EP3971494B1 - Klimatisierungsvorrichtung - Google Patents
Klimatisierungsvorrichtung Download PDFInfo
- Publication number
- EP3971494B1 EP3971494B1 EP19928505.7A EP19928505A EP3971494B1 EP 3971494 B1 EP3971494 B1 EP 3971494B1 EP 19928505 A EP19928505 A EP 19928505A EP 3971494 B1 EP3971494 B1 EP 3971494B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pipe
- liquid
- refrigerant supply
- refrigerant
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/0007—Indoor units, e.g. fan coil units
- F24F1/0068—Indoor units, e.g. fan coil units characterised by the arrangement of refrigerant piping outside the heat exchanger within the unit casing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/40—Fluid line arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/06—Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
- F24F1/26—Refrigerant piping
- F24F1/32—Refrigerant piping for connecting the separate outdoor units to indoor units
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B13/00—Compression machines, plants or systems, with reversible cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/006—Compression machines, plants or systems with reversible cycle not otherwise provided for two pipes connecting the outdoor side to the indoor side with multiple indoor units
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/023—Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
- F25B2313/0231—Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units with simultaneous cooling and heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/027—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
- F25B2313/0272—Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using bridge circuits of one-way valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/19—Pressures
- F25B2700/193—Pressures of the compressor
- F25B2700/1931—Discharge pressures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/19—Pressures
- F25B2700/193—Pressures of the compressor
- F25B2700/1933—Suction pressures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/20—Disposition of valves, e.g. of on-off valves or flow control valves
Definitions
- the present disclosure relates to an air-conditioning apparatus including a relay unit installed between an outdoor unit and an indoor unit.
- refrigerant that carries heat is circulated through pipes that connects an outdoor unit and an indoor unit, to thereby generate conditioned air.
- air-conditioning apparatuses capable of simultaneously performing cooling and heating have been developed.
- a plurality of indoor units are installed, and a relay unit is thus installed between an outdoor unit and the indoor units.
- the relay unit distributes refrigerant to the indoor units.
- an air-conditioning apparatus disclosed in Patent Literature 1 is an existing air-conditioning apparatus capable of simultaneously performing cooling and heating.
- the air-conditioning apparatus of Patent Literature 1 includes a heat source unit that operates as an outdoor unit, a plurality of indoor units, and a relay unit that is installed between the heat source unit and the indoor units.
- the relay unit of the air-conditioning apparatus has a plurality of branch ports that allow the relay unit to be connected to the respective indoor units.
- the branch ports of the relay unit are connected using flare nuts to pipes that are installed at an actual place and connected to the indoor units.
- Each of the branch ports of the relay unit is formed such that a joint is brazed to a copper pipe.
- Each of the pipes at the actual place includes a flare nut provided at one end of each pipe. The flare nut of the pipe at the actual place is screwed onto the joint of the branch port using a spanner, whereby the pipe at the actual place is connected to the branch port of the relay unit.
- Patent Literature 2 states that, to resolve a problem in a conventional branch unit of a refrigerant circuit wherein maintainability is bad even when it is grounded in an underpart of a roof, under a floor, or in a high place, in the refrigerant circuit branch unit or the air conditioner, a single outdoor unit and a plurality of indoor units are connected by the refrigerant circuit via the branch unit, and refrigerant is supplied from the outdoor unit to the plurality of indoor units via the branch unit.
- the branch unit is composed of a casing composed of a lid body wherein a top face and a bottom face can be attached and detached.
- Patent Literature 3 states that, to minimize time for mounting and removing a refrigerant branching box by making joints capable of being easily connected and disconnected by providing a plurality of refrigerant outlet pipes having greater lengths in proportion to their distances from an access cover, Outlet side pipes and an inlet side pipe are protruded from one side face of a main body of a refrigerant branching box: length differences (m) and (n) are provided between the outlet side pipes making the length of the pipes greater in proportion to their distances from an access cover of a container part for the refrigerant branching box. In relation to the access cover closing the container part the refrigerant branching box is contained such as to occupy a space close toward the side end. Joints can be easily connected and disconnected by a wrench without interference with the outlet side pipes.
- each of the flare nuts is tightened while a hexagonal portion of an associated one of the joints is being fastened with a spanner.
- the relay unit are formed to have a plurality of branch ports for the pipes at the actual place.
- the distance between any adjacent two of the branch ports in the relay unit is short. Therefore, in such a connection work as described above, when a pipe at the actual place is connected to an associated branch port of the relay unit, this connection may be obstructed by another branch port.
- a spanner cannot be engaged with the hexagonal portion of the joint at an appropriate angle.
- the spanner if the spanner is forcedly moved in such a manner as to apply a force to the hexagonal portion of the joint, the spanner may be slipped, thus deforming the joint. Consequently, a crack may be formed at the brazed portion of the joint, causing a leak of refrigerant.
- the present invention is applied to solve the above problem, and relates to an air-conditioning apparatus that enables the workability of a connection work of connecting a relay unit to pipes connected to an indoor unit to be improved.
- An air-conditioning apparatus includes a plurality of indoor units and is capable of performing a cooling only operation, a heating only operation, and a simultaneous cooling and heating operation.
- Fig. 1 illustrates a configuration of an air-conditioning apparatus 100 according to Embodiment 1.
- the air-conditioning apparatus 100 includes an outdoor unit 51, indoor units 52a and 52b, and a relay unit 53.
- the relay unit 53 is installed between the outdoor unit 51 and the indoor units 52a and 52b.
- the outdoor unit 51 and the relay unit 53 are connected by a first liquid pipe 104 through which liquid refrigerant flows and a first gas pipe 103 through which gas refrigerant flows.
- the relay unit 53 and the indoor unit 52a are connected by a second liquid pipe 105a through which the liquid refrigerant flows and a second gas pipe 106a through which the gas refrigerant flows.
- the relay unit 53 and the indoor unit 52b are connected by a second liquid pipe 105b through which the liquid refrigerant flows and a second gas pipe 106b through which the gas refrigerant flows.
- Embodiment 1 is an air-conditioning apparatus in which the indoor units 52a and 52b can perform a cooling operation or a heating operation independently of each other, Embodiment 1 is not limited to this example. In other words, Embodiment 1 is applicable to any type of air-conditioning apparatus as long as the air-conditioning apparatus includes the relay unit 53.
- the outdoor unit 51 includes a compressor 1, a four-way valve 3, an outdoor heat exchanger 2, an accumulator 4, a refrigerant flow control unit 54, and an outdoor-side control unit 201.
- the compressor 1 sucks, compresses, and discharges refrigerant.
- a device whose capacity is controlled to change the amount of refrigerant to be sent per unit time such as an inverter circuit, can be used.
- the first pressure sensor 31 detects a pressure Pd of discharged refrigerant.
- the second pressure sensor 32 detects a pressure Ps of refrigerant to be sucked into the compressor 1.
- the pressure Pd detected by the first pressure sensor 31 and the pressure Ps detected by the second pressure sensor 32 are transmitted as data to the outdoor-side control unit 201.
- the outdoor-side control unit 201 operates as a controller that performs a centralized control of the entire air-conditioning apparatus.
- the outdoor heat exchanger 2 causes refrigerant to flow therein and causes heat exchange to be performed between the refrigerant and outdoor air.
- the outdoor heat exchanger 2 operates as an evaporator to evaporate and gasify the refrigerant.
- the outdoor heat exchanger 2 operates as a condenser to condense and liquefy the refrigerant.
- the four-way valve 3 is a valve that switches the flow of the refrigerant between flows of the refrigerant for respective operations. That is, when the four-way valve 3 switches the flow of the refrigerant, the operation is switched between, for example, the cooling operation and the heating operation.
- the accumulator 4 accumulates an excess of liquid refrigerant.
- the refrigerant flow control unit 54 includes check valves 7a, 7b, 7c, and 7d, which will be described later, and each of which permits the refrigerant to flow only in one direction.
- the refrigerant flow control unit 54 includes four connection pipes 130, 131, 132, and 133 that connect connection points a, b, c, and d and the four check valves 7a, 7b, 7c, and 7d each of which permits the refrigerant to flow in one direction.
- the refrigerant flow control unit 54 is one of the components of the outdoor unit 51.
- the connection pipe 130 is a pipe that connects the connection point c and the connection point a.
- the connection pipe 131 is a pipe that connects the connection point d and the connection point b.
- the connection pipe 132 is a pipe that connects the connection point c and the connection point d.
- the connection pipe 133 is a pipe that connects the connection point a and the connection point b.
- connection pipe 132 connects the first gas pipe 103 connected to the relay unit 53 and a third gas pipe 102 connected to the compressor 1.
- connection pipe 133 connects the first liquid pipe 104 connected to the relay unit 53 and a third liquid pipe 101 connected to the compressor 1.
- the check valve 7a is provided at the connection pipe 132 and permits the refrigerant to flow in a direction from the connection point c toward the connection point d.
- the check valve 7b is provided at the connection pipe 133 and permits the refrigerant to flow in a direction from the connection point a toward the connection point b.
- the check valve 7c is provided at the connection pipe 131 and permits the refrigerant to flow in a direction from the connection point d toward the connection point b.
- the check valve 7d is provided at the connection pipe 130 and permits the refrigerant to flow in a direction from the connection point c toward the connection point a.
- the indoor unit 52a includes an indoor heat exchanger 5a, an indoor expansion device 6a, and an indoor-side control unit 202a.
- the indoor unit 52b includes an indoor heat exchanger 5b, an indoor expansion device 6b, and an indoor-side control unit 202b.
- the second gas pipe 106a is connected to one end of the indoor heat exchanger 5a.
- the second gas pipe 106b is connected to one end of the indoor heat exchanger 5b.
- the indoor heat exchangers 5a and 5b each cause refrigerant that has passed through the relay unit 53 to flow therein, and cause heat exchange to be performed between the refrigerant and air to be conditioned.
- the indoor heat exchangers 5a and 5b each operate as a condenser to condense and liquefy the refrigerant.
- the indoor heat exchangers 5a and 5b each operate as an evaporator to evaporate and gasify the refrigerant.
- the other end of the indoor heat exchanger 5a is connected to the indoor expansion device 6a.
- the other end of the indoor heat exchanger 5b is connected to the indoor expansion device 6b.
- the indoor expansion device 6a is connected to the second liquid pipe 105a.
- the indoor expansion device 6b is connected to the second liquid pipe 105b.
- the indoor expansion devices 6a and 6b each operate as a pressure reducing valve and an expansion valve to reduce the pressure of the refrigerant and expand the refrigerant.
- Each of the indoor expansion devices 6a and 6b is only required to be capable of adjusting the pressure of the refrigerant, depending on an air-conditioning load.
- a flow control device such as an electronic expansion valve, can be used.
- a first temperature sensor 33a and a second temperature sensor 34a are provided in the indoor unit 52a.
- a first temperature sensor 33b and a second temperature sensor 34b are provided in the indoor unit 52b.
- the first temperature sensor 33a and the second temperature sensor 34a each detect the temperature of the refrigerant that flows into or out of the indoor heat exchanger 5a.
- the first temperature sensor 33b and the second temperature sensor 34b each detect the temperature of the refrigerant that flows into or out of the indoor heat exchanger 5b.
- the first temperature sensor 33a and the second temperature sensor 34a each transmit a signal indicating the detected temperature to the indoor-side control unit 202a.
- the first temperature sensor 33b and the second temperature sensor 34b each transmit a signal indicating the detected temperature to the indoor-side control unit 202b.
- the relay unit 53 includes a gas-liquid separator 8, first on-off valves 9a and 9b, second on-off valves 10a and 10b, a first expansion device 11, a second expansion device 12, a first heat exchanger 13, a second heat exchanger 14, check valves 15a, 15b, 16a, and 16b, and a relay-unit control unit 203.
- the components of the relay unit 53 are controlled by the relay-unit control unit 203.
- the components of the relay unit 53 are connected by a first bypass pipe 110, a first relay-unit liquid pipe 111, a first relay-unit gas pipe 112, and a second bypass pipe 113.
- the relay unit 53 is connected to the outdoor unit 51 by the first liquid pipe 104 and the first gas pipe 103.
- the relay unit 53 is connected to the indoor unit 52a by the second liquid pipe 105a and the second gas pipe 106a, and is connected to the indoor unit 52b by the second liquid pipe 105b and the second gas pipe 106b.
- the relay unit 53 controls the flow of the refrigerant between the outdoor unit 51 and each of the indoor units 52a and 52b.
- the indoor units 52a and 52b perform the simultaneous cooling and heating operation.
- the term "simultaneous cooling and heating operation" means an operation in which one of the indoor units performs the cooling operation and the other performs the heating operation.
- the relay unit 53 can be connected to up to 16 indoor units 52 by increasing the number of on-off valves 9, that of on-off valves 10, that of check valves 15, and that of check valves 16. Also, although it is described by way of example that the maximum number of indoor units 52 that can be provided is 16, it is not limiting, and the maximum number of indoor units 52 may be any number larger than or equal to 1.
- the gas-liquid separator 8 separates the refrigerant into liquid refrigerant and gas refrigerant, and is connected to the first liquid pipe 104, the first relay-unit liquid pipe 111, and the first relay-unit gas pipe 112.
- the first liquid pipe 104 connects the outdoor unit 51 and the gas-liquid separator 8.
- the first relay-unit liquid pipe 111 connects the gas-liquid separator 8 and each of the check valves 15a and 15b.
- the first relay-unit gas pipe 112 connects the gas-liquid separator 8 and each of the first on-off valves 9a and 9b.
- the second gas pipe 106a branches and connects to the first on-off valve 9a and the second on-off valve 10a.
- the second gas pipe 106b branches and connects to the first on-off valve 9b and the second on-off valve 10b.
- Each of the first on-off valves 9a and 9b is opened to permit the gas refrigerant that flows through the first relay-unit gas pipe 112 to flow out of the relay unit 53, or is closed to shut out the flow of the gas refrigerant.
- Each of the first on-off valves 9a and 9b is in the opened state while the indoor unit 52a or 52b connected to the valve by the second gas pipe 106a or 106b is in the heating operation.
- Each of the second on-off valves 10a and 10b is opened to permit gas refrigerant that flows from the second gas pipe 106a or 106b of the indoor unit 52a or 52b to flows into the relay unit 53, or is closed to shut out the flow of the gas refrigerant.
- Each of the second on-off valves 10a and 10b is in the opened state while the indoor unit 52a or 52b connected to the valve by the second gas pipe 106a or 106b is in the cooling operation.
- the second on-off valves 10a and 10b are connected to the first gas pipe 103.
- the first heat exchanger 13 causes the liquid refrigerant separated by the gas-liquid separator 8 and liquid refrigerant that has passed through the second heat exchanger 14 to flow in the first heat exchanger 13, and cause heat exchange to be performed between the liquid refrigerants that flow in the first heat exchanger 13.
- the first expansion device 11 reduces the pressure of the liquid refrigerant that has passed through the first heat exchanger 13 and causes the refrigerant to flow into the second heat exchanger 14.
- the second heat exchanger 14 causes the refrigerant that has been reduced in pressure by the first expansion device 11 and liquid refrigerant that has been reduced in pressure by the second expansion device 12 to flow in the second heat exchanger 14, and cause heat exchange to be performed between the refrigerant and the liquid refrigerant that flow in the second heat exchanger 14.
- the first heat exchanger 13, the first expansion device 11, and the second heat exchanger 14 are interposed between the gas-liquid separator 8 and a relay-unit trifurcate portion 55, and are connected by the first relay-unit liquid pipe 111.
- the first bypass pipe 110 connects the relay-unit trifurcate portion 55 and the first gas pipe 103 via the second expansion device 12, the second heat exchanger 14, and the first heat exchanger 13.
- the first bypass pipe 110 collects liquid refrigerant and returns the liquid refrigerant to the outdoor unit 51.
- a flow control device whose opening degree can be changed to finely control the flow rate, such as an electronic expansion valve, may be used.
- the check valve 16a permits the refrigerant to flow in a direction from the connection point f to the connection point e.
- the check valve 15a permits the refrigerant to flow in a direction from the connection point g to the connection point f.
- the check valve 16b permits the refrigerant to flow in a direction from the connection point h to the connection point e.
- the check valve 15b permits the refrigerant to flow in a direction from the connection point g to the connection point h.
- the first relay-unit liquid pipe 111 branches at the connection point g and connects to the check valves 15a and 15b.
- the second liquid pipe 105a branches at the connection point f and connects to the check valves 15a and 16a.
- the check valves 15a and 16a are connected to the second liquid pipe 105a such that refrigerant from the check valve 15a flows to the second liquid pipe 105a and refrigerant from the second liquid pipe 105a flows to the check valve 16a.
- the second liquid pipe 105b branches at the connection point h and connects to the check valves 15b and 16b.
- the check valves 15b and 16b are connected to the second liquid pipe 105b such that refrigerant from the check valve 15b flows to the second liquid pipe 105b and refrigerant from the second liquid pipe 105b flows to the check valve 16b.
- the second bypass pipe 113 connects the first heat exchanger 13 and each of the check valves 16a and 16b.
- the second bypass pipe 113 branches at the connection point e and connects to the check valves 16a and 16b.
- the connection point g is connected to the first bypass pipe 110 and the first relay-unit liquid pipe 111 via the relay-unit trifurcate portion 55.
- Fig. 2 is a perspective view of the entire configuration of the relay unit included in the air-conditioning apparatus according to Embodiment 1.
- Fig. 2 illustrates an appearance of the relay unit 53 that can be connected to up to 16 indoor units 52.
- the relay unit 53 is formed in the shape of a cuboid.
- the relay unit 53 has an upper surface, a lower surface, and four side surfaces.
- side surface A one of two side surfaces that extend in a width direction
- side surface B one of two side surfaces that extend in a longitudinal direction
- the side surface A and the side surface B are adjacent to each other and perpendicular to each other.
- a second relay-unit gas pipe 141 and a second relay-unit liquid pipe 142 are provided at the side surface A.
- the second relay-unit gas pipe 141 and the second relay-unit liquid pipe 142 protrude outwardly from the side surface A in a direction perpendicular to the side surface A.
- the second relay-unit gas pipe 141 is joined by brazing to the first gas pipe 103 that extends as illustrated in Fig. 1 .
- the second relay-unit liquid pipe 142 is joined by brazing to the first liquid pipe 104 (see Fig. 1 ).
- 16 liquid-refrigerant supply pipes 143 and 16 gas-refrigerant supply pipes 144 are provided at the side surface B.
- the liquid-refrigerant supply pipes 143 and the gas-refrigerant supply pipes 144 protrude outwardly from the side surface B in a direction perpendicular to the side surface B.
- Each of the liquid-refrigerant supply pipes 143 is a first refrigerant supply pipe.
- Each of the gas-refrigerant supply pipes 144 is a second refrigerant supply pipe.
- a single first refrigerant supply pipe and a single second refrigerant supply pipe are provided as a single pair of refrigerant supply pipes.
- the single pair of refrigerant supply pipes are connected to a single indoor unit 52.
- Fig. 2 illustrates 16 pairs of refrigerant supply pipes, that is, 16 pairs of liquid-refrigerant supply pipes 143 and gas-refrigerant supply pipes 144.
- the relay unit 53 can be connected to up to 16 indoor units 52.
- each of the number of liquid-refrigerant supply pipes 143 and the number of gas-refrigerant supply pipes 144 is not limited to 16 and may be any number as long as it is larger than or equal to the number of indoor units 52 to which the relay unit is connected.
- the liquid-refrigerant supply pipes 143 are connected by flare nuts to the second liquid pipes 105a and 105b that extend as illustrated in Fig.
- the gas-refrigerant supply pipes 144 are connected by flare nuts to the second gas pipes 106a and 106b that extend as illustrated in Fig. 1 .
- the liquid-refrigerant supply pipes 143 are located above the gas-refrigerant supply pipes 144.
- Each of the liquid-refrigerant supply pipes 143 may be offset rightwards or leftwards from an associated one of the gas-refrigerant supply pipes 144 only by a predetermined distance, not directly above the associated gas-refrigerant supply pipe 144.
- the relay unit 53 further includes a hanging lug 145.
- the relay unit 53 When installed, the relay unit 53 is hung with the hanging lug 145, using, for example, hanging bolts in a space above a ceiling in a building, for example.
- a direction in which the liquid-refrigerant supply pipes 143 and the gas-refrigerant supply pipes 144 extend, or the direction perpendicular to the side surface B, will be referred to as "axial direction" of the liquid-refrigerant supply pipes 143 and the gas-refrigerant supply pipes 144. Therefore, the axial direction is a horizontal direction when the relay unit 53 is hung.
- two liquid-refrigerant supply pipes 143 are connected to respective second liquid pipes, that is, the second liquid pipes 105a and 105b, and two gas-refrigerant supply pipes 144 are connected to respective gas pipes, that is, the second gas pipes 106a and 106b.
- the following description is made with respect to an example in which a single liquid-refrigerant supply pipe 143 is connected to the second liquid pipe 105a, and a single gas-refrigerant supply pipe 144 is connected to the second gas pipe 106a.
- FIGs. 6 to 9 illustrate a relay unit 53R as a reference example to be referred to in an explanation of advantages of Embodiment 1. Similarly, a description concerning the configuration as illustrated in Figs. 6 to 9 will also be simplified and made with respect to an example in which a liquid-refrigerant supply pipe 143R is connected to the second liquid pipe 105a, and a gas-refrigerant supply pipe 144R is connected to the second gas pipe 106a. That is, regarding the configuration as illustrated in each of Figs. 6 to 9 , a description concerning the second liquid pipe 105b and the second gas pipe 106b will be omitted.
- Fig. 6 is a partial side view illustrating the configuration of each of the refrigerant supply pipes of the relay unit of the reference example.
- Fig. 6 is a side view of the relay unit 53R of the reference example as viewed side-on with respect to the side surface A.
- the liquid-refrigerant supply pipe 143R and the gas-refrigerant supply pipe 144R protrude from the side surface B.
- the liquid-refrigerant supply pipe 143R is provided above the gas-refrigerant supply pipe 144R.
- the length L1 of a protruding portion of the liquid-refrigerant supply pipe 143R is less than or equal to the length L2 of that of the gas-refrigerant supply pipe 144R.
- the liquid-refrigerant supply pipe 143R includes a first pipe 161aR fixed to the side surface B of the relay unit 53R and a liquid-pipe joint 151 aR located at a distal end of the first pipe 161aR.
- the liquid-pipe joint 151aR is a first joint.
- the liquid-pipe joint 151aR is connected to the second liquid pipe 105a using a liquid-pipe flare nut 152aR.
- the liquid-pipe flare nut 152aR is provided at a distal end of the second liquid pipe 105a.
- the gas-refrigerant supply pipe 144R includes a second pipe 161bR fixed to the side surface B of the relay unit 53R and a gas-pipe joint 151bR jointed at a distal end of the second pipe 161bR.
- the gas-pipe joint 151bR is a second joint.
- the gas-pipe joint 151bR is connected to the second gas pipe 106a using a gas-pipe flare nut 152bR.
- the gas-pipe flare nut 152bR is provided at a distal end of the second gas pipe 106a.
- Fig. 7 is a partial side view illustrating a configuration of the joint provided in the refrigerant supply pipe of the relay unit in the reference example.
- Fig. 7 illustrates a configuration of the liquid-pipe joint 151aR of the reference example as illustrated in Fig. 6 .
- the liquid-pipe joint 151aR includes a first portion 155R that is a hexagonal pipe and a second portion 156R to be fitted in the liquid-pipe flare nut 152aR. Since the first portion 155R is the hexagonal pipe, the first portion 155R has six outer side surfaces and six outer corners.
- brazed portion 154R An end of the first portion 155R in the axial direction is brazed and fixed to the first pipe 161aR of the liquid-refrigerant supply pipe 143R.
- This brazed portion will hereinafter be referred to as "brazed portion 154R".
- the outside diameter of the first portion 155R is larger than that of the second portion 156R.
- the second portion 156R is formed in the shape of a circular tube, and a distal end portion of the second portion 156R is tapered toward a distal end of the distal end portion.
- Figs. 8 and 9 illustrate a state in which the spanner is located to hold the first portion 155R.
- Fig. 8 is a diagram illustrating the joint included in the liquid-refrigerant supply pipe of the relay unit 53R of the reference example in the case where the joint is deformed.
- FIG. 9 is a diagram illustrating the state in which the spanner is located to hold the joint in the reference example as illustrated in Fig. 7 .
- Fig. 8 illustrates the above state as viewed side-on with respect to the side surface B of the relay unit 53R.
- Fig. 9 illustrates the above state as viewed side-on view with respect to a side surface that is opposite to the side surface A of the relay unit 53R.
- the first portion 155R of the liquid-pipe joint 151aR is held and fixed by a spanner 1000.
- arrows P each indicating a direction in which a force is applied to the liquid-pipe joint 151aR by the spanner 1000.
- Fig. 8 illustrates a state in which the spanner 1000 is located to hold the first portion 155R of the liquid-pipe joint 151aR at an inappropriate angle and is slipped.
- the spanner 1000 holds two opposite outer corners of the first portion 155R, not two opposite outer side surfaces of the first portion 155R.
- an excessive force may be applied to the first portion 155R of the liquid-pipe joint 151aR, thus deforming the first portion 155R and the first pipe 161aR. Consequently, a crack may be formed at the brazed portion 154R, causing a leak of the refrigerant.
- Fig. 3 is a partial side view illustrating a configuration of each of the refrigerant supply pipes in the relay unit 53 of Embodiment 1.
- Fig. 3 illustrates the refrigerant supply pipes as viewed side-on with respect to the side surface A of the relay unit 53.
- the liquid-refrigerant supply pipe 143 and the gas-refrigerant supply pipe 144 protrude from the side surface B in the direction perpendicular to the side surface B of the relay unit 53.
- the liquid-refrigerant supply pipe 143 is provided above the gas-refrigerant supply pipe 144.
- the length L1 of a protruding portion of the liquid-refrigerant supply pipe 143 is greater than the length L2 of that of the gas-refrigerant supply pipe 144.
- the length L1 of the protruding portion of the liquid-refrigerant supply pipe 143 is 120 mm.
- the length L1 is not limited to 120 mm.
- the length L1 may be appropriately set to fall within the range of, for example, 100 to 150 mm.
- the liquid-refrigerant supply pipe 143 includes a first pipe 161a fixed to the side surface B of the relay unit 53 and a liquid-pipe joint 151a located at a distal end of the first pipe 161a.
- the liquid-pipe joint 151a is a first joint.
- the liquid-pipe joint 151a is connected to the second liquid pipe 105 using a liquid-pipe flare nut 152a.
- the gas-refrigerant supply pipe 144 includes a second pipe 161b fixed to the side surface B of the relay unit 53 and a gas-pipe joint 151b located at a distal end of the second pipe 161b.
- the gas-pipe joint 151b is a second joint.
- the gas-pipe joint 151b is connected to the second gas pipe 106 using a gas-pipe flare nut 152b.
- the configuration of the liquid-pipe joint 151a in Embodiment 1 is basically the same as that in the reference example as illustrated in Fig. 7 . That is, the liquid-pipe joint 151a of Embodiment 1 includes a first portion 155 that is a hexagonal pipe and a second portion 156 to be fitted in the liquid-pipe flare nut 152a.
- the first portion 155 and the second portion 156 are molded and formed integral with each other. Alternatively, the first portion 155 and the second portion 156 may be formed as separate portions, and then joined to each other. Since the second portion 156 is not illustrated in Fig. 3 , the second portion 156R as illustrated in Fig. 7 or the second portion 156 as illustrated in Fig.
- first portion 155 is the hexagonal pipe, the first portion 155 has six outer side surfaces and six outer corners.
- the first portion 155 has a hexagonal outer peripheral portion and a circular inner peripheral portion.
- an end of the first portion 155 in the axial direction is brazed and fixed to the first pipe 161a of the liquid-refrigerant supply pipe 143.
- This brazed portion will hereinafter be referred to as "brazed portion 154". Since the brazed portion 154 is not illustrated in Fig. 3 , the brazed portion 154R as illustrated in Fig. 7 or the brazed portion 154 as illustrated in Fig. 4 , which will be described later, should be referred to.
- the second portion 156 is provided at one of ends of the first portion 155 that is closer to the indoor unit 52a.
- the second portion 156 is connected to the indoor heat exchanger 5a of the indoor unit 52a by the second liquid pipe 105a and the indoor expansion device 6a.
- the second portion 156 is formed in the shape of a circular tube.
- a distal end portion of the second portion 156 is tapered toward a distal end of the distal end portion. Since the liquid-pipe flare nut 152a is screwed onto the second portion 156, an outer peripheral surface of the second portion 156 and an inner peripheral surface of the liquid-pipe flare nut 152a are processed to have threads as necessary.
- the outside diameter of the first portion 155 is larger than that of the second portion 156.
- the length L1 of the protruding portion of the liquid-refrigerant supply pipe 143 that protrudes from the side surface B in Embodiment 1 is greater than that of the protruding portion of the liquid-refrigerant supply pipe 143R of the reference example as illustrated in Fig. 6 .
- the length L1 of the liquid-refrigerant supply pipe 143 is, for example, double the length L1 of the liquid-refrigerant supply pipe 143R as illustrated in Fig. 6 .
- the length L2 of the gas-refrigerant supply pipe 144 in Embodiment 1 is equal to the length L2 of the gas-refrigerant supply pipe 144R as illustrated in Fig. 6 . Therefore, in Embodiment 1, as illustrated in Fig. 3 , the length L1 of the liquid-refrigerant supply pipe 143 is greater than the length L2 of the gas-refrigerant supply pipe 144.
- the spanner 1000 is easily engaged with the first portion 155 of the liquid-pipe joint 151a from below the relay unit 53, and the liquid-pipe flare nut 152a is easily tightened. That is, when the spanner 1000 is moved and engaged with the first portion 155 of the liquid-pipe joint 151a from below the relay unit 53, the gas-refrigerant supply pipe 144 does not interfere with movement of the spanner 1000. The spanner 1000 can thus be engaged at an appropriate angle with the first portion 155 of the liquid-pipe joint 151a. It is therefore possible to prevent deformation of the first portion 155 of the liquid-pipe joint 151a and deformation of the liquid-refrigerant supply pipe 143.
- the length L1 of the liquid-refrigerant supply pipe 143 as illustrated in Fig. 3 will be described. It should be noted that of the two ends of the first portion 155 of the liquid-pipe joint 151a in the axial direction, an end closer to the relay unit 53 will be referred to as "relay-unit-53-side end” and the other end will be referred to as "indoor-unit-52-side end”.
- the length L1 may be set such that the distance from the side surface B to the indoor-unit-side end of the first portion 155 of the liquid-pipe joint 151a is longer than the distance from the side surface B to the distal end of the gas-refrigerant supply pipe 144. To be more specific, as illustrated in Fig.
- the difference between the distance from the side surface B to the indoor-unit-52-side end of the first portion 155 of the liquid-pipe joint 151a and the distance from the side surface B to the distal end of the gas-refrigerant supply pipe 144 is a distance D.
- Fig. 3 illustrates a state in which the gas-pipe flare nut 152b is fitted to the distal end of the gas-refrigerant supply pipe 144.
- the position of the distal end of the gas-refrigerant supply pipe 144 is the position of one of ends of the gas-pipe flare nut 152b that is closer to the indoor unit 52.
- the distance D and the length L1 are set such that the distance D is longer than or equal to a predetermined first threshold Dth.
- the first threshold Dth is determined based on the thickness T of the spanner 1000. Specifically, it is preferable that the first threshold Dth be set to the value of the thickness T of the spanner 1000. For example, where the length S of the first portion 155 of the liquid-pipe joint 151a in the axial direction is 17 mm, the thickness T of a round spanner that is compliant with Japanese Industrial Standards (JIS) B 4630 is 8 mm.
- JIS Japanese Industrial Standards
- the first threshold Dth is set to 8 mm, and the length L1 is set such that the distance D is longer than or equal to the first threshold Dth.
- the spanner 1000 to be used is also changed.
- the thickness T of the spanner is changed.
- the first threshold Dth is appropriately set based on the thickness T of the changed spanner 1000, and the length L1 is set such that the distance D is longer than or equal to the first threshold Dth.
- the spanner is used in the example described above, it is not limiting, and another tool may be used. If another tool is used, it suffice that the first threshold Dth is appropriately set based on the thickness T of the tool.
- the liquid-refrigerant supply pipes 143 are arranged at regular intervals at the side surface B of the relay unit 53.
- the spanner 1000 it is preferable that the spanner 1000 could be rotated without contacting another liquid-refrigerant supply pipe 143. It is therefore also preferable that any adjacent two of the liquid-refrigerant supply pipes 143 be arranged apart from each other by a distance longer than or equal to a predetermined second threshold Wth.
- the spanner 1000 has a width W.
- the second threshold Wth is determined based on the width W of the spanner 1000.
- the second threshold Wth be set to 1/2 of the width W of the spanner 1000.
- the spanner 1000 can be rotated without contacting another liquid-refrigerant supply pipe 143.
- the gas-refrigerant supply pipes 144 it is preferable that that any adjacent two of the gas-refrigerant supply pipes 144 be arranged apart from each other by a distance longer than or equal to the second threshold Wt.
- the liquid-refrigerant supply pipes 143 are arranged at regular intervals, and the same is true of the gas-refrigerant supply pipes 144, it is not limiting. That is, it is not indispensable that the liquid-refrigerant supply pipes 143 are arranged at irregular intervals, and the gas-refrigerant supply pipes 144 are arranged at irregular intervals.
- the tool for use in the above example is the spanner, the tool is not limited to the spanner. Any other tool may be used.
- the second threshold Wth if another tool is used, it suffices that the second threshold Wth is appropriately set based on the width W of the tool.
- Fig. 4 is a partial side view of a configuration of another example of the refrigerant supply pipe of the relay unit 53 in Embodiment 1.
- Fig. 4 illustrates a liquid-pipe joint 151a of the refrigerant supply pipe in a modification of Embodiment 1.
- the liquid-pipe joint 151a includes the first portion 155 that is a hexagonal pipe, the second portion 156 to be fitted in the liquid-pipe flare nut 152a, and a third portion 153 brazed to the first pipe 161a of the liquid-refrigerant supply pipe 143.
- brazed portion 154 a portion that is brazed to the third portion 153 and the first pipe 161a of the liquid-refrigerant supply pipe 143 will be referred to as "brazed portion 154".
- the third portion 153 is located at one of ends of the first portion 155 that is closer to the relay unit 53.
- the second portion 156 is located at the other end of the first portion 155, that is, one of the ends of the first portion 155 that is closer to the indoor unit 52.
- the third portion 153 is formed in the shape of a circular tube. Thus, an outer circumferential portion and an inner circumferential portion of the third portion 153 are both circular.
- the shapes of the first portion 155 and the second portion 156 of the liquid-pipe joint 151a are basically the same as those of the first portion 155 and the second portion 156 of the liquid-pipe joint 151a in Embodiment 1. It should be noted that the outside diameter of the third portion 153 is smaller than that of the first portion 155. The outside diameter of the second portion 156 is smaller than that of the first portion 155. The outside diameter of the second portion 156 may be the same as or different from that of the third portion 153. As described above, the liquid-pipe joint 151a in the modification as illustrated in Fig. 4 includes the first portion 155, the second portion 156, and the third portion 153 that is formed in the shape of a circular tube.
- the third portion 153 which is brazed and fixed to the first pipe 161a of the liquid-refrigerant supply pipe 143 by the brazed portion 154, is formed in the shape of a circular tube, not a hexagonal tube.
- the length S of the first portion 155 of the liquid-pipe joint 151a in the axial direction is 17 mm.
- the length of the third portion 153 of the liquid-pipe joint 151a in the axial direction is 5 mm
- the length S of the first portion of the liquid-pipe joint 151a in the axial direction is 12 mm.
- the sum of the length of the first portion 155 and the length of the third portion 153 in the modification is the same as the length of the first portion 155 in Embodiment 1.
- the sum of the length of the first portion 155 and the length of the third portion 153 may be the same as or different from the length of the first portion 155 in Embodiment 1.
- Fig. 5 is a diagram illustrating the spanner located to hold the joint included in the refrigerant supply pipe as illustrated in Fig. 4.
- Fig. 5 illustrates the liquid-pipe joint 151a in the modification as illustrated in Fig. 4 .
- Fig. 9 is a diagram illustrating the spanner located to hold the joint in the reference example as illustrated in Fig. 7 .
- Fig. 9 illustrates the liquid-pipe joint 151aR in the reference example.
- Fig. 9 illustrates the spanner 1000 located to hold the liquid-pipe joint 151aR in the reference example.
- Fig. 9 is a side view except for a hatched area, which is illustrated as a section.
- the spanner 1000 is located close to the brazed portion 154R.
- the spanner 1000 is located only on thin part of the first portion 155R of the liquid-pipe joint 151aR, as a result of which the first portion 155R may be easily deformed.
- Fig. 5 illustrates the spanner 1000 located to hold the liquid-pipe joint 151a in the modification of Embodiment 1, which is illustrated in Fig. 4.
- Fig. 5 is a side view except for a hatched area, which is illustrated as a section.
- arrows P each indicate a direction in which a force is applied to the liquid-pipe joint 151a by the spanner 1000.
- the liquid-pipe joint 151a in the modification includes the third portion 153 formed in the shape of a circular tube, as described with reference to Fig. 4 .
- the spanner 1000 is located on the first portion 155 of the liquid-pipe joint 151a, but not on the third portion 153.
- the distance between the brazed portion 154 and the spanner 1000 is longer than that in the reference example as illustrated in Fig. 9 .
- this deformation does not affect the brazed portion 154.
- the spanner 1000 is located on thick part of the first portion 155 of the liquid-pipe joint 151a. Accordingly, the first portion 155 is not easily deformed.
- the gas-pipe joint 151b may be also formed to have a third portion 153 formed in the shape of a circular tube.
- the following is a description concerning the case where the gas-pipe joint 151b is formed to have a third portion 153 formed in the shape of a circular tube.
- the configuration of the gas-pipe joint 151b is basically the same as that of the liquid-pipe joint 151a, the gas-pipe joint 151b formed in the above manner will also be described with reference to Figs. 4 and 5 .
- reference signs 151a and 161a indicated in Figs. 4 and 5 are replaced by reference signs 151b and 161b.
- the gas-pipe joint 151b includes a first portion 155, a second portion 156, and a third portion 153.
- the first portion 155 of the gas-pipe joint 151b is provided at the distal end of the second pipe 161b.
- the second portion 156 of the gas-pipe joint 151b is provided at one of ends of the first portion 155 of the gas-pipe joint 151b that is closer to the indoor unit 52b, and is connected to the indoor heat exchanger 5b of the indoor unit 52b via the second liquid pipe 105b and the indoor expansion device 6b.
- the third portion 153 of the gas-pipe joint 151b is provided at an end portion of the first portion 155 of the gas-pipe joint 151b that is closer to the relay unit 53, and is brazed to the second pipe 161b of the gas-refrigerant supply pipe 144 by the brazed portion 154. Therefore, needless to say, in the case where the gas-pipe joint 151b includes the third portion 153, it is possible to obtain the same advantages as in the case where the liquid-pipe joint 151a includes the third portion 153.
- the relay unit 53 of Embodiment 1 includes the liquid-refrigerant supply pipe 143, which is the first refrigerant supply pipe, and the gas-refrigerant supply pipe 144, which is the second refrigerant supply pipe.
- the liquid-refrigerant supply pipe 143 and the gas-refrigerant supply pipe 144 protrude from the side surface B of the relay unit 53, that is, from the same side surface.
- the liquid-refrigerant supply pipe 143 is provided above the gas-refrigerant supply pipe 144.
- the length L1 of the protruding portion of the liquid-refrigerant supply pipe 143 that protrudes from the side surface B is set longer than the length L2 of the protruding portion of the gas-refrigerant supply pipe 144 that protrudes from the side surface B.
- the gas-refrigerant supply pipe 144 does not interfere with the connection work of connecting the liquid-refrigerant supply pipe 143, and the spanner 1000 can be moved and engaged with to the liquid-pipe joint 151a at an appropriate angle and the liquid-pipe flare nut 152a can thus be tightened by the spanner 1000. Therefore, the spanner 1000 is not engaged with the liquid-pipe joint 151a at an inappropriate angle. It is therefore possible to prevent deformation of the liquid-pipe joint 151a, thereby preventing damage to the brazed portion 154 and also occurrence of a refrigerant leak.
- the first refrigerant supply pipe is the liquid-refrigerant supply pipe 143
- the second refrigerant supply pipe is the gas-refrigerant supply pipe 144
- the first refrigerant supply pipe may be the gas-refrigerant supply pipe 144
- the second refrigerant supply pipe may be the liquid-refrigerant supply pipe 143.
- the length L1 of the first refrigerant supply pipe is set longer than the length L2 of the second refrigerant supply pipe. As a result, the workability at the time of connecting the first refrigerant supply pipe can be improved.
- the liquid-refrigerant supply pipe 143 includes the first pipe 161a and the liquid-pipe joint 151a, which is a first joint.
- the liquid-pipe joint 151a includes the first portion 155, the second portion 156, and the third portion 153.
- the first portion 155 of the first joint is provided at the distal end of the first pipe 161a.
- the second portion 156 is provided at one of the ends of the first portion 155 that is closer to the indoor unit 52a, and is connected to the indoor heat exchanger 5a of the indoor unit 52a.
- the third portion 153 is provided at one of the ends of the first portion 155 that is closer to the relay unit 53, and is fixed to the first pipe 161a by the brazed portion 154.
- the first portion 155, the second portion 156, and the third portion 153 are molded and formed integrally with each other.
- at least one of the first portion 155, the second portion 156, and the third portion 153 may be formed independently of the others, and then jointed to the others. Since the spanner 1000 is located on the first portion 155, the spanner 1000 is not located on the third portion 153.
- the spanner 1000 is located apart from the brazed portion 154 by a longer distance. Thus, even if the first portion 155 of the liquid-pipe joint 151a is deformed, this deformation does not easily affect the brazed portion 154. It is therefore possible to prevent formation of a crack in the brazed portion 154, thus preventing occurrence of a leak of the refrigerant.
- the gas-pipe joint 151b which is the second joint, may be formed to have the first portion 155, the second portion 156, and the third portion 153.
- the third portion 153 is fixed to the second pipe 161b by the brazed portion 154. Therefore, since the third portion 153 is located between the first portion 155 and the brazed portion 154, in the connection work, the spanner 1000 is located apart from the brazed portion 154 by a longer distance. Thus, even if the first portion 155 of the gas-pipe joint 151b is deformed, this deformation does not easily affect the brazed portion 154. Therefore, it is possible to prevent formation of a crack in the brazed portion 154, thus preventing occurrence of a leak of the refrigerant.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Compression-Type Refrigeration Machines With Reversible Cycles (AREA)
- Other Air-Conditioning Systems (AREA)
Claims (4)
- Klimatisierungsvorrichtung, die aufweist:eine Außeneinheit (51), die einen Außenwärmetauscher (2) umfasst;eine Inneneinheit (52), die einen Innenwärmetauscher (5a, 5b) umfasst; undeine Relaiseinheit (53), die zwischen der Außeneinheit (51) und der Inneneinheit (52) vorgesehen ist und die ein oder mehrere erste Kühlmittelzuführrohre (143) und ein oder mehrere zweite Kühlmittelzuführrohre (144) umfasst, die mit dem Innenwärmetauscher (5a, 5b) der Inneneinheit (52) verbunden sind,wobei das eine oder die mehreren ersten Kühlmittelzuführrohre (143) und das eine oder die mehreren zweiten Kühlmittelzuführrohre (144) aus einer Seitenfläche (B) der Relaiseinheit (53) vorstehen,das eine oder die mehreren ersten Kühlmittelzuführrohre (143) jeweils oberhalb eines verknüpften des einen oder der mehreren zweiten Kühlmittelzuführrohre (144) vorgesehen sind,eine Länge (L1) eines Teils des einen oder der mehreren ersten Kühlmittelzuführrohre (143), die aus der Seitenfläche (B) vorstehen, größer als eine Länge (L2) eines Teils des einen oder der mehreren zweiten Kühlmittelzuführrohre (144) ist, die aus der Seitenfläche (B) vorstehen,das eine oder die mehreren ersten Kühlmittelzuführrohre (143) jeweils umfassen: ein erstes Rohr (161a), das an der Seitenfläche (B) der Relaiseinheit (53) fixiert ist; und ein erstes Verbindungsstück (151a), das bei einem distalen Ende des ersten Rohrs (161a) lokalisiert ist,das erste Verbindungsstück (151a) aufweist: einen ersten Abschnitt (155), der bei dem distalen Ende des ersten Rohrs (161a) lokalisiert ist; einen zweiten Abschnitt (156), der bei einem der Enden des ersten Abschnitts (155) lokalisiert ist, das näher zur Inneneinheit (52) ist, wobei der zweite Abschnitt (156) mit dem Innenwärmetauscher (5a, 5b) der Inneneinheit (52) verbunden ist; einen dritten Abschnitt (153), der in der Form eines kreisförmigen Rohrs ausgebildet ist und der bei dem anderen Ende des ersten Abschnitts (155) lokalisiert ist, wobei das andere Ende des ersten Abschnitts (155) näher zur Relaiseinheit (53) ist; und einen hartgelöteten Abschnitt (154), der zwischen dem dritten Abschnitt (153) und dem ersten Rohr (161a) des ersten Kühlmittelzuführrohrs (143) lokalisiert ist, wobei der dritte Abschnitt (153) mit dem ersten Rohr (161a) des ersten Kühlmittelzuführrohrs (143) hartgelötet ist, undeine Entfernung (L2 + D) von der Seitenfläche (B) zu dem einen der Enden des ersten Abschnitts (155) länger als eine Entfernung (L2) von der Seitenfläche (B) zu einem distalen Ende des zweiten Kühlmittelzuführrohrs (144) ist.
- Klimatisierungsvorrichtung nach Anspruch 1, wobeidie Anzahl des einen oder der mehreren ersten Kühlmittelzuführrohre (143) zwei oder mehr ist, und die Anzahl des einen oder der mehreren zweiten Kühlmittelzuführrohre (144) zwei oder mehr ist,irgendwelche zwei benachbarten des einen oder der mehreren ersten Kühlmittelzuführrohre (143) beabstandet voneinander vorgesehen sind, undirgendwelche zwei benachbarten des einen oder der mehreren zweiten Kühlmittelzuführrohre (144) beabstandet voneinander vorgesehen sind.
- Klimatisierungsvorrichtung nach Anspruch 1 oder 2, wobeidas eine oder die mehreren zweiten Kühlmittelzuführrohre (144) jeweils umfassen: ein zweites Rohr (161b), das an der Seitenfläche (B) der Relaiseinheit (53) fixiert ist; und ein zweites Verbindungsstück (151b), das bei einem distalen Ende des zweiten Rohrs (161b) lokalisiert ist,das zweite Verbindungsstück (151b) einen ersten Abschnitt (155), einen zweiten Abschnitt (156), einen dritten Abschnitt (153) und einen hartgelöteten Abschnitt (154) umfasst,der erste Abschnitt (155) des zweiten Verbindungsstücks (151b) bei dem distalen Ende des zweiten Rohrs (161b) lokalisiert ist,der zweite Abschnitt (156) des zweiten Verbindungsstücks (151b) bei einem der Enden des ersten Abschnitts (155) des zweiten Verbindungsstücks (151b) lokalisiert ist, das näher zur Inneneinheit (52) ist, und mit dem Innenwärmetauscher (5a, 5b) der Inneneinheit (52) verbunden ist, undder dritte Abschnitt (153) des zweiten Verbindungsstücks (151b) in der Form eines kreisförmigen Rohrs ausgebildet ist, bei dem anderen Ende des ersten Abschnitts (155) des zweiten Verbindungsstücks (151b) lokalisiert ist und an dem zweiten Rohr (161b) eines verknüpften des einen oder der mehreren zweiten Kühlmittelzuführrohre (144) durch den hartgelöteten Abschnitt (154) des zweiten Verbindungsstücks (151b) fixiert ist, wobei das andere Ende des ersten Abschnitts (155) näher zur Relaiseinheit (53) ist.
- Klimatisierungsvorrichtung nach einem der Ansprüche 1 bis 3, wobeidas eine oder die mehreren ersten Kühlmittelzuführrohre (143) jeweils ein Flüssigkühlmittelzuführrohr sind, durch welches flüssiges Kühlmittel fließt, unddas eine oder die mehreren zweiten Kühlmittelzuführrohre (144) jeweils ein Gaskühlmittelzuführrohr sind, durch welches Gaskühlmittel strömt.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2019/019539 WO2020230321A1 (ja) | 2019-05-16 | 2019-05-16 | 空気調和装置 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP3971494A1 EP3971494A1 (de) | 2022-03-23 |
| EP3971494A4 EP3971494A4 (de) | 2022-05-18 |
| EP3971494B1 true EP3971494B1 (de) | 2023-12-27 |
Family
ID=73289146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP19928505.7A Active EP3971494B1 (de) | 2019-05-16 | 2019-05-16 | Klimatisierungsvorrichtung |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20220154949A1 (de) |
| EP (1) | EP3971494B1 (de) |
| JP (1) | JP7118258B2 (de) |
| WO (1) | WO2020230321A1 (de) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2023057646A (ja) * | 2021-10-12 | 2023-04-24 | 東尾メック株式会社 | ヘッダー構造体 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2502194B2 (ja) * | 1990-12-20 | 1996-05-29 | 三菱電機株式会社 | 空気調和装置 |
| JP3235189B2 (ja) | 1992-06-25 | 2001-12-04 | 三菱電機株式会社 | 空気調和装置 |
| JP3132198B2 (ja) * | 1992-10-29 | 2001-02-05 | 松下電器産業株式会社 | 空気調和機の冷媒分岐箱 |
| JP2002277003A (ja) * | 2001-03-19 | 2002-09-25 | Fujitsu General Ltd | 空気調和機 |
| JP4375111B2 (ja) * | 2004-05-14 | 2009-12-02 | 三菱電機株式会社 | 空気調和装置の冷媒回路分岐ユニット |
| WO2010119555A1 (ja) * | 2009-04-17 | 2010-10-21 | 三菱電機株式会社 | 熱媒体変換機及び空気調和装置 |
| KR20150072991A (ko) * | 2013-12-20 | 2015-06-30 | 엘지전자 주식회사 | 냉매관 연결부재 |
-
2019
- 2019-05-16 WO PCT/JP2019/019539 patent/WO2020230321A1/ja not_active Ceased
- 2019-05-16 JP JP2021519231A patent/JP7118258B2/ja active Active
- 2019-05-16 EP EP19928505.7A patent/EP3971494B1/de active Active
- 2019-05-16 US US17/437,547 patent/US20220154949A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| EP3971494A4 (de) | 2022-05-18 |
| JPWO2020230321A1 (ja) | 2021-11-04 |
| WO2020230321A1 (ja) | 2020-11-19 |
| JP7118258B2 (ja) | 2022-08-15 |
| US20220154949A1 (en) | 2022-05-19 |
| EP3971494A1 (de) | 2022-03-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5467604A (en) | Multiroom air conditioner and driving method therefor | |
| US9062787B2 (en) | Valve block, and valve block unit | |
| US20210131706A1 (en) | Air conditioner and indoor unit | |
| CN101231016B (zh) | 多联式空调机的管道连接检查装置及其方法 | |
| US11022354B2 (en) | Air conditioner | |
| US20200318853A1 (en) | Ceiling-embedded air-conditioning apparatus | |
| EP3797856A1 (de) | Anpassbares drucklufttrocknersystem mit mehreren einheiten | |
| GB2451722A (en) | Piping kit for air conditioning apparatus and air handling unit having the same | |
| KR100631539B1 (ko) | 멀티형 공기조화기의 통신선 오결선 검출시스템 및 방법 | |
| EP3971494B1 (de) | Klimatisierungsvorrichtung | |
| JP4482675B2 (ja) | マルチ形空気調和装置の切換ユニット | |
| US20050150247A1 (en) | Outdoor unit of air conditioner | |
| EP0834707B1 (de) | Ausseneinheit für eine klimaanlage mit getrennten geräten | |
| US11940176B2 (en) | Refrigerant flow path switching unit and air conditioner including the same | |
| US11536466B2 (en) | Systems and methods for gas valve assembly of an HVAC system | |
| JPH0643652Y2 (ja) | 空気調和機 | |
| KR101321535B1 (ko) | 공기조화기의 분지관 | |
| JPWO2022059136A5 (de) | ||
| CN215490058U (zh) | 一种空调室外机及空调器 | |
| EP4438962A1 (de) | Deckenklimaanlage | |
| KR20050111276A (ko) | 멀티 에어컨의 접속관 및 그 배관연결방법 | |
| US20180106486A1 (en) | Flexible tubing for hvac system | |
| KR200326219Y1 (ko) | 멀티에어컨의 냉매배관구조 | |
| JPH04320763A (ja) | 冷凍装置 | |
| JPH05157325A (ja) | 空気調和機 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20210915 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20220419 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F16K 27/00 20060101ALI20220411BHEP Ipc: F24F 1/32 20110101ALI20220411BHEP Ipc: F25B 41/00 20210101AFI20220411BHEP |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F16K 27/00 20060101ALI20230203BHEP Ipc: F24F 1/32 20110101ALI20230203BHEP Ipc: F25B 41/00 20060101AFI20230203BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20230221 |
|
| GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| INTC | Intention to grant announced (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20230802 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230921 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602019044265 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240328 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240328 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240327 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20231227 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1644874 Country of ref document: AT Kind code of ref document: T Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240327 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240427 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240427 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240429 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240429 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602019044265 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20240930 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240516 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240516 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240531 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20240531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240516 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240531 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20250327 Year of fee payment: 7 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250402 Year of fee payment: 7 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20190516 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20190516 |