EP3220032B1 - Élément de gaine - Google Patents

Élément de gaine Download PDF

Info

Publication number
EP3220032B1
EP3220032B1 EP16160463.2A EP16160463A EP3220032B1 EP 3220032 B1 EP3220032 B1 EP 3220032B1 EP 16160463 A EP16160463 A EP 16160463A EP 3220032 B1 EP3220032 B1 EP 3220032B1
Authority
EP
European Patent Office
Prior art keywords
lead
space
floor
pipes
openings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16160463.2A
Other languages
German (de)
English (en)
Other versions
EP3220032C0 (fr
EP3220032A1 (fr
Inventor
Teemu Inha
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Uponor Innovation AB
Original Assignee
Uponor Innovation AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Uponor Innovation AB filed Critical Uponor Innovation AB
Priority to EP16160463.2A priority Critical patent/EP3220032B1/fr
Publication of EP3220032A1 publication Critical patent/EP3220032A1/fr
Application granted granted Critical
Publication of EP3220032C0 publication Critical patent/EP3220032C0/fr
Publication of EP3220032B1 publication Critical patent/EP3220032B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03DWATER-CLOSETS OR URINALS WITH FLUSHING DEVICES; FLUSHING VALVES THEREFOR
    • E03D11/00Other component parts of water-closets, e.g. noise-reducing means in the flushing system, flushing pipes mounted in the bowl, seals for the bowl outlet, devices preventing overflow of the bowl contents; devices forming a water seal in the bowl after flushing, devices eliminating obstructions in the bowl outlet or preventing backflow of water and excrements from the waterpipe
    • E03D11/13Parts or details of bowls; Special adaptations of pipe joints or couplings for use with bowls, e.g. provisions in bowl construction preventing backflow of waste-water from the bowl in the flushing pipe or cistern, provisions for a secondary flushing, for noise-reducing
    • E03D11/16Means for connecting the bowl to the floor, e.g. to a floor outlet
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms

Definitions

  • the present invention relates to a lead-through element according to the preamble of claim 1.
  • the present invention is also directed to a method for leading pipes through floor structures via lead-through elements.
  • the sanitary rooms, i.e. bathrooms, lavatories or washrooms, of buildings with several floors and several apartments have water and sewage installations arranged into vertical shafts running inside structural walls, and into horizontal lines inside the floor/ceiling structures between the floors.
  • the pipes and other conducting elements for water and sewage installations are embedded within structures of stone, concrete, tile or other such building material.
  • costly and time-consuming cutting-in operations are needed to access the pipes.
  • installation assemblies or plumbing arrangement elements are intended to be installed in a vertical line in each vertically successive sanitary room of a building.
  • the installation assemblies may comprise a cassette or cabinet with at least part of the plumbing, piping, insulation and connecting points pre-installed within the cassette casing at a factory by experts, thus eliminating the need of on-site precision work and possible installation mistakes.
  • the installation assembly may need to have correct dimensions and very tight tolerances for the variation in different dimensions to ensure a successful final on-site installation.
  • the objective of the invention is to provide an improved lead-through element for leading pipes and other conducting elements through structures.
  • the lead-through element is particularly intended to be used in connection with plumbing arrangement elements that are installed in a vertically aligned line in several sanitary rooms or units arranged on top of each other, for example in an apartment building or block of flats with several floors.
  • the present invention provides a lead-through element for leading pipes through a floor structure.
  • the lead-through element is specified in claim 1.
  • the first part is continuously connectable to a water barrier membrane of the first space.
  • the lead-through element Due to the single continuous water barrier membrane connections for each and every individual pipe led through the lead-through element, the space requirement of different pipe and pipeline arrangements may be significantly reduced. Instead of providing every pipe individual water barrier membrane continuations between the joints of each pipe and the floor structure, the lead-through element provides one effective water barrier membrane continuation between the first part and the first space, and the second part and the second space. Therefore the pipes may be installed closer to each other, reducing the space required for plumbing lines. For example, even small sanitary spaces can be renovated in line with current building codes and requirements without sacrificing space to the plumbing lines. The space requirements may be even further reduced by leading more than one pipe through one lead-through channel.
  • the pipes may comprise at least one of the following: tap water pipe, grey water pipe, hot water pipe, cold water pipe, waste water pipe, thermal pipe, or other conducting element, including electric wires and telecommunications or data communications cables.
  • a system for leading pipes through floor structures to establish a continuous vertical line of pipes between at least two vertically adjoining spaces is disclosed.
  • the system is characterized by what is specified in claim 16.
  • a method for leading pipes through floor structures via the lead-through elements, to establish a continuous vertical line of pipes between at least two vertically adjoining spaces is disclosed.
  • the method is specified in claim 18.
  • the lead-through element, the system and the method may be utilized in connection with a plumbing arrangement element.
  • the plumbing arrangement element may be prefabricated so as to improve the quality of different parts and their installation, reduce work required at the installation site, improve installation time and ease, and cause less error in installation.
  • a prefabricated plumbing arrangement element may require significantly smaller installation surface area, as the critical installation operations may be performed in the prefabrication stage.
  • these plumbing arrangement elements may require skills and precision in the on-site installation operations, for example in aligning the vertical line of pipes and other conducting elements, leading them through the floor structures between two vertically adjoining spaces, and connecting all pipelines.
  • securing the wet sealing of the spaces (floor and ceiling lead-through points, as well as the entire floor structure at the area surrounding the lead-through), and vertically aligning the water and sewage lines through all the floors of the building, may be challenging.
  • lead-through herein is meant generally the connection or joint between two separate spaces one of which is located wholly or partially above the other, the connection extending from the ceiling of the space below to the floor level of the space above, and extending through the floor structure between the two spaces.
  • pipeline and pipe herein is meant any extended conduit or conducting line, comprising several individual pieces of pipe connected to each other to form a conducting line, including but not limited to fresh water pipes, grey water pipes and sewage pipes.
  • the term pipeline may also encompass conduits such as electric wires or data/telecommunications cables.
  • the two terms pipe and pipeline may be used interchangeably throughout this disclosure.
  • water barrier membrane herein is meant a continuous water and moisture proof layer or structure of material that prohibits movement of water, liquid or moisture from a space towards the surrounding building structures (floors, walls, ceilings).
  • a water barrier membrane may typically be a layer of spreadable waterproofing material or a layer of waterproofing film, sheet or tape.
  • Figures 1a , 1b , 2a and 2b show a lead-through element 1 for leading pipes, pipelines or other conduits through horizontal building structures such as floor/ceiling structures or floor structures 180 which may be for example concrete floor slabs, disposed between two vertically adjoining spaces (toilets, washrooms, bathrooms, lavatories or other such sanitary rooms, as well as various technical spaces or basement spaces of a building).
  • the lead-through element 1 may be used for leading through pipes in connection with a plumbing arrangement element 8 (see Figures 2a and 2b ).
  • the plumbing arrangement element 8 is an installation cabinet or cassette comprising a at least side walls 81, 82, and a front panel (not shown), a top part 83, and further comprising at least partially pre-installed pipes 70 for water, waste water and heating, as well as other conduits such as electrical wires or telecommunications wires, as well as different connections for those pipes and conduits, for example connections for a plumbing fixture such as a toilet bowl or a washbasin, for a shower, or for a washing machine water inlet pipes.
