CN104195890B - A kind of railway solidification is closed railway roadbed and solidifies the method closed - Google Patents

A kind of railway solidification is closed railway roadbed and solidifies the method closed Download PDF

Info

Publication number
CN104195890B
CN104195890B CN201410395929.9A CN201410395929A CN104195890B CN 104195890 B CN104195890 B CN 104195890B CN 201410395929 A CN201410395929 A CN 201410395929A CN 104195890 B CN104195890 B CN 104195890B
Authority
CN
China
Prior art keywords
railway
railway roadbed
closed
solidification
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410395929.9A
Other languages
Chinese (zh)
Other versions
CN104195890A (en
Inventor
刘义安
周飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410395929.9A priority Critical patent/CN104195890B/en
Publication of CN104195890A publication Critical patent/CN104195890A/en
Application granted granted Critical
Publication of CN104195890B publication Critical patent/CN104195890B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The present invention relates to a kind of railway solidification close railway roadbed and solidification close method, wherein railway solidification close railway roadbed comprise be separately positioned on railway ballast both sides gear quarrel wall, be located at the packing material in railway roadbed and be arranged on the anti-crack concrete layer at railway roadbed top; The method that railway ballast solidification is closed adopts following steps: one, ballast cleaning; Two, gear quarrel wall is built; Three, railway roadbed is made firm by ramming; Four, railway roadbed is closed and is built solidification; The present invention is convenient to make gear quarrel wall and railway roadbed ballast form firm entirety, and be convenient to clear up, load and unload the material transported, the ballast of rail track is closed, both ensured that railway roadbed was firm, can ensure again can not become scattered about on ballast again by the material of railway transportation, be convenient to become scattered about the material cleaning on rail track in transport, cargo handling process simultaneously, cut the waste, ensure sanitation of environment.

