ES2285904B1 - METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS. - Google Patents

METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS. Download PDF

Info

Publication number
ES2285904B1
ES2285904B1 ES200501826A ES200501826A ES2285904B1 ES 2285904 B1 ES2285904 B1 ES 2285904B1 ES 200501826 A ES200501826 A ES 200501826A ES 200501826 A ES200501826 A ES 200501826A ES 2285904 B1 ES2285904 B1 ES 2285904B1
Authority
ES
Spain
Prior art keywords
prefabricated concrete
pillars
concrete pillars
perfect
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
ES200501826A
Other languages
Spanish (es)
Other versions
ES2285904A1 (en
Inventor
Alfredo Dolado Bartolome
Alfredo Dolado Archilla
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to ES200501826A priority Critical patent/ES2285904B1/en
Publication of ES2285904A1 publication Critical patent/ES2285904A1/en
Application granted granted Critical
Publication of ES2285904B1 publication Critical patent/ES2285904B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

La armadura metálica para la fijación y anclaje de pilares de hormigón prefabricados tiene como objeto la simple y perfecta colocación de las vainas o tubos flexibles en las que posteriormente se acoplará una columna o pilar de hormigón prefabricado. El invento se compone de dos placas metálicas con diversos orificios en los cuales se encajan las vainas tanto en la parte superior como inferior evitando posibles desplazamientos de las mismas. También dispone de un orificio en la parte central de mayor tamaño para facilitar la vibración del hormigón. Asimismo, las placas están solidificadas por cuatro ángulos en las esquinas, los cuales llevan en la parte final un sistema para la nivelación de la armadura. Sus ventajas son claras, a parte de lo económico del mismo, la garantía del perfecto montaje de los distintos tipos de pilares. Actualmente no hay nada parecido.The metal reinforcement for the fixing and anchoring of precast concrete pillars has as its object the simple and perfect placement of the sheaths or flexible pipes in which a prefabricated concrete column or pillar will subsequently be attached. The invention is composed of two metal plates with various holes in which the pods are fitted both in the upper and lower part avoiding possible displacements thereof. It also has a hole in the larger central part to facilitate the vibration of the concrete. Likewise, the plates are solidified by four angles in the corners, which have in the final part a system for the leveling of the armor. Its advantages are clear, apart from its economic, the guarantee of the perfect assembly of the different types of pillars. Currently there is nothing similar.

Description

Armadura metálica para la fijación y anclaje de pilares de hormigón prefabricados.Metal frame for fixing and anchoring precast concrete pillars.

La invención se refiere a un dispositivo de colocación de conductos tubulares flexibles, a partir de un soporte o armadura metálica para la correcta colocación de las vainas procedentes de pilares de estructura de hormigón prefabricadas en el sector de la construcción.The invention relates to a device of placement of flexible tubular ducts, from a support or metal armor for the correct placement of the pods coming from prefabricated concrete structure pillars in the construction sector.

Actualmente se está utilizando un sistema muy complejo para unir dichos pilares de hormigón a las zapatas, lo que provoca numerosos retrasos en la ejecución de las obras e incluso una mala ejecución de las mismas. Con dicha invención, lo que se pretende conseguir es mejorar las condiciones, tanto económicas como de tiempo a los elementos hasta ahora utilizados y subsanar los inconvenientes que presentan los sistemas tradicionales de unión de estas piezas.A very current system is currently being used complex for joining said concrete pillars to the shoes, which causes numerous delays in the execution of the works and even a bad execution of them. With said invention, what is It aims to achieve is to improve conditions, both economic as of time to the elements used so far and correct the drawbacks of traditional systems of union of these pieces.

Entre las múltiples ventajas que en la práctica aporta el objeto de la patente, resalta la facilidad de colocación, lo económico y la garantía de un perfecto montaje de todo tipo de pilares de hormigón que hacen mucho más viable la labor de los operarios, así como de los técnicos competentes, ya que nos aseguramos desde el primer momento que el ensamblaje será perfecto.Among the many advantages that in practice provides the object of the patent, highlights the ease of placement, the economic and the guarantee of a perfect assembly of all kinds of concrete pillars that make the work of the operators, as well as competent technicians, since we we assure from the first moment that the assembly will be perfect.

Dicha armadura o soporte está compuesta de dos placas metálicas debidamente solidarizadas con la armadura, con unas aberturas circulares para la correcta colocación de los tubos o conductos que variará dependiendo de la medida de los mismos. Así mismo, dispone de otro orificio central que se destinará para facilitar la vibración del hormigón. Las placas en cuestión están unidas a través de cuatro ángulos debidamente solidarizados como hemos dicho anteriormente, y en cuyos extremos incorporan una solución para un perfecto nivelado de la armadura a través de un regulador de altura, con unas medidas que variarán dependiendo de la altura y dimensión del pilar, así como la carga a soportar.Said armor or support is composed of two metal plates duly in solidarity with the armor, with circular openings for the correct placement of the tubes or ducts that will vary depending on their measurement. So It also has another central hole that will be used to facilitate the vibration of concrete. The plates in question are united through four duly sympathetic angles as we have said before, and at whose ends they incorporate a solution for a perfect leveling of the armor through a height regulator, with measures that will vary depending on the height and dimension of the pillar, as well as the load to support.

Para completar la descripción que hemos realizado y con el objeto de ayudar a una mejor comprensión de las características de la invención, se va a realizar una descripción detallada en base a un juego de dibujos que se acompaña a esta memoria descriptiva formando parte de la misma:To complete the description we have done and in order to help a better understanding of the characteristics of the invention, a description will be made detailed based on a set of drawings that accompanies this descriptive report being part of it:

En la figura uno se muestra una vista en planta del sistema de invención.A plan view is shown in figure one of the invention system.

