EP4162204A1 - Plant for burning waste - Google Patents
Plant for burning wasteInfo
- Publication number
- EP4162204A1 EP4162204A1 EP21793106.2A EP21793106A EP4162204A1 EP 4162204 A1 EP4162204 A1 EP 4162204A1 EP 21793106 A EP21793106 A EP 21793106A EP 4162204 A1 EP4162204 A1 EP 4162204A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- passage
- plant
- burning chamber
- contracted passage
- inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002699 waste material Substances 0.000 title claims abstract description 13
- 238000002485 combustion reaction Methods 0.000 claims abstract description 45
- 239000003517 fume Substances 0.000 claims abstract description 39
- 238000002347 injection Methods 0.000 claims abstract description 14
- 239000007924 injection Substances 0.000 claims abstract description 14
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims abstract description 10
- 229910052760 oxygen Inorganic materials 0.000 claims abstract description 10
- 239000001301 oxygen Substances 0.000 claims abstract description 10
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 9
- 230000002950 deficient Effects 0.000 claims abstract description 6
- 239000004575 stone Substances 0.000 claims description 67
- 239000000463 material Substances 0.000 claims description 12
- 230000007423 decrease Effects 0.000 claims description 6
- HBMJWWWQQXIZIP-UHFFFAOYSA-N silicon carbide Chemical compound [Si+]#[C-] HBMJWWWQQXIZIP-UHFFFAOYSA-N 0.000 claims description 6
- 229910010271 silicon carbide Inorganic materials 0.000 claims description 6
- 239000000446 fuel Substances 0.000 description 23
- 239000007789 gas Substances 0.000 description 14
- 239000003546 flue gas Substances 0.000 description 8
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 7
- 238000000034 method Methods 0.000 description 5
- 239000007788 liquid Substances 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 239000000567 combustion gas Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- 239000002245 particle Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 239000008187 granular material Substances 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000000197 pyrolysis Methods 0.000 description 2
- 239000000779 smoke Substances 0.000 description 2
- 239000004449 solid propellant Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 125000004432 carbon atom Chemical group C* 0.000 description 1
- 229910010293 ceramic material Inorganic materials 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000002309 gasification Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010813 municipal solid waste Substances 0.000 description 1
- 239000011368 organic material Substances 0.000 description 1
- 125000004430 oxygen atom Chemical group O* 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000011214 refractory ceramic Substances 0.000 description 1
- 239000011819 refractory material Substances 0.000 description 1
- 239000011343 solid material Substances 0.000 description 1
- 239000007790 solid phase Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 238000004056 waste incineration Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F23L9/00—Passages or apertures for delivering secondary air for completing combustion of fuel
- F23L9/04—Passages or apertures for delivering secondary air for completing combustion of fuel by discharging the air beyond the fire, i.e. nearer the smoke outlet
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/02—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
- F23G5/027—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage
- F23G5/0276—Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage using direct heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/08—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating
- F23G5/14—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating including secondary combustion
- F23G5/16—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating including secondary combustion in a separate combustion chamber
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23M—CASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
- F23M5/00—Casings; Linings; Walls
- F23M5/02—Casings; Linings; Walls characterised by the shape of the bricks or blocks used
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23C—METHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN A CARRIER GAS OR AIR
- F23C2202/00—Fluegas recirculation
- F23C2202/50—Control of recirculation rate
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G2201/00—Pretreatment
- F23G2201/40—Gasification
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G2900/00—Special features of, or arrangements for incinerators
- F23G2900/00001—Exhaust gas recirculation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G2900/00—Special features of, or arrangements for incinerators
- F23G2900/52001—Rotary drums with co-current flows of waste and gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/20—Incineration of waste; Incinerator constructions; Details, accessories or control therefor having rotating or oscillating drums
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2700/00—Ash removal, handling and treatment means; Ash and slag handling in pulverulent fuel furnaces; Ash removal means for incinerators
- F23J2700/003—Ash removal means for incinerators
Definitions
- the present invention relates to a plant for burning waste comprising a rotary furnace, an after-burning chamber connected to the furnace, a primary incineration part comprising the furnace and a first part of the after-burning chamber.
- the after burning chamber is for initial incineration of the waste in an oxygen deficient environment at a lower temperature interval in the furnace and in the first part of the after-burning chamber for producing combustible fumes therein.