Description

A kind of railway solidification is closed railway roadbed and solidifies the method closed
Technical field
The present invention relates to the solidification of a kind of railway close railway roadbed and solidify the method closed, belong to Railway Transport Industry.
Background technology
The railway lines such as current rail yard, goods yard, power plant are mostly on roadbed lays stone ballast aggregate, repaves sleeper and steel-rail structure.Owing to having space between ballast aggregate, especially unload seam, when granule materials unloads on car, have many materials to fall within ballast aggregate, cannot clear up, not only form waste greatly, also cause ballast aggregate to pollute, affect circuit and stablize.For this reason, the coal yard special purpose railroad had at present directly railway roadbed is made concrete, but it is not owing to having ballast, and railway roadbed loses elasticity, have impact on the steady of vehicle pass-through, and very easily causes the damage of rail and wheel.
Along with the progress of high ferro technology, solid concrete roabed technology is applied unloading in seam, and the solid concrete roabed technology that namely seam have employed high ferro is unloaded by the Cao Fei pasture coal wharf as newly-built.But the solid concrete roabed adopting high ferro technical transform and come, construction technical requirement is high, invests huge, belongs to waste for goods yard, field of standing, the power plant industrial siding such as to unload coal relative to its travelling speed.For the rail yard built up, goods yard, power plant's industrial siding, transformation need circuit all to remove clean out after could construct, construction period is very long, invests huge, and this will have a strong impact on normal production and transport order.
Summary of the invention
Railway roadbed solidification is closed under being to provide a kind of condition stable at guarantee circuit by technical problem to be solved by this invention, makes railway roadbed smooth surface, and the railway solidification that railroad ballast is closed is closed railway roadbed and solidifies the method closed.
The present invention adopts following technical scheme:
The present invention adopts following technical scheme:
The method that railway ballast solidification of the present invention is closed adopts following steps:
One, ballast cleaning: first impurity in railway roadbed is removed clean, supplement or removing the ballast;
Two, gear quarrel wall is built: along toe ground, railway ballast both sides place excavation foundation ditch, tamp at the bottom of foundation ditch, beat 20-30cm 37 lime earth bed course, formwork supporting plate on 37 lime earth bed course, the gear quarrel wall of pouring reinforcement concrete is moved towards on downline road, on described gear quarrel wall, end face is L apart from the distance of rail bottom surface, and described L is 10-12cm; Gear quarrel wall arranges shrinkage joint and drain hole;
Three, railway roadbed is made firm by ramming: repeatedly made firm by ramming by the ballast aggregate in railway roadbed, mend quarrel, compacting, and in railway roadbed, immerse ballast aggregate glue or bituminous concrete or CA mortar, is tamped by ballast aggregate hole in railway roadbed;
Four, railway roadbed is closed and is built solidification: arrange elaxtic seal at railway roadbed top and between railway roadbed top and each side of sleeper, then build anti-crack concrete layer at elaxtic seal top, described anti-crack concrete layer top is smooth surface;
Described railway solidification is closed railway roadbed and is comprised the gear quarrel wall being separately positioned on railway ballast both sides, be located at the packing material in railway roadbed and be arranged on the anti-crack concrete layer at elaxtic seal top, at described railway roadbed top and between railway roadbed top and each side of sleeper, elaxtic seal is set, described packing material is ballast aggregate glue, bituminous concrete or CA mortar, described anti-crack concrete layer thickness is 8-15cm, described anti-crack concrete layer upper surface is P apart from the distance of rail bottom surface, described P is 8-10cm, the upper end face of described anti-crack concrete layer is higher than end face on gear quarrel wall,
Described anti-crack concrete layer reduces from railroad track center to railway roadbed both sides, and the gradient of reduction is 2%-5%;
Described anti-crack concrete layer is that steel fibre and ordinary concrete mix;