  • the lead-through element 1 may be used in connection with all kinds of sanitary piping and/or plumbing pipelines, without the plumbing arrangement element 8.
  • the lead-through element 1 comprises a first part 10, intended for installation or mounting onto and into a floor 150 of a first space 801; and a second part 20, intended for installation or mounting onto and into a ceiling 170 of a second space 802, located below the first space and separated from the first space 801 by a floor structure 180.
  • a first part 10 and the second part 20 Prior to the installation or mounting of the first part 10 and the second part 20, an appropriate initial circular lead-through holes or openings (not shown) are pierced or otherwise arranged into the floor structure 180 disposed between the first and second spaces by for example drilling or boring.
  • At least one intermediate casing 31, 32, 33 is extended from the first part 10 to the second part 20 to form a lead-through channel 310, 320, 330 from the first space 801 to the second space 802, the lead-through channel 310, 320, 330 providing a channel through the floor structure 180 for pipes 70.
  • the intermediate casing or casings 31, 32, 33 may have a circular cross-section, as has the lead-through channel or channels 310, 320, 330.
  • the intermediate casings 31, 32, 33 have a length chosen according to the thickness of the floor structure 180 so that the casings 31, 32, 33 have a sufficient length to extend from the first part 10, disposed in the first space 801, to the second part 20, disposed in the second space 802.
  • the first part 10 comprises a rectangular face 100 comprising a first edge 100a, a second edge 100b, a third edge 100c, and a fourth edge 100d. From the first edge second, third and fourth edges 100a, 100b, 100c, 100d, corresponding side walls 101a, 101b, 101c, 101d extend downwards at a right angle (i.e. towards the floor 150 when the first part 10 is installed in place) .
  • a first plate 102 extends outwards from the face 100, again at a right angle so that the plate 102 is aligned with the floor 150 when the first part 10 is installed in place.
  • the first plate 102 forms a collar structure around the first edge 100a, the second edge 100b and the third edge 100c of the face 100.
  • the first plate 102 comprises an upper side 102a and an underside 102b. Further, the plate 102 has a first back edge 102d.
  • the first plate 102 may have rounded corners.
  • the plate 102 extends upwards at a right angle (i.e. away from the floor 150 when the first part 10 is installed in place) to form a first flange 103 comprising a first face side 103a and first backside 103b.
  • the first flange 103 is perpendicular in relation to a plane defined by the face 100 and the plate 102.
  • the first flange 103 may have rounded corners.
  • FIG. 1b Another embodiment is depicted in Fig. 1b , especially suited in cases where the lead-through element 1 is configured to be disposed in a corner (more specifically, a right-hand corner, as seen from the front or from the direction of the first sidewall 101a) of a space 801, 802.
  • the first plate 102 extends outwards from the face 100, again at a right angle so that the first plate 102 is aligned with the floor 150 when the first part 10 is installed in place.
  • the first plate 102 forms a collar structure around the first edge 100a and the second edge 100b of the face 100.
  • the first plate 102 comprises an upper side 102a and an underside 102b. Further, the plate 102 has a second back edge 102c. Also in this embodiment, the first plate 102 may have rounded corners.
  • the plate 102 extends upwards at a right angle (i.e. away from the floor 150 when the first part 10 is installed in place) to form a first flange 103 comprising a first face side 103a and first backside 103b.
  • the first flange 103 is perpendicular in relation to a plane defined by the face 100 and the plate 102.
  • the first flange 103 may have rounded corners.
  • the first plate 102 may also be arranged around the perimeter of the first sidewall 101a and the third sidewall 101c to form a collar structure around the first edge 100a and the third edge 100c of the face 100; and the first plate 102 may also be configured to extend upwards at a right angle at the first back edge 102d and a first front edge 102b to form a first flange 103; in order to achieve a mirror image version of the first part 10 of a lead-through element 1, to be mountable in a left-hand corner of a space 801, 802.
  • the first plate 102 has mounting holes 40 arranged into a number of locations, for example at the corners, for mounting and installing the first part 10 onto and into the floor 150 of the first space 801. Further, also the first flange 103 may have similar mounting holes arranged into a number of locations, for example at the corners, for mounting and securing the first part further onto a wall 160 of the first space 801.
  • the mounting may be executed in any suitable manner, for example by bolts, screws or pins (not shown) arranged through the mounting holes 40 and secured into the floor 150 or into counterparts arranged into the floor 150, and/or wall 160 of the room or counterparts arranged into the wall 160.
  • the mounting holes 40 may be so configured as to accommodate sunk screws, for example by counter-sinking.
  • the first part 10 When the first part 10 is mounted in place, the underside of the first plate 102 engages the floor 150, and the first backside of the first flange 103 engages the wall 160 at its backside 103b, as can be seen in Figure 2a .
  • the first part 10 is mountable onto the floor 150 of the first room 801 by engaging the underside 102b with the floor 150, and onto the wall 160 of the first room 801 by engaging the first backside 103b with the wall 160.
  • the first part may thus be mounted onto the floor 150 only, or onto both the floor 150 and the wall 160 of the first space 801, depending on what is required in a particular installation.
  • the insides of the sidewalls 81, 82 of the element 8 are brought in contact with the second sidewall 101b and the third sidewall 101c, and the front panel of the assembly 8 brought into contact with the first side wall 101a, to ensure that the plumbing arrangement element 8 ends up secured in a correct position.
  • the face 100, the edges 100a-d and the side walls 101a-d define a stand 105 for securing the plumbing arrangement element 8 in a correct position.
  • the dimensions of the first part 10 may depend on the plumbing arrangement element 8 with which the lead-through element 1 is intended to be used.
  • the length of the first edge 100a i.e. the distance between the second side wall 101b and the third side wall 101c