- the plant comprises a secondary incineration part comprising a second part of the after burning chamber and a contracted passage between the first and second parts of the after-burning chamber for subjecting the fumes to an increase in velocity between the first part and the second part of the after-burning chamber, the passage comprising an inlet for forced injection of combustion air into the contracted passage for conclusive combustion of the combustible fumes at a higher temperature interval in the passage and in the second part of the after-burning chamber.
- WO2010123444 A1 discloses a method and an incineration plant where fuel can be burnt at high temperatures in order to avoid undesired imperfectly combusted residual products.
- the fuel is initially incinerated in an oxygen- deficient environment at a lower temperature interval in the furnace and in a first stage of the after-burning chamber to thereby produce combustible fumes therein.
- Means such as a suction blower are provided for drawing the fumes from the rotating furnace and through after-burning chamber.
- the combustible fumes are subjected to an increase in velocity by being passed through a contracted passage defined by a separating wall between the first stage and a second stage of the after-burning chamber.
- Combustion air is blown into the contracted passage to thereby obtain a complete combustion of the combustible fumes at a higher temperature interval in the passage and in the second stage of the after-burning chamber.
- a highest possible amount of combustion air should interact with a highest possible amount of combustible fumes per time unit.
- To blow the combustion air into a larger volume of combustible fumes, for example in the first or second stage of the combustion or after-burning chamber, will not result in such an efficient and complete combustion, since then the oxygen atoms of the combustion air and the carbon atoms of the fumes would have less opportunity to interact in the slower flow of the larger volume.
- the after burning chamber is divided into two stages: a first stage having a lower combustion temperature, for example 950 °C, and a second stage having a higher combustion temperature, for example 1200 °C.
- the flue-gas passage provides a high increase in velocity for the fumes or flue-gases that together with the extra supply of combustion air in the passage provide for a renewed combustion that substantially burns all non- combusted organic material in the fuel and the gases thereof.
- the furnace and the after-burning chamber should then have an efficient heat-insulating and heat-accumulating lining, i.e. the lining may need a certain minimum thickness.
- Such minimum thickness may vary depending on selected lining materials and plant size, but may for a typical waste incineration plant need to be about 1,3 m in the after-burning chamber and about 0,5 m in the rotating furnace. Even temperatures and an efficient combustion are thereby obtained in the process. There is thereby also little or no need for additional fuels such as combustible oil or gases to keep the process running.
- the preservation of the steady state condition can further be controlled by selectively returning combusted fumes to the furnace from a combusted fumes outlet of the plant.
- the steady state condition may, however, also be controlled in other ways, for example by adaption of the fuel feed rate to the present type of fuel.
- the lower temperature interval can extend between about 950 °C and 1100 °C and the higher temperature interval can extend between about 1100 °C and 1200 °C.
- non-combusted residual products can be received through an open bottom of the first stage of the after-burning chamber.
- Non-combusted residual products of the second stage of the after-burning chamber can be received by a particulate bed at a bottom of the second stage.
- the lining of the furnace may further have a varying height or thickness to provide spaces between a temporary bottom face of the rotating furnace and the fuel, whereby cool solid fuel is not allowed to form an insulation against the temporary bottom face of the rotating furnace barrel.
- the hot gases in the furnace may then more easily access all faces of the fuel. If the height or thickness varies in the circumferential direction, the projecting portions of the lining may also more easily carry the fuel around and mix the fuel in the furnace so that all portions of the fuel positively comes into contact with the oxygen-depleted hot gases.
- furnace While the furnace is specifically adapted for the incineration of solid fuel, it can also incinerate fluid fuel.
- a plant for burning waste comprises a rotary furnace, an after-burning chamber connected to the furnace, a primary incineration part comprising the furnace and a first part of the after-burning chamber for initial incineration of the waste in an oxygen deficient environment in the furnace and in the first part of the after-burning chamber for producing combustible fumes therein, a secondary incineration part comprising a second part of the after-burning chamber and a contracted passage between the first and second parts of the after-burning chamber for subjecting the fumes to an increase in velocity between the first part and the second part of the after-burning chamber.
- the contracted passage may alternatively be referred to as a constricted passage, or passage.
- Relative directions such as downstream, upstream, lower, upper, and similar are used to refer to the corresponding directions when the plant is oriented for its intended use and the fumes flow in their intended direction, i.e. from the rotary furnace, towards the after burning chamber, and onwards.
