an intermediate region between the concrete components (7) and the track bed structure (2,4;16) being filled in with a solidifying filling material (8) in order to fix the position of the concrete components (7), or from cast-in-situ concrete or a combination of concrete components (7) and cast-in-situ concrete on the track bed structure (2,4;16). The inventive method is characterised in that the track bed structure (2,4;16) is created from an existing ballast bed (2), the ballast being at least partially compacted. The invention also relates to a corresponding communication track of a rigid track.

Description

Procedimiento para la construcción de una vía fija y calzada correspondiente.Procedure for the construction of a road fixed and corresponding roadway.

La presente invención se refiere a un procedimiento para la construcción de una vía fija para el tráfico ferroviario de alta velocidad a partir de piezas acabadas de hormigón prefabricadas, que se depositan sobre una capa de soporte y se vierte en un espacio intermedio entre las piezas acabadas de hormigón y la capa de soporte, para la fijación de la posición de las piezas acabadas de hormigón, una masa de relleno que se consolida o se construye a partir de hormigón preparado en el lugar o una combinación de piezas acabadas de hormigón y hormigón preparado en el lugar sobre la capa de soporte, así como a una plataforma de vía correspondiente de una vía fija. La capa de soporte se construye en este caso a partir de un lecho de balasto existente.The present invention relates to a procedure for the construction of a fixed road for traffic High-speed rail from finished parts of precast concrete, which is deposited on a support layer and it is poured into an intermediate space between the finished pieces of concrete and support layer, for fixing the position of the finished concrete pieces, a filling mass that consolidates or is constructed from concrete prepared on site or a combination of finished concrete and concrete parts prepared in place on the support layer, as well as a corresponding track platform of a fixed track. The layer of support is built in this case from a bed of ballast existing.

La construcción de calzadas para el tráfico ferroviario de alta velocidad se realiza habitualmente o bien sobre una superestructura de balasto o con una vía fija, que está construida, por ejemplo, a partir de una pluralidad de piezas acabadas de hormigón. En la superestructura de balasto es un inconveniente la alta intensidad de mantenimiento, mientras que en la vía fija hay que contar con un tiempo de construcción más prolongado y con costes más elevados. Si se construye un recorrido de alta velocidad, entonces éste o bien se construye sobre un recorrido nuevo o sustituye a un recorrido ferroviario convencional. En el último caso se desmonta completamente el lecho de balasto existente y se construye una capa de soporte fraguada hidráulicamente, sobre la que se tienden o bien se construyen las piezas acabadas de hormigón o una capa de hormigón preparada en el lugar o una combinación de ambas. Este desmontaje del recorrido antiguo y la construcción del recorrido nuevo provoca esencialmente el tiempo de construcción largo y los costes altos.Road construction for traffic High-speed rail is usually done or over a ballast superstructure or with a fixed track, which is constructed, for example, from a plurality of pieces finished concrete. In the ballast superstructure is a inconvenient the high maintenance intensity while in the fixed track must have more construction time prolonged and with higher costs. If a tour is built high speed, then this one is either built on a new route or replaces a conventional rail route. In the latter case the ballast bed is completely disassembled existing and a set support layer is constructed hydraulically, on which they tend or else the finished concrete pieces or a layer of concrete prepared in the place or a combination of both. This dismantling of the route old and the construction of the new route essentially causes Long construction time and high costs.

El documento UD 3.656.690 describe una calzada para un tren de alta velocidad, en la que se utiliza un lecho de balasto existente, para construir la calzada. Los carriles y traviesas antiguos son retirados en este caso y se desmonta el lecho de balasto existente. El balasto se limpia y se construye de nuevo finalmente en forma de un canalón. Los flancos del canalón se consolidan y se limpia el espacio intermedio entre los flancos. Encima se construyen planchas de hormigón para la nueva calzada. Debido al desmontaje del lecho de balasto antiguo, el tiempo de construcción es aquí también correspondientemente largo.UD 3,656,690 describes a roadway for a high-speed train, in which a bed of existing ballast, to build the road. The rails and old sleepers are removed in this case and the existing ballast bed. The ballast is cleaned and constructed of Again finally in the form of a gutter. The flanks of the gutter are consolidate and clean the intermediate space between the flanks. Above, concrete slabs are built for the new road. Due to the disassembly of the old ballast bed, the time of Construction is also correspondingly long here.

El cometido de la presente invención es crear un procedimiento para la construcción de una vía fija y una calzada correspondiente, que evita los inconvenientes mencionados anteriormente y posibilitar de una manera especialmente rápida y con costes relativamente reducidos un tráfico ferroviario de alta velocidad.The purpose of the present invention is to create a procedure for the construction of a fixed track and a road corresponding, which avoids the aforementioned inconveniences above and enable in a particularly fast and with relatively low costs high rail traffic speed.

El cometido se soluciona por medio de un procedimiento y una calzada con las características de las reivindicaciones independientes.The task is solved by means of a procedure and a roadway with the characteristics of the independent claims.

En el procedimiento de acuerdo con la invención para la construcción de una vía fija para el tráfico ferroviario de alta velocidad se depositan, por ejemplo, piezas acabadas de hormigón prefabricadas sobre una capa de soporte y se vierte en un espacio intermedio entre las piezas acabadas y la capa de soporte, para la fijación de la posición de las piezas acabada, una masa de relleno que se consolida. De una manera alternativa o en combinación con las piezas acabadas de hormigón, se puede construir la vía fija también con hormigón preparado en el lugar, que se vierte sobre la capa de soporte. La capa de soporte se construye de un lecho de balasto existente. El balasto utilizado para el recorrido de vía antigua a desmontar es utilizado, por lo tanto, para la construcción de una capa de soporte para la nueva vía fija. De acuerdo con la invención, se consolida el balasto, introduciendo un aglutinante entre las traviesas de una vía todavía antigua en el lecho de balasto y retirando, después del fraguado del aglutinante, la vía, las traviesas y el balasto excesivo.In the process according to the invention for the construction of a fixed track for rail traffic high speed are deposited, for example, finished parts of precast concrete on a support layer and poured into a intermediate space between the finished parts and the support layer, for fixing the position of the finished parts, a mass of filler that consolidates. In an alternative way or in Combination with finished concrete pieces, it can be built the fixed track also with concrete prepared on site, which pour over the support layer. The support layer is constructed of an existing ballast bed. The ballast used for the old track route to be dismantled is therefore used for the construction of a support layer for the new fixed track. According to the invention, the ballast is consolidated, introducing a binder between the sleepers of a still old road in the bed of ballast and removing, after setting the binder, the track, the sleepers and the excessive ballast.

Si se introduce el aglutinante entre las traviesas de una vía todavía antigua en el lecho de balasto, entonces se puede ver aquí una ventaja muy especial.If the binder is introduced between sleepers of a still old track in the bed of ballast, then a very special advantage can be seen here.

