EP4197075A1 - Système d'alimentation - Google Patents

Système d'alimentation

Info

Publication number
EP4197075A1
EP4197075A1 EP21946273.6A EP21946273A EP4197075A1 EP 4197075 A1 EP4197075 A1 EP 4197075A1 EP 21946273 A EP21946273 A EP 21946273A EP 4197075 A1 EP4197075 A1 EP 4197075A1
Authority
EP
European Patent Office
Prior art keywords
voltage
battery
fet
converter
output voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP21946273.6A
Other languages
German (de)
English (en)
Other versions
EP4197075A4 (fr
Inventor
Alexei Tikhonski
Robert L. Myers
James P. Novak
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Litech Laboratories LLC
Original Assignee
Litech Laboratories LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Litech Laboratories LLC filed Critical Litech Laboratories LLC
Publication of EP4197075A1 publication Critical patent/EP4197075A1/fr
Publication of EP4197075A4 publication Critical patent/EP4197075A4/fr
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • H02J7/04Regulation of charging current or voltage
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/04Constant-current supply systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/08Three-wire systems; Systems having more than three wires
    • H02J1/084Three-wire systems; Systems having more than three wires for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/342The other DC source being a battery actively interacting with the first one, i.e. battery to battery charging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2207/00Indexing scheme relating to details of circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J2207/20Charging or discharging characterised by the power electronics converter

