EP3536599A1 - Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station - Google Patents

Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station Download PDF

Info

Publication number
EP3536599A1
EP3536599A1 EP19382160.0A EP19382160A EP3536599A1 EP 3536599 A1 EP3536599 A1 EP 3536599A1 EP 19382160 A EP19382160 A EP 19382160A EP 3536599 A1 EP3536599 A1 EP 3536599A1
Authority
EP
European Patent Office
Prior art keywords
lng
ship
natural gas
liquefied natural
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19382160.0A
Other languages
German (de)
French (fr)
Other versions
EP3536599B1 (en
Inventor
Miguel DUVISON SANTIAGO
Roberto CERRATO ORTEGA
Francisco Javier GALLO CARRASCO
Juan ROMERO BLANCO
Jordi Josep ESPARBE MAINAR
Piedad GARCÍA DÍAZ
Mario BONAUT PRIETO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naturgy LNG SL
Original Assignee
Naturgy Energy Group SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naturgy Energy Group SA filed Critical Naturgy Energy Group SA
Priority to SI201930010T priority Critical patent/SI3536599T1/en
Publication of EP3536599A1 publication Critical patent/EP3536599A1/en
Application granted granted Critical
Publication of EP3536599B1 publication Critical patent/EP3536599B1/en
Priority to HRP20201951TT priority patent/HRP20201951T1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/002Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods
    • B63B25/008Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods for wheeled cargo
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/18Detachable decks
    • B63B25/20Detachable decks for motor vehicles or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/14Arrangement of ship-based loading or unloading equipment for cargo or passengers of ramps, gangways or outboard ladders ; Pilot lifts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/19Other loading or unloading equipment involving an intermittent action, not provided in groups B63B27/04 - B63B27/18
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/28Barges or lighters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/061Fluid distribution for supply of supplying vehicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0165Applications for fluid transport or storage on the road
    • F17C2270/0168Applications for fluid transport or storage on the road by vehicles
    • F17C2270/0171Trucks