  • the length of the first edge 100a may vary between 400 - 700 mm, being for example 645 mm, 655 mm or 665 mm.
  • the length of the second edge 100b and the third edge 100c i.e. the distance between the first side wall 101a and the fourth side wall 101d
  • the length of the second edge 100b and the third edge 100c may vary between 200 - 250 mm, being for example 215 mm, 230, mm or 235 mm.
  • the length of the first edge 100a is 650 mm and the length of the second and third edges 100b, 100c is 220 mm.
  • the height H 101 of the sidewalls 101a-101c may be 15 mm. In other embodiments, the height H 101 of the sidewalls 101a-101c may vary between 10 - 100 mm, being for example 20 mm, 65 mm or 80 mm. The height H 101 of the sidewalls 101a-c may be chosen to ensure that the plumbing arrangement element 8 may be secured in place onto the first part 10 of the lead-through element 1, as explained earlier.
  • the height H 101 depends on a particular installation solution: when the first part 10 is mounted onto a finished floor 150 (i.e. on the finished surface of the floor 150), the height H 101 may be 10 - 20 mm.
  • the height H 101 may be greater, for example 80 mm to accommodate the additional layers of the floor 150 being poured or otherwise installed on site.
  • the face 100 may protrude from the floor structure at a height approximately corresponding to H 101 in the embodiment where the first part is installed onto the floor 150, that is to say, for example 10 - 20 mm.
  • the width W 102 of the first plate 102 may be 30 mm. In other embodiments, the width W 102 of the plate 102 may vary between 20 - 50 mm, being for example 25 mm, 35 mm or 45 mm. Lastly, in an embodiment, the height H 103 of the first flange 103 may be for example 30 mm. In other embodiments, the height H 103 of the first flange 103 may vary between 20 - 50 mm, being for example 25 mm, 35 mm, or 45 mm. The width W 102 of the first plate 102and the height H 103 may be equal. The width W 102 of the first plate 102and the height H 103 may depend on the particular installation environment on site, for example by the joining strip chosen to join the first part 10 to the water barrier membrane of the space 801.
  • the first part 10 further comprises one or more circular first opening 11, 12, 13, arranged into the face 100, from which the at least one intermediate casing 31, 32, 33 is arranged to extend downwards through the floor structure 180 towards the room below, all the way to the second part 20 mounted in place to the ceiling of the second room 802.
  • the second part 20 has a corresponding number of circular second openings 21, 22, 23.
  • the first part 10 may have more than one opening 11, 12, 13, for example two openings 21, 22, or three openings 11, 12, 13.
  • the second part 20 may have more than one opening.
  • the number of the intermediate casings 31, 32, 33 and the lead-through channels 310, 320, 330 naturally corresponds to the number of the first and second openings.
  • Each of the corresponding openings 11, 12, 13 and 21, 22, 23, and hence also the intermediate casings 31, 32, 33 and the lead-through channels 310, 320, 330 may have the same diameter or they may have different diameters depending on the type and/or number of pipes to be led through each lead-through channel 310, 320, 330 of the lead-through element 1.
  • the diameter may be 120 - 170 mm.
  • the diameter may be 40 - 170 mm, depending on the number of pipes to be led through.
  • the first opening or openings 11, 12, 13, the second opening or openings 21, 22, 23 and the intermediate casing or casings 31, 32, 33 all have a common vertical axis extending through the center point of each circular element.
  • the first openings 11, 12, 13 are concentric with the second openings 21, 22, 23, as can be seen in figures 1a and 1b .
  • Each first opening 11, 12, 13 comprises a collar 110, 120, 130 arranged at the edge of the opening and surrounding the edge of the openings.
  • the collar 110, 120, 130 protrudes upwards from the face 100.
  • the collar 110, 120, 130 also extends in the opposite direction or downwards from the face 101 (i.e. towards the lower room 802 when the first part is installed in place onto the floor 150, and inside the lead-through channel 310, 320, 330).
  • each intermediate casing 31, 32, 33 is arranged to contact the underside 102b of the plate 102 of the first part 10 so that the downwards-extending part of the collar 110, 120, 130 ends up inside the intermediate casing 31, 32, 33 and the lead-through channel 310, 320, 330.
  • the upwards-protruding part of the collar 110, 120, 130 ensures that any leaks puddling on the face 101 of the first part 10 may not enter the lead-through channel 310, 320, 330, but may be led to or towards the floor 150 where the leaks may be effectively noticed before any damage to the building structures or other elements takes place.
  • the total height of the collar 110, 120, 130 may be for example 7,5 mm. In other embodiments, the height of the collar 110, 120, 130 may vary between 5 - 10 mm, being for example 5,5 mm, 7 mm or 8,5 mm. In an embodiment, the height of the upwards-protruding part of the collar 110, 120, 130 may be for example 2,5 mm. In other embodiments, the height of the upwards-protruding part of the collar 110, 120, 130 may be vary between 0 - 5 mm, being for example 2 mm, 3 mm or 3,75 mm. In an embodiment, the height of the downwards-extending part of the collar 110, 120, 130 may be for example 5 mm.
  • the height of the downwards-extending part of the collar 110, 120, 130 may vary between 3 - 10 mm, being for example 6 mm, 7,5 mm or 8 mm.
  • the height of the collar parts may depend for example on the method of production of the first part 10, the installation room available for installing the lead-through element 1 in a space 801, 802, or on country-specific building codes and regulations concerning installation of structures in wet spaces.
  • the first part 10 may further comprise at least one vertical support member 50 integrally arranged or fixed onto the face 100.
  • the vertical support member 50 is intended for providing support and/or load-bearing for a plumbing fixture, for example a body of a toilet bowl or toilet seat.
  • the vertical support member 50 may, for example, comprise a spindle, a threaded rod or screwing rod, and a nut or other such stopping element with which an appropriate height for the plumbing fixture may be chosen by shifting the nut upwards or downward the rod, and which may effectively bear the weight of the plumbing fixture towards the floor 150.
  • the vertical support member 50 may also comprise an angle iron with suitable connecting members.
  • This kind of vertical support member 50 offer advantages over previous solutions, where full-wall mount structures or feet structures have been used to provide enough support for a plumbing fixture. Such prior art solutions require post-installation adjustments as a separate installation procedure. Further, as the support members 50 in the first part 10 are a part of the lead-through element 1, a water barrier treatment that forms a continuous water barrier membrane between the floor 150 and the first part 10 may provide a water barrier also for the vertical support member 50 bearing the weight of the plumbing fixture to the floor 150 without any additional water barrier treatment or structures, which may be needed with conventional support structures.