Definitions

  • Modern information technology and telecommunication systems contain electrical distribution buses that operate at a wide variety of distribution bus voltages.
  • computer servers commonly distribute 12 volts (“V”) to their internal subsystems such as memory, processor, storage, cooling fans, and I/O (such internal subsystems to which a distribution bus provides a supply voltage are referred to herein as a “load circuit,” or simply a “load”).
  • V volts
  • Wired telecommunications systems commonly use a 48 V distribution bus voltage level
  • wireless telecommunications and cell site systems often use 24 V as their internal power distribution bus voltage level.
  • a regulated distribution bus will have a specified voltage tolerance applied to its nominal value. For example, a 12 V distribution bus with a +/–10% tolerance will have an operational envelope ranging from a maximum level of 13.2 V down to a minimum level of 10.8 V.
  • battery systems have been developed that are optimized for delivering very high electrical currents for short durations.
  • Battery systems typically include one or more battery cells (herein, the terms “battery” and “cell” may be used interchangeably). Because of their small size, these have become attractive in some equipment types for the purpose of replacing a traditional Uninterruptable Power Supply (“UPS”) serving the role of a short-term electrical backup of equipment in the event of outages of AC main power.
  • UPS Uninterruptable Power Supply
  • These high-power battery systems are unique in their capability to deliver a very high discharge current, but have a shortcoming of only being capable of slowly accepting a charging current. This ratio of discharge current to charge current can be as high as 30:1, or even 40:1, with technology that is currently commercially available.
  • High-power battery systems used today for short duration backup applications typically employ output regulators in the form of DC-DC converters capable of processing high energy (e.g., an output DC-DC converter) to match the output voltage of the battery system to the distribution bus voltage, and to prevent the backflow of current from the distribution bus into the batteries, which would result in unsafe charging currents and represent a safety hazard.
  • a charging current is provided through a separate path from discharge current, and may be provided by a separate, low-power charging DC-DC converter.
  • MOSFETs are commonly used in these applications because they contain, by nature of their fabrication process, a diode (i.e., a parasitic body diode), which allows current to flow in one direction through the MOSFET even when the MOSFET is switched OFF.
  • a diode i.e., a parasitic body diode
  • This body diode represents a problem in many applications, but is actually utilized as an advantage in embodiments of the present disclosure.
  • Many of today’s battery systems utilize two switches positioned back-to-back, each of which includes either a parasitic body diode in parallel with each switch or an external diode across the switch.
  • the switch with the forward-facing diode (facing from the battery to the load) is considered the “Charge” switch (in its OFF state, it blocks any charging current), and the other switch is the “Discharge” switch (in its OFF state, it blocks any discharge current).
  • This scheme works for low-power distribution buses where the following conditions are met: (1) total current capacity of the bus (either available on the bus or consumed by the load coupled to the bus) does not exceed either the safe charge or discharge currents of the battery, (2) the distribution bus voltage is controllable such that it can be raised sufficiently high when needed in order for the battery to receive a full charge after it becomes discharged, and (3) the allowable operating voltage of the load circuit ranges between or includes the minimum battery terminal voltage when the battery is fully discharged (i.e., 0% state of charge), and the maximum battery terminal voltage when the battery is fully charged (i.e., 100% state of charge).
  • FIG. 2 illustrates a “high-side” configuration of switches, where the switches Q 1 and Q 2 (e.g., MOSFETs) are arranged such that the switches are connected to the high voltage side (+ side) of the battery.
  • switches Q 1 and Q 2 e.g., MOSFETs
  • the switches Q 1 and Q 2 are connected so that the battery can be charged and discharged depending on which of the two switches is switched ON.
  • a controller is coupled to each of the switches and exerts control over which of the switches is switched ON, under what conditions, and for what duration. Charge and discharge control is thus exerted by the controller.
  • the controller may allow or disallow charge or discharge based on battery state of health, level of charge, instantaneous capacity, voltage, current, temperature, or any other parameters that the designer may select.
  • the combination of the switches, their parasitic body diodes, and the controller allow for charge control (prohibiting charge flow from the distribution bus to the battery), discharge control (prohibiting charge flow from the battery to the distribution bus), or complete electrical isolation of the battery terminals from the distribution bus (prohibiting charge flow in either direction).
  • This dual switch control scheme works in many battery applications where the allowable charge current, discharge current, and available bus currents are close in magnitude, or where the allowable charge current is considerably higher than the available bus current.
  • Laptop computer batteries have a typical design point where the charge rate is approximately equal to the discharge rate, e.g., near 1C (i.e., one times the nominal battery capacity, C).
  • Portable phone batteries can be designed to have higher charge rates (e.g., up to 4C), but typically have very low discharge rates. This allows phones to be charged quickly while at the same time having a long operational life on a single charge. At these low charge and discharge rates, the parasitic body diodes of the switches have adequate thermal and power capabilities to pass the necessary charge and discharge currents with minimal temperature rise and power loss.
  • the battery selected for such an application would need to be as close as possible to +12 V (e.g., 3 or 4 series-connected cells charged to 4.0 V per cell).
  • +12 V e.g., 3 or 4 series-connected cells charged to 4.0 V per cell.
  • regulating systems have been designed for controlling the electrical output when converting battery voltage from one voltage level to another to safe connection to a power bus.
  • a linear regulator can be used to provide a uniform voltage output at a specific value or set point.
  • a feedback circuit that includes an operational amplifier (“OPAMP”) that drives a series-pass element (e.g., a transistor with a diode in parallel).
  • OPAMP operational amplifier
  • series-pass element e.g., a transistor with a diode in parallel
  • a step-down or “buck” converter requires an input voltage higher than its output voltage for operation, and is incapable of creating an output voltage equal to or greater than its input voltage.
  • a typical input- output voltage relationship of a buck converter is shown in FIG. 4. This requires a series- connected battery stack with a higher series cell count to raise the input voltage to the converter to the required level necessary to achieve high efficiency and a manageable switching duty cycle.
  • BMS battery management system
  • FIG.5 An alternative is shown in FIG.5, where a DC-DC converter is implemented as a “buck-boost” converter, which is capable of creating a constant output voltage regardless of whether the input voltage is lower than, equal to, or higher than the constant output voltage, with recognition that if the input voltage drops too low, the converter operating parameters, such as input current, may grow too large for continued safe operation. For this reason, most buck-boost converters include an input undervoltage protection limit, or “UV Shutdown” limit, to prevent damage to the converter.
  • UV Shutdown an input undervoltage protection limit
  • Buck-Boost converters allow lower series cell counts than would be achievable with a buck converter, but integrated circuits that form the heart of the control circuit for the buck-boost converter are more difficult to find and generally more expensive than control integrated circuits (“ICs”) for buck converters.
  • ICs control integrated circuits
  • FIG. 5 The typical input-output voltage relationship of a buck-boost converter is shown in FIG. 5. It should be noted that no matter which DC-DC configuration is used in the current state of the art configuration – linear, switching buck, or switching buck-boost – the DC-DC converter must be designed both electrically and thermally to handle the maximum output power of the battery system.
  • FIG.1 illustrates a circuit block diagram configured in accordance with embodiments of the present disclosure.
  • FIG.2 illustrates a system representing a prior art example of a charge and discharge control system for a battery coupled to a power supply and load.
  • FIG.3 illustrates a prior art implementation of a linear regulator DC-DC converter for regulating the output of a battery connected to a load.
  • FIG.4 illustrates an input voltage versus output voltage characteristic of a step down (buck) converter suitable for use in embodiments of the present disclosure.
  • FIG.5 illustrates an input voltage versus output voltage characteristic of a step up/step down (buck-boost) converter suitable for use in embodiments of the present disclosure.
  • FIG.6 illustrates a prior art system for using a DC-DC converter in combination with a battery and controller for providing a regulated output voltage to a load.
  • FIG.7 illustrates a circuit block diagram of a system disclosed within U.S. Published Patent Application No.2020/0350779.
  • FIG.8 illustrates a plot of a family of voltage curves versus state of charge (“SOC”) at different possible load currents for an exemplary lithium-ion rechargeable battery where four cells are connected in series and the cells are composed of the Lithium Manganese Cobalt chemistry.
  • FIG.9 illustrates a non-limiting representation of control steps using a binary sequencing scheme available in the system disclosed within U.S. Published Patent Application No. 2020/0350779.
  • FIG.10 illustrates a plot of a family of voltage curves versus state of charge (“SOC”) at different possible load currents for an exemplary lithium-ion rechargeable battery where four cells are connected in series and the cells are composed of the Lithium Iron Phosphate (“LFP”) chemistry.
  • FIG.11 illustrates an output current limit characteristic of a DC-DC converter suitable for use in embodiments of the present disclosure.
  • FIG.12 illustrates a specified load voltage tolerance range and various control thresholds and setpoints for control of a system in accordance with embodiments of the present disclosure.
  • FIG.13 illustrates a simplified block diagram of the system shown in FIG.1 configured in accordance with embodiments of the present disclosure.
  • FIG.14 illustrates a block diagram of a non-limiting example of control elements used in embodiments of the present disclosure that implements system state determination functions, input signals into the control elements, and outputs signals of the control elements.
  • FIG.15 illustrates a simplified schematic diagram of a non-limiting example of an electronic circuit implementing state determination functions in accordance with embodiments of the present disclosure.
  • FIGS.16a, 16b and 16c illustrate a set of truth tables implemented in the non-limiting example of the state determination elements used in embodiments of the present disclosure, showing output signal levels from the control elements based on differing states of the input signal, and a truth table defining which combination of output signal levels will trigger a control action.
  • FIGS.17a, 17b and 17c illustrate a set of tables demonstrating several non-limiting sequences of ON/OFF controls that result in a stepwise increase or decrease of total impedance of the network of FET/resistor pairs illustrated in FIG 1.
  • FIG.18 illustrates a flowchart diagram of a process configured in accordance with embodiments of the present disclosure.
  • FIGS.19–20 illustrate a time domain analysis showing the instantaneous level of the voltage at the output node Vo of the system illustrated in FIG.1, the slope (rising or falling) of the voltage at the output node V o , and the resulting instantaneous state of the control signals for various exemplary situations that may be incurred during the operation of the system.
  • the MOSFETs When MOSFETs are utilized as the switches, the MOSFETs may be operated in a predetermined (e.g., programmed) manner to take advantage of inherent forward voltage drops of the body diodes of the MOSFETs and/or an external resistance (e.g., a resistive element) coupled in series with each MOSFET to regulate the delivery of an output voltage and current from a battery.
  • Such circuitry may be configured to replace a battery discharge DC-DC converter, withstand high discharge currents, and/or operate more efficiently in many of the operating modes as compared to linear or switching regulators operating at high power.
  • Rechargeable batteries such as Lithium-ion (“Li-ion”) based rechargeable batteries
  • Li-ion Lithium-ion
  • a rechargeable battery can be constructed with different internal materials and specific chemical compositions that define the operational voltage range, the maximum discharge current, the internal impedance, and the specific capacity of each battery cell.
  • Each of these parameters defines a family of discharge voltage versus discharge current curves (also referred to as “V-I curves”) unique to each type of cell.
  • Batteries may be constructed with a certain chemical energy capacity as determined by the finite weight or volume of active chemical materials contained within each cell of the battery. The capacity is measured by discharge at a given current and time measured until a certain minimum voltage is achieved. The capacity is typically reported in milli-amp-hours (“mAh”) or amp-hours (“Ah”).