- Any reference to cross sectional areas are to be understood as referencing the cross sectional area taken perpendicular to an intended flow direction of said portion of the plant.
- Inner and outer respectively refer to directions facing towards or away from a center of the cross sectional area of the relevant portion of the plant.
- the initial incineration of the waste in the furnace and in the first part of the after-burning chamber is performed at a lower temperature than the conclusive combustion of the combustible fumes in the passage and in the second part of the after-burning chamber.
- the passage comprises an inlet for forced injection of combustion air into the contracted passage for conclusive combustion of the combustible fumes in the passage and in the second part of the after-burning chamber.
- the contracted passage comprises a narrowing part followed downstream by a widening part having a cross sectional area larger than the cross sectional area of the narrowing part immediately upstream of the widening part.
- the contracted passage is arranged to cause the speed of combustibles fumes flowing through the plant to increase as they pass through the contracted passage, such that the speed of the combustible fumes is at least 3 times higher at the end of the narrowing part than in the first and/or the second part of the after-burning chamber, preferably at least 4 times higher, most preferably at least 5 times higher.
- conclusive combustion is taken to mean that the combustion is more complete, i.e. that the combustion happens at a higher efficiency than what would happen had the inlet and the contracted passage not been present between the first and the second parts of the after-burning chamber.
- the narrowing part is arranged on an inlet side of the contracted passage such that the opening of the contracted passage has a cross sectional area that is larger than the cross sectional area of the narrowing part downstream of the opening.
- the cross section area of the narrowing part is thus gradually decreasing from the opening of the contracted passage.
- the pressure drop is also minimized with a more funnel shaped part of the narrowing part.
- the widening part is followed downstream by a second narrowing part having a cross sectional area that is smaller than the cross sectional area of the widest part of the widening part.
- the second narrowing part following the widening part further increases the turbulence and therefor also the combustion efficiency.
- the cross sectional area of the second narrowing part is constant from the downstream end of the widening part and the second part of the after-burning chamber.
- a transition from the second narrowing part to the second part of the after-burning chamber is sharp.
- an edge of the downstream end of the second narrowing part is sharp.
- the edge may have a radius of less than 25 mm, preferably less than 15 mm, most preferably less than 5 mm.
- the edge may define a 90° corner between the lower wall of the contracted passage and the second part of the after-burning chamber.
- the contracted passage is arranged horizontally. It could of course also have a slight tilt, however, in order to have an easier control of the combustion process the contracted passage should be more or less horizontally arranged rather than vertically.
- the contracted passage is arranged at an angle of between 75 and 105° relative to the first part of the after-burning chamber and/or the second part of the after-burning chamber, preferably between 80 and 100°, most preferably between 85 and 95°.
- the cross section of the contracted passage is rectangular. The construction of the contracted passage is facilitated having a rectangular shape as compared to for instance a circular cross section since the cross section area is changing throughout the contracted passage.
- the contracted passage comprises an upper wall and a lower wall, wherein the inlet is provided on the upper wall and wherein the narrowing part and the widening part are provided by the lower wall.
- the lower wall of the rectangular shape of the contracted passage varies in distance to the upper wall such that the narrowing and widening parts are presented or achieved. Having the change in cross section area made by adjusting only the lower wall facilitates the construction.
- the upper wall extends straight between the first and second parts of the after-burning chamber, i.e. between an inlet side and an outlet side of the contracted passage. Consequently, the lower wall provides the narrowing part and the widening part. Additionally or alternatively, the lower wall also provides the second narrowing part.
- the lower wall, at the narrowing part of the contracted passage is angled relative the upper wall such that the cross-sectional area of the contracted passage decreases in a downstream direction.
- the lower wall, at the widening part of the contracted passage is concave such that the cross sectional area of the contracted passage increases in a downstream direction until a widening part bottom is reached, after which the cross sectional area decreases to the second narrowing part.
- the contracted passage is defined by a plurality of shaped stones lining the upper wall, the lower wall and the walls connecting the upper wall and the lower wall of the contracted passage.
- the stones are provided with a flat inner surface.
- the stones are provided with a flat inner surface and arranged at an angle relative to the stones defining the upper wall, such that a funnel is formed thereby.
- the widening part of the contracted passage is formed by a combination of stones having convex inner surfaces and concave inner surfaces.
- the widening part comprises a first convex radius formed by at least one stone having a convex inner surface, wherein the first convex radius is between 300 and 450 mm, preferably between 325 and 425 mm, most preferably between 350 and 400 mm.
