EP4378790A1 - Temporary explosion-proof suspended ropeway bridge - Google Patents
Temporary explosion-proof suspended ropeway bridge Download PDFInfo
- Publication number
- EP4378790A1 EP4378790A1 EP22210999.3A EP22210999A EP4378790A1 EP 4378790 A1 EP4378790 A1 EP 4378790A1 EP 22210999 A EP22210999 A EP 22210999A EP 4378790 A1 EP4378790 A1 EP 4378790A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rope
- winch
- ropeway
- pulley
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 230000000694 effects Effects 0.000 claims description 2
- 239000002360 explosive Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
- YYCPSEFQLGXPCO-UHFFFAOYSA-N xi-p-Menth-3-ene Chemical compound CC(C)C1=CCC(C)CC1 YYCPSEFQLGXPCO-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B7/00—Rope railway systems with suspended flexible tracks
- B61B7/02—Rope railway systems with suspended flexible tracks with separate haulage cables
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention is composed of a steel rope, erect a temporary explosion-proof suspended ropeway bridge, applied to urgently transport personnel, vehicles, or similar heavy equipment over mountain valleys, col, cliffs, and other areas where bridges are required, a temporary ropeway bridge may be quickly erected by the method of the present invention, the method is that, when the personnel and equipment reach the valley side, start with a guide rope path (14), two people carried portable stakes (8) (Patent 112018006104.3) and tools across the valley, after installing the portable stake, personnel from both sides shall cooperate with the erection of steel wire rope ropeway (11), Install the crane pulley (6), it can transport ordinary vehicles or military vehicles, tanks and vehicles, armored vehicles, self-propelled artillery and other equipment through the canyon, the characteristics are that, installation and disassembly simply save time, flexible, concealed, not easy to detect, can adjust the flexibility degree and droop degree at any time, not easy to be hit by other rigid objects or a guided bomb hit it, even if it hits it, can also automatically slide on.
Description
- The present invention relates to a technology of erecting a temporary ropeway bridge and a necessary engineering equipment assembly, and specifically to a steel rope ropeway composed of a wire rope suspension structure, acting as a temporary bridge for transporting heavy vehicle equipment and having an explosion-proof function.
- The main role of a bridge is to make personnel, vehicles and heavy equipment across a section of areas that cannot pass normally, such as rivers, valleys and other naturally formed obstacles, and the buildings are set up on rivers, lakes, seas, mountains and valleys, so that vehicles and pedestrians can pass smoothly. A complete bridge, the basic components of the bridge span part, pier part, support part, abutment part, pier and foundation composition, these are the most basic components, it can be said that without these several parts of the bridge is not a complete bridge. Construction of such a 100 meters long, 50 tons of bridge, at least a year, generally this kind of bridge are fixed position, public exposure, long use, impossible to remove or change position, no concealment, if there is explosives into a bridge from the air, it is easy to hit any part of the bridge, and repair the bridge needs a long time, also can't guarantee safety. Therefore, how to avoid the occurrence of these adverse conditions, to ensure that a large number of personnel and equipment can surprise smoothly through between the valley without a bridge, therefore developed a single wire rope combination winch, portable stake, positioning pile, simple ropeway bridge, with simple operation, anytime, anywhere, convenient, convenient to use, high concealment, not easy to find, difficult to destroy.
- In order to mountain channel for person, vehicles and other equipment passing between canyon in very short time, the present invention provided a device and method structure to erect temporary explosion-proof suspended ropeway bridge, the structure has a convenient conditions for convenient installation, anytime, easy operation, fast time saving, less auxiliary erection equipment, only two people can installed in a very short time, and good concealment, flexible structure, not easy to find or destroy, to achieve the purpose of passing through many personnel and equipment in a state of emergency
- To achieve the above purpose, the present invention is a temporary explosion-proof suspended ropeway bridge. The installation method is, when the personnel and vehicle equipment to the valley side, First, build a guide rope path that can transport people and light tools and equipment to the other side, two men then carried portable stakes (
PCT / CN2018 / 081654 - Further, the one end of the guide rope is attached with a barbed anchor hook. Further, the anchor hook with a gun thrust is fired through the small rocket to the other side of the area.
