EP4219894A1 - Support pillar for mine roof - Google Patents
Support pillar for mine roof Download PDFInfo
- Publication number
- EP4219894A1 EP4219894A1 EP22211076.9A EP22211076A EP4219894A1 EP 4219894 A1 EP4219894 A1 EP 4219894A1 EP 22211076 A EP22211076 A EP 22211076A EP 4219894 A1 EP4219894 A1 EP 4219894A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pillar
- spatial structure
- sidewalls
- sidewall
- closing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/48—Chocks or the like
- E21D15/483—Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
Definitions
- the subject matter of the invention is an artificial pillar, especially an inter-room pillar, for use in underground mining, especially in the mines of non-ferrous metal ores and chemical raw materials where single-layer, room and pillar or strip mining methods are used.
- inter-room pillars are removed to residual dimensions, and waste rock, being a part of the exploitation gate, can be located within the post-exploitation space so-called goaf, as dry backfill.
- the Polish patent description PL158092B1 discloses a room and pillar method of deposit exploitation in which the pillars located near the roof falls are partially removed by means of cuttings whereas the post-exploitation void is eliminated by roof collapse forced by blasting works, and at the same time the remains of pillars left in the post-exploitation void are blasted . In order to minimize the loss of raw material, the most efficient use of the deposit is sought.
- the Polish patent description PL 189980 B1 discloses a technology for the clean removing of mineral deposits using a room and pillar method, which lie in that the row of pillars located near the goaf line is mechanically removed after previously placing a substitute support pillar formed from the waste rock in the vicinity thereof.
- the Chinese patent description CN107524470B discloses an artificial pillar which consists of a specific fluid-permeable geotextile bag reinforced with steel hoops.
- the pillar comprises a supply spigot and a vent spigot.
- the filling of the pillar is a mixture of a solidifying substance and broken waste rock.
- a similar solution is also disclosed in the Chinese patent description CN103562497B .
- the polymer geo grids are used in the mining industry as elements of backfill dam or as safety grids, forming the lining of the excavation.
- international patent application WO2008/087537A2 discloses the use of a flexible polypropylene-polyethylene grid as a reinforcement for a geotextile in a backfill dam.
- a polymeric safety grid made of polypropylene with flame retardant additives is known from US patent description US5096335A .
- the grid provides additional protection of the roof and the underground sides of work to which it is anchored and can also be used in room and pillar mining methods.
- the location of the safety grid on the pillars sidewalls and along the rooms prevents the rock from falling into the excavation and reducing its lateral dimensions, while at the same time it does not constitute an obstacle, in case of the need of ripping the pillars.
- the purpose of the invention is to develop an easy-to-construct artificial pillar especially an inter-room pillar, which would make it possible to reduce the loss of raw material in the residual pillars left, where it is not possible to remove the deposit cleanly and, moreover, to make it possible to manage in situ waste rock whose increasing production is associated with the small thickness of seams or pseudo-seams and the need to rip off waste rock in the roof or seam floor during mining and preparatory works.
- an artificial pillar especially an inter-room pillar formed of a spatial structure filled with waste rock
- the spatial structure is made of a flexible grid and comprises a sidewalls and a closing sidewall and a bottom resting on the floor, whereas at the top of the sidewalls and the closing sidewall are suspended to the roof by means of rock bolts, wherein the rock bolts suspending the closing sidewall being equipped with additional fastening elements.
- the flexible grid is made of a polymer, especially polyethylene or polypropylene.
- the spatial structure is made of a single cross-shaped grid element and it is also advantageous when the spatial structure is made of two grid sections crossing each other in the area constituting the bottom of the spatial structure.
- Fig. 1 shows a spatial structure prepared for filling with waste rock
- Fig. 2 the completed artificial inter-room pillar.
- the artificial inter-room pillar ( Fig. 1, Fig. 2 ) was built in a row of inter-room pillars, in place of the support pillar that was previously removed.
- On the floor 2 is the square bottom 5 of a spatial structure made of a single, originally flat cross-shaped polypropylene grid element, the arms of which are the sidewalls 6, 7, 8 and the closing sidewall 9, wherein the closing sidewall 9 is located on the side of the face of the exploitation front, and the sidewalls 7, 8 are located on the side of the adjacent pillars 3 and 4 in the same row, and the sidewall 6 - from the side of the goafs.
- the sidewalls 6, 7 and 8 are suspended directly on the roof 1 by means of rock bolts 10, 11, 12 and 13.
- the closing sidewall 9 located on the side of the face of the exploitation front, is fastened on additional fastening elements 14 and 15, which are hooks, constituting the rock bolt 13, 14 equipment.
- additional fastening elements 14 and 15 which are hooks, constituting the rock bolt 13, 14 equipment.