  • the second part 20 comprises rectangular second plate 200 with a ceiling-engaging side 200a and an outer side 200b.
  • the second plate 200 comprises a third back edge 201d and a fourth front edge 201c.
  • the corners of the second plate 200 may be rounded.
  • the second plate 200 is arranged to extend downward at a right angle (i.e. away from the ceiling 170 when the second part 20 is installed in place) to form a second flange 203 comprising a second face side 203a and second backside 203b.
  • the second plate 200 is arranged to extend downward at a right angle (i.e. away from the ceiling 170 when the second part 20 is installed in place) to also form a second flange 203 comprising a second face side 203a and a second backside 203b.
  • This embodiment is suited in cases where the lead-through element 1 is configured to be disposed in a corner.
  • the second part 20 may in this case also be configured as a mirror image, with the flange arranged at the opposite edge from the fourth back edge 201c.
  • the chosen configuration of the second part 20 in regard to the form and position of the second flange 203 is naturally intended to correspond to that of the first part 10 of any particular lead-through element 1.
  • the second flange 203 is perpendicular in relation to a plane defined by the plate 200. Also the flange 203 may have rounded corners.
  • the second plate 200 has mounting holes 40 arranged into a number of locations, for example at the corners and/or near their edges, for mounting or installing the second part 20 onto and into the ceiling 170 of the second space 802.
  • the mounting may be executed in any suitable manner, for example by bolts, screws or pins (not shown) arranged through the mounting holes 40 and secured into the ceiling 170 of the room 802 or into counterparts (not shown) arranged into the ceiling 170.
  • the second flange 203 may have mounting holes 40, so that the second part 20 may also be additionally secured onto a wall 160 of the room 802 or into counterparts arranged into the wall 160, similarly to what has been disclosed earlier in connection with the first part 10.
  • the second plate 200 is intended for engaging the ceiling 170 at its ceiling-engaging side 200a
  • the second flange 203 is intended for engaging the wall 160 at its backside 202b, as can be seen in Figure 2b .
  • the second part 20 is mountable onto the ceiling 170 of the second space 802 by engaging the ceiling-engaging side 200a with the ceiling 170, and, additionally, onto the wall 160 of the second space 802 by engaging the second backside 203b with the wall.
  • the dimensions of the second part 20 may depend on the plumbing arrangement element 8 with which the lead-through element 1 is intended to be used.
  • the length of a front edge 201a and the second back edge 201d i.e. the distance between a first side edge 201b and a second side edge 201c
  • the length of the first edge 201a and the fourth edge 201d may vary between 400 - 700 mm, being for example 645 mm, 655 mm or 665 mm.
  • the length of the first side edge 201b and the second side edge 201c i.e. the distance between the front edge 201a and the second back edge 201d
  • the length of the second edge 201b and the third edge 201c may vary between 200 - 250 mm, being for example 215 mm, 230, mm or 235 mm.
  • the length of the front edge 201a and the second back edge 201d may be 650 mm and the length of the first side edge 201b and the second side edge 201c may be 220 mm.
  • the height H 203 of the second flange 203 may be for example 30 mm. In other embodiments, the height H 203 of the second flange 203 may vary between 20 - 50 mm, being for example 25 mm, 35 mm, or 45 mm. The height H 203 may depend on the particular installation environment on site, for example by the joining strip chosen to join the first part 10 to the water barrier membrane of the space 802.
  • each structural detail listed above may vary independently, regardless of the dimensions of the other structural details.
  • the dimensions of the second part 20 correspond to the dimensions of the first part 10 in any particular lead-through element 1, to form a single suitably dimensioned entirety of a lead-through element 1.
  • the second part 20 further comprises at least one circular second opening 21, 22, 23, arranged into the plate 200, from which the at least one intermediate casing 31, 32, 33 is arranged to extend upwards through the floor structure 180 towards the first room 801, all the way to the first part 10, which has a corresponding number of circular first openings 11, 12, 13, as explained earlier.
  • Each second opening 21, 22, 23 has a collar 210, 220, 230 surrounding the edge of the opening 21, 22, 23.
  • the collars 210, 220, 230 extend upwards from the ceiling-engaging side 200a of the plate 200 (i.e. towards the room above when the second part 20 is installed in place onto the ceiling 170, and either outside or inside the intermediate casing 31, 32, 32 and lead-through channel 310, 320, 330).
  • each intermediate casing 31, 32, 33 is arranged to contact the ceiling-engaging side 200a of the second part 20 so that the upwards-extending part of the collar 210, 220, 230 ends up either outside or inside the intermediate casing 31, 32, 33 and the lead-through channel 310, 320, 330.
  • the ceiling-engaging side 200b of the second plate 200 may be used to retain the intermediate parts 30, 31, 32 in place once the second part is mounted in place.
  • the height of the collar 210, 220, 230 may be for example 5 mm. In other embodiments, the height of the collar 110, 120, 130 may vary between 2 - 10 mm, being for example 6 mm, 7,5 mm or 8,5 mm. The height of the collar 210, 220, 230 may depend for example on the method of production of the first part 20, the installation room available for installing the lead-through element 1 in a space, or on country-specific building codes and regulations concerning installation of structures in wet spaces.
  • the second part 20 may further comprise at least one connector 60, which is intended for engaging a plumbing arrangement element 8.
  • the connector 60 may be a pin, a bolt, a screw or any other suitable type of connecting element that has a counterpart arranged at the top part 83 of the plumbing arrangement element 8.
  • the top part 83 of the assembly 8 is brought in contact with the second part 20, and two connectors 60, arranged at or near the outer corners of the second plate 200, are inserted into their counterpart (not shown) to ensure that the plumbing arrangement element 8 ends up aligned and secured in a correct position.