En la figura dos se muestra una vista en alzado correspondiente a la figura anterior.An elevation view is shown in figure two corresponding to the previous figure.

En la figura tres se muestra una vista en perspectiva de la figura anterior.Figure three shows a view in perspective of the previous figure.

Claims (1)

1. Armadura metálica para la fijación y anclaje de pilares de hormigón prefabricados, que se caracteriza por conseguir una perfecta unión de los pilares de hormigón prefabricados con la zapata caracterizado porque presenta:1. Metal reinforcement for fixing and anchoring of prefabricated concrete pillars, which is characterized by achieving a perfect union of the prefabricated concrete pillars with the shoe characterized in that it has:
--
dos placas de anclaje para la perfecta colocación de lo tubos flexibles o vainas las cuales tienen unas aberturas circulares con una medida que variará dependiendo de la medida de la vaina.two anchor plates for the perfect placement of flexible tubes or pods which have circular openings with a measure which will vary depending on the size of the sheath.
--
Cuatro ángulos solidarizados a las placas de anclaje para la unión y consistencia de las placas.Four angles in solidarity with the anchor plates for the union and consistency of the plates.
--
Cuatro niveladores en la parte final de los ángulos para la correcto montaje de la armadura metálica.Four levelers at the end of the angles for the correct metal armor assembly.
ES200501826A 2005-07-26 2005-07-26 METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS. Expired - Fee Related ES2285904B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES200501826A ES2285904B1 (en) 2005-07-26 2005-07-26 METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES200501826A ES2285904B1 (en) 2005-07-26 2005-07-26 METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS.

Publications (2)

Publication Number Publication Date
ES2285904A1 ES2285904A1 (en) 2007-11-16
ES2285904B1 true ES2285904B1 (en) 2008-11-01

Family

ID=38654305

Family Applications (1)

Application Number Title Priority Date Filing Date
ES200501826A Expired - Fee Related ES2285904B1 (en) 2005-07-26 2005-07-26 METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS.

Country Status (1)

Country Link
ES (1) ES2285904B1 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1025289A (en) * 1964-01-30 1966-04-06 Vincent Esme Vincent Improved foundation pile for supporting structural components
FR2453240A1 (en) * 1979-04-06 1980-10-31 Girec Sa Entreprises Precast reinforced concrete base block for building foundation - has pyramidal base and upper section retaining tubes for pre-cast stanchions
FR2488929A1 (en) * 1980-08-21 1982-02-26 Draux Michel METHOD FOR ANCHORING OR CONSTITUTION OF FOUNDATIONS FOR BUILDING ELEMENT OR SIMILAR
FR2591259A1 (en) * 1985-12-10 1987-06-12 Malie Louis Prefabricated block intended to support a frame pillar or a foundation element
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
JP3002107B2 (en) * 1994-12-19 2000-01-24 勤伍 内藤 Column base structure and column base construction method

Also Published As

Publication number Publication date
ES2285904A1 (en) 2007-11-16

Similar Documents

Publication Publication Date Title
ES2550106T3 (en) Anti-chipping flange
ES2794126T3 (en) Frame structure and method of construction of the same
ES2568064T3 (en) Foundation of a wind power plant
ES2403689T3 (en) Anchor post
ES2536986T3 (en) Concrete structure
ES2525405T3 (en) Procedure to mount tower elements to form sections of a hybrid tower of a wind turbine
ES2522440A2 (en) Steel pipe socket and method for connecting steel pipe pile with steel pipe column using same
ES2285904B1 (en) METAL ARMOR FOR THE FIXATION AND ANCHORAGE OF PREFABRICATED CONCRETE PILLARS.
ES2315182B1 (en) DEVICE FOR PLACEMENT ON FLOATING Slabs AND ITS INSTALLATION SYSTEM.
JP7197879B2 (en) Falling rock protection fence
JP2015129410A (en) Jig for constructing column for solar panel
KR20140108776A (en) Apparatus for reinforcing a connection part of a rigid-frame bridge
ES2631881B2 (en) ANTIVIBRATION RIGID ANCHORAGE DEVICE FOR CONSTRUCTION
ES2306550B1 (en) FERRALLA ARMOR FOR BEAMS OF REINFORCED CONCRETE.
JP6562544B2 (en) Cylindrical caisson scaffolding
ES2220236A1 (en) Multiplant building structure, has work holding part holding in work of self-supporting beams and armor elements crossing junction of pillars and extended in preslab direction, and hyper-static knots placed in situ concrete
ES2774322T3 (en) Punching reinforcement element and construction with a plate with a punching reinforcement element
ES2677793B1 (en) HEAD FOR BEAM ENCOUNTERS
CA2816154A1 (en) Suspended accurate placement system hanger for rebar
RU2016142556A (en) PRE-STRESSED STEEL CONCRETE BEAM
CN211446555U (en) Bailey beam limiting device for bridge abutment of steel trestle
US1348445A (en) Reinforced-concrete construction
ES2662926A1 (en) WIND TOWER PEDESTAL (Machine-translation by Google Translate, not legally binding)
ES2288784B1 (en) IMPROVED PREFABRICATED PILLAR SYSTEM.
ES2672256B2 (en) Tower construction procedure

Legal Events

Date Code Title Description
EC2A Search report published

Date of ref document: 20071116

Kind code of ref document: A1

FG2A Definitive protection

Ref document number: 2285904B1

Country of ref document: ES

FD1A Patent lapsed

Effective date: 20100315