EP3415816B1 - A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine - Google Patents
A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine Download PDFInfo
- Publication number
- EP3415816B1 EP3415816B1 EP18397514.3A EP18397514A EP3415816B1 EP 3415816 B1 EP3415816 B1 EP 3415816B1 EP 18397514 A EP18397514 A EP 18397514A EP 3415816 B1 EP3415816 B1 EP 3415816B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steam
- temperature
- auxiliary
- superheater
- steam turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 28
- 239000000446 fuel Substances 0.000 claims description 99
- 239000007789 gas Substances 0.000 claims description 28
- 239000000567 combustion gas Substances 0.000 claims description 23
- 230000037361 pathway Effects 0.000 claims description 22
- 238000002309 gasification Methods 0.000 claims description 4
- 230000005611 electricity Effects 0.000 description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 18
- 238000004519 manufacturing process Methods 0.000 description 17
- 230000007423 decrease Effects 0.000 description 12
- 230000008569 process Effects 0.000 description 12
- 239000007788 liquid Substances 0.000 description 9
- 238000005259 measurement Methods 0.000 description 9
- 238000010438 heat treatment Methods 0.000 description 6
- 238000002485 combustion reaction Methods 0.000 description 5
- 238000010248 power generation Methods 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000001276 controlling effect Effects 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000000704 physical effect Effects 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000020169 heat generation Effects 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000008016 vaporization Effects 0.000 description 2
- 239000002028 Biomass Substances 0.000 description 1
- 238000009835 boiling Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000009834 vaporization Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/16—Controlling superheat temperature by indirectly cooling or heating the superheated steam in auxiliary enclosed heat-exchanger
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G1/00—Steam superheating characterised by heating method
- F22G1/16—Steam superheating characterised by heating method by using a separate heat source independent from heat supply of the steam boiler, e.g. by electricity, by auxiliary combustion of fuel oil
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/02—Applications of combustion-control devices, e.g. tangential-firing burners, tilting burners
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/18—Controlling superheat temperature by by-passing steam around superheater sections
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/20—Controlling superheat temperature by combined controlling procedures
Definitions
- the disclosed solution relates to the operation of a steam turbine power plant comprising a boiler for steam generation.
- Steam turbine power plants are commonly used for production of electricity.
- CHP combined heat and power
- a boiler burning suitable fuel, produces steam with a mass flow rate, which steam is conveyed to a steam turbine.
- Steam refers to water in a gaseous state.
- thermal energy released by the burnt fuel is transferred into the steam.
- the steam entering the steam turbine is typically pressurized at 80-180 bar and has a temperature typically in the range of 450-560 °C.
- a power plant i.e. electricity is being produced
- the pressure of the steam entering the turbine is kept constant while its temperature may change.
- the steam turbine converts thermal energy in the steam into rotary motion on the turbine output shaft. This shaft then drivers an electric generator via a suitable driveline.
- a steam turbine requires steam of sufficiently high quality for viable operation. This typically means that the steam entering the steam turbine must contain a sufficiently high amount of thermal energy to be released in the steam turbine as the steam travels through the turbine. If the incoming steam contains too little thermal energy it is not acceptable for the steam turbine, since such steam may condense prematurely and thereby risk steam turbine damage or failure.
- the load range of a steam turbine power plant can not be lowered below a threshold at which the boiler burns just enough fuel so that the thermal energy transferred in the boiler into the steam enables satisfying the minimum quality criteria for the steam entering the steam turbine.
- the power plant may not be viably operated.
- steam turbine power plants have a limitation with respect to their downward load range flexibility, which limits their use in electricity production namely, with low loads i.e. low volume of electricity production.
- document GB 682410 A discloses a separate combustion chamber for the purpose of superheating steam in a power plant after the steam has exited a steam generator.
- the teaching is to shut down any auxiliary superheating with low loads and to rely on an internal combustion engine when only low power plant loads are required.
- Document US 3002347 A discloses a power plant designed for running efficiently at constant high load and with two-staged fuel combustion with a pressurized system requiring separating of combustible gases from solids and liquids between the combustion stages.
- the solution comprises a method of extending the load range for viable operating W v of a steam turbine power plant comprising a boiler with a superheater for supplying superheated steam to a steam turbine, the steam turbine having a required minimum viable temperature T v of steam entering the steam turbine, the load range for viable operating W v of the steam turbine power plant being extended by means of controllably using an auxiliary superheating chamber comprising an auxiliary superheater to further superheat steam.
- Such controllable use of the auxiliary superheating chamber may entail that based on determining the temperature T of the steam entering the steam turbine:
- controllable use of the auxiliary superheating chamber may entail that based on determining the temperature T of the steam entering the steam turbine:
- the solution thereby enables the required minimum viable temperature T V of steam entering the steam turbine to be satisfied both within the load range for normal operating of the power plant and the load range for low load operating of the power plant.
- the solution further comprises a system which may comprise a boiler with a superheater for supplying superheated steam to a steam turbine, the steam turbine having a required minimum viable temperature T V of steam entering the steam turbine; a controllably usable auxiliary superheating chamber comprising an auxiliary superheater and a burner, the auxiliary superheater installed in a steam forward conveyance pathway between the superheater and the steam turbine; and a control unit adapted to:
- control unit may be adapted to:
- the system may thereby enable the required minimum viable temperature T V of steam entering the steam turbine to be satisfied both within the load range for normal operating of the power plant and the load range for low load operating of the power plant.
- a steam turbine has specified minimum quality requirements for incoming steam.
- Steam quality typically refers to (1) steam temperature, (2) steam pressure and (3) proportion of entrained liquid content in the steam.
- High quality steam is of high enough temperature and pressure and contains little to no entrained liquid. If steam is not of high enough quality, it will condense too early along its way through the steam turbine, whereby condensate water droplets may cause problems. Such problems comprise, for example, formed water droplets hitting turbine blades, typically towards the end of the steam turbine, which creates a risk of turbine damage or failure.
- the disclosed solution alleviates this problem by enabling supplying, by controllably using an auxiliary superheating chamber comprising an auxiliary superheater, steam of sufficiently high quality also in situations in which the thermal energy production in the boiler is insufficient alone to maintain sufficient steam quality.
- Steam of sufficiently high quality requires that a sufficiently large amount of thermal energy is produced in the boiler and then transferred to the steam. Such energy transfer is typically brought about so that water is pre-heated in the boiler to form steam, whereafter steam is further heated in a superheater or superheaters installed in the boiler.
- Superheater is a device preferably used to convert steam into superheated steam.
- Superheated steam is steam at a temperature which is higher than the boiling point of the substance such as water at a particular pressure. Steam in a superheated state contains no entrained liquid. Thus, the temperature of superheated steam may decrease by some amount before entrained liquid begins to form. Therefore, the higher the temperature of superheated steam, the more it may cool, i.e. release energy, before entrained liquid begins to form.
- steam of sufficiently high quality for a steam turbine refers to steam which is superheated to such a temperature that the superheated steam contains high enough energy so that it will not condensate prematurely in the steam turbine as it releases energy while travelling through the steam turbine.
- the pressure of the steam entering the steam turbine is kept constant in a power plant system. This pressure begins to decrease once steam enters the steam turbine, wherein the steam starts to release energy and expand.
- Lower boiler load i.e. lower heat generation in the boiler, results in less thermal energy being transferred to the steam which, in turn, results in lower quality steam.
- Boiler load may be controlled by adjusting the amount of fuel being fed into the boiler to be burned. As is well known in the industry, the amount of thermal energy generated in the boiler and/or transferred into the steam can be inferred, for example calculated, from the volume of fuel per unit of time being fed into the boiler and the type of fuel being fed.
- the boiler comprises an arrangement for automatically adjusting the amount of air and/or other gases required in the fuel burning process as a function of the amount of fuel being fed.
- Such automatic adjustment of air and/or other gases may be effected, for example, by measuring the level of oxygen present in the combustion gases and adjusting the feed of fuel and/or the air and/or other gases such that an optimal oxygen level in the combustion gases, known as the lambda value, is obtained.
- the volume of steam produced in terms of mass flow rate typically decreases relatively linearly as a function of the load.
- the electricity output of the plant i.e. the load of the power plant, is correspondingly reduced.
- a boiler At and above its minimum rated load a boiler is capable of transferring sufficient amount of thermal energy to the produced steam mass flow for the steam to be of sufficient quality for the steam turbine. Below the minimum rated load of the boiler, the amount of thermal energy transferred to the produced steam mass flow is no longer sufficient for the steam to be of sufficient quality for the steam turbine, even though the reduced mass flow rate of the steam could still be appropriate for electricity generation purposes at that time.
- the minimum rated load of a boiler is the minimum load with which the boiler is capable of producing steam of sufficient quality for the steam turbine.
- the steam is not of acceptable quality for the steam turbine. In practice this usually means that the steam is not sufficiently hot, since the pressure of the steam entering the turbine is typically kept constant when electricity is being produced.
- An advantage of the disclosed solution is that steam turbine-based power generation may be made more capable of such flexible adjusting of power production. This is because below the minimum rated viable load of the boiler, the auxiliary superheating chamber comprising an auxiliary superheater may be employed to further superheat steam thereby ensuring supplying steam of sufficient quality to the steam turbine.
- the minimum rated viable load of a boiler defines the minimum rated viable load of a power plant comprising a boiler for steam production. Below this minimum rated viable load of a power plant, the power plant typically must be shut down in order to avoid risking a steam turbine damage.
- the minimum rated viable load of a boiler currently in practice defines the range of downward load flexibility of a power plant, from the full rated load of a power plant to its minimum rated viable load. The disclosed solution enables extending the viable load range of a steam turbine power plant downwards below the minimum rated viable load of the boiler.
- the minimum rated viable load of a power plant is about 30-40% below its full rated load.
- Some power plants comprising fluidized bed boilers have a minimum rated viable load of about 60% below the full rated load.
- the disclosed solution enables running a steam turbine power generation plants with a wide load range for viable operating, particularly such that the load range for viable operating of the power plant extends below the minimum rated viable load of the power plant as typically determined by the minimum rated viable load of the boiler.
- Such extended load range for viable operating of the power plant below its minimum rated viable load has the benefit of enabling the power plant to better respond to changing power demand conditions.
- a power plant is used to refer to a steam turbine power plant wherein a steam turbine 3 may be used to convert thermal energy of steam into mechanical work, which mechanical work may be converted into electricity by a generator 9 .
- FIG. 1 schematically illustrates, according to an embodiment of the invention, a system for producing steam to be used in a steam turbine 3 according to the solution.
- Steam enters the steam turbine 3 with a mass flow rate ⁇ , defined as the mass of steam entering the steam turbine 3 per unit of time.
- the steam turbine may have minimum requirements for the properties of the steam entering the steam turbine for viable operating of the steam turbine 3 .
- Such minimum requirements may comprise, for example, a minimum viable temperature T V for the steam entering the steam turbine 3 such that if the temperature T of the steam entering the steam turbine is below the minimum viable temperature T V , the steam turbine may not be operated viably.
- There may be additional such minimum requirements as well, such as a minimum viable pressure for the steam entering the steam turbine 3 such that if the pressure of the steam entering the steam turbine 3 is below the minimum viable pressure, the steam turbine 3 may not be operated viably.
- Determining steam properties may be performed by installing a flowmeter and/or a pressure sensor and/or a temperature sensor in a steam conveyance line, and relaying the signal(s) from this/these instruments to an apparatus such as a dedicated steam flow computer and/or a control unit 23 for processing and/or storage. It is to be appreciated that determining steam properties is well known in the industry and appropriate equipment for this purpose commercially available. Steam properties, once determined for example through measurement, may be used as control input data by the control unit 23 .
- steam properties may be determined by way of measurement at least in a line 31 at its terminus at the steam turbine 3 .
- steam properties may be determined otherwise as well, for example based on measurements in other loci in the system.