El recorrido de alta velocidad se puede preparar de esta manera, mientras que se realiza todavía el tráfico ferroviario sobre la vía antigua. Solamente se rellenan con aglutinante las zonas libres accesibles del lecho de balasto y de esta manera se crea la base para la construcción posterior de la vía para el tráfico ferroviario de alta velocidad. El tiempo de inactividad entre el tráfico ferroviario sobre las vías antiguas y el tráfico ferroviario sobre las vías nuevas se puede mantener de esta manera muy corto. Si se retiran las vías, las traviesas y el balasto excesivo después del fraguado del aglutinante, entonces se crea la base para la construcción de las planchas parciales acabadas de hormigón sobre la capa de soporte. También esta medida contribuye a que se pueden dimensionar muy corto el tiempo de inactividad.High speed travel can be prepared in this way, while traffic is still done railway on the old track. They are only filled with binder the accessible free areas of the ballast bed and of this way the base for the later construction of the track is created for high speed rail traffic. The time of inactivity between rail traffic on old roads and rail traffic on new roads can be maintained from This way too short. If the tracks, the sleepers and the excessive ballast after setting the binder, then it creates the basis for the construction of partial plates finished of concrete on the support layer. Also this measure contributes to the fact that the time of inactivity.

Mientras que el lecho de balasto convencional no era apropiado para poder cumplir los altos requerimientos para el tráfico ferroviario de alta velocidad, ahora a través de la elaboración del lecho de balasto existente es posible mejorar esencialmente las propiedades y utilizar la infraestructura antigua para la nueva capa de soporte. De esta manera se consigue la ventaja de que la transformación de una instalación de vía convencional en una instalación de vía para el tráfico ferroviario de alta velocidad se puede realizar de una manera relativamente rápida y con costes favorables.While the conventional ballast bed does not it was appropriate to meet the high requirements for high-speed rail traffic, now through the elaboration of the existing ballast bed is possible to improve essentially the properties and use the old infrastructure for the new support layer. This way you get the advantage of transforming a track installation conventional in a railway installation for rail traffic high speed can be performed in a relatively way Fast and with favorable costs.

A través de la consolidación del balasto a partir del lecho de balasto existente con un aglutinante hidráulico, especialmente mortero de cemento o un aglutinante bituminoso o a base de plástico, se vuelve la capa de soporte generada de esta manera de alta capacidad de soporte y especialmente también muy resistente debido a las vibraciones y cargas, que se producen durante el funcionamiento del tráfico ferroviario de alta velocidad. De esta manera, se crea un sustrato duradero y fiable para el tendido de las piezas acabadas de hormigón, que se emplean la mayoría de las veces como planchas, o la capa de hormigón preparada en el lugar.Through the consolidation of the ballast to from the existing ballast bed with a binder hydraulic, especially cement mortar or binder bituminous or plastic based, it becomes the support layer generated in this way of high support capacity and especially also very resistant due to vibrations and loads, which produced during the operation of high rail traffic speed. In this way, a durable and reliable substrate is created for laying finished concrete parts, which are used most of the time as irons, or the concrete layer prepared in place.

Si se introduce el aglutinante a presión en las cavidades de lecho de balasto, entonces se obtiene una zona de soporte del lecho de balasto que atraviesa, en determinadas circunstancias, el lecho de balasto completo. Las cavidades, que están presentes entre las piedras de balasto individuales, se utilizan para poder aplicar el aglutinante. Se obtiene una unión entre el aglutinante y el balasto, con lo que se crea una capa de soporte muy fiable. A través de la utilización de presión durante la introducción del aglutinante se posibilita una penetración especialmente profunda del aglutinante a través del lecho de balasto, con lo que se crea una capacidad de soporte muy grande.If the pressure binder is introduced into the ballast bed cavities, then an area of ballast bed support that crosses, in certain circumstances, the complete ballast bed. The cavities, which are present between individual ballast stones, it used to apply the binder. You get a union between the binder and the ballast, which creates a layer of very reliable support. Through the use of pressure during introduction of the binder penetration is possible especially deep binder through the bed of ballast, which creates a very large support capacity.

Para la introducción del aglutinante en el lecho de balasto son ventajosas lanzas de inyección, que se introducen con agitación en el lecho de balasto y a través de las cuales se puede introducir a presión el aglutinante en las cavidades del lecho de balasto. La penetración del aglutinante a través del lecho de balasto se puede realizar de esta manea de forma muy uniforme y selectiva.For the introduction of the binder in the bed of ballast are advantageous injection lances, which are introduced with agitation in the ballast bed and through which can bind the binder into the cavities of the bed of ballast. Binder penetration through the bed ballast can be done in this way very uniformly and selective

Si se introduce el aglutinante al menos en una dirección a una distancia entre sí, de manera que se obtienen en el lecho de balasto zonas fraguadas hidráulicamente y zonas intermedias no rellenas, entonces se puede conseguir la capacidad de soporte requerida individual de la capa de soporte. Con una capacidad de soporte reducida, las zonas intermedias no rellenas son mayores que con una capacidad de soporte más elevada requerida de la capa de soporte.If the binder is introduced in at least one direction at a distance from each other, so that they are obtained in the ballast bed hydraulically forged and intermediate zones do not fill, then you can get the support capacity required individual support layer. With a capacity of reduced support, intermediate unfilled areas are larger than with a higher support capacity required from the layer of support.

Para evitar que la masa de relleno vertida entre la capa de soporte y la pieza acabada de hormigones filtre en la zona no rellena del lecho de balasto, está previsto de una manera más ventajosa que al menos las zonas no rellenas sean cerradas herméticamente en la superficie. A tal fin, se aplica, por ejemplo, una capa de mortero de cemento relativamente fina sobre las zonas no rellenas y, dado el caso, adicionalmente sobre las zonas fraguadas. La masa de relleno penetrará de esta manera con obstáculos en las cavidades del lecho de balasto y, por lo tanto, no soportará en una medida suficiente la plancha parcial acabada de hormigón.To prevent the dough from pouring between the support layer and the finished concrete piece filter in the area not filled with the ballast bed, is provided in a way more advantageous that at least the unfilled areas are closed tightly on the surface. To that end, it applies, for example, a layer of relatively fine cement mortar over the areas do not fill in and, if necessary, additionally on the areas set. The filling dough will penetrate in this way with obstacles in the ballast bed cavities and therefore will not support to a sufficient extent the partial plate finished concrete.

Adicional o alternativamente a la introducción a presión de aglutinante en las cavidades del lecho de balasto, pertenece a la invención y es ventajoso que sea fresada la superficie del lecho de balasto y el material fresado que resulta en este caso sea mezclado con el aglutinante. A continuación se aplica la mezcla sobre la superficie del lecho de balasto restante como capa de soporte. Después del fraguado de esta mezcla, se construye la plancha parcial acabada de hormigón o la capa de hormigón preparada en el lugar sobre la nueva superficie resultante. Por medio de este procedimiento para el fraguado del balasto con el aglutinante para la formación de una capa de soporte se crea de la misma manera muy rápidamente una capa de soporte. En este caso, sin embargo, en oposición a la realización especialmente ventajosa de la introducción a presión del aglutinante entre las traviesas de la vía antigua, es necesario que la vía antigua haya sido desmontada antes de que sea fresada la capa superior del lecho de balasto y sea construida nueva.Additionally or alternatively to the introduction to binder pressure in the ballast bed cavities, belongs to the invention and it is advantageous that the surface of the ballast bed and the resulting milled material in this case be mixed with the binder. Then you apply the mixture on the surface of the remaining ballast bed as a support layer. After setting this mixture, it build the finished concrete partial plate or the layer of prepared concrete in place on the new surface resulting. Through this procedure for setting the ballast with the binder for the formation of a support layer a support layer is created very quickly. In this case, however, as opposed to the realization especially advantageous of the introduction of the binder under pressure between the cross ties of the old road, it is necessary that the old road has been disassembled before the upper layer of the bed is milled of ballast and be built new.