  • This capacity is represented herein by the letter “C” corresponding to the continuous current available from the battery for 1 hour that results in the battery discharging from a state of 100% state of charge (“SOC”) (i.e., fully charged to a maximum allowed voltage) to a state of 0% SOC (i.e., fully discharged to a minimum allowed voltage).
  • SOC state of charge
  • 0% SOC i.e., fully discharged to a minimum allowed voltage
  • FIG.8 illustrates a plot of a family of voltage curves versus SOC at different possible load currents (i.e., V-I curves) for an exemplary battery of four series-connected lithium-ion rechargeable cells, using Nickel Manganese Cobalt (“NMC”) chemistry.
  • NMC Nickel Manganese Cobalt
  • These curves define an exemplary operating envelope within which the battery voltage may operate for various conditions of battery current and SOC. More specifically, the plot in FIG.8 represents voltage curves versus SOC at different load currents wherein the battery possesses a capacity of 1 Ah during current demands of 10 A, 12 A, 15 A, and 20 A.
  • the terminal voltage of a battery at any given SOC will shift lower as a function of an increase in current demand.
  • the distances between the curves on the voltage scale as current demand increases are due to the battery cell’s internal resistance or impedance.
  • the battery terminal voltage at a given SOC is dependent not only on SOC, but on the discharge current demand as well, and exists within the operating envelope defined by the characteristic curves.
  • the output (discharge) voltages of typical batteries are not constant, but variable with discharge current present at the battery output terminals and SOC, and thus a typical battery by itself does not possess an inherent capability to regulate or maintain its discharge voltage within a specific voltage range over the time it takes for the stored energy to be depleted from the battery or with changing load currents.
  • any sources feeding power to the distribution bus be required to regulate the voltages supplied to the distribution bus to ensure that a maximum and minimum voltage excursion on the distribution bus be limited to a specified value above or below a desired nominal value, i.e., the allowable range of voltages that can be tolerated by a load coupled to the distribution bus to ensure a specified (e.g., error-free) operation (herein referred to as the “specified load voltage tolerance range”).
  • a specified load voltage tolerance range e.g., error-free
  • the operating envelope for a discharging battery with respect to a particular load may be divided into several regions, and in this example, Regions 1, 2, 3, and 4.
  • the Region 1 area defines operating points on the battery terminal voltage versus SOC curves that lie below the specified load voltage tolerance range of the load.
  • the Region 2 area defines operating points on the battery terminal voltage versus SOC curves that lie within the specified load voltage tolerance range.
  • the Region 3 area defines certain operating points on the battery terminal voltage versus SOC curves that lie above the specified load voltage tolerance range.
  • embodiments of the present disclosure are configured to provide a finer control of the output voltage provided to a load utilizing a N FET/resistor pair network (e.g., see FIG.9).
  • the top boundary of the Region 3 area lies above the top boundary of the Region 2 area by less than about 5% of the nominal value of the load voltage (e.g., 0.6 V in the case of a 12 V nominal load voltage, 1.2 V in the case of a 24 V nominal load voltage, etc.).
  • the Region 4 area defines operating points on the battery terminal voltage versus SOC curves that lie above the Region 3 area.
  • FIG. 7 illustrates a circuit block diagram of a system 700 as disclosed within U.S. Published Patent Application No.2020/0350779.
  • the system 700 employs a battery system 706 configured to selectively couple an output terminal of a battery 708 to a distribution bus 704 through a defined switching configuration that includes a network of N (where N>2) parallel- connected discharge switches 710a...710d (e.g., MOSFETs), each coupled in series with a resistor 750a...750d to form a network of N FET/resistor pairs.
  • N where N>2
  • parallel- connected discharge switches 710a...710d e.g., MOSFETs
  • the system 700 may be utilized for batteries that have battery terminal voltages that extend above the specified load voltage tolerance range (e.g., as required by a load 705; for example, see the Region 2 area shown in the example of FIG. 8).
  • the system 700 can be employed to regulate the supplied voltage to the distribution bus 704 substantially within this specified load voltage tolerance range of 12 V +/–5% as shown in the Region 2 area of FIG.8, even though the voltage present at the terminals of the battery 708 is above this Region 2 range.
  • the voltage present at the terminals of the battery 708 may be configured to lie above the specified load voltage tolerance range (for example, see the Region 3 and Region 4 areas shown in the example of FIG.8) of the distribution bus 704 at some SOC and battery current conditions, while the voltage supplied to the load 705 is adjusted to substantially match the specified load voltage tolerance range of the distribution bus 704 under other SOC or battery current conditions such as the Region 2 area.
  • the specified load voltage tolerance range for example, see the Region 3 and Region 4 areas shown in the example of FIG.8
  • Each of the resistors 750a...750d may be configured with a different resistive value, and may be configured such that the resistive value of each resistor in the series 750a...750d is lower than the previous resistor in the series (e.g., the resistor 750b has a resistive value lower than the resistor 750a, the resistor 750c has a resistive value lower than the resistor 750b, etc.).
  • the FET/resistor pairs may be connected in parallel between the battery terminal and the distribution bus 704 through another switching element (e.g., a MOSFET) 711 that prevents charging of the battery directly from the distribution bus 704, and where each of the N FETs 710a...710d and its paired resistor, as well as the FET 711, is independently controlled by the controller 702 via the control lines 721a...721e.
  • a MOSFET e.g., MOSFET
  • embodiments may be implemented with one or more of the resistors 750a...750d having substantially equivalent resistive values.
  • the number, N, of parallel-connected discharge control FET/resistor pairs can range from two to any number that can be practically controlled by the controller 702.
  • the number, N, of discharge control FET/resistor pairs may be generally determined by a number of factors such as the minimum and maximum voltages available from the battery 708, the expected range of minimum and maximum output currents, and the required minimum and maximum output voltage range (e.g., as determined by a specified load voltage tolerance range (for example, see the Region 2 area shown in the example of FIG.8)).
  • the battery 708 may be coupled to the distribution bus 704 by activating (e.g., switching ON) by the controller 702 one or more of the N FETs 710a...710d in a predetermined manner (e.g., sequential, binary counting sequence, or any other sequence), such as beginning with the FET 710a, which may be paired with the highest resistive value resistor 750a.
  • the FET 710a Upon switching ON of the FET 710a, current will commence flowing to the load 705, and the terminal voltage of the battery 708 will begin to drop in accordance with the battery impedance characteristic curves (e.g., see FIG.8 and FIG.10). If the current supplied to the load 705 through the series combination of the FET/resistor pair 710a/750a is sufficiently high, the voltage drop across the series combination of the FET/resistor pair 710a/750a will increase until the voltage supplied to the load 705 drops to a predetermined threshold, which may be set (e.g., within the controller 702) in accordance with a minimum regulation point specification of the load 705 (e.g., a lower limit of a specified load voltage tolerance range).
  • a predetermined threshold which may be set (e.g., within the controller 702) in accordance with a minimum regulation point specification of the load 705 (e.g., a lower limit of a specified load voltage tolerance range).
  • the controller 702 may be configured to switch OFF the FET/resistor pair 710a/750a, and switch ON the FET paired with the resistor 750b, which may have the next highest resistive value among the series of resistors 750a...750d.
  • the resistor 750b in series with the FET 710b can be configured to have a resistive value significantly smaller than that of the resistor 750a, and thus the voltage drop across the series combination of the FET 710b and the resistor 750b will be lower than that across the series combination of the FET 710a and the resistor 750a.
  • An effect of this will be to increase the output voltage supplied to the load 705 above the previously noted threshold pertaining to the minimum regulation point specification of the load 705 (e.g., a lower limit of a specified load voltage tolerance range), and thus keep the output voltage supplied to the load 705 above this minimum predetermined threshold.
  • the minimum regulation point specification of the load 705 e.g., a lower limit of a specified load voltage tolerance range
  • the output voltage supplied to the load 705 can be maintained by the controller 702 within the application regulation window (e.g., the specified load voltage tolerance range (for example, see the Region 2 area shown in the example of FIG.8)) under changing battery terminal voltages and load currents, as sensed by the controller 702 via the battery voltage sensor 742, the output voltage sensor 741, and the current sensor 707, by the controller 702 selectively activating the N FETs 710a...710d (e.g., in an upward binary counting sequence or other suitable sequence) to increase the voltage supplied to the load 705, or selectively deactivating the N FETs 710a...710d (e.g., in a downward binary counting sequence) to decrease the voltage supplied to the load 705, where the FET 710a is associated with the least significant bit of the binary sequential counter, and the FET 710d (or higher) is associated with the most significant bit.
  • the application regulation window e.g., the specified load voltage tolerance range (for example, see the Region 2 area shown in the example of
  • FIG.9 shows a total voltage drop across the parallel-connected FET/resistor pairs as a function of a binary counting sequence for selective activation by the controller 702 of the N FETs 710a...710d.
  • the load 705 Due to its placement in the battery system 706 between the output terminal of the battery 708 and the input terminal V o of the load 705, the load 705 sees its input voltage to be the terminal voltage of the battery 708 minus the voltage drop across the FET/resistor pair network.
  • regulation of the voltage supplied to the load 705 e.g., substantially within a specified load voltage tolerance range
  • the controller 702 can adjust the impedance (i.e., and consequently, the voltage drop) across the FET/resistor pair network.
  • Such a network of N parallel discharge switching elements can be configured to operate (e.g., in response to instructions received from the controller 702) as a high current digital-to-analog converter where the source voltage (i.e., from the battery 708) is not constant over time (e.g., see FIG.8), but varies with load current and SOC.
  • the source voltage i.e., from the battery 708
  • the current sensor 707 may be utilized by the controller 702 to compensate for variations in both input and output voltages (i.e., the battery 708 and the load 705).
  • the resulting system 700 is thus configured as a network of N fixed impedance elements (i.e., the N FETs 710a...710d and associated resistors 750a...750d), which can be switched in and out of the network by the controller 702 to compensate for changes in voltages on the input (i.e., the battery 708) and the output (i.e., the load 705). Varying the resistive values of the resistors 750a...750d will define the individual element impedances. Each FET/resistor pair can be configured with a specific voltage drop at a predetermined applied current. As a result, the system 700 can be configured to control a network of elements defining a variable, controllable impedance between the battery 708 and the load 705.
  • the network is adjusted by the controller 702 such that the total impedance is increased and the voltage supplied to the load 705 is decreased.
  • the network is reconfigured by the controller 702 such that the total impedance is reduced and thus the voltage across the network is also reduced, serving to maintain the voltage supplied to the load 705 within a desired range (e.g., substantially within a specified load voltage tolerance range).
  • the compensating voltage drop across the network which is subtracted from the battery voltage, can then be controlled by the controller 702 using any number of different control techniques such that a resulting voltage supplied to the load 705 is controlled through sequencing of the various N FET/resistor pairs in the system 700 to provide high resolution voltage matching whenever the battery operating point exists (e.g., drifts for whatever reason) within the Regions 1, 2, or 3 operating ranges (e.g., as shown in FIG.8). Because the system 700 can only reduce the supplied battery voltage to some lower voltage required by the load 705, there will be some areas of the battery characteristic curves that are unusable, for example, corresponding to the Region 1 area as shown in FIG. 8.
  • FIG. 1 illustrates a circuit block diagram of a system 100 configured in accordance with embodiments of the present disclosure.
  • the system 100 may be configured to provide power to a load via a distribution bus from a secondary power source when there is a failure of a primary power source.
