EP3354371A1 - Continuous slab casting method - Google Patents

Continuous slab casting method Download PDF

Info

Publication number
EP3354371A1
EP3354371A1 EP16848756.9A EP16848756A EP3354371A1 EP 3354371 A1 EP3354371 A1 EP 3354371A1 EP 16848756 A EP16848756 A EP 16848756A EP 3354371 A1 EP3354371 A1 EP 3354371A1
Authority
EP
European Patent Office
Prior art keywords
slab
mold
cooling
continuous casting
submerged nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16848756.9A
Other languages
German (de)
French (fr)
Other versions
EP3354371A4 (en
EP3354371B1 (en
Inventor
Sang Hum Kwon
Sang Woo Han
Young Mok Won
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Posco Holdings Inc
Original Assignee
Posco Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Posco Co Ltd filed Critical Posco Co Ltd
Publication of EP3354371A1 publication Critical patent/EP3354371A1/en
Publication of EP3354371A4 publication Critical patent/EP3354371A4/en
Application granted granted Critical
Publication of EP3354371B1 publication Critical patent/EP3354371B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/055Cooling the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/124Accessories for subsequent treating or working cast stock in situ for cooling
    • B22D11/1246Nozzles; Spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/128Accessories for subsequent treating or working cast stock in situ for removing
    • B22D11/1282Vertical casting and curving the cast stock to the horizontal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould
    • B22D11/225Controlling or regulating processes or operations for cooling cast stock or mould for secondary cooling