La mezcla del aglutinante con el material fresado resultante se puede realizar aplicando el aglutinantes antes del fresado sobre la superficie del lecho de balasto. A través de la eliminación por fresado del aglutinante y del lecho de balasto se lleva a cabo de una manera automática una mezcla de aglutinante y balasto. Esta mezcla se puede aplicar de nuevo a continuación sobre el lecho de balasto restante y se puede endurecer.The mixture of the binder with the material resulting milling can be done by applying the binders before milling on the surface of the ballast bed. Through of milling the binder and bed ballast is carried out automatically a mixture of binder and ballast. This mixture can be applied again to continuation on the remaining ballast bed and you can toughen.

De una manera alternativa, para muchos casos de aplicación es ventajoso que el aglutinante sea mezclado después del fresado con el material fresado. El material fresado se lleva a tal fin, por ejemplo, a una cámara de mezcla, en la que se mezclan el aglutinante y el material entre sí y a continuación se aplica de nuevo sobre la capa de balasto restante. Después del fraguado del aglutinante se ha creado también aquí una caspa de soporte fija y con capacidad de soporte.Alternatively, for many cases of application is advantageous that the binder is mixed after milled with the milled material. The milled material is brought to such end, for example, to a mixing chamber, in which the binder and material with each other and then applied of new over the remaining ballast layer. After setting a fixed support dandruff has also been created here and With support capacity.

Otra alternativa a la construcción de una capa de soporte utilizando el lecho de balasto antiguo y el aglutinante consiste en que se deposita el aglutinante sobre el lecho de balasto a modo de una abrazadera, penetrando el aglutinante en la superficie del lecho de balasto y cerrando lateralmente. De esta manera, se impide que el lecho de balasto se rompa por el lateral. El aglutinante, que penetra parcialmente en el lecho de balasto, se ocupa de esta manera de un dentado de la abrazadera con e lecho de balasto y, por lo tanto, proporciona una capa de soporte estable para un tráfico ferroviario de alta velocidad sin interferencias. El aglutinante hidráulico se fragua con el balasto del lecho de balasto existente y de esta manera forma la capa de soporte, sobre la que se pueden construir las piezas acabadas de hormigón o la capa de hormigón preparado en el lugar.Another alternative to building a layer of support using the old ballast bed and the binder is that the binder is deposited on the bed of ballast by way of a clamp, penetrating the binder into the surface of the ballast bed and closing laterally. This In this way, the ballast bed is prevented from breaking on the side. The binder, which partially penetrates the bed of ballast, is occupies in this way a jagged clamp with the bed of ballast and therefore provides a stable support layer for high-speed rail traffic without interference. The hydraulic binder is set with the ballast of the bed of existing ballast and thus forms the support layer, on which you can build the finished concrete pieces or the layer of concrete prepared on site.

Si se introduce un desagüe en la capa de soporte y/o permanece un desagüe en el balasto restante existente, entonces se combinan entre sí de una manera ventajosa las ventajas de una capa de soporte estable con la capacidad de desagüe de una capa de balasto.If a drain is introduced into the support layer  and / or a drain remains in the existing remaining ballast, then the advantages are combined in an advantageous way of a stable support layer with the drain capacity of a roadbed.

En una calzada de acuerdo con la invención de una vía fija para un vehículo ferroviario del tráfico ferroviario de alta velocidad construida a partir de piezas acabadas de hormigón prefabricadas, se colocan las piezas acabadas de hormigón sobre una capa de soporte. Se vierte una masa de relleno que se consolida en un espacio intermedio entre las piezas acabadas de hormigón y la capa de soporte. En lugar de las piezas acabadas de hormigón puede servir también una capa de hormigón preparado en el lugar u hormigón preparado en el lugar en combinación con piezas acabadas para la construcción de una vía fija.On a roadway according to the invention of a fixed track for a railway vehicle of railway traffic High speed built from finished concrete parts prefabricated, finished concrete pieces are placed on a support layer A filling dough is poured that consolidates into an intermediate space between the finished concrete pieces and the support layer Instead of the finished concrete pieces you can also serve a layer of concrete prepared on site or concrete prepared on site in combination with finished parts for construction of a fixed track.

La capa de soporte está construida a partir de un lecho de balasto existente. De acuerdo con la invención, el balasto está consolidado al menos en parte en el lecho de balasto, siendo introducido un aglutinante entre las traviesas de una vía todavía antigua en el lecho de balasto. De esta manera es posible ya la preparación de la infraestructura de la calzada para la nueva instalación de vía cuando circula todavía el tráfico ferroviario sobre la instalación de vía antigua. Solamente cuando el aglutinante, que se amarra en forma de columnas en el lecho de balasto, ha fraguado y han terminado los trabajos habituales de preparación, se puede realizar rápidamente la construcción de una calzada. La capa de soporte formada de esta manera se puede construir de una manera muy rápida y con coste favorable y presenta una capacidad de soporte alta, como es necesaria para el funcionamiento de trenes de alta velocidad. A través de la utilización del lecho de balasto existente se reduce claramente el material así como el tiempo para la preparación de la infraestructura de la calzada.The support layer is constructed from an existing ballast bed. According to the invention, the ballast is consolidated at least in part on the ballast bed, a binder being introduced between the sleepers of a track still old in the bed of ballast. In this way it is possible already roadway infrastructure preparation for the new track installation when rail traffic still circulates about the installation of old road. Only when the binder, which is tied in the form of columns in the bed of ballast, has set and have finished the usual work of preparation, you can quickly build a road. The support layer formed in this way can be build in a very fast way and with favorable cost and presents a high support capacity, as is necessary for the High speed train operation. Through the Use of the existing ballast bed clearly reduces the material as well as the time for the preparation of the road infrastructure.

Si se combina el balasto con un aglutinante que se fragua hidráulicamente o bituminoso o a base de plástico, entonces se obtiene una capa de soporte especialmente sólida y con capacidad de soporte.If the ballast is combined with a binder that It is forged hydraulically or bituminous or plastic based, then a particularly solid support layer is obtained and with support capacity

Es especialmente ventajoso que el aglutinante sea introducido a presión en las cavidades del lecho de balasto. De esta maneras se posibilita una penetración profunda del aglutinante a través del balasto. De esta manera, se consigue una alta resistencia de la capa de soporte. El aglutinante alimentado a presión al lecho de soporte rellena, por una parte, las cavidades del lecho de balasto y comprime, dado el caso, el balasto suelto adicionalmente para la consolidación con el aglutinante.It is especially advantageous that the binder be introduced under pressure into the cavities of the ballast bed. From this way a deep penetration of the binder is possible Through the ballast. In this way, you get a high resistance of the support layer. The binder fed to pressure to the support bed fills, on the one hand, the cavities of the ballast bed and compresses, if necessary, the loose ballast additionally for consolidation with the binder.