  • the primary power source may be a power supply unit coupled to an AC power source
  • the secondary power source may be a battery.
  • the system 100 employs a battery system 106 that is configured to selectively couple, under control of the controller 102, an output terminal of a battery 108 to a distribution bus 104 through a DC-DC converter 170 and a switching configuration that includes a network of N (where N ⁇ 1) parallel- connected discharge switches 110b...110d (e.g., MOSFETs), each coupled in series with a resistor 150b...150d to form a network of N FET/resistor pairs (also referred to herein as the “N FET/resistor pair network”).
  • N parallel- connected discharge switches 110b...110d
  • resistor 150b...150d e.g., MOSFETs
  • Each of the resistors 150b...150d may be configured with a different resistive value, and may be configured such that the resistive value of each resistor in the series 150b...150d is lower than the previous resistor in the series (e.g., the resistor 150c has a resistive value lower than the resistor 150b, the resistor 150d has a resistive value lower than the resistor 150c, etc.).
  • embodiments may be implemented with one or more of the resistors 150b...150d having substantially equivalent resistive values.
  • the N FET/resistor pairs may be connected in parallel and be similarly interposed between the positive terminal of the battery 108 and the distribution bus 104 through another switching element (e.g., a MOSFET) 111, which may be implemented to prevent charging of the battery 108 directly from the distribution bus 104, and where each of the N FETs 110b...110d, as well as the FET 111, is selectively and independently controlled by the controller 102 via the control lines 121b...121e.
  • a MOSFET MOSFET
  • the number, N, of parallel-connected discharge control FET/resistor pairs can range from one to any number that can be practically controlled by the controller 102, and may be generally determined by one or more factors such as the minimum and maximum voltages available from the battery 108, the expected range of minimum and maximum output currents, and the required minimum and maximum output voltage range (e.g., as determined by a specified load voltage tolerance range (for example, see the Region 2 area shown in the example of FIG. 8)). Changes in the terminal voltages and load currents of the battery 108 may be sensed by the controller 102 via the battery voltage sensor 142 and the current sensor 107.
  • the system 100 may be utilized for batteries that have battery terminal voltages at valid operating points that extend above the specified load voltage tolerance range (e.g., as required by a load 105; for example, see the Region 2 area shown in the example of FIG.8 as compared to the entire range of battery operating points including those that are outside the Region 2 area such as those contained in Regions 1, 3, and 4).
  • the system 100 can be employed to regulate the supplied battery voltage substantially within this specified load voltage tolerance range.
  • the voltage of the battery 108 may be configured to lie above the specified load voltage tolerance range (for example, see the Region 3 and Region 4 areas shown in the example of FIG. 8) of the distribution bus 104 at some SOC and battery current conditions, and substantially match the specified load voltage tolerance range (see the Region 2 area shown in the example of FIG. 8) of the distribution bus 104 under other SOC or battery current conditions.
  • Operation of the system 100 is similar to that of the system 700 with a DC-DC converter 170 implemented according to the VIN versus VOUT and output current limit characteristics (e.g., see FIG.11) of the type of DC-DC converter 170 implemented within the system 100, and which may be configured to be able to handle the delivery of a current to the load 105 when the load 105 is demanding low current (i.e., less than approximately 25% of the maximum current that might be required by the load 105) and the battery 108 is operating at high a state of charge (e.g., SOC values greater than approximately 70%), for example, corresponding to operation of the system 100 in the Region 4 area as shown in FIG.8 or FIG.10.
  • a state of charge e.g., SOC values greater than approximately 70%
  • the DC-DC converter 170 can be of any of the types described herein (e.g., linear regulator, switching buck, switching buck-boost, or other), including, but not limited, to those described with respect to FIGS.4, 5, and 11.
  • the DC-DC converter 170 does not need to be configured (e.g., sized) to handle the maximum output power of the battery as in prior art implementations, but rather may be configured so that it can process about 25% to 30% of the maximum output power of the battery, since, in the system 100, the balance of the output power is delivered by the N FET/resistor pair network as is further described herein.
  • FIG. 4 illustrates the input versus output voltage (V IN versus V OUT ) characteristics of a non-limiting example of a switching buck converter, which is suitable for implementation as the DC-DC converter 170 within the system 100. Note that for V IN > V OUT Setpoint, the DC-DC converter operates as a normal buck converter, maintaining the output voltage VOUT to be substantially the same as the V OUT Setpoint.
  • V OUT Setpoint is also referred to herein as the battery DC-DC converter setpoint (e.g., see FIG.12), and may be predetermined to be at a voltage level at which the DC-DC converter 170 is configured to begin providing current to the load 105 subsequent to a failure of the PSU 101, such as further described herein with respect to FIGS.12 and 19.
  • FIG. 12 the battery DC-DC converter setpoint
  • FIG. 5 illustrates the input versus output voltage (V IN versus V OUT ) characteristics of a non-limiting example of a buck-boost converter, which is also suitable for implementation as the DC-DC converter 170 within the system 100, in which the above described “low dropout” characteristic is not needed, as the DC-DC converter automatically switches from buck mode (VIN > V OUT Setpoint) to boost mode when V IN ⁇ V OUT Setpoint, thus maintaining the output voltage V OUT to be equal to the V OUT Setpoint regardless of the input voltage V IN until the UV Shutdown input voltage is reached.
  • FIG.11 illustrates current limit characteristics for a DC-DC converter implemented within the system 100 in which the x-axis represents time.
  • the DC-DC converter For all DC-DC converter output currents Io at or below an output current value referred to as the Current Limit Transition Point (where the output voltage of the DC-DC converter changes from constant voltage to constant current), the DC-DC converter is configured to maintain the output voltage V OUT of the DC-DC converter constant.
  • the output voltage V OUT drops slightly, or is said to “droop.” This represents a transition of the DC-DC converter from a “constant voltage” mode to a “droop current limit” mode, where the output voltage V OUT is allowed to decrease below the VOUT Setpoint for a narrow range of output current values between I limit(A) and I limit(A) plus a few percent. In other words, for any value of current from 0 up to I limit(A) , the output voltage VOUT of the DC-DC converter is maintained at the VOUT Setpoint.
  • This lowering of the voltage of the battery 108 as battery discharge current increases may be caused by the internal resistance or impedance of each battery cell.
  • the amount of voltage drop of the battery 108 will depend on the magnitude of the current supplied by the battery 108 to the load 105 and the internal impedance of each of the cells in the battery 108.
  • the chemical composition of the cells of the battery 108 may be chosen for their voltage, current capability, and impedance characteristics to be able to support the full power requirements of the distribution bus 104 to which they are coupled, while maintaining a voltage drop small enough to keep the distribution bus 104 within its voltage limits during the discharge event (e.g., substantially within a specified load voltage tolerance range).
  • the system 100 may be configured so that at values of currents delivered to the load 105 that are below the Current Limit Transition Point (see Ilimit(A) depicted in FIG. 11) of the DC-DC converter 170 and at high states of charge of the battery 108, current may be supplied to the load 105 solely by the DC-DC converter 170, or by the DC-DC converter 170 in combination with some predetermined number of the FET/resistor pairs within the N FET/resistor pair network depending on the instantaneous operating point of the family of V-I curves of the battery 108.
  • Ilimit(A) depicted in FIG. 11 Current Limit Transition Point
  • Embodiments of the present disclosure will now be described with respect to a non- limiting exemplary application and operation of the system 100 in which the controller 102 is configured to deliver power to the load 105 within a specified load voltage tolerance range.
  • a specified load voltage tolerance range may also be referred to herein as an application regulation window, which defines the voltage range that may be required by a load associated with a specific end-use application.
  • Such a specified load voltage tolerance range may be composed of a nominal, or desired, output voltage V o and a +/– percentage range.
  • FIG. 12 illustrates a graphical representation of a non-limiting example of various setpoints and thresholds that may be implemented in the system 100 based on a desired output voltage Vo (e.g., 12 V) and a specified load voltage tolerance range (e.g., +/–5%). Solely for the sake of describing embodiments of the present disclosure, reference will be made to the non- limiting exemplary V-I curves of FIG.8.
  • the controller 102 may be configured to maintain the voltage supplied to the load 105 between the Upper and Lower Regulation Limits defining the specified load voltage tolerance range.
  • FIG. 12 also shows that within the Upper and Lower Regulation Limits, some other thresholds and setpoints may be configured within the design of the system 100.
  • the value for the PSU output voltage setpoint of the PSU 101 may be selected as the normal operating output voltage supplied by the PSU 101, and will be selected to be within the specified load voltage tolerance range.
  • the Upper Control Threshold (“UCT”) set between the PSU output voltage setpoint and the battery DC-DC converter setpoint (in this example selected to be 12.3 V)
  • the Lower Control Threshold (“LCT”) which is set below the battery DC-DC converter setpoint and above the Lower Regulation Limit (in this example, the LCT is selected to be 11.9 V).
  • the UCT and LCT values are further described with respect to FIGS.14 and 15. Utilization of these thresholds and setpoints is further described herein.
  • the battery DC-DC converter setpoint is selected to be within the specified load voltage tolerance range, lower than the PSU output voltage setpoint, and above the LCT, and may be optimized by analyzing the dynamic characteristics of the system 100.
  • Selection of the Upper and Lower Regulation Limits may be determined as a function of the specification and requirements of the load 105.
  • the value of the UCT may be selected at some appropriate value below the PSU output voltage setpoint so that monitoring of a decrease of the output voltage V o below the UCT indicates to the battery system 106 that there may be a failure of the PSU 101, or that the output voltage Vo supplied to the load 105 by the battery system 106 has increased too much and may potentially increase outside of the specified load voltage tolerance range.
  • the value of the LCT may be selected at some appropriate value below the battery DC-DC converter setpoint so that monitoring of a decrease of the output voltage Vo below the LCT indicates to the battery system 106 that more current needs to be supplied from the battery 108 to the load 105 via the N FET/resistor pair network.
  • Selection by the designer of the system 100 of the values for UCT and LCT, which are within the specified load voltage tolerance range, may be a function of the particular characteristics of the battery 108 (e.g., terminal voltage, characteristic curves, etc.), the dynamic characteristics of the load 105 (e.g., magnitude and rise and fall times of dynamic load currents), and the effective capacitance of the system 100, designated as CLOAD 160.
  • This system capacitance, CLOAD 160 may represent a sum of capacitances coupled to the output node V o in the system 100 (e.g., any output capacitors that are present in the PSU 101 that have been included to help stabilize the feedback control loop of PSU 101, any output capacitors present at the output of the DC-DC converter 170 to improve transient response or help stabilize the control loop of the DC-DC converter 170, any capacitance associated with the load 105, and any other capacitance added by the designer of the battery system 106).
  • FIG. 13 illustrates a simplified block diagram of the system 100, which is presented for describing how monitoring of the voltage at the output node V o is utilized by the controller 102 to regulate an amount of impedance inserted between the battery 108 and the load 105 in accordance with embodiments of the present disclosure, as further described herein.
  • the battery system 106 and the PSU 101 are coupled to the distribution bus 104 at the output node Vo.
  • Also coupled to the distribution bus 104 at the output node V o are the load 105 and the system capacitance, CLOAD 160.
  • the sum of any currents at any node in a system must be zero.
  • the voltage at the output node V o will be unchanging. If (i Batt + i PSU ) > i Load , then i Capacitance will be positive (i.e., the system capacitance CLOAD 160 will be charging), dVCapacitance/dt will also be positive, and the voltage at the output node V o will be increasing with respect to time.
  • iCapacitance will be negative (i.e., the system capacitance C LOAD 160 will be discharging into the load 105), dV Capacitance /dt will also be negative, and the voltage at the output node Vo will be decreasing with respect to time.
