EP4296429A1 - Gutter for surface drainage of roadways, method for producing a gutter and method for applying a pavement marking - Google Patents
Gutter for surface drainage of roadways, method for producing a gutter and method for applying a pavement marking Download PDFInfo
- Publication number
- EP4296429A1 EP4296429A1 EP23180683.7A EP23180683A EP4296429A1 EP 4296429 A1 EP4296429 A1 EP 4296429A1 EP 23180683 A EP23180683 A EP 23180683A EP 4296429 A1 EP4296429 A1 EP 4296429A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- drainage channel
- protective
- recess
- gutter
- sacrificial material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 7
- 239000000463 material Substances 0.000 claims abstract description 50
- 230000001681 protective effect Effects 0.000 claims abstract description 41
- 239000007788 liquid Substances 0.000 claims abstract description 10
- 239000010426 asphalt Substances 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 8
- 239000013521 mastic Substances 0.000 claims description 4
- 239000002986 polymer concrete Substances 0.000 claims description 4
- 238000003801 milling Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/223—Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
- E03F3/046—Open sewage channels
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
Definitions
- the invention relates to a drainage channel for surface drainage of roadways and an arrangement comprising one or more such drainage channels and a roadway.
- the invention further relates to a method for producing such a drainage channel and a method for applying a road marking.
- Roadways are understood to mean, in particular, roadways, preferably in road tunnels.
- the inside of the tunnel wall is usually followed by a walkway and/or escape route, a drainage channel and then the roadway.
- the edges of the road are usually marked by road markings. Since there is always a desire to save space in tunnel construction, there is a desire to arrange road markings next to the road, at least in sections. This means that the road marking should be placed on the drainage channel.
- the problem is that when the road marking is renewed, the old road marking has to be removed, for example by milling. If this road marking is now on the drainage channel, removing the old road marking can lead to significant damage to the drainage channel.
- the invention is therefore based on the object of providing a new drainage channel, in particular a drainage channel in which the problem of damage when renewing the road marking is at least largely avoided. Furthermore, it is the object of the invention to provide an arrangement comprising one or more such drainage channels and a roadway which avoids the aforementioned problem. In addition, a new manufacturing process for such drainage channels as well as a new process for applying road markings should be specified.
- the drainage channel according to the invention is characterized in that the side section has a recess for receiving a protective and/or sacrificial material that differs from the material of the channel body.
- the advantage of the drainage channel according to the invention is, in particular, that when the road marking is renewed, only the protective and/or sacrificial material is largely damaged, whereas the drainage channel itself remains at least predominantly free of any damage, since direct contact of the channels with an abrasive tool or Vehicle is avoided by means of the protective and/or sacrificial material in the recess.
- the receiving space preferably has an oval cross-sectional shape, with the cross-section tapering in a direction from the gutter head to the bottom of the gutter body.
- the cross section has an egg shape with the point pointing downwards.
- a receiving channel for receiving cables extends in the longitudinal direction L and/or parallel to the receiving space through the channel body, in particular through one of the side walls of the channel body.
- the recess is filled, in particular completely, with a protective and/or sacrificial material as a base for the road marking, the protective and/or sacrificial material preferably being cast into the recess.
- the gutter head has two side sections arranged opposite one another and extending in the longitudinal direction, a first side section of the two side sections being arranged adjacent to the roadway when the drainage channel is installed, the recess being arranged in the first side section .
- the term installed state is understood in particular to mean a state in which the drainage channel is arranged, for example laid, parallel and/or adjacent to the roadway. Particularly preferably, when installed, the drainage channel is arranged, for example laid, between a roadway and a walkway and/or escape route and/or a curb.
- the side sections are connected by webs, with a slot being provided between two webs that are adjacent in the longitudinal direction, with a liquid preferably being able to flow through the slots from the surface into the receiving space.
- Knobs can be provided on the top of the webs.
- the gutter head can be designed to be closed. This means in particular that the gutter head has no slots or other interruptions for draining water from an upper side of the gutter body.
- a second side section arranged opposite the first side section can form a projection.
- the second side section preferably borders on a walkway and/or escape route and/or a curb.
- the projection extends in particular beyond the top of the webs.
- the projection has an undercut on its outer side surface, in particular in order to save material.
- the recess is preferably designed in a step shape, with the recess extending from an outer side surface and from an upper side of the side section into the side section.
- the recess adjoins the roadway when the drainage channel is installed. Furthermore, it can be provided that the depth of the recess corresponds to the thickness of the road surface, in particular the thickness of the asphalt.
- the protective and/or sacrificial material is or preferably comprises mastic asphalt or concrete.
- the channel body is formed, for example, from concrete, in particular polymer concrete. If the channel body is made of concrete or polymer concrete, the protective and/or sacrificial material differs from the material of the channel body, with mastic asphalt preferably forming the protective and/or sacrificial material. If the channel body is made of a material other than concrete, the protective and/or sacrificial material can be concrete.
- the arrangement according to the invention comprises one or more drainage channels according to the invention and a roadway, wherein the drainage channel or the several drainage channels are arranged, preferably laid, parallel and / or adjacent to the road, the side section with the recess being arranged adjacent to the road.
- drainage channels are provided, they are arranged in a row in such a way that a continuous channel is formed through the receiving spaces of the drainage channels.
- a protective and/or sacrificial material is provided in the recess of the drainage channel or drainage channels, the protective and/or sacrificial material adjoining the roadway.
- the roadway preferably has a layer structure with at least two, preferably three, layers, the top layer being formed by the road surface, in particular asphalt.
- the thickness of the protective and/or sacrificial material of the drainage channel or several drainage channels preferably corresponds to the thickness of the road surface.
- a channel body extending in the longitudinal direction is produced, in particular cast in a mold, the channel body being designed in such a way that the channel body has a receiving space for receiving a liquid to be discharged, the receiving space being formed by two opposite ones arranged side walls, a floor and a gutter head, and wherein the gutter head has at least one side section extending in the longitudinal direction.