Si el aglutinante no se introduce sobre todo el lecho de balasto, sino que presenta una distancia al menos en una dirección, entonces están dispuestas en el lecho de balasto zonas fraguadas hidráulicamente y zonas intermedias no rellenas. La construcción de una capa de soporte de este tipo se posibilita de esta manera de forma especialmente rápida. Especialmente cuando el aglutinante es introducido a presión en las cavidades, se consigue una resistencia y una capacidad de soporte habitualmente suficientes de la capa de soporte, aunque permanezca zonas intermedias no rellenas.If the binder is not introduced over all the ballast bed, but has a distance of at least one direction, then zones are arranged in the ballast bed hydraulically set and intermediate areas not filled. The construction of a support layer of this type is possible This way especially quickly. Especially when the binder is introduced under pressure in the cavities, it is achieved usually sufficient strength and support capacity of the support layer, even if intermediate areas remain stuffed

Para evitar que la masa de relleno entre la capa de soporte y la pieza acabada de hormigón se filtre en las zonas no rellenas de la capa de soporte y, por lo tanto, no pueda rellenar completamente la cavidad entre la capa de soporte y la pieza acabada de hormigón. Está previsto de una manera más ventajosa que las zonas no rellenas estén cerradas herméticamente en la superficie con un agente de obturación. Un agente de obturación de este tipo puede ser, por ejemplo, un mortero de cemento, que se aplica sobre las zonas no rellenas y, dado el caso, también sobre las zonas rellenas y de esta manera crea una superficie hermética uniforme para la masa de relleno.To prevent the filling mass between the layer of support and the finished piece of concrete seeps into the areas not you fill in the support layer and therefore cannot fill completely the cavity between the support layer and the piece finished concrete. It is provided in a more advantageous way than unfilled areas are tightly closed in the surface with a sealing agent. A shutter agent of this type can be, for example, a cement mortar, which applies to unfilled areas and, if necessary, also to the filled areas and in this way creates a tight surface uniform for the filling dough.

Si la superficie del lecho de balasto es fresada adicional o alternativamente a la introducción a presión del aglutinante en el lecho de balasto y se mezcla el material fresado con el aglutinante, entonces se obtiene un material compuesto, que forma la capa de soporte. Este material compuesto se aplica sobre la superficie del lecho de balasto restante y es adecuado para construir las piezas acabadas de hormigón o la capa de hormigón preparada en el lugar sobre esta superficie que se obtiene nueva de esta manera.If the surface of the ballast bed is milled additionally or alternatively to the pressure introduction of the binder in the ballast bed and the milled material is mixed with the binder, then a composite material is obtained, which form the support layer. This composite material is applied on the  surface of the remaining ballast bed and is suitable for build the finished concrete pieces or the concrete layer prepared in place on this surface that is obtained new from this way.

Si el aglutinante es líquido y se aplica a modo de abrazadera sobre el lecho de balasto, entonces se consigue una retención especialmente buena del balasto a partir del lecho de balasto. En algunos casos de aplicación, puede ser suficiente este tipo de construcción para la capa de soporte a partir de un lecho de balasto existente y un aglutinante. En este caso es especialmente ventajoso que el aglutinante penetre aproximadamente de 5 a 20 cm en la superficie y en los laterales del lecho de balasto para proporcionar un anclaje del aglutinante con la capa de balasto. De esta manera se obtiene una retención conjunta especialmente firme y una alta capacidad de soporte del lecho de balasto antiguo con el aglutinante dispuesto adicionalmente. De esta manera se posibilita el funcionamiento de trenes de alta velocidad sobre el lecho de balasto antiguos elaborado de esta manera.If the binder is liquid and is applied as a clamp on the bed of ballast, then you get a especially good ballast retention from the bed of ballast. In some application cases, this may be sufficient type of construction for the support layer from a bed of existing ballast and a binder. In this case it is especially advantageous that the binder penetrates approximately 5 to 20 cm on the surface and on the sides of the ballast bed for provide an anchor of the binder with the ballast layer. From this way you get a particularly firm joint retention and a high bearing capacity of the old ballast bed with the additionally arranged binder. In this way it is possible the operation of high-speed trains on the bed of Ancient ballast crafted this way.

La presente invención presenta, además de las ventajas mencionadas, también la ventaja de que especialmente en el caso de la disposición de zonas no rellenas y zonas rellenas del lecho de balasto se puede realizar un desagüe a través de las zonas no rellenas. Esto es especialmente ventajoso sobre todo durante la mase de ampliación, durante la que se mantiene el funcionamiento de la circulación convencional.The present invention presents, in addition to the mentioned advantages, also the advantage that especially in the case of the provision of unfilled areas and filled areas of the A ballast bed can be drained through the zones Do not fill. This is especially advantageous especially during the extension master, during which the operation of Conventional circulation

Otras ventajas de la presente invención se describen en los ejemplos de realización siguientes. En este caso:Other advantages of the present invention are described in the following embodiments. In this case:

La figura 1 muestra una vista en planta superior sobre una superestructura de balasto con una vía
convencional y aglutinante introducido.
Figure 1 shows a top plan view on a ballast superstructure with a track
Conventional and binder introduced.

La figura 2 muestra una sección transversal a través de la superestructura de balasto de la figura 1.Figure 2 shows a cross section to through the ballast superstructure of figure 1.

La figura 3 muestra una superestructura de balasto preparada para el tendido de una vía fija.Figure 3 shows a superstructure of ballast prepared for laying a fixed track.

La figura 4 muestra una sección transversal a través de una capa de soporte de acuerdo con la invención y una plancha parcial acabada.Figure 4 shows a cross section to through a support layer according to the invention and a partial plate finished.

La figura 5 muestra el fresado de una capa de balasto.Figure 5 shows the milling of a layer of ballast.

La figura 6 muestra una sección transversal a través de un lecho de balasto con aglutinante fresado, yFigure 6 shows a cross section to through a bed of ballast with milled binder, and

La figura 7 muestra una sección transversal de un lecho de balasto con aglutinante circundante.Figure 7 shows a cross section of a bed of ballast with surrounding binder.

Los ejemplos siguientes explican la invención con la ayuda de una vía fija con piezas acabadas de hormigón. Pero la invención no está limitada a ello, sino que se puede utilizar también cuando la vía fija se construye de hormigón preparado en el lugar o en combinación con hormigón preparado en el lugar y piezas acabadas de hormigón.The following examples explain the invention with the help of a fixed track with finished concrete pieces. But the invention is not limited thereto, but can be used also when the fixed track is constructed of concrete prepared in the place or in combination with concrete prepared on site and parts finished concrete.