Definitions

  • the present invention relates to a continuous casting method for a slab and, more particularly, to a continuous casting method for a slab, which controls locations of segregations and shrinkage cavities that are generated within a slab.
  • a slab that is a half-finished product is manufactured in a continuous casting process using molten steel that is manufactured via an iron-making process and a steel-making process, and the slab is produced as the coil of a desired thickness by consumers in the rolling process.
  • Fig. 1 is a view schematically illustrating a general continuous casting equipment
  • Fig. 2 is a schematic view illustrating solidification structures of a slab that is manufactured by the general continuous casting equipment.
  • molten steel 1 that is refined in a steel-making process is accommodated in a ladle 10, is moved to a continuous casting factory, and is then located on a tundish 20. Further, the molten steel that is accommodated in the ladle 10 is injected into the tundish 20 through a shroud nozzle, and the molten steel 1 that has been injected into the tundish 20 is continuously injected into a mold 30 through an submerged nozzle 21.
  • the molten steel 1 that has been supplied to the mold 30 is primarily cooled while passing through the mold 30, is then withdrawn and is mainly cooled by cooling water that is sprayed from spaces between a plurality of segment rolls while being rolled by the rolls, and is thus manufactured into a slab 2.
  • the slab 2 that is continuously casted in this way is cut to have a predetermined length by a cutter 50, and is transferred to a rolling process by a transfer roller 60.
  • defects of the slab 2 remain after the rolling, and thus, defective products may be caused.
  • defects include solidification shrinkage cavities and center segregations that are generated at a center of the slab in a thickness direction thereof, as illustrated in Fig. 2 .
  • tensile stress is generated at a central portion of the slab in a thickness direction thereof.
  • a temperature of a surface of the slab is decreased more rapidly than that of the central portion thereof, and the central portion of the slab in the thickness direction thereof is under a tensile stress due to such a temperature difference.
  • the magnitude of the tensile stress that results from such a temperature difference becomes larger, and when such a tensile stress is focused on the segregations 4 and the solidification shrinkage cavities 3, which have been mentioned above, defects of the central portion of the slab 2 are expanded, and thus defective products may be generated.
  • a typical technology for reducing defects such as the center segregations 4 and the solidification shrinkage cavities 3 that cause defective products is soft reduction.
  • the soft reduction technology is a technology that applies a roll force to a slab 2 by segment rolls 40 during continuous casting.
  • the number of porosities that are generated by solidification shrinkage is minimized by physically compressing solidification shrinkage cavities 3 by rolling the slab at an end of solidification by a solidified and shrunk degree, and at the same time, center segregations 4 are suppressed from being generated in the slab 2 by suppressing molten steel in which solutes that exist between columnar crystals are concentrated from being introduced into the central portion of the slab in the thickness direction thereof.
  • the soft reduction technology because large-scale rolling equipment should be installed in a continuous casting machine and the rolling is performed at an end of solidification, the segregations 4 and the solidification shrinkage cavities 3 may not be sufficiently removed.
  • technologies for reducing defects such as the center segregations 4 and the solidification shrinkage cavities 3 include an submerged nozzle 21, particularly, improvement of a structure of a discharge hole of the submerged nozzle 21, control of spraying of cooling water in a secondary cooling zone and the like.
  • such methods are adapted to suppress the center segregations 4 and the solidification shrinkage cavities 3 from being generated, but have a problem in that the center segregations 4 and the solidification shrinkage cavities 3 cannot be completely removed.
  • the present invention provides a continuous casting method for a slab, in which a location of an submerged nozzle that supplies molten steel to a mold is changed so that locations of segregations and solidification shrinkage cavities that are generated within the slab are controlled.
  • a continuous casting method for a slab according to an embodiment of the present invention may include: primarily cooling a slab by a mold while molten steel is injected into an area that is biased from a central portion of an inside of the mold in a thickness direction of the slab; and secondarily cooling the slab by spraying cooling water to a surface of the slab while drawing the slab that is primarily cooled by the mold.
  • an submerged nozzle may be input into the mold that includes a pair of long sides that face each other and a pair of short sides that face each other, the molten steel may be injected into the mold, and the submerged nozzle may be biased in a direction of one long side that is selected from the pair of long sides.
  • the slab In the secondarily cooling, the slab may be drawn from the mold downward and may be drawn while being forwardly bent, and in the primarily cooling, the direction in which the submerged nozzle is biased may be a direction of a long side that is arranged on a front side with reference to a direction in which the slab is drawn among the pair of long sides.
  • a difference between a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 20 mm or longer.
  • a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 10 mm or longer.
  • a length ratio (d1:d2) of the distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and the distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 1:3.
  • the slab may be drawn from the mold downward and may be drawn while being forwardly bent, an amount of cooling water that is sprayed from an upper side of the slab may be maintained to be larger than an amount of cooling water that is sprayed from a lower side of the slab until the drawn slab is completely solidified, and the amount of cooling water that is sprayed from the lower side of the slab may be maintained to be larger than the amount of cooling water that is sprayed from the upper portion of the slab after the drawn slab is completely solidified.
  • a location of an submerged nozzle that is placed within a mold is changed and molten steel is injected not into a central portion of the mold but into an area of the mold, which is biased in a thickness direction of a slab, so that locations where segregations and solidification shrinkage cavities are generated may be moved from a central portion to a surface of the slab.
  • the solidification shrinkage cavities are more easily compressed in a rolling process for the slab, and the segregations are not situated at a location where a maximum tensile stress is generated in a cooling process after rolling so that cracks are prevented from being propagated. Accordingly, inner defects of final products may be reduced.
  • Fig. 3A is a view illustrating the location of an submerged nozzle within a mold in general continuous casting equipment
  • Fig. 3B is a view illustrating the state in which the location of the submerged nozzle within the mold that is applied to a continuous casting method for a slab according to an embodiment of the present invention is changed
  • Fig. 4 illustrates the flow and temperature analysis results for molten steel within the mold that is applied to the continuous casting method for a slab according to the embodiment of the present invention
  • Fig. 5 is a picture illustrating the slab that is manufactured by the continuous casting method for a slab according to the embodiment of the present invention
  • Fig. 6 is a compression simulation result according to locations of solidification shrinkage cavities during rolling