  • V o the voltage across the system capacitance C LOAD 160
  • C * dVCapacitance/dt represent a set of state variables of the system 100, which are utilized within embodiments of the present disclosure as described herein.
  • FIG.14 illustrates a block diagram of a non-limiting implementation for the state determination system 141 (see FIG.1), which may be configured to determine values representing the state variables of the system 100 (i.e., V o and dV o /dt).
  • the Threshold Detector 1401 receives the output voltage Vo as an input and compares Vo to the UCT and LCT limits (see FIG. 12).
  • a truth table for the operation of the Threshold Detector 1401 is shown in Table 16a of FIG.16. If the output voltage Vo is at a voltage level above the UCT, then a signal Upper Control Threshold Exceeded (“UCTE”) signal is set to a logic level 1, and upon the output voltage V o dropping below the UCT, the UCTE will be reset to a logic level 0.
  • UCTE Upper Control Threshold Exceeded
  • LCTE Lower Control Threshold Exceeded
  • a truth table for the operation of the Differentiator 1402 is shown in Table 16b of FIG.16.
  • the UCTE, LCTE, dVo/dt Negative, and dVo/dt Positive signals (also collectively referred to herein as the “state determination signals”) are delivered from the state determination system 141 to the controller 102 via the signal lines 180.
  • the controller 102 is configured to receive the state determination signals from the state determination system 141 and perform operations in accordance with the truth table set forth in Table 16c of FIG.16 as further described with respect to the system and process 1800 of FIG.18.
  • FIG. 15 illustrates a simplified schematic diagram of a non-limiting example of how the state determination system 141 may be implemented with an operational amplifier (OP1) and voltage comparators (CMP1...CMP4) to produce the truth table shown in Table 16c of FIG. 16, where the comparator reference values pertain to the example provided with respect to FIG.12.
  • OP1 operational amplifier
  • CMP1...CMP4 voltage comparators
  • the granularity of the control steps is not constant over the operating range, and it can be seen that while operating in the Region 3 area (see FIG.8), fine control is available (note that in FIG.9, 70% of the available control steps exist in the VBAT–Vo difference range of 0.5V or less), but when operating in the Region 4 area where the V BAT –V o difference ranges from 0.5 V to 3.0 V, only very coarse and imprecise control is available due to the fewer number of available control steps.
  • the Region 4 area is an operating range of poor electrical efficiency, since there will be a high V-I losses in resistive elements when in this range.
  • the Region 4 area is where coarse control of the output voltage V o is provided by incorporation of the DC-DC converter 170, since, DC-DC converters alleviate such efficiency problems as they are specifically intended to have high efficiency in this area. Therefore, the system 700 has poor efficiency and control in the Region 4 area, while the system 100 alleviates these problems by incorporation of the DC-DC converter 170, which significantly improves performance in the Region 4 area, while the finer control of the output voltage Vo can be provided by controlling the total impedance of the N FET/resistor pair network, as will be further described herein with respect to FIG.18.
  • the choice of using a standard buck DC-DC converter or a buck-boost DC-DC converter may be determined by the requirements of the load 105 being powered by the system 100, as well as the V-I curves for the specific chemistry and configuration of the battery 108.
  • the system 700 is capable of delivering current to the load 705 only at voltages below the battery voltage. As a result, in many cases there will be energy in the battery 708 that cannot be utilized.
  • the Region 1 area identifies battery operating points that lie below the specified load voltage tolerance range for the load. Anytime the battery operating point exists in the Region 1 area of the family of V-I curves, the battery energy cannot be utilized.
  • the area of the curves that exist in the Region 1 area for the Iron Phosphate battery system of FIG.10 is significantly larger than that for the Nickel Manganese Cobalt system of FIG.8 (for example, up to about 40% SOC when operating at a maximum load of 60 A). This represents a significant amount of unusable energy that is stranded in the Region 1 area as previously described, and may not be acceptable for a particular application that is desired to powered by such a battery system.
  • a potential solution is to replace the battery system 706 in FIG.7, with the battery system 106 in FIG.1 implementing a DC-DC converter design (e.g., a buck-boost DC-DC converter) with an appropriate maximum power and current limit setting for the DC-DC converter 170, as this type of converter is capable of boosting battery voltages that are lower than voltages within the specified load voltage tolerance range up to output voltages compatible with the specified load voltage tolerance range. Note that care may need to be considered when using a buck-boost converter for the DC-DC converter 170 to prevent power circulation from output to battery (input) when the DC-DC converter 170 is boosting the output voltage above the voltage supplied by the battery 108.
  • a DC-DC converter design e.g., a buck-boost DC-DC converter
  • connection point of the output of the DC-DC converter 170 may be moved to the drain side of the transistor 111 (as compared to the FET/resistor pairs 110b...110d and 150b...150d, which are coupled to the source side of the transistor 111).
  • the transistor 111 When operating in boost mode, the transistor 111 is switched OFF, thus blocking any power circulation from the output of the DC-DC converter 170 to the battery 108.
  • a result of the operation of the DC-DC converter 170 in boost mode is that 100% of the output power delivered while the battery 108 is discharging in the Region 4 area should be delivered through the DC-DC converter 170 and not through the N FET/resistor pair network.
  • FIG. 17 illustrates several non-limiting examples of FET/resistor activation/deactivation sequences that may be implemented within the controller 102 depending on specific battery and load characteristics and requirements. Table 17a represents a binary counting sequence similar to the one described with respect to FIG.9, which may be implemented within the controller 102.
  • the FETS 110b, 110c, and 110d may be switched ON in a binary upward counting sequence, where the FET 110b represents the least significant bit and the FET 110d represents the most significant bit, and where each succeeding binary digit represents a decreasing total impedance of the N FET/resistor pair network.
  • counting upward one binary digit at a time results in decreasing the total impedance of the N FET/resistor pair network
  • counting downward one digit at a time results in increasing the total impedance of the N FET/resistor pair network.
  • Table 17b represents a sequential sequence in which the FETS may be switched ON/OFF sequentially, rather than in a binary counting mode, such that in order to decrease the total impedance of the N FET/resistor pair network, the first FET 110b is switched ON, then the FET 110c is switched ON (without first switching off the FET 110b), and finally the FET 110d is switched ON.
  • the controller 102 may be configured to switch OFF the FET in the most significant bit position, then switch OFF the FET in the next most significant bit position, and so on until all FETs are switched OFF.
  • the binary counting sequence represented in Table 17a may be implemented within the controller 102 when the battery 108 is composed of NMC battery cells such as those represented in FIG.8, where only about 20% of the area traced by the minimum current V-I curve and the maximum current V-I curve lies within the Region 2 area, and the majority of the area outside of the Region 2 area is located above the Region 2 area in Regions 3 and 4.
  • the sequential sequence of Table 17b may be implemented within the controller 102 when the battery 108 is composed of Iron Phosphate battery cells such as that represented in FIG.
  • the exemplary battery 108 is based on the four-series cell Iron Phosphate battery shown in FIG. 10, with a maximum load current of 60 Amperes, and a minimum load current of 1 Ampere.
  • the DC-DC converter 170 is configured as a suitable buck DC-DC converter (with characteristics shown as in FIG.4), with a Current Limit Transition Point Ilimit(A) as in FIG.11 chosen to be 15 Amperes, or 25% of the maximum current of the load 105.
  • the battery DC-DC converter setpoint is set to 12.0 V
  • the PSU output voltage setpoint is set to 12.35 V
  • the UCT is set to 12.3 V
  • the LCT is set to 11.9 V.
  • the controller 102 is configured to step the impedance of the N FET/resistor pair network up and down in a sequential manner as represented in Table 17b of FIG.17.
  • the resistor 150b may be configured with the highest resistive value among all the resistors 150b...150d. In accordance with embodiments of the present disclosure, this resistive value for the resistor 150b may be determined by the maximum value of voltage for the battery 180 traced by the allowed V-I curves of minimum and maximum load current design points.
  • this resistive value may be identified by Point A shown in FIG.10 (13.4 V) and subtracting the value of the battery DC-DC converter setpoint, which is 12.0 V and represented by Point B shown in FIG.10. The result is then divided by the Current Limit Transition Point (I limit(A) , or 15 A) of the DC-DC converter 170, which provides the desired resistive value for the resistor 150b.
  • I limit(A) Current Limit Transition Point
  • the resistor 150c may be configured to have the next lowest resistive value in the sequence, and may be configured to have a resistive value equal to or slightly less than 1/10 th of the resistive value of the resistor 150b (e.g., 9 milli-Ohms).
  • the resistor 150d may be configured to have a resistive value of equal to or slightly less than 1/10 th that of the resistor 150c (e.g., 0.9 milli-Ohms).
  • the total resistance of the N FET/resistor pair network when all FETS are switched ON is 0.8 milli-Ohms. This provides a total voltage drop of 48 milli-Volts across the N FET/resistor pair network at a maximum load of 60 A. Since, as shown in FIG. 10, the Iron Phosphate cell characteristic V-I curves lie largely within the Region 2 operating range for values of current above the Current Limit Transition Point Ilimit(A) of 15 A and below the maximum defined load current of 60 A, the system 100 may be configured with such a relatively low number of FET/resistor pairs in parallel, a sequential FET activation sequence, and a relatively aggressive reduction in resistor values for each sequential pair as previously described..
  • the system 100 may be configured with a larger number of FET/resistor pairs in parallel, a binary counting sequence, and a more gradual reduction in resistor values for each sequential pair, since, as shown in FIG.8, a relatively greater portion of the V-I curves exist above the Region 2 operating range (i.e., the specified load voltage tolerance range).
  • the PSU 101 when properly operating (i.e., AC input power is present and within values specified, and/or no hardware failures exist within the PSU 101), the PSU 101 is designed to have sufficient output current capacity to supply the full load current to the load 105.
  • the PSU 101 will cease to provide current to the load 105, and the battery system 106 will discharge energy from the battery 108 to supply current to the load 105.
  • the battery system 106 is configured to supply the current from the battery 108 between current paths provided by the DC- DC converter 170 in combination with the N FET/resistor pair network in a manner to maintain the voltage at the output node Vo to be within the specified load voltage tolerance range delimited by the Upper and Lower Regulation Limits as shown in FIG.12.
  • the controller 102 may be configured to control the balancing of the output current from the discharging battery 108 as between the DC-DC converter 170 and the N FET/resistor pair network so that the voltage supplied to the load 105 is regulated between the Upper and Lower Regulation Limits (i.e., within the specified load voltage tolerance range).
  • the following descriptions represent example transitions that can occur as part of the current balancing and voltage regulation process.
  • FIG.18 A non-limiting exemplary process for providing current from the battery 108 to the load 105 by the battery system 106, in accordance with embodiments of the present disclosure, is now described with respect to the system and process 1800 of FIG.18, which may be implemented for operation within the controller 102.
  • the DC-DC converter 170 operates in accordance with FIG.4, the state determination system 141 is configured to operate in accordance with the truth tables set forth in Tables 16a and 16b of FIG.16, and the controller 102 is configured to operate in accordance with the truth table set forth in Table 16c of FIG.16 and the FET sequences set forth in the Table 17b of FIG.17.
  • FIGS. 19–20 illustrate a time-domain analysis showing exemplary operations of the system 100 of a supply of the output voltage from the battery 108 and the PSU 101 to the output node V o , and corresponding transitions of the signals provided from the state determination system 141 to the controller 102.
  • FIG.19 illustrates the exemplary time-domain analysis during the time interval t 0 –t 10
  • FIG.20 illustrates the exemplary time-domain analysis during the time interval t10–t21.
  • the exemplary operation of the system and process 1800 is described with reference to the time instances of FIG.19 and FIG.
  • FIG.19 and FIG. 20 are not drawn to scale, and certain time intervals shown may be measured in microseconds while others may be measured in seconds or minutes.
  • the PSU 101 is properly operating, and may have been turned on at some previous period of time.