- Determining of the properties of steam, including its temperature, as it enters into the steam turbine 3 may be indirect. This means that steam properties are measured further upstream or downstream, for example in the steam conveyance pathway which terminates at the steam turbine 3 , and that the measurement results are converted into values for the properties of the steam to be determined, for example as it enters into the steam turbine 3 , by using known conversion factors. Such known conversion factors may be obtained through, for example, comparative measurements at loci of interest, of they may be derived from calculations based on the physical properties of the system.
- the notion of determining steam properties, as it used in this text, includes also indirect determining as just described.
- the pressure of the steam may be kept constant, at least when the power plant produces electricity, in which case the minimum requirements for the properties of the steam entering the steam turbine 3 may in practical terms be captured by the minimum viable temperature T V for the steam entering the steam turbine 3 .
- the steam turbine 3 may be adapted to drive, via a driveline 70 , an electric generator 9 which may supply electricity to an electricity-consuming process via a line 44 .
- the electricity-consuming process may be a specific and/or localized process such as in a manufacturing facility, or the electricity-consuming process may be aggregate electricity consumption in an electrical grid such as a district, a regional or a national electrical grid.
- superheated steam is produced by superheating steam in a superheater 11 installed in a boiler 10 .
- apparatuses upstream from the superheater 11 such as a heat exchanger 25 or a plurality of such heat exchangers may be employed to vaporize the water circulating in the system such that the water is already steam when it enters the superheater 11 .
- upstream from the superheater 11 may be additional apparatuses such as a heat exchanger or heat exchangers 15 for pre-heating the circulating water before vaporization.
- the superheater 11 may be a single superheater device. Alternatively, the superheater 11 may be an aggregate of a plurality of individual superheater devices. Superheating the steam is brought about by transferring to the steam thermal energy resulting from burning fuel in in the boiler 10 with a burner (not depicted). The same applies to the heat exchanger or heat exchangers 25 .
- the boiler 10 may be of a known type, such as of the fluidized bed type or of the pulverized coal-fired type.
- Fuel may be supplied from a fuel source 21 via a line 49 to the boiler to be burned. Air or other suitable gas or gas mixture required for burning the fuel may be conveyed to the boiler 10 via a line 50 or multiple such lines. Non-gaseous combustion residues such as ash resulting from burning the fuel may be expelled from the boiler 10 via a line 51 . Combustion gases resulting from burning the fuel may be expelled from the boiler 10 via a duct 71 .
- thermal energy may be captured from the combustion gases with means in addition to the superheater 11 .
- additional means of thermal recovery may comprise a heat exchanger or heat exchangers 15 .
- the varieties and using of heat exchangers are well known in the industry, and such knowledge readily applies to the heat exchanger or heat exchangers 15 .
- the power plant may be run with a load W , which refers to the amount of electricity generated by the generator 9 per unit of time, as driven by the steam turbine 3.
- a load W refers to the amount of electricity generated by the generator 9 per unit of time, as driven by the steam turbine 3.
- the amount of electricity generated by the generator 9 per unit of time i.e. the power output of the generator 9
- the load W of the power plant may be inferred from the heat consumption of the power plant, since it is well known that the load W of a power plant is highly correlated with its heat consumption.
- the heat consumption in turn, can be inferred from the amount of fuel burned in a unit of time for the purposes of heat generation in the power plant.
- the volume of fuel being burned in a power plant for the purposes of producing and heating steam and the load W of the power plant have a correlation which is characteristic for each power plant and known by the operators and/or programmed into the control apparatuses of the power plant.
- the load W of the power plant may be controlled by adjusting the fuel being burned for the purposes of producing and heating steam.
- the power plant may be run with different loads W , as illustrated in Figures 4 a to 4 d .
- Figure 4 a represents the operation of a conventional system for producing steam to be used in a steam turbine 3.
- Figures 4 b to 4 d represent the operation a system for producing steam to be used in a steam turbine 3 according to the disclosed solution comprising a controllably utilizable auxiliary superheating chamber comprising an auxiliary superheater.
- a power plant may have a full rated load W F .
- the temperature T of the superheated steam entering into the steam turbine 3 is at its maximum, i.e. at the temperature T F of the steam with full power plant load.
- the temperature T of the superheated steam entering into the steam turbine 3 further decreases and eventually reaches a minimum viable temperature T V , which refers to the lowest acceptable temperature for the superheated steam entering the steam turbine 3 .
- This load W of the power plant, at which the temperature T of the steam entering the steam turbine 3 is at the minimum viable temperature T V is referred to as the minimum rated viable load W MV of the power plant.
- the load range between for viable operating W V of the power plant is, inclusively, the load range between the minimum rated viable load W MV and the full rated load W F .
- the load range for unviable operating W U of the power plant is the load range with loads below the range for viable operating W V .
- the temperature T of the steam entering the steam turbine 3 is at or above the minimum viable temperature T V .
- the temperature T of the steam entering the steam turbine 3 is below the minimum viable temperature T V .
- the system comprises an auxiliary superheating chamber 1 which comprises an auxiliary superheater 2 .
- the auxiliary superheater 2 may be used to further superheat the steam originating from the superheater 11 of the boiler 10 .
- the auxiliary superheater 2 may be a single superheater device.
- the auxiliary superheater 2 may be an aggregate of a plurality of individual superheater devices.
- the auxiliary superheating chamber 1 may include a burner 24 which burns fuel thereby releasing thermal energy. Fuel may be burned in the burner 24 in such an amount that the released thermal energy is transferred to steam flowing through the auxiliary superheater 2 of the auxiliary superheating chamber 1 to the extent that the steam is further superheated in the auxiliary superheater 2 .
- the auxiliary superheating chamber 1 may additionally be connected to a line 54 constituting an inlet supplying incoming air or other suitable gas or gas mixture for the fuel burning process.
- the auxiliary superheating chamber 1 comprising the auxiliary superheater 2 is installed in a steam forward conveyance pathway comprising lines 30 , 31 .
- the steam forward conveyance pathway thus runs from the superheater 11 to the steam turbine 3 .
- a back conveyance pathway begins with a line 34 at the steam turbine 3 and terminates with a line 55 at the superheater 11 .
- water circulating in the system may at a given point be in a gaseous state, i.e. steam, and/or in a liquid state, depending on its temperature and/or its pressure at that given point.
- steam may be continuously conveyed through the auxiliary superheater 2 en route from the superheater 11 to the steam turbine 3 .
- steam may be selectably conveyed either through the auxiliary superheater 2 en route from the superheater 11 to the steam turbine 3 or by bypassing the auxiliary superheater 2 via a line 58 constituting a steam diversion pathway.
- selectable conveyance may be effected by a valve arrangement 26 .
- the valve arrangement 26 may be controlled by the control unit 23 .
- the control unit 23 may effect the selected conveyance, i.e. control the valve arrangement 26 , by using steam quality measurements as input data.
- Such input data may comprise, for example, at least the temperature T of the steam entering the steam turbine 3 , for example as measured at the terminus of the line 31 at the steam turbine 3 , whereby steam may be selectably conveyed via the auxiliary superheater 2 when the temperature T of the steam entering the steam turbine is near, at or below the minimum viable temperature T V .
- fuel may be burned continuously in the auxiliary superheating chamber 1 when the power plant is producing electricity or is in a hot standby mode.
- Hot standby means that while electricity is not being produced in the power plant, the boiler 10 and the superheating chamber 1 and the steam turbine 3 are kept at an elevated temperature, i.e. above ambient temperature, in order to reduce the time required to heat the said system components to a production temperature.
- the volume of fuel being burned in the auxiliary superheating chamber 1 may vary.
- a low amount of fuel being burned in the auxiliary superheating chamber 1 may be such that the auxiliary superheating chamber 1 may be kept at a hot standby temperature.
- This hot standby temperature of the auxiliary superheating chamber 1 may be defined such that at such a temperature the superheated steam travelling through the auxiliary superheater 2 is not further superheated in the auxiliary superheater 2 .
- such a hot standby temperature may be equal to or less than the temperature T of the superheated steam entering the auxiliary superheater 2 .
- the hot standby temperature is higher than ambient temperature.
- the boiler 10 produces steam with a mass flow ⁇ and a temperature T .
- the auxiliary superheater 2 may be used to further superheat this steam as needed.
- the auxiliary superheater 2 may be used, as needed, to increase the temperature T of the steam originating from the boiler 10 before the steam enters the steam turbine 3 .
- the auxiliary superheater may be controllably used to superheat steam.
- controllable use refers to controlling the amount of fuel being burned in the burner 24 in the superheating chamber 1 , thereby controlling the amount of thermal energy released and transferred into the steam flowing through the auxiliary superheater 2 .
- controllable use additionally refers to the selective conveyance and non-conveyance of steam through the auxiliary superheater 2 , for example as effected by a valve arrangement 26 .
- the thermal energy transferred into the steam in the boiler 10 is sufficient to maintain the temperature T of the steam entering the steam turbine 3 at or above the minimum viable temperature T V .
- the auxiliary superheating chamber 1 may be kept at a standby temperature as explained above.
- the thermal energy transferred into the steam in the boiler 10 may not be sufficient alone to maintain the temperature T of the steam entering the steam turbine 3 at or above the minimum viable temperature T V .
- the auxiliary superheating chamber 1 may be employed to further superheat the steam conveyed through the auxiliary superheater 2 . Such further superheating may be brought about by increasing the volume of fuel being fed to the burner 24 .
- the load W of the power plant is below its minimum rated viable load W MV , i.e. the minimum viable load without further superheating of steam between the boiler 10 and the steam turbine 3 , the higher the load of the auxiliary superheating chamber 1 advantageously may be set.
- the load of the auxiliary superheating chamber 1 and/or the boiler 10 may controlled by the control unit 23 .
- the control unit 23 may effect such load control by using steam quality measurements as input data and/or controlling the volume of fuel fed to the burner 24 and/or the boiler 10 .
- the said input data may comprise, for example, at least the temperature T of the steam entering the steam turbine 3 , for example as measured at the terminus of the line 31 at the steam turbine 3 .
- alert temperature T A for the temperature T of the steam entering the steam turbine 3 .
- the alert temperature T A is higher than the minimum viable temperature T V and lower than the temperature of steam entering the steam turbine 3 with full power plant load T F .
- the primary purpose of the alert temperature T A is to serve as a control signal for the controllable use of the auxiliary superheating chamber 1 such that lowering the load of the boiler 10 does not result in the temperature T of the steam entering into the steam turbine 3 dropping below the minimum viable temperature T V until the load W of the power plant reaches the minimum viable load W MVA with the auxiliary superheating chamber 1 in use.
- That the alert temperature T A serving as a control signal means that when the temperature T of the steam entering the steam turbine 3 reaches the alert temperature T A , this may be used as a trigger for control actions. Such control actions may be effected, for example, by the control unit 23 .
- the alert temperature T A may be fixed to a certain temperature, for example as being a certain number of temperature degrees above the minimum viable temperature T V .
- the alert temperature T A may be variable, for example as a function of the load W of the power plant, or depending on the rate with which the temperature T of the steam entering the steam turbine 3 is changing.
- the value or the value function of the alert temperature T A may be specified according to the properties of the power plant system and its behavior in different situations such that the auxiliary superheating chamber 1 may be appropriately employed to further superheat steam so that lowering the load of the boiler 10 does not result in the temperature T of the steam entering into the steam turbine 3 dropping below the minimum viable temperature T V until the load W of the power plant reaches the minimum viable load W MVA with the auxiliary superheating chamber 1 in use.
- the controllable use of the auxiliary superheating chamber 1 does not necessarily have to be such that it strictly maintains the steam at a fixed temperature at or near the alert temperature T A .
- the employment of the auxiliary superheating chamber 1 may be such that the temperature T of the steam entering the steam turbine 3 may fluctuate above the minimum viable temperature T V , as illustrated in Figure 4 c .