  • Fig. 7 is a schematic view illustrating center segregations that is remained in a product and stress distribution.
  • the continuous casting method for a slab is implemented using the general continuous casting equipment illustrated in Fig. 1 .
  • the method is achieved by changing the location where a molten steel 1 accommodated in a tundish 20 is injected into a mold 30 while changing the location of an submerged nozzle 21 through which the molten steel 1 is injected into the mold 30.
  • the continuous casting method for a slab largely includes: performing primary cooling the molten steel 1 using the mold 30 while injecting the molten steel 1 into an inner area of the mold 30 to be biased from the central portion of the mold 30 to a thickness direction thereof, and performing secondary cooling by spraying cooling water to the surface of the slab 2 which is drawn out after being primarily cooled down by the mold 30.
  • an submerged nozzle 21a is not arranged at the central portion of the inside of the mold 30 as illustrated in Fig. 3A but an submerged nozzle 21b is arranged on the area thereof to be biased toward the direction widthwise of the slab 2as illustrated in Fig. 3B in order to allow the molten steel 1 to be injected to the direction biased in the widthwise of the slab 2.
  • the mold 30 is composed of a pair of long sides 30a and 30b that face each other and a pair of short sides 30c and 30d that face each other.
  • the submerged nozzle 21b is arranged to be biased toward the direction of one long side 30a that is selected from the pair of long sides 30a and 30b.
  • a flow strength (flow rate) of the molten steel 1 in the biased area is induced to be greater than that of the other areas.
  • a result as illustrated in Fig. 4A may be obtained. It may be identified in Fig. 4A that an area that has red color (relatively dark part) is an area that has a high flow strength, and flow rates in respective areas on the surface of the molten steel have little difference but a stronger flow field is formed in the areas by 2m under the molten steel surface in the biased direction than at the center.
  • Fig. 4B illustrates a calculated temperature field on this area, and it may be identified that temperatures are different from each other in a thickness direction, which is similar to the result of the flow field.
  • Fig. 4A illustrates a calculated temperature field on this area, and it may be identified that temperatures are different from each other in a thickness direction, which is similar to the result of the flow field.
  • an area having a red color is an area having a relatively high temperature and the fact that a temperature difference occurs means that solidification completion is generated not at a central portion of its thickness but at a portion thereof in the biased direction.
  • a direction in which the submerged nozzle 21 is biased is a direction of the long side 30a that is arranged on a front side with reference to a direction in which the slab 2 is drawn among the pair of long sides 30a and 30b.
  • the direction in which the submerged nozzle 21 is biased is set to be a direction of an upper surface of the drawn slab 2.
  • the point at which the segregations 4 and the solidification shrinkage cavities 3 are generated is biased in a direction of an upper surface of the slab 2 by biasing the point at which solidification is completed in a direction of an upper portion rather than a lower surface portion of the drawn slab 2.
  • casting is performed while the submerged nozzle 21 that is generally located at a center of the mold 30 is moved in an arrow direction.
  • d1 refers to a distance between the submerged nozzle 21 and the long side 30a that is selected from the pair of long sides 30a and 30b
  • d2 refers to a distance between the submerged nozzle 21 and the other long side 30b among the pair of long sides 30a and 30b.
  • the submerged nozzle 21 is arranged such that a length ratio (d2/d1) of d1 and d2 is 1, 3, 4 and 7 and casting is then performed.
  • a length difference between d1 and d2 becomes larger a location where solidification is completed is moved not to a central portion of the slab 2 but to a surface thereof.
  • the solidification shrinkage cavities 3 and the segregations 4 are moved not to the central portion of the slab 2 in the thickness direction but to the surface thereof.
  • a difference between d1 and d2 is required to be larger than 20mm.
  • the submerged nozzle 21 is arranged such that both d1 and d2 are 10mm or greater respectively.
  • a length ratio (d1:d2) of d1 and d2 is 1:3.
  • Fig. 5 illustrates a result obtained by performing casting when a length ratio (d1:d2) of d1 and d2 is 1:3, and it may be identified that an area having a red color (area near solidification completion line) indicates an area having a relatively high temperature and a location thereof is biased not to the central portion of the slab 2 in its thickness but to an upper portion thereof. That is, as the location of the submerged nozzle 21 is moved, the flow and temperature fields are changed. Because of this, it may be identified that the location where the solidification is completed may be biased not to the central portion in the thickness direction but to either one surface.
  • the segregations 4 and the solidification shrinkage cavities 3 are biased not to the central portion of the slab 2 in the thickness direction thereof but to the upper surface thereof by a predetermined interval.
  • d2 is much greater than d1
  • the segregations 4 and the solidification shrinkage cavities 3 are largely biased to the surface of the slab 2.
  • the defects are exposed to the surfaces in a rolling process and surface defects may thus be caused. Accordingly, it is preferred that the length ratio (d1:d2) of d1 and d2 is maintained to be 1:3.
  • the flow and temperature fields of the molten steel 1 are changed, so that the point where the solidification is completed is biased to the upper surface of the slab 2.
  • bending of the slab 2 is occurred by a residual stress that is caused by a cooling difference that is generated between the upper surface and a lower surface of the slab 2 during the solidification, and thus it may be difficult to transfer the slab 2 using a transfer roller 60.
  • an amount of cooling water that is sprayed to an upper side of the slab 2 may be maintained to be greater than an amount of cooling water that is sprayed to a lower side of the slab 2 until the slab 2 that is drawn in the performing of the secondary cooling is completely solidified, and the amount of cooling water that is sprayed to the lower side of the slab 2 may be maintained same as or to be greater than the amount of cooling water that is sprayed to the upper portion of the slab 2 after the drawn slab 2 is completely solidified.
  • inner defects of a thick plate product are identified through ultrasonic inspection.
  • defects are detected at central portions of most of thick plate products in thickness directions thereof, and are caused by the solidification shrinkage cavities 3 and the segregations 4 that are generated in the central portion in the thickness direction during the continuous casting.
  • the defects are easily detected as the products have a higher strength and a heavier gauge and this is caused by the following reason.
  • the surface of a product that is produced after the slab 2 is rolled is firstly cooled. That is, the surface of the product is in a low temperature state and an interior thereof is in a relatively high temperature state. Accordingly, a tensile stress is generated at a central portion of the product in a thickness direction thereof.
  • a segregation 4 is located at the central portion of the slab 2 in the thickness direction thereof, a crack is easily generated due to stress concentration and propagated, and thus becomes causes of defects at the ultrasonic inspection.
  • the thick plate product is highly strengthened and extremely thickened, the tensile stress is more largely increased, and thus a defect incidence is increased.