- the widening part further comprises a first concave radius formed by a plurality of stones each having a concave inner surface, wherein the first concave radius is between 500 and 900 mm, preferably between 550 and 850 mm, most preferably between 600 and 800 mm.
- the widening part further comprises a second convex radius formed by at least one stone having a convex inner surface, wherein the second convex radius is between 300 and 450 mm, preferably between 325 and 425 mm, most preferably between 350 and 400 mm.
- the shaped stones are made from a silicon carbide material.
- the inner surface of the shaped stones is polished.
- the shaped stones are joined by a seam having a thickness of no more than 3 mm, preferably no more than 2 mm, most preferably no more than 1 mm.
- the seam is made from a silicon carbide material.
- the inlet for forced injection of combustion air into the contracted passage is arranged to inject air in the widening part of the contracted passage. This placement increases the turbulence created.
- the inlet for forced injection of combustion air into the contracted passage is an elongated slot.
- the inlet comprises inlet stones.
- said inlet stones are made from the same material as the shaped stones defining the contracted passage.
- the inlet stones define an air channel in the shape of an elongated slot for passage of air from a source of inlet air into the contracted passage.
- the inlet stones are arranged in a row such that a channel is formed therethrough.
- the channel extends at least 90% of the width of the contracted passage.
- the source of inlet air may for example be connected to the inlet through a blower, which forces air into the widening part of the contracted passage such that a turbulent flow is achieved.
- the inlet stones comprises at least one H-shaped stone, and two C-shaped end stones provided on opposite ends of said H-shaped stone.
- the H-shaped stones have a width of between 120 and 170 mm, preferably between 130 and 160 mm, most preferably between 140 and 150 mm.
- the H- shaped stones have a length of between 300 and 360 mm, preferably between 310 and 350 mm, most preferably between 320 and 340 mm.
- each one of the H-shaped stones define an air channel for passage of air, said channel extending in a width direction of the H-shaped stone, and said channel having a width of between 5 and 25 mm, preferably between 10 and 20 mm.
- Said channel is interrupted by a central support connecting the two sides of the H-shaped stone, wherein the central support has a width of between 15 and 45 mm, preferably between 20 and 40 mm, most preferably between 25 and 35 mm.
- the C-shaped stones have the same width as the H-shaped stones, and also define an air channel for passage of air, said air channel having the same width as that defined by the H-shaped stones.
- the width of the contracted passage is between 2400 and 3600 mm, preferably between 2600 and 3400 mm, most preferably between 2800 and 3200 mm.
- the elongated slot is arranged transversely to the direction of the flow in the contracted passage.
- the plant further comprises a second inlet for forced injection of combustion air into the contracted passage.
- the second inlet is arranged downstream of the first inlet in the contracted passage according to a further aspect of the present invention.
- the second inlet for forced injection of combustion air in the contracted passage is an elongated slot according to yet a further aspect of the present invention.
- the second inlet comprises inlet stones defining an air channel for passage of air from a source of inlet air into the contracted passage.
- the inlet stones of the second inlet are identical to the inlet stones of the first inlet.
- the elongated slot of the second inlet is arranged transversely to the direction of the flow in the contracted passage.
- the first and second inlets are elongated slots arranged in parallel and transversely to the direction of the flow in the contracted passage. Also, according to one aspect of the present invention the slots of the first and second inlets are both arranged to inject air into the widening part of the contracted passage.
- Figure 1 is a diagrammatic sectional view of a portion of a plant according to the invention
- Figure 2 is a side view of a contracted passage according to the present invention.
- Figure 3 is a schematic view of the upper wall of the contracted passage, including the first and second inlet and the stones forming the two inlets.
- a plant 1 for burning waste comprises a rotary furnace 2, an after-burning chamber 3 connected to the furnace 2, a primary incineration part 4 comprising the furnace 2 and a first part 5 of the after-burning chamber 3 for initial incineration of the waste in an oxygen deficient environment at a lower temperature interval in the furnace 2 and in the first part 5 of the after-burning chamber 3 for producing combustible fumes therein.
- a secondary incineration part 6 comprises a second part 7 of the after-burning chamber 3 and a contracted passage 8 between the first and second parts 5, 7 of the after-burning chamber 3 for subjecting the fumes to an increase in velocity between the first part 5 and the second part 7 of the after-burning chamber 3, the passage 8 comprising a first inlet 9 for forced injection of combustion air into the contracted passage 8 for conclusive combustion of the combustible fumes at a higher temperature interval in the passage 8 and in the second part 7 of the after-burning chamber 3.