- Further, personnel, portable stakes, tools, and other spare parts are transported to the other side by the guide rope.
- Further, people transported by the guide rope are dressed in foam or airbag type or other styles of protective clothing.
- Further, the guide rope adopts the industrial standard, the most commonly used is the safety rope for the fire fighter, the selected model to meet the weight of all the portable stake components transported at a time.
- Further, the steel wire rope for forming the ropeway bridge uses the steel core steel wire rope.
- Further, the wire rope can be painted with camouflage of the same color as the surrounding scenery.
- Further, the nominal tensile strength of the wire rope is greater than 2,000MPa.
- Further, the wire rope nominal diameter is determined according to the maximum weight of the equipment in a single transport vehicle.
- Further, the ropeway bridge wire rope has a manual chain unwinding device, which can apply tension or relaxation of the steel rope to adjust the steel rope sag as required.
- Further, Install a crane point slide on the steel rope ropeway, which moves forward or backward along the steel rope ropeway to form a ropeway bridge transporting personnel and equipment.
- Further, in order to make the lifting point on the wire rope moving more stable safety, using longitudinal layout of more than two pulley , flexible ropes are attached to the front and rear of the pulley, The two ends of the rope are connected to the small deceleration winch, dragging the pulley back and forth to achieve the effect of transporting the vehicle equipment, the winch can be manual or electric or various small engines
- Further, the flexible rope of the towing point pulley movement can be connected to the pulley or directly to the transported vehicle equipment, as determined based on the site situation.
- Further, a winch one-directional braking supporting positioning pile device is generally used when fixing the winch
- Further, according to the site geological terrain situation, the portable stake of the fixed steel wire rope can be replaced by a winch one-directional braking supporting positioning pile device.
- The beneficial effects achieved by the present invention are:
The present invention proposes a ropeway bridge with little equipment demand, a simple, fast and convenient erection process, and is based on a single wire rope, can be erected anytime and anywhere, high concealment, not easy to destroy, when the personnel and equipment through, can be immediately removed, to achieve the unexpected, unpredictable, unimaginable and other bridges that do not feature during construction and use. - The present invention uses a temporary explosion-proof suspended ropeway bridge composed by a single wire rope, a winch winding the wire rope and a portable stake (pct / cn2018 / 081654), reasonable structure, simple operation, no difficulty, the erection and disassembly process is time-saving and convenient. Steel rope ropeway has only a few couplings with winches and portable stakes, which are standard industrial parts. Through practical verification, the theoretical bearing capacity can be shown and proved, ensuring the reliable safety and stability in practical use.
-
-
FIG. 1 is a schematic diagram of the visible partial working state of the integral apparatus of the present invention -
FIG. 2 is a schematic diagram of the ropeway bridge device of the present invention -
FIG. 3 is a schematic diagram of the explosion-proof function operation process of the present invention -
FIG. 4 is a schematic practical application diagram of the device of the present invention - The tab in the attached
Figure 1-2 is described as follows:
1-Guide rope winch, 2-guide rope anchor hook, 3-guide rope crane pulley, 4-ropeway bridge steel rope winch, 5-winch fixed pile, 6-ropeway bridge steel rope crane pulley, 7-heavy vehicle equipment, 8-portable stake, 9-slide forward winch, 10- slide back winch, 11-ropeway bridge steel rope, 12-pull back steel rope, 13-forward steel rope, 14-guide rope. - In order to more clearly explain the objectives, technical solutions, and advantages of the present invention, the present invention is further described in detail in connection with the accompanying drawings.