- Either a recess is formed on the side section when producing the channel body, for example by providing a corresponding mold or an insert in the mold, or the recess is introduced into the side section after the channel body has been produced, for example by means of milling.
- a protective and/or sacrificial material is introduced into the recess, in particular cast.
- an arrangement comprising one or more drainage channels according to the invention and a roadway, the drainage channel or the plurality of drainage channels being arranged, preferably laid, parallel and/or adjacent to the roadway, wherein the side section with the recess is arranged adjacent to the roadway, with a protective and / or sacrificial material being provided in the recess of the drainage channel or drainage channels, the protective and / or sacrificial material adjoining the roadway.
- a road marking is then applied to the arrangement in such a way that the road marking is arranged in sections on the road and in sections on the protective and/or sacrificial material of the drainage channel.
- the road marking is removed for renewal, in particular completely, by removing the area of the road and the protective and/or sacrificial material provided with the road marking, in particular by means of milling, and then applying a second road marking in such a way that the second road marking is arranged in sections on the roadway and in sections on the protective and / or sacrificial material of the drainage channel.
- FIG. 1 shows a drainage channel 10 for surface drainage of roadways 11, in particular roadways 11 in tunnel structures.
- the drainage channel 10 is designed and provided in sections as a base for a road marking 12, as FIG. 3 shows.
- the drainage channel 10 has a channel body 13 extending in the longitudinal direction L with a receiving space 14 for receiving a liquid to be discharged, the receiving space 14 being delimited by two side walls 15 arranged opposite one another, a base 16 and a channel head 17.
- the receiving space 14 has an oval cross-sectional shape, with the cross-section tapering in a direction from the gutter head 17 to the bottom 16 of the gutter body 13.
- FIG. 1 also shows that a receiving channel 21 for receiving cables extends in the longitudinal direction L and parallel to the receiving space 14 through one of the side walls 15 of the channel body 13.
- the gutter head 17 has two side sections 18 extending in the longitudinal direction L.
- the side sections 18 are connected by webs 22, with a slot 23 being provided between two webs 22 adjacent in the longitudinal direction L, through which a liquid can flow from the surface into the receiving space 14.
- Knobs can be arranged on the top of the webs 22.
- a first of the two side sections 18 has a recess 19 that runs through in the longitudinal direction L for receiving a protective and/or sacrificial material 20 that differs from the material of the channel body 13.
- This first side section 18 with the recess 19 is in FIG. 3 shown, installed state of the drainage channel 10 is arranged adjacent to the roadway 11.
- the term installed state is understood to mean a state in which the drainage channel 10 is arranged parallel and adjacent to the roadway 11 and between the roadway 11 and a walkway and/or escape route 24.
- the recess 19 is stepped-shaped, with the recess 19 extending from an outer side surface 28 and from an upper side 29 of the side section 18 into the side section 18.
- FIG. 3 shows that the recess 19 is completely filled with a protective and/or sacrificial material 20 as a base for the road marking 12.
- the protective and/or sacrificial material 20 is mastic asphalt.
- the channel body 13 is made of polymer concrete.
- the protective and/or sacrificial material 20 is preferably cast into the recess 19.
- the depth of the recess 19 corresponds to the thickness of the road surface 30, the road surface 30 preferably being asphalt.
- the projection extends beyond the top 25 of the webs 22 and has an undercut 27 on its outer side surface 26 in order to save material.
- FIG. 3 shows a sectional view of an arrangement 31, comprising a plurality of drainage channels 10 arranged in series and a roadway 11, the drainage channels 10 being arranged parallel and adjacent to the roadway 11 and the first side section 18 with the recess 19 being arranged adjacent to the roadway 11.
- the drainage channels 10 are arranged in a row in such a way that a continuous channel for a liquid to be discharged is formed through the receiving spaces 14 of the drainage channels 10.
- the roadway 11 has a layer structure with several layers, the top layer being formed by the road surface 30, in particular asphalt.
- a protective and/or sacrificial material 20 is arranged in the recesses 19 of the drainage channels 10, with the protective and/or sacrificial material 20 adjoining the roadway 11.
- the thickness of the protective and/or sacrificial material 20 of the drainage channels 10 corresponds to the thickness of the road surface 30.
- a channel body 13 extending in the longitudinal direction L is formed into one Casting mold, wherein the channel body 13 is designed such that the channel body 13 has a receiving space 14 for receiving a liquid to be discharged, the receiving space 14 being delimited by two oppositely arranged side walls 15, a bottom 16 and a channel head 17, and wherein the Gutter head 17 has at least one side section 18 extending in the longitudinal direction L.
- the recess 19 on the side section 18 can already be formed when producing the channel body 13 by providing a corresponding mold or an insert in the mold. Alternatively, the recess 19 can be introduced into the side section 18 by milling after the gutter body 13 has been manufactured.
- the protective and/or sacrificial material 29 can then be poured into the recess 19.
- the arrangement 31 is first used FIG. 3 provided, and then a road marking 12 is applied in such a way that the road marking 12 is arranged in sections on the road 11 and in sections on the protective and / or sacrificial material 20 of the drainage channel 10.