- the contracted passage 8 comprises a narrowing part 10 followed downstream by a widening part 11 having a cross sectional area larger than the cross sectional area of the narrowing part 10 immediately upstream of the widening part 11.
- the narrowing part is arranged on an inlet side 12 of the contracted passage 8 such that the opening of the contracted passage 8 has a cross sectional area that is larger than the cross sectional area of the narrowing part 10 downstream of the opening.
- the widening part 11 is followed downstream by a second narrowing part 37 having a cross sectional area that is smaller than the cross sectional area of the widest part of the widening part 11.
- the contracted passage 8 is defined by a plurality of shaped stones 13a, 13b, 13c, 14a lining its upper wall 14, its lower wall 13 and the walls connecting the upper wall 14 and the lower wall 13.
- the widening part 11 of the contracted passage 8 is formed by a combination of stones 13b, 13c having convex inner surfaces and concave inner surfaces, such that a curved shape is formed.
- the curved shape defines a space in which the combustion gas may turbulently mix with the air injected from the two inlets 9, 15, such that the combustion efficiency is increased.
- the lower wall 13 of the widening part 11 has an upstream first convex radius R1 formed by a stone 13b having a convex inner surface, such that a smooth transition from the narrowing part 10 to the widening part 11 is achieved.
- the upstream first convex radius R1 is approximately 375 mm.
- the widening part 11 also has a first concave radius R2 formed directly downstream of the first convex radius R1.
- the first concave radius R2 is formed by a number of stones 13c each having a concave inner surface.
- a concave widening part 11 is provided such that a space for turbulent mixture of combustion gas and inlet air is formed.
- the first concave radius R2 is approximately 700 mm.
- the widening part 11 has a second downstream convex radius R3 formed by a stone 13b having a convex inner surface, such that a smooth transition between the widening part 11 and the second narrowing part 37 is formed.
- the second downstream convex radius R3 is approximately 375 mm.
- the lower wall 13, at the widening part 11 of the contracted passage 8 is concave such that the cross sectional area of the contracted passage 8 increases in a downstream direction until a widening part bottom is reached, after which the cross sectional area of the contracted passage 8 decreases to the second narrowing part 37.
- the shaped stones 13a, 13b, 13c, 14a used to form the contracted passage 8 are made from a polished silicon carbide material, that has a smooth inner surface such that very little material from the combustion gas is deposited thereon when the plant 1 is used.
- Figure 3 is a schematic view of the upper wall 14 of the contracted passage 8, including the first and second inlet 9, 15 and the stones 9a, 9b, 15a, 15b forming the two inlets 9, 15.
- the shaped stones 13a, 13b, 13c, 14a are joined by a very thin seam 43.
- This seam has a thickness of no more than 1 mm, thus further increasing the overall smoothness of the walls formed by the shaped stones 13a, 13b, 13c, 14a.
- the seam 43 is made from the same material as the shaped stones 13a, 13b, 13c, 14a, i.e. a silicon carbide material
- the upper wall 14 has, in an area immediately above the widening part 11, two inlets 9, 15.
- the inlets 9, 15 are made from inlet stones 9a, 9b, 15a, 15b defining a respective air channel therethrough in the shape of an elongated slot for passage of air from a source of inlet air into the contracted passage 8.
- the inlet stones 9a, 9b, 15a, 15b are arranged in a row such that the channel formed thereby extends at least 90% of the width of the contracted passage 8.
- the inlets 9, 15 are made from two types of inlet stones 9a, 9b, 15a, 15b.
- Each inlet 9, 15 has a number of H-shaped stone 9a, 15a arranged so that the short ends thereof abut, and two C-shaped end stones 9b, 15b provided on opposite ends of the H-shaped stones 9a, 15a.
- Each one of the H-shaped stones 9a, 15a define an air channel for passage of air.
- the channel extends in a width direction of the H-shaped stone 9a, 15a, and has a width of approximately 15 mm.
- the central support 9c, 15c has a width of approximately 30 mm.
- the contracted passage 8 is arranged horizontally. Further, the cross section of the contracted passage 8 is rectangular and wherein a lower wall 13 of the rectangular shape of the contracted passage 8 varies in distance to an upper wall 14 of the contracted passage 8 such that the narrowing and widening parts are presented.
- the lower wall 13 does this by having different portions thereof being angled, curved or parallel relative to the upper wall 14, as will be described in the following.
- the contracted passage 8 is arranged at an angle of approximately 90° relative to both the first part 5 of the after-burning chamber 3 and the second part 7 of the after-burning chamber 3.
- the first inlet 9 for forced injection of combustion air into the contracted passage 8 is arranged to inject air in the widening part 11 of the contracted passage 8.
- the first inlet 9 for forced injection of combustion air into the contracted passage 8 is an elongated slot arranged transversely to the direction of the flow in the contracted passage 8.
- the second inlet 15 for forced injection of combustion air into the contracted passage 8 is further a second inlet 15 for forced injection of combustion air into the contracted passage 8, wherein the second inlet 15 is arranged downstream of the first inlet 9 in the contracted passage 8.
- the second inlet 15 for forced injection of combustion air in the contracted passage 8 is an elongated slot arranged transversely to the direction of the flow in the contracted passage 8.
- the first and second inlets 9, 15 are thus arranged in parallel and transversely to the direction of the flow in the contracted passage 8. They are further both arranged in and arranged to inject air into the widening part 11 of the contracted passage 8.
- FIGmatic view of figure 1 shows an incineration plant 1 having a rotational furnace or kiln 2 which is fed from a conduit 16 with fuel 17 in the form of, for example municipal solid waste, by means of a screw feeder 18.
- the furnace can also be fed with gaseous and liquid fuels through fuel lines 19, 20 connected to the furnace 2. Also combusted fumes that have passed the plant 1 can be returned to the furnace 2 through a line 21.
- the furnace 2 On a typical incineration process, the furnace 2 is rotated about 1 rpm by a known drive (not shown), and it will then take about 1 hour for newly fed-in fuel to be gasified to primary fumes / combustive gas and other particles to be introduced in a first part 5 of two parts 5, 6 in the after-burning chamber 3.
- Non-gasified solid materials drop down into a water container 22, for example, in the bottom of the first part 5 and are transported away for further handling by means of a conveyor 23 such as a screw conveyor.
- the after-burning chamber 3 as well as the furnace 2 has a large mass (typically totaling to 1500 tons), i.e.
- a thick lining 24 in the after-burning chamber 3 may typically have a thickness of about 1,3 m.
- the heat losses through the lining of the afterburning chamber 3 may typically be about 200 kcal/m 2 /h, while those in the furnace 2 may be about 1700 kcal/m 2 /h; the furnace 2 has a relatively smaller mass of refractory and insulating material as otherwise the weight of the furnace 2 would be too high.
- the interior surface layer of chamber 3 can be composed of relatively thin refractory blocks 25 having a thickness of about 40 mm, whereby the thick blocks 26 located behind the thin blocks 25 do not need to be replaced when renovating the after burning chamber 3.
- a separating wall 27 that divides chamber 3 into its both parts 5 and 7.
- the vertical separating wall 27 extends also a distance horizontally between the both parts 5 and 7 of the after-burning chamber 3 to define an elongate passage in the shape of a flue-gas channel or a flame port 8 in the top portion of the after-burning chamber 3.
- an inlet 9 for combustion air fed by a blower 28 that typically delivers an airflow having a flow rate of about 30 m/s.
- a second inlet 15 for air fed by a blower 29. It typically delivers a pulsed airflow for increasing the turbulence in the widening part 11 and thus the overall efficiency of the plant 1.
- Both inlets 9, 15 supply air with a high content of oxygen. The higher the carbon content of the passing gas, the higher the temperature will be.
- the plant 1 can be regarded as divided into a primary incineration part 4 with an oxygen-depleted, gasifying incineration environment and a secondary incineration part 6 with an oxygen-rich, highly combustive combustion environment.
- a boiler in the shape of a gas-liquid heat exchanger 30 is connected to an outlet 31 for the smoke gases or fumes from the second part 6 of the after-burning chamber 3.
- Steam capable of powering a turbine 32 is generated in the heat exchanger 30.
- Turbine 32 is in turn capable of driving a generator 33 for producing electrical power.
- a suction blower or fan 34 is present at an outlet of the fumes from the boiler 30 for providing a sufficient negative pressure or vacuum in the furnace 2, afterburning chamber 3 and boiler / heat exchanger 30 to draw the fumes or smoke gases through the plant 1.
- a plurality of different components may further be present, such as a flue-gas purifier, and other components capable of handling solid, liquid and gaseous residual products needed to be taken care of during plant operation.
- a steady state condition is maintained in the rotating kiln/furnace 2 and in the after-burning chamber 3.
- an initial incineration condition prevails in the form of partial pyrolysis in a gasifying, oxygen-depleted environment that produces combustive gas in a substantially constant, lower temperature interval of about 950- 1100 °C.
- the fuel 17 can be almost totally gasified so as to leave a minimum amount of residual ash of only about 4-5 % of the original fuel content, which residual ash falls down into the vertical shaft formed by the first part 5.
- the residual ash may also comprise solid components of a high melting point in the fuel, such as glass and metals, which are prevented from being melted in the lower temperature and may detrimentally adhere to the lining 24.
- a final incineration condition prevails with a substantially constant increased temperature interval of about 1100-1200 °C.
- the increased temperature is obtained in that the combustive gas produced in the incineration part 4 is accelerated to a high velocity (typically about 30 m/s) according to the principle of Bernoulli in the contracted passage 8, and in that combustion air is blown across the combustive gas by the blower.
- a high velocity typically about 30 m/s
- very large amounts of O2 may then effectively interact in the reduced passage with very large amounts of combustible CO in the combustive gas for being transformed into CO2 in the resulting heated and combusted fumes that leaves the after-burning chamber 3.
- the velocity of the fumes is decreased.
- Possible remaining solid residual products, such as magma fall down onto the bottom of the secondary part 6 in the vicinity of the boiler and are cooled into solid phase.
- that bottom may have a particle bed layer 35 of clay granules, such as chamotte clay granules.
- a number of temperature sensors 36 may be located at suitable places in the plant 1 to sense the steady state condition in the plant 1.
- the temperatures sensed by the sensors 36 are signaled via signal connections such as signal lines 38 to a computer 39 such as a control computer for the plant 1.
- Computer 39 can then, by means of the temperature information, compare the actual state with a desired steady state in a software application. On deviations between the actual and desired states, the computer can, for example, increase or decrease the return flow of cool fumes through line 21 , by controlling a valve 40 in the line 21 via a signal connection 41.
- the return flow of cool fumes need to be increased to decrease the mean temperature in the part 4 down to at least 1100 °C. It may also be possible to feed water into the plant 1 for cooling purposes. If, on the other hand, the temperature sensors 36 signals that the plant 1 runs the risk of being cooled down to a temperature below the steady state condition, the return flow of cool fumes will be throttled down and possibly also the furnace 2 and the after-burning chamber 3 may temporarily be fed by additional fuel via lines 19 and/or 20. These processes are also controlled in a manner known as such by the computer 39 via signal connections 38, 41 , as schematically indicated in figure 1.
- gaseous or liquid fuels that are supplied through lines 19, 20 can be burned in the furnace 2.
- one or more gas or oil burners 42 may additionally be provided in the walls of the after-burning chamber 3.
- first inlet 9 could be the inlet with pulsed flow and the second inlet 15 could have a steady flow in the contracted passage 8.