- As shown in
Figure 1 , Temporary explosion-proof suspended ropeway bridge, wherein : Guide rope winch 1, guiderope anchor hook 2, guide rope crane pulley 3, ropebridge rope winch 4, winchfixed pile 5, rope bridge steelrope crane pulley 6,heavy vehicle equipment 7,portable stake 8,slide forward winch 9,slide back winch 10,rope bridge rope 11,back steel rope 12,forward steel rope 13,guide rope 14. Once the specifications and models of these devices are selected, a temporary suspended steel wire rope ropeway bridge can be erected between the mountain valleys, valleys and cliffs, through which people, vehicles and other equipment can be transported through the other side of the mountain canyon one by one. Generally, remove it immediately after completing a transport task, so it is not recommended as a long-term ordinary bridge. - When the personnel and vehicle equipment reached the valley side, first install the guide rope winch 1, rope
bridge cable winch 4, winch fixedpile 5, and the ropewaybridge steel rope 11, backpull steel rope 12,drag steel rope 13 with thecrane pulley 6 assembly, then erect a guide rope that carries people and light tools and equipment to the other side, there are many ways to build light-duty guide ropeways, generally, but not limited to: Fire rescue mode, industrial aerial operation mode, high-altitude power installation mode and special operations team off-road mode, as long as the personnel and light equipment and tools can be transported to the other side of the canyon. - The way given in
Figure 1 is that, fixed the light guide rope winch 1 wrapped around the rope first, then tie theguide rope 14 to the small rocket, the small rocket has been fitted with the guiderope anchor hook 2, launch the small rocket across the canyon, after confirming that theanchor hook 2 is fixed, send two personnel hung on guide rope crane pulley 3, portable stake 8 (pct / cn2018 / 081654),light winch 9, one end of the ropewaybridge steel rope 11, and the necessary working tools to the other side of the canyon through theguide rope 14, after installing the portable stake, people on both sides of the canyon cooperate to set up a heavy steel wire rope ropeway, connect one end of the ropewaybridge steel rope 11 to a portable stake, at this point, thecrane pulley 6 can slide back and forth, the vehicle and other equipment are connected to the crane pulley and then can be transported to the other side of the canyon
Claims (8)
- The temporary explosion-proof suspended ropeway bridge comprising:
By the guide rope winch, guide the rope anchor hook, guide crane pulley, cable steel rope winch, winch fixed pile, steel rope crane pulley, portable stake, crane pulley forward winch, crane pulley back winch, ropeway bridge steel rope, pull back steel rope, forward steel rope, guide rope constitute the main structure of the ropeway bridge, equipment to be delivered are hung on the crane pulley, The crane pulley slide moves back and forth on the steel rope ropeway to achieve the effect of transporting supplies on both sides of the crossing area. - The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, to make the crane pulley move back and forth, place pulley forward winch and pulley back winch with flexible safety ropes on both sides of the span area, two flexible safety ropes are connected to the ends of the crane pulley or directly to the front and rear of the delivery equipment, turn the pulley forward winch and the pulley back winch respectively to enable the crane pulley of the mounted equipment to achieve the purpose of transporting objects
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, the ropeway steel rope winch is used in conjunction with the winch fixed pile to prevent the ropeway steel rope winch from moving during work. The common winch fixed pile adopts a winch one-directional brake supporting positioning pile device.
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, the portable stake is a Portable mechanically assembled ground fixation stake device (pct / cn2018 / 081654) that is installed in accordance with the technical requirements of this portable stake.
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, one end of the guide rope is attached with a barbed anchor hook, launched by a small rocket to the other side of the crossing area, and then, the personnel, the guide rope winch, the portable stake (pct / cn2018 / 081654), and the necessary tools are transported to the other side of the crossing area.
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, all of the winches in the present invention have a controllable drop rope and release brake lock function, which can control the droop of the cable steel rope and prevent damage from rigid collision with rigid objects or explosives.
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, the ropeway bridge wire rope is installed at the portable stake link with an industrial heavy manual chain device, which allows you to fine-tune the droop of the rope as desired.