Described elaxtic seal is SBS modified asphalt waterproof coiled material.
Gear quarrel wall of the present invention is 30-60cm in the underground degree of depth, and height is on the ground 50-80cm, and end face width is 15-30cm; Described gear quarrel wall cross section is trapezoidal, and its side adjacent with railway roadbed is vertical plane, and its opposite side is inclined-plane, and the angle β of described inclined-plane and surface water plane is 50-70 ゜.
The spacing at the described shrinkage joint that the present invention is adjacent is 20-30m; The width at shrinkage joint is 5-10mm; Pitch spunyarn is set in shrinkage joint.
Drain hole of the present invention is low inside and high outside setting by keeping off quarrel wall Inside To Outside, and the gradient of described drain hole is 2%-5%; Outside drain hole, the height on distance of center circle ground is 9-15cm, and the diameter of bore of described drain hole is 40-60mm.
The thickness of anti-crack concrete layer of the present invention is 8-15cm.
Good effect of the present invention is as follows:
The present invention is convenient to make gear quarrel wall and railway roadbed ballast form firm entirety, and be convenient to clear up, load and unload the material transported, the ballast of rail track is closed, both ensured that railway roadbed was firm, can ensure again can not become scattered about on ballast again by the material of railway transportation, be convenient to become scattered about the material cleaning on rail track in transport, cargo handling process simultaneously, cut the waste, ensure sanitation of environment.In railway roadbed, packing material is as ballast aggregate glue, bituminous concrete or CA mortar etc., to ensure that ballast is firm, can forever vehicle pass through, at described railway roadbed top and arrange elaxtic seal such as SBS modified asphalt waterproof coiled material etc. between railway roadbed top and each side of sleeper and do flexible spacer, the vibrations activity reducing sleeper during vehicle pass-through on the impact of end face closed concrete layer, prevent simultaneously follow-up build anti-crack concrete time have concrete and concrete slurry to immerse bottom sleeper.Pitch spunyarn, as the packing material at shrinkage joint, has construction simple, and it is convenient to fill, and water-tight performance is good; Between sleeper, build anti-crack concrete, make roadbed become smooth surface, when effectively ensureing that railroad train loads and unloads granular goods, avoid the material be scattered to invade in railroad ballast, the pellet be simultaneously scattered also is convenient to cleaning.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention;
Accompanying drawing 2 keeps off quarrel wall construction schematic diagram for the present invention;
Accompanying drawing 3 is the structural representation between anti-crack concrete layer of the present invention and sleeper.
In the accompanying drawings: 1 gear quarrel wall, 2 anti-crack concrete layers, 3 packing materials, 4 elaxtic seals, 5 sleepers, 6 railway roadbeds, 7 rails, 8 drain holes, 9 37 lime earth bed courses, 10 ground, 11 shrinkage joint, 12 pitch spunyarns.
Detailed description of the invention
As shown in accompanying drawing 1,2,3, railway of the present invention solidification close railway roadbed comprise be separately positioned on railway ballast 6 both sides gear quarrel wall 1, be located at the packing material 3 in railway roadbed 6 and be arranged on the anti-crack concrete layer 2 that elaxtic seal 4 top mixes by steel fibre and ordinary concrete, the anti-crack concrete layer 2 that steel fibre and ordinary concrete mix can significantly improve the tensile strength of anti-crack concrete, flexural strength and fatigue resistance, in pavement engineering, application can obvious thickness thinning, improves pavement performance; At described railway roadbed 6 top and between railway roadbed 6 top and each side of sleeper 5, elaxtic seal 4 is set, described elaxtic seal 4 is SBS modified asphalt waterproof coiled material, it has good resistance to elevated temperatures, can use in the temperature range of-25 DEG C to+100 DEG C degree, have higher elasticity and fatigue durability and up to 1500% elongation rate and stronger puncture-resistant ability, tear-resistant ability, be applicable to using in distortion and the larger waterproofing of vibration; Described packing material 3 is ballast aggregate glue, bituminous concrete or CA mortar, described anti-crack concrete layer 2 thickness is 8-15cm, the best is 9cm, described anti-crack concrete layer 2 upper surface is apart from rail 7 bottom surface 8-10cm, the best is 10cm, the upper end face of described anti-crack concrete layer 2 is higher than end face 1-2cm on gear quarrel wall 1, the best is 2cm, such height is convenient to remove leftover materials and foreign material, described anti-crack concrete layer 2 reduces from railroad track center to railway roadbed 6 both sides, reduce the gradient forming 2%-5%, gradient the best is 2%, can prevent ponding on anti-crack concrete layer 2 like this.