- the road marking 12 is completely removed for renewal by removing the area of the road 11 and the protective and/or sacrificial material 20 provided with the road marking 12 by means of milling, and then a second road marking 12 is applied in such a way that the second road marking 12 is in sections on the roadway 11 and in sections on the protective and / or sacrificial material 20 of the drainage channel 10 is arranged.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Road Paving Structures (AREA)
- Sewage (AREA)
Abstract
Die Erfindung betrifft eine Entwässerungsrinne (10) zur Oberflächenentwässerung von Fahrbahnen (11), wobei die Entwässerungsrinne (10) zumindest abschnittsweise als Untergrund für eine Fahrbahnmarkierung (12) ausgebildet und/oder vorgesehen ist, wobei die Entwässerungsrinne (10) einen sich in Längsrichtung (L) erstreckenden Rinnenkörper (13) mit einem Aufnahmeraum (14) zur Aufnahme einer abzuführenden Flüssigkeit aufweist, wobei der Aufnahmeraum (14) durch zwei einander gegenüberliegend angeordnete Seitenwände (15), einen Boden (16) und einen Rinnenkopf (17) begrenzt ist, wobei der Rinnenkopf (17) wenigstens einen sich in Längsrichtung (L) erstreckenden Seitenabschnitt (18) aufweist.Die Erfindung ist dadurch gekennzeichnet, dass der Seitenabschnitt (18) eine Aussparung (19) zur Aufnahme eines sich vom Material des Rinnenkörpers (13) unterscheidenden Schutz- und/oder Opfermaterials (20) aufweist.Die Erfindung betrifft ferner eine Anordnung, ein Verfahren zur Herstellung einer Entwässerungsrinne und ein Verfahren zum Aufbringen einer Fahrbahnmarkierung.The invention relates to a drainage channel (10) for the surface drainage of roadways (11), the drainage channel (10) being designed and/or provided at least in sections as a base for a roadway marking (12), the drainage channel (10) extending in the longitudinal direction ( L) has an extending channel body (13) with a receiving space (14) for receiving a liquid to be discharged, the receiving space (14) being delimited by two side walls (15) arranged opposite one another, a base (16) and a channel head (17), wherein the gutter head (17) has at least one side section (18) extending in the longitudinal direction (L). The invention is characterized in that the side section (18) has a recess (19) for receiving a material that is different from the material of the gutter body (13). Protective and/or sacrificial material (20).The invention further relates to an arrangement, a method for producing a drainage channel and a method for applying a road marking.
Description
Die Erfindung betrifft eine Entwässerungsrinne zur Oberflächenentwässerung von Fahrbahnen sowie eine Anordnung umfassend eine oder mehrere solche Entwässerungsrinnen und eine Fahrbahn. Ferner betrifft die Erfindung ein Verfahren zur Herstellung einer solchen Entwässerungsrinne und ein Verfahren zum Aufbringen einer Fahrbahnmarkierung.The invention relates to a drainage channel for surface drainage of roadways and an arrangement comprising one or more such drainage channels and a roadway. The invention further relates to a method for producing such a drainage channel and a method for applying a road marking.
Derartige Entwässerungsrinnen zur Oberflächenentwässerung von Fahrbahnen, insbesondere von Fahrbahnen in Tunnelbauwerken, wobei die Entwässerungsrinne zumindest abschnittsweise als Untergrund für eine Fahrbahnmarkierung ausgebildet und/oder vorgesehen ist, weisen einen sich in Längsrichtung erstreckenden Rinnenkörper mit einem Aufnahmeraum zur Aufnahme einer abzuführenden Flüssigkeit auf, wobei der Aufnahmeraum durch zwei einander gegenüberliegend angeordnete Seitenwände, einen Boden und einen Rinnenkopf begrenzt ist, wobei der Rinnenkopf wenigstens einen, vorzugsweise zwei, sich in Längsrichtung erstreckenden Seitenabschnitt aufweist.Such drainage channels for surface drainage of roadways, in particular roadways in tunnel structures, the drainage channel being designed and/or provided at least in sections as a base for a roadway marking, have a longitudinally extending channel body with a receiving space for receiving a liquid to be discharged, the receiving space is delimited by two oppositely arranged side walls, a base and a gutter head, the gutter head having at least one, preferably two, side sections extending in the longitudinal direction.
Unter Fahrbahnen werden insbesondere Straßenfahrbahnen, vorzugsweise in Straßentunneln, verstanden.Roadways are understood to mean, in particular, roadways, preferably in road tunnels.
Im Tunnelbau, insbesondere im Tunnelbau für Straßentunnel, folgt auf die Tunnelwand nach innen üblicherweise ein Geh- und/oder Rettungsweg, eine Entwässerungsrinne und anschließend die Fahrbahn. Die Fahrbahnränder werden üblicherweise durch Fahrbahnmarkierungen gekennzeichnet. Da im Tunnelbau stets die Bestrebung zu Platzersparnis besteht, besteht der Wunsch Fahrbahnmarkierungen zumindest abschnittsweise neben der Fahrbahn anzuordnen. Das heißt, die Fahrbahnmarkierung soll auf der Entwässerungsrinne angeordnet werden.In tunnel construction, especially in tunnel construction for road tunnels, the inside of the tunnel wall is usually followed by a walkway and/or escape route, a drainage channel and then the roadway. The edges of the road are usually marked by road markings. Since there is always a desire to save space in tunnel construction, there is a desire to arrange road markings next to the road, at least in sections. This means that the road marking should be placed on the drainage channel.
Allerdings besteht das Problem, dass bei der Erneuerung der Fahrbahnmarkierung die alte Fahrbahnmarkierung, beispielsweise durch Fräsen, abgetragen werden muss. Befindet sich diese Fahrbahnmarkierung nun auf der Entwässerungsrinne, kann das Abtragen der alten Fahrbahnmarkierung zu erheblichen Schäden an der Entwässerungsrinne führen.However, the problem is that when the road marking is renewed, the old road marking has to be removed, for example by milling. If this road marking is now on the drainage channel, removing the old road marking can lead to significant damage to the drainage channel.
Der Erfindung liegt daher die Aufgabe zugrunde, eine neue Entwässerungsrinne anzugeben, insbesondere eine Entwässerungsrinne, bei der das Problem der Beschädigung bei der Erneuerung der Fahrbahnmarkierung zumindest weitestgehend vermieden wird. Ferner ist es Aufgabe der Erfindung eine Anordnung umfassend eine oder mehrere solche Entwässerungsrinnen und eine Fahrbahn anzugeben, die das vorgenannte Problem vermeidet. Darüber hinaus soll ein neues Herstellungsverfahren für solche Entwässerungsrinnen sowie ein neues Verfahren zum Aufbringen einer Fahrbahnmarkierung angegeben werden.The invention is therefore based on the object of providing a new drainage channel, in particular a drainage channel in which the problem of damage when renewing the road marking is at least largely avoided. Furthermore, it is the object of the invention to provide an arrangement comprising one or more such drainage channels and a roadway which avoids the aforementioned problem. In addition, a new manufacturing process for such drainage channels as well as a new process for applying road markings should be specified.