La figura 1 muestra una vista en planta superior sobre un sustrato 1 y una parrilla de carriles 3 construida sobre un lecho de balasto 2. El lecho de balasto 2 está preparado para la transformación para una capa de soporte de una vía fija. A tal fin, en el lecho de balasto 2 están realizadas una pluralidad de columnas 4, que están constituidas de balasto y aglutinante. Las columnas 4 están dispuestas entre traviesas 5 y, por lo tanto, se pueden introducir en el lecho de balasto 2, sin que debe ajustarse de una manera duradera el funcionamiento de circulación. Después de que las columnas 4 han sido introducidas, por ejemplo, a presión y con lanzas de inyección en el lecho de balasto 2, se puede reanudar el funcionamiento de circulación. A través de esta interrupción sólo de corta duración se posibilita una construcción especialmente de coste más favorable o bien una preparación de coste favorable de la construcción de una vía fija.Figure 1 shows a top plan view on a substrate 1 and a rail of lanes 3 built on a bed of ballast 2. The bed of ballast 2 is prepared for transformation for a support layer of a fixed track. To that end, a plurality of columns are made in the ballast bed 2  4, which are constituted of ballast and binder. Columns 4 they are arranged between sleepers 5 and therefore can be enter the bed of ballast 2, without adjusting it Lasting way the circulation operation. After what columns 4 have been introduced, for example, under pressure and with injection lances on the bed of ballast 2, you can resume the circulation operation Through this interruption only of short duration a construction especially of more favorable cost or a favorable cost preparation of the construction of a fixed track.

Las columnas 4 están dispuestas en series, que se encuentran en cada caso entre dos traviesas 5. El lecho de balasto 2 no relleno es en este caso todavía suficiente para proporcionar un desagüe. Entre las columnas 4 se encuentra, además, el lecho de balasto 2 no relleno.Columns 4 are arranged in series, which they are in each case between two sleepers 5. The bed of ballast 2 not filled is in this case still enough to Provide a drain. Among the columns 4 is also the ballast bed 2 not filled.

La figura 2 muestra una sección transversal a través de un lecho de balasto 2 de acuerdo con la figura 1. Se deduce claramente que las columnas 4 están dispuestas sobre el sustrato 1 y están distanciadas con respecto a la superficie del lecho de balasto 2. Además, presentan distancias entre sí, que corresponden esencialmente a la anchura de las traviesas 5. De esta manera, es posible que las columnas 4 se puedan introducir desde el lado superior del lecho de balasto 2 entre las traviesas 5 en el lecho de balasto 2. Las columnas 4 se forman en este caso con aglutinante y el balasto a partir de lecho de balasto 2. Los lados superiores de las columnas 4 están aproximadamente en un nivel, de manera que sirven posteriormente como capa de soporte uniforme para una plancha parcial acabada de hormigón.Figure 2 shows a cross section to through a bed of ballast 2 according to figure 1. It clearly deduces that columns 4 are arranged on the substrate 1 and are distanced from the surface of the ballast bed 2. In addition, they have distances from each other, which correspond essentially to the width of the sleepers 5. Of this way, it is possible that columns 4 can be entered from the upper side of the ballast bed 2 between the sleepers 5 in the ballast bed 2. Columns 4 are formed in this case with binder and ballast from bed of ballast 2. The sides upper columns 4 are approximately in one level, of so that they later serve as a uniform support layer for a partial plate finished with concrete.

En la figura 3 se muestra una representación en perspectiva de una capa de soporte, que ha sido preparada de acuerdo con las representaciones de las figuras 1 y 2. La parrilla de vías antigua 3 con las traviesas 5 y los carriles 6 ha sido desmontada en el tiempo intermedio. El balasto sobrante del lecho de balasto 2 ha sido eliminado, de manera que las superficies de las columnas 4 se encuentran esencialmente en un plano. Las columnas 4 forman los soportes para una vía fija dispuesta encima en un instante posterior. El balasto sobrante, que se había dispuesto sobre la superficie de las columnas 4 en el lecho de balasto 2 antiguo, ha sido retirado a ambos lados y se puede utilizar posteriormente, por ejemplo, para el relleno del talud.Figure 3 shows a representation in perspective of a support layer, which has been prepared from according to the representations of figures 1 and 2. The grill of old tracks 3 with sleepers 5 and lanes 6 has been disassembled in the intermediate time. The remaining ballast of the bed of Ballast 2 has been removed, so that the surfaces of the columns 4 are essentially in a plane. Columns 4 they form the supports for a fixed track arranged above in a later instant. The remaining ballast, which had been arranged on the surface of columns 4 in the ballast bed 2 old, has been removed on both sides and can be used later, for example, for the filling of the slope.

La figura 4 muestra una sección transversal a través de la estructura de acuerdo con la invención de una vía fija. Sobre el sustrato 1 están dispuestos el lecho de balasto 2 y las columnas 4, que están construidas a partir del balasto del lecho de balasto 2 y de un aglutinante consolidado con el mismo. La vía 6 está fijada sobre una pieza acabada de hormigón 7, que está realizada en forma de plancha. La pieza acabada de hormigón 7 se apoya sobre husillos conocidos y no representados sobre la capa de soporte, que está constituida por el lecho de balasto 2 y las columnas 4. A través de la nivelación de la pieza acabada de hormigón 7 de acuerdo con el desarrollo requerido del recorrido de la vía 6 se obtiene un espacio hueco entre la pieza acabada de hormigón 7 y la capa de soporte formada por el lecho de hormigón 2 y las columnas 4. Este espacio hueco se rellena con una masa de relleno 8 para asegurar la posición de la pieza acabada de hormigón y evitar flexiones.Figure 4 shows a cross section to through the structure according to the invention of one way fixed. On the substrate 1 the ballast bed 2 and columns 4, which are constructed from the ballast of bed of ballast 2 and a binder consolidated with it. The track 6 is fixed on a finished piece of concrete 7, which is made in the form of an iron. The finished concrete piece 7 is rests on spindles known and not represented on the layer of support, which is made up of ballast bed 2 and the columns 4. Through the leveling of the finished piece of concrete 7 according to the required development of the path of track 6 you get a hollow space between the finished piece of concrete 7 and the support layer formed by the concrete bed 2 and columns 4. This hollow space is filled with a mass of padding 8 to ensure the position of the finished concrete piece and avoid pushups.

Para impedir que la masa de relleno 8 se filtre en el lecho de balasto 2 no consolidado, antes de la colocación de la pieza acabada de hormigón 7 sobre la capa de soporte se provee la superficie de la capa de soporte con un agente de obturación 9. El agente de obturación 9, que puede ser, por ejemplo, un mortero de cemento, hace que la masa de relleno 8 no pueda penetrar en las cavidades del lecho de balasto 2 y no pueda rellenar completamente el espacio hueco entre la pieza acabada de hormigón y la capa de soporte.To prevent filler dough 8 from leaking in the unconsolidated ballast bed 2, before placing the finished concrete piece 7 on the support layer is provided the surface of the support layer with a sealing agent 9. The sealing agent 9, which may be, for example, a mortar of cement, makes the filling mass 8 cannot penetrate the cavities of the ballast bed 2 and cannot completely fill the hollow space between the finished concrete piece and the layer of support.

Para poder proporcionar un desagüe de la pieza acabada de hormigón 7, están previstos tubos 10, que conducen el agua a través de la pieza acabada de hormigón 7, la masa de relleno 8 y el agente de obturación 9. En la zona no rellena del lecho de balasto 2 se puede filtrar el agua a continuación o se puede conducir lateralmente hacia fuera del lecho de balasto 2.In order to provide a part drain finished of concrete 7, tubes 10 are provided, which lead the water through the finished concrete piece 7, the filling mass 8 and the sealing agent 9. In the area not filled with the bed of ballast 2 you can filter the water below or you can drive laterally out of the ballast bed 2.