As shown in accompanying drawing 1,2,3, the method that railway ballast solidification of the present invention is closed, it adopts following steps:
One, ballast cleaning: first impurity in railway roadbed 6 is removed clean, supplement or removing the ballast;
Two, gear quarrel wall is built: along toe ground place, railway ballast 6 both sides excavation foundation ditch, tamp at the bottom of foundation ditch, beat 20-30cm 37 lime earth bed course, the best is 30cm, formwork supporting plate on cushion lime, the gear quarrel wall 1 of pouring reinforcement concrete is moved towards on downline road, and described gear quarrel wall 1 end face is 10-12cm apart from the distance L of rail bottom surface, and the best is 12cm; Gear quarrel wall 1 arranges shrinkage joint 11 and drain hole 8; The degree of depth of described gear quarrel wall 1 under ground 10 is 30-60cm, and the best is 30cm, and the height on ground 10 is 50-80cm, and the best is 60cm, and end face width is 15-30cm, and the best is 20cm; Described gear quarrel wall 1 cross section is trapezoidal, and its side adjacent with railway roadbed is vertical plane, and its opposite side is inclined-plane, and the angle β of inclined-plane and ground 10 horizontal plane is 50-70 ゜, and the best is 70 ゜; The spacing at adjacent described shrinkage joint 11 is 20-30m, and the best is 25m; The width at described shrinkage joint 11 is 5-10mm, and the best is 10mm, arranges pitch spunyarn 12 in shrinkage joint 11; Described drain hole 8 is low inside and high outside setting by gear quarrel wall 1 Inside To Outside, and the gradient of described drain hole 8 is 2%-5%, and the best is 2%, outside drain hole 8, the height on distance of center circle ground is 9-15cm, the best is 10cm, and the diameter of bore of described drain hole 8 is 40-60mm, and the best is 50mm.
Three, railway roadbed is made firm by ramming: repeatedly made firm by ramming by the ballast aggregate of railway roadbed 6, mend quarrel, compacting, and in railway roadbed 6, immerse ballast aggregate glue or bituminous concrete or CA mortar, is tamped by ballast aggregate hole in railway roadbed 6;
Four, railway roadbed closes solidification: arrange elaxtic seal 4 at railway roadbed 6 top and between railway roadbed 6 top and each side of sleeper 5, then build anti-crack concrete layer 2 at elaxtic seal 4 top, described anti-crack concrete layer 2 top is smooth surface; The thickness of described anti-crack concrete layer 2 is 8-15cm, and the best is 9cm.
The present invention is convenient to make gear quarrel wall 1 form firm entirety with railway roadbed 6 ballast, and be convenient to clear up, load and unload the material transported, the ballast of rail track is closed, both ensured that railway roadbed was firm, can ensure again can not become scattered about on ballast again by the material of railway transportation, be convenient to become scattered about the material cleaning on rail track in transport, cargo handling process simultaneously, cut the waste, ensure sanitation of environment.In railway roadbed 6, packing material 3 is as ballast aggregate glue, bituminous concrete or CA mortar etc., firm to ensure railway roadbed 6, can forever vehicle pass through, at described railway roadbed 6 top and arrange elaxtic seal 4 such as SBS modified asphalt waterproof coiled material etc. between railway roadbed 6 top and each side of sleeper and do flexible spacer, reduce the vibrations activity of sleeper during vehicle pass-through to the impact of end face closed concrete layer, prevent simultaneously follow-up build anti-crack concrete time have concrete and concrete slurry to immerse bottom sleeper 5, anti-crack concrete layer 2 is built between sleeper 5, railway roadbed 6 end face is made to become smooth surface, when effectively can ensure that railroad train loads and unloads granular goods, the material be scattered is avoided to invade in railroad ballast, the pellet be simultaneously scattered also is convenient to cleaning.