Abstract

The present invention relates to a continuous casting method for a slab, which controls locations of segregations and shrinkage cavities that are generated within a slab. The continuous casting method for a slab according to an embodiment of the present invention includes: primarily cooling the slab by a mold while the molten steel is injected into an area that is biased from a central portion of an inside of the mold in a thickness direction of the slab; and secondarily cooling the slab by spraying cooling water to a surface of the slab while drawing the slab that is primarily cooled by the mold.

Description

    TECHNICAL FIELD
  • The present invention relates to a continuous casting method for a slab and, more particularly, to a continuous casting method for a slab, which controls locations of segregations and shrinkage cavities that are generated within a slab.
  • BACKGROUND ART
  • In general, in a steel factory, a slab that is a half-finished product is manufactured in a continuous casting process using molten steel that is manufactured via an iron-making process and a steel-making process, and the slab is produced as the coil of a desired thickness by consumers in the rolling process.
  • Fig. 1 is a view schematically illustrating a general continuous casting equipment, and Fig. 2 is a schematic view illustrating solidification structures of a slab that is manufactured by the general continuous casting equipment.
  • As illustrated in Fig. 1, molten steel 1 that is refined in a steel-making process is accommodated in a ladle 10, is moved to a continuous casting factory, and is then located on a tundish 20. Further, the molten steel that is accommodated in the ladle 10 is injected into the tundish 20 through a shroud nozzle, and the molten steel 1 that has been injected into the tundish 20 is continuously injected into a mold 30 through an submerged nozzle 21. The molten steel 1 that has been supplied to the mold 30 is primarily cooled while passing through the mold 30, is then withdrawn and is mainly cooled by cooling water that is sprayed from spaces between a plurality of segment rolls while being rolled by the rolls, and is thus manufactured into a slab 2.
  • The slab 2 that is continuously casted in this way is cut to have a predetermined length by a cutter 50, and is transferred to a rolling process by a transfer roller 60.
  • In particular, when the slab 2 is rolled into a thick steel plate, defects of the slab 2 remain after the rolling, and thus, defective products may be caused. Examples of such defects include solidification shrinkage cavities and center segregations that are generated at a center of the slab in a thickness direction thereof, as illustrated in Fig. 2.
  • When solute-concentrated residual molten steel is collected in a solidification shrinkage part near a solidification end point in a continuous casting process, this is changed into segregations 4, and when the solidification shrinkage part is not filled and a space remains therein, this is changed into solidification shrinkage cavities 3, that is, center porosities. Such defects remain at the center of the slab even after thick plate rolling.
  • Further, while a thick plate rolling/cooling process is undergone, tensile stress is generated at a central portion of the slab in a thickness direction thereof. In the cooling process after rolling, a temperature of a surface of the slab is decreased more rapidly than that of the central portion thereof, and the central portion of the slab in the thickness direction thereof is under a tensile stress due to such a temperature difference. In particular, as the thickness of the slab becomes thicker, the magnitude of the tensile stress that results from such a temperature difference becomes larger, and when such a tensile stress is focused on the segregations 4 and the solidification shrinkage cavities 3, which have been mentioned above, defects of the central portion of the slab 2 are expanded, and thus defective products may be generated.
  • A typical technology for reducing defects such as the center segregations 4 and the solidification shrinkage cavities 3 that cause defective products is soft reduction. The soft reduction technology is a technology that applies a roll force to a slab 2 by segment rolls 40 during continuous casting. In the technology, the number of porosities that are generated by solidification shrinkage is minimized by physically compressing solidification shrinkage cavities 3 by rolling the slab at an end of solidification by a solidified and shrunk degree, and at the same time, center segregations 4 are suppressed from being generated in the slab 2 by suppressing molten steel in which solutes that exist between columnar crystals are concentrated from being introduced into the central portion of the slab in the thickness direction thereof. However, in the soft reduction technology, because large-scale rolling equipment should be installed in a continuous casting machine and the rolling is performed at an end of solidification, the segregations 4 and the solidification shrinkage cavities 3 may not be sufficiently removed.
  • Further, even though the generation of the center segregations 4 and the solidification shrinkage cavities 3 are suppressed, some of them remain in the central portion of the slab/product in the thickness direction thereof, and a tensile stress that is generated during rolling/cooling is maximized at the central portion in the thickness direction, and thus, defects are generated at the central portion of the slab 2 in the thickness direction thereof. In particular, when the thickness of the slab 2 is large or accelerated cooling should be performed in a rolling process, a temperature difference between the central portion thereof in the thickness direction thereof and a surface thereof becomes much larger, a probability that defective products are caused is further increased.
  • Further, technologies for reducing defects such as the center segregations 4 and the solidification shrinkage cavities 3 include an submerged nozzle 21, particularly, improvement of a structure of a discharge hole of the submerged nozzle 21, control of spraying of cooling water in a secondary cooling zone and the like. However, such methods are adapted to suppress the center segregations 4 and the solidification shrinkage cavities 3 from being generated, but have a problem in that the center segregations 4 and the solidification shrinkage cavities 3 cannot be completely removed.
  • DISCLOSURE TECHNICAL PROBLEM
  • The present invention provides a continuous casting method for a slab, in which a location of an submerged nozzle that supplies molten steel to a mold is changed so that locations of segregations and solidification shrinkage cavities that are generated within the slab are controlled.
  • TECHNICAL SOLUTION
  • A continuous casting method for a slab according to an embodiment of the present invention may include: primarily cooling a slab by a mold while molten steel is injected into an area that is biased from a central portion of an inside of the mold in a thickness direction of the slab; and secondarily cooling the slab by spraying cooling water to a surface of the slab while drawing the slab that is primarily cooled by the mold.
  • In the primarily cooling, an submerged nozzle may be input into the mold that includes a pair of long sides that face each other and a pair of short sides that face each other, the molten steel may be injected into the mold, and the submerged nozzle may be biased in a direction of one long side that is selected from the pair of long sides.
  • In the secondarily cooling, the slab may be drawn from the mold downward and may be drawn while being forwardly bent, and in the primarily cooling, the direction in which the submerged nozzle is biased may be a direction of a long side that is arranged on a front side with reference to a direction in which the slab is drawn among the pair of long sides.
  • In the primarily cooling, a difference between a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 20 mm or longer.
  • In the primarily cooling, a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 10 mm or longer.
  • In the primarily cooling, a length ratio (d1:d2) of the distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and the distance d2 between the submerged nozzle and the other long side among the pair of long sides may be 1:3.