La figura 5 muestra el fresado de un aglutinante 15, por ejemplo mortero u hormigón, en el lecho de balasto 2. Sobre el lecho de balasto 2 está aplicada la capa de aglutinante 15, que es fresada junto con una parte del lecho de balastro 2 por medio de una fresa. El material fresado del lecho de balasto 2 y del aglutinante 15 se mezcla y a continuación se aplica como capa de soporte 16 sobre la parte restante del lecho de balasto. Después del fraguado del aglutinante 15 en la capa de soporte 16 se crea una capa con alta capacidad de soporte para la construcción de una vía fija para el tráfico ferroviario de alta velocidad. En lugar de aplicar el aglutinante 15 antes del fresado sobre el lecho de balasto 2, puede ser también ventajoso erosionar solamente el lecho de balasto 2 con una fresa 17 y mezclarlo en una instalación de mezcla no representada con el aglutinante 15. A continuación se aplica la capa de soporte 16, como ya se ha explicado, sobre el lecho de balasto 2 restante.Figure 5 shows the milling of a binder 15, for example mortar or concrete, in ballast bed 2. Envelope the ballast bed 2 is applied the binder layer 15, which it is milled together with a part of the ballast bed 2 by means of a strawberry. The milled material of the ballast bed 2 and the binder 15 is mixed and then applied as a layer of support 16 on the remaining part of the ballast bed. After from the setting of the binder 15 in the support layer 16 a layer with high support capacity for the construction of a track Fixed for high-speed rail traffic. Instead of apply binder 15 before milling on the bed of ballast 2, it can also be advantageous to erode only the bed of ballast 2 with a strawberry 17 and mix it in an installation of mixture not represented with binder 15. Next, apply the support layer 16, as already explained, on the remaining bed of ballast 2.

La figura 6 muestra una sección transversal a través de una capa de soporte 16 según la figura 5, sobre la que está dispuesta una pieza acabada de hormigón 7. Para el relleno del espacio hueco entre la pieza acabada de hormigón 7 y la capa de soporte 16 está dispuesta de nuevo una masa de relleno 8, que fija la posición de la pieza acabada de hormigón 7.Figure 6 shows a cross section to through a support layer 16 according to figure 5, on which a finished piece of concrete 7 is arranged. For the filling of the hollow space between the finished concrete piece 7 and the layer of support 16 is again arranged a filling mass 8, which fixes the position of the finished concrete piece 7.

La figura 7 muestra otra forma de realización de la invención en una sección trasversal a través de la calzada. El lecho de balasto 2 está rodeado en este caso con una capa de aglutinante 15. El aglutinante 15 rodea el lecho de balasto 2 tanto en su lado superior como también en sus flancos. De esta manera se consigue un cercamiento en forma de abrazadera del lecho de balasto 2 con la capa de aglutinante 15. La capacidad de soporte y la retención del lecho de balasto 2 se elevan de esta manera y se consigue una capacidad de soporte muy buena de la capa de soporte, que no se modifica en su posición tampoco en el caso de vibraciones, por ejemplo cuando circula por encima un tren de alta velocidad. El gasto de mantenimiento de una calzada de este tipo se mantiene de esta manera especialmente reducido. El aglutinante 15 puede ser introducido en este caso fácilmente en las cavidades del lecho de balasto 2, éste es especialmente el caso cuando en el aglutinante 15 se trata de un mortero fluido, que se puede filtrar fácilmente en el lecho de balasto 2, antes de que se fragüe. Sobre la superficie del aglutinante 15 se rellena de nuevo la pieza acabada de hormigón con la vía 6 y una masa de relleno 8 dispuesta entre la pieza acabada de hormigón 7 y el aglutinante 15.Figure 7 shows another embodiment of the invention in a cross section through the road. He ballast bed 2 is surrounded in this case with a layer of binder 15. Binder 15 surrounds the bed of ballast 2 both on its upper side as well as on its flanks. This way it get a ballast bed clamp-shaped enclosure 2 with the binder layer 15. The bearing capacity and the ballast bed retention 2 rise in this way and it get a very good support capacity of the support layer, which does not change in position either in the case of vibrations, for example when a high-speed train runs over it. He maintenance expense of such a roadway remains of This way especially reduced. The binder 15 can be introduced in this case easily into the bed cavities of Ballast 2, this is especially the case when in the binder 15 it is a fluid mortar, which can be easily filtered in the bed of ballast 2, before it set. Over the surface from the binder 15 the finished concrete part is refilled with track 6 and a filling mass 8 arranged between the piece Finished concrete 7 and binder 15.

La presente invención no está limitada a los ejemplos de realización representados. En particular, son posibles combinaciones de las preparaciones individuales del lecho de balasto 2. Así, por ejemplo, en el lecho de balasto 2 se pueden introducir columnas 4 y se puede aplicar adicionalmente una capa de soporte 16 a través de fresado sobre las columnas 4. Además, se puede realizar una sujeción circundante de acuerdo con la figura 7 en combinación con el fresado de las figuras 5 y 6 y/o la construcción de columnas 4. El aglutinante no tiene que poder fraguarse hidráulicamente. También se pueden utilizar aglutinantes a base de plástico o alquitrán. En el caso de utilización de hormigón preparado en el lugar para la construcción de la calzada, no es necesario habitualmente disponer una masa de relleno 8 sobre la capa de soporte 16, además se pretende la aplicación de la obturación del balasto restante antes de la aplicación del hormigón preparado en el lugar.The present invention is not limited to Examples of embodiment represented. In particular, they are possible combinations of individual ballast bed preparations 2. Thus, for example, the ballast bed 2 can be introduced columns 4 and a support layer 16 can be applied additionally through milling on columns 4. In addition, it can be performed a surrounding fastener according to figure 7 in combination with the milling of figures 5 and 6 and / or the construction of columns 4. The binder does not have to be able to set hydraulically. You can also use plastic-based binders or tar. In the case of using concrete prepared in the place for the construction of the road, it is not necessary usually arranging a filling mass 8 on the layer of support 16, in addition the application of the sealing of the Ballast remaining before the application of the concrete prepared in the place.

Claims (19)