  • the second part 20 and the connectors 60 enable support for the plumbing arrangement element 8 during its installation, thereby eliminating the need for separate support structures during installation of the assembly 8.
  • the first part 10 and the second part 20 may be constructed from sheet metal, stainless steel, or plastic.
  • the two parts may be constructed for example by folding or by welding metal sheets, or by deep drawing plastic.
  • the intermediate casings 31, 32, 33 may be constructed from plastic, such as polyethylene (PE), cross-linked PE (PEX), polypropylene (PP), polycarbonate (PC), polybutylene (PB), polyvinyl chloride (PVC), from or a plastic-metal composite (e.g. a thin layer of aluminum surrounded by any suitable plastic such as PP, PE or PEX, on both sides), or from stainless steel.
  • the intermediate casings 31, 32, 33 may, for example, be suitable lengths of pipe made from one the aforementioned materials. The material may be chosen to accommodate any country-specific building codes and regulations concerning construction of wet spaces and for example fire safety.
  • the lead-through element 1 is installed or mounted into place between two vertically adjoining spaces as follows: First, a continuous vertical line is established for all the required pipelines and/or conducting elements, the vertical line extending from the bottom-most space to the top-most space in one plumbing line of a building. Between each vertically adjoining space 801, 802, a required number of initial circular lead-through holes or openings are arranged or pierced by drilling or boring through each intervening floor structure 180, the floor structure being for example a voided or a solid concrete floor or slab.
  • each circular hole may vary 1) according to the type of pipe/pipes or conducting element/elements to be led through that channel, and 2) so that the continuous vertical line, as well as the alignment of plumbing arrangement elements 8, should any be used, may be kept constant despite any possible variations in placement of the different lead-through channels.
  • the second part 20 or lower part of the lead-through element 1 is installed or mounted in place onto and into the ceiling 160 of the second space 802, i.e. the space below the floor structure 180.
  • the openings 21, 22, 23 are aligned with the initial lead-through openings arranged into the floor structure 180, and the second plate 200 is brought into contact with the ceiling 170 so that the ceiling-engaging side 200a contacts the ceiling 170.
  • the second flange 203 is similarly brought into contact with the wall 160 so that the backside 202b of the second flange 203 engages the wall 160.
  • the second part 20 is then secured in place with suitable securing elements such as screw or bolts connected to their counterparts in the ceiling 170 and the wall 160 through the mounting holes 40.
  • the ceiling 170 may be treated with a suitable water barrier treatment so that a continuous water barrier membrane is formed over the ceiling 170 and the second part 20.
  • the second part 20 may be connected to an existing water barrier membrane of the second space with a joining strip of suitable material. In an embodiment, this may be achieved by applying a layer of water barrier membrane in the form of a waterproofing material or waterproofing mat over the face side 200b of the second part 20 and extending material well into the similar waterproofing material of the surrounding ceiling 170 to ensure the formation of a continuous water barrier membrane.
  • the second part may be pre-treated with a water proofing material prior to the installation, and only the seams or joints between the second part 20 and the ceiling 170 need to be retreated with a water proofing material.
  • a plumbing arrangement element 8 may be installed in place and connected to the second part 20 via the connectors 60, as explained earlier.
  • the first part 10 or upper part of the lead-through element 1 is installed or mounted in place onto and into the floor 150 of the first space 801, i.e. the space above the floor structure 180.
  • the openings 11, 12, 13 are aligned with the initial lead-through holes arranged into the floor structure 180, and the first plate 102 is brought into contact with the floor 150 so that the underside 102b of the first plate 102 engages the floor 150.
  • the first flange 103 is similarly brought into contact with the wall 160 so that the backside 103b of the first flange 103 engages the wall 160.
  • the first part 10 is then secured in place with suitable securing elements such as screw or bolts connected to their counterparts in the floor 150 and the wall 160 through the mounting holes 40.
  • the floor 150 may be treated with a suitable water barrier treatment so that a continuous water barrier membrane is formed over the floor 150 and the first part 10.
  • the second part 10 may be connected to an existing water barrier membrane of the first space. In an embodiment, this may be achieved by applying a layer of water barrier membrane in the form of a waterproofing material or waterproofing mat over the totality of the first part 10 above the floor 150 and extending material well into the similar waterproofing material of the surrounding floor 150 to ensure the formation of a continuous water barrier membrane.
  • the first part may be pretreated with a waterproofing material prior to the installation, similarly to the second part 20 as explained above.
  • a plumbing arrangement element 8 may be installed in place and connected to the first part 10, as explained earlier.
  • the second part 20 may be installed before or after the first part 10, or the two parts 10, 20 may be installed simultaneously.
  • the intermediate casings 31, 32, 33 are inserted into the initial lead-through channels for example via the second openings 21, 22, 23 of the second part 20 and secured in place to form the lead-through channels 310, 320, 330. This may be done in connection with mounting in place the second part 20 so that the second collars 210, 220, 230 are inserted into the intermediate casings 31, 32, 33 which are then retained by the second plate 200.
  • the intermediated casings may also be inserted later so that the second collars 201, 220, 230 end up outside the intermediate casings 31, 32, 33. In that case, the two parts need to be connected by suitable means.
  • Each lead-through channel 310, 320, 330 may house one pipe 70 or conductive element, or several pipes.
  • the installed lead-through element 1 may function as a fire stopping compartment. It is also possible to install additional fire-stopping and/or preventing materials and/or products within the lead-through element 1.
  • the lead-through element 1 may also provide an effective leak water guidance member, shielding the floor/ceiling structure from any water or moisture in case the pipes or pipe connections above the lead-through element 1 are compromised.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Claims (19)