Definitions

  • the invention is comprised in the technical field of natural gas transport and logistics systems, more specifically in the transport of liquefied natural gas LNG from gas deposits or gas-producing countries to the end consumers or clients, when said consumers are in hard-to-access marine locations.
  • the transport and distribution ship of the invention is likewise comprised in the field of marine means used for the transport and distribution of liquefied natural gas between end consumers or clients who may be located close to or far from the coast, but are scatter about in a large are of islands, between which logistic transport can be done at sea.
  • the ship of the invention is also comprised in the technical field of refueling other ships, more specifically ships powered with liquefied natural gas LNG.
  • the transport of liquefied natural gas LNG from natural gas-producing countries to consumer countries is done through large ships called gas carriers.
  • gas carriers In these carriers, the gas must be kept at a temperature of -161° C for long journeys, with the gas natural being transported in liquid state at a pressure greater than atmospheric pressure.
  • the large gas carriers have a cargo capacity of between 30,000 and 266,000 m 3 .
  • LNG is transported in tanks that withstand these low temperatures, with the LNG being kept at the temperature at which it has been loaded, i.e., at about -161°C throughout the entire voyage, but depending on its temperature and pressure, part of the liquid evaporates due to boiling.
  • the evaporated gas is normally used to drive the carrier, either consuming it in boilers or using it in engines which use the gas as fuel.
  • PCT patent application WO2016/036690 is known, which relates to a system for small scale marine transportation of cryogenic hydrocarbons, i.e., it relates to small scale liquefied natural gas transportation, said system including a plurality of swap barges each having a cryogenic hydrocarbon capacity of 25,000 m 3 or less, and a transfer ship, where the plurality of small scale LNG swap barges and the transfer ship cooperate to distribute gas to facilities on land, where the liquefied gas is unloaded and regasified.
  • This system facilities the supply of natural gas to coastal regions which a shallow draft, rendering their use suitable in these circumstances, but there is still a need for a port infrastructure for the storage of liquefied natural gas and even a regasification plant from where the gas is distributed through pipelines to the end consumer or client.
  • a second problem in this type of consumers is that although they have port facilities for unloading LNG, they do not have large LNG tanker trucks; furthermore they lack pipelines distributing LNG among consumers.
  • An LNG transport and distribution system which does not depend on each specific island or area to be supplied, which is a completely autonomous system, is therefore advisable.
  • Spanish patent application P201730936 belonging to the same applicant discloses a carrier for liquefied natural gas (LNG) tanker trucks provided solely for being supplied by a small LNG carrier and for the tanker trucks in the carrier to be loaded through the loading posts. Once the ship approaches land, the tanker trucks are distributed on land to supply users, and return to the carrier to be consequently filled and to subsequently initiate the cycle.
  • LNG liquefied natural gas
  • LNG liquefied natural gas
  • the object of the invention consisting of a ship for refueling ships powered by liquefied natural gas (LNG), as well as of a liquefied natural gas LNG loading station, comprising:
  • each tanker truck has at least one pump for the transfer of liquefied natural gas, preferably as many transfer pumps as there tanker trucks supplying LNG to the ship to be refueled being used.
  • the ship has a circuit in the ship itself, formed by a manifold joining the loading/unloading modules of the bays with the connection module linked to the ship to be refueled, which circuit has its own pump for the transfer of liquefied natural gas between the tanker trucks and the ship to be refueled with liquefied natural gas.
  • the means of access and means of exit for the tanker trucks can be the same, or the means of access can be located at the end opposite the means of exit for the tanker trucks in the ship, whereby small sized tanker trucks which can be maneuvered on the deck of the ship and can exit through the access through which they entered can be used, or when larger sized tanker trucks are used, which are difficult to maneuver as they require a large space, the most suitable arrangement would be the trucks entering at one end of the carrier and exiting at the opposite end according to the orientation of the tanker truck tractor heads.
  • the means of access and exit for the tanker trucks consist of drive-on ramps for the tanker trucks, as it will facilitate getting the trucks on and off the deck of the ship, with each tanker truck being located at its loading post for loading LNG.
  • connection module for connecting the ship to the LNG supply, which comprises:
  • connection module for connecting the ship to the LNG supply, which comprises:
  • This ship does not have LNG tanks for supplying fuel to a third party, but rather it is a means of transferring and distributing LNG from the small LNG carrier and the tanker trucks arranged on its deck.
  • the deck of the ship is divided into one or multiple loading posts for tanker trucks, since deck space can be optimized for loading multiple tanker trucks, where it can adopt configurations with four, six, nine, or more loading posts for tanker trucks, adapted to the size of the ship.
  • Each loading post for tanker trucks corresponds to at least one loading/unloading module for loading/unloading LNG in/from the tanker trucks.
  • These loading/unloading modules for loading/unloading LNG in or from the tanker trucks comprise:
  • a final detail to be taken into account is the discharge conduit for the gases coming from LNG vaporization of the tanker trucks, which in a preferable arrangement of the invention is removed from the ship to be liquefied outside of same, although being able to liquefy it in the ship itself or being able to use it for consumption of the drive engines thereof in the event they are powered by gas is not ruled out.
  • the refueling ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station, is completed with the inclusion of systems that are essential for handling the ship and the products transported in it:
  • Figures 1 to 3 respectively depict a profile view, plan view, and cross-section view of a ship (1) for carrying tanker trucks (3) such as the one proposed by the invention, in which said ship has a planar surface which is the deck (2), which is accessed from either the bow access (4) or from the stern access (5), which bow (4) and stern (5) are indifferent in this case as the ship can navigate anyway as it has having propulsion systems (6) on both sides and is thus able to increase maneuverability.
  • said ship has nine loading posts (9) for tanker trucks, where the trucks are located in rows of three by three, covering the deck of the ship.
  • the cross-section view of the ship which is shown in Figure 3 , three of the tanker trucks (3) can be seen aligned with the loading/unloading modules (10) for the tanker trucks.
  • Figure 4 depicts a schematic bird's eye perspective view of a ship (1) like that of the invention loading or unloading tanker trucks (3) on or off the deck (2) of the ship. This depiction allows seeing how a tanker truck (3) accesses the bow access (4) through the bow ramp (7) and how another tanker truck (3) is already placed in its loading/unloading post (9) so that the LNG tanker truck can be filled from the loading/unloading module (10) or LNG can be unloaded for refueling another ship. These operations are carried out when the ship approaches the small LNG carrier and is connected to it for the operations for loading tanker trucks, or if another ship to be refueled in bunkering operations approaches, the tanks are unloaded to the ship to be refueled.
  • Figures 5 and 6 depict schematic plan views of the process of loading and unloading the trucks on the deck of the ship.
  • they are observed by means of arrows the flow of empty trucks entering in the ship (1) through the stern access (5), and it can also be observed how each tanker truck is located in its loading/unloading post (9) for being connected to the loading/unloading modules (10).
  • the ship (1) reaches port, its bow and the bow access (4) are facing the dock of the port, so that the trucks follow a flow without maneuvers on the ship (1), i.e., if the tanker trucks enter at the bow, they must exit through the stern (5), thereby avoiding maneuvers of the tanker trucks on the deck of the ship (2).
  • Figure 7 depicts a diagram of the layout of conduits existing in the ship (1) and how it is connected to the small LNG carrier (11) or to the ship to be refueled (11') through the connection module (12) of the ship.
  • This same figure shows the twelve loading modules (10), each of which will have
  • the distribution module (17) for distributing LNG in the ship is, and it is basically made up of LNG feed lines (15) and LNG vapor lines (16), which are connected to the small LNG carrier (11) or to the ship to be refueled (11').
  • Figure 8 depicts a diagram of the loading and unloading module for a tanker truck (3).
  • the loading/unloading area (20) of the tanker truck (3) has been separated from the area for the connection to the pumping module (21) from the tanker trucks (3) in the event of choosing the operation for refueling carriers by means of the pumping module.
  • the ship of the invention carries tanks in the two operations that can be performed.
  • the tanker trucks (3) are filled from an LNG carrier, which is done through area (20) of the loading and unloading module, where the LNG feed line (13) and the LNG vapor return line (14) can be seen.
  • LNG When the ship is performing refueling operations, LNG is unloaded from the tank (3) through the LNG line consisting of the LNG loader/unloader (13) of area (20), when it uses the pump of the tank for performing a transfer, or it uses the connection to the pumping module (21) when the pumping equipment of the ship of the invention is in charge of removing the LNG from the tanks for the transfer thereof to the ship to be refueled.
  • the vaporized gas connection formed by the boil-off gas BOG unloader (14) for maintaining pressure in the system will be the same in both cases of pumping.
  • FIG. 9 shows a diagram of pipes in the event of using the pumping module (23) for bunkering with the ship that is going to be refueled through the connection module (12) of the ship.
  • Said figure shows the connection between the loading/unloading posts (10) for the trucks to a manifold (22), the pumping equipment (23) for the liquefied natural gas aspirated from said manifold (22), and LNG pumping connections consisting of the LNG and boil-off gas pumping module (18) consisting of the boil-off gas BOG pumping module (19), to the connection module (12) of the ship as it appears in Figure 7 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Transportation (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention consists of an LNG tanker ship which is used as a liquefied natural gas LNG loading station for operations for refueling ships powered by liquefied gas LNG, in operations which are commonly known as bunkering.
When used as a liquefied natural gas loading station, the ship is supplied from an LNG carrier which refills the tanks of the ship; when approaching the coast, these tanks are unloaded for supplying end consumers.
In bunkering or the operation for refueling ships powered by liquefied natural gas LNG, the tanks themselves and their pumping equipment, or by means of a central pumping system in the ship, transfer the gas from the tanks to the ship to be refueled.