Claims (4)

1. the method that the solidification that railway roadbed is closed in railway solidification is closed, is characterized in that the method that railway ballast solidification is closed adopts following steps:
One, ballast cleaning: first interior for railway roadbed (6) impurity is removed clean, supplement or removing the ballast;
Two, gear quarrel wall is built: along toe ground place, railway ballast (6) both sides excavation foundation ditch, tamp at the bottom of foundation ditch, beat 20-30cm 37 lime earth bed course (9), at the upper formwork supporting plate of 37 lime earth bed course (9), gear quarrel wall (1) of pouring reinforcement concrete is moved towards on downline road, the upper end face of described gear quarrel wall (1) is L apart from the distance of rail (7) bottom surface, and described L is 10-12cm; Gear quarrel wall (1) arranges shrinkage joint (11) and drain hole (8);
Three, railway roadbed is made firm by ramming: repeatedly made firm by ramming, mend quarrel, compacting by the ballast aggregate in railway roadbed (6), and to immersing ballast aggregate glue or bituminous concrete or CA mortar in railway roadbed (6), is tamped by interior for railway roadbed (6) ballast aggregate hole;
Four, railway roadbed is closed and is built solidification: arrange elaxtic seal (4) at railway roadbed (6) top and between railway roadbed (6) top and sleeper (5) each side, then build anti-crack concrete layer (2) at elaxtic seal (4) top, described anti-crack concrete layer (2) top is smooth surface;
Described railway solidification is closed railway roadbed and is comprised gear quarrel wall (1) being separately positioned on railway ballast (6) both sides, be located at the packing material (3) in railway roadbed (6) and be arranged on the anti-crack concrete layer (2) at elaxtic seal (4) top, at described railway roadbed (6) top and between railway roadbed (6) top and sleeper (5) each side, elaxtic seal (4) is set, described packing material (3) is ballast aggregate glue, bituminous concrete or CA mortar, described anti-crack concrete layer (2) thickness is 8-15cm, described anti-crack concrete layer (2) upper surface is P apart from the distance of rail (7) bottom surface, described P is 8-10cm, the upper end face of described anti-crack concrete layer (2) is higher than the upper end face of gear quarrel wall (1),
Described anti-crack concrete layer (2) is reduced from railroad track center to railway roadbed (6) both sides, and the gradient of reduction is 2%-5%;
Described anti-crack concrete layer (2) mixes for steel fibre and ordinary concrete;
Described elaxtic seal (4) is SBS modified asphalt waterproof coiled material.
2. the method that the solidification that railway roadbed is closed in a kind of railway solidification according to claim 1 is closed, it is characterized in that described gear quarrel wall (1) degree of depth under ground (10) is 30-60cm, height on ground (10) is 50-80cm, and end face width is 15-30cm; Described gear quarrel wall (1) cross section is trapezoidal, and itself and railway roadbed (6) adjacent side are vertical plane, and its opposite side is inclined-plane, and the angle β of described inclined-plane and surface water plane is 50-70 ゜.
3. the method that the solidification that railway roadbed is closed in a kind of railway solidification according to claim 1 is closed, is characterized in that the spacing at adjacent described shrinkage joint (11) is 20-30m; The width at shrinkage joint (11) is 5-10mm; Pitch spunyarn (12) is set in shrinkage joint (11).
4. the method that the solidification that railway roadbed is closed in a kind of railway solidification according to claim 1 is closed, it is characterized in that described drain hole (8) is low inside and high outside setting by gear quarrel wall (1) Inside To Outside, the gradient of described drain hole (8) is 2%-5%; The height of drain hole (8) distance of center circle ground, outside (10) is 9-15cm, and the diameter of bore of described drain hole (8) is 40-60mm.
CN201410395929.9A 2014-08-13 2014-08-13 A kind of railway solidification is closed railway roadbed and solidifies the method closed Active CN104195890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410395929.9A CN104195890B (en) 2014-08-13 2014-08-13 A kind of railway solidification is closed railway roadbed and solidifies the method closed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410395929.9A CN104195890B (en) 2014-08-13 2014-08-13 A kind of railway solidification is closed railway roadbed and solidifies the method closed

Publications (2)

Publication Number Publication Date
CN104195890A CN104195890A (en) 2014-12-10
CN104195890B true CN104195890B (en) 2015-12-09

Family

ID=52081243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410395929.9A Active CN104195890B (en) 2014-08-13 2014-08-13 A kind of railway solidification is closed railway roadbed and solidifies the method closed

Country Status (1)

Country Link
CN (1) CN104195890B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629597A (en) * 2019-05-04 2019-12-31 纵超前 Standard gauge steel rail attached to inner ballast outer plate track bed reconstructed from railway ballast sleeper track bed

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283943A (en) * 2016-10-09 2017-01-04 北京交通大学 Elastic roadbed structure
CN106245466A (en) * 2016-10-09 2016-12-21 北京交通大学 Combined elastic ballast bed structure
CN107522429B (en) * 2017-08-18 2020-08-11 北京交通大学 Prefabricated railway ballast-asphalt track and preparation method thereof
CN111395075A (en) * 2020-03-09 2020-07-10 朔黄铁路发展有限责任公司 Maintenance method of ballast track bed
CN115262291A (en) * 2022-08-09 2022-11-01 中铁第六勘察设计院集团有限公司 Structure for embedding railway ballast retaining wall into concrete pavement and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19707296C2 (en) * 1997-02-11 1999-11-25 Betonwerk Rethwisch Gmbh Process for the production of a solid carriageway and suitable precast concrete parts
JP2002129503A (en) * 2000-10-25 2002-05-09 East Japan Railway Co Method for repairing slab type track
CN1732315A (en) * 2002-12-27 2006-02-08 马克斯博革建筑有限公司 Method for constructing a rigid track and a communication track
RU2007148869A (en) * 2007-12-29 2009-07-10 Алексей Дмитриевич Савватеев (RU) Tramway Device
CN102877381A (en) * 2012-11-02 2013-01-16 北京交通大学 Integral ballast bed lateral restraining device
EP2666907A1 (en) * 2012-05-23 2013-11-27 Colas Rail Railway track with sleepers on continuous concrete slab and manufacturing method
KR20140001647A (en) * 2012-06-28 2014-01-07 한국건설기술연구원 Method for constructing paving-track for railroad