  • In the secondarily cooling, the slab may be drawn from the mold downward and may be drawn while being forwardly bent, an amount of cooling water that is sprayed from an upper side of the slab may be maintained to be larger than an amount of cooling water that is sprayed from a lower side of the slab until the drawn slab is completely solidified, and the amount of cooling water that is sprayed from the lower side of the slab may be maintained to be larger than the amount of cooling water that is sprayed from the upper portion of the slab after the drawn slab is completely solidified.
  • ADVANTAGEOUS EFFECTS
  • According to an embodiment of the present invention, a location of an submerged nozzle that is placed within a mold is changed and molten steel is injected not into a central portion of the mold but into an area of the mold, which is biased in a thickness direction of a slab, so that locations where segregations and solidification shrinkage cavities are generated may be moved from a central portion to a surface of the slab.
  • In this way, as the locations of the segregations and the solidification shrinkage cavities are moved to the surface, the solidification shrinkage cavities are more easily compressed in a rolling process for the slab, and the segregations are not situated at a location where a maximum tensile stress is generated in a cooling process after rolling so that cracks are prevented from being propagated. Accordingly, inner defects of final products may be reduced.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • Fig. 1 is a view schematically illustrating a general continuous casting equipment;
    • Fig. 2 is a schematic view illustrating the solidification structure of a slab that is manufactured by the general continuous casting equipment;
    • Fig. 3A is a view illustrating the location of an submerged nozzle within a mold in the general continuous casting equipment;
    • Fig. 3B is a view illustrating the state in which the location of the submerged nozzle within the mold that is applied to a continuous casting method for a slab according to an embodiment of the present invention is changed;
    • Fig. 4 illustrates the flow and temperature analysis results for molten steel within the mold that is applied to the continuous casting method for a slab according to the embodiment of the present invention;
    • Fig. 5 is a picture illustrating the slab that is manufactured by the continuous casting method for a slab according to the embodiment of the present invention;
    • Fig. 6 is a compression simulation result according to locations of solidification shrinkage cavities during rolling; and
    • Fig. 7 is a schematic view illustrating the remained center segregations in a product and stress distribution.
    BEST MODE FOR THE INVENTION
  • Hereinafter, embodiments of the present invention will be described in more detail with reference to the accompanying drawings. However, the present invention is not limited to the following embodiments, but will be implemented in various different shapes. Only, the present embodiments make disclosure of the present invention complete, and are provided to completely notify those skilled in the art of the scope of the present invention. The same reference numerals on the drawings refer to the same elements.
  • Fig. 3A is a view illustrating the location of an submerged nozzle within a mold in general continuous casting equipment, Fig. 3B is a view illustrating the state in which the location of the submerged nozzle within the mold that is applied to a continuous casting method for a slab according to an embodiment of the present invention is changed, Fig. 4 illustrates the flow and temperature analysis results for molten steel within the mold that is applied to the continuous casting method for a slab according to the embodiment of the present invention, Fig. 5 is a picture illustrating the slab that is manufactured by the continuous casting method for a slab according to the embodiment of the present invention, Fig. 6 is a compression simulation result according to locations of solidification shrinkage cavities during rolling, and Fig. 7 is a schematic view illustrating center segregations that is remained in a product and stress distribution.
  • As illustrated in the drawings, the continuous casting method for a slab according to one embodiment of the present invention is implemented using the general continuous casting equipment illustrated in Fig. 1. However, the method is achieved by changing the location where a molten steel 1 accommodated in a tundish 20 is injected into a mold 30 while changing the location of an submerged nozzle 21 through which the molten steel 1 is injected into the mold 30.
  • In other words, the continuous casting method for a slab according to one embodiment of the present invention largely includes: performing primary cooling the molten steel 1 using the mold 30 while injecting the molten steel 1 into an inner area of the mold 30 to be biased from the central portion of the mold 30 to a thickness direction thereof, and performing secondary cooling by spraying cooling water to the surface of the slab 2 which is drawn out after being primarily cooled down by the mold 30.
  • In the performing of the primary cooling, an submerged nozzle 21a is not arranged at the central portion of the inside of the mold 30 as illustrated in Fig. 3A but an submerged nozzle 21b is arranged on the area thereof to be biased toward the direction widthwise of the slab 2as illustrated in Fig. 3B in order to allow the molten steel 1 to be injected to the direction biased in the widthwise of the slab 2. In detail, the mold 30 is composed of a pair of long sides 30a and 30b that face each other and a pair of short sides 30c and 30d that face each other. Here, the submerged nozzle 21b is arranged to be biased toward the direction of one long side 30a that is selected from the pair of long sides 30a and 30b.
  • Thus, a flow strength (flow rate) of the molten steel 1 in the biased area is induced to be greater than that of the other areas. Then, a result as illustrated in Fig. 4A may be obtained. It may be identified in Fig. 4A that an area that has red color (relatively dark part) is an area that has a high flow strength, and flow rates in respective areas on the surface of the molten steel have little difference but a stronger flow field is formed in the areas by 2m under the molten steel surface in the biased direction than at the center. Fig. 4B illustrates a calculated temperature field on this area, and it may be identified that temperatures are different from each other in a thickness direction, which is similar to the result of the flow field. In Fig. 4B, an area having a red color (relatively dark part) is an area having a relatively high temperature and the fact that a temperature difference occurs means that solidification completion is generated not at a central portion of its thickness but at a portion thereof in the biased direction.
  • Meanwhile, as illustrated in Fig. 1, in the continuous casting equipment, a plurality of segment rolls 40 that simultaneously compress and draw the slab 2 toward a lower side of the mold 30 are forwardly bent. Here, it is preferred that a direction in which the submerged nozzle 21 is biased is a direction of the long side 30a that is arranged on a front side with reference to a direction in which the slab 2 is drawn among the pair of long sides 30a and 30b. Thus, the direction in which the submerged nozzle 21 is biased is set to be a direction of an upper surface of the drawn slab 2. Accordingly, the point at which the segregations 4 and the solidification shrinkage cavities 3 are generated is biased in a direction of an upper surface of the slab 2 by biasing the point at which solidification is completed in a direction of an upper portion rather than a lower surface portion of the drawn slab 2.
  • Next, a degree to which the submerged nozzle 21 is biased will be described.
  • As illustrated in Fig. 3B, casting is performed while the submerged nozzle 21 that is generally located at a center of the mold 30 is moved in an arrow direction. Here, "d1" refers to a distance between the submerged nozzle 21 and the long side 30a that is selected from the pair of long sides 30a and 30b, and "d2" refers to a distance between the submerged nozzle 21 and the other long side 30b among the pair of long sides 30a and 30b.