- waste rock 16 inside the spatial structure.
- the side edges of the adjacent sidewalls 6 and 7, 6 and 8, 7 and 9, and 8 and 9, are additionally fastened together at half height by means of connecting elements, not shown in the drawing, which are steel stitches .
- the spatial structure is made of two intersecting sections of polyethylene grid, which overlap in the area constituting the bottom 5 of the spatial structure, and the side edges of the adjacent sidewalls 6, 7, 8, 9 of the spatial structure are stitched along the entire height with a polyethylene cord.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Processing Of Solid Wastes (AREA)
- Tents Or Canopies (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
- The subject matter of the invention is an artificial pillar, especially an inter-room pillar, for use in underground mining, especially in the mines of non-ferrous metal ores and chemical raw materials where single-layer, room and pillar or strip mining methods are used.
- In order to minimize the loss of raw material left in the goaf, and to facilitate the transition of pillars into the range of operation under the post-destruction characteristics, inter-room pillars are removed to residual dimensions, and waste rock, being a part of the exploitation gate, can be located within the post-exploitation space so-called goaf, as dry backfill. The Polish patent description
discloses a room and pillar method of deposit exploitation in which the pillars located near the roof falls are partially removed by means of cuttings whereas the post-exploitation void is eliminated by roof collapse forced by blasting works, and at the same time the remains of pillars left in the post-exploitation void are blasted . In order to minimize the loss of raw material, the most efficient use of the deposit is sought. The Polish patent descriptionPL158092B1 discloses a technology for the clean removing of mineral deposits using a room and pillar method, which lie in that the row of pillars located near the goaf line is mechanically removed after previously placing a substitute support pillar formed from the waste rock in the vicinity thereof.PL 189980 B1 - The Chinese patent description
CN107524470B discloses an artificial pillar which consists of a specific fluid-permeable geotextile bag reinforced with steel hoops. In the upper part, the pillar comprises a supply spigot and a vent spigot. The filling of the pillar is a mixture of a solidifying substance and broken waste rock. A similar solution is also disclosed in the Chinese patent descriptionCN103562497B . - The polymer geo grids, are used in the mining industry as elements of backfill dam or as safety grids, forming the lining of the excavation. For example, international patent application
WO2008/087537A2 discloses the use of a flexible polypropylene-polyethylene grid as a reinforcement for a geotextile in a backfill dam. Similarly, a polymeric safety grid made of polypropylene with flame retardant additives is known from US patent descriptionUS5096335A . The grid provides additional protection of the roof and the underground sides of work to which it is anchored and can also be used in room and pillar mining methods. The location of the safety grid on the pillars sidewalls and along the rooms prevents the rock from falling into the excavation and reducing its lateral dimensions, while at the same time it does not constitute an obstacle, in case of the need of ripping the pillars. - The purpose of the invention is to develop an easy-to-construct artificial pillar especially an inter-room pillar, which would make it possible to reduce the loss of raw material in the residual pillars left, where it is not possible to remove the deposit cleanly and, moreover, to make it possible to manage in situ waste rock whose increasing production is associated with the small thickness of seams or pseudo-seams and the need to rip off waste rock in the roof or seam floor during mining and preparatory works.
- The essence of an artificial pillar, especially an inter-room pillar formed of a spatial structure filled with waste rock, is that the spatial structure is made of a flexible grid and comprises a sidewalls and a closing sidewall and a bottom resting on the floor, whereas at the top of the sidewalls and the closing sidewall are suspended to the roof by means of rock bolts, wherein the rock bolts suspending the closing sidewall being equipped with additional fastening elements.
- Advantageously the flexible grid is made of a polymer, especially polyethylene or polypropylene.
- Also, it is advantageous when the spatial structure is made of a single cross-shaped grid element and it is also advantageous when the spatial structure is made of two grid sections crossing each other in the area constituting the bottom of the spatial structure.
- It is advantageous when the closing sidewall is located on the side of the exploitation front.
- Furthermore it is advantageous when the side edges of the adjacent sidewalls and the closing sidewall are fastened together by means of connecting elements or stitched together with cords.
- It is advantageous when additional fastening elements are hooks or catches.