Die Aufgabe wird hinsichtlich der Entwässerungsrinne gelöst durch den Gegenstand des Anspruchs 1, hinsichtlich der Anordnung durch den Gegenstand des Anspruchs 10, hinsichtlich des Herstellungsverfahrens durch den Gegenstand des Anspruchs 12 und hinsichtlich des Verfahrens zum Aufbringen einer Fahrbahnmarkierung durch den Gegenstand des Anspruchs 14. Vorteilhafte Ausgestaltungen und Weiterbildungen sind in den jeweils abhängigen Ansprüchen angegeben.The task is solved with regard to the drainage channel by the subject matter of claim 1, with regard to the arrangement by the subject matter of
Die erfindungsgemäße Entwässerungsrinne ist dadurch gekennzeichnet, dass der Seitenabschnitt eine Aussparung zur Aufnahme eines sich vom Material des Rinnenkörpers unterscheidenden Schutz- und/oder Opfermaterials aufweist.The drainage channel according to the invention is characterized in that the side section has a recess for receiving a protective and/or sacrificial material that differs from the material of the channel body.
Der Vorteil der erfindungsgemäßen Entwässerungsrinne besteht insbesondere darin, dass bei einer Erneuerung der Fahrbahnmarkierung weitestgehend lediglich das Schutz- und/oder Opfermaterial beschädigt wird, wohingegen die Entwässerungsrinne selbst zumindest überwiegend frei von etwaigen Beschädigungen bleibt, da ein direkter Kontakt der Rinnen mit einem abtragenden Werkzeug oder Fahrzeug mittels des Schutz- und/oder Opfermaterials in der Aussparung vermieden wird.The advantage of the drainage channel according to the invention is, in particular, that when the road marking is renewed, only the protective and/or sacrificial material is largely damaged, whereas the drainage channel itself remains at least predominantly free of any damage, since direct contact of the channels with an abrasive tool or Vehicle is avoided by means of the protective and/or sacrificial material in the recess.
Bevorzugt weist der Aufnahmeraum eine im Querschnitt ovale Form auf, wobei sich der Querschnitt in einer Richtung vom Rinnenkopf zum Boden des Rinnenkörpers hin verjüngt. In anderen Worten hat der Querschnitt eine Eiform mit Spitze nach unten.The receiving space preferably has an oval cross-sectional shape, with the cross-section tapering in a direction from the gutter head to the bottom of the gutter body. In other words, the cross section has an egg shape with the point pointing downwards.
Es kann vorgesehen sein, dass sich ein Aufnahmekanal zur Aufnahme von Kabeln in Längsrichtung L und/oder parallel zum Aufnahmeraum durch den Rinnenkörper, insbesondere durch eine der Seitenwände des Rinnenkörpers, erstreckt.It can be provided that a receiving channel for receiving cables extends in the longitudinal direction L and/or parallel to the receiving space through the channel body, in particular through one of the side walls of the channel body.
Gemäß einer besonders bevorzugten Weiterbildung der Erfindung ist die Aussparung, insbesondere vollständig, mit einem Schutz- und/oder Opfermaterial als Untergrund für die Fahrbahnmarkierung gefüllt, wobei das Schutz- und/oder Opfermaterial vorzugsweise in die Aussparung eingegossen ist.According to a particularly preferred development of the invention, the recess is filled, in particular completely, with a protective and/or sacrificial material as a base for the road marking, the protective and/or sacrificial material preferably being cast into the recess.
Gemäß einer bevorzugten Ausführungsvariante der Erfindung ist vorgesehen, dass der Rinnenkopf zwei sich gegenüberliegend angeordnete und in Längsrichtung erstreckende Seitenabschnitte aufweist, wobei ein erster Seitenabschnitt der zwei Seitenabschnitte im eingebauten Zustand der Entwässerungsrinne angrenzend zur Fahrbahn angeordnet ist, wobei die Aussparung in dem ersten Seitenabschnitt angeordnet ist.According to a preferred embodiment variant of the invention, it is provided that the gutter head has two side sections arranged opposite one another and extending in the longitudinal direction, a first side section of the two side sections being arranged adjacent to the roadway when the drainage channel is installed, the recess being arranged in the first side section .
Unter eingebautem Zustand wird insbesondere ein Zustand verstanden, in dem die Entwässerungsrinne parallel und/oder angrenzend zur Fahrbahn angeordnet, beispielsweise verlegt, ist. Besonders bevorzugt ist die Entwässerungsrinne im eingebauten Zustand zwischen einer Fahrbahn und einem Geh- und/oder Rettungsweg und/oder einem Bordstein angeordnet, beispielsweise verlegt.The term installed state is understood in particular to mean a state in which the drainage channel is arranged, for example laid, parallel and/or adjacent to the roadway. Particularly preferably, when installed, the drainage channel is arranged, for example laid, between a roadway and a walkway and/or escape route and/or a curb.
Es kann vorgesehen sein, dass die Seitenabschnitte durch Stege verbunden sind, wobei zwischen zwei in Längsrichtung benachbarten Stegen je ein Schlitz vorgesehen ist, wobei vorzugsweise eine Flüssigkeit durch die Schlitze von der Oberfläche in den Aufnahmeraum fließen kann. An der Oberseite der Stege können Noppen vorgesehen sein.It can be provided that the side sections are connected by webs, with a slot being provided between two webs that are adjacent in the longitudinal direction, with a liquid preferably being able to flow through the slots from the surface into the receiving space. Knobs can be provided on the top of the webs.
Alternativ kann der Rinnenkopf geschlossen ausgebildet sein. Das heißt insbesondere, dass der Rinnenkopf keine Schlitze oder anderweitige Unterbrechungen zum Abführen von Wasser von einer Oberseite des Rinnenkörpers aufweist.Alternatively, the gutter head can be designed to be closed. This means in particular that the gutter head has no slots or other interruptions for draining water from an upper side of the gutter body.