- The temporary explosion-proof suspended ropeway bridge according to claim 1, characterized in that, the cable rope adopts steel core wire rope with a nominal tension of greater than 2000mpa, the wire rope surface is painted with camouflage of the same color as the surrounding landscape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP22210999.3A EP4378790A1 (en) | 2022-12-02 | 2022-12-02 | Temporary explosion-proof suspended ropeway bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP22210999.3A EP4378790A1 (en) | 2022-12-02 | 2022-12-02 | Temporary explosion-proof suspended ropeway bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4378790A1 true EP4378790A1 (en) | 2024-06-05 |
Family
ID=84387558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP22210999.3A Pending EP4378790A1 (en) | 2022-12-02 | 2022-12-02 | Temporary explosion-proof suspended ropeway bridge |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP4378790A1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US806505A (en) * | 1905-08-24 | 1905-12-05 | William Marion Shelton | Mail-box-delivery device. |
KR200336877Y1 (en) * | 2003-10-02 | 2003-12-24 | 김송조 | Apparatus For delivering cable-carrage |
CN207727552U (en) * | 2017-12-02 | 2018-08-14 | 徐少钢 | A kind of portable mechanism spud pile device upper in combination |
CN115045175A (en) * | 2022-06-30 | 2022-09-13 | 徐少钢 | Temporary explosion-proof suspended ropeway bridge formed by single steel rope |
-
2022
- 2022-12-02 EP EP22210999.3A patent/EP4378790A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US806505A (en) * | 1905-08-24 | 1905-12-05 | William Marion Shelton | Mail-box-delivery device. |
KR200336877Y1 (en) * | 2003-10-02 | 2003-12-24 | 김송조 | Apparatus For delivering cable-carrage |
CN207727552U (en) * | 2017-12-02 | 2018-08-14 | 徐少钢 | A kind of portable mechanism spud pile device upper in combination |
CN115045175A (en) * | 2022-06-30 | 2022-09-13 | 徐少钢 | Temporary explosion-proof suspended ropeway bridge formed by single steel rope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7140802B2 (en) | Retractable wide-span vehicle barrier system | |
US2365778A (en) | Mobile device for repelling the attack of enemy aircraft | |
CN104890851B (en) | Near space balloon system safety release method | |
CN110354426B (en) | Design method and system for fire-fighting system of multi-rotor unmanned aerial vehicle | |
CN107792790A (en) | Installation and application for the aerial cableway of mountain region construction material transport | |
US20090008186A1 (en) | Evacuation and rescue system for elevated structures | |
CN107469243A (en) | Skyscraper external rescue throwing extension system | |
CN201197853Y (en) | Vehicle-mounted cable railway type fire-fighting rescue device | |
CN104196255A (en) | Mobile safety net hanging method for plant roof installation | |
CN109985330B (en) | High-rise fire rescue vehicle based on remote anchoring dispatch of aircraft | |
CN115045175A (en) | Temporary explosion-proof suspended ropeway bridge formed by single steel rope | |
EP4378790A1 (en) | Temporary explosion-proof suspended ropeway bridge | |
CN110469102B (en) | High-altitude combined steel beam member installation operation platform and construction method thereof | |
EP0022807A1 (en) | Process and device of controlled triggering of avalanches | |
Aguilar et al. | Rocket sled strength testing of large, supersonic parachutes | |
RU2549728C2 (en) | Passengers and cargoes air transportation and system to this end | |
CN110065888A (en) | A kind of cable crane main rope Demolition Construction method | |
CN113605230A (en) | Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor | |
DE10251280A1 (en) | Aerostatic flying device comprises balloon-like hollow component filled with several gas bags forming outer skin and especially constructed as supporting gas envelope connected to platform by support framework | |
CN112563972A (en) | Tracking cannon cableway crossing construction method and system | |
KR100523762B1 (en) | Construction wire connection system | |
GB2343061A (en) | Protective device for use in replacement of overhead cables | |
EP3492145A1 (en) | Person rescue system and method for evacuating people from a building | |
RU2209745C2 (en) | Device for azimuth orientation and locking of cargo on external store | |
RU2816641C1 (en) | Method of constructing airship bridge over canyon |