1. Procedimiento para la construcción de una vía fija para el tráfico ferroviario de alta velocidad a partir de piezas acabadas de hormigón (7) prefabricadas, que se depositan sobre una capa de soporte (2, 4; 16) y se vierte en un espacio intermedio entre las piezas acabadas de hormigón (7) y la capa de soporte (2, 4; 16), para la fijación de la posición de las piezas acabadas de hormigón (7), una masa de relleno (8) que se consolida o se construye a partir de hormigón preparado en el lugar o una combinación de piezas acabadas de hormigón (7) y hormigón preparado en el lugar sobre la capa de soporte (2, 4; 16), en el que la capa de soporte (2, 4; 16) se construye a partir de un lecho de balasto (2) existente, en el que el balasto está al menos en parte consolidado, caracterizado porque se introduce un aglutinante (15) entre las traviesas (5) de una vía (6) todavía antigua en el lecho de balasto (2) y después del fraguado del aglutinante (15) se retiran la vía (6), las traviesas (5) y el balasto excesivo.1. Procedure for the construction of a fixed track for high-speed rail traffic from finished precast concrete parts (7), which are deposited on a support layer (2, 4; 16) and poured into a space intermediate between the finished concrete pieces (7) and the support layer (2, 4; 16), for fixing the position of the finished concrete pieces (7), a filling mass (8) that consolidates or it is constructed from concrete prepared in place or a combination of finished pieces of concrete (7) and concrete prepared in place on the support layer (2, 4; 16), in which the support layer (2, 4; 16) is constructed from an existing ballast bed (2), in which the ballast is at least partially consolidated, characterized in that a binder (15) is introduced between the sleepers (5) of a track (6) ) still old in the bed of ballast (2) and after the setting of the binder (15) the track (6) is removed, the sleepers (5) and excessive ballast. 2. Procedimiento de acuerdo con la reivindicación anterior, caracterizado porque el balasto se combina para la consolidación con un aglutinante (15) que se fragua hidráulicamente o aglutinante bituminoso o aglutinante a base de plástico.2. Method according to the preceding claim, characterized in that the ballast is combined for consolidation with a binder (15) that is hydraulically set or bituminous binder or plastic-based binder. 3. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque el aglutinante (15) es introducido a presión en las cavidades del lecho de balasto (2).Method according to one of the preceding claims, characterized in that the binder (15) is introduced under pressure into the cavities of the ballast bed (2). 4. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque en el lecho de balasto (2) se introducen lanzas de inyección, especialmente se introducen con agitación, a través de las cuales se introduce a presión el aglutinante (15) en las cavidades del lecho de balasto (2).4. Method according to one of the preceding claims, characterized in that injection lances (2) are introduced into the ballast bed, especially with stirring, through which the binder (15) is introduced under pressure into the ballast bed cavities (2). 5. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque el aglutinante (15) se introduce en al menos una dirección a una distancia entre sí, de manera que en el lecho de balasto (2) se obtienen zonas fraguadas hidráulicamente y zonas intermedias no rellenas.Method according to one of the preceding claims, characterized in that the binder (15) is introduced in at least one direction at a distance from each other, so that hydraulically set zones and zones are obtained in the ballast bed (2). intermediate not filled. 6. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque las zonas no rellenas son cerradas herméticamente en la superficie.Method according to one of the preceding claims, characterized in that the unfilled areas are sealed in the surface. 7. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque la superficie del lecho de balasto (2) es fresada, el material fresado que se obtiene en este caso es mezclado con el aglutinante (15) y se aplica sobre la superficie del lecho de balasto (2) restante como capa de soporte (16), y porque después del fraguado de esta mezcla, se construye la vía fija sobre la superficie nueva resultante.Method according to one of the preceding claims, characterized in that the surface of the ballast bed (2) is milled, the milled material obtained in this case is mixed with the binder (15) and applied on the surface of the ballast bed (2) remaining as a support layer (16), and because after the setting of this mixture, the fixed track is built on the resulting new surface. 8. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque el aglutinante (15) es aplicado antes del fresado sobre la superficie del lecho de balasto (2).Method according to one of the preceding claims, characterized in that the binder (15) is applied before milling on the surface of the ballast bed (2). 9. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque el aglutinante (15) es mezclado, después del fresado, con el material fresado.Method according to one of the preceding claims, characterized in that the binder (15) is mixed, after milling, with the milled material. 10. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque el aglutinante (15) o bien porque la capa de soporte (16) se tienda sobre el lecho de balasto (2) a modo de una abrazadera, en el que el aglutinante (15) penetra en la superficie del lecho de balasto (2) y se cierra lateralmente.Method according to one of the preceding claims, characterized in that the binder (15) or because the support layer (16) is placed on the ballast bed (2) as a clamp, in which the binder (15) penetrates the surface of the ballast bed (2) and closes laterally. 11. Procedimiento de acuerdo con una de las reivindicaciones anteriores, caracterizado porque se incorpora un desagüe en la capa de soporte y/o se mantiene en el balasto restante existente.Method according to one of the preceding claims, characterized in that a drain is incorporated in the support layer and / or is maintained in the existing remaining ballast. 12. Calzada de una vía fija para un vehículo ferroviario del tráfico ferroviario de alta velocidad a partir de piezas acabadas de hormigón (7) prefabricadas, que se depositan sobre una capa de soporte (2, 4; 16) y en la que se vierte en un espacio intermedio entre las piezas acabadas de hormigón (7) y la capa de soporte (2, 4; 16), para la fijación de la posición de las piezas acabadas de hormigón (7), una masa de relleno (8) que se consolida o se construye a partir de hormigón preparado en el lugar o una combinación de piezas acabadas de hormigón (7) y hormigón preparado en el lugar sobre la capa de soporte (2, 4; 16), en la que la capa de soporte (2, 4; 16) se construye a partir de un lecho de balasto (2) existente, en la que el balasto está al menos en parte consolidado, caracterizada porque se introduce un aglutinante (15) entre las traviesas (5) de una vía (6) todavía antigua en el lecho de balasto (2), en la que el aglutinante (15) y el balasto son introducidos en forma de columnas (4), que forman la capa de soporte (2, 4; 16), en el lecho de balasto (2).12. Fixed-track roadway for a high-speed rail traffic rail vehicle from finished concrete parts (7) prefabricated, which are deposited on a support layer (2, 4; 16) and into which it is poured in an intermediate space between the finished concrete pieces (7) and the support layer (2, 4; 16), for fixing the position of the finished concrete pieces (7), a filling mass (8) that it is consolidated or constructed from concrete prepared in place or a combination of finished pieces of concrete (7) and concrete prepared in place on the support layer (2, 4; 16), in which the support layer (2, 4; 16) is constructed from an existing ballast bed (2), in which the ballast is at least partially consolidated, characterized in that a binder (15) is introduced between the sleepers (5) of a track (6) still old in the ballast bed (2), in which the binder (15) and the ballast are introduced into form of columns (4), which form the support layer (2, 4; 16), in the ballast bed (2). 13. Calzada de acuerdo con la reivindicación anterior, caracterizada porque el balasto está consolidado con un aglutinante (15) que se fragua hidráulicamente o aglutinante bituminoso o aglutinante a base de plástico.13. Roadway according to the preceding claim, characterized in that the ballast is consolidated with a binder (15) that is hydraulically set or bituminous binder or plastic based binder. 14. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque el aglutinante (15) es introducido a presión en las cavidades del lecho de balasto (2).14. Roadway according to one of the preceding claims, characterized in that the binder (15) is pressurized into the cavities of the ballast bed (2). 15. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque el aglutinante (15) está introducido al menos en una dirección a una distancia entre sí, de manera que en el lecho de balasto (2) están dispuestas zonas fraguadas hidráulicamente y zonas intermedias no rellenas.15. Roadway according to one of the preceding claims, characterized in that the binder (15) is inserted at least one direction at a distance from each other, such that hydraulically set zones and zones are arranged in the ballast bed (2). intermediate not filled. 16. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque las zonas no rellenas están cerradas herméticamente en la superficie con un agente de obturación (9).16. Roadway according to one of the preceding claims, characterized in that the unfilled areas are hermetically sealed on the surface with a sealing agent (9). 17. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque la superficie del lecho de balasto (2) está fresada, porque el material fresado se mezcla con el aglutinante (15) y se aplica sobre la superficie del lecho de balasto (2) restante, y porque la vía fija está construida sobre la superficie nueva resultante.17. Roadway according to one of the preceding claims, characterized in that the surface of the ballast bed (2) is milled, because the milled material is mixed with the binder (15) and applied on the surface of the ballast bed (2 ) remaining, and because the fixed track is built on the resulting new surface. 18. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque el aglutinante (15) es líquido y se coloca junto con balasto como capa de soporte (16) a modo de una abrazadera sobre el lecho de balasto (2) y penetra aproximadamente de 5 a 20 cm en la superficie y los lados del lecho de balasto (2).18. Roadway according to one of the preceding claims, characterized in that the binder (15) is liquid and is placed together with ballast as a support layer (16) as a clamp on the ballast bed (2) and penetrates approximately 5 to 20 cm on the surface and sides of the ballast bed (2). 19. Calzada de acuerdo con una de las reivindicaciones anteriores, caracterizada porque se incorpora un desagüe en la capa de soporte (2, 4; 16) y/o se mantiene en el lecho de balasto (2) restante existente.19. Roadway according to one of the preceding claims, characterized in that a drain is incorporated in the support layer (2, 4; 16) and / or is maintained in the existing remaining ballast bed (2).
ES03813884T 2002-12-27 2003-12-06 PROCEDURE FOR THE CONSTRUCTION OF A CORRESPONDING FIXED AND FOOTWEAR ROAD. Expired - Lifetime ES2316873T3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10261641A DE10261641A1 (en) 2002-12-27 2002-12-27 Method of making a slab track and track
DE10261641 2002-12-27