Ein zweiter, dem ersten Seitenabschnitt gegenüberliegend angeordneter Seitenabschnitt kann eine Auskragung ausbilden. Der zweite Seitenabschnitt grenzt im eingebauten Zustand bevorzugt an einen Geh- und/oder Rettungsweg und/oder einen Bordstein an. Die Auskragung reicht insbesondere über die Oberseite der Stege hinaus. Ferner kann vorgesehen sein, dass die Auskragung an ihrer äußeren Seitenfläche einen Hinterschnitt aufweist, insbesondere um Material zu sparen.A second side section arranged opposite the first side section can form a projection. When installed, the second side section preferably borders on a walkway and/or escape route and/or a curb. The projection extends in particular beyond the top of the webs. Furthermore, it can be provided that the projection has an undercut on its outer side surface, in particular in order to save material.
Bevorzugt ist die Aussparung stufenförmig ausgebildet ist, wobei sich die Aussparung von einer äußeren Seitenfläche und von einer Oberseite des Seitenabschnitts aus in den Seitenabschnitt hinein erstreckt.The recess is preferably designed in a step shape, with the recess extending from an outer side surface and from an upper side of the side section into the side section.
Bevorzugt ist vorgesehen, dass die Aussparung im eingebauten Zustand der Entwässerungsrinne an die Fahrbahn angrenzt. Ferner kann vorgesehen sein, dass die Tiefe der Aussparung der Dicke des Fahrbahnbelags, insbesondere der Dicke des Asphalts, entspricht.It is preferably provided that the recess adjoins the roadway when the drainage channel is installed. Furthermore, it can be provided that the depth of the recess corresponds to the thickness of the road surface, in particular the thickness of the asphalt.
Das Schutz- und/oder Opfermaterial ist oder umfasst vorzugsweise Gussasphalt oder Beton. Der Rinnenkörper ist beispielsweise aus Beton, insbesondere Polymerbeton, gebildet. Sofern der Rinnenkörper aus Beton oder Polymerbeton gebildet ist, unterscheidet sich das Schutz- und/oder Opfermaterial vom Material des Rinnenkörpers, wobei vorzugsweise Gussasphalt das Schutz- und/oder Opfermaterial bildet. Sofern der Rinnenkörper aus einem anderen Material als Beton gebildet ist, kann es sich bei dem Schutz- und/oder Opfermaterial um Beton handeln.The protective and/or sacrificial material is or preferably comprises mastic asphalt or concrete. The channel body is formed, for example, from concrete, in particular polymer concrete. If the channel body is made of concrete or polymer concrete, the protective and/or sacrificial material differs from the material of the channel body, with mastic asphalt preferably forming the protective and/or sacrificial material. If the channel body is made of a material other than concrete, the protective and/or sacrificial material can be concrete.
Die erfindungsgemäße Anordnung umfasst eine oder mehrere erfindungsgemäße Entwässerungsrinnen und eine Fahrbahn, wobei die Entwässerungsrinne oder die mehreren Entwässerungsrinnen parallel und/oder angrenzend zur Fahrbahn angeordnet, vorzugsweise verlegt, sind, wobei der Seitenabschnitt mit der Aussparung jeweils angrenzend zur Fahrbahn angeordnet ist.The arrangement according to the invention comprises one or more drainage channels according to the invention and a roadway, wherein the drainage channel or the several drainage channels are arranged, preferably laid, parallel and / or adjacent to the road, the side section with the recess being arranged adjacent to the road.
Sofern mehrere Entwässerungsrinnen vorgesehen sind, werden diese derart in Reihe angeordnet, dass durch die Aufnahmeräume der Entwässerungsrinnen ein durchgehender Kanal gebildet wird.If several drainage channels are provided, they are arranged in a row in such a way that a continuous channel is formed through the receiving spaces of the drainage channels.
Gemäß einer besonders bevorzugten Ausführungsvariante der Anordnung ist in der Aussparung der Entwässerungsrinne oder Entwässerungsrinnen ein Schutz- und/oder Opfermaterial vorgesehen ist, wobei das Schutz- und/oder Opfermaterial an die Fahrbahn angrenzt.According to a particularly preferred embodiment variant of the arrangement, a protective and/or sacrificial material is provided in the recess of the drainage channel or drainage channels, the protective and/or sacrificial material adjoining the roadway.
Bevorzugt weist die Fahrbahn einen Schichtaufbau mit wenigstens zwei, vorzugsweise drei, Schichten auf, wobei die oberste Schicht durch den Fahrbahnbelag, insbesondere aus Asphalt, gebildet wird. Die Dicke des Schutz- und/oder Opfermaterials der Entwässerungsrinne oder der mehreren Entwässerungsrinnen entspricht vorzugsweise der Dicke des Fahrbahnbelags.The roadway preferably has a layer structure with at least two, preferably three, layers, the top layer being formed by the road surface, in particular asphalt. The thickness of the protective and/or sacrificial material of the drainage channel or several drainage channels preferably corresponds to the thickness of the road surface.
Gemäß dem erfindungsgemäßen Verfahren zur Herstellung einer erfindungsgemäßen Entwässerungsrinne wird ein sich in Längsrichtung erstreckender Rinnenkörper hergestellt, insbesondere in einer Gussform gegossen, wobei der Rinnenkörper derart ausgebildet wird, dass der Rinnenkörper einen Aufnahmeraum zur Aufnahme einer abzuführenden Flüssigkeit aufweist, wobei der Aufnahmeraum durch zwei einander gegenüberliegend angeordnete Seitenwände, einen Boden und einen Rinnenkopf begrenzt ist, und wobei der Rinnenkopf wenigstens einen, sich in Längsrichtung erstreckenden Seitenabschnitt aufweist.According to the method according to the invention for producing a drainage channel according to the invention, a channel body extending in the longitudinal direction is produced, in particular cast in a mold, the channel body being designed in such a way that the channel body has a receiving space for receiving a liquid to be discharged, the receiving space being formed by two opposite ones arranged side walls, a floor and a gutter head, and wherein the gutter head has at least one side section extending in the longitudinal direction.