- the range of load W of the power plant in which the auxiliary superheating chamber 1 is used to further superheat steam is referred to as the load range for low load operating W L of the power plant.
- the load range for viable operating W V of the power plant may be extended below the minimum rated viable load W MV ( W MV being unviable without the auxiliary superheating chamber 1 used to further superheat the steam originating from the superheater 11 ) such that the load range for viable operating W V comprises both the load range for normal operating W N and the load range for low load operating W L , as illustrated in Figures 4 b to 4 d .
- decrease in the load of the boiler 1 may result in decrease in the mass flow ⁇ and the temperature T in the steam originating from the boiler 10 .
- the load W of the power plant decreases.
- the load of the superheating chamber 1 may be increased, by increasing the fuel feed to the burner 24, to compensate the reduced load of the boiler 1 , and thusly maintain the reduced mass flow rate ⁇ of the steam at or above the minimum viable temperature T V when the steam enters the steam turbine 3.
- the load range for viable operating W V of the power plant may be extended downwards below the minimum rated viable load W MV (without the auxiliary superheater 2 , as illustrated in Figure 4 a ) by installing and controllably using the auxiliary superheater 2 between the boiler 10 and the steam turbine 3 .
- such controllable use of the auxiliary superheater may additionally mean selectably conveying or not conveying steam through the auxiliary superheater 2 with the valve arrangement 26 as explained above.
- the minimum viable temperature T V of the steam entering into the steam turbine 3 may be satisfied according to the solution both within the load range W N for normal operating of a power plant as well as within the load range W L for low load operating of a power plant.
- fuel may be supplied to the auxiliary superheating chamber 2 from a fuel source 6 via a line 42 .
- a fuel source 6 may be the same as supplied to the boiler 10 .
- the fuel may be different from the fuel which is supplied to the boiler 10 .
- the fuel sources 6 , 21 may be, but need not be, combined into a common fuel source.
- the fuel supplied to and burned in the auxiliary superheating chamber 1 may be product gas generated by gasification with a gasifier 4 .
- the fuel supply 6 may contain initial fuel to be gasified into final fuel burned in the auxiliary superheating chamber 1 .
- Such initial fuels to be gasified may comprise, for example, biomass and/or waste.
- initial fuel may be conveyed from the fuel source 6 via a line 39 to the gasifier 4 .
- the final fuel may be conveyed from the gasifier 4 to the auxiliary superheating chamber 1 via a line or lines 40 , 41 , 42 .
- the gasifier 4 may be of a known type, such as of the fluidizing bed type.
- air or other suitable gas or gas mixture may be supplied to the gasifier 4 via a line 38 or multiple such lines.
- Gasification residues may be expelled from the gasifier via a line 36 .
- the product gas conveyance pathway comprising the lines 40 , 41 , 42 may further comprise a cooler 5 for cooling the product gas and/or a filter 7 for filtering out undesirable substances from the product gas before the product gas is supplied to the auxiliary superheating chamber 1 .
- a cooler 5 for cooling the product gas
- a filter 7 for filtering out undesirable substances from the product gas before the product gas is supplied to the auxiliary superheating chamber 1 .
- heat energy may be conveyed from the cooler 5 to a heat exchanger 8 installed in the back conveyance pathway between lines 32 and 48 , wherein the heat energy may be released into the water in the back conveyance pathway en route to be vaporized.
- heat conveyance from the cooler 5 to the heat exchanger 8 may be brought about by circulating an appropriate heat transfer medium in the lines 52 and 53 between the cooler 5 and the heat exchanger 8 .
- the heat exchanger 8 may be used to pre-heat the water to be vaporized.
- product gas may be additionally conveyed via line 47 to the boiler 10 to be used as fuel.
- Such fuel use may be advantageously used, for example, as fuel being burned during hot standby, and/or as supplementary fuel, and/or as main fuel and/or as the only fuel for the boiler 10 .
- the fuel conveyed via line 47 to the boiler may be burned with a burner 72 installed in the boiler 10 .
- This burner 72 may be dedicated to burning fuel to maintain the boiler 10 in hot standby.
- the burner 72 may have multiple functionalities, such as burning fuel conveyed via lines 49 and/or 47 during normal operations when electricity is being produced in the power plant and/or burning fuel conveyed via lines 49 and/or 47 during hot standby.
- fuel is continuously consumed in the burner 24 of the auxiliary superheating chamber 1 and/or the boiler 10 so that the gasifier 4 may be kept in continuous operation.
- This has the benefit of avoiding start-up (i.e. heating) and shut-down periods for the gasifier 4 .
- start-up and shut-down periods may be several hours in duration, which imposes disadvantageous restrictions on the flexibility in terms of the load variability of the power plant.
- the combustion gases resulting from burning fuel in the auxiliary superheating chamber 1 may be conveyed via a gas conveyance passage into the boiler 10 in which thermal energy may be recovered from the combustion gases.
- the combustion gases may be conveyed from the auxiliary superheating chamber 1 into the boiler 10 via a line 43 as the gas conveyance passage as illustrated in Figure 1 .
- the auxiliary superheating chamber 1 is installed to the outer wall of the boiler 10 the combustion gases may be conveyed from the auxiliary superheating chamber 1 to the boiler 10 via an opening between the auxiliary superheating chamber 1 and the boiler 10 .
- Thermal recovery of the said combustion gases in the boiler 10 may be effected, for example, by the superheater 11 and/or the heat exchanger 15 and/or any other means of recovering thermal energy that the boiler 1 comprises.
- the combustion gases resulting from burning fuel in the auxiliary superheating chamber 1 may be vented out from the auxiliary superheating chamber via a line 37 such that the said combustion gases are not conveyed into the boiler 10 .
- the said combustion gases may be conveyed via a line 37 to elsewhere in the system (not shown), or alternatively to another system or process (not shown), or alternatively to the atmosphere (not shown).
- thermal energy may be captured from these gases with a suitable heat exchanger arrangement, for example in a manner similar to how the heat exchanger 15 may be used to capture thermal energy from the combustion gases expelled from the boiler 10 .
- the steam conveyed to the steam turbine 3 may be conveyed back to the boiler 10 via a line or lines 34 , 35 , 33 , 32, 48, 55 which constitute the back conveyance pathway terminating at the superheater 11 .
- the back conveyance pathway may additionally comprise a condenser 14 for recovering heat from the steam and transferring it to a heat-consuming process 22 .
- the condenser 14 may comprise a single condenser device, or it may comprise a plurality of individual condenser devices.
- the condenser 14 may be connected to a heat-consuming process 22 with lines 45, 46 , in which a heat transfer medium, such as water, may circulate between the condenser 14 and the heat-consuming process 22 .
- a heat transfer medium such as water
- the back conveyance pathway may comprise a pump or pumps 20 for effecting the circulation of the circulating substance between the boiler 10 and the steam turbine 3 .
- the back conveyance pathway may comprise a heat exchanger 25 in the boiler 10 for pre-heating or preferably vaporizing the water before it enters the superheater 11 .
- the heat exchanger 25 may comprise a single heat exchanger device, or it may comprise a plurality of individual heat exchanger devices. The properties and use of such heat exchangers is well known in the industry and this knowledge readily applies to the heat exchanger 25 .
- the heat exchanger 25 may comprise a plurality of tubes (not specifically illustrated) integrated into the side walls of the boiler 10 .
- Additional pre-heating of water in the back conveyance pathway may be effected by a heat exchanger 15 installed in the boiler 10 , such as in the duct 71 for expelling the combustion gases from the boiler 10 as illustrated in Figure 1 .
- the heat exchanger 15 installed in the boiler 10 may comprise a single heat exchanger device, or it may comprise a plurality of individual heat exchanger devices. If installed in the duct 71 as illustrated in Figure 1 , the heat exchanger 15 may capture thermal energy from the combustion gases of the boiler 10 and/or the auxiliary superheating chamber 2 before the combustion gases are expelled from the boiler 10 via the duct 71 of the boiler.
- the capacity of the auxiliary superheating chamber 1 i.e. the amount of thermal energy it can generate in a unit of time, is selected such that when the power plant is run with a load W below its minimum rated viable load W MV , the auxiliary superheating chamber 1 is capable of further superheating the steam originating from the superheater 11 such that the minimum viable temperature T V of the steam entering the steam turbine 3 is satisfied.
- the auxiliary superheating chamber 1 advantageously is capable of transferring to the steam the thermal energy required after the steam has been superheated at the superheater 11 so that the temperature T of the steam entering the steam turbine 3 is at least the minimum viable temperature T V such that the load range W L for the low load operating of the power plant extends substantially below its minimum rated viable load W MV .
- the auxiliary superheating chamber 1 comprising the auxiliary superheater 2 may be used to extend the load range for viable operating of a power plant W V such that the load range for viable operating W V of the power plant comprises both the load range for normal operating W N and the load range for low load operating W L , wherein the auxiliary superheating chamber 1 may be used to further superheat steam in the load range for low load operating W L .
- the auxiliary superheating chamber 1 may be used within the load range for normal operating of the power plant W N as well for example so as to use the auxiliary superheater 2 to further superheat the steam originating from the superheater 11 already before the minimum viable temperature T V of the steam entering the steam turbine 3 is reached, as illustrated in Figures 4 b to 4 d .
- the load range for viable operating W V of the power plant is, inclusively, the load range between its minimum viable load W MVA and its full rated load W F .
- the auxiliary superheating chamber 1 may additionally be utilized as a means to maintain the system in a hot standby mode.
- Standby means that no electricity is being produced in the power plant, in which case the boiler 10 may be run down for example by way of no or very little fuel being burned in the boiler 10 , or kept in a hot standby mode by way of burning fuel in the boiler in an amount sufficient to keep the boiler 10 at an elevated temperature.
- Hot standby for the system means that the circulating water, in gaseous and/or liquid state, is maintained in such a high temperature that the system can be started up, i.e. electricity production with the generator 9 be started, with a start-up time substantially shorter than would be the case of the system was shut down without maintaining high temperature in the circulation of the circulating substance.
- the thermal energy release to the circulating water required for maintaining the system in a hot standby temperature may be brought about by the superheating chamber 1 in which case no fuel or very little fuel may be burned in the boiler 10 .
- the thermal energy release to the circulating water required for maintaining the system in a hot standby temperature may be brought about by both the superheating chamber 1 and the boiler 10 .
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
- The disclosed solution relates to the operation of a steam turbine power plant comprising a boiler for steam generation.
- Steam turbine power plants are commonly used for production of electricity. In combined heat and power (CHP) plants, thermal energy not captured by the steam turbine is additionally utilized as useful heat.
- In steam turbine power generation, a boiler, burning suitable fuel, produces steam with a mass flow rate, which steam is conveyed to a steam turbine. Steam refers to water in a gaseous state. In the boiler, thermal energy released by the burnt fuel is transferred into the steam.
- The steam entering the steam turbine is typically pressurized at 80-180 bar and has a temperature typically in the range of 450-560 °C. Typically, when a power plant is in operation, i.e. electricity is being produced, the pressure of the steam entering the turbine is kept constant while its temperature may change. The steam turbine converts thermal energy in the steam into rotary motion on the turbine output shaft. This shaft then drivers an electric generator via a suitable driveline.
- A steam turbine requires steam of sufficiently high quality for viable operation. This typically means that the steam entering the steam turbine must contain a sufficiently high amount of thermal energy to be released in the steam turbine as the steam travels through the turbine. If the incoming steam contains too little thermal energy it is not acceptable for the steam turbine, since such steam may condense prematurely and thereby risk steam turbine damage or failure.
- For this reason, the load range of a steam turbine power plant can not be lowered below a threshold at which the boiler burns just enough fuel so that the thermal energy transferred in the boiler into the steam enables satisfying the minimum quality criteria for the steam entering the steam turbine. Below this threshold, i.e. the minimum viable rated load of the power plant, the power plant may not be viably operated.
