EP3849019A1 - Conductor connecting terminal - Google Patents
Conductor connecting terminal Download PDFInfo
- Publication number
- EP3849019A1 EP3849019A1 EP21150398.2A EP21150398A EP3849019A1 EP 3849019 A1 EP3849019 A1 EP 3849019A1 EP 21150398 A EP21150398 A EP 21150398A EP 3849019 A1 EP3849019 A1 EP 3849019A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- conductor
- spring
- section
- busbar
- connection terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004020 conductor Substances 0.000 title claims abstract description 361
- 239000011810 insulating material Substances 0.000 claims abstract description 34
- 238000003780 insertion Methods 0.000 claims description 57
- 230000037431 insertion Effects 0.000 claims description 57
- 238000007373 indentation Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 description 7
- 238000000926 separation method Methods 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000012546 transfer Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 230000007704 transition Effects 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000012777 electrically insulating material Substances 0.000 description 3
- 230000002349 favourable effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000003825 pressing Methods 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 230000001154 acute effect Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008092 positive effect Effects 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/28—Clamped connections, spring connections
- H01R4/48—Clamped connections, spring connections utilising a spring, clip, or other resilient member
- H01R4/4809—Clamped connections, spring connections utilising a spring, clip, or other resilient member using a leaf spring to bias the conductor toward the busbar
- H01R4/4828—Spring-activating arrangements mounted on or integrally formed with the spring housing
- H01R4/48365—Spring-activating arrangements mounted on or integrally formed with the spring housing with integral release means
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/28—Clamped connections, spring connections
- H01R4/48—Clamped connections, spring connections utilising a spring, clip, or other resilient member
- H01R4/4809—Clamped connections, spring connections utilising a spring, clip, or other resilient member using a leaf spring to bias the conductor toward the busbar
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R9/00—Structural associations of a plurality of mutually-insulated electrical connecting elements, e.g. terminal strips or terminal blocks; Terminals or binding posts mounted upon a base or in a case; Bases therefor
- H01R9/22—Bases, e.g. strip, block, panel
- H01R9/24—Terminal blocks
- H01R9/2491—Terminal blocks structurally associated with plugs or sockets
Landscapes
- Installation Of Bus-Bars (AREA)
- Connections Arranged To Contact A Plurality Of Conductors (AREA)
- Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)
Abstract
Die Erfindung betrifft eine Leiteranschlussklemme (1) zum Anschluss elektrischer Leiter (2) an eine Stromschiene (3), wobei die Leiteranschlussklemme ein Isolierstoffgehäuse (22), eine Stromschiene und eine Klemmfeder (4) hat, und wobei die Klemmfeder einen Klemmschenkel (5) und einen an der Stromschiene gelagerten Anlageschenkel (6) hat, die durch einen Federbogen (7) miteinander verbunden sind, wobei der Anlageschenkel vom Federbogen ausgehend hinter der Auflagerung (8) des Anlageschenkels an der Stromschiene einen elastischen, auslenkbaren Federabschnitt mit einer Auflaufschräge (10) zur Führung des anzuschließenden Leiters hat.The invention relates to a conductor connection terminal (1) for connecting electrical conductors (2) to a busbar (3), the conductor connection terminal having an insulating material housing (22), a busbar and a clamping spring (4), and the clamping spring having a clamping leg (5). and has a contact limb (6) mounted on the busbar, which are connected to one another by a spring bow (7), the contact limb, starting from the spring bow, behind the support (8) of the contact limb on the busbar, an elastic, deflectable spring section with a run-up bevel (10) ) has to guide the conductor to be connected.
Description
Die Erfindung betrifft eine Leiteranschlussklemme zum Anschluss elektrischer Leiter an eine Stromschiene. Die Leiteranschlussklemme hat ein Isolierstoffgehäuse, eine Stromschiene und eine Klemmfeder. Die Klemmfeder hat einen Klemmschenkel und einen an der Stromschiene gelagerten Anlageschenkel. Der Klemmschenkel und der Anlageschenkel sind durch einen Federbogen miteinander verbunden.The invention relates to a conductor connection terminal for connecting electrical conductors to a busbar. The conductor connection terminal has an insulating material housing, a busbar and a clamping spring. The clamping spring has a clamping leg and a contact leg mounted on the busbar. The clamping leg and the contact leg are connected to one another by a spring bow.
Derartige Leiteranschlussklemmen sind bereits aus dem Stand der Technik bekannt. Gemäß der
Die
Die
Gemäß der
Vor diesem Hintergrund ist es Aufgabe der Erfindung, eine Leiteranschlussklemme mit einem kompakten Aufbau und verbesserter Kontaktierung bereitzustellen.Against this background, it is the object of the invention to provide a conductor connection terminal with a compact structure and improved contacting.
Die Aufgabe wird durch eine Leiteranschlussklemme gemäß Anspruch 1 gelöst. Vorteilhafte Ausführungsformen der Leiteranschlussklemme sind den Unteransprüchen zu entnehmen.The object is achieved by a conductor connection terminal according to
Es wird vorgeschlagen, dass der Anlageschenkel der Klemmfeder vom Federbogen ausgehend hinter der Auflagerung des Anlageschenkels an der Stromschiene einen elastischen, auslenkbaren Federabschnitt mit einer Auflaufschräge zur Führung des anzuschließenden Leiters hat.It is proposed that the contact leg of the clamping spring, starting from the spring arch, behind the support of the contact leg on the busbar, has an elastic, deflectable spring section with a bevel for guiding the conductor to be connected.
Hierdurch wird eine Leiteranschlussklemme bereitgestellt, mit der der anzuschließende Leiter nicht nur mit dem Klemmschenkel, sondern zusätzlich mit einem Federabschnitt des Anlageschenkels zuverlässig kontaktiert und geklemmt wird. Durch die Auslenkbarkeit und Elastizität des Federabschnitts können elektrische Leiter unterschiedlichen Durchmessers sicher gehalten und mit ausreichender Federkraft beaufschlagt werden. Leiter mit großem Leiterquerschnitt bzw. -durchmesser werden aufgrund der Auslenkbarkeit des Federabschnitts mit genügend Federkraft seitens des Klemmschenkels und des Federabschnitts beaufschlagt, ohne dass der Leiter beispielsweise durch Quetschen, Pressen, Drücken, Klemmen oder Zwängen o.ä. eine unerwünschte Verformung erfährt. Jedoch werden auch Leiter mit kleinem Leiterquerschnitt bzw. -durchmesser aufgrund des Federabschnitts, der in diesem Fall eine geringere Auslenkung durch den eingeführten Leiter erfährt, und des Klemmschenkels besonders sicher kontaktiert und geklemmt. Mit einem Auflaufen des Leiters auf die Auflaufschräge entsteht in Abhängigkeit des Leiterquerschnitts und Leiterdurchmessers eine unterschiedliche Kontaktüberlappung.This provides a conductor connection terminal with which the conductor to be connected is reliably contacted and clamped not only with the clamping leg, but also with a spring section of the contact leg. Due to the deflectability and elasticity of the spring section, electrical conductors can be different Diameter can be held securely and applied with sufficient spring force. Due to the deflectability of the spring section, conductors with a large conductor cross-section or diameter are subjected to sufficient spring force on the part of the clamping leg and the spring section without the conductor experiencing undesirable deformation, for example through squeezing, pressing, pressing, clamping or forcing or the like. However, even conductors with a small conductor cross-section or diameter are contacted and clamped particularly securely due to the spring section, which in this case experiences less deflection due to the inserted conductor, and the clamping leg. When the conductor runs up on the run-up slope, a different contact overlap arises depending on the conductor cross-section and conductor diameter.
In dieser Anmeldung sind die unbestimmten Artikel "ein/eine" als solche und nicht als Zahlwörter zu verstehen und haben den Wortsinn von "mindestens ein/eine".In this application, the indefinite articles “a” are to be understood as such and not as numerals and have the literal meaning of “at least one”.
Durch die Elastizität des Federabschnitts ist auch die Auflaufschräge an jeden in die Leiteranschlussklemme eingeführten Leiter optimal angepasst, da der Federabschnitt entsprechend dem Leiterdurchmesser ausgelenkt wird und sich die Auflaufschräge hierdurch selbst optimal positioniert. Die Auslenkung des Federabschnitts und die Federkraft stehen in Abhängigkeit zu dem Querschnitt des eingeführten Leiters. Leiter mit kleinerem Querschnitt bewirken eine geringere Auslenkung und eine geringere Anpresskraft des Federabschnitts. Leiter mit größerem Querschnitt bewirken eine größere Auslenkung und eine größere Anpresskraft des Federabschnitts. Dabei wird unter Anpresskraft eine Kraft verstanden, die in Normalrichtung gegen einen anderen Körper wirkt und sich bei gleichmäßig verteilter Belastung aus dem mit der Fläche multiplizierten Druck ergibt. Somit ist die Funktion der Auflaufschräge nicht mehr von der Leitereinsteckkraft, sondern von der Federkraft des Federabschnitts abhängig, sodass das Einführen eines elektrischen Leiters erleichtert ist.Due to the elasticity of the spring section, the run-up bevel is also optimally adapted to each conductor inserted into the conductor connection terminal, since the spring section is deflected according to the conductor diameter and the run-up bevel itself is optimally positioned as a result. The deflection of the spring section and the spring force are dependent on the cross section of the inserted conductor. Conductors with a smaller cross section cause less deflection and less pressing force of the spring section. Conductors with a larger cross section cause a greater deflection and a greater contact pressure of the spring section. In this context, the contact force is understood to mean a force which acts in the normal direction against another body and which results from the pressure multiplied by the area when the load is uniformly distributed. Thus, the function of the run-up slope is no longer dependent on the conductor insertion force, but on the spring force of the spring section, so that the insertion of an electrical conductor is made easier.