Entweder wird eine Aussparung an dem Seitenabschnitt beim Herstellen des Rinnenkörpers ausgebildet, beispielsweise durch Bereitstellen einer entsprechenden Gussform oder eines Einlegers in der Gussform, oder die Aussparung wird nach dem Herstellen des Rinnenkörpers in den Seitenabschnitt eingebracht, beispielsweise mittels Fräsen.Either a recess is formed on the side section when producing the channel body, for example by providing a corresponding mold or an insert in the mold, or the recess is introduced into the side section after the channel body has been produced, for example by means of milling.
Besonders bevorzugt wird ein Schutz- und/oder Opfermaterial in die Aussparung eingebracht, insbesondere eingegossen.Particularly preferably, a protective and/or sacrificial material is introduced into the recess, in particular cast.
Gemäß dem erfindungsgemäßen Verfahren zum Aufbringen einer Fahrbahnmarkierung, wird zunächst eine Anordnung bereitgestellt, wobei die Anordnung eine oder mehrere erfindungsgemäße Entwässerungsrinnen und eine Fahrbahn umfasst, wobei die Entwässerungsrinne oder die mehreren Entwässerungsrinnen parallel und/oder angrenzend zur Fahrbahn angeordnet, vorzugsweise verlegt, sind, wobei der Seitenabschnitt mit der Aussparung jeweils angrenzend zur Fahrbahn angeordnet ist, wobei in der Aussparung der Entwässerungsrinne oder Entwässerungsrinnen ein Schutz- und/oder Opfermaterial vorgesehen ist, wobei das Schutz- und/oder Opfermaterial an die Fahrbahn angrenzt.According to the method according to the invention for applying a roadway marking, an arrangement is first provided, the arrangement comprising one or more drainage channels according to the invention and a roadway, the drainage channel or the plurality of drainage channels being arranged, preferably laid, parallel and/or adjacent to the roadway, wherein the side section with the recess is arranged adjacent to the roadway, with a protective and / or sacrificial material being provided in the recess of the drainage channel or drainage channels, the protective and / or sacrificial material adjoining the roadway.
Anschließend wird eine Fahrbahnmarkierung derart auf die Anordnung aufgebracht, dass die Fahrbahnmarkierung abschnittsweise auf der Fahrbahn und abschnittsweise auf dem Schutz- und/oder Opfermaterial der Entwässerungsrinne angeordnet wird.A road marking is then applied to the arrangement in such a way that the road marking is arranged in sections on the road and in sections on the protective and/or sacrificial material of the drainage channel.
Bevorzugt wird die Fahrbahnmarkierung zur Erneuerung, insbesondere vollständig, abgetragen, indem der mit der Fahrbahnmarkierung versehene Bereich der Fahrbahn und des Schutz- und/oder Opfermaterials, insbesondere mittels Fräsen, abgetragen wird, und anschließend eine zweite Fahrbahnmarkierung derart aufgebracht wird, dass die zweite Fahrbahnmarkierung abschnittsweise auf der Fahrbahn und abschnittsweise auf dem Schutz- und/oder Opfermaterial der Entwässerungsrinne angeordnet wird.Preferably, the road marking is removed for renewal, in particular completely, by removing the area of the road and the protective and/or sacrificial material provided with the road marking, in particular by means of milling, and then applying a second road marking in such a way that the second road marking is arranged in sections on the roadway and in sections on the protective and / or sacrificial material of the drainage channel.
Die Erfindung wird nachstehend mit weiteren Einzelheiten unter Bezug auf die beigefügten Zeichnungen näher erläutert. Die dargestellten Ausführungsformen stellen Beispiele dar, wie die erfindungsgemäße Entwässerungsrinne ausgestaltet sein kann.The invention is explained in more detail below with further details with reference to the accompanying drawings. The embodiments shown represent examples of how the drainage channel according to the invention can be designed.
In diesen zeigen,
- Fig. 1
- eine perspektivische Ansicht einer Entwässerungsrinne nach einem erfindungsgemäßen Ausführungsbeispiel;
- Fig. 2
- einen Querschnitt durch eine Entwässerungsrinne nach einem erfindungsgemäßen Ausführungsbeispiel;
- Fig. 3
- einen Querschnitt durch eine Entwässerungsrinne nach einem erfindungsgemäßen Ausführungsbeispiel in einem eingebauten Zustand.
- Fig. 1
- a perspective view of a drainage channel according to an embodiment of the invention;
- Fig. 2
- a cross section through a drainage channel according to an embodiment of the invention;
- Fig. 3
- a cross section through a drainage channel according to an embodiment of the invention in an installed state.
Im Folgenden werden für gleiche und gleich wirkende Teile dieselben Bezugsziffern verwendet.In the following, the same reference numbers are used for identical and identically acting parts.