Description

    Technical Field of the Invention
  • The invention is comprised in the technical field of natural gas transport and logistics systems, more specifically in the transport of liquefied natural gas LNG from gas deposits or gas-producing countries to the end consumers or clients, when said consumers are in hard-to-access marine locations.
  • The transport and distribution ship of the invention is likewise comprised in the field of marine means used for the transport and distribution of liquefied natural gas between end consumers or clients who may be located close to or far from the coast, but are scatter about in a large are of islands, between which logistic transport can be done at sea.
  • The ship of the invention is also comprised in the technical field of refueling other ships, more specifically ships powered with liquefied natural gas LNG.
  • Prior State of the Art
  • The transport of liquefied natural gas LNG from natural gas-producing countries to consumer countries is done through large ships called gas carriers. In these carriers, the gas must be kept at a temperature of -161° C for long journeys, with the gas natural being transported in liquid state at a pressure greater than atmospheric pressure. The large gas carriers have a cargo capacity of between 30,000 and 266,000 m3.
  • LNG is transported in tanks that withstand these low temperatures, with the LNG being kept at the temperature at which it has been loaded, i.e., at about -161°C throughout the entire voyage, but depending on its temperature and pressure, part of the liquid evaporates due to boiling. The evaporated gas is normally used to drive the carrier, either consuming it in boilers or using it in engines which use the gas as fuel.
  • Usually when the transported gas is unloaded at a port, a small amount of the load is left in the tanks which, as it gradually evaporates during the journey, will keep the tanks cold, and only a more intense final cooling is needed before loading the LNG again. This is achieved with that same remaining load, removing it from the tanks, which, when it evaporates, cools it at the temperature required for loading.
  • These large gas carriers need ports with a deep draft, and furthermore, due to the load they transport, both the loading and unloading of liquefied natural gas are performed at loading terminals far from ports, which are connected with land through pipelines.
  • For transporting LNG to end consumers or clients, there are basically two systems, the first system in which the pipelined gas reaches a large number of consumers such as homes, industries, shopping centers, etc., and comes from regasification plants, or directly from gas pipelines connected to gas extraction plants. However, in areas far away from large points of consumption or isolated from the gas pipeline network, investing in pipelined supply networks is not cost-effective, so large LNG storage tanks are used and they are generally supplied by tanker trucks which regularly fill such tanks. The invention described herein relates to providing service to clients of this type.
  • PCT patent application WO2016/036690 is known, which relates to a system for small scale marine transportation of cryogenic hydrocarbons, i.e., it relates to small scale liquefied natural gas transportation, said system including a plurality of swap barges each having a cryogenic hydrocarbon capacity of 25,000 m3 or less, and a transfer ship, where the plurality of small scale LNG swap barges and the transfer ship cooperate to distribute gas to facilities on land, where the liquefied gas is unloaded and regasified. This system facilities the supply of natural gas to coastal regions which a shallow draft, rendering their use suitable in these circumstances, but there is still a need for a port infrastructure for the storage of liquefied natural gas and even a regasification plant from where the gas is distributed through pipelines to the end consumer or client.
  • One problem that may arise is when end consumers or clients are located, for example, on very scattered islands or archipelagos, where it is not cost-effective to build those port facilities in each and every one of those places, because it is not worth it economically, making it impossible to enable supplying liquefied natural gas to a very numerous group of clients who are scattered around those islands.
  • A second problem in this type of consumers is that although they have port facilities for unloading LNG, they do not have large LNG tanker trucks; furthermore they lack pipelines distributing LNG among consumers. An LNG transport and distribution system which does not depend on each specific island or area to be supplied, which is a completely autonomous system, is therefore advisable.
  • Spanish patent application P201730936 belonging to the same applicant discloses a carrier for liquefied natural gas (LNG) tanker trucks provided solely for being supplied by a small LNG carrier and for the tanker trucks in the carrier to be loaded through the loading posts. Once the ship approaches land, the tanker trucks are distributed on land to supply users, and return to the carrier to be consequently filled and to subsequently initiate the cycle.
  • The need to enable said ship to be used as an LNG bunkering ship, i.e., liquefied natural gas (LNG) refueling means for other ships powered with liquefied natural gas (LNG), has been observed.
  • Description of the Invention
  • For the purpose of optimizing LNG supply in remote areas such as islands, which lack port areas adapted for LNG supply, and the supply from these islands to the rest of the island by means of trucks or by means of pipelines, and furthermore being able to offer the possibility of refueling other ships, has been developed the object of the invention consisting of a ship for refueling ships powered by liquefied natural gas (LNG), as well as of a liquefied natural gas LNG loading station, comprising:
    • at least one liquefied natural gas LNG tanker truck, located on the deck of the ship;
    • a single connection module which allows connecting the ship to the LNG supply from a supply source or the ship to the carrier that is going to be refueled;
    • at least one loading/unloading module for loading/unloading the LNG in/from the tanker trucks;
    • at least one distribution module for distributing the LNG linking the connection module for connecting the ship to the LNG supply or to the carrier to be refueled and the loading/unloading module for loading/unloading the LNG in/from the tanker trucks;
    • means of access for the tanker trucks to the ship;
    • means of exit for the tanker trucks from the ship;
      said ship being characterized in that
    • the connection module of the ship has a liquefied natural gas connection which allows both the inlet of liquefied natural gas into the ship and the outlet of liquefied natural gas from the ship, as well as a boil-off gas (BOG) connection;
    • the distribution module being able to transfer the liquefied natural gas between the connection module and the loading module, while the boil-off gas (BOG) flows between the loading module and the connection module in operations for loading tanker trucks. During operations for refueling other ships, the liquefied natural gas flows between the loading module and the connection module and the boil-off gas (BOG) of the tanker trucks is connected to the boil-off gas (BOG) manifold to control pressure.
    • the loading module for loading LNG in the tanker trucks is a loading/unloading module for loading/unloading the LNG in/from the tanker trucks.