- Therefore, steam turbine power plants have a limitation with respect to their downward load range flexibility, which limits their use in electricity production namely, with low loads i.e. low volume of electricity production.
- For example, document
GB 682410 A US 3002347 A discloses a power plant designed for running efficiently at constant high load and with two-staged fuel combustion with a pressurized system requiring separating of combustible gases from solids and liquids between the combustion stages. - The method according to the disclosed solution is defined by what is stated in
claims claims 7 and 8. - The solution comprises a method of extending the load range for viable operating Wv of a steam turbine power plant comprising a boiler with a superheater for supplying superheated steam to a steam turbine, the steam turbine having a required minimum viable temperature Tv of steam entering the steam turbine, the load range for viable operating Wv of the steam turbine power plant being extended by means of controllably using an auxiliary superheating chamber comprising an auxiliary superheater to further superheat steam.
- Such controllable use of the auxiliary superheating chamber may entail that based on determining the temperature T of the steam entering the steam turbine:
- (1) when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV: fuel is burned in the boiler to generate thermal energy to be transferred into steam in the superheater to generate superheated steam satisfying the required minimum viable temperature TV of the steam entering the steam turbine; the superheated steam from the superheater is conveyed to the auxiliary superheater of the auxiliary superheating chamber; fuel is burned with a burner in the auxiliary superheating chamber to keep the superheating chamber in a hot standby temperature; and the superheated steam is conveyed from the auxiliary superheater to the steam turbine;
and - (2) when the temperature T of the steam entering the steam turbine is at or below the alert temperature TA: fuel is burned in the boiler to generate thermal energy to be transferred into steam in the superheater to generate superheated steam; the superheated steam is conveyed from the superheater to the auxiliary superheater of the auxiliary superheating chamber; the superheated steam is further superheated by burning fuel with a burner in the auxiliary superheating chamber to generate thermal energy to be transferred into the superheated steam in the auxiliary superheater such that the required minimum viable temperature Tv of steam entering the steam turbine is satisfied; and the superheated steam is conveyed from the auxiliary superheater to the steam turbine.
- Alternatively, such controllable use of the auxiliary superheating chamber may entail that based on determining the temperature T of the steam entering the steam turbine:
- (1) when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV: fuel is burned in the boiler to generate thermal energy to be transferred into steam in the superheater to generate superheated steam satisfying the required minimum viable temperature TV of the steam entering the steam turbine; the superheated steam is conveyed from the superheater to the steam turbine by bypassing the auxiliary superheater with a steam diversion pathway; fuel is burned with a burner in the auxiliary superheating chamber to keep the superheating chamber in a hot standby temperature;
and - (2) when the temperature T of the steam entering the steam turbine is at or below the alert temperature TA: fuel is burned in the boiler to generate thermal energy to be transferred into steam in the superheater to generate superheated steam; the superheated steam is conveyed from the superheater to the auxiliary superheater of the auxiliary superheating chamber; the superheated steam is further superheated by burning fuel with a burner in the auxiliary superheating chamber to generate thermal energy to be transferred into the superheated steam in the auxiliary superheater such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied; and the superheated steam is conveyed from the auxiliary superheater to the steam turbine.
- The solution thereby enables the required minimum viable temperature TV of steam entering the steam turbine to be satisfied both within the load range for normal operating of the power plant and the load range for low load operating of the power plant.
- The solution further comprises a system which may comprise a boiler with a superheater for supplying superheated steam to a steam turbine, the steam turbine having a required minimum viable temperature TV of steam entering the steam turbine; a controllably usable auxiliary superheating chamber comprising an auxiliary superheater and a burner, the auxiliary superheater installed in a steam forward conveyance pathway between the superheater and the steam turbine; and a control unit adapted to:
- determine the temperature T of the steam entering the steam turbine;
- when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV : control the burning of fuel in the burner such that the superheating chamber is kept in a hot standby temperature; and
- when the temperature T of the steam entering the steam turbine at or below the alert temperature TA: control the burning of fuel in the burner such that thermal energy is transferred into the superheated steam in the auxiliary superheater such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied.
- Alternatively, the control unit may be adapted to:
- determine the temperature T of the steam entering the steam turbine;
- when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV: control a valve arrangement such that superheated steam is conveyed from the superheater to the steam turbine, the steam thereby bypassing the auxiliary superheater via a steam diversion pathway; and control the burning of fuel in the burner such that the superheating chamber is kept in a hot standby temperature; and
- when the temperature T of the steam entering the steam turbine at or below the alert temperature TA: control the valve arrangement such that superheated steam is conveyed from the superheater to the auxiliary superheater; and control the burning of fuel in the burner such that thermal energy is transferred into the superheated steam in the auxiliary superheater such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied.
- The system may thereby enable the required minimum viable temperature TV of steam entering the steam turbine to be satisfied both within the load range for normal operating of the power plant and the load range for low load operating of the power plant.
- Typically, a steam turbine has specified minimum quality requirements for incoming steam. Steam quality typically refers to (1) steam temperature, (2) steam pressure and (3) proportion of entrained liquid content in the steam. High quality steam is of high enough temperature and pressure and contains little to no entrained liquid. If steam is not of high enough quality, it will condense too early along its way through the steam turbine, whereby condensate water droplets may cause problems. Such problems comprise, for example, formed water droplets hitting turbine blades, typically towards the end of the steam turbine, which creates a risk of turbine damage or failure. The disclosed solution alleviates this problem by enabling supplying, by controllably using an auxiliary superheating chamber comprising an auxiliary superheater, steam of sufficiently high quality also in situations in which the thermal energy production in the boiler is insufficient alone to maintain sufficient steam quality.
- Steam of sufficiently high quality requires that a sufficiently large amount of thermal energy is produced in the boiler and then transferred to the steam. Such energy transfer is typically brought about so that water is pre-heated in the boiler to form steam, whereafter steam is further heated in a superheater or superheaters installed in the boiler. Superheater is a device preferably used to convert steam into superheated steam.
- Superheated steam is steam at a temperature which is higher than the boiling point of the substance such as water at a particular pressure. Steam in a superheated state contains no entrained liquid. Thus, the temperature of superheated steam may decrease by some amount before entrained liquid begins to form. Therefore, the higher the temperature of superheated steam, the more it may cool, i.e. release energy, before entrained liquid begins to form.
- Typically, steam of sufficiently high quality for a steam turbine refers to steam which is superheated to such a temperature that the superheated steam contains high enough energy so that it will not condensate prematurely in the steam turbine as it releases energy while travelling through the steam turbine.
- Typically, the pressure of the steam entering the steam turbine is kept constant in a power plant system. This pressure begins to decrease once steam enters the steam turbine, wherein the steam starts to release energy and expand.
- Lower boiler load, i.e. lower heat generation in the boiler, results in less thermal energy being transferred to the steam which, in turn, results in lower quality steam. Boiler load may be controlled by adjusting the amount of fuel being fed into the boiler to be burned. As is well known in the industry, the amount of thermal energy generated in the boiler and/or transferred into the steam can be inferred, for example calculated, from the volume of fuel per unit of time being fed into the boiler and the type of fuel being fed. Typically, the boiler comprises an arrangement for automatically adjusting the amount of air and/or other gases required in the fuel burning process as a function of the amount of fuel being fed. Such automatic adjustment of air and/or other gases may be effected, for example, by measuring the level of oxygen present in the combustion gases and adjusting the feed of fuel and/or the air and/or other gases such that an optimal oxygen level in the combustion gases, known as the lambda value, is obtained.
- When the load of a boiler is reduced, the volume of steam produced in terms of mass flow rate typically decreases relatively linearly as a function of the load. When the steam mass flow is reduced, the electricity output of the plant, i.e. the load of the power plant, is correspondingly reduced.
- At and above its minimum rated load a boiler is capable of transferring sufficient amount of thermal energy to the produced steam mass flow for the steam to be of sufficient quality for the steam turbine. Below the minimum rated load of the boiler, the amount of thermal energy transferred to the produced steam mass flow is no longer sufficient for the steam to be of sufficient quality for the steam turbine, even though the reduced mass flow rate of the steam could still be appropriate for electricity generation purposes at that time.
- Thus, the minimum rated load of a boiler is the minimum load with which the boiler is capable of producing steam of sufficient quality for the steam turbine. Below this minimum rated load, the steam is not of acceptable quality for the steam turbine. In practice this usually means that the steam is not sufficiently hot, since the pressure of the steam entering the turbine is typically kept constant when electricity is being produced.
- With regard to a large-scale electrical grid, the increasing generation of electricity from renewable sources such as solar and wind power poses challenges. This is because such renewable energy sources are inherently variable in terms of their power output because of, for example, weather conditions and the night-day sunlight cycle. Consequently, in an electrical grid comprising such renewable or otherwise variable power production, other modes of power production in the grid such as steam turbine-based power generation should preferably be capable of flexibly adjusting their power output in order to appropriately complement the variable power sources so that the demand for electricity in the grid is met at all times. As is well known, demand for electricity is variable as well.
- An advantage of the disclosed solution is that steam turbine-based power generation may be made more capable of such flexible adjusting of power production. This is because below the minimum rated viable load of the boiler, the auxiliary superheating chamber comprising an auxiliary superheater may be employed to further superheat steam thereby ensuring supplying steam of sufficient quality to the steam turbine.
- Without such further superheating, the minimum rated viable load of a boiler defines the minimum rated viable load of a power plant comprising a boiler for steam production. Below this minimum rated viable load of a power plant, the power plant typically must be shut down in order to avoid risking a steam turbine damage. Thus, the minimum rated viable load of a boiler currently in practice defines the range of downward load flexibility of a power plant, from the full rated load of a power plant to its minimum rated viable load. The disclosed solution enables extending the viable load range of a steam turbine power plant downwards below the minimum rated viable load of the boiler.
- Conventionally, the minimum rated viable load of a power plant is about 30-40% below its full rated load. Some power plants comprising fluidized bed boilers have a minimum rated viable load of about 60% below the full rated load.
- Conventionally, a further hindrance for the load range flexibility of steam turbine power plants is that their shutdown and start-up times may be considerably long, such as up to 12 hours. Therefore, such power plants are not capable of flexibly adjusting to changing electricity demand conditions by means of shutdown-start-up cycles. Such non-productive shutdown and start-up periods are costly as well. The disclosed solution enables reducing the need for such shutdown-start-up cycles by way of enabling a steam turbine power plant to be operated with an extended load range by controllably using an auxiliary superheating chamber comprising an auxiliary superheater to further superheat steam supplied to the steam turbine. Thus, the disclosed solution enables running a steam turbine power generation plants with a wide load range for viable operating, particularly such that the load range for viable operating of the power plant extends below the minimum rated viable load of the power plant as typically determined by the minimum rated viable load of the boiler. Such extended load range for viable operating of the power plant below its minimum rated viable load, as enabled by the disclosed solution, has the benefit of enabling the power plant to better respond to changing power demand conditions.
-
- Figure 1
- schematically illustrates the steam production system of a steam turbine power plant according to an embodiment of the invention, the system comprising an auxiliary superheating chamber for further superheating steam as needed.
- Figure 2
- schematically illustrates the steam production system of
Figure 1 , wherein the fuel supplied to the auxiliary superheating chamber and optionally supplied to the boiler is gaseous and produced in a gasifier. - Figure 3
- schematically illustrates the steam production system of
Figure 1 , wherein steam may be selectably conveyed and not conveyed through the auxiliary superheating chamber. - Figure 4a
- schematically illustrates the idealized relationships of the mass flow (ṁ) of steam and the temperature (T) of steam entering a steam turbine to the load (W) of a steam turbine power plant in a conventional steam production system.
- Figures 4b-c
- schematically illustrate the idealized relationships of the mass flow (m) of steam and the temperature (T) of steam entering a steam turbine to the load (W) of a steam turbine power plant in a steam production system according to the disclosed solution.
- Figure 5
- schematically illustrates the steam production system of a steam turbine power plant according to another embodiment of the invention, the system comprising an auxiliary superheating chamber for further superheating steam as needed.
- Figure 6a
- schematically illustrates the idealized relationship between the load (W) and the heat consumption of a power plant.
- Figure 6b
- schematically illustrates the idealized relationship between the fuel consumption and the heat consumption of a power plant.
- The figures are not in scale or suggestive of the physical layout or the dimensions of system components.
- In the text, reference is made to the figures with the following numerals and denotations:
- W
- Load of a power plant at a point of time
- WF
- Full rated load of a power plant
- WMV
- Minimum rated viable load of a power plant
- WMVA
- Minimum viable load of a power plant
- WN
- Load range for normal operating of a power plant
- WL
- Load range for low load operating of a power plant
- WU
- Load range for unviable operating of a power plant
- WV
- Load range for viable operating of a power plant
- T
- Temperature of steam entering a turbine
- TF
- Temperature of steam entering a turbine with full power plant load
- TV
- Minimum viable temperature of steam entering a steam turbine
- ṁ
- Mass flow rate of steam
- ṁ F
- Mass flow rate of steam with full boiler load
- 1
- Auxiliary superheating chamber
- 2
- Auxiliary superheater
- 3
- Steam turbine
- 4
- Gasifier
- 5
- Cooler
- 6
- Fuel source
- 7
- Filter
- 8
- Heat exchanger
- 9
- Generator
- 10
- Boiler
- 11
- Superheater
- 13
- Electricity-consuming process
- 14
- Condenser
- 15
- Heat exchanger
- 20
- Pump
- 21
- Fuel source
- 22
- Heat-consuming process
- 23
- Control unit
- 24
- Burner
- 25
- Heat exchanger
- 26
- Valve arrangement
- 30 to 58
- Line
- 70
- Driveline
- 71
- Duct
- 72
- Burner
- In the text and in the figures, the notion of a "line" is used to refer to any suitable conveyance passageway without any definite characterization of the physical properties of the passageway. It is to be appreciated that a person skilled in the art is capable of determining the physical properties of a passageway according to the properties and the volume of the material to be conveyed as well as other such pertinent conveyance parameters and requirements.
- In the text, unless otherwise specified, the notion of a "power plant" is used to refer to a steam turbine power plant wherein a
steam turbine 3 may be used to convert thermal energy of steam into mechanical work, which mechanical work may be converted into electricity by a generator 9. -
Figure 1 schematically illustrates, according to an embodiment of the invention, a system for producing steam to be used in asteam turbine 3 according to the solution. Steam enters thesteam turbine 3 with a mass flow rate ṁ, defined as the mass of steam entering thesteam turbine 3 per unit of time. The steam turbine may have minimum requirements for the properties of the steam entering the steam turbine for viable operating of thesteam turbine 3. Such minimum requirements may comprise, for example, a minimum viable temperature TV for the steam entering thesteam turbine 3 such that if the temperature T of the steam entering the steam turbine is below the minimum viable temperature TV , the steam turbine may not be operated viably. There may be additional such minimum requirements as well, such as a minimum viable pressure for the steam entering thesteam turbine 3 such that if the pressure of the steam entering thesteam turbine 3 is below the minimum viable pressure, thesteam turbine 3 may not be operated viably. - Determining steam properties may be performed by installing a flowmeter and/or a pressure sensor and/or a temperature sensor in a steam conveyance line, and relaying the signal(s) from this/these instruments to an apparatus such as a dedicated steam flow computer and/or a
control unit 23 for processing and/or storage. It is to be appreciated that determining steam properties is well known in the industry and appropriate equipment for this purpose commercially available. Steam properties, once determined for example through measurement, may be used as control input data by thecontrol unit 23. - Referring to
Figure 1 , steam properties may be determined by way of measurement at least in aline 31 at its terminus at thesteam turbine 3. In addition, as will be explained below, steam properties may be determined otherwise as well, for example based on measurements in other loci in the system. - Determining of the properties of steam, including its temperature, as it enters into the
steam turbine 3 may be indirect. This means that steam properties are measured further upstream or downstream, for example in the steam conveyance pathway which terminates at thesteam turbine 3, and that the measurement results are converted into values for the properties of the steam to be determined, for example as it enters into thesteam turbine 3, by using known conversion factors. Such known conversion factors may be obtained through, for example, comparative measurements at loci of interest, of they may be derived from calculations based on the physical properties of the system. The notion of determining steam properties, as it used in this text, includes also indirect determining as just described. - In a power plant, the pressure of the steam may be kept constant, at least when the power plant produces electricity, in which case the minimum requirements for the properties of the steam entering the
steam turbine 3 may in practical terms be captured by the minimum viable temperature TV for the steam entering thesteam turbine 3. - The
steam turbine 3 may be adapted to drive, via adriveline 70, an electric generator 9 which may supply electricity to an electricity-consuming process via aline 44. The electricity-consuming process may be a specific and/or localized process such as in a manufacturing facility, or the electricity-consuming process may be aggregate electricity consumption in an electrical grid such as a district, a regional or a national electrical grid. - In the system, superheated steam is produced by superheating steam in a
superheater 11 installed in aboiler 10. As is well known, apparatuses upstream from thesuperheater 11, such as aheat exchanger 25 or a plurality of such heat exchangers may be employed to vaporize the water circulating in the system such that the water is already steam when it enters thesuperheater 11. In addition, upstream from thesuperheater 11 may be additional apparatuses such as a heat exchanger orheat exchangers 15 for pre-heating the circulating water before vaporization. - The
superheater 11 may be a single superheater device. Alternatively, thesuperheater 11 may be an aggregate of a plurality of individual superheater devices. Superheating the steam is brought about by transferring to the steam thermal energy resulting from burning fuel in in theboiler 10 with a burner (not depicted). The same applies to the heat exchanger orheat exchangers 25. - The
boiler 10 may be of a known type, such as of the fluidized bed type or of the pulverized coal-fired type. Fuel may be supplied from afuel source 21 via aline 49 to the boiler to be burned. Air or other suitable gas or gas mixture required for burning the fuel may be conveyed to theboiler 10 via aline 50 or multiple such lines. Non-gaseous combustion residues such as ash resulting from burning the fuel may be expelled from theboiler 10 via aline 51. Combustion gases resulting from burning the fuel may be expelled from theboiler 10 via aduct 71. - Before combustion gases are expelled from the boiler, thermal energy may be captured from the combustion gases with means in addition to the
superheater 11. According to the embodiment depicted inFigure 1 , such additional means of thermal recovery may comprise a heat exchanger orheat exchangers 15. The varieties and using of heat exchangers are well known in the industry, and such knowledge readily applies to the heat exchanger orheat exchangers 15. - The power plant may be run with a load W, which refers to the amount of electricity generated by the generator 9 per unit of time, as driven by the
steam turbine 3. As is well known in the industry, the amount of electricity generated by the generator 9 per unit of time, i.e. the power output of the generator 9, may be measured based on the voltage and current of the electricity output. Alternatively or in addition, the load W of the power plant may be inferred from the heat consumption of the power plant, since it is well known that the load W of a power plant is highly correlated with its heat consumption. The heat consumption, in turn, can be inferred from the amount of fuel burned in a unit of time for the purposes of heat generation in the power plant. The precise relationships between the amount of fuel burned in a unit of time and heat consumption, and between heat consumption and load W is typically plant-specific due to, for example, plant-specific energy losses.Figures 6 a and 6 b illustrate the idealized relationships between these measures. Such measurements are a part of normal power plant instrumentation. - The volume of fuel being burned in a power plant for the purposes of producing and heating steam and the load W of the power plant have a correlation which is characteristic for each power plant and known by the operators and/or programmed into the control apparatuses of the power plant. Thus, the load W of the power plant may be controlled by adjusting the fuel being burned for the purposes of producing and heating steam.
- The power plant may be run with different loads W, as illustrated in
Figures 4 a to 4 d. -
Figure 4 a represents the operation of a conventional system for producing steam to be used in asteam turbine 3.Figures 4 b to 4 d represent the operation a system for producing steam to be used in asteam turbine 3 according to the disclosed solution comprising a controllably utilizable auxiliary superheating chamber comprising an auxiliary superheater. - As illustrated in
Figure 4 a, a power plant may have a full rated load WF . This refers to the load W of the power plant which may be obtained with a full rated load of theboiler 10, i.e. when a maximum amount of thermal energy is being transferred in theboiler 10 into the steam fed into thesteam turbine 3. At this full rated load WF of the power plant, the temperature T of the superheated steam entering into thesteam turbine 3 is at its maximum, i.e. at the temperature TF of the steam with full power plant load. - Decreasing the load W of the power plant from the full rated load WF means that less thermal energy is being transferred in the
boiler 10 into the stem fed into thesteam turbine 3. Consequently, the temperature T of the superheated steam entering into thesteam turbine 3 decreases from the temperature TF obtainable at with the full rated power plant load WF . Typically, the pressure of the superheated steam is kept constant, but the mass flow rate ṁ of the superheated steam entering thesteam turbine 3 typically decreases as a function of the energy being transferred in theboiler 10 into the steam, as illustrated inFigure 4 a. - Still referring to
Figure 4 a, when further decreasing the load W of the power plant as just described, the temperature T of the superheated steam entering into thesteam turbine 3 further decreases and eventually reaches a minimum viable temperature TV , which refers to the lowest acceptable temperature for the superheated steam entering thesteam turbine 3. This load W of the power plant, at which the temperature T of the steam entering thesteam turbine 3 is at the minimum viable temperature TV is referred to as the minimum rated viable load WMV of the power plant. Conventionally, the load range between for viable operating WV of the power plant is, inclusively, the load range between the minimum rated viable load WMV and the full rated load WF . - The load range for unviable operating WU of the power plant is the load range with loads below the range for viable operating WV .