- a further possibility could be a combination, wherein the inlets could both supply gas with pulsed flows or both with constant flows.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Incineration Of Waste (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE2050453 | 2020-04-21 | ||
PCT/SE2021/050365 WO2021215988A1 (en) | 2020-04-21 | 2021-04-21 | Plant for burning waste |
Publications (2)
Publication Number | Publication Date |
---|---|
EP4162204A1 true EP4162204A1 (en) | 2023-04-12 |
EP4162204A4 EP4162204A4 (en) | 2024-08-14 |
Family
ID=78269721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21793106.2A Pending EP4162204A4 (en) | 2020-04-21 | 2021-04-21 | Plant for burning waste |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4162204A4 (en) |
WO (1) | WO2021215988A1 (en) |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5138189B2 (en) * | 1973-08-06 | 1976-10-20 | ||
DE2549076A1 (en) * | 1975-11-03 | 1977-05-12 | Kraftanlagen Ag | Solid and liquid waste combustion system - has rotary main combustion chamber and after burner chamber surrounding a mixer tube |
JPS558516A (en) * | 1978-07-01 | 1980-01-22 | Yasuyuki Michimae | Method of incinerating industrial wastes for pollution prevention and its incinerator |
DE3533240A1 (en) * | 1985-09-18 | 1987-03-26 | Didier Werke Ag | AIRCOOLABLE FIREPLACE WALL |
JPH07310914A (en) * | 1994-05-16 | 1995-11-28 | Yoshida Seisakusho:Kk | Incinerator |
JP3092794B2 (en) * | 1996-09-13 | 2000-09-25 | サニー工業株式会社 | Incinerator device and incineration method |
JP2002228134A (en) * | 2001-01-29 | 2002-08-14 | Mitsubishi Heavy Ind Ltd | Exhaust gas treatment equipment for drier |
EP2085693A3 (en) * | 2008-01-31 | 2016-03-16 | Anton Maggale | Method and device for burning solid fuel |
SE533716C2 (en) * | 2009-04-22 | 2010-12-14 | Kappa Sa | Solid fuel combustion process and plant |
KR101160055B1 (en) * | 2011-12-29 | 2012-06-26 | 주식회사 엔테크 | The horizontal-type burner |
DE202014101757U1 (en) * | 2014-04-14 | 2014-06-13 | Ludwig Bräutigam | Burning insert for lintel burners |
US20160215979A1 (en) * | 2015-01-23 | 2016-07-28 | Resco Products, Inc. | Refractory bricks and methods of identifying a refractory brick composition |
KR101748390B1 (en) * | 2017-04-26 | 2017-06-16 | 주식회사 그린이앤지 | Incinerator for incinerating fishing net |
-
2021
- 2021-04-21 EP EP21793106.2A patent/EP4162204A4/en active Pending
- 2021-04-21 WO PCT/SE2021/050365 patent/WO2021215988A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
EP4162204A4 (en) | 2024-08-14 |
WO2021215988A1 (en) | 2021-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4479655B2 (en) | Grate-type waste incinerator and its combustion control method | |
US20120312026A9 (en) | Pyrolyzing gasification system and method of use | |
US4177740A (en) | Apparatus for generating heat from waste fuel | |
US4934931A (en) | Cyclonic combustion device with sorbent injection | |
JP4548785B2 (en) | Waste gasification melting apparatus melting furnace, and control method and apparatus in the melting furnace | |
US4300460A (en) | Method for generating heat from waste fuel | |
US20120247374A1 (en) | Independent vector control system for gasification furnace | |
JP5611418B2 (en) | Combustion control method for gasification melting system and system | |
EP1726877B1 (en) | Method and device for controlling injection of primary and secondary air in an incineration system | |
WO2010123444A1 (en) | Method and plant for burning solid fuel | |
WO2001009547A1 (en) | Burners with high turndown ratio and gas combustor | |
JP4972944B2 (en) | Combustion treatment method and apparatus for combustible waste | |
EP4162204A1 (en) | Plant for burning waste | |
JP3956862B2 (en) | Combustion control method for waste incinerator and waste incinerator | |
JP2003074817A (en) | Waste gasifying/melting equipment, and its operation method | |
CN220061735U (en) | Flue gas post-combustion device comprising more than one flue gas vortex combustion chamber | |
JP2005308272A (en) | Fire grate type waste incinerator | |
JP2004077013A (en) | Operation method of waste incinerator, and waste incinerator | |
JP7467383B2 (en) | Biomass fuel combustion furnace and boiler system, and method for burning biomass fuel | |
CN215216204U (en) | Combustion-supporting device and boiler | |
JP6906878B1 (en) | Combustion furnace and boiler system | |
JP2004163009A (en) | Operation method of waste incineration system and waste incineration system | |
JPS61168704A (en) | Turned downward combustion burner for granular solid fuel | |
KR20240130531A (en) | Centrifugal continuous combustion device using a nanotechnology-applied SRF incinerator and carbon nanotube heater system device | |
CN116481020A (en) | Flue gas post-combustion device comprising more than one flue gas vortex combustion chamber |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20230223 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20240716 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F23G 5/20 20060101ALI20240710BHEP Ipc: F23M 5/02 20060101ALI20240710BHEP Ipc: F23L 9/00 20060101ALI20240710BHEP Ipc: F23G 5/027 20060101ALI20240710BHEP Ipc: F23B 90/06 20110101ALI20240710BHEP Ipc: F23B 80/00 20060101ALI20240710BHEP Ipc: F23B 10/02 20110101ALI20240710BHEP Ipc: F23G 5/16 20060101AFI20240710BHEP |