  • In liquefied natural gas LNG operations for refueling other ships which are powered by gas, internationally referred to as bunkering operations, there is at least one pump for the transfer of liquefied natural gas between the tanker trucks and the ship to be refueled with liquefied natural gas, this pump being for the transfer of liquefied natural gas between the tanker trucks and the ship to be refueled, each tanker truck has at least one pump for the transfer of liquefied natural gas, preferably as many transfer pumps as there tanker trucks supplying LNG to the ship to be refueled being used.
  • Optionally the ship has a circuit in the ship itself, formed by a manifold joining the loading/unloading modules of the bays with the connection module linked to the ship to be refueled, which circuit has its own pump for the transfer of liquefied natural gas between the tanker trucks and the ship to be refueled with liquefied natural gas.
  • The means of access and means of exit for the tanker trucks can be the same, or the means of access can be located at the end opposite the means of exit for the tanker trucks in the ship, whereby small sized tanker trucks which can be maneuvered on the deck of the ship and can exit through the access through which they entered can be used, or when larger sized tanker trucks are used, which are difficult to maneuver as they require a large space, the most suitable arrangement would be the trucks entering at one end of the carrier and exiting at the opposite end according to the orientation of the tanker truck tractor heads.
  • The means of access and exit for the tanker trucks consist of drive-on ramps for the tanker trucks, as it will facilitate getting the trucks on and off the deck of the ship, with each tanker truck being located at its loading post for loading LNG.
  • In operations for filling tanker trucks, the ship, with its empty tanker trucks, will approach the small LNG carrier, which performs the functions of a mother ship, and the ship is connected to the small LNG carrier through the connection module for connecting the ship to the LNG supply, which comprises:
    • at least one connection for an LNG pipe through which LNG is supplied to the ship carrying the tanker trucks, located on the deck of the ship;
    • at least one unloading connection for unloading gases coming from the vaporized natural gas;
    • loading hoses between the ship and the small LNG carrier, which can be used for the transfer of LNG and of the gases coming from LNG vaporization;
    • at least one instrumentation and control module for the transferred LNG and unloading of gases performed, which monitor and control the entire loading process.
  • In operations for refueling other ships, or bunkering, the ship, with its tanker trucks filled, will approach the ship to be refueled and is connected through the connection module for connecting the ship to the LNG supply, which comprises:
    • a connection module incorporating the LNG manifold receiving the liquefied natural gas LNG from the tanker trucks;
    • a distribution module formed by two manifolds, an LNG manifold connecting the connection module with the carrier to be refueled, with the unloading module of each truck, and the other being a boil-off gas BOG manifold connecting the boil-off gas BOG system of the tanker trucks to control pressure;
    • a pumping equipment for pumping the liquefied natural gas between the tanker trucks and the ship to be refueled, said pumping equipment being formed by the LNG transfer pumps themselves on the tanker trucks, or pumping equipment of the carrier itself, formed by a manifold joining the loading/unloading modules of the trucks with the connection module linked to the ship to be refueled, is used;
    • loading/unloading hoses for the liquefied natural gas LNG;
    • at least one fiscal control and instrumentation module for the transferred LNG.
  • This ship does not have LNG tanks for supplying fuel to a third party, but rather it is a means of transferring and distributing LNG from the small LNG carrier and the tanker trucks arranged on its deck.
  • The deck of the ship is divided into one or multiple loading posts for tanker trucks, since deck space can be optimized for loading multiple tanker trucks, where it can adopt configurations with four, six, nine, or more loading posts for tanker trucks, adapted to the size of the ship. Each loading post for tanker trucks corresponds to at least one loading/unloading module for loading/unloading LNG in/from the tanker trucks. These loading/unloading modules for loading/unloading LNG in or from the tanker trucks comprise:
    • an LNG loader/unloader for loading/unloading LNG in or from the tanker trucks;
    • a boil-off gas (BOG) unloader for unloading BOG from the tanker trucks;
    • control and safety valves;
    • a fiscal control, instrumentation, and measurement system for the process of loading/unloading LNG in or from the tanks of the trucks;
    • loading/unloading hoses and connection/disconnection systems between hoses and tanks of the trucks.
  • To make the ship reversible and to enable the trucks to enter and exit at both ends of the ship, a configuration has been used in which the number of loading modules aligned with the axis of the ship is equal to the number of loading posts for tanker trucks plus one, making the ship reversible as regards both the loading and the unloading of tanker trucks.
  • A final detail to be taken into account is the discharge conduit for the gases coming from LNG vaporization of the tanker trucks, which in a preferable arrangement of the invention is removed from the ship to be liquefied outside of same, although being able to liquefy it in the ship itself or being able to use it for consumption of the drive engines thereof in the event they are powered by gas is not ruled out.
  • The refueling ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station, is completed with the inclusion of systems that are essential for handling the ship and the products transported in it:
    • emergency systems for the rapid disconnection of the aerial hoses connecting the ship and the small LNG carrier or the ship to be refueled;
    • emergency systems interrupting the operation for loading/unloading LNG in/from the tanker trucks in the event of an abnormality or leak;
    • fire detection and extinction systems;
    • accidental LNG spill management system.
    Brief Description of the Drawings
  • For the purpose of helping to better understand the features of the invention according to a preferred practical embodiment thereof, a set of drawings is attached as an integral part of said description in which the following has been depicted with an illustrative and non-limiting character:
    • Figures 1 to 3 respectively depict a profile view (Figure 1), plan view (Figure 2), and cross-section view (Figure 3) of a refueling ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station, such as the one proposed by the invention.
    • Figure 4 depicts a schematic bird's eye perspective view of a ship like that of the invention loading tanker trucks on the deck of the ship.
    • Figures 5 and 6 depict schematic plan views of the process of loading and unloading the trucks on and off the deck of the ship.
    • Figure 7 depicts a diagram of the layout of conduits existing in the ship for the operation for loading the tanker trucks and when the ship performs operations for refueling other ships.
    • Figure 8 depicts a diagram of the layout of conduits between the connection module of the ship and a tanker truck.