  • Thus, the submerged nozzle 21 is arranged such that a length ratio (d2/d1) of d1 and d2 is 1, 3, 4 and 7 and casting is then performed. Here, it may be identified that as a length difference between d1 and d2 becomes larger, a location where solidification is completed is moved not to a central portion of the slab 2 but to a surface thereof. In other words, the solidification shrinkage cavities 3 and the segregations 4 are moved not to the central portion of the slab 2 in the thickness direction but to the surface thereof. However, a difference between d1 and d2 is required to be larger than 20mm. Otherwise, locations where the segregations 4 and the solidification shrinkage cavities 3 are generated do not largely deviate from the central portion of the slab 2 in the thickness direction thereof, and thus, this is not effective in improving qualities of rolled products. Further, when a length of either one of d1 and d2 is smaller than 10mm, solidified layers are re-melted as the discharged molten steel strongly collides with the solidified layers, and thus, an operating accident may occur.
  • Thus, as a difference between d1 and d2 becomes larger while being 20mm or more, this is advantageous in moving a solidification completion location. However, it is preferred that the submerged nozzle 21 is arranged such that both d1 and d2 are 10mm or greater respectively. Preferably, it is optimal that a length ratio (d1:d2) of d1 and d2 is 1:3.
  • Fig. 5 illustrates a result obtained by performing casting when a length ratio (d1:d2) of d1 and d2 is 1:3, and it may be identified that an area having a red color (area near solidification completion line) indicates an area having a relatively high temperature and a location thereof is biased not to the central portion of the slab 2 in its thickness but to an upper portion thereof. That is, as the location of the submerged nozzle 21 is moved, the flow and temperature fields are changed. Because of this, it may be identified that the location where the solidification is completed may be biased not to the central portion in the thickness direction but to either one surface. Thus, the segregations 4 and the solidification shrinkage cavities 3 are biased not to the central portion of the slab 2 in the thickness direction thereof but to the upper surface thereof by a predetermined interval. However, when d2 is much greater than d1, the segregations 4 and the solidification shrinkage cavities 3 are largely biased to the surface of the slab 2. Thus, the defects are exposed to the surfaces in a rolling process and surface defects may thus be caused. Accordingly, it is preferred that the length ratio (d1:d2) of d1 and d2 is maintained to be 1:3.
  • As above, as the molten steel 1 is injected in a state in which the location of the submerged nozzle 21 is biased, the flow and temperature fields of the molten steel 1 are changed, so that the point where the solidification is completed is biased to the upper surface of the slab 2. In this case, bending of the slab 2 is occurred by a residual stress that is caused by a cooling difference that is generated between the upper surface and a lower surface of the slab 2 during the solidification, and thus it may be difficult to transfer the slab 2 using a transfer roller 60.
  • To prevent such a problem from being generated, in the present embodiment, an amount of cooling water that is sprayed to an upper side of the slab 2 may be maintained to be greater than an amount of cooling water that is sprayed to a lower side of the slab 2 until the slab 2 that is drawn in the performing of the secondary cooling is completely solidified, and the amount of cooling water that is sprayed to the lower side of the slab 2 may be maintained same as or to be greater than the amount of cooling water that is sprayed to the upper portion of the slab 2 after the drawn slab 2 is completely solidified.
  • Next, an effect that may be expected as the segregations 4 and the solidification shrinkage cavities 3 that are generated when the slab 2 is manufactured are changed from the central portion of the slab 2 in the thickness direction thereof to the upper surface thereof will be described.
  • First, inner defects of a thick plate product are identified through ultrasonic inspection. At the ultrasonic inspection, defects are detected at central portions of most of thick plate products in thickness directions thereof, and are caused by the solidification shrinkage cavities 3 and the segregations 4 that are generated in the central portion in the thickness direction during the continuous casting. Even though the same amount of the solidification shrinkage cavities 3 and the same amount of the segregations 4 are generated inside the slab 2, the defects are easily detected as the products have a higher strength and a heavier gauge and this is caused by the following reason.
  • First, as the products are thickened, a rolling amount of the slab 2 is reduced, and thus compression of the solidification shrinkage cavities 3 becomes more difficult. In particular, because deformation of the central portion of the slab 2 in the thickness direction thereof is less than that of the surface thereof during the rolling, the compression of the solidification shrinkage cavities 3 becomes more and more difficult. Because of this, it may be identified that even though rolling is performed at the same rolling amount, a solidification shrinkage cavity 3b that is located at 1/4 of the thickness is compressed more easily than a solidification shrinkage cavity 3a at the central portion in the thickness direction, as illustrated in Fig. 6. When an extremely thick plate is produced in a state in which the thickness of the slab 2 is determined, a rolling amount is relatively small, and thus, the compression of the solidification shrinkage cavities 3 becomes more difficult.
  • However, when the solidification shrinkage cavities 3 are biased not to the central portion of the slab 2 in the thickness direction thereof but to the upper surface thereof, a porosity is compressed more easily, so that defects by the ultrasonic inspection may be reduced.
  • In addition, the surface of a product that is produced after the slab 2 is rolled is firstly cooled. That is, the surface of the product is in a low temperature state and an interior thereof is in a relatively high temperature state. Accordingly, a tensile stress is generated at a central portion of the product in a thickness direction thereof. In particular, when a segregation 4 is located at the central portion of the slab 2 in the thickness direction thereof, a crack is easily generated due to stress concentration and propagated, and thus becomes causes of defects at the ultrasonic inspection. In particular, as the thick plate product is highly strengthened and extremely thickened, the tensile stress is more largely increased, and thus a defect incidence is increased.
  • Thus, as in the present embodiment, even though the segregation 4 and the solidification shrinkage cavity 3 are not completely removed, locations where the segregation 4 and the solidification shrinkage cavity 3 are generated are moved as illustrated in Fig. 7, the compression is performed more easily in a rolling process. Thereafter, the segregation 4 is not situated at a location where a maximum tensile stress is generated in a cooling process, and thus, the crack is prevented from being propagated, so that defects of a final product may be reduced.
  • Although the present invention has been described with reference to the accompanying drawings and the above-described exemplary embodiments, the present invention is not limited thereto, and is limited by the following appended claims. Thus, the present invention may be variously modified and changed by those skilled in the art without departing from the technical spirit that is provided by the following appended claims.
  • [Descriptions of reference numerals]
  • 1: Molten steel 2: Slab
    3: Solidification shrinkage cavity 4: Segregation
    10: Ladle 11: Shroud nozzle
    20: Tundish 21: Submerged nozzle
    30: Mold 30a, 30b: Long sides
    30c, 30d: Short sides 40: Segment rolls
    50: Cutter 60: Transfer roller