- The subject matter of the invention is illustrated in the embodiment in the simplified drawing, in which
Fig. 1 shows a spatial structure prepared for filling with waste rock, andFig. 2 - the completed artificial inter-room pillar. - The artificial inter-room pillar (
Fig. 1, Fig. 2 ) was built in a row of inter-room pillars, in place of the support pillar that was previously removed. On the floor 2 is thesquare bottom 5 of a spatial structure made of a single, originally flat cross-shaped polypropylene grid element, the arms of which are thesidewalls 6, 7, 8 and theclosing sidewall 9, wherein theclosing sidewall 9 is located on the side of the face of the exploitation front, and the sidewalls 7, 8 are located on the side of theadjacent pillars 3 and 4 in the same row, and the sidewall 6 - from the side of the goafs. Thesidewalls 6, 7 and 8 are suspended directly on the roof 1 by means of 10, 11, 12 and 13. Therock bolts closing sidewall 9 located on the side of the face of the exploitation front, is fastened on 14 and 15, which are hooks, constituting theadditional fastening elements 13, 14 equipment. There isrock bolt waste rock 16 inside the spatial structure. The side edges of the 6 and 7, 6 and 8, 7 and 9, and 8 and 9, are additionally fastened together at half height by means of connecting elements, not shown in the drawing, which are steel stitches .adjacent sidewalls - In another embodiment of the pillar, the spatial structure is made of two intersecting sections of polyethylene grid, which overlap in the area constituting the
bottom 5 of the spatial structure, and the side edges of the 6, 7, 8, 9 of the spatial structure are stitched along the entire height with a polyethylene cord.adjacent sidewalls - The use of flexible grid for the construction of the spatial structure makes it possible to spread it on the floor 2 of the excavation and freely suspend the
sidewalls 6, 7, 8, whereas the closing of theclosing sidewall 9 can be realized in stages, by pinning or stitching from below a section of its edge with the edges of the adjacent walls 7 and 8 after locating a storage parts ofwaste rock 15 in the emerging spatial structure of the artificial pillar. After the spatial structure is completely filled withwaste rock 16, the structure is finally closed by suspending theclosing sidewall 9 by means of 14 and 15 and by additionally clipping or stitching its edges with the edges of the adjacent walls 7 and 8.fastening elements
Claims (7)
- An artificial pillar, especially an inter-room pillar, formed of a spatial structure filled with waste rock, characterized in that the spatial structure is made of flexible grid and comprises sidewalls (6, 7, 8) and a closing sidewall (9) and a bottom (5) resting on the floor (2), whereas at the top the sidewalls (6, 7, 8) and the closing sidewall (9) are suspended to the roof (1) by means of rock bolts (10, 11, 12, 13), wherein the rock bolts (12,13) suspending closing sidewall (9) are equipped with additional fastening elements (14).
- The pillar according to claim. 1, characterized in that the flexible grid is made of a polymer, especially polyethylene or polypropylene.
- The pillar according to claim 1, characterized in that the spatial structure is made of a single cross-shaped grid element.
- The pillar according to claim 1, characterized in that the spatial structure is made of two grid sections intersecting in the area of the bottom (5).
- The pillar according to claim 1, characterized in that the closing sidewall (9) on the side of the exploitation front is located.
- The pillar according to claim 1, characterized in that the side edges of adjacent to each other sidewalls (6, 7, 8) and closing sidewall (9) are fastened together by means of connecting elements or stitched together with cords.
- The pillar according to claim. 1, characterized in that the additional fastening elements (14) are hooks or catches.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL439784A PL246370B1 (en) | 2021-12-09 | 2021-12-09 | Artificial pillar, especially interventricular |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP4219894A1 true EP4219894A1 (en) | 2023-08-02 |
| EP4219894C0 EP4219894C0 (en) | 2024-12-04 |
| EP4219894B1 EP4219894B1 (en) | 2024-12-04 |
Family
ID=84820030
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP22211076.9A Active EP4219894B1 (en) | 2021-12-09 | 2022-12-02 | Support pillar for mine roof |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP4219894B1 (en) |
| PL (1) | PL246370B1 (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2186607A (en) * | 1986-02-14 | 1987-08-19 | British Reinforced Concrete Eng Co Ltd | Mine roof support pack for cementitious filling |
| WO1991006746A1 (en) * | 1989-10-25 | 1991-05-16 | Fosroc International Limited | A method of sealing an opening |
| US5096335A (en) | 1991-03-27 | 1992-03-17 | The Tensar Corporation | Polymer grid for supplemental roof and rib support of combustible underground openings |
| PL158092B1 (en) | 1988-07-21 | 1992-08-31 | Gorniczo Hutniczy Miedzi | A chamber and pillar system of mining deposition |
| US20050070187A1 (en) * | 2003-09-30 | 2005-03-31 | Cavenagh Edward J. | Form for containing settable filler material during setting |