    • Figure 9 depicts a diagram of the layout of conduits between the loading/unloading posts for loading/unloading the trucks, the liquefied natural gas pumping equipment, and the supply of the liquefied natural gas to the ship to be refueled.
    Detailed Description of a Preferred Embodiment of the Invention
  • Figures 1 to 3 respectively depict a profile view, plan view, and cross-section view of a ship (1) for carrying tanker trucks (3) such as the one proposed by the invention, in which said ship has a planar surface which is the deck (2), which is accessed from either the bow access (4) or from the stern access (5), which bow (4) and stern (5) are indifferent in this case as the ship can navigate anyway as it has having propulsion systems (6) on both sides and is thus able to increase maneuverability.
  • To facilitate access of the tanker trucks (3) to the deck (2) of the ship, there are bow ramps (7) and stern ramps (8) which facilitate tanker trucks (3) driving on and off the ship.
  • It can be seen in these figures that said ship has nine loading posts (9) for tanker trucks, where the trucks are located in rows of three by three, covering the deck of the ship. In the cross-section view of the ship, which is shown in Figure 3, three of the tanker trucks (3) can be seen aligned with the loading/unloading modules (10) for the tanker trucks.
  • Figure 4 depicts a schematic bird's eye perspective view of a ship (1) like that of the invention loading or unloading tanker trucks (3) on or off the deck (2) of the ship. This depiction allows seeing how a tanker truck (3) accesses the bow access (4) through the bow ramp (7) and how another tanker truck (3) is already placed in its loading/unloading post (9) so that the LNG tanker truck can be filled from the loading/unloading module (10) or LNG can be unloaded for refueling another ship. These operations are carried out when the ship approaches the small LNG carrier and is connected to it for the operations for loading tanker trucks, or if another ship to be refueled in bunkering operations approaches, the tanks are unloaded to the ship to be refueled.
  • In this same depiction and when dealing with operations for loading LNG in the tanker trucks, it can be seen how, once the tanker trucks (3) are filled with LNG, the ship heads for port, being placed such that the stern ramp (8) is deployed, the tanker trucks exiting in the direction of travel through the stern access (5).
  • It can be observed in this same Figure 4 that while there are nine loading/unloading posts (9) on the deck of the ship, there are twelve loading modules (10) and that is due to the reversibility of the ship, which could allow access to or exit from the ship from both the bow and the stern, so it is necessary to provide an aligned configuration of loading modules in a number such that it is the number of loading posts plus one defining the loading modules to be aligned longitudinally with the axis of the ship (1). In this case, as there are three parallel alignments of loading posts, there will be three more loading modules than there are number of loading posts, as can be observed in the mentioned figure.
  • Figures 5 and 6 depict schematic plan views of the process of loading and unloading the trucks on the deck of the ship. In Figure 6, they are observed by means of arrows the flow of empty trucks entering in the ship (1) through the stern access (5), and it can also be observed how each tanker truck is located in its loading/unloading post (9) for being connected to the loading/unloading modules (10). When the ship (1) reaches port, its bow and the bow access (4) are facing the dock of the port, so that the trucks follow a flow without maneuvers on the ship (1), i.e., if the tanker trucks enter at the bow, they must exit through the stern (5), thereby avoiding maneuvers of the tanker trucks on the deck of the ship (2).
  • Figure 7 depicts a diagram of the layout of conduits existing in the ship (1) and how it is connected to the small LNG carrier (11) or to the ship to be refueled (11') through the connection module (12) of the ship. This same figure shows the twelve loading modules (10), each of which will have
    • an LNG loader/unloader (13) for loading or unloading LNG in and from the tanker trucks (3);
    • a boil-off gas BOG unloader (14) for unloading BOG from the tanker trucks (3), removing vaporized LNG;
    • control valve (27), shut-off valve (31), and safety valve (28) assuring safe filling of the tanks;
    • a fiscal control, instrumentation, and measurement system for the process of loading LNG in the tanks of the trucks (29);
    • loading hoses and connection/disconnection systems between hoses and tanks of the trucks (30).
  • These last three elements are not shown in detail in the drawing, but the distribution module (17) for distributing LNG in the ship is, and it is basically made up of LNG feed lines (15) and LNG vapor lines (16), which are connected to the small LNG carrier (11) or to the ship to be refueled (11').
  • This figure highlights the unloading of the LNG pumping module (18) which is used in bunkering functions when refueling a ship (11'), only when the option of the carrier pumping module and the connection of the pumping module for the boil-off gas BOG (19) are used.
  • Figure 8 depicts a diagram of the loading and unloading module for a tanker truck (3). In said diagram, the loading/unloading area (20) of the tanker truck (3) has been separated from the area for the connection to the pumping module (21) from the tanker trucks (3) in the event of choosing the operation for refueling carriers by means of the pumping module.
  • In this diagram, it can be seen how the ship of the invention carries tanks in the two operations that can be performed. In the operation for loading tanks (3), the tanker trucks (3) are filled from an LNG carrier, which is done through area (20) of the loading and unloading module, where the LNG feed line (13) and the LNG vapor return line (14) can be seen.
  • When the ship is performing refueling operations, LNG is unloaded from the tank (3) through the LNG line consisting of the LNG loader/unloader (13) of area (20), when it uses the pump of the tank for performing a transfer, or it uses the connection to the pumping module (21) when the pumping equipment of the ship of the invention is in charge of removing the LNG from the tanks for the transfer thereof to the ship to be refueled. The vaporized gas connection formed by the boil-off gas BOG unloader (14) for maintaining pressure in the system will be the same in both cases of pumping. This figure shows the control valve (27), the safety valve (28), the fiscal control, instrumentation, and measurement system of the process of loading LNG in the tanks of the trucks (29), the shut-off valve (31), and loading/unloading hoses (32) and connection/disconnection systems between hoses and tanks of the trucks (3). Figure 9 shows a diagram of pipes in the event of using the pumping module (23) for bunkering with the ship that is going to be refueled through the connection module (12) of the ship. Said figure shows the connection between the loading/unloading posts (10) for the trucks to a manifold (22), the pumping equipment (23) for the liquefied natural gas aspirated from said manifold (22), and LNG pumping connections consisting of the LNG and boil-off gas pumping module (18) consisting of the boil-off gas BOG pumping module (19), to the connection module (12) of the ship as it appears in Figure 7.

