EP3365601B1 - Crematoria - Google Patents

Crematoria Download PDF

Info

Publication number
EP3365601B1
EP3365601B1 EP15801206.2A EP15801206A EP3365601B1 EP 3365601 B1 EP3365601 B1 EP 3365601B1 EP 15801206 A EP15801206 A EP 15801206A EP 3365601 B1 EP3365601 B1 EP 3365601B1
Authority
EP
European Patent Office
Prior art keywords
chamber
crematorium
primary
plenum
tertiary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP15801206.2A
Other languages
German (de)
French (fr)
Other versions
EP3365601A1 (en
Inventor
Vincent FERGUSON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INCINER8 Ltd
Original Assignee
Inciner8 Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inciner8 Ltd filed Critical Inciner8 Ltd
Priority to PL15801206T priority Critical patent/PL3365601T3/en
Publication of EP3365601A1 publication Critical patent/EP3365601A1/en
Application granted granted Critical
Publication of EP3365601B1 publication Critical patent/EP3365601B1/en
Priority to HRP20191204TT priority patent/HRP20191204T1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G1/00Furnaces for cremation of human or animal carcasses
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/40Portable or mobile incinerators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2206/00Waste heat recuperation
    • F23G2206/10Waste heat recuperation reintroducing the heat in the same process, e.g. for predrying
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2900/00Special features of, or arrangements for incinerators
    • F23G2900/70Incinerating particular products or waste
    • F23G2900/7009Incinerating human or animal corpses or remains