Claims (7)

  1. A continuous casting method for a slab, in which a slab is continuously casted, the continuous casting method comprising:
    primarily cooling the slab by a mold while the molten steel is injected into an area that is biased from a central portion of an inside of the mold to a thickness direction of the slab; and
    secondarily cooling the slab by spraying cooling water to a surface of the slab while drawing the slab that is primarily cooled by the mold.
  2. The continuous casting method of claim 1, wherein in the primarily cooling, an submerged nozzle is input into the mold that includes a pair of long sides that face each other and a pair of short sides that face each other, the molten steel is injected into the mold, and the submerged nozzle is biased in a direction of one long side that is selected from the pair of long sides.
  3. The continuous casting method of claim 2, wherein in the secondarily cooling, the slab is drawn from the mold downward and is drawn while being forwardly bent, and
    wherein in the primarily cooling, the direction in which the submerged nozzle is biased is a direction of a long side that is arranged on a front side with reference to a direction in which the slab is drawn among the pair of long sides.
  4. The continuous casting method of claim 2, wherein in the primarily cooling, a difference between a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides is 20 mm or longer.
  5. The continuous casting method of claim 2, wherein in the primarily cooling, a distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and a distance d2 between the submerged nozzle and the other long side among the pair of long sides are 10mm or longer respectively.
  6. The continuous casting method of claim 2, wherein in the primarily cooling, a length ratio (d1:d2) of the distance d1 between the submerged nozzle and one long side that is selected from the pair of long sides and the distance d2 between the submerged nozzle and the other long side among the pair of long sides is 1:3.
  7. The continuous casting method of claim 2, wherein in the secondarily cooling, the slab is drawn from the mold downward and is drawn while being forwardly bent,
    wherein an amount of cooling water that is sprayed to an upper side of the slab is maintained to be greater than an amount of cooling water that is sprayed to a lower side of the slab until the point that the drawn slab is completely solidified, and
    wherein the amount of cooling water that is sprayed to the lower side of the slab is maintained same or to be greater than the amount of cooling water that is sprayed to the upper portion of the slab after the point that the drawn slab is completely solidified.
EP16848756.9A 2015-09-24 2016-06-03 Continuous slab casting method Active EP3354371B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020150135925A KR101941877B1 (en) 2015-09-24 2015-09-24 Continuous casting method for cast slab
PCT/KR2016/005922 WO2017052030A1 (en) 2015-09-24 2016-06-03 Continuous slab casting method

Publications (3)

Publication Number Publication Date
EP3354371A1 true EP3354371A1 (en) 2018-08-01
EP3354371A4 EP3354371A4 (en) 2018-08-08
EP3354371B1 EP3354371B1 (en) 2019-10-02

Family

ID=58386181

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16848756.9A Active EP3354371B1 (en) 2015-09-24 2016-06-03 Continuous slab casting method

Country Status (6)

Country Link
EP (1) EP3354371B1 (en)
JP (1) JP6461357B2 (en)
KR (1) KR101941877B1 (en)
CN (1) CN107206476B (en)
BR (1) BR112017016554A2 (en)
WO (1) WO2017052030A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109093083A (en) * 2018-09-28 2018-12-28 邢台钢铁有限责任公司 A kind of continuous casting steel billet and its manufacturing method of surface quality optimization

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101974566B1 (en) * 2017-10-12 2019-09-05 주식회사 포스코 Method for casting slab and casting apparatus
CN115846608B (en) * 2023-03-02 2023-04-28 北京科技大学 Continuous casting process on-line control method and system based on nozzle offset degree analysis