Claims (18)

  1. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station,
    comprising:
    - at least one liquefied natural gas LNG tanker truck (3), located on the deck (2) of the ship (1);
    - a connection module (12) for connecting the ship to the LNG supply from a supply source;
    - at least one loading module (10) for loading the LNG in the tanker trucks (3);
    - at least one distribution module (17) for distributing the LNG linking the connection module (12) for connecting the ship (1) to the LNG supply and the loading module (10) for loading the LNG in the tanker trucks (3);
    - means of access for the tanker trucks to the ship (7);
    - means of exit for the tanker trucks from the ship (8);
    characterized in that
    - the connection module (12) of the ship has a liquefied natural gas connection which is the LNG feed line (15) which allows both the inlet of liquefied natural gas into the ship and the outlet of liquefied natural gas from the ship, as well as a boil-off gas (BOG) connection which is the LNG vapor line (16);
    - the distribution module (17) being able to transfer the liquefied natural gas between the connection module (12) and the loading module (10), while the boil-off gas (BOG) flows between the loading module (10) and the connection module (12) in operations for loading tanker trucks (3), and in operations for refueling other ships, the liquefied natural gas flows between the loading module (10) and the connection module (12) and the boil-off gas (BOG) of the tanker trucks is connected to the boil-off gas (BOG) manifold through the LNG vapor line (16) to control pressure;
    - the loading module for loading LNG in the tanker trucks (3) is a loading/unloading module (10) for loading/unloading the LNG in/from the tanker trucks (3).
  2. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that it has at least one piece of pumping equipment (23) for the transfer of liquefied natural gas between the tanker trucks (3) and the ship to be refueled with liquefied natural gas.
  3. Refueling tanker ship for ships powered by liquefied natural gas (LNG), as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that the pump for the transfer of liquefied natural gas between the tanker trucks and the ship to be refueled with liquefied natural gas consists of the at least one pump each tanker truck has for the transfer of liquefied natural gas.
  4. Refueling tanker ship for ships powered by liquefied natural gas (LNG), as well as a liquefied natural gas LNG loading station according to claim 3, characterized in that there are as many transfer pumps as there are tanker trucks supplying LNG to the ship to be refueled.
  5. Refueling tanker ship for ships powered by liquefied natural gas (LNG), as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that the at least one pump for the transfer of liquefied natural gas between the tanker trucks (3) and the ship to be refueled with liquefied natural gas belongs to a circuit of the ship itself, formed by a manifold (22) joining the loading/unloading modules (10) of the bays with the connection module (12) linked to the ship to be refueled.
  6. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that the means of access and the means of exit for the tanker trucks are the same.
  7. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that the means of access are located at the end opposite the means of exit for the tanker trucks in the ship.
  8. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1, 5, and 7, characterized in that the means of access and exit for the tanker trucks consist of drive-on ramps (7), (8) for the tanker trucks (3).
  9. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that the connection module (12) for connecting the ship to the LNG supply comprises:
    - at least one connection for an LNG pipe consisting of the LNG feed line (15);
    - at least one boil-off gas (BOG) unloading connection which is the LNG vapor line (16);
    - liquefied natural gas LNG loading/unloading hoses (30) when the ship is used for loading tanker trucks or for refueling ships powered with gas; and
    - at least one fiscal control and instrumentation module for the transferred LNG, nitrogen and unloading of gases performed (29).
  10. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claim 1, characterized in that each loading/unloading module (10) for loading/unloading the LNG in or from the tanker trucks (3) comprises:
    - an LNG loader/unloader (13) for loading or unloading LNG in or from the tanker trucks (3);
    - a boil-off gas (BOG) unloader (14) for unloading BOG from the tanker trucks (3);
    - control valve (27), shut-off valve (31), and safety valve (28);
    - a fiscal control, instrumentation, and measurement system (29) for the process of loading/unloading LNG in or from the tanks of the trucks; and
    - loading/unloading hoses (32) and connection/disconnection systems between hoses and tanks of the trucks (3).
  11. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 10, characterized in that the ship has multiple loading posts (9) where the LNG tanker trucks (3) are located, and where these loading posts (9) have loading/unloading modules (10) for loading/unloading LNG in or from the tanker trucks (3), adapted to the size of the tanker trucks and to the dimensions of the ship.
  12. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 11, characterized in that the ship (1) has at least two loading/unloading modules (10) aligned with the axis of the ship.
  13. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 11, characterized in that the ship (1) has at least two loading/unloading modules (10) aligned along an axis perpendicular to the axis of the ship.
  14. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 13, characterized in that the number of loading/unloading modules (10) aligned with the axis of the ship is equal to the number of loading posts (9) for tanker trucks (3) plus one, making the ship reversible as regards both the loading and the unloading of tanker trucks (3).
  15. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to the preceding claims, characterized in that the boil-off gas (BOG) of the discharge conduit of the tanker trucks is removed from the ship to be handled outside of same.
  16. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 14, characterized in that the boil-off gas (BOG) of the discharge conduit of the tanker trucks is liquefied in the ship itself.
  17. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to claims 1 to 14, characterized in that the boil-off gas (BOG) of the discharge conduit of the tanker trucks is consumed by the engines of the ship.
  18. Refueling tanker ship for ships powered by liquefied natural gas LNG, as well as a liquefied natural gas LNG loading station according to the preceding claims, characterized in that it further comprises
    - emergency systems for the rapid disconnection of the aerial hoses connecting the ship and the small LNG ship or the ship to be refueled;
    - emergency systems interrupting the operation for loading/unloading LNG in/from the tanker trucks in the event of an abnormality or leak;
    - fire detection and extinction systems; and
    - accidental LNG spill management system.
EP19382160.0A 2018-03-06 2019-03-05 Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station Active EP3536599B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SI201930010T SI3536599T1 (en) 2018-03-06 2019-03-05 Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station
HRP20201951TT HRP20201951T1 (en) 2018-03-06 2020-12-07 Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201830217A ES2724565B2 (en) 2018-03-06 2018-03-06 TANK CARRIER FOR REFUELING VESSELS PROPELLED BY LIQUEFIED NATURAL GAS (LNG), AS WELL AS LIQUEFIED NATURAL GAS LOADING STATION