Die Entwässerungsrinne 10 gemäß
Der Rinnenkopf 17 weist zwei sich in Längsrichtung L erstreckende Seitenabschnitte 18 auf. Die Seitenabschnitte 18 sind durch Stege 22 verbunden, wobei zwischen zwei in Längsrichtung L benachbarten Stegen 22 je ein Schlitz 23 vorgesehen ist, durch den eine Flüssigkeit von der Oberfläche in den Aufnahmeraum 14 fließen kann. An der Oberseite der Stege 22 können Noppen angeordnet sein.The
Ein erster der beiden Seitenabschnitte 18 weist eine in Längsrichtung L durchgehende Aussparung 19 zur Aufnahme eines sich vom Material des Rinnenkörpers 13 unterscheidenden Schutz- und/oder Opfermaterials 20 auf. Dieser erste Seitenabschnitt 18 mit der Aussparung 19 ist im in
Der zweite, dem ersten Seitenabschnitt 18 gegenüberliegend angeordnete Seitenabschnitt 18 bildet eine Auskragung aus und grenzt im eingebauten Zustand an den Geh- und/oder Rettungsweg 24 an. Die Auskragung reicht über die Oberseite 25 der Stege 22 hinaus und weist an ihrer äußeren Seitenfläche 26 einen Hinterschnitt 27 auf, um Material zu sparen.The
Die Fahrbahn 11 weist einen Schichtaufbau mit mehreren Schichten auf, wobei die oberste Schicht durch den Fahrbahnbelag 30, insbesondere aus Asphalt, gebildet ist.The
In den Aussparungen 19 der Entwässerungsrinnen 10 ist das ein Schutz- und/oder Opfermaterial 20 angeordnet, wobei das Schutz- und/oder Opfermaterial 20 an die Fahrbahn 11 angrenzt. Die Dicke des Schutz- und/oder Opfermaterials 20 der Entwässerungsrinnen 10 entspricht der Dicke des Fahrbahnbelags 30.A protective and/or sacrificial material 20 is arranged in the
Bei einem Verfahren zur Herstellung einer Entwässerungsrinne gemäß
Bei einem Verfahren zur Aufbringen einer Fahrbahnmarkierung 12 wird zunächst die Anordnung 31 gemäß
- 1010
- Entwässerungsrinnedrainage channel
- 1111
- Fahrbahnroadway
- 1212
- FahrbahnmarkierungRoad marking
- 1313
- Rinnenkörpergutter body
- 1414
- AufnahmeraumRecording room
- 1515
- SeitenwandSide wall
- 1616
- BodenFloor
- 1717
- Rinnenkopfgutter head
- 1818
- SeitenabschnittPage section
- 1919
- Aussparungrecess
- 2020
- Schutz- und/oder OpfermaterialProtective and/or sacrificial material
- 2121
- AufnahmekanalRecording channel
- 2222
- Stegweb
- 2323
- Schlitzslot
- 2424
- Geh- und/oder RettungswegWalkway and/or escape route
- 2525
- OberseiteTop
- 2626
- Seitenflächeside surface
- 2727
- HinterschnittUndercut
- 2828
- Seitenflächeside surface
- 2929
- OberseiteTop
- 3030
- Fahrbahnbelagroad surface
- 3131
- Anordnungarrangement
- LL
- LängsrichtungLongitudinal direction
Claims (15)
dadurch gekennzeichnet, dass
die Aussparung (19) mit einem Schutz- und/oder Opfermaterial (20) als Untergrund für die Fahrbahnmarkierung (12) gefüllt ist.Drainage channel according to claim 1,
characterized in that
the recess (19) is filled with a protective and/or sacrificial material (20) as a base for the road marking (12).
dadurch gekennzeichnet, dass
der Rinnenkopf (17) zwei sich gegenüberliegend angeordnete und in Längsrichtung erstreckende Seitenabschnitte (18) aufweist, wobei ein erster Seitenabschnitt (18) der zwei Seitenabschnitte (18) im eingebauten Zustand der Entwässerungsrinne (10) angrenzend zur Fahrbahn (11) angeordnet ist, wobei die Aussparung (19) in dem ersten Seitenabschnitt (18) angeordnet ist.Drainage channel according to claim 1 or 2,
characterized in that
the gutter head (17) has two side sections (18) arranged opposite one another and extending in the longitudinal direction, a first side section (18) of the two side sections (18) being arranged adjacent to the roadway (11) when the drainage channel (10) is installed, wherein the recess (19) is arranged in the first side section (18).
dadurch gekennzeichnet, dass
die Seitenabschnitte (18) durch Stege (22) verbunden sind, wobei zwischen zwei in Längsrichtung (L) benachbarten Stegen (22) je ein Schlitz (23) vorgesehen ist.Drainage channel according to claim 3,
characterized in that
the side sections (18) are connected by webs (22), with a slot (23) being provided between two webs (22) adjacent in the longitudinal direction (L).
dadurch gekennzeichnet, dass
ein zweiter, dem ersten Seitenabschnitt (18) gegenüberliegend angeordneter Seitenabschnitt (18) eine Auskragung ausbildet.Drainage channel according to claim 3 or 4,
characterized in that
a second side section (18) arranged opposite the first side section (18) forms a projection.
dadurch gekennzeichnet, dass
die Aussparung (19) stufenförmig ausgebildet ist, wobei sich die Aussparung (19) von einer äußeren Seitenfläche (28) und von einer Oberseite (29) des Seitenabschnitts (18) aus in den Seitenabschnitt (18) hinein erstreckt.Drainage channel according to one of the preceding claims,
characterized in that
the recess (19) is stepped-shaped, the recess (19) extending from an outer side surface (28) and from an upper side (29) of the side section (18) into the side section (18).
dadurch gekennzeichnet, dass
das Schutz- und/oder Opfermaterial (20) Gussasphalt ist oder umfasst.Drainage channel according to one of the preceding claims,
characterized in that
the protective and/or sacrificial material (20) is or includes mastic asphalt.
dadurch gekennzeichnet, dass
der Rinnenkörper (13) aus Beton, insbesondere Polymerbeton, gebildet ist.Drainage channel according to one of the preceding claims,
characterized in that
the channel body (13) is made of concrete, in particular polymer concrete.
dadurch gekennzeichnet, dass
das Schutz- und/oder Opfermaterial (20) Beton ist oder umfasst, oder der Rinnenkörper (13) aus Beton gebildet ist.Drainage channel according to one of claims 1 to 6,
characterized in that
the protective and/or sacrificial material (20) is or comprises concrete, or the channel body (13) is made of concrete.
dadurch gekennzeichnet, dass
in der Aussparung (19) der Entwässerungsrinne (10) oder den Aussparungen der Entwässerungsrinnen (10) ein Schutz- und/oder Opfermaterial (20) vorgesehen ist, wobei das Schutz- und/oder Opfermaterial (20) jeweils an die Fahrbahn (11) angrenzt.Arrangement according to claim 10,
characterized in that
A protective and/or sacrificial material (20) is provided in the recess (19) of the drainage channel (10) or the recesses of the drainage channels (10), the protective and/or sacrificial material (20) being attached to the roadway (11). adjacent.