Trotz der großen Bandbreite von Leiterquerschnitten und -durchmessern, die mit der erfindungsgemäßen Leiteranschlussklemme verbindbar sind, wird eine kleinbauende Lösung mit einfachen Klemmfeder- und Stromschienengeometrien bereitgestellt. Somit ist die Leiteranschlussklemme auch für Anwendungen mit geringen Bauräumen und Platzverhältnissen geeignet. Überdies ist die Leiteranschlussklemme einfach und kostengünstig herstellbar, insbesondere aufgrund der unkomplizierten Klemmfeder- und Stromschienenkonstruktion, die zudem als Kontakteinsatz vormontierbar ist. Der Kontakteinsatz ist ohne Schwierigkeiten entgegen einer Entformungsrichtung eines Isolierstoffgehäuses einsetzbar, sodass auch die Montage der Leiteranschlussklemme erleichtert und beschleunigt ist.Despite the wide range of conductor cross-sections and diameters that can be connected to the conductor connection terminal according to the invention, a compact solution with simple clamping spring and busbar geometries is provided. The conductor connection terminal is therefore also suitable for applications with limited installation spaces and space. In addition, the conductor connection terminal can be produced simply and inexpensively, in particular due to the uncomplicated clamping spring and busbar construction, which can also be preassembled as a contact insert. The contact insert can be used against a demolding direction of an insulating material housing without difficulty, so that the assembly of the conductor connection terminal is also facilitated and accelerated.
Bei dem elastischen, auslenkbaren Federabschnitt des Anlageschenkels handelt es sich um einen Bereich zwischen dem freien Ende des Anlageschenkels und dem Federbogen, genauer zwischen dem freien Ende des Anlageschenkels und der Auflagerung des Anlageschenkels an der Stromschiene. Somit ist ein Teil des Anlageschenkels, nämlich der als Federabschnitt ausgebildete Teil, gegenüber einer Ausgangsposition verlagerbar. Diese Verlagerung erfolgt entgegen der Federkraft des Federabschnitts und erzeugt somit eine Vorspannung in dem Federabschnitt, die als Federkraft auf einen an dem Federabschnitt anliegenden elektrischen Leiter wirkt. Es ist nicht ausgeschlossen, dass weitere Teile des Anlageschenkels, wie beispielsweise ein Abschnitt zwischen Federbogen und Auflagerung des Anlageschenkels auf der Stromschiene, ebenfalls eine gewisse Elastizität oder Auslenkbarkeit haben. Grundsätzlich können die weiteren Teile des Anlageschenkels abseits des Federabschnitts jedoch auch eine höhere Steifigkeit als im Federabschnitt haben, um eine stabile Abstützung der Klemmfeder gegen die Stromschiene und/oder das Isolierstoffgehäuse zu ermöglichen.The elastic, deflectable spring section of the contact leg is an area between the free end of the contact leg and the spring bow, more precisely between the free end of the contact leg and the support of the contact leg on the busbar. Thus, a part of the contact leg, namely the part designed as a spring section, can be displaced with respect to a starting position. This displacement takes place against the spring force of the spring section and thus generates a preload in the spring section, which acts as a spring force on an electrical conductor lying against the spring section. It cannot be ruled out that further parts of the contact leg, such as a section between the spring bow and the support of the contact leg on the busbar, also have a certain elasticity or deflectability. In principle, however, the other parts of the contact leg apart from the spring section can also have a higher rigidity than in the spring section in order to enable stable support of the clamping spring against the busbar and / or the insulating material housing.
Der Federabschnitt kann sich ausgehend von der Auflagerung an der Stromschiene vom Auflagerungspunkt bis zum freien Ende erstrecken, um eine möglichst hohe Elastizität und Auslenkbarkeit des Federabschnitts zu ermöglichen. Der Federabschnitt kann jedoch auch von dem Auflagerungspunkt beabstandet und/oder von dem freien Ende beabstandet sein, um einen stabileren Anlageschenkel bereitzustellen.Starting from the support on the busbar, the spring section can extend from the support point to the free end in order to enable the spring section to be as elastic and deflectable as possible. However, the spring section can also be spaced apart from the point of support and / or spaced apart from the free end in order to provide a more stable contact leg.
Innerhalb der Leiteranschlussklemme ist die Klemmfeder derart angeordnet, dass in Leitereinführungsrichtung gesehen das freie Ende des Anlageschenkels hinter dem freien Ende des Klemmschenkels angeordnet ist. Somit ist der Klemmschenkel näher an einer Leitereinführungsöffnung angeordnet als der Anlageschenkel. Mit anderen Worten ist der Klemmschenkel der Schenkel der Klemmfeder, der einer Leitereinführungsöffnung zugewandt ist, während der Anlageschenkel ein von der Leitereinführungsöffnung abgewandter Schenkel der Klemmfeder ist.The clamping spring is arranged inside the conductor connection terminal in such a way that, viewed in the direction of conductor insertion, the free end of the contact leg is arranged behind the free end of the clamping leg. Thus the clamp leg is closer arranged on a conductor entry opening as the contact leg. In other words, the clamping leg is the leg of the clamping spring which faces a conductor insertion opening, while the contact leg is a leg of the clamping spring facing away from the conductor insertion opening.
Für die Stromschiene sind grundsätzlich mehrere geometrische Gestaltungen denkbar. So kann sich ein erster Abschnitt der Stromschiene im Wesentlichen parallel zur Leitereinführungsrichtung erstrecken, während ein zweiter Abschnitt der Stromschiene in einem Winkel von dem ersten Abschnitt abragt, sich beispielsweise quer zu diesem erstreckt. Der erste und der zweite Abschnitt können eine an eine T-Form angenäherte Geometrie haben. Der zweite Abschnitt kann sich auch unter spitzen oder stumpfen Winkeln von dem ersten Abschnitt aus erstrecken. Das von dem ersten Abschnitt abgewandte Ende des zweiten Abschnitts kann in einen dritten Abschnitt der Stromschiene übergehen, der sich im Wesentlichen parallel zur Leitereinführungsrichtung auf einer einem eingeführten Leiter gegenüberliegenden Seite des Isolierstoffgehäuses erstreckt.In principle, several geometric designs are conceivable for the busbar. Thus, a first section of the busbar can extend essentially parallel to the conductor insertion direction, while a second section of the busbar protrudes from the first section at an angle, for example extends transversely to the latter. The first and second sections can have a geometry approximating a T-shape. The second section can also extend from the first section at acute or obtuse angles. The end of the second section facing away from the first section can merge into a third section of the busbar, which extends essentially parallel to the conductor insertion direction on a side of the insulating material housing opposite an inserted conductor.
Die Auflagerung des Anlageschenkels auf der Stromschiene kann auf vielfältige Weise erfolgen, wobei die Stromschiene sowohl als Festlager als auch als Loslager für den Anlageschenkel ausgebildet sein kann. Zur Auflagerung des Anlageschenkels kann die Stromschiene, insbesondere der zweite Abschnitt der Stromschiene, eine Ausnehmung haben, durch die der Anlageschenkel der Klemmfeder geführt ist, sodass der Anlageschenkel an dem zweiten Abschnitt der Stromschiene gelagert ist. Die Stromschiene kann weitere Ausnehmungen haben und beispielsweise auch den Klemmschenkel der Klemmfeder lagern.The support leg can be supported on the busbar in a variety of ways, wherein the busbar can be designed both as a fixed bearing and as a loose bearing for the contact leg. To support the contact limb, the busbar, in particular the second section of the busbar, can have a recess through which the contact limb of the clamping spring is guided so that the contact limb is supported on the second section of the busbar. The busbar can have further recesses and, for example, also support the clamping leg of the clamping spring.
Zusätzlich zur Auflagerung des Anlageschenkels auf der Stromschiene kann die Klemmfeder weitere Lagerpunkte innerhalb der Leiteranschlussklemme haben. Beispielsweise können der Anlageschenkel und/oder der Federbogen auf oder an Innenflächen des Isolierstoffgehäuses aufliegen oder anliegen.In addition to the support leg resting on the busbar, the clamping spring can have additional bearing points within the conductor connection terminal. For example, the contact leg and / or the spring bow can rest or rest on the inner surfaces of the insulating material housing.
Die Auflaufschräge des Federabschnitts dient der Führung des anzuschließenden Leiters. Bei einer Auflaufschräge handelt es sich um eine gewinkelt zu dem eingeführten Leiter angestellte Auflagefläche, die durch die Anstellung ein allmähliches Auflaufen des Leiters auf den Anlageschenkel mit reduziertem Einführwiderstand und somit ein erleichtertes Einführen des Leiters ermöglicht. Der reduzierte Einführwiderstand wird durch die elastische Auslenkbarkeit des Federabschnitts noch weiter verbessert, da sich die Auflaufschräge in ihrer Position und in ihrer Winkelung dem jeweiligen eingeführten Leiter anpasst. Die Auflaufschräge kann in einem nicht ausgelenkten Zustand beispielsweise einen Winkel zwischen 30 und 60 Grad mit einem eingeführten Leiter einschließen, während sie in einem ausgelenkten Zustand einen Winkel zwischen 10 und 40 Grad mit dem Leiter einschließt.The run-up slope of the spring section is used to guide the conductor to be connected. A run-up bevel is a support surface that is angled to the inserted conductor and enables the conductor to gradually run onto the contact leg with reduced insertion resistance and thus easier insertion of the conductor. The reduced insertion resistance is further improved by the elastic deflectability of the spring section, since the position and angle of the run-up slope adapt to the respective inserted conductor. In a non-deflected state, the run-up slope can, for example, enclose an angle between 30 and 60 degrees with an inserted conductor, while in a deflected state it encloses an angle between 10 and 40 degrees with the conductor.
Durch den Federabschnitt des Anlageschenkels und durch den Klemmschenkel der Klemmfeder kann jeweils ein eine Klemmstelle bildender Kontaktpunkt zwischen einem anschließbaren elektrischen Leiter und der Stromschiene herstellbar sein. Unter einer Klemmstelle wird ein Bereich einer elektrischen Kontaktierung zwischen einem Anschlusselement, beispielsweise einer Stromschiene, und einem elektrischen Leiter verstanden. Durch den von dem Federabschnitt gebildeten Kontaktpunkt und den durch den Klemmschenkel gebildeten Kontaktpunkt liegen bei einem eingeführten Leiter zu jeder Zeit zwei Kontaktpunkte vor, sodass die Zuverlässigkeit der Kontaktierung sowie die insgesamt auf den Leiter wirkende Flächenpressung verbessert ist. Selbstverständlich kann die Klemmkraft des Federabschnitts und des Klemmschenkels durch geeignete Schenkelformen auf weitere Kontaktpunkte aufgeteilt sein.The spring section of the contact leg and the clamping leg of the clamping spring can be used to produce a contact point between a connectable electrical conductor and the busbar that forms a clamping point. A terminal point is understood to mean an area of electrical contact between a connection element, for example a busbar, and an electrical conductor. As a result of the contact point formed by the spring section and the contact point formed by the clamping leg, there are always two contact points for an inserted conductor, so that the reliability of the contact and the overall surface pressure acting on the conductor are improved. Of course, the clamping force of the spring section and of the clamping leg can be distributed to further contact points by means of suitable leg shapes.
Der Federabschnitt des Anlageschenkels der Klemmfeder kann einen Endanschlag für den elektrischen Leiter haben. Hierdurch wird eine zuverlässige Kammertrennung bei Mehrfachanschlussklemmen, wie beispielsweise Doppelanschlussklemmen, gewährleistet. Weiterhin wird die Länge des eingeführten Leiterabschnitts begrenzt und das Leiterende vor einem Kontakt mit anderen Klemmenbestandteilen geschützt. Durch die einteilige Ausformung des Endanschlags mit dem Anlageschenkel der Klemmfeder wird eine besonders einfache Gestaltung eines Leiteranschlags zur Verfügung gestellt, da der Endanschlag nicht durch andere, aufwendiger herzustellende Komponenten wie beispielsweise das Isolierstoffgehäuse bereitgestellt werden muss.The spring section of the contact leg of the clamping spring can have an end stop for the electrical conductor. This ensures reliable chamber separation in the case of multiple connection terminals, such as double connection terminals. Furthermore, the length of the inserted conductor section is limited and the conductor end is protected from contact with other terminal components. The one-piece molding of the end stop with the contact leg of the clamping spring provides a particularly simple design of a conductor stop, since the end stop does not have to be provided by other components that are more complex to manufacture, such as the insulating housing.
Dies wirkt sich zudem positiv auf die Entformungsmöglichkeiten an Werkzeugen sowie auf die möglichen Montagetechniken aus. Der Endanschlag selbst kann ebenso wie der restliche Federabschnitt eine elastische Auslenkbarkeit für eine optimale Anpassung des Anschlags an einen eingeführten Leiter und einen reduzierten Einführwiderstand haben. Für eine stabile Anschlagsfunktion ist jedoch eine Ausgestaltung des Endanschlags sinnvoll, bei der der Endanschlag eine höhere Steifigkeit als der restliche Federabschnitt hat.This also has a positive effect on the demoulding options on tools and the possible assembly techniques. The end stop itself, like the rest of the spring section, can have elastic deflectability for optimal adaptation of the stop to an inserted conductor and a reduced insertion resistance. For a stable stop function, however, it makes sense to design the end stop in which the end stop is more rigid than the rest of the spring section.
Durch die elastische Auslenkbarkeit des Federabschnitts wirken die Auflaufschräge und der Endanschlag auf günstige Weise zusammen. Die Auflaufschräge verlagert sich beziehungsweise gibt einem eingeführten Leiter nach, sodass dieser mit wenig Einführwiderstand bis zum Endanschlag geführt wird. In konventionellen Klemmfederkonstruktionen mit vergleichsweise starren Auflaufschrägen kann es hingegen dazu kommen, dass Leiter an der Schrägen blockieren und zulasten der Kontaktüberlappung nicht oder nur mit erhöhter Leitereinsteckkraft bis zu einem möglicherweise vorhandenen Anschlag geführt werden können. Vorliegend ist jedoch durch die Verlagerbarkeit des Federabschnitts ein Erreichen des Endanschlags auch bei geringer Einsteckkraft gewährleistet. Überdies wird durch die Verlagerung des Federabschnitts in Abhängigkeit des Leiterdurchmessers sichergestellt, dass das Leiterende den Endanschlag trifft und nicht hieran vorbei geführt wird, wie es beispielsweise bei Leitern mit kleinem Durchmesser und einteilig mit Isolierstoffgehäusen ausgeformten Endanschlägen vorkommen kann.Due to the elastic deflectability of the spring section, the run-up slope and the end stop cooperate in a favorable manner. The run-up slope shifts or gives way to an inserted conductor so that it is guided to the end stop with little insertion resistance. In conventional spring clip constructions with comparatively rigid run-up bevels, however, it can happen that conductors block on the bevels and, to the detriment of the contact overlap, cannot be guided up to a possibly existing stop or can only be guided with increased conductor insertion force. In the present case, however, the displaceability of the spring section ensures that the end stop is reached even with a low insertion force. In addition, the displacement of the spring section depending on the conductor diameter ensures that the conductor end hits the end stop and is not guided past it, as can occur, for example, with conductors with a small diameter and end stops formed in one piece with insulating material housings.
Die Stromschiene und/oder das Isolierstoffgehäuse können eine Einbuchtung, eine Ausnehmung oder eine Öffnung zur Aufnahme des Endanschlags haben. Hierdurch kann der Endanschlag größer oder länger ausgeführt werden, als es bei einer Leiteranschlussklemme mit im Bereich des Endanschlags geschlossener Stromschiene und/oder geschlossenem Isolierstoffgehäuse möglich wäre. Im unausgelenkten Zustand kann der Endanschlag somit zumindest abschnittsweise in die Stromschiene und/oder das Isolierstoffgehäuse eintauchen. Somit trägt ein solcher versenkbarer Endanschlag zu einer kompakteren Bauform bei. Auch bei eingeführten Leitern mit geringem Leitungsdurchmesser, bei denen der Federabschnitt gegebenenfalls nur geringfügig ausgelenkt ist, kann der Endanschlag zumindest abschnittsweise von der Stromschiene und/oder dem Isolierstoffgehäuse aufgenommen sein. Durch die zumindest teilweise Aufnahme in der Stromschiene und/oder dem Isolierstoffgehäuse wird ein weiterer Lagerpunkt der Klemmfeder bereitgestellt und somit der Anlageschenkel der Klemmfeder insgesamt mechanisch stabilisiert. Durch die Einbuchtung, Ausnehmung oder Öffnung der Stromschiene und/oder des Isolierstoffgehäuses kann durch die größere mögliche Ausdehnung des Endanschlags eine höhere Bandbreite an für die Leiteranschlussklemme geeigneten Leiterdurchmessern realisiert werden. So kann auch für größere Leiterdurchmesser bei Mehrfachanschlussklemmen eine zuverlässige Kammertrennung gewährleistet werden.The busbar and / or the insulating material housing can have an indentation, a recess or an opening for receiving the end stop. As a result, the end stop can be made larger or longer than would be possible with a conductor connection terminal with a busbar and / or a closed insulating material housing in the area of the end stop. In the undeflected state, the end stop can thus dip into the busbar and / or the insulating material housing, at least in sections. Such a retractable end stop thus contributes to a more compact design. Even with inserted conductors with a small line diameter, in which the spring section is possibly only slightly deflected, the end stop can at least in sections from the Be included busbar and / or the insulating housing. As a result of the at least partial accommodation in the busbar and / or the insulating material housing, a further bearing point of the clamping spring is provided and thus the contact leg of the clamping spring is mechanically stabilized overall. Due to the indentation, recess or opening of the busbar and / or the insulating material housing, a higher bandwidth of conductor diameters suitable for the conductor connection terminal can be realized through the greater possible extension of the end stop. In this way, reliable chamber separation can be guaranteed even for larger conductor diameters with multiple connection terminals.
Der Endanschlag kann sich unmittelbar an die Auflaufschräge des Federabschnitts des Anlageschenkels anschließen. Hiermit wird eine besonders kurze und kompakte Bauform der Klemmfeder bereitgestellt. Die Auflaufschräge geht unmittelbar in den Endanschlag über und führt einen eingesteckten elektrischen Leiter direkt auf den Anschlag zu.The end stop can directly adjoin the run-up slope of the spring section of the contact leg. This provides a particularly short and compact design of the clamping spring. The run-up slope goes directly into the end stop and leads an inserted electrical conductor directly to the stop.
Der Endanschlag kann in einem Winkel von der Auflaufschräge abragen. Unter Berücksichtigung des Anstellwinkels der Auflaufschräge bezüglich eines eingeführten Leiters ist es günstig, wenn der Endanschlag in einem stumpfen Winkel von der Auflaufschräge abragt. Es kann sich durch den Winkel zwischen Endanschlag und Auflaufschräge ergeben, dass sich der Endanschlag quer, also in einem rechten Winkel zu der Leitereinführungsrichtung erstreckt. Hierdurch trifft das Leiterende eines eingeführten Leiters gleichmäßig auf die Fläche des Endanschlags.The end stop can protrude from the run-up slope at an angle. Taking into account the angle of inclination of the run-up slope with respect to an inserted conductor, it is advantageous if the end stop protrudes from the run-up slope at an obtuse angle. The angle between the end stop and the run-up slope can result in the end stop extending transversely, that is to say at a right angle, to the conductor insertion direction. As a result, the end of an inserted conductor hits the surface of the end stop evenly.
Es kann auch ein Absatz an dem Federabschnitt des Anlageschenkels zwischen dem Endanschlag und der Auflaufschräge vorgesehen sein, der im Wesentlichen rechtwinklig zu dem Endanschlag verläuft. Ein solcher Absatz, der gemeinsam mit dem Endanschlag eine rechtwinklige Aufnahme für den Leiter bildet, ist optimal an die übliche zylindrische oder rechteckige Form eines Leiterendes angepasst. Ein eingeführter Leiter liegt auf dem Absatz im Vergleich zur Auflaufschräge gerader und sicherer auf. Auch bei größeren Auslenkungen des Federabschnitts durch größere Leiterdurchmesser stellt sich eine verbesserte Führung des Leiters ein.A shoulder can also be provided on the spring section of the contact leg between the end stop and the run-up slope, which is essentially at right angles to the end stop. Such a shoulder, which together with the end stop forms a right-angled receptacle for the conductor, is optimally adapted to the usual cylindrical or rectangular shape of a conductor end. An inserted ladder rests straighter and more securely on the ledge compared to the run-up slope. Even with larger deflections of the spring section due to larger conductor diameters, improved guidance of the conductor results.
Die Stromschiene kann an mindestens einem Kontaktpunkt, der eine Klemmstelle für einen anschließbaren elektrischen Leiter bildet, eine zum Leiter hin gerichtete Erhebung haben. Unter einer Erhebung wird ein ausgestelltes Material der Stromschiene verstanden. Die Erhebung liegt beispielsweise als Vorsprung, Nase, Absatz, Wölbung oder Erhöhung vor. Die Erhebung kann mit einer Querschnittsvergrößerung oder Querschnittsverlagerung der Stromschiene einhergehen. Durch die Erhebung an einem Kontaktpunkt wird eine verbesserte Kontaktierung zwischen Stromschiene und Leiter erreicht. An den deutlicher definierten Kontaktpunkten liegt ein konzentrierter und fokussierter Stromübergang vor. Die Stromschiene kann Erhebungen in Abhängigkeit der Anzahl an Kontaktpunkten haben. So können beispielsweise bei zwei Kontaktpunkten, die jeweils durch den Klemmschenkel und den Federabschnitt des Anlageschenkels gebildet werden, zwei Erhebungen vorhanden sein. Es ist jedoch auch genauso denkbar, weniger Erhebungen als Kontaktpunkte vorzusehen, um beispielsweise nur am Klemmschenkel oder am Federabschnitt einen konzentrierteren Stromübergang zu bewirken. Die Erhebungen der Stromschiene liegen vorteilhafterweise in einem ersten Abschnitt der Stromschiene vor, der im Wesentlichen parallel zur Leitereinführungsrichtung verläuft und an dem ein eingeführter Leiter zur Anlage und Kontaktierung kommt.The busbar can have an elevation directed towards the conductor at at least one contact point which forms a clamping point for a connectable electrical conductor. A survey is understood to mean an exposed material of the busbar. The elevation is present, for example, as a projection, nose, paragraph, bulge or elevation. The elevation can be accompanied by an increase in cross-section or a shift in the cross-section of the busbar. The elevation at a contact point improves the contact between the busbar and the conductor. There is a concentrated and focused current transfer at the more clearly defined contact points. The busbar can have elevations depending on the number of contact points. For example, with two contact points, which are each formed by the clamping leg and the spring section of the contact leg, two elevations can be present. However, it is also just as conceivable to provide fewer elevations than contact points in order, for example, to bring about a more concentrated current transfer only on the clamping leg or on the spring section. The elevations of the busbar are advantageously present in a first section of the busbar, which runs essentially parallel to the conductor insertion direction and on which an inserted conductor comes to rest and make contact.
Der Federabschnitt des Anlageschenkels kann zwischen der Auflaufschräge und der Auflagerung an der Stromschiene eine Abknickung haben. Unter einer solchen Abknickung wird ein gewinkelter Verlauf des Anlageschenkels mit einer Richtungsänderung oder Änderung der Erstreckung im Bereich der Abknickung bzw. eines die Abknickung kennzeichnenden Abknickpunktes verstanden. Vorliegend bildet ein solcher Abknickpunkt einen definierten Drehpunkt, um den der Federabschnitt auslenkbar ist. In dem Abknickpunkt kann auch ein Übergang von einem steiferen Abschnitt des Anlageschenkels zu einem elastischen, auslenkbaren Abschnitt des Anlageschenkels stattfinden. Es können auch mehrere Abknickungen vorgesehen sein, sodass der Federabschnitt einen mehrfach abgewinkelten Verlauf hat. Bei beengten Platzverhältnissen wird der Federabschnitt durch einen mehrfach abgewinkelten Verlauf effektiv verlängert und somit die mögliche erzielbare Federkraft oder Elastizität des Federabschnittes erhöht.The spring section of the contact leg can have a kink between the run-up bevel and the support on the busbar. Such a kink is understood to mean an angled course of the contact leg with a change in direction or change in extension in the area of the kink or a kink point characterizing the kink. In the present case, such a kink point forms a defined pivot point around which the spring section can be deflected. A transition from a stiffer section of the contact leg to an elastic, deflectable section of the contact leg can also take place at the kink point. Several kinks can also be provided so that the spring section has a course that is angled several times. In the case of confined spaces, the spring section is effectively lengthened by a multiple angled course and thus the possible achievable spring force or elasticity of the spring section is increased.
Der Klemmschenkel der Klemmfeder kann zwischen seinem freien Ende und dem Federbogen eine Abwinkelung haben. Hierbei kann das freie Ende des Klemmschenkels steiler in Richtung der Stromschiene verlaufen als der in Richtung Federbogen verlaufende Abschnitt des Klemmschenkels. Durch den steileren Anlauf bildet der Klemmschenkel an einem eingeführten Leiter eine Klemmkante, durch die die Pressung auf eine geringere Fläche konzentriert wird und somit ein verbesserter Stromübergang ermöglicht wird. Überdies wird die Breite der Klemmfeder in Leitereinführungsrichtung verringert und somit eine kürzere Bauform der Leiteranschlussklemme ermöglicht. Das freie Ende des Klemmschenkels kann steiler in Richtung eines ersten Abschnitts der Stromschiene verlaufen, der im Wesentlichen parallel zur Leitereinführungsrichtung verläuft und an dem ein eingeführter Leiter zur Anlage und Kontaktierung kommt.The clamping leg of the clamping spring can have an angle between its free end and the spring arch. Here, the free end of the clamping leg can run more steeply in the direction of the busbar than the section of the clamping leg extending in the direction of the spring arch. Due to the steeper approach, the clamping leg forms a clamping edge on an inserted conductor, through which the pressure is concentrated on a smaller area and thus an improved current transfer is made possible. In addition, the width of the clamping spring in the conductor insertion direction is reduced and thus a shorter design of the conductor connection terminal is made possible. The free end of the clamping leg can run more steeply in the direction of a first section of the busbar which runs essentially parallel to the conductor insertion direction and on which an inserted conductor comes to rest and make contact.
Die Länge des Klemmschenkels ausgehend vom Scheitelpunkt des Federbogens bis zum freien Ende des Klemmschenkels kann der Länge des Anlageschenkels ausgehend vom Scheitelpunkt des Federbogens bis zum Beginn der Auflaufschräge entsprechen. Da der Klemmschenkel in Abhängigkeit des Leiterdurchmessers des eingeführten Leiters elastisch auslenkbar ist, behindert die Auflaufschräge die Auslenkung die Verlagerung des Klemmschenkels gemäß der vorliegenden Ausführungsform nicht. Dies unterstützt die erzielbare hohe Bandbreite an mit der Leiteranschlussklemme verwendbaren Leiterdurchmessern.The length of the clamping leg starting from the apex of the spring arch to the free end of the clamping leg can correspond to the length of the contact leg starting from the apex of the spring arch to the start of the run-up slope. Since the clamping leg is elastically deflectable as a function of the conductor diameter of the inserted conductor, the run-up slope does not hinder the deflection and the displacement of the clamping leg according to the present embodiment. This supports the achievable wide range of conductor diameters that can be used with the conductor connection terminal.
Die Leiteranschlussklemme kann als Doppelanschluss mit einem bevorzugt symmetrischen Aufbau ausgebildet sein, in dem jeweils eine Stromschiene und Klemmfeder in einer Hälfte im Wesentlichen gespiegelt zueinander angeordnet und von einem gemeinsamen Isolierstoffgehäuse umgeben sind. Hierbei werden die erfindungsgemäß erzielten Bauraumvorteile besonders effektiv genutzt, da die Kompaktheit der Klemmenkonstruktion auf beiden Seiten der Doppelanordnung zum Tragen kommt. Bei einer Symmetrie ist überdies die Montage des Doppelanschlusses erleichtert, da keine baulichen Unterschiede zwischen beiden Anschlussseiten bestehen und bei der Herstellung lediglich die Spiegelbildlichkeit beider Anschlussseiten zu beachten ist.The conductor connection terminal can be designed as a double connection with a preferably symmetrical structure in which a busbar and clamping spring are arranged in one half essentially mirrored to one another and are surrounded by a common insulating material housing. The installation space advantages achieved according to the invention are used particularly effectively here, since the compactness of the terminal construction comes into play on both sides of the double arrangement. In the case of symmetry, the assembly of the double connection is also facilitated, since there are no structural differences between the two connection sides and only the mirror image of both connection sides has to be taken into account during production.
Bei der als Doppelanschluss vorgesehenen Leiteranschlussklemme ist insbesondere von einer Leiteranschlussklemme mit zwei gegenüberliegenden Leitereinführungsöffnungen auszugehen, das heißt, die Leiter werden in entgegengesetzten Leitereinführungsrichtungen von zwei Seiten aufeinander zu in die Anschlussklemme eingeführt.In the case of the conductor connection terminal provided as a double connection, a conductor connection terminal with two opposite conductor entry openings is to be assumed, that is, the conductors are inserted into the connection terminal in opposite conductor entry directions from two sides towards one another.
Mehrfach-Leiteranschlussklemmen sind gemäß dieser Anmeldung nicht auf Doppelanschlüsse beschränkt, sondern umfassen beispielsweise auch Dreifachanschlüsse, bei der drei elektrische Leiter in einer T-Form aufeinander zu gesteckt werden.According to this application, multiple conductor connection terminals are not restricted to double connections, but also include, for example, triple connections in which three electrical conductors are plugged into one another in a T-shape.
Die Erfindung wird nachfolgend anhand von Ausführungsbeispielen mit den beigefügten Zeichnungen näher erläutert. Es zeigen in schematischer Weise:
Figur 1- - einen Querschnitt der Leiteranschlussklemme in einer Ausführungsform;
Figur 2- - einen Querschnitt der Leiteranschlussklemme in einer weiteren Ausführungsform;
- Figur 3
- - einen Querschnitt einer als Doppelanschluss ausgeführten Leiteranschlussklemme mit einem eingesteckten Leiter;
Figur 4- - einen Querschnitt einer als Doppelanschluss ausgeführten Leiteranschlussklemme mit zwei eingesteckten Leitern;
Figur 5- - eine Seitenansicht der Leiteranschlussklemme in Leitereinsteckrichtung;
Figur 6- - einen Querschnitt der Leiteranschlussklemme in einer weiteren Ausführungsform.
- Figure 1
- - A cross section of the conductor connection terminal in one embodiment;
- Figure 2
- - A cross section of the conductor connection terminal in a further embodiment;
- Figure 3
- - A cross section of a conductor connection terminal designed as a double connection with an inserted conductor;
- Figure 4
- - A cross section of a conductor connection terminal designed as a double connection with two inserted conductors;
- Figure 5
- - A side view of the conductor connection terminal in the conductor insertion direction;
- Figure 6
- - A cross section of the conductor connection terminal in a further embodiment.
Die Leiteranschlussklemme 1 hat ein Isolierstoffgehäuse 22, das die Bauteile der Leiteranschlussklemme 1 vor äußeren physikalischen und chemischen Einwirkungen schützt und aus einem elektrisch isolierenden Material wie beispielsweise Kunststoff besteht. Das Isolierstoffgehäuse 22 umgibt die Leiteranschlussklemme 1 nahezu vollständig, enthält jedoch zumindest eine Leitereinführungsöffnung 23 zum Einführen eines elektrischen Leiters 2 in die Leiteranschlussklemme 1.The
Die Leiteranschlussklemme 1 hat eine Klemmfeder 4. Die Klemmfeder 4 hat einen Klemmschenkel 5 und einen Anlageschenkel 6. Der Klemmschenkel 5 und der Anlageschenkel 6 sind über einen Federbogen 7 miteinander verbunden, sodass sich zumindest an der Basis der Klemmfeder 4 eine U-Form ergibt. In Leitereinführungsrichtung RL gesehen, also ausgehend von der Leitereinführungsöffnung 23, ist das freie Ende 20 des Anlageschenkels 6 hinter dem freien Ende 19 des Klemmschenkels 5 angeordnet. Die Klemmfeder 4 stützt sich vorliegend mit ihrem Federbogen 7 gegen das Isolierstoffgehäuse 22 ab, während der Klemmschenkel 5 und der Anlageschenkel 6 in den von dem Isolierstoffgehäuse 22 eingeschlossenen Innenraum, auch Leiteranschlussraum genannt, hineinragen. Der Anlageschenkel 6 ist zusätzlich an der Stromschiene 3, beispielsweise an dem zweiten Abschnitt 3b der Stromschiene 3 gelagert, sodass sich der Anlageschenkel 6 auch gegen die Stromschiene 3 abstützt. Hierzu hat die Stromschiene 3 in ihrem zweiten Abschnitt 3b eine Ausnehmung, durch die der Anlageschenkel 6 geführt ist, sodass der Anlageschenkel 6 an dem zweiten Abschnitt 3b der Stromschiene 3 gelagert ist. Die Stelle der Durchführung des Anlageschenkels 6 durch die Stromschiene 3, an der der Anlageschenkel 6 auf der Stromschiene 3 aufliegt, wird als Auflagerung 8 bezeichnet. Ausgehend von der Auflagerung 8 in Richtung des freien Endes 20 des Anlageschenkels 6 erstreckt sich ein elastischer, auslenkbarer Federabschnitt 9 mit einer Auflaufschräge 10 zur Führung des Leiters 2.The
Der Anlageschenkel 6 erstreckt sich somit ausgehend von dem Federbogen 7 in Richtung des Leiters 2 und bildet mit seinem Federabschnitt 9 zusätzlich zum Klemmschenkel 5 eine weitere Federunterstützung zum Klemmen des Leiters 2 gegen die Stromschiene 3. Aufgrund der Elastizität des Federabschnitts 9 wird dieser beim Einführen eines Leiters 2 in Abhängigkeit des Leiterdurchmessers verlagert und passt sich somit unterschiedlichen Leiterquerschnitten an. Bei größeren Leiterdurchmessern wird der Federabschnitt 9 von dem Leiter 2 weiter nach unten, in Richtung des dritten Abschnitts 3c der Stromschiene 3 gedrückt. Bei kleineren Leiterdurchmessern wird der Federabschnitt 9 weniger ausgelenkt. In beiden Fällen wirkt die Federkraft des Federabschnitts 9 auf den Leiter 2 zu, sodass der Leiter 2 seinem Durchmesser entsprechend stark gegen die Stromschiene 3, vorliegend gegen den ersten Abschnitt 3a der Stromschiene 3, gepresst wird. Durch die Federkräfte des Federabschnitts 9 und des Klemmschenkels 5 bilden sich Kontaktpunkte zwischen dem Leiter 2 und der Stromschiene 3 aus. Somit liegt durch den Federabschnitt 9 des Anlageschenkels 6 und durch den Klemmschenkel 5 der Klemmfeder 4 jeweils ein eine Klemmstelle bildender Kontaktpunkt zwischen dem Leiter 2 und der Stromschiene 3 vor. An diesen Kontaktpunkten findet ein konzentrierter Stromübergang statt, der durch eine Erhebung 16 der Stromschiene 3 an zumindest einem Kontaktpunkt noch weiter verbessert werden kann. Die Stromschiene 3 kann somit an mindestens einem Kontaktpunkt, der eine Klemmstelle für einen anschließbaren elektrischen Leiter 2 bildet, eine zum Leiter 2 hin gerichtete Erhebung 16 haben.The
Durch den elastischen Federabschnitt 9 können verschiedene Leiter 2 mit unterschiedlichen Durchmessern zuverlässig gehalten werden, ohne Quetschungen zu unterliegen.By means of the
Gemeinsam mit dem Federabschnitt 9 ist auch die Auflaufschräge 10 elastisch und auslenkbar, sodass diese bei einem Einführen des Leiters 2 verlagert wird und somit dem eingeführten Leiter 2 nur einen geringen Widerstand entgegensetzt. Die Funktion der Auflaufschräge 10 hängt somit nicht mehr von der Leitereinsteckkraft, sondern von der Federkraft des Federabschnitts 9 ab. Die Auflaufschräge 10 dient dazu, die Leitereinführbewegung zu begrenzen und den Leiter 2 auch bei einem schiefen, also gewinkelten Einstecken wieder in Richtung Stromschiene 3 bzw. ersten Abschnitt 3a der Stromschiene 3 zu führen, um so die Leitereinsteckrichtung zu korrigieren. Die Auflaufschräge 10 verläuft, wie in
Gemäß
Der Federabschnitt 9 des Anlageschenkels 6 der Klemmfeder 4 hat einen Endanschlag 12 für den elektrischen Leiter 2. Hierdurch wird die Einführungslänge des Leiters 2 begrenzt. Das Leiterende des Leiters 2 wird von dem Endanschlag 12 aufgenommen und vor Kontakt mit anderen Klemmenbestandteilen geschützt. Insbesondere wird somit auch eine Kammertrennung gewährleistet, wie sie bei Mehrfachanschlüssen wie beispielsweise Doppelanschlüssen gewünscht wird. Des Weiteren wird eine konstante Kontaktüberlappung auch bei unterschiedlichen Leiterquerschnitten bewirkt.The
Gemäß
Durch den elastischen Federabschnitt 9 wird der Endanschlag 12 bei einer Verlagerung des Federabschnitts 9 durch einen eingeführten Leiter 2 automatisch an die richtige Position zur Aufnahme des Leiterendes geführt. Durch die ebenfalls verlagerte Auflaufschräge 10 erreicht der Leiter 2 zuverlässig die gewünschte Position im Bereich des Endanschlags 12. Es wird verhindert, dass der Leiter 2 an dem Endanschlag 12 vorbei geführt wird, wie es beispielsweise bei Leitern mit kleinem Durchmesser und einteilig mit Isolierstoffgehäusen ausgeformten Endanschlägen vorkommen kann.By the
Zur Betätigung der Leiteranschlussklemme 1 weist diese einen Drücker 24 auf. Mithilfe des beispielsweise handkraftbetätigten Drückers 24 kann der Klemmschenkel 5 manuell in Richtung des Anlageschenkels 6 verlagert werden, um einen Leiter 2 wie insbesondere auch mehrdrähtige Leiter 2 leichter einführen oder wieder lösen und zwischen dem Klemmschenkel 6 und der Stromschiene 3 positionieren zu können.To operate the
Bei der in
Die Stromschiene 3 und die Klemmfeder 4 können als Kontakteinsatz vormontiert und entgegen einer Entformungsrichtung RE des Isolierstoffgehäuses 22 in einer Montagerichtung RM in das Isolierstoffgehäuse 22 eingesetzt werden. Hierdurch ist eine besonders einfache und kostengünstige Herstellung und Montage der Leiteranschlussklemme 1 gewährleistet. Dies wird unter anderem durch die einfache Geometrie der Stromschiene 3 und der Klemmfeder 4 ermöglicht, da beispielsweise der Endanschlag 12 und die Anlaufschräge 10 bereits Teile der Klemmfeder 4 und damit des Kontakteinsatzes sein können und somit nicht durch entsprechende Ausformungen des Isolierstoffgehäuses 22 gebildet sein müssen, die wiederum die Montage des Kontakteinsatzes erschweren könnten.The busbar 3 and the
In
In
Die
Die Stromschiene 3 kann in jeder Klemmenhälfte K1, K2 in drei Abschnitte 3a, 3b, 3c unterteilt werden. Ein erster Abschnitt 3a verläuft im Wesentlichen parallel zur jeweiligen Leitereinführungsrichtung RL. Der erste Abschnitt 3a ist der Abschnitt der Stromschiene 3, an dem der eingeführte Leiter 2 anliegt und den der Leiter 2 elektrisch kontaktiert. Zusätzlich drückt eine Klemmfeder 4 den Leiter 2 gegen den ersten Abschnitt 3a der Stromschiene 3. Der zweite Abschnitt 3b der Stromschiene 3 ragt in einem Winkel von dem ersten Abschnitt 3a ab, beispielsweise kann er rechtwinklig abragen, sodass sich der zweite Abschnitt 3b im Wesentlichen quer zu dem ersten Abschnitt 3a erstreckt. Der zweite Abschnitt 3b kann quer zur Leitereinführungsrichtung RL verlaufen. An dem zweiten Abschnitt 3b ist ein Anlageschenkel 6 der Klemmfeder 4 gelagert. Der zweite Abschnitt 3b kann in einen dritten Abschnitt 3c der Stromschiene 3 übergehen. Der Übergang kann über einen Winkel oder eine Biegung erfolgen. Der dritte Abschnitt 3c kann wiederum parallel zum ersten Abschnitt 3a oder zur Leitereinführungsrichtung RL verlaufen. Der dritte Abschnitt 3c befindet sich auf einer dem ersten Abschnitt 3a gegenüberliegenden Seite der Leiteranschlussklemme 1. Zwischen dem ersten Abschnitt 3a und dem dritten Abschnitt 3c der Stromschiene 3 sind die Schenkel der Klemmfeder 4 angeordnet. Die Stromschiene 3 hat eine einfache Geometrie und kann problemlos als Massenbauteil hergestellt werden.The busbar 3 can be divided into three sections 3a, 3b, 3c in each clamp half K 1 , K 2. A first section 3a runs essentially parallel to the respective conductor insertion direction R L. The first section 3a is the section of the busbar 3 on which the inserted
Es können jeweils eine gesonderte Stromschiene 3 in jeder Klemmenhälfte K1, K2 vorliegen, sodass die Stromschienen 3 nicht miteinander verbunden sind. Günstig ist es jedoch, wenn eine gemeinsame Stromschiene 3 für beide Klemmenhälften K1, K2 vorgesehen ist und die Stromschiene 3 der Klemmenhälfte K1 somit, beispielsweise im dritten Abschnitt 3c, in die Stromschiene 3 der Klemmenhälfte K2 übergeht.There can be a separate busbar 3 in each clamp half K 1 , K 2 , so that the busbars 3 are not connected to one another. However, it is favorable if a common busbar 3 for both clamp halves K 1 , K 2 is provided and the busbar 3 of the clamp half K 1 thus merges into the busbar 3 of the clamp half K 2, for example in the third section 3c.