Definitions

  • This invention relates to crematoria, and in particular to mobile or portable crematoria suitable for use in humanitarian applications.
  • Crematoria are used for burning human or animal remains and generally comprise a combustion chamber into which a human or animal body is placed, typically inside a coffin (casket).
  • the combustion chamber comprises a primary burner, which ignites, and which sustains the combustion of, the body within it. Once the contents of the combustion chamber have been fully burned, the resulting ash is collected, and removed, and the process can then be repeated as and when required.
  • a crematorium In contrast to an incinerator, which is used for the burning of general waste, a crematorium needs to be specially adapted to take into account various factors.
  • the flue gasses in an incinerator typically pass through a secondary burner to minimise or eliminate toxic combustion products
  • the secondary burn needs to be sustained to ensure that potentially bio-hazardous combustion products are not vented to atmosphere.
  • incinerators can be operated on a continuous basis: that is with waste being added batch-wise or continuously-fed. However, in the case of a crematorium, this is not generally considered to be respectful, and tends to breach many religious and cultural customs and requirements.
  • Crematoria are typically infrastructural installations, that is to say, comprising purpose-built buildings housing the crematorium itself, as well as chapels, mortuaries and other facilities that often accompany the respectful cremation of human remains.
  • crematoria are not widely available due to cultural and religious taboos associated with cremation.
  • there are circumstances where cremation is indicated notwithstanding the lack of facilities. For example, during the outbreak of a contagious disease, or following on from a natural disaster, there may be a great many bodies that need to be cremated because it is not possible or safe, under those circumstances, to follow burial practices. Further, in the case of certain natural disasters, especially where key infrastructure has been damaged, any available crematoria that would ordinarily have been used, may be out of operation.
  • KR100824597 (Sung, 23 April 2008 ), which discloses a crematorium according to the preamble of claim 1; EP2194324 (Park, 9 June 2010 ); and EP2045525 (Allessandretti, 8 April 2009 ).
  • an incinerator is not able to respect the cultural and religious requirements associated with cremation.
  • incinerators are not adapted to be used intermittently: there being a requirement for a prolonged pre-heat and a cool-down cycle before it can be used again. This is no conducive to one-body-at-a-time cremation.
  • This invention aims to provide a solution to one or more of the above problems and/or to provide an improved and/or alternative crematorium.
  • the invention thus provides a crematorium having three combustion chambers.
  • This arrangement may be considered to have various advantages, such as: By re-heating the flue gasses twice after they leave the primary combustion chamber, it may be possible to operate the primary combustion chamber at a lower temperature, thus shortening the interval between cremation cycles (due to shorter heat-up and cool-down intervals).
  • an incinerator which only has one secondary burner, to achieve the same levels of flue gas neutralisation, the primary burn needs to be much hotter than in the case of the invention.
  • the plenum chamber may act as a heat store underneath the primary combustion chamber.
  • the effects of cyclical thermal expansion and contraction (e.g. cracking of the refractory materials lining the chambers) associated with intermittent burn cycles may be reduced by maintaining the base wall (at least) of the primary combustion chamber at an elevated temperature, even when the primary burners are switched off.
  • the retention of heat in the plenum chamber may serve to speed-up the re-heat cycle of the primary combustion chamber when the crematorium is re-started.
  • a tertiary burner enables the already pre-heated flue gasses to be heated to a much higher temperature without necessarily needing higher capacity tertiary burners.
  • being able to use smaller burners with lower fuel requirements is generally considered to be advantageous.
  • the draw on the flue can be increased.
  • the crematorium comprised a primary combustion chamber, which is shaped and sized to accommodate a human body. Typically, therefore, the primary combustion chamber will be approximately 2 to 2.5 metres long, 1 to 1.5 metres wide and 1 to 1.5 metres high internally.
  • the primary combustion chamber is suitably manufactured from a refractory material, such as concrete or other pour-mouldable refractory materials or ceramics.
  • the primary combustion chamber suitably comprises an entrance doorway, at one end, through which a body to be cremated can be placed inside the primary combustion chamber.
  • the entrance doorway is suitably manufactured lined with a refractory material and due to its weight, may be mounted on a lift-assisted hinge or sliding device.
  • the primary combustion chamber comprises one or more ash chutes in its base wall through which ashes drop into a collection chamber.
  • An ash drawer may be provided within the collection chamber for conveniently containing the ashes and enabling them to be recovered from the primary combustion chamber.
  • the primary combustion chamber suitably comprises a plurality of primary burners. Such a configuration may serve to more evenly distribute heat with the primary combustion chamber and/or may enable smaller-capacity burners to be used.
  • the first outlet leads to the secondary chamber, and suitably comprises an aperture in a side wall of the primary combustion chamber providing fluid communication with an adjacent secondary chamber.
  • the secondary chamber may comprise a plurality of secondary burners for similar reasons to those stated previously.
  • the second outlet leads to the plenum chamber, and suitably comprises an aperture in a side wall of the secondary combustion chamber providing fluid communication with an adjacent plenum chamber.
  • the plenum chamber suitably comprises one or more baffles to cause the flue gasses to follow a serpentine path beneath the primary combustion chamber. This may increase the dwell time of the flue gasses in a re-heated state (increased time at temperature) and may also help to more evenly heat the base wall of the primary combustion chamber.
  • the third outlet leads to the tertiary chamber, and suitably comprises an aperture in a side wall of the plenum chamber providing fluid communication with an adjacent tertiary chamber.
  • the tertiary chamber may comprise a plurality of tertiary burners for similar reasons to those stated previously.
  • the flue suitably comprises a tubular flue stack, which in a preferred embodiment of the invention, is removable for storage and transportation.
  • the crematorium is containerised, that is to say, designed to fit into, and fitted into an ISO bulk transport container.
  • the containerisation of the crematorium facilitates the storage of the crematorium, in use, and also facilitates its transportation via land, sea or air.
  • the ISO container surrounding the crematorium is slightly oversized to provide some free space for the storage of fuel for the burners, the removed flue stack and/or other items (such as flat-packed coffins, religious artefacts etc.) that are needed when cremating a body.
  • the primary, secondary, plenum and tertiary chambers may be interconnected to form a unit.
  • the crematorium is at least partially modular, that is to say, having separate primary, secondary, plenum and tertiary chambers.
  • a shared tertiary chamber having a plurality of inlets that can register with, and/or be connected with a respective plurality of third outlets of a respective plurality of plenum chambers.
  • a modular crematorium system in which there is a shared tertiary and secondary chamber to which a plurality of modular crematoria connect, each modular crematorium comprising its own primary and plenum chambers whose outlets are configured to register with or otherwise connect to respective inlets of the shared secondary and tertiary chambers.
  • a crematorium 10 in accordance with the invention comprises a main body portion 12 that is mounted within an external enclosure 14 in the form, in the illustrated embodiment, of a bulk transport ISO container.
  • FIG. 1 of the drawings one of the sidewalls of the outer enclosure 14 has been removed for clarity.
  • the ISO container 14 is accessible via two sets of doors 16 located at opposite ends of the container, and it can be seen in Figure 1 in particular, that when the doors 16 have been opened, a narrow passageway is formed down one side of the container 14, which passageway 18 enables personnel to gain access to the crematorium 10 for servicing, maintenance and repair.
  • the passageway 18 additionally provides some empty space within the container 14, which enables other items to be transported along with the crematorium 10, for example fuel supplies, flat-packed coffins, etc., as may be required.