dadurch gekennzeichnet, dass
ein Schutz- und/oder Opfermaterial (20) in die Aussparung (19) eingebracht wird.Method according to claim 12,
characterized in that
a protective and/or sacrificial material (20) is introduced into the recess (19).
dadurch gekennzeichnet, dass
die Fahrbahnmarkierung (12) zur Erneuerung abgetragen wird, indem der mit der Fahrbahnmarkierung (12) versehene Bereich der Fahrbahn (11) und des Schutz- und/oder Opfermaterials (20) abgetragen wird, und anschließend eine zweite Fahrbahnmarkierung (12) derart aufgebracht wird, dass die zweite Fahrbahnmarkierung (12) abschnittsweise auf der Fahrbahn (11) und abschnittsweise auf dem Schutz- und/oder Opfermaterial (20) der Entwässerungsrinne (10) angeordnet wird.Method according to claim 14,
characterized in that
the road marking (12) is removed for renewal by removing the area of the road (11) and the protective and/or sacrificial material (20) provided with the road marking (12), and then a second road marking (12) is applied in this way that the second road marking (12) is arranged in sections on the road (11) and in sections on the protective and / or sacrificial material (20) of the drainage channel (10).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102022115542.0A DE102022115542A1 (en) | 2022-06-22 | 2022-06-22 | Drainage channel for surface drainage of roadways, arrangement, method for producing a drainage channel and method for applying a roadway marking |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4296429A1 true EP4296429A1 (en) | 2023-12-27 |
Family
ID=86942759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP23180683.7A Pending EP4296429A1 (en) | 2022-06-22 | 2023-06-21 | Gutter for surface drainage of roadways, method for producing a gutter and method for applying a pavement marking |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4296429A1 (en) |
DE (1) | DE102022115542A1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8706254U1 (en) * | 1987-04-30 | 1987-07-23 | Passavant-Werke Ag, 6209 Aarbergen, De | |
CH698270B1 (en) * | 2005-07-21 | 2009-06-30 | Creabeton Materiaux Ag Sa | Drainage channel with lateral drainage holes, and processes for their preparation. |
US20170191233A1 (en) * | 2016-01-05 | 2017-07-06 | Caterpillar Paving Products Inc. | Road Marking Scan and Transfer System |
CN107419640A (en) * | 2017-02-28 | 2017-12-01 | 衡阳市金泓建筑装饰设计有限公司 | A kind of safety-type road slot gutter |
-
2022
- 2022-06-22 DE DE102022115542.0A patent/DE102022115542A1/en active Pending
-
2023
- 2023-06-21 EP EP23180683.7A patent/EP4296429A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8706254U1 (en) * | 1987-04-30 | 1987-07-23 | Passavant-Werke Ag, 6209 Aarbergen, De | |
CH698270B1 (en) * | 2005-07-21 | 2009-06-30 | Creabeton Materiaux Ag Sa | Drainage channel with lateral drainage holes, and processes for their preparation. |
US20170191233A1 (en) * | 2016-01-05 | 2017-07-06 | Caterpillar Paving Products Inc. | Road Marking Scan and Transfer System |
CN107419640A (en) * | 2017-02-28 | 2017-12-01 | 衡阳市金泓建筑装饰设计有限公司 | A kind of safety-type road slot gutter |
Also Published As
Publication number | Publication date |
---|---|
DE102022115542A1 (en) | 2023-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0015426B1 (en) | Ground covering element with elevated areas on the top side separated by dummy gaps, group of such ground covering elements and process for manufacturing such elements | |
EP0657583B1 (en) | Plate-like paving stone particularly of concrete | |
EP3585626B1 (en) | Tire | |
DE1534262B1 (en) | Elastic, sealingly built-in lane transition with the top lying flush with the railway ceiling | |
DE1926281A1 (en) | Lane marking | |
CH663435A5 (en) | DRIVEWAY WITH AT LEAST ONE DRAINAGE GUTTER FOR CROSS-DRAINAGE. | |
CH674997A5 (en) | Square concrete paving slab | |
EP4296429A1 (en) | Gutter for surface drainage of roadways, method for producing a gutter and method for applying a pavement marking | |
DE2632660A1 (en) | Concrete or other artificial stone paving drainage - with horizontal cut=outs in individual stones forming continuous covered channels | |
DE7318067U (en) | JOINT SEAL FOR EXPANSION JOINTS IN CONCRETE SLAB ROAD CONSTRUCTIONS | |
CH630131A5 (en) | Concrete surfacing with joints between surfacing sections of a road | |
DE202021100232U1 (en) | Concrete shaped stone to delimit roadways | |
DE4428482A1 (en) | Gutter stone for drainage of surface water | |
DE7929663U1 (en) | STRIPS FOR INDUCTION OF CRACKS AND SEALING IN CONCRETE | |
DE3105814A1 (en) | "Curb" | |
DE10353080B3 (en) | Cast roadway drainage channel has cast concrete base with cast in tapering channel | |
DE102007046238A1 (en) | Molded brick for laying floor covering, has edge-sided area positioned in direct proximity to vertical side surfaces and forming dummy joint at level lower than remaining area of upper side, where remaining area forms viewing side of brick | |
DE102007026346B4 (en) | Separation strip and shaped stone to delineate a walkway from a bike path | |
EP1181413B1 (en) | Shaped block | |
DE20317542U1 (en) | Concrete paving stone has side nipples which enmesh with those projecting from an adjacent paving stone in a modular array of stones | |
DE202009004454U1 (en) | Sickerrigole | |
DE1934352C3 (en) | Attachment for processes in streets, squares or the like | |
DE2702461C3 (en) | Abutment for bridge structures | |
DE202012104463U1 (en) | Form stone and traffic area with molded block | |
DE3316148A1 (en) | Method for manufacturing concrete slabs, in particular industrial floors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20240326 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |