EP3847072A1 - Loading system and transporting wheeled vehicles on railway network - Google Patents

Loading system and transporting wheeled vehicles on railway network

Info

Publication number
EP3847072A1
EP3847072A1 EP19780016.2A EP19780016A EP3847072A1 EP 3847072 A1 EP3847072 A1 EP 3847072A1 EP 19780016 A EP19780016 A EP 19780016A EP 3847072 A1 EP3847072 A1 EP 3847072A1
Authority
EP
European Patent Office
Prior art keywords
wagon
platform
loading
railway
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19780016.2A
Other languages
German (de)
French (fr)
Other versions
EP3847072B1 (en
Inventor
Antonio LUCISANO
Francesco Lucisano
Maurizio LUCISANO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COELDA Software Srl
Original Assignee
COELDA Software Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COELDA Software Srl filed Critical COELDA Software Srl
Publication of EP3847072A1 publication Critical patent/EP3847072A1/en
Application granted granted Critical
Publication of EP3847072B1 publication Critical patent/EP3847072B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D3/00Wagons or vans
    • B61D3/16Wagons or vans adapted for carrying special loads
    • B61D3/18Wagons or vans adapted for carrying special loads for vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D3/00Wagons or vans
    • B61D3/16Wagons or vans adapted for carrying special loads
    • B61D3/18Wagons or vans adapted for carrying special loads for vehicles
    • B61D3/182Wagons or vans adapted for carrying special loads for vehicles specially adapted for heavy vehicles, e.g. public work vehicles, trucks, trailers
    • B61D3/184Wagons or vans adapted for carrying special loads for vehicles specially adapted for heavy vehicles, e.g. public work vehicles, trucks, trailers the heavy vehicles being of the trailer or semi-trailer type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D3/00Wagons or vans
    • B61D3/04Wagons or vans with movable floors, e.g. rotatable or floors which can be raised or lowered
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D47/00Loading or unloading devices combined with vehicles, e.g. loading platforms, doors convertible into loading and unloading ramps
    • B61D47/005Loading or unloading devices combined with road vehicles carrying wagons, e.g. ramps, turntables, lifting means

Definitions

  • the present invention relates to a loading system and transporting wheeled vehicles on railway network.
  • the present invention relates to a loading System and transporting wheeled vehicles on railway network, and in particular of articulated semi-trailer, of the type that can be integrated to an "intelligent management system" in the meaning that at the end was attributed with reference to the wagons of a rail transport system with automatic composition of the trains described in Italian patent No. 0001416154, assigned to the same Applicant.
  • the scope of the present invention is to provide a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer, in particular semi-trailers , who can, with a very high level of automation, switch from wheeled mode to rail mode and viceversa reducing the costs of the logistics of goods, since, while maintaining the ductility of the rubber of the sampling points and delivery operated by a conventional trucks, carries out, for the most part of the path, the transfer of only semitrailers with no drive along the railway line, with significant reduction in energy and personnel costs, having features such as to overcome the limitations that still affect the solutions previously described and with reference to the prior art.
  • a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer is provided, as defined in claim 1.
  • FIG. 1 shows a three-dimensional view of a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer in a phase of arrival of an articulated vehicle at the station, according to the invention
  • FIG. 2 shows a three-dimensional view of a smart elevator wagon of the system for loading and transporting on railway network wheeled vehicles, according to the invention
  • FIGS. 3a-3c show respectively a top view and side views with a lowered loading platform and a raised loading platform of the smart elevator wagon of Figure 2, according to the invention
  • FIG. 4a- 4c show a top view and side views with the lowered loading platform and raised loading platform of the smart elevator wagon of figure 2 with an articulated truck loaded on the smart elevator wagon of figure 2, according to the invention
  • FIG. 5a-5d show respectively a top view, a side view and sectional views with a raised loading platform and with a lowered loading platform of a smart carrier wagon, according to the invention
  • FIGS. 6a-6c show a top view and side views of the smart elevator wagon of Figures 5a-5d with an articulated truck loaded above, according to the invention
  • FIG. 7 shows a top view of a railway station set up to interface with the system for loading and transporting on railway network wheeled vehicles, according to the invention
  • figure 8 shows a three-dimensional view of a smart elevator wagon of the system for loading and transporting on railway network wheeled vehicles and of the articulated vehicle when approaching the articulated vehicle to the elevator wagon, according to the invention
  • figure 9 shows a three dimensional view of the elevator wagon of the system for loading and transporting on railway network wheeled vehicles with the articulated vehicle loaded , according to the invention ;
  • FIG. 10 shows a three-dimensional view of the elevator wagon in elevation phase and of the carrier wagon of Figure 9, with positioning of the carrier wagon, according to the invention
  • FIG. 11 shows a three-dimensional view of the elevator wagon and of the carrier wagon of Figure 9 in the loading phase of the articulated vehicle on the smart carrier wagon, according to the invention
  • FIG. 12 shows a three-dimensional view of the elevator wagon and of the smart carrier wagon during the release of the tractor from the semitrailer on the smart carrier wagon, according to the invention
  • FIG. 13 shows a three-dimensional view of the elevator wagon on which the motor drive of the articulated vehicle and of the smart carrier wagon on which the semi trailer of the articulated vehicle is loaded, according to the invention
  • FIG. 14 shows a three-dimensional view of the elevator wagon during the unloading of the tractor unit of the articulated vehicle and of the smart carrier wagon with the semi-trailer of the articulated vehicle being moved towards a railway train in the composition phase, according to the invention.
  • a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer, in a phase of arrival of an articulated vehicle in the station is shown, according to the invention.
  • the system 100 for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle 50 equipped with a drive and semitrailer comprises: a "station" computerized system, a smart elevator wagon 101 and a smart carrier wagon 102 interfaced with the station computerized system, in the meaning of terms used with reference to the wagons of a rail transport system with automatic train composition described in the Italian patent No.
  • a carriageable road infrastructure 103 that allows connection of the road network to an area where a service binary of the railway network is located, this area being connected to the railway line of the same railway network and being dedicated to the loading / unloading of the semi-trailer, subject to the asphalting of an adequate section of roads.
  • the carriageable road infrastructure 103 must allow both access and the exit of the articulated vehicle 50 in the moving direction and in its opposite.
  • FIG. 2 shows, in detail, the smart elevator wagon 101 comprising a platform 101a, configured to accommodate a wheeled vehicle, for example an articulated vehicle 50 equipped with a drive 51 and a semi-trailer 52, equipped, at a first end , of a first tipping plane 101b hinged at the first end and , at a second end, opposite to the first, of a second tipping plane 101c hinged at the second end, laterally of external containment fenders 121 configured to achieve the perfect alignment of the articulated vehicle 50 and laterally to the containment fenders 121, a gangway 122 for the passage of an operator.
  • a wheeled vehicle for example an articulated vehicle 50 equipped with a drive 51 and a semi-trailer 52, equipped, at a first end , of a first tipping plane 101b hinged at the first end and , at a second end, opposite to the first, of a second tipping plane 101c hinged at the second end, laterally of external containment fenders 121 configured to achieve
  • the platform 101a is coupled at the bottom to a linear structure lOld equipped , for example in a central portion, with an electronic control system 123 and, at its ends, of carriages lOlda with motorized rooms .
  • the smart elevator wagon 101 includes scissor lifting structures lOle, at least two, fixed between the linear structure lOld and the platform 101a.
  • Each lifting structure lOle is composed of two scissor systems (of the pantograph type) , allowing a movement in the vertical direction and supporting the platform 101a.
  • each scissor system is composed of four metal bars connected, two by two, by central pins and, at the ends , by upper and lower hinges.
  • the lifting structures lOle are configured to lift and lower the platform 101a of the smart elevator wagon 101 through actuators , for example two lifting pistons for each lifting structure lOle, not shown in the figure.
  • the electronic control system 123 is positioned between the two lifting structures lOle is positioned .
  • the lifting of the platform 101a of the smart elevator wagon is advantageousously according to the invention.
  • the smart elevator wagon 101 comprises a computerized system like that typical of smart wagons of the aforementioned Applicant's patent application, configured to be able to further automatically manage the raising / lowering of the platform 101a and the movement of the elevator wagon 101 along the railway infrastructure to position itself in the specific areas set up for interaction with the smart carrier wagon
  • the smart carrier wagon comprises at least two locking systems lOlf that rise during the displacement maneuvers of the wagon and are lowered during the loading maneuvers of the articulated vehicle 50 preventing the movement of the elevator wagon 101 and providing support for load support.
  • the smart elevator wagon 101 comprises load sensors configured to detect the presence on board of a vehicle, to check the tolerability limits of the load, and to check the compatibility of the load distribution.
  • the smart elevator wagon 101 comprises systems to aid loading and unloading operations and movement of the articulated vehicle 50 or the single drive 51.
  • the computerized system 123 located on the smart elevator wagon 101 is configured to interact with the computerized system of station, as described in the aforementioned patent application of the same Applicant, and to operate the raising / lowering of the loading platform 101a through the systems lOle, which are adapted to cause the switch of the platform 101a position from a next level position at the street level to an elevated position aligned to the height of the upper standard buffers of the usual railway wagons and viceversa, compatibly with data coming from on-board sensors, in particular of load sensors and other sensors.
  • the computerized system 123 also automatically manages the movement of the elevator wagon 101 to position itself in the maneuver or rest areas according to the indications received electronically from the station computerized system.
  • the smart elevator wagon 101 includes a battery that can be recharged automatically installing an induction system in the where the wagon 101 operates, or positioning the wagon 101 in a specific area where the connection to the electricity network can be done in automatic or manual mode.
  • FIG. 5 schematically shows the smart carrier wagon 102, in the sense that it comprises all the implementations present in the patent previously mentioned in the name of the same Applicant, comprising a linear structure equipped with two wheel systems 102aa among which a loading platform 102a is included configured to receive the semi- trailer 52 of the articulated vehicle 50 and configured to be lowered and raised, on command of the computerized system present on the wagon , so that it can be raised up to the level of the buffer 102ab level to allow horizontal transit of the semi trailer 52.
  • a first end of the carrier wagon 102 comprises a flat portion 102ca configured to house the front part of the semi- trailer 52 after it has been loaded onto the loading platform 102a, and to be able to lock it by means of an adjustable locking system 102cb.
  • the flat portion 102ca is equipped on each side with a tipping platform 102c for the passage of an operator.
  • the front part of the loading platform 102a positioned in correspondence of the parking stands of the semitrailer 52 when it is loaded, it is equipped with a self-leveling platform 102d to facilitate the support of the semi- trailer 52 during the loading or unloading phase to allow the disengagement of the drive.
  • the self leveling platform 102d prevents the trucker from releasing and resting the parking stands on the ground manually, for the release of the drive 51.
  • the truck driver With the automatism of the platform, the truck driver will have to limit himself to manually disable the connections (electrical and other installations) and finally unblock the drive 51.
  • the lowering of the self-leveling platform realizes the leveling of the semi-trailer 52 in the best position to carry out the transport.
  • Figure 6 shows the smart 102 with the smart carrier wagon 102 with the semitrailer 52 of the articulated vehicle 50 loaded on the loading platform 102a.
  • the smart carrier wagon 102 comprises load sensors to determine if the weight of the semitrailer is suitable for transport in relation to the characteristics of the railway section to be traveled.
  • the smart carrier wagon 102 comprises systems to aid loading and unloading operations and movement of the articulated vehicle or the single drive.
  • the stations can be equipped with an apparatus 104 for the automatic control of the shape of the wheeled vehicle, adapted to perform an automatic verification of the compatibility of silhouettes of wheeled vehicles loaded on the wagons, with the characteristics of the route of the railway network to be covered for delivery.
  • a verification apparatus 104 of the silhouettes of the loaded wagons can be implemented with sensors, cameras, or other detection systems detecting the shape of the objects.
  • the movements of all road and rail vehicles operating in the area in which the system 100 operates are managed by the station computerized system which has the full and exclusive control of the area where are the tracks, when it is necessary to manage loading / unloading operations of wheeled vehicles.
  • the articulated vehicle 50 in the delivery phase from the road network to the railway network , the articulated vehicle 50 , with the semi-trailer 52 to be loaded, is placed in a special area with tracks coplanar with the street plan.
  • the driver of the articulated vehicle accessing from his tablet or other similar systems present on the drive, through a specific application preloaded on the same tablet and which allows to interface telematically with the station computerized system, communicates its credentials to carry out the loading operation .
  • the smart elevator wagon 101 After verification and acceptance of the credentials authorizing the loading of the semi trailer 52 , the smart elevator wagon 101 will be managed to move independently and, once it reaches the loading position, it will lower one of the tipping platforms 101b or 101c, which will act as a connection ramp to allow the articulated vehicle 50 to always go forward.
  • the positioning of the elevator wagon 101 at a precise point of the tracks' asphalted area depends on the wagon that carries out the transport which is unidirectional since it allows operations only on one side. Consequently the access direction of the articulated vehicle 50 on board the elevator wagon 101 can take place only in a specific direction through the platforms 101b or 101c.
  • the tipping platform 101b or 101c is raised and by means of the systems lOle for lifting the loading platform 101a , is raised up to the height of the buffers 102ab of the carrier wagon, made to arrive automatically at the rear of the elevator wagon 101 , where the semi-trailer must be moved.
  • the tipping platform 101b or 101c is lowered again to form a corridor with the carrier wagon 102 and the articulated vehicle 50 is driven in reverse until it reaches the position suitable for transferring the semi trailer 52 onto the smart carrier wagon 102.
  • the driveway road infrastructure 103 which allows access to a service binary 203 of the railway network connected to the railway line of the railway, includes a load / unload line 103a comprising unsurfaced binaries to be carriageable and connection elements 103b to the service binary 203.
  • 100 shown in figures 8-14 comprises the steps of:
  • the elevator wagon 101 is positioned in the correct position to raise the entire articulated vehicle 50. So, the first tipping platform 101b or 101c is lowered to the ground, after the driver is positioned to stand on it and has provided the credentials to the station computerized system that coordinates all the operations, through a dedicated application, and the articulated vehicle 50 is loaded on the elevator wagon 101. The first tipping platform 101b or 101c is raised and then the platform 101a of the elevator wagon 101 is lifted. The carrier wagon 102 is appended empty to carry out the loading operation.
  • the second tipping platform 101b or 101c of the elevator wagon 101 is lowered in correspondence of the carrier wagon 102.
  • the semitrailer 52 is loaded with its drive 51 in reverse, and, thereafter, the support 102d placed on the wagon platform to support the stands of the front of the trailer is elevated. Then the driving 51 is unlocked and is positioned on the elevator wagon 101.
  • the first tipping platform 101b or 101c of the elevator wagon 101 is raised. After that a leveling of the semitrailer is made suitably lowering the support base of the stands, that is, the self-leveling platform 102d of the carrier wagon 102 with the blocking of the semi-trailer 52 by means of the towing nail with the device 102cb and the rear wheels with the locking devices.
  • the carrier wagon 102 is then removed for stop in other area or insertion in a railway train. Then the elevator wagon 101 is lowered at street level and then positioned in good position (area for the disengagement of the drive in the asphalt travel direction) . Following the second tipping platform 101b or 101c is lowered to allow the exit of the drive 51. Then the second tipping platform 101b or 101c of the elevator wagon 101 is raised when the elevator wagon 101 is moved to the rest area.
  • the elevator wagon 101 For the unloading of a semi-trailer arrived with another carrier wagon at the area 100, the elevator wagon 101 is positioned in the correct position to make only the drive 51 of the articulated vehicle 50 rises in the correct direction. Then the second tipping platform 101b or 101c for the connection to the ground of the elevator wagon 101 after the driver, who has already positioned himself to climb on it, has supplied the credentials through the app . Then the drive 51 is loaded on the elevator wagon 101. The first tipping platform 101b or 101c is raised and the platform of the elevator wagon 101 is raised too. The carrier wagon 102 is appended to carry out the unloading operation of the loaded semi-trailer 52 .
  • the second tipping platform 101 b or 101c of the elevator wagon 101 is lowered on the carrier wagon 101 102 and the blocks of the semi-trailer 102cb and the blocks of the rear wheels are unhooked and the platform 102a of the carrier wagon is raised. Then the support 102d for the elevation of the semi-trailer stands is raised. The reversing of the drive 51 is performed to engage the semi trailer 52 and subsequent forward exit of the articulated vehicle 50 (drive 51 and semitrailer 52) positioning on the elevator wagon 101, after the platform 102d of the carrier wagon 102 has been lowered. Then the second tipping platform 101b or 101c of the elevator wagon 101 is raised.
  • the elevator wagon 101 is lowered to street level and positioned low down in good position (area for the disengagement of the articulated vehicle in the asphalted direction of travel) . Then the second tipping platform 101b or 101c of elevator wagon 101 is lowered to allow the exit of the articulated and subsequently the second tipping platform 101b or 101c of the elevator wagon 101 and then be moved to a parking area.
  • the loading system and transporting wheeled vehicles on railway network facilitates the operations of maneuvering the drive of the articulated vehicle, since it allows the access of the articulated vehicle always in forward gear, making the maneuver very simple.
  • Another advantage of the loading system and transporting wheeled vehicles on railway network is to automatically perform the perfect alignment of the semitrailer, which is the most complicated part of the loading operation in reverse.
  • the loading system and transporting wheeled vehicles on railway network according to the invention on a railway network is efficient and low cost.

Abstract

A system (100) for loading and transporting on railway network wheeled vehicles comprising one articulated vehicle (50) equipped with a drive (51) and semitrailer (52), the system (100) comprising: a computerized system configured to be placed in a station of the railway network; at least one elevator wagon (101) interfaced with the railway station computerized system; at least one carrier wagon (102); and a carriageable road infrastructure (103). The elevator wagon (101) comprises: a platform (101a); a linear structure (101d) to which the platform (101a) is inferiorly coupled; lifting structures (101e); an electronic control system (123); and auxiliary systems. The carrier wagon (102) comprises a linear structure equipped with two wheel systems (102aa) between which a load platform (102a) is comprised; load sensors; systems to assist in loading and unloading maneuvers and handling of the articulated vehicle (50) or of the single drive (51).

Description

DESCRIPTION
"Loading System and transporting wheeled vehicles on railway network"
k k k The present invention relates to a loading system and transporting wheeled vehicles on railway network.
In particular, in the present invention relates to a loading System and transporting wheeled vehicles on railway network, and in particular of articulated semi-trailer, of the type that can be integrated to an "intelligent management system" in the meaning that at the end was attributed with reference to the wagons of a rail transport system with automatic composition of the trains described in Italian patent No. 0001416154, assigned to the same Applicant.
As it is known, for the transport of railway wagons from factories to the delivery destination, or, conversely, by picking places in factories delivery free of tracks connected to the rail network, it is necessary to charge the wagon on a special vehicle equipped with wheel pulled by a tractor up to the rail delivery or pickup station of destination .
An attempt has been made to overcome the excessively high costs of this transfer method by loading semi-trailers of articulated lorries on locked-up trains in the railway stations, loading them from the top on " few " wagons , using a bridge crane. This solution is, however, competitive only on ports that handle a large number of semi-trailers , as the infrastructure has very high costs. Therefore, only a few stops can be connected, at acceptable costs.
Another known solution is the so-called "rolling highways", consisting in loading an entire train sequentially starting from a series of wheeled vehicles. This procedure, however, presupposes that the drivers of the vehicles also have to travel with the same train, in addition to the constraint that the connection is only between two points, the one of departure and the one of arrival .
It has been also tried to overcome this problem by designing autonomous mixed rail / wheeled vehicles that able to be moved with the two modes. However , these known vehicles are specific drives with very specific functions. So, these are not adapted to make long trips, or can be adapted to be used as systems for the transport of goods. Moreover, these known vehicles do not lend themselves to interact with "smart" systems or vehicles which exchange information, for example to be able to move independently on the rail network and / or to automatically engage or unhook thanks to the presence of computerized systems, such as those present in the "intelligent" wagons of the aforementioned patent of the same Applicant.
One solution to this problem has been reported in the Italian patent application No. UB2016A001791, which describes a transport vehicle capable of circulating ambivalently on the road network or on the railway network comprising: - a floor equipped at the bottom with a first system of rear railed wheels and a second system of front railed wheels and at least one pair of rear rubber wheels ; - an exchange system between the position of the rear and front railed wheels and of the rear rubber wheels according to the type of wheels required for road or rail traffic; and - a computerized system configured to automatically manage the movements of the transport vehicle in the configuration of railway circulation and to carry out the coupling with the tractor of an articulated vehicle hooking up the means of transport; in which the exchange system comprises movable mechanical elements connected, at a first end, in a rotary manner, to hooking brackets placed below the floor and, at a second end, to axes around which the rear rubber wheels are respectively rotatable. The mobile mechanical elements are configured to be automatically controlled by the computerized system via an actuator system.
However this solution suffers from the problem that the presence on board of both the rail and road circulation systems, and of the other components of the smart wagon, like the batteries, overloads the vehicle particularly during the road circulation, reducing the net load. Furthermore, the passage from road to rail mode may present operational difficulties in correctly managing the alignment maneuver on the rails.
The scope of the present invention is to provide a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer, in particular semi-trailers , who can, with a very high level of automation, switch from wheeled mode to rail mode and viceversa reducing the costs of the logistics of goods, since, while maintaining the ductility of the rubber of the sampling points and delivery operated by a conventional trucks, carries out, for the most part of the path, the transfer of only semitrailers with no drive along the railway line, with significant reduction in energy and personnel costs, having features such as to overcome the limitations that still affect the solutions previously described and with reference to the prior art.
According to the present invention, a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer is provided, as defined in claim 1.
For a better understanding of the present invention, a preferred embodiment is now described for semi-trailers , purely by way of non-limiting example, with reference to the attached drawings, in which:
- the figure 1 shows a three-dimensional view of a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer in a phase of arrival of an articulated vehicle at the station, according to the invention;
- the figure 2 shows a three-dimensional view of a smart elevator wagon of the system for loading and transporting on railway network wheeled vehicles, according to the invention;
- Figures 3a-3c show respectively a top view and side views with a lowered loading platform and a raised loading platform of the smart elevator wagon of Figure 2, according to the invention;
- figures 4a- 4c show a top view and side views with the lowered loading platform and raised loading platform of the smart elevator wagon of figure 2 with an articulated truck loaded on the smart elevator wagon of figure 2, according to the invention;
- figures 5a-5d show respectively a top view, a side view and sectional views with a raised loading platform and with a lowered loading platform of a smart carrier wagon, according to the invention;
- Figures 6a-6c show a top view and side views of the smart elevator wagon of Figures 5a-5d with an articulated truck loaded above, according to the invention;
- figure 7 shows a top view of a railway station set up to interface with the system for loading and transporting on railway network wheeled vehicles, according to the invention;
figure 8 shows a three-dimensional view of a smart elevator wagon of the system for loading and transporting on railway network wheeled vehicles and of the articulated vehicle when approaching the articulated vehicle to the elevator wagon, according to the invention; figure 9 shows a three dimensional view of the elevator wagon of the system for loading and transporting on railway network wheeled vehicles with the articulated vehicle loaded , according to the invention ;
- figure 10 shows a three-dimensional view of the elevator wagon in elevation phase and of the carrier wagon of Figure 9, with positioning of the carrier wagon, according to the invention;
- figure 11 shows a three-dimensional view of the elevator wagon and of the carrier wagon of Figure 9 in the loading phase of the articulated vehicle on the smart carrier wagon, according to the invention;
- figure 12 shows a three-dimensional view of the elevator wagon and of the smart carrier wagon during the release of the tractor from the semitrailer on the smart carrier wagon, according to the invention;
- figure 13 shows a three-dimensional view of the elevator wagon on which the motor drive of the articulated vehicle and of the smart carrier wagon on which the semi trailer of the articulated vehicle is loaded, according to the invention;
- figure 14 shows a three-dimensional view of the elevator wagon during the unloading of the tractor unit of the articulated vehicle and of the smart carrier wagon with the semi-trailer of the articulated vehicle being moved towards a railway train in the composition phase, according to the invention.
With reference to this and the figures and, in particular, to figure 1, a system for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle equipped with a drive and semitrailer, in a phase of arrival of an articulated vehicle in the station is shown, according to the invention. More specifically, the system 100 for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle 50 equipped with a drive and semitrailer comprises: a "station" computerized system, a smart elevator wagon 101 and a smart carrier wagon 102 interfaced with the station computerized system, in the meaning of terms used with reference to the wagons of a rail transport system with automatic train composition described in the Italian patent No. 0001416154 in the name of the same Applicant; and a carriageable road infrastructure 103 that allows connection of the road network to an area where a service binary of the railway network is located, this area being connected to the railway line of the same railway network and being dedicated to the loading / unloading of the semi-trailer, subject to the asphalting of an adequate section of roads. The carriageable road infrastructure 103 must allow both access and the exit of the articulated vehicle 50 in the moving direction and in its opposite.
Figure 2 shows, in detail, the smart elevator wagon 101 comprising a platform 101a, configured to accommodate a wheeled vehicle, for example an articulated vehicle 50 equipped with a drive 51 and a semi-trailer 52, equipped, at a first end , of a first tipping plane 101b hinged at the first end and , at a second end, opposite to the first, of a second tipping plane 101c hinged at the second end, laterally of external containment fenders 121 configured to achieve the perfect alignment of the articulated vehicle 50 and laterally to the containment fenders 121, a gangway 122 for the passage of an operator. The platform 101a is coupled at the bottom to a linear structure lOld equipped , for example in a central portion, with an electronic control system 123 and, at its ends, of carriages lOlda with motorized rooms . Furthermore, the smart elevator wagon 101 includes scissor lifting structures lOle, at least two, fixed between the linear structure lOld and the platform 101a. Each lifting structure lOle is composed of two scissor systems (of the pantograph type) , allowing a movement in the vertical direction and supporting the platform 101a. Even more detailed, each scissor system is composed of four metal bars connected, two by two, by central pins and, at the ends , by upper and lower hinges.
According to an aspect of the invention, the lifting structures lOle are configured to lift and lower the platform 101a of the smart elevator wagon 101 through actuators , for example two lifting pistons for each lifting structure lOle, not shown in the figure.
According to an aspect of the invention, the electronic control system 123 is positioned between the two lifting structures lOle is positioned .
Advantageously according to the invention, the lifting of the platform 101a of the smart elevator wagon
101 can be controlled both by manual mode and by automatic mode.
Advantageously according to the invention, the smart elevator wagon 101 comprises a computerized system like that typical of smart wagons of the aforementioned Applicant's patent application, configured to be able to further automatically manage the raising / lowering of the platform 101a and the movement of the elevator wagon 101 along the railway infrastructure to position itself in the specific areas set up for interaction with the smart carrier wagon
102 to be able to carry out the pick-up / delivery of the semi- trailer 52 of the articulated vehicle 50 positioned on the platform 101a, as shown in Figure 3, and in the subsequent Figures 10-12.
Advantageously according to the invention, the smart carrier wagon comprises at least two locking systems lOlf that rise during the displacement maneuvers of the wagon and are lowered during the loading maneuvers of the articulated vehicle 50 preventing the movement of the elevator wagon 101 and providing support for load support.
Advantageously according to the invention, the smart elevator wagon 101 comprises load sensors configured to detect the presence on board of a vehicle, to check the tolerability limits of the load, and to check the compatibility of the load distribution.
Advantageously according to the invention, the smart elevator wagon 101 comprises systems to aid loading and unloading operations and movement of the articulated vehicle 50 or the single drive 51.
According to a further aspect of the invention, the computerized system 123 located on the smart elevator wagon 101 is configured to interact with the computerized system of station, as described in the aforementioned patent application of the same Applicant, and to operate the raising / lowering of the loading platform 101a through the systems lOle, which are adapted to cause the switch of the platform 101a position from a next level position at the street level to an elevated position aligned to the height of the upper standard buffers of the usual railway wagons and viceversa, compatibly with data coming from on-board sensors, in particular of load sensors and other sensors.
The computerized system 123 also automatically manages the movement of the elevator wagon 101 to position itself in the maneuver or rest areas according to the indications received electronically from the station computerized system.
According to an aspect of the invention, the smart elevator wagon 101 includes a battery that can be recharged automatically installing an induction system in the where the wagon 101 operates, or positioning the wagon 101 in a specific area where the connection to the electricity network can be done in automatic or manual mode.
Figure 5 schematically shows the smart carrier wagon 102, in the sense that it comprises all the implementations present in the patent previously mentioned in the name of the same Applicant, comprising a linear structure equipped with two wheel systems 102aa among which a loading platform 102a is included configured to receive the semi- trailer 52 of the articulated vehicle 50 and configured to be lowered and raised, on command of the computerized system present on the wagon , so that it can be raised up to the level of the buffer 102ab level to allow horizontal transit of the semi trailer 52.
According to an aspect of the invention, a first end of the carrier wagon 102 comprises a flat portion 102ca configured to house the front part of the semi- trailer 52 after it has been loaded onto the loading platform 102a, and to be able to lock it by means of an adjustable locking system 102cb. Moreover, the flat portion 102ca is equipped on each side with a tipping platform 102c for the passage of an operator.
The front part of the loading platform 102a positioned in correspondence of the parking stands of the semitrailer 52 when it is loaded, it is equipped with a self-leveling platform 102d to facilitate the support of the semi- trailer 52 during the loading or unloading phase to allow the disengagement of the drive.
In addition, to fix the semi-trailer 52 during transport, in addition to the lock system 102cb, there is also a rear-wheel lock system.
Eventually another locking system of the front wheels may also be present. Advantageously according to the invention, the self leveling platform 102d prevents the trucker from releasing and resting the parking stands on the ground manually, for the release of the drive 51. With the automatism of the platform, the truck driver will have to limit himself to manually disable the connections (electrical and other installations) and finally unblock the drive 51.
With an automatic control of the electronic system of the wagon, the lowering of the self-leveling platform realizes the leveling of the semi-trailer 52 in the best position to carry out the transport.
Figure 6 shows the smart 102 with the smart carrier wagon 102 with the semitrailer 52 of the articulated vehicle 50 loaded on the loading platform 102a.
Advantageously according to the invention, the smart carrier wagon 102 comprises load sensors to determine if the weight of the semitrailer is suitable for transport in relation to the characteristics of the railway section to be traveled.
Advantageously according to the invention, the smart carrier wagon 102 comprises systems to aid loading and unloading operations and movement of the articulated vehicle or the single drive. Moreover, advantageously according to the invention, the stations can be equipped with an apparatus 104 for the automatic control of the shape of the wheeled vehicle, adapted to perform an automatic verification of the compatibility of silhouettes of wheeled vehicles loaded on the wagons, with the characteristics of the route of the railway network to be covered for delivery. In particular, such a verification apparatus 104 of the silhouettes of the loaded wagons can be implemented with sensors, cameras, or other detection systems detecting the shape of the objects.
According to a further aspect of the invention, the movements of all road and rail vehicles operating in the area in which the system 100 operates, are managed by the station computerized system which has the full and exclusive control of the area where are the tracks, when it is necessary to manage loading / unloading operations of wheeled vehicles.
Operationally, in the delivery phase from the road network to the railway network , the articulated vehicle 50 , with the semi-trailer 52 to be loaded, is placed in a special area with tracks coplanar with the street plan. The driver of the articulated vehicle, accessing from his tablet or other similar systems present on the drive, through a specific application preloaded on the same tablet and which allows to interface telematically with the station computerized system, communicates its credentials to carry out the loading operation . After verification and acceptance of the credentials authorizing the loading of the semi trailer 52 , the smart elevator wagon 101 will be managed to move independently and, once it reaches the loading position, it will lower one of the tipping platforms 101b or 101c, which will act as a connection ramp to allow the articulated vehicle 50 to always go forward. The positioning of the elevator wagon 101 at a precise point of the tracks' asphalted area depends on the wagon that carries out the transport which is unidirectional since it allows operations only on one side. Consequently the access direction of the articulated vehicle 50 on board the elevator wagon 101 can take place only in a specific direction through the platforms 101b or 101c. Subsequently the tipping platform 101b or 101c is raised and by means of the systems lOle for lifting the loading platform 101a , is raised up to the height of the buffers 102ab of the carrier wagon, made to arrive automatically at the rear of the elevator wagon 101 , where the semi-trailer must be moved. Then the tipping platform 101b or 101c is lowered again to form a corridor with the carrier wagon 102 and the articulated vehicle 50 is driven in reverse until it reaches the position suitable for transferring the semi trailer 52 onto the smart carrier wagon 102.
According to an aspect of the invention, as shown in figure 7, the driveway road infrastructure 103 which allows access to a service binary 203 of the railway network connected to the railway line of the railway, includes a load / unload line 103a comprising unsurfaced binaries to be carriageable and connection elements 103b to the service binary 203.
In use, the methodology of operation of the system
100 shown in figures 8-14 , comprises the steps of:
1) arriving in a railway station of an articulated vehicle 50, autonomous positioning of the smart elevator wagon 101 in the loading zone 103 of the vehicular road infrastructure 103, and made available for the smart carrier wagon 102;
2) closure during the entire loading operation and transfer of the semi-trailer of the pathway used for loading by the rail vehicles, approaching of the articulated vehicle 50 and lowering the first tipping plane 101b or 101c of the elevator wagon 101 according to the orientation of the carrier wagon
102; 3) loading the articulated vehicle 50 on the elevator wagon 101 and lifting the first tipping platform 101 or 101c;
4) positioning the smart carrier wagon 102;
5) Raising the platform of the elevator wagon with the articulated vehicle 50 on board;
6) Lowering the tipping platform 101b or 101c to create the passage corridor with the carrier wagon; ) moving the articulated vehicle 50 on the smart carrier wagon 102 and release of the drive 51;
8) positioning the drive 51 on the elevator wagon, lifting the tilting platform 101b or 101c leveling the semitrailer by means of the platform 102d, blocking of the rear wheels and lowering of the semitrailer 52 placed on the platform 102a inside the smart carrier wagon 102;
9) lowering the platform 101a of the elevator wagon 101;
10) unloading the drive 51 and managing the exit of the same from the railway line;
11) moving the smart carrier wagon 102 towards a train in composition on the railway line. More in detail, to load the semi-trailer 52 onto the carrier wagon 102 , the elevator wagon 101 is positioned in the correct position to raise the entire articulated vehicle 50. So, the first tipping platform 101b or 101c is lowered to the ground, after the driver is positioned to stand on it and has provided the credentials to the station computerized system that coordinates all the operations, through a dedicated application, and the articulated vehicle 50 is loaded on the elevator wagon 101. The first tipping platform 101b or 101c is raised and then the platform 101a of the elevator wagon 101 is lifted. The carrier wagon 102 is appended empty to carry out the loading operation. As a result, the second tipping platform 101b or 101c of the elevator wagon 101 is lowered in correspondence of the carrier wagon 102. The semitrailer 52 is loaded with its drive 51 in reverse, and, thereafter, the support 102d placed on the wagon platform to support the stands of the front of the trailer is elevated. Then the driving 51 is unlocked and is positioned on the elevator wagon 101. The first tipping platform 101b or 101c of the elevator wagon 101 is raised. After that a leveling of the semitrailer is made suitably lowering the support base of the stands, that is, the self-leveling platform 102d of the carrier wagon 102 with the blocking of the semi-trailer 52 by means of the towing nail with the device 102cb and the rear wheels with the locking devices. The carrier wagon 102 is then removed for stop in other area or insertion in a railway train. Then the elevator wagon 101 is lowered at street level and then positioned in good position (area for the disengagement of the drive in the asphalt travel direction) . Following the second tipping platform 101b or 101c is lowered to allow the exit of the drive 51. Then the second tipping platform 101b or 101c of the elevator wagon 101 is raised when the elevator wagon 101 is moved to the rest area.
For the unloading of a semi-trailer arrived with another carrier wagon at the area 100, the elevator wagon 101 is positioned in the correct position to make only the drive 51 of the articulated vehicle 50 rises in the correct direction. Then the second tipping platform 101b or 101c for the connection to the ground of the elevator wagon 101 after the driver, who has already positioned himself to climb on it, has supplied the credentials through the app . Then the drive 51 is loaded on the elevator wagon 101. The first tipping platform 101b or 101c is raised and the platform of the elevator wagon 101 is raised too. The carrier wagon 102 is appended to carry out the unloading operation of the loaded semi-trailer 52 . The second tipping platform 101 b or 101c of the elevator wagon 101 is lowered on the carrier wagon 101 102 and the blocks of the semi-trailer 102cb and the blocks of the rear wheels are unhooked and the platform 102a of the carrier wagon is raised. Then the support 102d for the elevation of the semi-trailer stands is raised. The reversing of the drive 51 is performed to engage the semi trailer 52 and subsequent forward exit of the articulated vehicle 50 (drive 51 and semitrailer 52) positioning on the elevator wagon 101, after the platform 102d of the carrier wagon 102 has been lowered. Then the second tipping platform 101b or 101c of the elevator wagon 101 is raised.
The elevator wagon 101 is lowered to street level and positioned low down in good position (area for the disengagement of the articulated vehicle in the asphalted direction of travel) . Then the second tipping platform 101b or 101c of elevator wagon 101 is lowered to allow the exit of the articulated and subsequently the second tipping platform 101b or 101c of the elevator wagon 101 and then be moved to a parking area.
With similar easily understandable maneuvers it is possible to load any wheeled vehicle onto carrier wagons 102, suitably configuring the wheel locking systems of the vehicles, at least two or more than two, on the loading platform 102a. Therefore, the loading system and transporting wheeled vehicles on railway network according to the invention facilitates the operations of maneuvering the drive of the articulated vehicle, since it allows the access of the articulated vehicle always in forward gear, making the maneuver very simple.
Another advantage of the loading system and transporting wheeled vehicles on railway network is to automatically perform the perfect alignment of the semitrailer, which is the most complicated part of the loading operation in reverse.
Finally, the loading system and transporting wheeled vehicles on railway network according to the invention on a railway network is efficient and low cost.
Finally it is clear that the loading system and transporting wheeled vehicles on railway network, and in particular of semi-trailers of articulated vehicles here described and illustrated may be subject to modifications and variations without thereby departing from the scope of the present invention, as defined in the appended claims.

Claims

CLAIMS :
1. System (100) for loading and transporting on railway network wheeled vehicles comprising at least one articulated vehicle (50) equipped with a drive (51) and semitrailer (52), the system (100) comprising:
- a computerized system configured to be placed in a station of the railway network;
- at least one elevator wagon (101) interfaced with the railway station computerized system;
- at least one carrier wagon (102) interfaced with the railway station computerized system; and a carriageable road infrastructure (103) for connecting the road network to a specific area comprising a railway network service binary (203) for use by the elevator wagon (101), the railway network being connected to the railway line of the same network, configured for allowing the access and the exit of the articulated vehicle (50) in two travelling directions ;
characterized in that the elevator wagon (101) comprises:
- a platform (101a), configured to house a wheeled vehicle (50), provided with a first tipping plane (101b) hinged to a first end; a second tipping plane
(101c) hinged to a second end opposite to the first one ; lateral external containment fenders (121) configured to achieve perfect alignment of the wheeled vehicle (50) ; and a gangway (122) for the passage of an operator, sideways to the containment fenders (121) ;
a linear structure (lOld) to which the platform (101a) is inferiorly coupled, comprising, at its ends, carriages (lOlda) with motorized rooms;
- lifting structures (lOle) fixed between the linear structure (lOld) and the platform (101a) and configured to raise and lower the platform (101a) of the elevator wagon (101) by means of actuators, configured for switching the position of the platform (101a) from a level position close to the road level to a raised position aligned with the standard upper height of buffers of the usual railway wagons and vice versa, depending on the data provided by on board sensors ;
- an electronic control system (123) comprised in the linear structure (lOld) and configured to interact with the railway station computerized system and operate the raising / lowering of the loading platform (101a) through the lifting systems (lOle) ; and - auxiliary systems to assist in loading and unloading maneuvers and in handling of the articulated vehicle
(50) or of the single drive (51); and
- the carrier wagon (102) comprises:
- a linear structure equipped with two wheel systems
(102aa) between which a load platform (102a) is comprised configured to house the semi-trailer (52) of the articulated vehicle (50) and configured to be lowered and raised, on command of a computerized system present on the carrier wagon (102), in such a way as to be able to be raised up to the level of buffers (102ab) to allow horizontal transit of semi trailer ( 52 ) ;
a first end comprising a flat portion (102ca) configured to accommodate the front part of the semitrailer (52) after being loaded on the loading platform (102), and to be able to lock it by means of an adjustable locking system (102cb), the flat portion (102c) being provided on each side with a tipping platform (102c) for the passage of an operator;
- load sensors to determine if the weight of the semi trailer is suitable for transport in relation to the characteristics of the railway section to be covered; - systems to assist in loading and unloading maneuvers and handling of the articulated vehicle (50) or of the single drive (51); and
the carriageable road infrastructure (103) is configured to allow access to the service binary (203) and comprises a loading / unloading area (103a) comprising unsurfaced tracks made carriageable and connecting elements (103b) to the service binary (203) .
2. System (100) according to claim 1, characterized in that the electronic control system (123) is positioned between the lifting structures (lOle) .
3. System (100) according to claim 1, characterized in that the platform (101a) is configured to be operated in manual or automatic mode.
4. System (100) according to claim 1, characterized by the fact the elevator wagon (101) comprises at least two locking systems ( 101 f) able to rise during the moving maneuvers of the wagon and to lower during the loading maneuvers of the articulated vehicles (50) preventing the movement of the elevator wagon (101) and providing support for load support;
5. System (100) according to claim 1, characterized in that the elevator wagon (101) comprises load sensors configured to detect the presence of a vehicle on board, to check the tolerability limits of the load, and to check the compatibility of the load distribution.
6. System (100) according to claim 1, characterized in that the computerized system (123) is configured to automatically manage the moving of the elevator wagon (101) for positioning in the maneuvering areas or stop areas according to the information received electronically from the railway station computerized system.
7. System (100) according to claim 1, characterized in that the intelligent elevator wagon (101) comprises a battery rechargeable automatically or by connection to the electricity network.
8. System (100) according to claim 1, characterized in that the front part of the load platform (102a) faced to the loading side (102ca), placed at the stands of the semi trailer (52) when it is loaded, it is equipped with a self-leveling platform (102d) to facilitate the support of the semi-trailer (52) during the loading or unloading phase to allow the disengagement of the drive (51) and the leveling of the semi-trailer in the correct position for transport .
EP19780016.2A 2018-09-06 2019-09-03 Loading system and transporting wheeled vehicles on railway network Active EP3847072B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT201800008388 2018-09-06
PCT/IB2019/057396 WO2020049443A1 (en) 2018-09-06 2019-09-03 Loading system and transporting wheeled vehicles on railway network

Publications (2)

Publication Number Publication Date
EP3847072A1 true EP3847072A1 (en) 2021-07-14
EP3847072B1 EP3847072B1 (en) 2022-08-03