  • the main body 12 of the crematorium 10 is formed from a number of chambers, namely: a primary combustion chamber 20, which is located above a plenum chamber 22.
  • the plenum chamber 22 connects to a tertiary chamber 24 and the tertiary chamber 24 is vented to atmosphere via a flue stack 26.
  • the flue stack 26 is removable for transportation and storage purposes, and can be stowed in the passageway 18 when the crematorium 10 is not in use.
  • the crematorium 10 additionally comprises a secondary combustion chamber 28, which interconnects the primary combustion chamber 20, and the plenum chamber 22.
  • Each of the primary 20, secondary 28, and tertiary 24 chambers are provided with burner units 30, 32, 34, whose functions shall be described hereinbelow.
  • Each of the chambers 20, 22, 24, 28 are lined with refractory materials, such as cast concrete or slabs of refractory ceramics, to withstand the elevated temperatures that they experience, in use.
  • the refractory materials are held within a steel framework 36 to provide a robust construction and to prevent movement of the chambers relative to one another, for example during transportation.
  • the primary combustion chamber 20 is formed from sheets of relatively thick refractory material 38, which are held in place by the supporting steel sheet and frame support system 36 mentioned previously.
  • the primary combustion chamber 20 is shaped and sized to accommodate a human body although will be appreciated that the dimensions of the primary combustion chamber can be selected to suit various requirements and also to optimise the combustion process as will be readily understood by persons skilled in the art.
  • the primary combustion chamber 20 is accessible via a doorway 40, which is also lined with refractory material, which selectively opens and closes one end of the primary combustion chamber 20 to permit a body to be placed inside it.
  • the doorway 40 is supported on a hinge system comprising gas struts 42 to facilitate lifting and lowering the considerable weight of the door 40 in use.
  • the primary combustion chamber 20 comprises a base wall 50, which separates the primary combustion chamber 20 from the plenum chamber 22 below it.
  • the base wall 50 comprises an ash chute 52 that enables ashes that remain in the combustion chamber 20 after cremation, to be brushed, or otherwise fed, into an ash collection drawer 54 below.
  • the ash collection drawer 54 facilitates the removal of the ashes from the primary combustion chamber 20 after each cremation cycle.
  • a service hatch 56 is also provided to facilitate maintenance of the interior of the primary combustion chamber 20.
  • the primary combustion chamber 20 is fitted with two primary burners 30, which ignite, and sustain the combustion of, the content of the primary combustion chamber, in use. It will be apparent to those skilled in the art that the provision of a number of primary burners 30 may be advantageous from the point of view of more evenly distributing the heat and combustion process within the primary combustion chamber 20. The precise configuration of the primary burners is outside the scope of this disclosure, but will be readily apparent to those skilled in the art.
  • the primary combustion chamber 20 comprises a first outlet 68 through which flue gasses can escape (as indicated by arrow 62) into the secondary combustion chamber 28.
  • the secondary combustion chamber comprises a secondary burner 32, which re-heats the flue gases and the down-angle of the secondary burner 32 is such that it forces the flue gases down inside the secondary chamber 28 and into the plenum chamber 22 located below the primary combustion chamber 20.
  • the configuration of the secondary burner 32 facilitates the extraction of flue gases from the primary chamber 20 into the plenum chamber 22, via the secondary chamber 28.
  • the plenum chamber 22 is also formed from slabs of refractory material so that they can withstand the high temperatures of use.
  • the slabs are arranged to support the base wall 50 of the primary combustion chamber 20, and also to form a series of staggered baffles 64, which cause the flue gases to follow a serpentine pathway (as indicated by arrow 66) through the plenum chamber 22 below the primary combustion chamber 20.
  • baffles 64 serves to increase the dwell time of the flue gases within the plenum chamber 22, thus increasing their time-at-temperature, and thereby improving the neutralisation of the flue gases - as will be readily apparent to those skilled in the art.
  • the flue gases pass through the plenum chamber 22, following the serpentine path 66 described above, before passing through an internal aperture 68 in one of the baffles 64 and then proceeding in an opposite direction, along an opposite side of the plenum chamber 22 (as indicated by dashed arrow 70), until the flue gases are discharged into the tertiary chamber 24 at the far end of the main body 12.
  • the tertiary chamber 24 comprises a tertiary burner 34 located towards its base and angled slightly downwardly, to direct the flue gases along the base of the tertiary chamber 24 before they escape via the flue stack 26, which is in fluid communication therewith.
  • the crematorium 10 of the invention comprises essentially three chambers, namely the primary combustion chamber 20 in which the body is cremated; a secondary chamber 28 in which the flue gases are re-heated; a plenum chamber 22, through which the flue gases pass and in doing so increase the dwell time of the flue gases at elevated temperature and storing heat also in the base wall 50 of the primary combustion chamber 20; and a tertiary chamber 24 in which the flue gases are re-heated again by the tertiary burner 34 before they escape to atmosphere via the flue 26.
  • This particular configuration may be advantageous because the time-at-temperature of the flue gases is greatly increased, thereby increasing the neutralisation efficiency of the system. Further, some of the heat generated by the system, in use, can be preserved in a heat store formed by the various chambers of the crematorium 10.
  • a first type of modular crematorium 100 in accordance with the invention which comprises a shared, central secondary 102 and tertiary chamber 104 unit 105, to which one or more main body portions 106 can be selectively affixed.
  • the main body portions 106 each comprise a primary combustion chamber 20 as previously described, which sits atop a plenum chamber 22.
  • the primary combustion chamber 20 has an outlet tube 60 that connects to an inlet 108 of the secondary chamber 102.
  • the secondary chamber 102 has an outlet 110 that connects to an inlet tube 112 of the plenum chamber 22.
  • flue gasses flow, as indicated by arrow 62, from the primary combustion chamber 20, into the plenum chamber 22, via the secondary chamber 102.
  • the plenum chamber 22 has baffles (not shown) that cause the flow of flue gasses, as indicated by arrow 66, to flow through the plenum chamber 22 to a plenum outlet tube 114 that connects to an inlet 116 of the tertiary chamber 104.
  • the flue stack 26 provides an outlet for the twice-reheated flue gasses, as indicate by arrow 116.
  • a second type of modular crematorium 120 in accordance with the invention which comprises a shared, central tertiary chamber 104 formed as a unit 105, to which one or more main body portions 106 can be selectively affixed.
  • the main body portions 106 in this embodiment, each comprise a primary combustion chamber 20 as previously described, which sits atop a plenum chamber 22 and adjacent to a secondary chamber 122.
  • the primary combustion chamber 20 has an outlet 60 connecting an inlet of the secondary chamber 122.
  • the secondary chamber 122 has an outlet 130 that connects to an inlet of the plenum chamber 22.
  • flue gasses flow, as indicated by arrow 62, from the primary combustion chamber 20, into the plenum chamber 22, via the secondary chamber 122.
  • the plenum chamber 22 has baffles (not shown) that cause the flow of flue gasses, as indicated by arrow 66, to flow through the plenum chamber 22 to a plenum outlet tube 124 that connects to an inlet 126 of the tertiary chamber 124.
  • the flue stack 26 provides an outlet for the twice-reheated flue gasses, as indicated by arrow 116.
  • the modular systems described above enable a central unit 105 to be used in conjunction with one or more main body portions 106, 126, thus forming a group.
  • the main advantages of such a configuration are rationalisation, flexibility and expandability: the system 100, 120 can be adapted or modified to suit different requirements from a kit of parts. Further, by grouping the central secondary 102 and tertiary chamber 104 as a unit 105, or simply by sharing a tertiary chamber 124, the burners (not shown) of these chambers can be operated independently of the burners of the primary combustion chambers 20, thus potentially leading to shorter cycle times for the main body portions 106, which now only need to partially re-heated between cycles.

Description

  • This invention relates to crematoria, and in particular to mobile or portable crematoria suitable for use in humanitarian applications.
  • Crematoria are used for burning human or animal remains and generally comprise a combustion chamber into which a human or animal body is placed, typically inside a coffin (casket). The combustion chamber comprises a primary burner, which ignites, and which sustains the combustion of, the body within it. Once the contents of the combustion chamber have been fully burned, the resulting ash is collected, and removed, and the process can then be repeated as and when required.
  • In contrast to an incinerator, which is used for the burning of general waste, a crematorium needs to be specially adapted to take into account various factors. For example, the flue gasses in an incinerator typically pass through a secondary burner to minimise or eliminate toxic combustion products, whereas in the case of a crematorium, particularly in cases where infected bodies need to be burned (as was the case in the recent African Ebola outbreak), the secondary burn needs to be sustained to ensure that potentially bio-hazardous combustion products are not vented to atmosphere. Secondly, whereas in an incinerator, the ashes are emptied after a number of combustion cycles, or continuously: in the case of a crematorium, the ashes need to be collected separately at the end of each cycle, to avoid mixing the ashes of different bodies, which is of paramount importance when attempting to respect religious and cultural customs. Thirdly, incinerators can be operated on a continuous basis: that is with waste being added batch-wise or continuously-fed. However, in the case of a crematorium, this is not generally considered to be respectful, and tends to breach many religious and cultural customs and requirements.
  • Crematoria are typically infrastructural installations, that is to say, comprising purpose-built buildings housing the crematorium itself, as well as chapels, mortuaries and other facilities that often accompany the respectful cremation of human remains. In many cultures, or areas of the world, crematoria are not widely available due to cultural and religious taboos associated with cremation. However, there are circumstances where cremation is indicated, notwithstanding the lack of facilities. For example, during the outbreak of a contagious disease, or following on from a natural disaster, there may be a great many bodies that need to be cremated because it is not possible or safe, under those circumstances, to follow burial practices. Further, in the case of certain natural disasters, especially where key infrastructure has been damaged, any available crematoria that would ordinarily have been used, may be out of operation.
  • A need therefore exists for a portable crematorium which can be rapidly deployed, and which respects cultural and religious customs and requirements.
  • Various examples of known incinerators are described in: KR100824597 (Sung, 23 April 2008 ), which discloses a crematorium according to the preamble of claim 1; EP2194324 (Park, 9 June 2010 ); and EP2045525 (Allessandretti, 8 April 2009 ).
  • In circumstances such as those described above, it is known to use portable incinerators to cremate human remains. Containerised incinerators are well-known and have been used, in extreme situations, to cremate human remains. However, the use of portable incinerators to cremate human remains is not generally considered to be an acceptable solution for a number of reasons.
  • First, the secondary burn of a waste incinerator is often insufficient to kill or neutralise biological pathogens in the flue gasses. In the case of an epidemic, the use of incinerators to cremate human remains can lead to the venting of biohazardous materials into the atmosphere near to the incinerator.
  • Second, an incinerator is not able to respect the cultural and religious requirements associated with cremation. The reasons for this are that incinerators are not adapted to be used intermittently: there being a requirement for a prolonged pre-heat and a cool-down cycle before it can be used again. This is no conducive to one-body-at-a-time cremation.
  • Third, due to the size of known containerised incinerators, they are inherently inefficient: being designed to burn much larger quantities of general waste than a crematorium, which is designed to cremate a single human body.
  • Fourth, the recovery of ashes on a per-cycle basis is not possible or practical with an incinerator.
  • A need therefore exists for a solution to one or more of the above problems. This invention aims to provide a solution to one or more of the above problems and/or to provide an improved and/or alternative crematorium.
  • The invention is set forth in the appended independent claim. Optional and/or preferred features of the invention are set forth in the appended dependent claims.
  • The invention thus provides a crematorium having three combustion chambers. This arrangement may be considered to have various advantages, such as:
    By re-heating the flue gasses twice after they leave the primary combustion chamber, it may be possible to operate the primary combustion chamber at a lower temperature, thus shortening the interval between cremation cycles (due to shorter heat-up and cool-down intervals). In the case of an incinerator, which only has one secondary burner, to achieve the same levels of flue gas neutralisation, the primary burn needs to be much hotter than in the case of the invention.
  • The plenum chamber may act as a heat store underneath the primary combustion chamber. Thus, the effects of cyclical thermal expansion and contraction (e.g. cracking of the refractory materials lining the chambers) associated with intermittent burn cycles may be reduced by maintaining the base wall (at least) of the primary combustion chamber at an elevated temperature, even when the primary burners are switched off. Further, the retention of heat in the plenum chamber may serve to speed-up the re-heat cycle of the primary combustion chamber when the crematorium is re-started.
  • The use of a tertiary burner enables the already pre-heated flue gasses to be heated to a much higher temperature without necessarily needing higher capacity tertiary burners. In humanitarian situations, where fuel may be scarce, being able to use smaller burners with lower fuel requirements is generally considered to be advantageous.
  • By re-re-heating the flue gasses in the tertiary chamber, the draw on the flue can be increased.
  • By causing the flue gasses to pass through the secondary chamber, the plenum chamber, and the tertiary chamber increases the dwell time of the flue gasses at elevated temperature. Increased time-at-temperature is generally accepted to lead to greater neutralisation of the flue gasses, which in the case of cremating biohazardous remains, can be highly advantageous.
  • Other possible advantages of the invention will be readily apparent to those skilled in the art.
  • The crematorium comprised a primary combustion chamber, which is shaped and sized to accommodate a human body. Typically, therefore, the primary combustion chamber will be approximately 2 to 2.5 metres long, 1 to 1.5 metres wide and 1 to 1.5 metres high internally. The primary combustion chamber is suitably manufactured from a refractory material, such as concrete or other pour-mouldable refractory materials or ceramics.
  • The primary combustion chamber suitably comprises an entrance doorway, at one end, through which a body to be cremated can be placed inside the primary combustion chamber. The entrance doorway is suitably manufactured lined with a refractory material and due to its weight, may be mounted on a lift-assisted hinge or sliding device.
  • Suitably, the primary combustion chamber comprises one or more ash chutes in its base wall through which ashes drop into a collection chamber. An ash drawer may be provided within the collection chamber for conveniently containing the ashes and enabling them to be recovered from the primary combustion chamber.
  • The primary combustion chamber suitably comprises a plurality of primary burners. Such a configuration may serve to more evenly distribute heat with the primary combustion chamber and/or may enable smaller-capacity burners to be used.
  • The first outlet leads to the secondary chamber, and suitably comprises an aperture in a side wall of the primary combustion chamber providing fluid communication with an adjacent secondary chamber.
  • The secondary chamber may comprise a plurality of secondary burners for similar reasons to those stated previously.
  • The second outlet leads to the plenum chamber, and suitably comprises an aperture in a side wall of the secondary combustion chamber providing fluid communication with an adjacent plenum chamber. The plenum chamber suitably comprises one or more baffles to cause the flue gasses to follow a serpentine path beneath the primary combustion chamber. This may increase the dwell time of the flue gasses in a re-heated state (increased time at temperature) and may also help to more evenly heat the base wall of the primary combustion chamber.
  • The third outlet leads to the tertiary chamber, and suitably comprises an aperture in a side wall of the plenum chamber providing fluid communication with an adjacent tertiary chamber. The tertiary chamber may comprise a plurality of tertiary burners for similar reasons to those stated previously.
  • The flue suitably comprises a tubular flue stack, which in a preferred embodiment of the invention, is removable for storage and transportation.
  • Suitably the crematorium is containerised, that is to say, designed to fit into, and fitted into an ISO bulk transport container. The containerisation of the crematorium facilitates the storage of the crematorium, in use, and also facilitates its transportation via land, sea or air. Suitably, the ISO container surrounding the crematorium is slightly oversized to provide some free space for the storage of fuel for the burners, the removed flue stack and/or other items (such as flat-packed coffins, religious artefacts etc.) that are needed when cremating a body.
  • The primary, secondary, plenum and tertiary chambers may be interconnected to form a unit. However, in certain embodiments of the invention, the crematorium is at least partially modular, that is to say, having separate primary, secondary, plenum and tertiary chambers. In one embodiment of the invention, there is provided a shared tertiary chamber having a plurality of inlets that can register with, and/or be connected with a respective plurality of third outlets of a respective plurality of plenum chambers. Such a configuration enables multiple crematoria to be deployed on one side and to benefit from the use of a single tertiary chamber. In a yet further embodiment of the invention, there is provided a modular crematorium system in which there is a shared tertiary and secondary chamber to which a plurality of modular crematoria connect, each modular crematorium comprising its own primary and plenum chambers whose outlets are configured to register with or otherwise connect to respective inlets of the shared secondary and tertiary chambers.
  • Various embodiments of the invention shall now be described, by way of example only, with reference to the accompanying drawings in which:
    • Figure 1 is a perspective view of a crematorium in accordance with the invention;
    • Figure 2 is a sectional view of the crematorium of Figure 1 on II-II;
    • Figure 3 is a cutaway view of the crematorium of Figure 1 showing its internal configuration;
    • Figures 4, 5 and 6 are schematic perspective, side and plan views, respectively, of a first type of modular crematorium in accordance with the invention; and
    • Figures 7, 8 and 9 are schematic perspective, side and plan views, respectively, of a second type of modular crematorium in accordance with the invention.
  • Referring to Figure 1 of the drawings, a crematorium 10 in accordance with the invention comprises a main body portion 12 that is mounted within an external enclosure 14 in the form, in the illustrated embodiment, of a bulk transport ISO container.
  • In Figure 1 of the drawings, one of the sidewalls of the outer enclosure 14 has been removed for clarity. The ISO container 14 is accessible via two sets of doors 16 located at opposite ends of the container, and it can be seen in Figure 1 in particular, that when the doors 16 have been opened, a narrow passageway is formed down one side of the container 14, which passageway 18 enables personnel to gain access to the crematorium 10 for servicing, maintenance and repair.
  • The passageway 18 additionally provides some empty space within the container 14, which enables other items to be transported along with the crematorium 10, for example fuel supplies, flat-packed coffins, etc., as may be required.
  • The main body 12 of the crematorium 10 is formed from a number of chambers, namely: a primary combustion chamber 20, which is located above a plenum chamber 22. The plenum chamber 22 connects to a tertiary chamber 24 and the tertiary chamber 24 is vented to atmosphere via a flue stack 26.
  • Although not apparent from the drawings, the flue stack 26 is removable for transportation and storage purposes, and can be stowed in the passageway 18 when the crematorium 10 is not in use.
  • As can be seen more clearly from Figures 2 and 3 of the drawings, the crematorium 10 additionally comprises a secondary combustion chamber 28, which interconnects the primary combustion chamber 20, and the plenum chamber 22.
  • Each of the primary 20, secondary 28, and tertiary 24 chambers are provided with burner units 30, 32, 34, whose functions shall be described hereinbelow.
  • Each of the chambers 20, 22, 24, 28 are lined with refractory materials, such as cast concrete or slabs of refractory ceramics, to withstand the elevated temperatures that they experience, in use. The refractory materials are held within a steel framework 36 to provide a robust construction and to prevent movement of the chambers relative to one another, for example during transportation.
  • Referring now to Figure 2 of the drawings, which shows the main body 12 of the crematorium 10 in section, it can be seen that the primary combustion chamber 20 is formed from sheets of relatively thick refractory material 38, which are held in place by the supporting steel sheet and frame support system 36 mentioned previously.
  • The primary combustion chamber 20 is shaped and sized to accommodate a human body although will be appreciated that the dimensions of the primary combustion chamber can be selected to suit various requirements and also to optimise the combustion process as will be readily understood by persons skilled in the art.
  • The primary combustion chamber 20 is accessible via a doorway 40, which is also lined with refractory material, which selectively opens and closes one end of the primary combustion chamber 20 to permit a body to be placed inside it. As can be seen from Figure 3 of the drawings, the doorway 40 is supported on a hinge system comprising gas struts 42 to facilitate lifting and lowering the considerable weight of the door 40 in use.
  • The primary combustion chamber 20 comprises a base wall 50, which separates the primary combustion chamber 20 from the plenum chamber 22 below it. The base wall 50 comprises an ash chute 52 that enables ashes that remain in the combustion chamber 20 after cremation, to be brushed, or otherwise fed, into an ash collection drawer 54 below. The ash collection drawer 54 facilitates the removal of the ashes from the primary combustion chamber 20 after each cremation cycle. A service hatch 56 is also provided to facilitate maintenance of the interior of the primary combustion chamber 20.
  • The primary combustion chamber 20 is fitted with two primary burners 30, which ignite, and sustain the combustion of, the content of the primary combustion chamber, in use. It will be apparent to those skilled in the art that the provision of a number of primary burners 30 may be advantageous from the point of view of more evenly distributing the heat and combustion process within the primary combustion chamber 20. The precise configuration of the primary burners is outside the scope of this disclosure, but will be readily apparent to those skilled in the art.
  • The primary combustion chamber 20 comprises a first outlet 68 through which flue gasses can escape (as indicated by arrow 62) into the secondary combustion chamber 28.
  • The secondary combustion chamber comprises a secondary burner 32, which re-heats the flue gases and the down-angle of the secondary burner 32 is such that it forces the flue gases down inside the secondary chamber 28 and into the plenum chamber 22 located below the primary combustion chamber 20. Thus, the configuration of the secondary burner 32 facilitates the extraction of flue gases from the primary chamber 20 into the plenum chamber 22, via the secondary chamber 28.
  • The plenum chamber 22 is also formed from slabs of refractory material so that they can withstand the high temperatures of use. The slabs are arranged to support the base wall 50 of the primary combustion chamber 20, and also to form a series of staggered baffles 64, which cause the flue gases to follow a serpentine pathway (as indicated by arrow 66) through the plenum chamber 22 below the primary combustion chamber 20.
  • The provision of baffles 64 serves to increase the dwell time of the flue gases within the plenum chamber 22, thus increasing their time-at-temperature, and thereby improving the neutralisation of the flue gases - as will be readily apparent to those skilled in the art.
  • The flue gases pass through the plenum chamber 22, following the serpentine path 66 described above, before passing through an internal aperture 68 in one of the baffles 64 and then proceeding in an opposite direction, along an opposite side of the plenum chamber 22 (as indicated by dashed arrow 70), until the flue gases are discharged into the tertiary chamber 24 at the far end of the main body 12.
  • The tertiary chamber 24 comprises a tertiary burner 34 located towards its base and angled slightly downwardly, to direct the flue gases along the base of the tertiary chamber 24 before they escape via the flue stack 26, which is in fluid communication therewith.
  • It will be appreciated, from the foregoing description, that the crematorium 10 of the invention comprises essentially three chambers, namely the primary combustion chamber 20 in which the body is cremated; a secondary chamber 28 in which the flue gases are re-heated; a plenum chamber 22, through which the flue gases pass and in doing so increase the dwell time of the flue gases at elevated temperature and storing heat also in the base wall 50 of the primary combustion chamber 20; and a tertiary chamber 24 in which the flue gases are re-heated again by the tertiary burner 34 before they escape to atmosphere via the flue 26.
  • This particular configuration may be advantageous because the time-at-temperature of the flue gases is greatly increased, thereby increasing the neutralisation efficiency of the system. Further, some of the heat generated by the system, in use, can be preserved in a heat store formed by the various chambers of the crematorium 10.
  • Various modular embodiments of the invention are shown now in the remaining drawings.
  • Referring to Figures 4 to 6 of the drawings, a first type of modular crematorium 100 in accordance with the invention is shown, which comprises a shared, central secondary 102 and tertiary chamber 104 unit 105, to which one or more main body portions 106 can be selectively affixed. The main body portions 106 each comprise a primary combustion chamber 20 as previously described, which sits atop a plenum chamber 22. The primary combustion chamber 20 has an outlet tube 60 that connects to an inlet 108 of the secondary chamber 102. The secondary chamber 102 has an outlet 110 that connects to an inlet tube 112 of the plenum chamber 22. Thus, flue gasses flow, as indicated by arrow 62, from the primary combustion chamber 20, into the plenum chamber 22, via the secondary chamber 102.
  • The plenum chamber 22 has baffles (not shown) that cause the flow of flue gasses, as indicated by arrow 66, to flow through the plenum chamber 22 to a plenum outlet tube 114 that connects to an inlet 116 of the tertiary chamber 104. The flue stack 26 provides an outlet for the twice-reheated flue gasses, as indicate by arrow 116.
  • Referring now to Figures 7 to 9 of the drawings, a second type of modular crematorium 120 in accordance with the invention is shown, which comprises a shared, central tertiary chamber 104 formed as a unit 105, to which one or more main body portions 106 can be selectively affixed. The main body portions 106, in this embodiment, each comprise a primary combustion chamber 20 as previously described, which sits atop a plenum chamber 22 and adjacent to a secondary chamber 122.
  • The primary combustion chamber 20 has an outlet 60 connecting an inlet of the secondary chamber 122. The secondary chamber 122 has an outlet 130 that connects to an inlet of the plenum chamber 22. Thus, flue gasses flow, as indicated by arrow 62, from the primary combustion chamber 20, into the plenum chamber 22, via the secondary chamber 122.
  • The plenum chamber 22 has baffles (not shown) that cause the flow of flue gasses, as indicated by arrow 66, to flow through the plenum chamber 22 to a plenum outlet tube 124 that connects to an inlet 126 of the tertiary chamber 124. The flue stack 26 provides an outlet for the twice-reheated flue gasses, as indicated by arrow 116.
  • The modular systems described above enable a central unit 105 to be used in conjunction with one or more main body portions 106, 126, thus forming a group. The main advantages of such a configuration are rationalisation, flexibility and expandability: the system 100, 120 can be adapted or modified to suit different requirements from a kit of parts. Further, by grouping the central secondary 102 and tertiary chamber 104 as a unit 105, or simply by sharing a tertiary chamber 124, the burners (not shown) of these chambers can be operated independently of the burners of the primary combustion chambers 20, thus potentially leading to shorter cycle times for the main body portions 106, which now only need to partially re-heated between cycles.

Claims (15)

  1. A crematorium (10) comprising sequentially interconnected primary (20), secondary (28), plenum (22) and tertiary (24) chambers, the primary chamber (20) being a combustion chamber shaped and sized to accommodate a human body and comprising one or more burners (30) adapted, in use, to ignite, and sustain the combustion of, a human body placed inside the primary combustion chamber (20); characterised by: the secondary (28) and tertiary (24) chambers each comprising one or more additional burners (34, 32) adapted, in use, to re-heat flue gasses expelled from the primary chamber (20), and wherein the plenum chamber (22) is located adjacent the primary chamber (20) such that re-heated flue gasses expelled from the secondary chamber (28) heat at least one wall (50) of the primary chamber (20).
  2. The crematorium (10), of claim 1, wherein the primary (20) and plenum (22) chambers are separated by a dividing wall (50), which dividing wall is heated by the said re-heated flue gasses.
  3. The crematorium (10) of claim 1 or claim 2, wherein the primary chamber (20) is located atop the plenum chamber (22).
  4. The crematorium (10) of any preceding claim, wherein the tertiary chamber (24) comprises a detachable flue stack (26).
  5. The crematorium (10) of any preceding claim, wherein the primary chamber (20) comprises an entrance doorway (40), through which, in use, a body to be cremated can be placed inside the primary chamber (20), the entrance doorway (40) being mounted on a lift-assisted hinge or sliding device (42).
  6. The crematorium (10) of any preceding claim, wherein any one or more of: the primary chamber (20); the secondary chamber (28); the plenum chamber (22); the tertiary chamber (24); and the entrance doorway (40), through which, in use, a body to be cremated can be placed inside the primary chamber, are manufactured from, or lined with, a refractory material.
  7. The crematorium (10) of any preceding claim, wherein the primary chamber (20) comprises one or more ash chutes (52) in a base wall (50) thereof, leading to one or more ash collection chambers, and an ash drawer (54) within the collection chamber.
  8. The crematorium (10) of any preceding claim, wherein the plenum chamber (22) comprises one or more baffles (64) arranged, in use, to cause the flue gasses to follow a serpentine path (66) therethrough.
  9. The crematorium (10) according to any preceding claim, wherein the crematorium is a mobile crematorium, said mobile crematorium comprising an outer enclosure (12), the outer enclosure (12) comprising an ISO bulk transport container.
  10. The crematorium (10) of any preceding claim, wherein any one or more of the primary (20), secondary (28), plenum (22) and tertiary (24) chambers comprises a service hatch.
  11. The crematorium (10) of any preceding claim, wherein an outlet of one or more of the burners (32, 34) is angled downwardly.
  12. The crematorium (10) of any preceding claim, wherein the primary (20), secondary (28), plenum (22) and tertiary (24) chambers are interconnected as a unit.
  13. The crematorium (10) of any of claims 1 to 11, wherein the primary (20) and plenum (22) chambers are formed as a first unit (106), and wherein the secondary (28) and tertiary (24) chambers are formed as a second unit (122), the first (106) and second (122) units being separable from one another.
  14. The crematorium (10) of any of claims 1 to 11, wherein the primary (20), secondary (28) and plenum chambers (22) are formed as a first unit (106), and wherein the tertiary chamber (24) is formed as a second unit (105), the first (106) and second (105) units being separable from one another.
  15. The crematorium (10) of claim 13 or 14, comprising a second unit (122, 105) and a plurality of first units (106, 105) connectable to the second unit.
EP15801206.2A 2015-10-23 2015-10-23 Crematoria Not-in-force EP3365601B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PL15801206T PL3365601T3 (en) 2015-10-23 2015-10-23 Crematoria
HRP20191204TT HRP20191204T1 (en) 2015-10-23 2019-07-02 Crematoria

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/GB2015/053192 WO2017068312A1 (en) 2015-10-23 2015-10-23 Crematoria

Publications (2)

Publication Number Publication Date
EP3365601A1 EP3365601A1 (en) 2018-08-29
EP3365601B1 true EP3365601B1 (en) 2019-04-10

Family

ID=54705206

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15801206.2A Not-in-force EP3365601B1 (en) 2015-10-23 2015-10-23 Crematoria

Country Status (9)

Country Link
US (1) US20180283684A1 (en)
EP (1) EP3365601B1 (en)
AU (1) AU2015412402A1 (en)
DK (1) DK3365601T3 (en)
ES (1) ES2733698T3 (en)
HR (1) HRP20191204T1 (en)
LT (1) LT3365601T (en)
PL (1) PL3365601T3 (en)
WO (1) WO2017068312A1 (en)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3812795A (en) * 1973-03-14 1974-05-28 Austral Incinerator Corp Incinerator
US3838651A (en) * 1973-03-14 1974-10-01 R Dingwell Incinerators
US4685403A (en) * 1986-12-08 1987-08-11 Crawford James P Auxiliary incinerator apparatus
US5926933A (en) * 1995-01-17 1999-07-27 R & K Incinerator, Inc. Method of lining an animal carcass incinerator
GB9609151D0 (en) * 1996-05-01 1996-07-03 Cremation Techn Int Ltd Cremators
US20060090676A1 (en) * 2004-11-03 2006-05-04 Onex, Inc. Crematory with incinerator
KR100824597B1 (en) * 2006-11-29 2008-04-23 성래경 Mouable crematories device being odorless enuironmentally sonnd
ITBS20070143A1 (en) * 2007-10-02 2009-04-03 Cesarina Alessandretti FUNERAL CELL
US20100139533A1 (en) * 2008-12-05 2010-06-10 Jin-shin Park Movable integrated cremation device
US20110036280A1 (en) * 2009-08-12 2011-02-17 Bruce Toase Waste processing system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
PL3365601T3 (en) 2019-09-30
EP3365601A1 (en) 2018-08-29
LT3365601T (en) 2019-09-25
WO2017068312A1 (en) 2017-04-27
AU2015412402A1 (en) 2018-06-07
ES2733698T3 (en) 2019-12-02
DK3365601T3 (en) 2019-07-08
US20180283684A1 (en) 2018-10-04
HRP20191204T1 (en) 2019-10-18

Similar Documents

Publication Publication Date Title
TW200404980A (en) Process for the pyrolysis of medical waste and other waste materials
JP5754788B1 (en) Oil making apparatus and dry distillation gasification oil incineration system provided with the same
CN106219574A (en) The preparation method of fuse salt
US3259083A (en) Incinerator with afterburner
CN109915839A (en) A kind of vertical danger waste treatment equipment
US7814845B2 (en) Dual chamber system for gasifying biomass waste
EP3365601B1 (en) Crematoria
EP2045525B1 (en) Mobile cremation systems
CN201503210U (en) Environment-friendly kiln for firing waste bricks
CN204100252U (en) Poultry farms spoil incinerator for innocent treatment
WO2020017372A1 (en) Garbage incineration facility
KR100419297B1 (en) Traveling crematory
RU2692631C2 (en) Mobile plant for disinfecting medical waste by ozone
CN111076177A (en) Skid-mounted medical waste incinerator
CN212204544U (en) Novel medical garbage incinerator
US1070209A (en) Garbage-incinerator.
JP2019060546A (en) Crematory and cremation method
JP2005233602A (en) Incineration device
US20230296247A1 (en) Livestock incinerator
KR20170118333A (en) Movable type melting incinerator for dead livestock
CN208186358U (en) A kind of sufficient garbage disposal furnace of garbage disposal
RU2095687C1 (en) Incinerator
US951905A (en) Incinerator.
US409022A (en) de soldenhoff
CH698982B1 (en) Incineration system used for the incineration of unseparated waste in harsh environmental conditions comprises combustion chamber with fume-recirculation pipe for heat recovery

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180511

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

DAX Request for extension of the european patent (deleted)
INTG Intention to grant announced

Effective date: 20181213

DAV Request for validation of the european patent (deleted)
GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

INTC Intention to grant announced (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

INTG Intention to grant announced

Effective date: 20190305

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1119192

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015028174

Country of ref document: DE

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: INCINER8 LTD

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20191204

Country of ref document: HR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20190704

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1119192

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190410

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191204

Country of ref document: HR

Payment date: 20191003

Year of fee payment: 5

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20191204

Country of ref document: HR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190710

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190910

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190711

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2733698

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20191202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190810

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015028174

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20191021

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

26N No opposition filed

Effective date: 20200113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191204

Country of ref document: HR

Payment date: 20210105

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: MC

Payment date: 20201202

Year of fee payment: 6

Ref country code: IE

Payment date: 20201125

Year of fee payment: 6

Ref country code: LT

Payment date: 20201216

Year of fee payment: 6

Ref country code: DK

Payment date: 20201130

Year of fee payment: 6

Ref country code: FR

Payment date: 20201125

Year of fee payment: 6

Ref country code: CH

Payment date: 20201129

Year of fee payment: 6

Ref country code: GB

Payment date: 20201125

Year of fee payment: 6

Ref country code: ES

Payment date: 20201202

Year of fee payment: 6

Ref country code: IT

Payment date: 20201127

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20201204

Year of fee payment: 6

Ref country code: LV

Payment date: 20201209

Year of fee payment: 6

Ref country code: BE

Payment date: 20201129

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20201130

Year of fee payment: 6

Ref country code: NL

Payment date: 20201130

Year of fee payment: 6

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015028174

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HR

Payment date: 20210105

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20151023

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

REG Reference to a national code

Ref country code: HR

Ref legal event code: PBON

Ref document number: P20191204

Country of ref document: HR

Effective date: 20211023

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20211031

REG Reference to a national code

Ref country code: LT

Ref legal event code: MM4D

Effective date: 20211023

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20211101

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20211031

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20211023

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211102

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211101

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: LT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: HR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211023