Publications (2)

Publication Number Publication Date
EP3536599A1 true EP3536599A1 (en) 2019-09-11
EP3536599B1 EP3536599B1 (en) 2020-09-16

Family

ID=65766962

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19382160.0A Active EP3536599B1 (en) 2018-03-06 2019-03-05 Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station

Country Status (9)

Country Link
EP (1) EP3536599B1 (en)
CY (1) CY1123759T1 (en)
DK (1) DK3536599T3 (en)
ES (1) ES2724565B2 (en)
HR (1) HRP20201951T1 (en)
LT (1) LT3536599T (en)
PL (1) PL3536599T3 (en)
PT (1) PT3536599T (en)
SI (1) SI3536599T1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114427656A (en) * 2022-03-09 2022-05-03 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf boat filling station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011046315A2 (en) * 2009-10-16 2011-04-21 대우조선해양 주식회사 Ship for supplying liquefied fuel gas
WO2015090327A2 (en) * 2013-12-19 2015-06-25 Kosan Crisplant A/S Liquid natural gas transfer
EP3012185A1 (en) * 2013-06-18 2016-04-27 Krylov State Research Centre Tug/bunker barge combination
KR101710997B1 (en) * 2015-12-07 2017-03-02 에스티엑스조선해양 주식회사 Loading device for lng

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4753835B2 (en) * 2006-10-23 2011-08-24 中国電力株式会社 Ship and fuel supply method to ship
KR101148078B1 (en) * 2009-09-22 2012-05-24 삼성중공업 주식회사 Ship and fuel supply system having the same
FR2978119B1 (en) * 2011-07-22 2014-09-05 Stx France Sa SHIP EQUIPPED WITH FUEL STORAGE SYSTEM AND CORRESPONDING METHOD
ES2671846B2 (en) * 2017-07-14 2019-01-14 Gas Natural Sdg S A Liquefied natural gas tank truck barge gnl

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011046315A2 (en) * 2009-10-16 2011-04-21 대우조선해양 주식회사 Ship for supplying liquefied fuel gas
EP3012185A1 (en) * 2013-06-18 2016-04-27 Krylov State Research Centre Tug/bunker barge combination
WO2015090327A2 (en) * 2013-12-19 2015-06-25 Kosan Crisplant A/S Liquid natural gas transfer
KR101710997B1 (en) * 2015-12-07 2017-03-02 에스티엑스조선해양 주식회사 Loading device for lng

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114427656A (en) * 2022-03-09 2022-05-03 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf boat filling station
CN114427656B (en) * 2022-03-09 2023-12-08 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf filling station