- Thus, in the range for viable operating WV a power plant, the temperature T of the steam entering the
steam turbine 3 is at or above the minimum viable temperature TV . In the range for unviable operating WU of a power plant, the temperature T of the steam entering thesteam turbine 3 is below the minimum viable temperature TV. - According to the solution, as illustrated in
Figure 1 , the system comprises anauxiliary superheating chamber 1 which comprises anauxiliary superheater 2. Theauxiliary superheater 2 may be used to further superheat the steam originating from thesuperheater 11 of theboiler 10. Theauxiliary superheater 2 may be a single superheater device. Alternatively, theauxiliary superheater 2 may be an aggregate of a plurality of individual superheater devices. - The
auxiliary superheating chamber 1 may include aburner 24 which burns fuel thereby releasing thermal energy. Fuel may be burned in theburner 24 in such an amount that the released thermal energy is transferred to steam flowing through theauxiliary superheater 2 of theauxiliary superheating chamber 1 to the extent that the steam is further superheated in theauxiliary superheater 2. - The
auxiliary superheating chamber 1 may additionally be connected to aline 54 constituting an inlet supplying incoming air or other suitable gas or gas mixture for the fuel burning process. - According to the solution and
Figure 1 , theauxiliary superheating chamber 1 comprising theauxiliary superheater 2 is installed in a steam forward conveyancepathway comprising lines superheater 11 to thesteam turbine 3. - A back conveyance pathway begins with a
line 34 at thesteam turbine 3 and terminates with aline 55 at thesuperheater 11. In the back conveyance pathway, water circulating in the system may at a given point be in a gaseous state, i.e. steam, and/or in a liquid state, depending on its temperature and/or its pressure at that given point. - According to the embodiment depicted in
Figure 1 , steam may be continuously conveyed through theauxiliary superheater 2 en route from thesuperheater 11 to thesteam turbine 3. - According to another embodiment depicted in
Figure 3 , steam may be selectably conveyed either through theauxiliary superheater 2 en route from thesuperheater 11 to thesteam turbine 3 or by bypassing theauxiliary superheater 2 via aline 58 constituting a steam diversion pathway. Such selectable conveyance may be effected by avalve arrangement 26. Thevalve arrangement 26 may be controlled by thecontrol unit 23. Thecontrol unit 23 may effect the selected conveyance, i.e. control thevalve arrangement 26, by using steam quality measurements as input data. Such input data may comprise, for example, at least the temperature T of the steam entering thesteam turbine 3, for example as measured at the terminus of theline 31 at thesteam turbine 3, whereby steam may be selectably conveyed via theauxiliary superheater 2 when the temperature T of the steam entering the steam turbine is near, at or below the minimum viable temperature TV . - According to the embodiment depicted in
Figure 1 , fuel may be burned continuously in theauxiliary superheating chamber 1 when the power plant is producing electricity or is in a hot standby mode. Hot standby means that while electricity is not being produced in the power plant, theboiler 10 and the superheatingchamber 1 and thesteam turbine 3 are kept at an elevated temperature, i.e. above ambient temperature, in order to reduce the time required to heat the said system components to a production temperature. - The volume of fuel being burned in the
auxiliary superheating chamber 1 may vary. A low amount of fuel being burned in theauxiliary superheating chamber 1 may be such that theauxiliary superheating chamber 1 may be kept at a hot standby temperature. This hot standby temperature of theauxiliary superheating chamber 1 may be defined such that at such a temperature the superheated steam travelling through theauxiliary superheater 2 is not further superheated in theauxiliary superheater 2. For example, such a hot standby temperature may be equal to or less than the temperature T of the superheated steam entering theauxiliary superheater 2. The hot standby temperature is higher than ambient temperature. - It is to be appreciated that the notion of temperature and its measurement with respect to both the
boiler 10 and correspondingly theauxiliary superheating chamber 1 is well known in the industry including established methodology and equipment for this purpose. - According to the embodiment depicted in
Figure 1 , theboiler 10 produces steam with a mass flow ṁ and a temperature T. Theauxiliary superheater 2 may be used to further superheat this steam as needed. In other words, theauxiliary superheater 2 may be used, as needed, to increase the temperature T of the steam originating from theboiler 10 before the steam enters thesteam turbine 3. Thus, the auxiliary superheater may be controllably used to superheat steam. - Such controllable use refers to controlling the amount of fuel being burned in the
burner 24 in thesuperheating chamber 1, thereby controlling the amount of thermal energy released and transferred into the steam flowing through theauxiliary superheater 2. Furthermore, in embodiments comprising asteam diversion pathway 58, as is depicted inFigure 3 , such controllable use additionally refers to the selective conveyance and non-conveyance of steam through theauxiliary superheater 2, for example as effected by avalve arrangement 26. - Referring to
Figure 4 b, when the power plant operates in the load range WN for normal operating, i.e. between its full rated load WF and minimum rated viable load WMV , inclusively, the thermal energy transferred into the steam in theboiler 10 is sufficient to maintain the temperature T of the steam entering thesteam turbine 3 at or above the minimum viable temperature TV . In such a case, theauxiliary superheating chamber 1 may be kept at a standby temperature as explained above. - Still referring to
Figure 4 b, when the power plant operates in the load range below its minimum viable load WMV , the thermal energy transferred into the steam in theboiler 10 may not be sufficient alone to maintain the temperature T of the steam entering thesteam turbine 3 at or above the minimum viable temperature TV . In such a case, theauxiliary superheating chamber 1 may be employed to further superheat the steam conveyed through theauxiliary superheater 2. Such further superheating may be brought about by increasing the volume of fuel being fed to theburner 24. Hence, the more the load W of the power plant is below its minimum rated viable load WMV , i.e. the minimum viable load without further superheating of steam between theboiler 10 and thesteam turbine 3, the higher the load of theauxiliary superheating chamber 1 advantageously may be set. - The load of the
auxiliary superheating chamber 1 and/or theboiler 10 may controlled by thecontrol unit 23. Thecontrol unit 23 may effect such load control by using steam quality measurements as input data and/or controlling the volume of fuel fed to theburner 24 and/or theboiler 10. The said input data may comprise, for example, at least the temperature T of the steam entering thesteam turbine 3, for example as measured at the terminus of theline 31 at thesteam turbine 3. - Still referring to
Figure 4 b, there may be an alert temperature TA for the temperature T of the steam entering thesteam turbine 3. Advantageously, the alert temperature TA is higher than the minimum viable temperature TV and lower than the temperature of steam entering thesteam turbine 3 with full power plant load TF . The primary purpose of the alert temperature TA is to serve as a control signal for the controllable use of theauxiliary superheating chamber 1 such that lowering the load of theboiler 10 does not result in the temperature T of the steam entering into thesteam turbine 3 dropping below the minimum viable temperature TV until the load W of the power plant reaches the minimum viable load WMVA with theauxiliary superheating chamber 1 in use. - That the alert temperature TA serving as a control signal means that when the temperature T of the steam entering the
steam turbine 3 reaches the alert temperature TA , this may be used as a trigger for control actions. Such control actions may be effected, for example, by thecontrol unit 23. - According to what is depicted in
Figure 4 b, the alert temperature TA may be fixed to a certain temperature, for example as being a certain number of temperature degrees above the minimum viable temperature TV . - Alternatively, according to what is depicted in
Figure 4 d, the alert temperature T A may be variable, for example as a function of the load W of the power plant, or depending on the rate with which the temperature T of the steam entering thesteam turbine 3 is changing. Thus, the value or the value function of the alert temperature TA may be specified according to the properties of the power plant system and its behavior in different situations such that theauxiliary superheating chamber 1 may be appropriately employed to further superheat steam so that lowering the load of theboiler 10 does not result in the temperature T of the steam entering into thesteam turbine 3 dropping below the minimum viable temperature T V until the load W of the power plant reaches the minimum viable load WMVA with theauxiliary superheating chamber 1 in use. - Even if the alert temperature TA is specified to be a fixed temperature, the controllable use of the
auxiliary superheating chamber 1 does not necessarily have to be such that it strictly maintains the steam at a fixed temperature at or near the alert temperature TA . In other words, the employment of theauxiliary superheating chamber 1 may be such that the temperature T of the steam entering thesteam turbine 3 may fluctuate above the minimum viable temperature TV, as illustrated inFigure 4 c . - Using the alert temperature TA as a control signal as described above, and in accordance with
Figures 4 b to 4 d, the range of load W of the power plant in which theauxiliary superheating chamber 1 is used to further superheat steam is referred to as the load range for low load operating WL of the power plant. Thus, with theauxiliary superheating chamber 1, the load range for viable operating WV of the power plant may be extended below the minimum rated viable load WMV (WMV being unviable without theauxiliary superheating chamber 1 used to further superheat the steam originating from the superheater 11) such that the load range for viable operating WV comprises both the load range for normal operating WN and the load range for low load operating WL , as illustrated inFigures 4 b to 4 d. - Thus, decrease in the load of the
boiler 1, as effected by decrease in the fuel feed into and to be burned in theboiler 10, may result in decrease in the mass flow ṁ and the temperature T in the steam originating from theboiler 10. As a result of the decrease in the mass flow ṁ of the steam, the load W of the power plant decreases. And, when the decreased load of theboiler 1 no longer is sufficient to produce steam at or above the alert temperature TA as the steam enters thesteam turbine 3, the load of the superheatingchamber 1 may be increased, by increasing the fuel feed to theburner 24, to compensate the reduced load of theboiler 1, and thusly maintain the reduced mass flow rate ṁ of the steam at or above the minimum viable temperature TV when the steam enters thesteam turbine 3. - In accordance with
Figures 4 b to 4 d, as the load W of the power plant still decreases, eventually the capacity of the superheatingchamber 1 is no longer sufficient to transfer a sufficient amount of energy to the steam so that the minimum viable temperature TV of the steam entering the steam turbine could be satisfied. This low load W is referred as the minimum viable load WMVA of the power plant (with theauxiliary superheating chamber 1 in operation). The range of load W of the power plant below this minimum viable load MMVA is referred to as the load range for unviable operating WU of a power plant comprising anauxiliary superheating chamber 1. - Referring to
Figures 4 b to 4 d, the load range for viable operating WV of the power plant may be extended downwards below the minimum rated viable load WMV (without theauxiliary superheater 2, as illustrated inFigure 4 a) by installing and controllably using theauxiliary superheater 2 between theboiler 10 and thesteam turbine 3. - According to the embodiment depicted in
Figure 3 , such controllable use of the auxiliary superheater may additionally mean selectably conveying or not conveying steam through theauxiliary superheater 2 with thevalve arrangement 26 as explained above. - Thus, referring to
Figures 4 b to 4 d, according to the solution, the minimum viable temperature TV of the steam entering into thesteam turbine 3 may be satisfied according to the solution both within the load range WN for normal operating of a power plant as well as within the load range WL for low load operating of a power plant. - According to the embodiment illustrated in
Figure 1 , fuel may be supplied to theauxiliary superheating chamber 2 from afuel source 6 via aline 42. Such fuel may be the same as supplied to theboiler 10. Alternatively, the fuel may be different from the fuel which is supplied to theboiler 10. In the case of theboiler 10 and theauxiliary superheating chamber 1 consuming the same fuel, thefuel sources - According to the embodiment illustrated in
Figure 2 , the fuel supplied to and burned in theauxiliary superheating chamber 1 may be product gas generated by gasification with agasifier 4. In such a case, thefuel supply 6 may contain initial fuel to be gasified into final fuel burned in theauxiliary superheating chamber 1. Such initial fuels to be gasified may comprise, for example, biomass and/or waste. As illustrated inFigure 2 , initial fuel may be conveyed from thefuel source 6 via aline 39 to thegasifier 4. The final fuel may be conveyed from thegasifier 4 to theauxiliary superheating chamber 1 via a line orlines - The
gasifier 4 may be of a known type, such as of the fluidizing bed type. For gasification, air or other suitable gas or gas mixture may be supplied to thegasifier 4 via aline 38 or multiple such lines. Gasification residues may be expelled from the gasifier via aline 36. - In the embodiment in which the
auxiliary superheating chamber 1 uses as fuel product gas generated with thegasifier 4, the product gas conveyance pathway comprising thelines cooler 5 for cooling the product gas and/or a filter 7 for filtering out undesirable substances from the product gas before the product gas is supplied to theauxiliary superheating chamber 1. The varieties and using of coolers and filters are well known in the industry, and such knowledge readily applies to thecooler 5 and the filter 7. - If the
cooler 5 is so used, as illustrated inFigure 2 , heat energy may be conveyed from thecooler 5 to aheat exchanger 8 installed in the back conveyance pathway betweenlines cooler 5 to theheat exchanger 8 may be brought about by circulating an appropriate heat transfer medium in thelines cooler 5 and theheat exchanger 8. Thus, theheat exchanger 8 may be used to pre-heat the water to be vaporized. - In the embodiment in which the
auxiliary superheating chamber 1 uses as fuel product gas generated with thegasifier 4, product gas may be additionally conveyed vialine 47 to theboiler 10 to be used as fuel. Such fuel use may be advantageously used, for example, as fuel being burned during hot standby, and/or as supplementary fuel, and/or as main fuel and/or as the only fuel for theboiler 10. During hot standby, the fuel conveyed vialine 47 to the boiler may be burned with aburner 72 installed in theboiler 10. Thisburner 72 may be dedicated to burning fuel to maintain theboiler 10 in hot standby. Alternatively, theburner 72 may have multiple functionalities, such as burning fuel conveyed vialines 49 and/or 47 during normal operations when electricity is being produced in the power plant and/or burning fuel conveyed vialines 49 and/or 47 during hot standby. - Advantageously, fuel is continuously consumed in the
burner 24 of theauxiliary superheating chamber 1 and/or theboiler 10 so that thegasifier 4 may be kept in continuous operation. This has the benefit of avoiding start-up (i.e. heating) and shut-down periods for thegasifier 4. Such start-up and shut-down periods may be several hours in duration, which imposes disadvantageous restrictions on the flexibility in terms of the load variability of the power plant. - The combustion gases resulting from burning fuel in the
auxiliary superheating chamber 1 may be conveyed via a gas conveyance passage into theboiler 10 in which thermal energy may be recovered from the combustion gases. The combustion gases may be conveyed from theauxiliary superheating chamber 1 into theboiler 10 via aline 43 as the gas conveyance passage as illustrated inFigure 1 . If theauxiliary superheating chamber 1 is installed to the outer wall of theboiler 10 the combustion gases may be conveyed from theauxiliary superheating chamber 1 to theboiler 10 via an opening between theauxiliary superheating chamber 1 and theboiler 10. Thermal recovery of the said combustion gases in theboiler 10 may be effected, for example, by thesuperheater 11 and/or theheat exchanger 15 and/or any other means of recovering thermal energy that theboiler 1 comprises. - According to another embodiment, as illustrated in
Figure 5 , the combustion gases resulting from burning fuel in theauxiliary superheating chamber 1 may be vented out from the auxiliary superheating chamber via aline 37 such that the said combustion gases are not conveyed into theboiler 10. In such a case, the said combustion gases may be conveyed via aline 37 to elsewhere in the system (not shown), or alternatively to another system or process (not shown), or alternatively to the atmosphere (not shown). In the case that the said combustion gases are not conveyed into theboiler 10, thermal energy may be captured from these gases with a suitable heat exchanger arrangement, for example in a manner similar to how theheat exchanger 15 may be used to capture thermal energy from the combustion gases expelled from theboiler 10. - Referring back to
Figure 1 , after the steam conveyed to thesteam turbine 3 has been utilized in thesteam turbine 3, it (i.e. water either in a gaseous or in a liquid state depending on its temperature and pressure) may be conveyed back to theboiler 10 via a line orlines superheater 11. As illustrated inFigure 1 , the back conveyance pathway may additionally comprise a condenser 14 for recovering heat from the steam and transferring it to a heat-consuming process 22. The condenser 14 may comprise a single condenser device, or it may comprise a plurality of individual condenser devices. The varieties and using of condensers are well known in the industry, and such knowledge readily applies to the condenser 14. The condenser 14 may be connected to a heat-consuming process 22 withlines - In addition, or alternatively, the back conveyance pathway may comprise a pump or pumps 20 for effecting the circulation of the circulating substance between the
boiler 10 and thesteam turbine 3. - In addition, or alternatively, the back conveyance pathway may comprise a
heat exchanger 25 in theboiler 10 for pre-heating or preferably vaporizing the water before it enters thesuperheater 11. Theheat exchanger 25 may comprise a single heat exchanger device, or it may comprise a plurality of individual heat exchanger devices. The properties and use of such heat exchangers is well known in the industry and this knowledge readily applies to theheat exchanger 25. According to an example theheat exchanger 25 may comprise a plurality of tubes (not specifically illustrated) integrated into the side walls of theboiler 10. - Additional pre-heating of water in the back conveyance pathway may be effected by a
heat exchanger 15 installed in theboiler 10, such as in theduct 71 for expelling the combustion gases from theboiler 10 as illustrated inFigure 1 . Theheat exchanger 15 installed in theboiler 10 may comprise a single heat exchanger device, or it may comprise a plurality of individual heat exchanger devices. If installed in theduct 71 as illustrated inFigure 1 , theheat exchanger 15 may capture thermal energy from the combustion gases of theboiler 10 and/or theauxiliary superheating chamber 2 before the combustion gases are expelled from theboiler 10 via theduct 71 of the boiler. - Advantageously, and referring to
Figures 4 b to 4 d, the capacity of theauxiliary superheating chamber 1, i.e. the amount of thermal energy it can generate in a unit of time, is selected such that when the power plant is run with a load W below its minimum rated viable load WMV , theauxiliary superheating chamber 1 is capable of further superheating the steam originating from thesuperheater 11 such that the minimum viable temperature TV of the steam entering thesteam turbine 3 is satisfied. That is, when the thermal energy transferred to steam in thesuperheater 11 is not sufficiently high for the steam fulfil the minimum viable temperature TV of steam entering theturbine 3 due to theboiler 10 being run at a low load, theauxiliary superheating chamber 1 advantageously is capable of transferring to the steam the thermal energy required after the steam has been superheated at thesuperheater 11 so that the temperature T of the steam entering thesteam turbine 3 is at least the minimum viable temperature TV such that the load range WL for the low load operating of the power plant extends substantially below its minimum rated viable load WMV . - In this manner, and according to the disclosed solution, the
auxiliary superheating chamber 1 comprising theauxiliary superheater 2 may be used to extend the load range for viable operating of a power plant WV such that the load range for viable operating WV of the power plant comprises both the load range for normal operating WN and the load range for low load operating WL , wherein theauxiliary superheating chamber 1 may be used to further superheat steam in the load range for low load operating WL . According to the disclosed solution, theauxiliary superheating chamber 1 may be used within the load range for normal operating of the power plant WN as well for example so as to use theauxiliary superheater 2 to further superheat the steam originating from thesuperheater 11 already before the minimum viable temperature TV of the steam entering thesteam turbine 3 is reached, as illustrated inFigures 4 b to 4 d. - Referring to
Figures 4 b to 4 d, in practice there may a minimum viable load WMVA of a power plant with anauxiliary superheating chamber 1 in operation such that with a load of the power plant W below the minimum viable load WMVA the thermal energy generation capacity of theauxiliary superheating chamber 1 is not sufficient to satisfy the minimum viable temperature TV of steam entering theturbine 3. Consequently, the load range for viable operating WV of the power plant is, inclusively, the load range between its minimum viable load WMVA and its full rated load WF . - The
auxiliary superheating chamber 1 may additionally be utilized as a means to maintain the system in a hot standby mode. Standby means that no electricity is being produced in the power plant, in which case theboiler 10 may be run down for example by way of no or very little fuel being burned in theboiler 10, or kept in a hot standby mode by way of burning fuel in the boiler in an amount sufficient to keep theboiler 10 at an elevated temperature. Hot standby for the system means that the circulating water, in gaseous and/or liquid state, is maintained in such a high temperature that the system can be started up, i.e. electricity production with the generator 9 be started, with a start-up time substantially shorter than would be the case of the system was shut down without maintaining high temperature in the circulation of the circulating substance. - During hot standby, the thermal energy release to the circulating water required for maintaining the system in a hot standby temperature may be brought about by the superheating
chamber 1 in which case no fuel or very little fuel may be burned in theboiler 10. Alternatively, during hot standby, the thermal energy release to the circulating water required for maintaining the system in a hot standby temperature may be brought about by both thesuperheating chamber 1 and theboiler 10.
Claims (12)
- A method of extending the load range for viable operating WV of a steam turbine power plant comprising a boiler (10) with a superheater (11) for supplying superheated steam to a steam turbine (3), the steam turbine having a required minimum viable temperature TV of steam entering the steam turbine, the load range for viable operating WV of the steam turbine power plant being extended by means of controllably using an auxiliary superheating chamber (1) comprising an auxiliary superheater (2) to further superheat steam; the method comprising:- determining the temperature T of the steam entering the steam turbine;- when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV ;• burning fuel in the boiler to generate thermal energy to be transferred into steam in the superheater (11) to generate superheated steam satisfying the required minimum viable temperature TV of the steam entering the steam turbine;• conveying the superheated steam from the superheater (11) to the auxiliary superheater (2) of the auxiliary superheating chamber (1);• burning fuel with a burner (24) in the auxiliary superheating chamber (1) to keep the auxiliary superheating chamber in a hot standby temperature, which temperature is higher than ambient temperature and not higher than the temperature of the superheated steam entering the auxiliary superheater (2);• conveying the superheated steam from the auxiliary superheater (2) to the steam turbine; and- when the temperature T of the steam entering the steam turbine is at or below the alert temperature TA ,• burning fuel in the boiler to generate thermal energy to be transferred into steam in the superheater (11) to generate superheated steam;• conveying the superheated steam from the superheater to the auxiliary superheater (2) of the auxiliary superheating chamber (1);• further superheating the superheated steam by burning fuel with a burner (24) in the auxiliary superheating chamber (1) to generate thermal energy to be transferred into the superheated steam in the auxiliary superheater (2) such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied;• conveying the superheated steam from the auxiliary superheater (2) to the steam turbine.
- A method of extending the load range for viable operating WV of a steam turbine power plant comprising a boiler (10) with a superheater (11) for supplying superheated steam to a steam turbine (3), the steam turbine having a required minimum viable temperature TV of steam entering the steam turbine, the load range for viable operating WV of the steam turbine power plant being extended by means of controllably using an auxiliary superheating chamber (1) comprising an auxiliary superheater (2) to further superheat steam; the method comprising:- determining the temperature T of the steam entering the steam turbine;- when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV ;• burning fuel in the boiler to generate thermal energy to be transferred into steam in the superheater (11) to generate superheated steam satisfying the required minimum viable temperature TV of the steam entering the steam turbine;• conveying the superheated steam from the superheater (11) to the steam turbine by bypassing the auxiliary superheater (2) with a steam diversion pathway (58);• burning fuel with a burner (24) in the auxiliary superheating chamber (1) to keep the auxiliary superheating chamber in a hot standby temperature, which temperature is higher than ambient temperature and not higher than the temperature of the superheated steam entering the auxiliary superheater (2);- when the temperature T of the steam entering the steam turbine at or below the alert temperature TA ,• burning fuel in the boiler to generate thermal energy to be transferred into steam in the superheater (11) to generate superheated steam;• conveying the superheated steam from the superheater (11) to the auxiliary superheater (2) of the auxiliary superheating chamber (1);• further superheating the superheated steam by burning fuel with a burner (24) in the auxiliary superheating chamber (1) to generate thermal energy to be transferred into the superheated steam in the auxiliary superheater (2) such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied;• conveying the superheated steam from the auxiliary superheater (2) to the steam turbine.
- The method according to claim 1 or 2, the method further comprising conveying combustion gases from the auxiliary superheating chamber to the boiler for thermal energy to be recovered from the said combustion gases.
- The method according to claim 1 or 2, the method further comprising conveying combustion gases via a line (37) from the auxiliary superheating chamber elsewhere than into the boiler, for example in the atmosphere.
- The method according to any of the preceding claims, the method further comprising generating product gas by gasification with a gasifier (4) and supplying the product gas to the burner (24) to be used as the fuel being burned.
- The method according to claim 5, the method further comprising conveying at least some of the product gas generated in the gasifier to the boiler to be used as fuel being burned in the boiler with a burner (72) during hot standby, and/or as supplementary fuel, and/or as main fuel and/or only fuel for the boiler.
- A system comprising- a boiler (10) with a superheater (11) for supplying superheated steam to a steam turbine (3), the steam turbine having a required minimum viable temperature TV of steam entering the steam turbine;- a controllably usable auxiliary superheating chamber (1) comprising an auxiliary superheater (2) and a burner (24), the auxiliary superheater installed in a steam forward conveyance pathway (30, 31) between the superheater (11) and the steam turbine;- a control unit (23) adapted to:• determine the temperature T of the steam entering the steam turbine;• when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV ,
▪ control the burning of fuel in the burner such that the auxiliary superheating chamber (1) is kept in a hot standby temperature, which temperature is higher than ambient temperature and not higher than the temperature of the superheated steam entering the auxiliary superheater (2);• when the temperature T of the steam entering the steam turbine at or below the alert temperature TA ,
▪ control the burning of fuel in the burner (24) such that thermal energy is transferred into the superheated steam in the auxiliary superheater (2) such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied. - A system comprising:- a boiler (10) with a superheater (11) for supplying superheated steam to a steam turbine (3), the steam turbine having a required minimum viable temperature TV of steam entering the steam turbine;- a controllably usable auxiliary superheating chamber (1) comprising an auxiliary superheater (2) and a burner (24), the auxiliary superheater installed in a steam forward conveyance pathway (30, 31) between the superheater (11) and the steam turbine;- a control unit (23) adapted to:• determine the temperature T of the steam entering the steam turbine;• when the temperature T of the steam entering the steam turbine is above an alert temperature TA , which alert temperature TA is higher than the required minimum viable temperature TV ,▪ control a valve arrangement (26) such that superheated steam is conveyed from the superheater (11) to the steam turbine, the steam thereby bypassing the auxiliary superheater (2) via a steam diversion pathway (58);▪ control the burning of fuel in the burner (24) such that the auxiliary superheating chamber (1) is kept in a hot standby temperature, which temperature is higher than ambient temperature and not higher than the temperature of the superheated steam entering the auxiliary superheater (2);• when the temperature T of the steam entering the steam turbine at or below the alert temperature TA ,▪ control the valve arrangement (26) such that superheated steam is conveyed from the superheater (11) to the auxiliary superheater (2);▪ control the burning of fuel in the burner such that thermal energy is transferred into the superheated steam in the auxiliary superheater (2) such that the required minimum viable temperature TV of steam entering the steam turbine is satisfied.
- The system according to claim 7 or 8, the system further comprising gas conveyance passage (43) adapted to convey combustion gases from the auxiliary superheating chamber (1) to the boiler.
- The system according to claim 7 or 8, the system further comprising a line (37) adapted to convey combustion gases from the auxiliary superheating chamber (1) to elsewhere than the boiler, for example in the atmosphere.
- The system according to any of the claims 7 to 10, the system further comprising:- a gasifier (4) adapted to generate product gas; and- lines (40, 41, 42) adapted to convey the product gas from the gasifier to the burner (24).
- The system according to claim 11, the system further comprising a line (47) adapted to convey product gas from the gasifier to the boiler.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL18397514T PL3415816T3 (en) | 2017-05-10 | 2018-04-24 | A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20175419A FI128267B (en) | 2017-05-10 | 2017-05-10 | A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3415816A1 EP3415816A1 (en) | 2018-12-19 |
EP3415816B1 true EP3415816B1 (en) | 2020-10-28 |
Family
ID=62152506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18397514.3A Active EP3415816B1 (en) | 2017-05-10 | 2018-04-24 | A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP3415816B1 (en) |
DK (1) | DK3415816T3 (en) |
ES (1) | ES2848053T3 (en) |
FI (1) | FI128267B (en) |
HU (1) | HUE052435T2 (en) |
PL (1) | PL3415816T3 (en) |
PT (1) | PT3415816T (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2606103A (en) | 1947-06-13 | 1952-08-05 | Comb Eng Superheater Inc | Chemical recovery furnace with high-temperature superheater |
GB682410A (en) | 1950-02-24 | 1952-11-12 | Vickers Electrical Co Ltd | Improvements relating to power plant |
US3002347A (en) | 1956-05-24 | 1961-10-03 | Babcock & Wilcox Co | Method and apparatus for a binary fluid power plant |
US3213831A (en) | 1963-12-23 | 1965-10-26 | Combustion Eng | Vapor generating apparatus |
SU1048237A1 (en) | 1982-01-20 | 1983-10-15 | Всесоюзный Заочный Политехнический Институт | Boiler plant |
SU1208406A1 (en) | 1984-06-25 | 1986-01-30 | Всесоюзный Дважды Ордена Трудового Красного Знамени Теплотехнический Научно-Исследовательский Институт Им.Ф.Э.Дзержинского | Steam generating plant |
US4676177A (en) | 1985-10-09 | 1987-06-30 | A. Ahlstrom Corporation | Method of generating energy from low-grade alkaline fuels |
JPH04129601U (en) | 1991-05-16 | 1992-11-27 | 金井 宏之 | steam generator |
US5239946A (en) | 1992-06-08 | 1993-08-31 | Foster Wheeler Energy Corporation | Fluidized bed reactor system and method having a heat exchanger |
JPH05256428A (en) | 1992-03-13 | 1993-10-05 | Takuma Co Ltd | Waste incinerating and processing device |
US5509997A (en) | 1991-11-26 | 1996-04-23 | A. Ahlstrom Corporation | Method of recovering energy from waste liquors from pulp processes |
JPH08303718A (en) | 1995-05-10 | 1996-11-22 | Mitsubishi Heavy Ind Ltd | Circulating fluidized bed boiler |
WO2003095738A1 (en) | 2002-05-13 | 2003-11-20 | Andritz Oy | Exhalation system |
US20050252624A1 (en) | 2002-07-22 | 2005-11-17 | Oy Metsa-Botnia Ab | Process and apparatus for producing thermal and electric energy |
WO2008156397A1 (en) | 2007-06-20 | 2008-12-24 | Metso Power Ab | Method for recovering chemicals and production of steam |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9841185B2 (en) * | 2013-10-29 | 2017-12-12 | Emerson Process Management Power & Water Solutions, Inc. | Steam temperature control using model-based temperature balancing |
-
2017
- 2017-05-10 FI FI20175419A patent/FI128267B/en active IP Right Review Request
-
2018
- 2018-04-24 PT PT183975143T patent/PT3415816T/en unknown
- 2018-04-24 ES ES18397514T patent/ES2848053T3/en active Active
- 2018-04-24 DK DK18397514.3T patent/DK3415816T3/en active
- 2018-04-24 EP EP18397514.3A patent/EP3415816B1/en active Active
- 2018-04-24 HU HUE18397514A patent/HUE052435T2/en unknown
- 2018-04-24 PL PL18397514T patent/PL3415816T3/en unknown
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2606103A (en) | 1947-06-13 | 1952-08-05 | Comb Eng Superheater Inc | Chemical recovery furnace with high-temperature superheater |
GB682410A (en) | 1950-02-24 | 1952-11-12 | Vickers Electrical Co Ltd | Improvements relating to power plant |
US3002347A (en) | 1956-05-24 | 1961-10-03 | Babcock & Wilcox Co | Method and apparatus for a binary fluid power plant |
US3213831A (en) | 1963-12-23 | 1965-10-26 | Combustion Eng | Vapor generating apparatus |
SU1048237A1 (en) | 1982-01-20 | 1983-10-15 | Всесоюзный Заочный Политехнический Институт | Boiler plant |
SU1208406A1 (en) | 1984-06-25 | 1986-01-30 | Всесоюзный Дважды Ордена Трудового Красного Знамени Теплотехнический Научно-Исследовательский Институт Им.Ф.Э.Дзержинского | Steam generating plant |
US4676177A (en) | 1985-10-09 | 1987-06-30 | A. Ahlstrom Corporation | Method of generating energy from low-grade alkaline fuels |
JPH04129601U (en) | 1991-05-16 | 1992-11-27 | 金井 宏之 | steam generator |
US5509997A (en) | 1991-11-26 | 1996-04-23 | A. Ahlstrom Corporation | Method of recovering energy from waste liquors from pulp processes |
JPH05256428A (en) | 1992-03-13 | 1993-10-05 | Takuma Co Ltd | Waste incinerating and processing device |
US5239946A (en) | 1992-06-08 | 1993-08-31 | Foster Wheeler Energy Corporation | Fluidized bed reactor system and method having a heat exchanger |
JPH08303718A (en) | 1995-05-10 | 1996-11-22 | Mitsubishi Heavy Ind Ltd | Circulating fluidized bed boiler |
WO2003095738A1 (en) | 2002-05-13 | 2003-11-20 | Andritz Oy | Exhalation system |
US20050252624A1 (en) | 2002-07-22 | 2005-11-17 | Oy Metsa-Botnia Ab | Process and apparatus for producing thermal and electric energy |
WO2008156397A1 (en) | 2007-06-20 | 2008-12-24 | Metso Power Ab | Method for recovering chemicals and production of steam |
Non-Patent Citations (1)
Title |
---|
"Steam, its generation and use", 1 January 2005, THE BABCOCK & WILCOX COMPANY, article KITTO JOHN B., STULTZ STEVEN C.: "Chapter 19 Boilers, Superheaters and Reheaters. Chapter 41", XP055937848 |
Also Published As
Publication number | Publication date |
---|---|
FI20175419A (en) | 2018-11-11 |
HUE052435T2 (en) | 2021-04-28 |
FI128267B (en) | 2020-02-14 |
EP3415816A1 (en) | 2018-12-19 |
ES2848053T3 (en) | 2021-08-05 |
DK3415816T3 (en) | 2021-02-01 |
PT3415816T (en) | 2021-01-11 |
PL3415816T3 (en) | 2021-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2245446C2 (en) | Combined cycle power plant and its operating process | |
CN102434288B (en) | Fuel-heating system | |
AU2018250745B2 (en) | Combined heat and power system and method of operation | |
FI128409B (en) | A method and a system for maintaining steam temperature with decreased loads of a steam turbine power plant comprising a fluidized bed boiler | |
CN107429576B (en) | Method for balancing and/or generating electrical energy and/or hydrogen and energy storage power plant | |
AU2001245857B2 (en) | Method and system for generating power | |
CN108884991B (en) | Method for operating boiler and boiler plant | |
EP3415816B1 (en) | A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine | |
AU2001245857A1 (en) | Method and system for generating power | |
KR101613227B1 (en) | Apparatus and method for power production using waste heat in a ship | |
JP6621310B2 (en) | Gasification device, control device, combined gasification power generation facility and control method | |
JP2013007533A (en) | Control method of once-through boiler and device therefor | |
Huang et al. | Control strategy for main steam pressure of combustion system of pulverized coal boiler | |
JP5615199B2 (en) | Combustion device | |
WO2017179551A1 (en) | Boiler operating method and boiler equipment | |
EP2596286A2 (en) | A method and a device for cooling wood gases | |
KR20160147243A (en) | Waste heat recovery apparatus for combustion furnace and method thereof | |
MAGASINER | THE EFFECT OF FUEL MOISTURE CONTENT ON THE PERFORMANCE OF A TYPICAL BAGASSE FIRED | |
Gupta | Design of temperature and pressure control logic for coal fired fluidized bed boiler on DCS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190617 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200728 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1328595 Country of ref document: AT Kind code of ref document: T Effective date: 20201115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018009150 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 3415816 Country of ref document: PT Date of ref document: 20210111 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20210104 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: FGE |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20210126 |
|
REG | Reference to a national code |
Ref country code: SK Ref legal event code: T3 Ref document number: E 36319 Country of ref document: SK |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E052435 Country of ref document: HU |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210129 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210128 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210228 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210128 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602018009150 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: MDE Opponent name: SUMITOMO SHI FW ENERGIA OY |
|
26 | Opposition filed |
Opponent name: SUMITOMO SHI FW ENERGIA OY Effective date: 20210629 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2848053 Country of ref document: ES Kind code of ref document: T3 Effective date: 20210805 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210424 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210430 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210228 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1328595 Country of ref document: AT Kind code of ref document: T Effective date: 20201028 |
|
APBM | Appeal reference recorded |
Free format text: ORIGINAL CODE: EPIDOSNREFNO |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240418 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20240325 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20240419 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240419 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240418 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20240423 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240524 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240419 Year of fee payment: 7 Ref country code: CZ Payment date: 20240412 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SK Payment date: 20240417 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240425 Year of fee payment: 7 Ref country code: FI Payment date: 20240425 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20240411 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240418 Year of fee payment: 7 Ref country code: HU Payment date: 20240422 Year of fee payment: 7 Ref country code: BE Payment date: 20240418 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201028 |