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19707296C2 (en) * 1997-02-11 1999-11-25 Betonwerk Rethwisch Gmbh Process for the production of a solid carriageway and suitable precast concrete parts
JP2002129503A (en) * 2000-10-25 2002-05-09 East Japan Railway Co Method for repairing slab type track
CN1732315A (en) * 2002-12-27 2006-02-08 马克斯博革建筑有限公司 Method for constructing a rigid track and a communication track
RU2007148869A (en) * 2007-12-29 2009-07-10 Алексей Дмитриевич Савватеев (RU) Tramway Device
EP2666907A1 (en) * 2012-05-23 2013-11-27 Colas Rail Railway track with sleepers on continuous concrete slab and manufacturing method
KR20140001647A (en) * 2012-06-28 2014-01-07 한국건설기술연구원 Method for constructing paving-track for railroad
CN102877381A (en) * 2012-11-02 2013-01-16 北京交通大学 Integral ballast bed lateral restraining device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629597A (en) * 2019-05-04 2019-12-31 纵超前 Standard gauge steel rail attached to inner ballast outer plate track bed reconstructed from railway ballast sleeper track bed

Also Published As

Publication number Publication date
CN104195890A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104195890B (en) A kind of railway solidification is closed railway roadbed and solidifies the method closed
CN103276639B (en) Roadbed structure for deep soft soil region
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN206396566U (en) A kind of U-shaped embankment structure of pile of the anti-ground collapse in karst area
CN203284708U (en) Subgrade structure of deep-layer loose and soft soil region
KR20120111127A (en) Single pile concrete track structure and its settlement recovering device
CN107060815A (en) The iterative structure and its construction method of longitudinal concealed beam and shield duct piece in railway roadbed
CN204849489U (en) Railway roadbed structure with subtract vibration isolation bed course
CN108193572A (en) A kind of method recycled to precast beam precasting yard hardened layer
CN203487418U (en) Subgrade surface reinforcement waterproof structure of ballastless track high speed railway
CN107938707A (en) Prefabricated assembled underground subway station top board structure
CN204000468U (en) A kind of railway solidifies sealing railway roadbed
CN108547198A (en) A kind of method that building or be transformed assembled platform and special precast module group
KR100901753B1 (en) Precast concrete block unit structure of a cross-tie used rail mounted gantry crane and method leveling the uneven precast concrete block unit structure by injecting the grout into a grouting hole
EP3997270B1 (en) Ballast-plastic composite body
CN110359375A (en) The construction method of precast segment girder precast field under a kind of bridge
CN102174815B (en) Method for constructing ash dam in dry ash yard
CN203360962U (en) Inclined roadbed reinforcing structure for cement-soil piles with anchor cables
CN112127216B (en) Prefabricated assembly type asphalt substrate type ballastless track and construction method thereof
CN101705647A (en) Construction method of flexible track foundation of 450t beam-hoisting crane
CN206109896U (en) III template self -compaction concrete of CRTS fill construction equipment
CN110939019A (en) Box type roadbed structure and heavy-duty railway roadbed
CN103290751B (en) Inclining anchor cable cement earth pile subgrade strengthening structure
CN113279290B (en) Construction method of railway waterproof roadbed structure in coastal high-water-level area
CN214737026U (en) Detachable ballast bed curing and sealing structure

Legal Events

Date Code Title Description