  1. Elément de traversée (1) destiné à faire passer des tuyaux (70) à travers une structure de plancher (180), l'élément de traversée (1) comprenant
    - une première partie pouvant être montée sur un plancher (150) d'un premier espace (801) au-dessus de la structure de plancher (108), la première partie (10) comprenant des premières ouvertures (11, 12, 13) et
    - une deuxième partie (20) pouvant être montée sur un plafond (170) d'un deuxième espace (802) situé au-dessous de la structure de plancher (180), la deuxième partie (20) comprenant des deuxièmes ouvertures (21, 22, 23), les deuxièmes ouvertures (21, 22, 23) étant concentriques aux premières ouvertures (11, 12, 13) lorsque l'élément de traversée (1) est mis en place,
    - l'élément de traversée comprenant en plus des compartiments intermédiaires (31, 32, 33), chaque compartiment étant configuré de manière à s'étendre depuis une première ouverture (11, 12, 13) à une deuxième ouverture (21, 22, 23) à l'intérieur d'un trou circulaire configuré de façon à s'étendre du premier espace (801) au deuxième espace (802) à travers la structure de plancher (180) entre la première ouverture (11, 12, 13) et la deuxième ouverture (21, 22, 23) lorsque l'élément de traversée (1) est mis en place, les compartiments intermédiaires (31, 32, 330) étant configurés pour former des canaux de traversée (310, 320, 330) entre la première partie (10) et la deuxième partie (20), au moins un tuyau (70) étant configuré pour être passé à travers chaque canal de traversée (310, 320, 330) du premier espace (801) au deuxième espace (802), caractérisé en ce que la première partie (10) comprend une première plaque (102) comportant un côté supérieur (102a), un côté inférieur (102b) et un premier bord arrière (102d), le premier bord arrière (102d) s'étendant vers le haut, à angle droit, pour former une première bride (103) comprenant un premier côté de face (103a) et un premier côté arrière (103b) et en ce que la première partie (10) peut être montée sur le plancher (150) du premier espace (801) en faisant s'engager le côté inférieur (102b) avec le plancher (150) et en ce que la première partie (10) comprend une face (100) définie par un premier bord (100a), un deuxième bord (100b), un troisième bord (100c) et un quatrième bord (100d) et des parois latérales correspondantes (101a, 101b, 101c, 101d) s'étendant vers le bas depuis les bords respectifs (100a, 100b, 100c, 100d) vers la première plaque (102), et en ce que la face (100), les bords (100a-d) et les parois latérales (101a-d) sont configurés pour définir un support (105) servant à fixer un élément de plomberie (8) dans une position correcte et en ce que chaque première ouverture (11, 12, 13) comprend un premier collier (110, 120, 130) faisant saillie vers le haut depuis la face (100) et s'étendant dans la direction opposée vers le bas depuis la face (100).
  2. Elément de traversée (1) suivant la revendication 1, caractérisé en ce que la première partie (10) peut être connectée de façon continue à une membrane faisant barrière à l'eau du premier espace (801).
  3. Elément de traversée (1) suivant la revendication 1 ou 2, caractérisé en ce que la deuxième partie (20) est configurée pour être connectée de manière continue à une membrane faisant barrière à l'eau du deuxième espace (802) afin que l'élément de traversée (1) forme une unique connexion à membrane faisant barrière à l'eau pour les tuyaux (70).
  4. Elément de traversée (1) suivant une des revendications 1 à 3, caractérisé en ce que deux ou plusieurs tuyaux peuvent être passés à travers au moins un canal de traversée individuel (310, 320, 330).
  5. Elément de traversée (1) suivant une des revendications 1 à 4, caractérisé en ce que la première plaque (102) comprend en plus un deuxième bord arrière (102c) s'étendant vers le haut, à angle droit, pour former également la première bride (103) et en ce que l'élément de traversée (1) est destiné à être monté dans un coin du premier espace (801).
  6. Elément de traversée (1) suivant une des revendications 1 à 5, caractérisé en ce que la première partie (10) est configurée pour être montée sur la surface d'un plancher fini (170) ou directement sur la structure de plancher (180) préalablement à la finition du plancher (170).
  7. Elément de traversée (1) suivant une des revendications 1 à 6, caractérisé en ce que la deuxième partie (20) comprend une deuxième plaque (200) comportant un côté qui s'engage dans le plafond (200a), un côté externe (200b) et un troisième bord arrière (201 d), le troisième bord arrière (201d) s'étendant vers le bas, à angle droit, pour former une deuxième bride (203), la deuxième bride (203) ayant un deuxième côté face (203a) et un deuxième côté arrière (203b) et cette deuxième partie (20) peut être montée sur le plafond (170) du deuxième espace (802) en engageant le côté s'engageant dans le plafond (200a) dans le plafond (170).
  8. Elément de traversée (1) suivant la revendication 7, caractérisé en ce que la deuxième plaque (200) comprend en plus un quatrième bord arrière (201c) s'étendant vers le haut, à angle droit, pour former également la deuxième bride (203), et en ce que l'élément de traversée (1) est destiné à être monté dans un coin du premier espace (801).
  9. Elément de traversée (1) suivant une des revendications 1 à 8, caractérisé en ce que la première partie (10) et la deuxième partie (20) comprennent des orifices de montage (40) à travers lesquels la première partie (10) et la deuxième partie (20) sont configurées pour être fixées en place par des éléments de fixation.
  10. Elément de traversée (1) suivant une des revendications 1 à 9, caractérisé en ce que les parties s'étendant vers le bas des premiers colliers (110, 120, 130) s'étendent vers le bas, à l'intérieur des compartiments intermédiaires (31, 32, 33) et des canaux de traversée (310, 320, 330).
  11. Elément de traversée (1) suivant une des revendications 1 à 10, caractérisé en ce que chaque deuxième ouverture (21, 22, 23) comprend un deuxième collier (210, 220, 230) s'étendant vers le haut depuis le côté s'engageant dans le plafond (200a) de la plaque (200).
  12. Elément de traversée (1) suivant une des revendications 11, caractérisé en ce que les deuxièmes colliers (210, 220, 230) s'étendent vers le haut, à l'intérieur des compartiments intermédiaires (31, 32, 33) et des canaux de traversée (310, 320, 330).
  13. Elément de traversée (1) suivant une des revendications 1 à 12, caractérisé en ce que la première partie (10) comprend au moins un élément de support vertical (50) configuré pour porter et diriger la charge d'une installation sanitaire agencée sur un élément de plomberie (8) vers la première partie (10) et le plancher (150) d'un espace (801, 802).
  14. Elément de traversée (1) suivant une des revendications 13, caractérisé en ce que l'élément de support vertical (50) est fixé dans la face (100) de la première partie (10).
  15. Elément de traversée (1) suivant une des revendications 1 à 14, caractérisé en ce que la deuxième partie (20) comprend au moins un connecteur (60) pour aligner et fixer un élément de plomberie (8) en place en connexion avec la deuxième partie (20) en engageant des contreparties disposées dans une partie supérieure (83) de l'élément de plomberie (8).
  16. Système destiné à faire passer des tuyaux (70) à travers des structures de plancher (180) pour établir une ligne de tuyaux (70) verticale continue entre au moins deux espaces adjacents verticalement (801, 802), le système comprenant des tuyaux (70) et un élément de traversée (1) suivant une des revendications 1 à 15, ledit élément (1) permettant de passer les tuyaux (70) à travers des structures de plancher (180) pour établir une ligne de tuyaux (70) verticale continue entre au moins deux espaces adjacents verticalement (801, 802).
  17. Système suivant la revendication 16, caractérisé en ce que l'élément (1) permet de disposer les tuyaux (70) de manière qu'ils passent à l'intérieur d'un élément de plomberie (8) disposé aligné verticalement dans chaque espace (801, 802).
  18. Procédé destiné à faire passer des tuyaux (70) à travers des structures de plancher (180) via des éléments de traversée (1) suivant une des revendications 1 à 15 pour établir une ligne de tuyaux (70) verticale continue entre au moins deux espaces adjacents verticalement (801, 802), le procédé comprenant les étapes suivantes
    - établir une ligne verticale continue pour un nombre de pipelines requis, la ligne verticale s'étendant depuis l'espace le plus bas vers l'espace le plus haut dans une ligne de plomberie d'un bâtiment,
    - disposer un nombre requis de trous circulaires s'étendant depuis un premier espace (801) à un deuxième espace (802) situé au-dessous du premier espace (801) à travers une structure de plancher (180),
    - monter une première partie (10) d'un élément de traversée (1) sur le plancher (150) du premier espace de manière que les ouvertures (11, 12, 13) pratiquées dans la première partie (10) sont alignées avec les trous circulaires,
    - monter une deuxième partie (20) de l'élément de traversée (1) sur le plafond (170) du deuxième espace de manière que les ouvertures (21, 22, 23) pratiquées dans la deuxième partie (20) sont alignées avec les trous circulaires et que les premières ouvertures (11, 12, 13) et les deuxièmes ouvertures (21 ,22, 23) sont concentriques,
    - agencer des compartiments intermédiaires (31, 32, 33) de manière qu'ils s'étendent depuis les premières ouvertures (11, 12, 13) aux deuxièmes ouvertures (21, 22, 23) à l'intérieur des trous circulaires et forment des canaux de traversée (310, 320, 330) entre la première partie (10) et la deuxième partie (20), et
    - faire passer au moins un tuyau (70) depuis le premier espace (801) au deuxième espace (802) à travers chaque canal de traversée (310, 320, 330).
  19. Procédé suivant la revendication 18, caractérisé en ce que les tuyaux (70) sont agencés pour passer à l'intérieur d'un élément de plomberie (8) disposé de manière aligné verticalement dans chaque espace (801, 802).
EP16160463.2A 2016-03-15 2016-03-15 Élément de gaine Active EP3220032B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP16160463.2A EP3220032B1 (fr) 2016-03-15 2016-03-15 Élément de gaine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP16160463.2A EP3220032B1 (fr) 2016-03-15 2016-03-15 Élément de gaine