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54126630A (en) * 1977-10-20 1979-10-02 Kobe Steel Ltd Continuous casting
JP2974544B2 (en) * 1993-05-31 1999-11-10 新日本製鐵株式会社 Sliding nozzle device in continuous casting machine
JPH08112650A (en) * 1994-10-12 1996-05-07 Nippon Steel Corp Continuous casting method and pouring device for continuous casting
IT1291931B1 (en) * 1997-06-19 1999-01-21 Voest Alpine Ind Anlagen PROCEDURE FOR THE PRODUCTION OF RAW STEEL CASTING TAPES WITH LOW CARBON CONTENT AND THIS OBTAINABLE TAPES
JP2001321901A (en) 2000-05-15 2001-11-20 Sumitomo Metal Ind Ltd Method for continuously casting steel
JP4734724B2 (en) * 2001-01-31 2011-07-27 Jfeスチール株式会社 Seamless steel pipe manufacturing method
JP2004090088A (en) * 2002-07-11 2004-03-25 Jfe Steel Kk Method for producing round billet for steel pipe, and round billet for steel pipe
CN101868314B (en) * 2007-11-19 2015-04-22 Posco公司 Continuous cast slab and method for manufacturing the same
KR101129982B1 (en) * 2009-09-28 2012-03-26 현대제철 주식회사 Mold Powdwe Supplying Apparatus for Continuous Casting Therewith
KR101175411B1 (en) * 2009-10-29 2012-08-20 현대제철 주식회사 Device for inserting powder in mold for continuous casting plant
JP5387508B2 (en) * 2010-06-01 2014-01-15 新日鐵住金株式会社 Continuous casting method, continuous casting control device and program
CN101941061B (en) * 2010-10-08 2012-05-30 阎瑞河 Method and device for casting extra large-section billet
KR101036320B1 (en) 2011-02-08 2011-05-23 주식회사 포스코 Cast slab and manufacturing method for the same
BR112015001929B1 (en) * 2012-07-31 2019-08-13 Jfe Steel Corp steel continuous casting method
JP6019989B2 (en) * 2012-09-20 2016-11-02 Jfeスチール株式会社 Secondary cooling method for continuous cast slabs
KR101394441B1 (en) * 2012-12-27 2014-05-13 주식회사 포스코 Continuous casting apparatus
KR20140118571A (en) * 2013-03-29 2014-10-08 주식회사 포스코 Continuous casting method using the mold powder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109093083A (en) * 2018-09-28 2018-12-28 邢台钢铁有限责任公司 A kind of continuous casting steel billet and its manufacturing method of surface quality optimization
CN109093083B (en) * 2018-09-28 2020-09-01 邢台钢铁有限责任公司 Continuous casting billet with optimized surface quality and manufacturing method thereof

Also Published As

Publication number Publication date
EP3354371A4 (en) 2018-08-08
WO2017052030A1 (en) 2017-03-30
KR20170036973A (en) 2017-04-04
EP3354371B1 (en) 2019-10-02
CN107206476A (en) 2017-09-26
BR112017016554A2 (en) 2018-04-10
CN107206476B (en) 2019-08-13
KR101941877B1 (en) 2019-01-25
JP2018501962A (en) 2018-01-25
JP6461357B2 (en) 2019-01-30

Similar Documents

Publication Publication Date Title
KR100191298B1 (en) Process for the production of a strip, a pre-strip or a slab
KR101739674B1 (en) Continuous casting method for cast slab
EP3354371B1 (en) Continuous slab casting method
EP3144080B1 (en) Continuous casting method for slab
EP3219408B1 (en) Continuous casting method for steel
JP5835531B2 (en) Continuous casting method for slabs for extra heavy steel plates
KR20110113195A (en) Hot-rolled titanium slab melted by electronbeam melting furnace, method of melting and method of hot-rolling titan slab
KR101936008B1 (en) Continuously cast piece and manufacturing method and manufacturing device therefor, manufacturing method and manufacturing device for thick steel plate
JP5754417B2 (en) Continuous casting method for slabs
KR101264635B1 (en) Apparatus for adding reduction force of strip and method for continuous casting using the same
CN110653276B (en) Rolling method for small-compression-ratio compaction welding porosity defect of large-size bar
JP3092543B2 (en) Manufacturing method of round billet slab by continuous casting
JPH10128512A (en) Unsolidified reduction rolling method for round billet
JPH10328800A (en) Production of round cast billet by continuous casting
JPH10180307A (en) Manufacture of billet for bar steel
SU1696015A1 (en) Method of producing thick-gauge plate
KR20140014845A (en) Fabricating method for slab
CN104226950A (en) Continuous casting blank edge shaping method and device
JPH09314298A (en) Continuous casting method
JPH05305395A (en) Continuous casting method
JP2008055512A (en) Continuously cast slab, and method for producing steel sheet using the same
JPH10305301A (en) Manufacturing method and device for bar steel billet

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170711

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20180705

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RIC1 Information provided on ipc code assigned before grant

Ipc: B22D 11/22 20060101ALI20190220BHEP

Ipc: B22D 11/103 20060101ALI20190220BHEP

Ipc: B22D 11/055 20060101ALI20190220BHEP

Ipc: B22D 11/124 20060101AFI20190220BHEP

Ipc: B22D 11/10 20060101ALI20190220BHEP

Ipc: B22D 11/128 20060101ALI20190220BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190402

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

INTC Intention to grant announced (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

INTG Intention to grant announced

Effective date: 20190827

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1185639

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016021906

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191002

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1185639

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200102

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200102

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200103

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200203

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016021906

Country of ref document: DE

PG2D Information on lapse in contracting state deleted

Ref country code: IS

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200202

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

26N No opposition filed

Effective date: 20200703

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200603

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200603

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200603

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602016021906

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG-SI, KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602016021906

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG- SI, KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602016021906

Country of ref document: DE

Owner name: POSCO HOLDINGS INC., KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602016021906

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG-SI, KR

Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602016021906

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG- SI, KR

Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230320

Year of fee payment: 8