Publications (1)

Publication Number Publication Date
ES2316873T3 true ES2316873T3 (en) 2009-04-16

Family

ID=32478102

Family Applications (1)

Application Number Title Priority Date Filing Date
ES03813884T Expired - Lifetime ES2316873T3 (en) 2002-12-27 2003-12-06 PROCEDURE FOR THE CONSTRUCTION OF A CORRESPONDING FIXED AND FOOTWEAR ROAD.

Country Status (8)

Country Link
EP (1) EP1576240B1 (en)
CN (1) CN1732315B (en)
AT (1) ATE415520T1 (en)
AU (1) AU2003296623A1 (en)
DE (2) DE10261641A1 (en)
ES (1) ES2316873T3 (en)
PL (1) PL213301B1 (en)
WO (1) WO2004059084A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007057064A1 (en) * 2007-11-27 2009-05-28 Hennecke Gmbh Method for strengthening a ballast bed and apparatus for carrying out the method
CN101424063B (en) * 2008-12-11 2011-06-15 浙江中联建设集团有限公司 A single time construction method for temporary and permanent roads
DE102010030334A1 (en) 2010-06-22 2011-12-22 Ed. Züblin Ag Method for rehabilitating a track system with a ballast bed
CN103452017A (en) * 2012-05-28 2013-12-18 中铁六局集团有限公司 Edge sealing construction method of non-slag track plate
CN103437252B (en) * 2013-08-05 2016-02-03 北京市轨道交通设计研究院有限公司 A kind of track bed structure and construction method thereof
CN104195890B (en) * 2014-08-13 2015-12-09 刘义安 A kind of railway solidification is closed railway roadbed and solidifies the method closed
CN107178010A (en) * 2017-07-06 2017-09-19 中铁上海工程局集团有限公司 A kind of city track traffic engineering assembled track laying device and method
CN115536325A (en) * 2021-06-30 2022-12-30 江苏苏博特新材料股份有限公司 Graphene modified emulsified asphalt-cement-based composite railway ballast elastic curing grouting material and preparation method and application thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1914712C3 (en) * 1969-03-22 1973-09-27 Stahlwerke Peine-Salzgitter Ag, 3150 Peine Method of making a railroad track
JPS521161B2 (en) * 1972-02-10 1977-01-12
US4232823A (en) * 1979-05-07 1980-11-11 Inseco Associates, Inc. Method and apparatus for installation of quench car track for coke oven batteries
GB8725290D0 (en) * 1987-10-28 1987-12-02 Waters J M Track support system
DE4104683A1 (en) * 1991-02-15 1992-08-20 Wayss & Freytag Ag Rail road bed - uses liq. mortar to form a plate in upper section of the ballast, with structured ballast particles to prevent downwards dispersion
DE10133246A1 (en) * 2001-07-09 2003-01-23 Walter Heilit Verkehrswegebau Conversion of ballasted trackbed to solid roadbed starts by removing rails and ballast used for concrete aggregate once crushed to size for concrete plate laid on bearing layer to complete solid roadbed.
CN2514029Y (en) * 2001-12-21 2002-10-02 李玉科 Broken rubber roadbed rail
DE20220484U1 (en) * 2002-06-21 2003-10-02 Jörger, Konrad, 70327 Stuttgart Platform construction method for fixed train track involves ballast surface and a rear formed surface using bringing the filling material and binding material to the ballast surface and mixing together

Also Published As

Publication number Publication date
WO2004059084A1 (en) 2004-07-15
CN1732315A (en) 2006-02-08
EP1576240B1 (en) 2008-11-26
EP1576240A1 (en) 2005-09-21
DE10261641A1 (en) 2004-07-08
DE50310840D1 (en) 2009-01-08
PL377384A1 (en) 2006-02-06
CN1732315B (en) 2010-05-12
PL213301B1 (en) 2013-02-28
ATE415520T1 (en) 2008-12-15
AU2003296623A1 (en) 2004-07-22

Similar Documents

Publication Publication Date Title
CN112048955B (en) Construction method for backfilling gravel roadbed
CN107059496B (en) A kind of track road-bridge transition section slip casting correction lifting method
CN110904823B (en) Bridge head bump treatment construction structure and construction method in high soft soil filling area
ES2316873T3 (en) PROCEDURE FOR THE CONSTRUCTION OF A CORRESPONDING FIXED AND FOOTWEAR ROAD.
CN209338921U (en) A kind of high-speed railway subgrade differential settlement reinforcing lifting leveling structure
CN102979021B (en) Construction method for treating vehicle jump at bridge head in highway
CN211228180U (en) Culvert structure capable of protecting embankment
CN102644224A (en) Novel roadbed side slope building protecting method and precast concrete blocks therefor
CN109853624B (en) Extension construction method for existing highway rectangular culvert
CN209836721U (en) Embankment widening longitudinal joint treatment structure
CN110172885A (en) Highway Construction in Desert method
CN214545888U (en) Novel tree pool structure
CN112900181B (en) Construction method for widening thin layer of asphalt pavement
KR102401085B1 (en) Labor saving ballast track structure having sleeper fixing and supporting apparatus for securing longitudinal and transverse axial, and construction method for the same
CN214992966U (en) Concrete road surface fracture subsidence section punishment structure
CN112663431B (en) Concrete pavement fracture subsidence section treatment structure and construction method
JPH03137303A (en) Building method for frame shaped slab track
CN211171537U (en) Road repairing roadbed structure
JP2006233584A (en) Bridge structure of girder bridge
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN108589461B (en) Hollow model and garden road construction process applying same
CN216663677U (en) Asphalt concrete construction joint seam reinforcing structure
US1745747A (en) Roadbed construction for railways
CN212025806U (en) Asphalt pavement
CN221721268U (en) Highway reconstruction and expansion embedded foam light soil roadbed filling structure