Also Published As

Publication number Publication date
HRP20201951T1 (en) 2021-04-16
LT3536599T (en) 2021-01-11
ES2724565B2 (en) 2020-09-10
CY1123759T1 (en) 2022-03-24
PT3536599T (en) 2020-10-08
EP3536599B1 (en) 2020-09-16
PL3536599T3 (en) 2021-03-22
DK3536599T3 (en) 2020-11-30
SI3536599T1 (en) 2021-07-30
ES2724565A1 (en) 2019-09-12

Similar Documents

Publication Publication Date Title
US11204117B2 (en) Dockside ship-to-ship transfer of LNG
RU2543603C2 (en) System and method for containerised shipment of fluids
EP3428054B1 (en) Barge for carrying liquefied natural gas lng tanker trucks
US10359229B2 (en) Floating liquefied natural gas commissioning system and method
KR101205351B1 (en) Lng bunkering vessel
US9416906B2 (en) System and method for transferring natural gas for utilization as a fuel
EP3428053B1 (en) Maritime system for the transport and distribution of liquefied natural gas lng
EP3536599B1 (en) Refueling tanker ship for ships powered by liquefied natural gas (lng), as well as a liquefied natural gas lng loading station
CN110642217A (en) System and method for LNG transport and distribution
US9546759B2 (en) System and method for transferring natural gas for utilization as a fuel
EP3012185B1 (en) Tug/bunker barge combination
US20170240251A1 (en) Liquefied natural gas fuel barge
KR102342200B1 (en) Bunkering Module System and Bunkering Method for a Ship
US20210214050A1 (en) Liquefied natural gas vessel
KR20220150447A (en) Liquefied gas supplying system and operating method thereof
Veiga et al. 13º Seminário Internacional de Transporte e Desenvolvimento Hidroviário Interior
KR20020000977A (en) Cargo sending device for safety in emergency of storing tank liquefied gas on the sea

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200220

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 27/34 20060101ALI20200602BHEP

Ipc: B63B 25/12 20060101ALI20200602BHEP

Ipc: B63B 25/14 20060101ALI20200602BHEP

Ipc: B63B 25/00 20060101AFI20200602BHEP

Ipc: B63H 21/38 20060101ALI20200602BHEP

Ipc: B63B 35/28 20060101ALI20200602BHEP

Ipc: B63B 27/00 20060101ALI20200602BHEP

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

INTG Intention to grant announced

Effective date: 20200707

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NATURGY LNG, S.L.

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019000702

Country of ref document: DE

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3536599

Country of ref document: PT

Date of ref document: 20201008

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20200929

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1313949

Country of ref document: AT

Kind code of ref document: T

Effective date: 20201015

REG Reference to a national code

Ref country code: FI

Ref legal event code: FGE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20201127

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20201951T

Country of ref document: HR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20200916

REG Reference to a national code

Ref country code: EE

Ref legal event code: FG4A

Ref document number: E020053

Country of ref document: EE

Effective date: 20201113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1313949

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20201951T

Country of ref document: HR

Payment date: 20210303

Year of fee payment: 3

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20201951

Country of ref document: HR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LT

Payment date: 20210301

Year of fee payment: 3

Ref country code: LU

Payment date: 20210322

Year of fee payment: 3

Ref country code: EE

Payment date: 20210316

Year of fee payment: 3

Ref country code: FI

Payment date: 20210322

Year of fee payment: 3

Ref country code: MC

Payment date: 20210323

Year of fee payment: 3

Ref country code: NO

Payment date: 20210324

Year of fee payment: 3

Ref country code: PT

Payment date: 20210304

Year of fee payment: 3

Ref country code: FR

Payment date: 20210324

Year of fee payment: 3

Ref country code: GR

Payment date: 20210324

Year of fee payment: 3

Ref country code: IE

Payment date: 20210323

Year of fee payment: 3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20210322

Year of fee payment: 3

Ref country code: DK

Payment date: 20210323

Year of fee payment: 3

Ref country code: IS

Payment date: 20210311

Year of fee payment: 3

Ref country code: LV

Payment date: 20210312

Year of fee payment: 3

Ref country code: DE

Payment date: 20210316

Year of fee payment: 3

Ref country code: PL

Payment date: 20210228

Year of fee payment: 3

Ref country code: SE

Payment date: 20210323

Year of fee payment: 3

Ref country code: TR

Payment date: 20210302

Year of fee payment: 3

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602019000702

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: MT

Payment date: 20210325

Year of fee payment: 3

Ref country code: HR

Payment date: 20210303

Year of fee payment: 3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CY

Payment date: 20210303

Year of fee payment: 3

26N No opposition filed

Effective date: 20210617

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SI

Payment date: 20210608

Year of fee payment: 3

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20220331

Year of fee payment: 4

REG Reference to a national code

Ref country code: HR

Ref legal event code: PBON

Ref document number: P20201951

Country of ref document: HR

Effective date: 20220305

REG Reference to a national code

Ref country code: LT

Ref legal event code: MM4D

Effective date: 20220305

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602019000702

Country of ref document: DE

REG Reference to a national code

Ref country code: FI

Ref legal event code: MAE

REG Reference to a national code

Ref country code: EE

Ref legal event code: MM4A

Ref document number: E020053

Country of ref document: EE

Effective date: 20220331

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

Ref country code: DK

Ref legal event code: EBP

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220905

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: LT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

Ref country code: HR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20220401

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220331

REG Reference to a national code

Ref country code: SI

Ref legal event code: KO00

Effective date: 20221122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220306

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220401

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: EE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221001

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220306

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221006

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220305

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20190305

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230305

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230305

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230305

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200916

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230305