  • the PSU 101 output voltage setpoint is 12.35 V, supplying the full load current to the load 105.
  • components of the battery system 106 are initialized (represented by the dashed line around the process blocks 1802–1805).
  • the controller 102 may be initialized in the process block 1802 (e.g., when it receives the AC_OK signal).
  • the controller 102 switches OFF the DC-DC converter 170 and all of the FETs 110b...101d via the signal lines 171 and 121b...121d, respectively.
  • the controller 102 may be configured to verify that the voltage present at the output node V o is equal to the PSU output voltage setpoint (e.g., by a voltage sensor implemented within the state determination system 141, such as in a similar manner as the battery voltage sensor 142, which sensed level of the output voltage Vo is provided to the controller 102 via the signal lines 180), and that the AC_OK signal on the signal line 112 is present (e.g., a logic level 1 is being received).
  • the DC-DC converter 170 is turned on via the control signal 171, whereby the DC-DC converter 170 stabilizes its output to its battery DC-DC converter setpoint (in this example, 12.0 V). However, because the voltage at the output node Vo is being held at 12.35 V by the PSU 101, no current flows from the DC-DC converter 170, and all current into the load 105 is provided by the PSU 101.
  • the system and process 1800 proceeds to the process block 1806, and waits for an interrupt generated by a rising edge transition of either the UCTE or LCTE signal received by the controller 102 from the state determination system 141 via the signal lines 180.
  • This waiting condition represents a steady state condition, which is represented in this example as the system state shown at the time instant t 0 in FIG.19.
  • the controller 102 may be configured to generate an interrupt upon receiving the rising edge (a logic level 0 to a logic level 1 transition) of either the UCTE signal (e.g., see 1901 in FIG. 19) or the LCTE signal (e.g., see 1902 in FIG.19 and FIG.20).
  • This interrupt transitions the system and process 1800 from the process block 1806 to the process block 1807 in which the state determination signals from the state determination system 141 are evaluated to determine if any FET control action is required to adjust the impedance of the N FET/resistor pair network either up or down, as will be further described herein.
  • this steady state condition in the process block 1806 continues.
  • the controller 102 maintains the FETS 110b...110d switched OFF. All load current is continuing to be supplied by the PSU 101, which is regulating the voltage supplied to the output node Vo at a point above the battery DC-DC converter setpoint of the DC-DC converter 170.
  • the voltage supplied to the output node V o is above the UCT, so the UCTE signal is at a logic level 1 (see Table 16a of FIG.16), and since the voltage Vo is not varying, the state determination system 141 maintains the dV o /dt Positive and dV o /dt Negative signals at logic level 0 values (see Table 16b of FIG.16). No interrupts have been generated in the process block 1806 as the controller 102 is still waiting for a rising edge on either the UCTE or LCTE signals.
  • an AC line failure or a hardware failure of the PSU 101 occurs (which would be signaled to the controller 102 via the AC_OK signal 112). This is designated in FIG.
  • the voltage Vo sufficiently decreases to be below the UCT, resulting in the state determination system 141 transitioning the UCTE signal from a logic level 1 to a logic level 0.
  • the process block 1806 is still waiting for an interrupt caused by either the UCTE or LCTE signals transitioning from a logic level 0 to a logic level 1.
  • the decreasing of the voltage V o continues during the time interval t1 to t2 as more energy may be delivered from CLOAD 160 to the load 105.
  • the voltage V o has now dropped until it has reached the battery DC- DC converter setpoint of the DC-DC converter 170, which has been set to 12.0 V.
  • the DC-DC converter 170 Upon reaching the Current Limit Transition Point I limit(A) at the time instant t 3 , the DC-DC converter 170 will enter its voltage “droop” mode (see FIG.11), and the output voltage Vo will begin to decrease as C LOAD 160 again begins to supply energy to the load 105, which can be seen during the time interval t3 to t4 in FIG.19.
  • the dVo/dt Negative signal delivered to the controller 102 from the state determination system 141 transitions to a logic level 1 during this time interval. However, no interrupt is yet generated in the process block 1806.
  • the controller 102 maintains the FETS 110b...110d switched OFF (corresponding to the Impedance Sequence 0 set forth in Table 17b of FIG.17) according to the truth table of Table 16c of FIG.16.
  • the output voltage V o crosses below the LCT causing the state determination system 141 to transition the LCTE signal from a logic level 0 to a logic level 1 (indicated as 1902 in FIG.19 at the time instant t 4 ), and an interrupt is generated by the process block 1806.
  • the system and process 1800 proceeds to the process block 1807, and the levels of the state determination signals received from the state determination system 141 are read by the controller 102.
  • the system and process 1800 then proceeds to the process block 1808 to determine whether these signal levels correspond to either of the conditions 2b or 3c as set forth in the truth table of Table 16c of FIG.16. Since in this example, at the time instant t4, the levels of the state determination signals are determined to correspond to condition 3c in the Table 16c, the system and process 1800 proceeds to the process block 1810, where the controller 102 determines that the impedance of the N FET/resistor pair network needs to decrease.
  • the controller 102 switches ON the FET 110b via the control signal 121b to configure the N FET/resistor pair network into the configuration of Impedance Sequence 1.
  • the time interval t4 to t5 represents that there may exist a propagation delay along the control line 121b of the switch ON signal sent to the FET 110b.
  • Such a propagation delay may be composed of the processing time of the process block 1806 in processing the interrupt at the time instant t 4 , the execution times of the process blocks 1807, 1808, and 1810, the signal propagation time needed for the ON signal to travel from the controller 102 to the FET 110b, and the switching time of the FET 110b.
  • This propagation time may be relatively short (e.g., on the order of microseconds), but there may be a measurable time delay between the time instant t4 when the need for an impedance change is first recognized and the time instant t 5 when the impedance state of the N FET/resistor pair network is actually changed and the system state variables respond.
  • the process block 1811 may be optionally included to insert a time delay (e.g., equal to the longest possible value of propagation delay) before the system and process 1800 returns to the process block 1807 to again reset the status of the state determination signals.
  • the time instant t5 represents the end of the propagation delay period, and at this instant it can be seen that the system state has responded to the control action taken at the time instant t4 (i.e., an increase in the voltage Vo). Therefore, after the time instant t 5 , the system and process 1800 returns to the process block 1807. At the time instant t5, the optional propagation delay of the process block 1811 has completed, and the FET 110b is now switched ON.
  • the result is that the current of the DC-DC converter 170 now drops below the Current Limit Transition Point as current is diverted away from the DC-DC converter 170, and the output voltage of the DC-DC converter 170 and therefore the output voltage Vo rises back towards its 12.0 V setpoint.
  • the controller 102 again reads the state determination signals and passes control to the process block 1808.
  • the controller 102 determines in the process block 1808 that the N FET/resistor pair network is operating according to condition 3b (see Table 16c of FIG.16), which corresponds to the “Neither” path exiting from the process block 1808.
  • the signals UCTE and LCTE are each evaluated by the controller 102 for a logic level 1.
  • the system and process 1800 will continuously loop from the process block 1812 to the process block 1807 to the process block 1808 and back to the process block 1812 until the rising output voltage V o crosses above the LCT threshold (indicated as occurring at the time instant t6) resulting in a transition of the LCTE signal from a logic level 1 to a logic level 0.
  • the output voltage Vo continues to rise because the output current from the DC-DC converter 170 continues to increase.
  • the system and process 1800 Upon the first invocation of the process block 1812 after the LCTE signal makes its transition to a logic level 0, the system and process 1800 will exit the process block 1812 and return to the process block 1806 and re-engage the wait state for an interrupt triggered by a rising edge on either the UCTE or LCTE signals.
  • the output voltage Vo will continue its increase towards the battery DC-DC converter setpoint of 12.0 V as output current rises in the DC-DC converter 170.
  • the Current Limit Transition Point will be reached, shown at approximately the midpoint between the time instants t6 and t7.
  • the system and process 1800 then proceeds to the process block 1810, where it is determined that since the N FET/resistor pair network is configured in Impedance Sequence 1 according to the truth table of Table 17b, the next step in the Impedance Sequence corresponding to condition 3c is Impedance Sequence 2.
  • the controller 102 maintains the FET 110b switched ON, switches ON the FET 110c via the control signal 121c, and then exits the process block 1810 and proceeds to the process block 1811.
  • the system and process 1800 may remain in the process block 1811, waiting for the FET 110c to switch ON.
  • the current generated by the battery 108 now has conductive paths through the DC-DC converter 170, the FET 110b/resistor 150b pair, and the FET 110c/resistor 150c pair.
  • the addition of the conductive path through the FET 110c/resistor 150c pair and the much lower impedance of this new conductive path diverts more current from the DC-DC converter 170, bringing its current down to a level below I limit(A) , and thus the output voltage Vo will again start to increase as the DC-DC converter 170, now operating at a reduced current, will attempt to regulate its output at its battery DC-DC converter setpoint (in this example, 12.0 V).
  • the system and process 1800 will then proceed to the process block 1807 whereby the controller 102 reads the state determination signals.
  • the system and process 1800 will proceed to the process block 1806 on its next pass through the process block 1812.
  • the system and process 1800 will remain in the process block 1806 until the next interrupt caused by a rising edge on either of the UCTE or LCTE signals.
  • the time interval encompassing t8 to t10 represents a steady state condition, with current to the load 105 kept at a constant level, and the battery 108 slowly discharging.
  • Controller 102 maintains the N FET/resistor pair network in the Impedance Condition 2 configuration.
  • the time instant t 10 shows an occurrence of a discontinuity in the trajectory of the output voltage Vo in which dVo/dt suddenly increases from a relatively small positive value to a relatively larger positive value.
  • a condition that could cause this sort of discontinuity is a sudden decrease of the current into the load 105, resulting in a positive current into CLOAD 160 and a corresponding change (increase) in dV o /dt.
  • the value of the output voltage Vo is increasing, and the system and process 1800 is in the process block 1806 waiting for an interrupt.
  • the time instant t11 indicates a situation when the output voltage Vo crosses above the UCT causing a rising edge on the UCTE signal (indicated as 1901 in FIG.20 at the time instant t 11 ) and generating an interrupt in the process block 1806.
  • the system and process 1800 then proceeds to the process block 1807, and the state determination signals received from the state determination system 141 are received by the controller 102.
  • the controller 102 determines that the combination of the signals is in condition 2b.
  • the system and process 1800 therefore proceeds to the process block 1809 where the controller 102 determines that the impedance of the N FET/resistor pair network needs to increase. Since the N FET/resistor pair network is currently configured in Impedance Sequence 2 (i.e., FET 110b switched ON, FET 110c switched ON, and FET 110d switched OFF), the controller 102 determines from Table 17b that an increase in impedance will result in the N FET/resistor pair network configured in Impedance Sequence 1.
  • the controller 102 switches OFF the FET 110c via the control line 121c to configured the N FET/resistor pair network into the configuration of Impedance Sequence 1.
  • the system and process 1800 then proceeds to the process block 1811 and enters the optional wait state equal to the maximum propagation delay as previously described herein.
  • the time instant t12 shows the effect of the impedance increase, which has caused dV o /dt to change sign and the logic levels of the dV o /dt Positive and dV o /dt Negative signals to invert.
  • the system and process 1800 proceeds to the process block 1807, where the levels of the state determination signals received from the state determination system 141 are received and read by the controller 102.
  • the process block 1808 is exited by the “Neither” path, and the system and process 1800 proceeds to the process block 1812.
  • the system and process 1800 will then loop through the process blocks 1807, 1808, and back to the process block 1812 until the output voltage V o drops below the UCT (indicated in FIG.20 at the time instant t13), causing the UCTE signal to transition from a logic level 1 to a logic level 0 (see Table 16a).
  • the process block 1812 is next processed, since neither of the UCTE or LCTE signals are at a logic level 1, the system and process 1800 will exit the process block 1812 and proceed to the process block 1806 where the system and process 1800 will again wait for an interrupt.
  • the time instant t 14 indicates a situation when the output voltage V o falls below the LCT resulting in the LCTE signal transitioning from a logic level 0 to a logic level 1 (indicated as 1902 in FIG.20 at the time instant t 14 ) resulting in an interrupt generated in the process block 1806.
  • the system and process 1800 will then proceed to the process block 1807 where the levels of the state determination signals received from the state determination system 141 are received and read by the controller 102.
  • the controller 102 maintains the FET 110b switched ON, and the controller 102 switches ON the FET 110c via the control signal 121c, and then exits the process block 1810 and proceeds to the process block 1811.
  • an optional appropriate propagation delay time may occur.
  • the controller 102 reads the state determination signals received from the state determination system 141 just after the time instant t15.
  • the controller 102 maintains the FETs 110b and 110c switched ON, and the controller 102 switches ON the FET 110d via the control signal 121d.
  • the N FET/resistor pair network is now in its lowest impedance state according to this non-liming example.
  • the system and process 1800 then exits the process block 1810 and proceeds to the process block 1811, where it may optionally wait for one more propagation delay time interval to the time instant t 16 . After the time instant t16 the system and process 1800 proceeds from the process block 1811 to the process block 1807 and the state determination signals produced by the state determination system 141 are received by the controller 102.
  • the system and process 1800 takes no impedance action and exits the process block 1808 through the path marked “Neither” and proceeds to the process block 1812, where the LCTE signal is evaluated and determined to be at a logic level 1.
  • the system and process 1800 then continuously loops through the process blocks 1807, 1808, and back to the process block 1812 until the output voltage V o crosses above the LCT as indicated at the time instant t17.
  • the LCTE and UCTE signals are both at a logic level 0, and on the next pass through the process block 1812, the system and process 1800 exits to the process block 1806, where it waits for the next interrupt.
  • the time instant t 18 indicates a change in dV o /dt, which may be attributable to an event such as an increase in the load current. Since the output voltage Vo is within the range set by the UCT and LCT, no interrupt is generated in the process block 1806, and the system and process 1800 remains in the process block 1806.
  • the time instant t19 represents another event that may occur during operation of the system 100 when there is a decrease in the current delivered to the load 105.
  • the system and process 1800 Since the output voltage Vo is still within the range set by the UCT and LCT, no interrupt is generated in the process block 1806.
  • the system and process 1800 remains in the process block 1806 waiting for an interrupt.
  • the time instant t 20 represents when the output voltage V o crosses above the UCT causing a rising edge on the UCTE signal (indicated as 1901 in FIG. 20 at the time instant t20) resulting in the generation of an interrupt in the process block 1806.
  • the system and process 1800 then proceeds to the process block 1807 where the levels of the state determination signals received from the state determination system 141 are received and read by the controller 102.
  • the process block 1808 is exited via path 2b, and the process block 1809 is executed.
  • the controller 102 determines that the impedance of the N FET/resistor pair network needs to increase, and since the N FET/resistor pair network is currently configured in accordance with Impedance Sequence 3, the next step in Table 17b of FIG.17 representing an increased impedance is determined to be Impedance Sequence 2. Consequently, the controller 102 will switch OFF the FET 110d via the control line 121d to configure the N FET/resistor pair network in accordance with Impedance Sequence 2. The system and process 1800 then proceeds to the process block 1811 to enter into an optional wait state equal to the maximum propagation delay (represented as the time interval t20 to t21) as previously described herein.
  • the maximum propagation delay represented as the time interval t20 to t21
  • the battery system 106 may continue to discharge the battery 108 while regulating the output voltage Vo in accordance with the system and process 1800 until the battery 108 is depleted of energy and the battery system 106 shuts OFF, or until the AC power is restored and the PSU 101 returns to operation.
  • the controller 102 may be configured to incrementally increase the impedance of the N FET/resistor pair network (e.g., step-by-step in accordance with the Table 17b of FIG. 17) until all of the FETS are switched OFF.
  • the DC-DC converter 170 may also be switched OFF. Additionally, at some point in time, charge can be restored to the battery 108 via the charger 103.
  • the controller 102 may be configured to turn OFF the battery system, such as by switching OFF all of the FETS in the N FET/resistor pair network, and switching OFF the DC-DC converter 170.
  • the N FET/resistor pair network may be operated in accordance with a couple of terminal configurations.
  • all of the FET/resistor pairs within the N FET/resistor pair network are switched OFF, resulting in no current flowing through the N FET/resistor pair network. For example, this may occur during an initial state of the system 100 when no current is being supplied to the load 105 from the battery 108 through the N FET/resistor pair network.
  • the current from the battery 108 will be supplied only through the DC-DC converter 170, which will regulate the output voltage V o to be within the range between UCT and LCT up to the point that the current supplied to the load 105 increases to reach the Current Limit Transition Point Ilimit(A), and the output voltage of the DC-DC converter 170 droops.
  • the controller 102 When the output voltage of the DC-DC converter 170 droops below the LCT, the controller 102 will decrease the impedance of the N FET/resistor pair network, and since all of the FET/resistor pairs within the N FET/resistor pair network are switched OFF, the N FET/resistor pair network has the full range of impedance reduction actions (e.g., see Tables 17a, 17b, 17c of FIG.17) available for the controller 102.
  • the controller 102 needs to increase the impedance of the N FET/resistor pair network, (e.g., in response to a reduction in the required load current) and the UCTE is triggered a sufficient number of times such that all FET/resistor pairs are switched OFF, the remaining current to the load 105 can be supplied by the DC-DC converter 170, because the current to the load 105 has dropped sufficiently so that the DC-DC converter 170 can again regulate the output voltage Vo without any additional conduction paths provided for the current via the N FET/resistor pair network.
  • a situation may occur when all of the FET/resistor pairs within the N FET/resistor pair network are switched ON and the controller is unable to further reduce the impedance of the N FET/resistor pair network (e.g., in accordance with any one of the Impedance Sequences set forth in the Tables 17a, 17b, 17c of FIG.17). For example, this might occur at conditions of high load currents and/or low battery states of charge, such as when the battery 108 operating point on the V-I curves exists at the lower limits of Region 2 (e.g., see FIGS.8 and 10).
  • the controller 102 may need to reduce the current supplied to the load 105 or operation of the system 100 stopped to avoid the output voltage Vo dropping below the Lower Regulation Limit (e.g., see FIG.12). If a buck- boost converter is used as the DC-DC converter 170, there may be additional options if the current supplied to the load 105 is reduced to a value below the Current Limit Transition Point.
  • operation of the system 100 may continue discharging of the battery 108 via the DC-DC converter 170 until the operating point of the battery 108 has reached the bottom boundary of the Region 1 area, which represents the minimum battery voltage allowed.
  • Another situation where this may occur is a short-circuit at the load 105 or other overloads beyond the design point of the system 100, such that the battery operating point exists at current levels outside of the allowed characteristic V-I curves of the battery 108. If this situation were to occur, the system 100 may be configured to protect itself by for example, terminating all current paths between the battery 108 and the load 105 (e.g., by switching OFF all FET/resistor pairs within the N FET/resistor pair network.
  • the DC-DC converter 170 may also be switched OFF via its control line 171, but this is not strictly necessary as the DC-DC converter 170 may be protected by its current limit characteristic.
  • the system 100 can be configured to maintain an output voltage provided to a load 105 from a battery 108 within a desired range of voltages as the battery 108 is discharging, including maintaining such an output voltage within a required operating voltage range (e.g., substantially within a specified load voltage tolerance range) so as to be able to implement the system 100 as a voltage regulator (e.g., for utilization as a Battery Backup Unit or DC UPS) .
  • a voltage regulator e.g., for utilization as a Battery Backup Unit or DC UPS
  • embodiments of the present disclosure are disclosed herein as utilizing a battery as a power source (e.g., for battery backup purposes), embodiments of the present disclosure may be configured to utilize any appropriate type of power source.
  • the system 100 is suitable for utilization with any type of power source (instead of a battery) that has an unregulated output voltage (e.g., the output voltage of such a power source varies outside of a specified load voltage tolerance range for a particular distribution bus and its associated load).
  • an unregulated output voltage e.g., the output voltage of such a power source varies outside of a specified load voltage tolerance range for a particular distribution bus and its associated load.
  • aspects of the present disclosure e.g., the system and process 1800
  • aspects of the present disclosure may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.), or embodiments combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “circuitry,” “module,” or “system.”
  • aspects of the present disclosure may take the form of a program product embodied in one or more computer readable storage medium(s) having computer readable program code embodied thereon. (However, any combination of one or more computer readable medium(s) may be utilized.
  • the computer readable medium may be a computer readable signal medium or a computer readable storage medium.
  • each block of the circuit block diagrams and/or the functionalities represented in the diagrams of FIGS. 1 and 18, and combinations of blocks in the circuit block diagrams and/or the functionalities represented in the diagrams of FIG. 14 and FIG. 15 can be implemented by special purpose hardware-based systems that perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
  • a module e.g., the controller 102
  • a module may also be implemented in programmable hardware devices such as field programmable gate arrays, programmable array logic, programmable logic devices, or the like.
  • programmable hardware devices such as field programmable gate arrays, programmable array logic, programmable logic devices, or the like.
  • all technical and scientific terms used herein have the same meaning as commonly understood to one of ordinary skill in the art to which the presently disclosed subject matter belongs.
  • the terms “a” and “an” mean “one or more” when used in this application, including the claims.
  • the term “about” is used to provide flexibility to a numerical range endpoint by providing that a given value may be “a little above” or “a little below” the endpoint.
  • the term “substantially” refers to the complete or nearly complete extent or degree of an action, characteristic, property, state, structure, item, or result.
  • an object that is “substantially” enclosed would mean that the object is either completely enclosed or nearly completely enclosed.
  • the exact allowable degree of deviation from absolute completeness may in some cases depend on the specific context. However, generally speaking, the nearness of completion will be so as to have the same overall result as if absolute and total completion were obtained.
  • the use of “substantially” is equally applicable when used in a negative connotation to refer to the complete or near complete lack of an action, characteristic, property, state, structure, item, or result.
  • the term “and/or” and the use of the “/” character between two words when used in the context of a listing of entities refers to the entities being present singly or in combination.
  • the phrase “A, B, C, and/or D” includes A, B, C, and D individually, but also includes any and all combinations and subcombinations of A, B, C, and D.
  • the term “electrically coupled” or the term “coupled” when used for describing pathways in electrical or electronic circuitry refers to components with a conduction path for electrical energy (i.e., current) in at least one direction between the components. Current does not need to be flowing along the conduction path for the components to be coupled or electrically coupled.
  • the components may be directly coupled with a conduction path including only low impedance wires and the like, or they may be indirectly coupled with semiconductors or higher impedance components that allow electrical energy to flow along the conduction path.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Secondary Cells (AREA)

Abstract

Un système d'alimentation fournit de l'énergie d'un bloc d'alimentation à une charge par l'intermédiaire d'un bus de distribution, et comprend un convertisseur continu-continu couplé en parallèle avec un réseau d'éléments de commutation couplés entre une borne de sortie du bloc d'alimentation et le bus de distribution. Un dispositif de commande est conçu pour activer ou désactiver sélectivement le convertisseur continu-continu et chacun des éléments de commutation pour permettre au bloc d'alimentation d'alimenter la charge par l'intermédiaire du bus de distribution. Les éléments de commutation peuvent être des transistors, et les diodes peuvent être des diodes de corps parasites des transistors. Le bloc d'alimentation peut être une batterie, telle qu'une batterie rechargeable. Un niveau de tension de sortie de la batterie peut être régulé par le dispositif de commande en fonction du fonctionnement du convertisseur continu-continu et d'un certain nombre de transistors activés ou désactivés.
EP21946273.6A 2021-10-19 2021-10-19 Système d'alimentation Pending EP4197075A4 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2021/055671 WO2023069082A1 (fr) 2021-10-19 2021-10-19 Système d'alimentation

Publications (2)

Publication Number Publication Date
EP4197075A1 true EP4197075A1 (fr) 2023-06-21
EP4197075A4 EP4197075A4 (fr) 2024-04-03

Family

ID=86058475

Family Applications (1)

Application Number Title Priority Date Filing Date
EP21946273.6A Pending EP4197075A4 (fr) 2021-10-19 2021-10-19 Système d'alimentation

Country Status (4)

Country Link
EP (1) EP4197075A4 (fr)
KR (1) KR20240078602A (fr)
CN (1) CN116267028A (fr)
WO (1) WO2023069082A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116565356B (zh) * 2023-07-06 2023-09-29 共模半导体技术(苏州)有限公司 一种电池管理系统及方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8330389B2 (en) * 2008-12-31 2012-12-11 Stmicroelectronics S.R.L. Switching power supply system for optical sources or a load requiring a controlled supply current
DE102016205037A1 (de) * 2016-03-24 2017-09-28 Robert Bosch Gmbh Gleichspannungs-Konverter und Verfahren zur Regelung eines Gleichspannungs-Konverters
WO2019125495A1 (fr) * 2017-12-22 2019-06-27 Litech Laboratories, Llc Connexion d'un système de batterie à un bus de distribution électrique

Also Published As

Publication number Publication date
EP4197075A4 (fr) 2024-04-03
KR20240078602A (ko) 2024-06-04
CN116267028A (zh) 2023-06-20
WO2023069082A1 (fr) 2023-04-27

Similar Documents

Publication Publication Date Title
US11695293B2 (en) Power system
US11171507B2 (en) Connection of battery system to electrical distribution bus
US11303137B2 (en) Systems and methods for controlling battery current
US8125189B2 (en) Systems for charging a battery in a closed loop configuration
US6329796B1 (en) Power management circuit for battery systems
US7893562B2 (en) Electric power supply system
US9373977B1 (en) Battery backup system for uninterrupted power supply
US11424629B1 (en) Battery charging and discharging circuit and terminal devices
US20060022640A1 (en) Power supply circuit for portable battery powered device
JP2008220167A (ja) 直列接続されたエネルギー蓄積装置のための等化システムおよび方法
GB2416606A (en) Power supply circuit for portable battery powered device
JPWO2012049910A1 (ja) 電力供給システムの出力回路
KR20070024493A (ko) 보다 작고 보다 높은 신뢰성을 가지는 전력 공급 모듈
US6949912B2 (en) Enabling circuit for avoiding negative voltage transients
KR20220058280A (ko) 배터리 장치를 충전하는 충전 집적 회로 및 이를 포함하는 전자 장치
US10236694B2 (en) Systems and methods for management of asymmetrical multi-tapped battery packs
WO2023069082A1 (fr) Système d'alimentation
US20210408822A1 (en) Method and apparatus for efficient power delivery in power supply system
US6597153B1 (en) Fast transient charging circuit
JP2009118683A (ja) 充電器とその充電方法および電源システム
TW202324897A (zh) 電源系統
US20230275452A1 (en) Power system, charging method, and discharging method
JP6923121B2 (ja) 電力供給装置

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20221230

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

A4 Supplementary search report drawn up and despatched

Effective date: 20240304

RIC1 Information provided on ipc code assigned before grant

Ipc: H02J 1/10 20060101ALI20240227BHEP

Ipc: H02J 1/08 20060101ALI20240227BHEP

Ipc: H02J 7/34 20060101ALI20240227BHEP

Ipc: H02J 7/04 20060101ALI20240227BHEP

Ipc: H02J 1/04 20060101AFI20240227BHEP