| PL189980B1 (en) | 1999-01-19 | 2005-10-31 | Kghm Polska Miedz Sa | Method of cleanly getting mineral deposits by pillar-and-stall working |
| WO2008087537A2 (en) | 2007-01-18 | 2008-07-24 | Skarboevig Nils Mittet | A support net for underground mine supports |
| US20120009023A1 (en) * | 2010-07-09 | 2012-01-12 | Bower Joseph P | Pumpable crib bag assembly and method of installation |
| CN103562497A (en) | 2011-02-24 | 2014-02-05 | 纳塔利·基拉塞 | Preloadable support |
| CN107524470A (en) | 2017-08-21 | 2017-12-29 | 长沙有色冶金设计研究院有限公司 | A kind of method of geotechnical fabric bag and rapid build artificial ore pillar |
-
2021
- 2021-12-09 PL PL439784A patent/PL246370B1/en unknown
-
2022
- 2022-12-02 EP EP22211076.9A patent/EP4219894B1/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2186607A (en) * | 1986-02-14 | 1987-08-19 | British Reinforced Concrete Eng Co Ltd | Mine roof support pack for cementitious filling |
| PL158092B1 (en) | 1988-07-21 | 1992-08-31 | Gorniczo Hutniczy Miedzi | A chamber and pillar system of mining deposition |
| WO1991006746A1 (en) * | 1989-10-25 | 1991-05-16 | Fosroc International Limited | A method of sealing an opening |
| US5096335A (en) | 1991-03-27 | 1992-03-17 | The Tensar Corporation | Polymer grid for supplemental roof and rib support of combustible underground openings |
| PL189980B1 (en) | 1999-01-19 | 2005-10-31 | Kghm Polska Miedz Sa | Method of cleanly getting mineral deposits by pillar-and-stall working |
| US20050070187A1 (en) * | 2003-09-30 | 2005-03-31 | Cavenagh Edward J. | Form for containing settable filler material during setting |
| WO2008087537A2 (en) | 2007-01-18 | 2008-07-24 | Skarboevig Nils Mittet | A support net for underground mine supports |
| US20120009023A1 (en) * | 2010-07-09 | 2012-01-12 | Bower Joseph P | Pumpable crib bag assembly and method of installation |
| CN103562497A (en) | 2011-02-24 | 2014-02-05 | 纳塔利·基拉塞 | Preloadable support |
| CN107524470A (en) | 2017-08-21 | 2017-12-29 | 长沙有色冶金设计研究院有限公司 | A kind of method of geotechnical fabric bag and rapid build artificial ore pillar |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4219894C0 (en) | 2024-12-04 |
| PL246370B1 (en) | 2025-01-13 |
| PL439784A1 (en) | 2023-06-12 |
| EP4219894B1 (en) | 2024-12-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2079694C (en) | Undercut excavation method | |
| US5782539A (en) | Wall-to-wall surface mining process | |
| CN104847356B (en) | Mining method of thin and small ore body | |
| Guo et al. | Numerical simulation of overburden and surface movements for Wongawilli strip pillar mining | |
| CN110331978A (en) | A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method | |
| CN111322109B (en) | Waste stone and tailing synergistic cemented filling method | |
| US4445723A (en) | Method of circle mining of ore | |
| CN115288684A (en) | Downward segmented filling mining method suitable for thick, large and broken ore bodies | |
| RU2344291C2 (en) | System of deposit development | |
| CN111852473B (en) | Mining method of thin vein | |
| RU2514933C1 (en) | Method of layer mining of high steeply inclined coal bed with extraction of coal from bedding pack | |
| US3999804A (en) | Longwall mining with chain pillar recovery | |
| RU2470157C1 (en) | Layer development method of thick steeply inclined coal formation | |
| CN108643912A (en) | A kind of induction caving afterwards filling mining methods | |
| CN105888664A (en) | Very thick hard coal mining method | |
| US4400035A (en) | Process for the extraction of thick coal seams | |
| EP4219894A1 (en) | Support pillar for mine roof | |
| CN105649673A (en) | Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams | |
| SU1721241A1 (en) | Method of dumping in working of useful mineral deposits | |
| KR101518471B1 (en) | Mining method for stratigraphic ore in soft rock | |
| RU2760270C1 (en) | Method for developing a large flat-lying seam with the release of coal under the cover | |
| RU2411360C1 (en) | Method of underground mining of massive steep ore deposits | |
| RU2187646C2 (en) | Method of opencast mining of beded mineral deposits | |
| CN108708725B (en) | safe and efficient gentle dip ore body mining method | |
| CN106761749A (en) | Large-inclination-angle coal bed breaking roof big gun is adopted and turns fully mechanized mining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20240131 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20240703 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602022008389 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| U01 | Request for unitary effect filed |
Effective date: 20241210 |
|
| U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT RO SE SI Effective date: 20241220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250304 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250305 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250304 |
|
| U1N | Appointed representative for the unitary patent procedure changed after the registration of the unitary effect |
Representative=s name: KUCZYNSKA, TERESA; PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250404 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241204 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20250905 |
|
| U20 | Renewal fee for the european patent with unitary effect paid |
Year of fee payment: 4 Effective date: 20251021 |