Family

ID=64316863

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19780016.2A Active EP3847072B1 (en) 2018-09-06 2019-09-03 Loading system and transporting wheeled vehicles on railway network

Country Status (10)

Country Link
US (1) US20210316767A1 (en)
EP (1) EP3847072B1 (en)
JP (1) JP2021535863A (en)
CN (1) CN112654550A (en)
CA (1) CA3111379A1 (en)
EA (1) EA039059B1 (en)
ES (1) ES2929418T3 (en)
PL (1) PL3847072T3 (en)
WO (1) WO2020049443A1 (en)
ZA (1) ZA202101243B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201900018554A1 (en) * 2019-10-11 2021-04-11 Crain Mobility S R L INTEGRATED MOBILITY SYSTEM
CN115071541A (en) * 2022-07-29 2022-09-20 眉山中车物流装备有限公司 Detachable tire settlement device

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1173693A (en) * 1957-04-26 1959-02-27 Atel Const Nord De La France Railway wagon for transporting road vehicles
US6666148B1 (en) * 1975-07-18 2003-12-23 National Steel Car Limited Vehicle carrying rail road car structure
US4547107A (en) * 1981-02-17 1985-10-15 Krause Robert A Intermodal rail truck and coupling system
US4653966A (en) * 1986-01-08 1987-03-31 Trailer Rail Partners Drop-deck intermodal bogie
DE3739277A1 (en) * 1987-11-20 1989-06-01 Leitz Ludwig METHOD FOR CHANGING ROAD VEHICLES FROM THE ROAD TO A TRAIN OR REVERSE AND DEVICES FOR CARRYING OUT THE PROCEDURE
US5246321A (en) * 1991-08-26 1993-09-21 Trinity Industries, Inc. Railway spine car
US6279483B1 (en) * 1996-11-04 2001-08-28 Railroad Technologies Pty. Ltd. Rail/road transport
NL1005456C2 (en) * 1997-03-06 1998-09-08 Harry Nijenhuis Management B V Rail terminal for containers and rail car.
FR2828457A1 (en) * 2001-08-08 2003-02-14 Alain Plaud Rail transport vehicle comprises variable level platforms each end of which rests on railway wagons, lateral supports and wheel accessories engage fixed ramps to give access to raised support platform
FR2850929B3 (en) * 2003-02-06 2005-01-07 Jean Claude Ramel DEVICE FOR THE RAIL TRANSPORT OF HEAVY-DUTY VEHICLES
DE102009052382A1 (en) * 2009-11-09 2011-05-12 Cargobeamer Ag Method and cargo handling terminal for handling semi-trailers from rail to road and vice versa, as well as towing vehicles for semi-trailers and semitrailer tractors therefor, as well as methods of transhipping semi-trailers from rail to road and vice versa and for transporting semi-trailers on rail
EP2902299B1 (en) * 2014-01-30 2018-07-25 Bayernhafen GmbH & Co. KG Loading device for a HGV semi trailer

Also Published As

Publication number Publication date
PL3847072T3 (en) 2023-04-17
US20210316767A1 (en) 2021-10-14
CA3111379A1 (en) 2020-03-12
EP3847072B1 (en) 2022-08-03
EA039059B1 (en) 2021-11-26
WO2020049443A1 (en) 2020-03-12
ES2929418T3 (en) 2022-11-29
ZA202101243B (en) 2021-10-27
EA202190472A1 (en) 2021-04-13
JP2021535863A (en) 2021-12-23
CN112654550A (en) 2021-04-13

Similar Documents

Publication Publication Date Title
RU2374107C2 (en) Method to transship cargoes and appropriate transportation system
US11634186B2 (en) Tugger train trailer, transport system, and transport method
US8875826B2 (en) System for replacing a battery of a ground transportation vehicle, particularly of an unmanned heavy-duty transportation vehicle for ISO containers
FI85405B (en) Lift and conveying arrangement for vehicles
US7779761B2 (en) Under-way vehicle transfer
CN110419071B (en) Transport vehicle for automatic guidance of containers and method for operating the vehicle, and system having an autonomous transport vehicle
US20110107938A1 (en) Method and transfer terminal for transferring semi-trailers from railway to roadway, and vice versa and for transporting semi-trailers by rail, as well as traction vehicle for semi-trailers and tractor trailer unit
RU2273578C2 (en) System of load transportation and loading and unloading of cars in turned position at railway station for combination rail-and-motor road carriages and method of application of said system
RU2191714C2 (en) Reloading system
EP3847072B1 (en) Loading system and transporting wheeled vehicles on railway network
CN204225542U (en) A kind of without dodging three-dimensional parking device
EP0020638B1 (en) Rotary loader and storage system
DE4120906A1 (en) Pick-a-back system for lorries on railway at intermediate stations - uses automatic computer controlled system, rotatable platforms on trucks or a system to rotate or push detached trucks towards loading ramps
RU2282548C2 (en) Turnable for slewing carrying gear of flat car for combination rail and road carriages
CN212224816U (en) Transport primary and secondary car
CN111236716A (en) Transport mother vehicle
CN111140058A (en) Transport primary and secondary car
CN114174615A (en) Conveyor device for moving vehicles and robot system comprising such a device
CN111305617A (en) Transport mother vehicle
CN219034217U (en) Vehicle carrying device and stereo garage system
JPH11246047A (en) Physical distribution facilities
CN212295821U (en) Transport mother vehicle
JP2755746B2 (en) Parking system
JPS6311266Y2 (en)
CN117881864A (en) Automatic parking system for motor vehicle

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210325

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220421

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1508521

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220815

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019017886

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2929418

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20221129

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220803

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221205

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1508521

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220803

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221203

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221104

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602019017886

Country of ref document: DE

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220903

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

26N No opposition filed

Effective date: 20230504

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220930

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220903

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20230904

Year of fee payment: 5

Ref country code: NL

Payment date: 20230928

Year of fee payment: 5

Ref country code: IT

Payment date: 20230914

Year of fee payment: 5

Ref country code: GB

Payment date: 20230928

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230926

Year of fee payment: 5

Ref country code: PL

Payment date: 20230829

Year of fee payment: 5

Ref country code: FR

Payment date: 20230921

Year of fee payment: 5

Ref country code: DE

Payment date: 20230928

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20231004

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20230929

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220803