Publications (3)

Publication Number Publication Date
EP3220032A1 EP3220032A1 (fr) 2017-09-20
EP3220032C0 EP3220032C0 (fr) 2023-07-12
EP3220032B1 true EP3220032B1 (fr) 2023-07-12

Family

ID=55640534

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16160463.2A Active EP3220032B1 (fr) 2016-03-15 2016-03-15 Élément de gaine

Country Status (1)

Country Link
EP (1) EP3220032B1 (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3083554B1 (fr) 2018-07-03 2022-06-24 Vinci Construction France Procede de realisation d'une traversee de dalle de plancher
CN111502185A (zh) * 2020-04-29 2020-08-07 河南远大可持续建筑科技有限公司 一种集成楼盖的预制水暖井套管组
CN113513157A (zh) * 2021-05-10 2021-10-19 山西四建集团有限公司 一种管井大直径套管预留施工方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4261598A (en) * 1979-08-06 1981-04-14 Cornwall Kenneth R Concrete floor embedded coupling for plastic pipe
IT8182507A0 (it) * 1981-03-23 1981-03-23 Knauf Italia Telaio di supporto costituito da una serie di elementi, perl'applicazione ed il fissaggio di apparecchiature di impianti idrico-sanitari e di riscaldamento, sulle pareti con struttura metallica.
US4488388A (en) * 1982-07-07 1984-12-18 Schmidt Victor P Supporting pipe clamp
AU3391895A (en) * 1994-08-31 1996-03-22 William Herbert Hoffman Supports
US7165275B2 (en) * 2005-03-18 2007-01-23 Clark Robert D Toilet mounting assembly
US9297157B2 (en) * 2012-02-27 2016-03-29 Matthew Brian Wendorff Toilet closet flange support kit
FR3011567B1 (fr) * 2013-10-09 2016-03-25 Proditherm Batiment et procede de construction

Also Published As

Publication number Publication date
EP3220032C0 (fr) 2023-07-12
EP3220032A1 (fr) 2017-09-20

Similar Documents

Publication Publication Date Title
US4341052A (en) Building utility core
JP2020186647A (ja) 公共設備設置用の事前に組み立てられた壁パネル
EP3220032B1 (fr) Élément de gaine
KR100515761B1 (ko) 냉온수배관 시스템의 시공방법
KR101218810B1 (ko) 조립식 욕실의 설치구조
KR101798582B1 (ko) 벽체 매립형 다층식 수전함
US10627018B2 (en) Pipe mount
FI12380U1 (fi) Läpivientikappale viemäriputken viemiseksi talon välipohjan läpi
KR101219145B1 (ko) 이중배관을 포함한 욕실의 배관 시스템
EP2792802A1 (fr) Unité modulaire
RU2645315C1 (ru) Инженерный модуль и способ его монтажа
EP3399113A1 (fr) Élément de plomberie
AU2018333832A1 (en) Building units and wastewater drainage
KR20090030997A (ko) 배관 연결용 슬리브조립체
EP3219862B1 (fr) Élément d'agencement de plomberie et sa méthode d'installation
FI20205116A1 (fi) Tilaelementti
JP2000120970A (ja) 屈曲管、およびそれを使用する配管方泡並びに曲げ配管部の耐火構造
JP6626318B2 (ja) 集合住宅における配管構造
KR102104940B1 (ko) 리모델링 공동주택의 욕실 층상배관 시공방법
KR200338297Y1 (ko) 배수가 용이한 분배기
FI128158B (fi) Putkistoelementti
SE2150523A1 (en) Wall pipe penetration assembly and method for mounting the wall pipe penetration assembly
IL36036A (en) Plumbing system
Wang Co-build vertical community: A bottom up vertical community based on a modular leasing system in vacant office building
NO MIDWESTERN STATE UNIVERSITY

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180314

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200312

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230209

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230602

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016080926

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

P04 Withdrawal of opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230811

U01 Request for unitary effect filed

Effective date: 20230811

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20230817

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231013

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231012

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231112

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231013

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016080926

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

U20 Renewal fee paid [unitary effect]

Year of fee payment: 9

Effective date: 20240325

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20240415