Die Leiteranschlussklemme 1 hat ein gemeinsames Isolierstoffgehäuse 22 für beide Klemmenhälften K1, K2, das die Bauteile der Leiteranschlussklemme 1 vor äußeren physikalischen und chemischen Einwirkungen schützt und aus einem elektrisch isolierenden Material wie beispielsweise Kunststoff besteht. Das Isolierstoffgehäuse 22 umgibt die Leiteranschlussklemme 1 nahezu vollständig, enthält jedoch zwei Leitereinführungsöffnungen 23 zum Einführen elektrischer Leiter 2 in die Leiteranschlussklemme 1.The
Die Leiteranschlussklemme 1 hat in jeder Klemmenhälfte K1, K2 eine Klemmfeder 4. Jede der beiden Klemmfedern 4 hat einen Klemmschenkel 5 und einen Anlageschenkel 6. Der Klemmschenkel 5 und der Anlageschenkel 6 sind über einen Federbogen 7 miteinander verbunden, sodass sich zumindest an der Basis der Klemmfedern 4 eine U-Form ergibt. In Leitereinführungsrichtung RL gesehen, also ausgehend von der jeweiligen Leitereinführungsöffnung 23, ist das freie Ende 20 des Anlageschenkels 6 hinter dem freien Ende 19 des Klemmschenkels 5 angeordnet. Die Klemmfeder 4 stützt sich vorliegend mit ihrem Federbogen 6 gegen das Isolierstoffgehäuse 22 ab, während der Klemmschenkel 5 und der Anlageschenkel 6 in den von dem Isolierstoffgehäuse 22 eingeschlossenen Innenraum, auch Leiteranschlussraum genannt, hineinragen. Der Anlageschenkel 6 ist zusätzlich an der Stromschiene 3, vorliegend an dem jeweiligen zweiten Abschnitt 3b der Stromschiene 3 gelagert, sodass sich der Anlageschenkel 6 auch gegen die Stromschiene 3 abstützt. Hierzu hat die Stromschiene 3 in ihrem jeweiligen zweiten Abschnitt 3b eine Ausnehmung, durch die der Anlageschenkel 6 geführt ist, sodass der Anlageschenkel 6 an dem zweiten Abschnitt 3b der Stromschiene 3 gelagert ist. Die Stelle der Durchführung des Anlageschenkels 6 durch die Stromschiene 3, an der der Anlageschenkel 6 auf der Stromschiene 3 aufliegt, wird als Auflagerung 8 bezeichnet. Ausgehend von der Auflagerung 8 in Richtung des freien Endes 20 des Anlageschenkels 6 erstreckt sich ein elastischer, auslenkbarer Federabschnitt 9 mit einer Auflaufschräge 10 zur Führung des Leiters 2.The conductor connection terminal 1 has a
Der Anlageschenkel 6 jeder Klemmfeder 4 erstreckt sich somit ausgehend von dem Federbogen 7 in Richtung des Leiters 2 und bildet mit seinem Federabschnitt 9 zusätzlich zum Klemmschenkel 5 eine weitere Federunterstützung zum Klemmen des jeweiligen Leiters 2 gegen die Stromschiene 3. Aufgrund der Elastizität des Federabschnitts 9 wird dieser beim Einführen eines Leiters 2 in Abhängigkeit des Leiterdurchmessers verlagert und passt sich somit unterschiedlichen Leiterquerschnitten an. Bei größeren Leiterdurchmessern wird der Federabschnitt 9 von dem jeweiligen Leiter 2 weiter nach unten, in Richtung des dritten Abschnitts 3c der Stromschiene 3 gedrückt. Bei kleineren Leiterdurchmessern wird der Federabschnitt 9 weniger ausgelenkt. In beiden Fällen wirkt die Federkraft des Federabschnitts 9 auf den Leiter 2 zu, sodass der Leiter 2 unabhängig von seinem Durchmesser gegen die Stromschiene 3, vorliegend gegen den ersten Abschnitt 3a der Stromschiene 3, gepresst wird. Durch die Federkräfte des Federabschnitts 9 und des Klemmschenkels 5 bilden sich, wie in den
Durch den elastischen Federabschnitt 9 können verschiedene Leiter 2 mit unterschiedlichen Durchmessern zuverlässig gehalten werden, ohne Quetschungen zu unterliegen.By means of the
Gemeinsam mit dem Federabschnitt 9 ist auch die Auflaufschräge 10 elastisch und auslenkbar, sodass diese bei einem Einführen eines Leiters 2 verlagert wird und somit dem eingeführten Leiter 2 nur einen geringen Widerstand entgegensetzt. Die Funktion der Auflaufschräge 10 hängt somit nicht mehr von der Leitereinsteckkraft, sondern von der Federkraft des Federabschnitts 9 ab. Die Auflaufschräge 10 dient dazu, die Leitereinführbewegung zu begrenzen und den Leiter 2 auch bei einem schiefen, also gewinkelten Einstecken wieder in Richtung Stromschiene 3 bzw. ersten Abschnitt 3a der Stromschiene 3 zu führen, um so die Leitereinsteckrichtung zu korrigieren. Die Auflaufschräge 10 verläuft, wie in den
In den
Der Endanschlag 12 ist vorteilhafterweise, wie in den
Durch den elastischen Federabschnitt 9 wird der Endanschlag 12 bei einer Verlagerung des Federabschnitts 9 durch einen eingeführten Leiter 2 automatisch an die richtige Position zur Aufnahme des Leiterendes geführt. Durch die ebenfalls verlagerte Auflaufschräge 10 erreicht der Leiter 2 zuverlässig die gewünschte Position im Bereich des Endanschlags 12. Es wird verhindert, dass der Leiter 2 an dem Endanschlag 12 vorbei geführt wird, wie es beispielsweise bei Leitern mit kleinem Durchmesser und einteilig mit Isolierstoffgehäusen ausgeformten Endanschlägen vorkommen kann.By the
Die Funktion der Auflaufschräge 10 und des Endanschlags 12 ist insbesondere in Figur 4 gut nachvollziehen. In der Klemmenhälfte K1 stößt gerade ein in der Einführung befindlicher Leiter 2 auf die Auflaufschräge 10 und beginnt hierdurch mit der Auslenkung des Federabschnitts 9. Folglich gibt der Federabschnitt 9 dem Leiter 2 nach und die Auflaufschräge 10 verlagert sich ebenfalls nach unten, sodass gleichzeitig auch der Winkel zwischen der Auflaufschrägen 10 und dem Leiter 2 reduziert wird. Durch diese Verlagerung und Winkelverkleinerung ist der Einführwiderstand beim Einführen des Leiters 2 gemindert. Bei Fortsetzung des Einführvorgangs wird der Leiter 2 weiter in Leitereinführungsrichtung RL geschoben, bis das Leiterende an den Endanschlag 12 trifft, wie es in der Klemmenhälfte K2 ersichtlich ist. In dieser Endposition wird der Federabschnitt 9 nicht weiter verlagert, sondern der Federabschnitt 9 spannt durch seine Federkraft den Leiter 2 vor und drückt ihn somit gegen den ersten Abschnitt 3a der Stromschiene 3.The function of the run-
Zur Betätigung der Leiteranschlussklemme 1 weist diese in jeder Klemmenhälfte K1, K2 einen Drücker 24 auf. Mithilfe des handkraftbetätigten Drückers 24 kann der Klemmschenkel 5 manuell in Richtung des Anlageschenkels 6 verlagert werden, um einen Leiter 2 leichter einführen und zwischen dem Klemmschenkel 6 und der Stromschiene 3 positionieren zu können.To operate the
In den
Die Leiteranschlussklemme 1 in
Die Leiteranschlussklemme 1 hat eine Stromschiene 3, die sich in vier Abschnitte 3a, 3b, 3c, 3d unterteilen lässt. Ein erster Abschnitt 3a verläuft im Wesentlichen parallel zur Leitereinführungsrichtung RL. Der erste Abschnitt 3a ist der Abschnitt der Stromschiene 3, an dem ein eingeführter Leiter anliegt und den der Leiter elektrisch kontaktiert. Zusätzlich drückt eine Klemmfeder 4 den Leiter gegen den ersten Abschnitt 3a der Stromschiene 3. Der zweite Abschnitt 3b der Stromschiene 3 ragt in einem Winkel von dem ersten Abschnitt 3a ab, beispielsweise kann er rechtwinklig abragen, sodass sich der zweite Abschnitt 3b im Wesentlichen quer zu dem ersten Abschnitt 3a erstreckt. Der zweite Abschnitt 3b kann quer zur Leitereinführungsrichtung RL verlaufen. An dem zweiten Abschnitt 3b ist ein Anlageschenkel 6 der Klemmfeder 4 gelagert. Der erste Abschnitt 3a kann in einen dritten Abschnitt 3c übergehen, insbesondere über einen Winkel oder eine Biegung. Der dritte Abschnitt 3c verläuft bevorzugt etwa parallel zu dem zweiten Abschnitt 3b. Der dritte Abschnitt 3c geht an seinem dem Übergang zum ersten Abschnitt 3a gegenüberliegenden Ende in einen vierten Abschnitt 3d über, insbesondere über einen Winkel oder eine Biegung.The
Die Klemmfeder 4 stützt sich einerseits gegen das Isolierstoffgehäuse 22, andererseits mit ihrem Anlageschenkel 6 gegen den zweiten Abschnitt 3b der Stromschiene 3 ab. Die Klemmfeder 4 weist zusätzlich zum Anlageschenkel 6 einen Klemmschenkel 5 auf, der mit dem Anlageschenkel 6 über einen Federbogen 7 verbunden ist. Zwischen dem freien Ende des Anlageschenkels 6 und der Auflagerung 8 des Anlageschenkels 6 auf der Stromschiene 3 hat der Anlageschenkel 6 einen elastischen, auslenkbaren Federabschnitt 9 mit einer Auflaufschräge 10 zur Führung eines anzuschließenden Leiters.The clamping
Durch den elastischen Federabschnitt 9 können verschiedene Leiter 2 mit unterschiedlichen Durchmessern zuverlässig gehalten werden, ohne Quetschungen zu unterliegen.By means of the
Gemeinsam mit dem Federabschnitt 9 ist auch die Auflaufschräge 10 elastisch und auslenkbar, sodass diese bei einem Einführen eines Leiters verlagert wird und somit dem eingeführten Leiter nur einen geringen Widerstand entgegensetzt. Die Funktion der Auflaufschräge 10 hängt somit nicht mehr von der Leitereinsteckkraft, sondern von der Federkraft des Federabschnitts 9 ab. Die Auflaufschräge 10 dient dazu, die Leitereinführbewegung zu begrenzen und den Leiter auch bei einem schiefen, also gewinkelten Einstecken wieder in Richtung Stromschiene 3 bzw. ersten Abschnitt 3a der Stromschiene 3 zu führen, um so die Leitereinsteckrichtung zu korrigieren.Together with the
In
- 11
- LeiteranschlussklemmeConductor connection terminal
- 22
- Leiterladder
- 33
- StromschieneBusbar
- 3a3a
- erster Abschnitt Stromschienefirst section busbar
- 3b3b
- zweiter Abschnitt Stromschienesecond section busbar
- 3c3c
- dritter Abschnitt Stromschienethird section busbar
- 3d3d
- vierter Abschnitt Stromschienefourth section busbar
- 44th
- KlemmfederClamp spring
- 55
- KlemmschenkelClamp leg
- 66th
- AnlageschenkelContact leg
- 77th
- FederbogenSpring bow
- 88th
- AuflagerungSupport
- 99
- FederabschnittSpring section
- 1010
- AuflaufschrägeApproach slope
- 1111
- KontaktpunktContact point
- 1212th
- EndanschlagEnd stop
- 1313th
- Öffnungopening
- 1414th
- Einbuchtungindentation
- 1616
- ErhebungElevation
- 1717th
- AbknickungKink
- 1818th
- AbwinkelungAngulation
- 1919th
- freies Ende Klemmschenkelfree end of clamping leg
- 2020th
- freies Ende Anlageschenkelfree end of contact leg
- 2121st
- ScheitelpunktVertex
- 2222nd
- IsolierstoffgehäuseInsulated housing
- 2323
- LeitereinführungsöffnungConductor entry opening
- 2424
- DrückerPusher
- αα
- Winkel Endanschlag/AuflaufschrägeAngle of end stop / approach slope
- L1L1
- Länge KlemmschenkelLength of clamp leg
- L2L2
- Länge Anlageschenkel bis AuflaufschrägeLength of the contact leg to the run-up slope
- RLRL
- LeitereinführungsrichtungConductor entry direction
- RERE
- EntformungsrichtungDischarge direction
- RMRM
- MontagerichtungMounting direction
- K1K1
-
Klemmenhälfte 1
Terminal half 1 - K2K2
-
Klemmenhälfte 2
Terminal half 2
Claims (14)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202020100088.8U DE202020100088U1 (en) | 2020-01-09 | 2020-01-09 | Conductor connection terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3849019A1 true EP3849019A1 (en) | 2021-07-14 |
EP3849019B1 EP3849019B1 (en) | 2023-04-05 |
Family
ID=74105838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21150398.2A Active EP3849019B1 (en) | 2020-01-09 | 2021-01-06 | Conductor connecting terminal |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3849019B1 (en) |
CN (1) | CN113113786A (en) |
DE (1) | DE202020100088U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023094219A1 (en) * | 2021-11-25 | 2023-06-01 | Phoenix Contact Gmbh & Co. Kg | Connection arrangement and connection terminal |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113782991B (en) * | 2021-09-14 | 2023-07-14 | 苏州华旃航天电器有限公司 | Lock wire structure with quick elasticity |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19735786A1 (en) | 1997-08-18 | 1999-02-25 | Abb Patent Gmbh | Screwless connecting clamp for electrical conductor |
US20050181681A1 (en) * | 2004-02-18 | 2005-08-18 | Smk Corporation | Waterproof relay connector |
CN102354831A (en) | 2011-08-15 | 2012-02-15 | 浙江正泰建筑电器有限公司 | Binding post apparatus without screw thread |
DE202011110604U1 (en) | 2011-08-03 | 2015-02-25 | Phoenix Contact Gmbh & Co. Kg | Spring pressure piece for producing an electrical spring contact element and electrical connector |
EP2947718A1 (en) * | 2014-05-23 | 2015-11-25 | Berker GmbH & Co. KG | Spring loaded clamping connection terminal |
WO2017081001A1 (en) | 2015-11-09 | 2017-05-18 | Wago Verwaltungsgesellschaft Mbh | Connection clamp |
CN109361078A (en) * | 2018-10-10 | 2019-02-19 | 宁波公牛电器有限公司 | A kind of wiring construction and switch socket |
EP3506432A2 (en) * | 2017-12-27 | 2019-07-03 | Panasonic Intellectual Property Management Co., Ltd. | Terminal device and power converter including the same |
-
2020
- 2020-01-09 DE DE202020100088.8U patent/DE202020100088U1/en active Active
-
2021
- 2021-01-05 CN CN202110007681.4A patent/CN113113786A/en active Pending
- 2021-01-06 EP EP21150398.2A patent/EP3849019B1/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19735786A1 (en) | 1997-08-18 | 1999-02-25 | Abb Patent Gmbh | Screwless connecting clamp for electrical conductor |
US20050181681A1 (en) * | 2004-02-18 | 2005-08-18 | Smk Corporation | Waterproof relay connector |
DE202011110604U1 (en) | 2011-08-03 | 2015-02-25 | Phoenix Contact Gmbh & Co. Kg | Spring pressure piece for producing an electrical spring contact element and electrical connector |
CN102354831A (en) | 2011-08-15 | 2012-02-15 | 浙江正泰建筑电器有限公司 | Binding post apparatus without screw thread |
EP2947718A1 (en) * | 2014-05-23 | 2015-11-25 | Berker GmbH & Co. KG | Spring loaded clamping connection terminal |
WO2017081001A1 (en) | 2015-11-09 | 2017-05-18 | Wago Verwaltungsgesellschaft Mbh | Connection clamp |
EP3506432A2 (en) * | 2017-12-27 | 2019-07-03 | Panasonic Intellectual Property Management Co., Ltd. | Terminal device and power converter including the same |
CN109361078A (en) * | 2018-10-10 | 2019-02-19 | 宁波公牛电器有限公司 | A kind of wiring construction and switch socket |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023094219A1 (en) * | 2021-11-25 | 2023-06-01 | Phoenix Contact Gmbh & Co. Kg | Connection arrangement and connection terminal |
BE1029961B1 (en) * | 2021-11-25 | 2023-06-26 | Phoenix Contact Gmbh & Co | Connection arrangement and connection terminal |
Also Published As
Publication number | Publication date |
---|---|
EP3849019B1 (en) | 2023-04-05 |
DE202020100088U1 (en) | 2021-04-12 |
CN113113786A (en) | 2021-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2843764B1 (en) | Spring clamp for conductor | |
EP3298659B1 (en) | Conductor connection terminal | |
DE102011055919B4 (en) | terminal | |
EP3028344B1 (en) | Electrical terminal and method | |
EP3507866B1 (en) | Conductor connection clamp | |
EP3118938B1 (en) | Connector | |
EP3849019B1 (en) | Conductor connecting terminal | |
EP2439816B1 (en) | Electric plug connector | |
WO2015091203A1 (en) | Terminal block | |
WO1999013533A1 (en) | Plug-in contact | |
EP0735616A2 (en) | Electric connector, especially for circuit boards | |
DE102008039219A1 (en) | Electrical connection device for connecting e.g. solid electrical conductors, has clamping leg comprising clamping area whose clamping edge exhibits lateral width that is larger than that of lateral width of recess of retaining device | |
EP3038213B1 (en) | Cable connection terminal for clamping at least one electrical conductor | |
DE202010016895U1 (en) | Connection device with spring clip | |
EP3539183B1 (en) | Contact element comprising a clamping terminal for a stranded conductor | |
EP0968548A1 (en) | Socket with contact regions disposed in the form of a hyperboloid | |
EP3123566B1 (en) | Socket contact for an electrical socket | |
DE102006006484A1 (en) | Plug part and socket part for an electrical plug connection and electrical plug connection arrangement with such a plug part and socket part | |
EP3849018A1 (en) | Conductor connecting terminal | |
DE10227235A1 (en) | Screwless conductor lead terminal has contact carrier and cooperating contact spring fitting through contact carrier for clamping inserted conductor lead | |
EP1047152B1 (en) | Electrical socket | |
DE2601429A1 (en) | Terminal plug connector for coaxial cable - has U:shaped collet formed from single sheet with inward facing jaws | |
EP3200288B1 (en) | Housing of an electrical connector housing or for mounting an electrical connector | |
DE10205613B4 (en) | contact element | |
EP3855570A1 (en) | Electrical terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20210806 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H01R 9/24 20060101ALN20221019BHEP Ipc: H01R 4/48 20060101AFI20221019BHEP |
|
INTG | Intention to grant announced |
Effective date: 20221108 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: LICHT, CORD-HENRIK Inventor name: MASTEL, RUDOLF Inventor name: AHLDAG, JOERG |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502021000533 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1558963 Country of ref document: AT Kind code of ref document: T Effective date: 20230415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230516 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230807 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230705 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230805 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230706 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502021000533 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20240108 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240129 Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |