EP2940407B1 - Heat pump hot water heater - Google Patents

Heat pump hot water heater Download PDF

Info

Publication number
EP2940407B1
EP2940407B1 EP12891024.7A EP12891024A EP2940407B1 EP 2940407 B1 EP2940407 B1 EP 2940407B1 EP 12891024 A EP12891024 A EP 12891024A EP 2940407 B1 EP2940407 B1 EP 2940407B1
Authority
EP
European Patent Office
Prior art keywords
water
heat exchanger
defrosting operation
refrigerant
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP12891024.7A
Other languages
German (de)
French (fr)
Other versions
EP2940407A1 (en
EP2940407A4 (en
Inventor
Hideo Chikami
Hiroki Ochi
Tim COESSENS
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Europe NV
Daikin Industries Ltd
Original Assignee
Daikin Europe NV
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Europe NV, Daikin Industries Ltd filed Critical Daikin Europe NV
Publication of EP2940407A1 publication Critical patent/EP2940407A1/en
Publication of EP2940407A4 publication Critical patent/EP2940407A4/en
Application granted granted Critical
Publication of EP2940407B1 publication Critical patent/EP2940407B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • F25B47/025Defrosting cycles hot gas defrosting by reversing the cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D11/00Central heating systems using heat accumulated in storage masses
    • F24D11/02Central heating systems using heat accumulated in storage masses using heat pumps
    • F24D11/0214Central heating systems using heat accumulated in storage masses using heat pumps water heating system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/0095Devices for preventing damage by freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1039Arrangement or mounting of control or safety devices for water heating systems for central heating the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/136Defrosting or de-icing; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/212Temperature of the water
    • F24H15/215Temperature of the water before heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/254Room temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/375Control of heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/375Control of heat pumps
    • F24H15/38Control of compressors of heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/02Heat pumps of the compression type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/12Heat pump
    • F24D2200/123Compression type heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/04Details of condensers
    • F25B2339/047Water-cooled condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/01Timing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2116Temperatures of a condenser
    • F25B2700/21161Temperatures of a condenser of the fluid heated by the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2117Temperatures of an evaporator
    • F25B2700/21171Temperatures of an evaporator of the fluid cooled by the evaporator

Definitions

  • the present invention relates to a heat pump hot water heater.
  • Patent Literature 1 JP 2010 - 181104 A discloses a hot water dispenser as a heat pump device equipped with a refrigerant circuit and a water circuit.
  • the refrigerant circuit is a type of circuit composed of a compressor, an outdoor heat exchanger and an indoor heat exchanger, and makes refrigerant circulate therethrough.
  • the water circuit is a type of circuit sharing the indoor heat exchanger with the refrigerant circuit, and makes water flow therethrough.
  • the refrigerant In the refrigerant circuit, the refrigerant, compressed to have high temperature in the compressor, is heat-exchanged with the water and cooled down in the indoor heat exchanger, and is reduced in pressure, and then is heat-exchanged with outdoor air and heated in the outdoor heat exchanger.
  • the water, flowing through the water circuit, is heat-exchanged with the refrigerant and heated in the indoor heat exchanger.
  • the heat pump device performs a defrosting operation for melting the frost attached to the outdoor heat exchanger.
  • the heat pump device performs a reverse cycle operation for causing the refrigerant to circulate through the refrigerant circuit in a direction opposite to that in a normal operation. Accordingly, the refrigerant, compressed to have high temperature in the compressor, flows into the outdoor heat exchanger, and the outdoor heat exchanger is defrosted.
  • EP 2 530 410 A1 discloses a heat pump which comprises a refrigerant circuit, a water circuit, a control unit, and an expansion valve.
  • the refrigerant circuit through which refrigerant is to circulate the refrigerant circuit including a first heat exchanger, a second heat exchanger and a compressor, the first heat exchanger being configured to cause heat exchange between air and the refrigerant, the second heat exchanger being configured to cause heat exchange between the refrigerant and water, the compressor being configured to compress the refrigerant.
  • the water circuit through which the water is to flow the water circuit including the second heat exchanger and a water supply mechanism, the water supply mechanism being configured to supply the water to the second heat exchanger.
  • the control unit being configured to control the refrigerant circuit and the water circuit so as to perform a defrosting operation of the first heat exchanger.
  • the expansion valve is an electric valve for regulating the flow rate and the pressure of the refrigerant circulating through the refrigerant circuit.
  • Patent Literature 1 discloses a heat pump device configured to perform the reverse cycle operation-based defrosting after heat is accumulated in the indoor heat exchanger by feeding hot water, stored in a hot water storage tank connected to the water circuit, to the indoor heat exchanger.
  • Patent Literature 2 ( WO 2006/103815 ) discloses a heat pump device having a mode for performing the reverse cycle operation-based defrosting by utilizing the heat of hot water remaining in the water circuit and a mode for performing defrosting by causing the high-temperature refrigerant discharged from the compressor in the refrigerant circuit to flow through the outdoor heat exchanger, and subsequently, by causing the refrigerant having passed through the outdoor heat exchanger to flow back to the compressor without changing the status quo of the refrigerant.
  • the aforementioned heat pump devices are required to change either the configuration of the refrigerant circuit or that of the water circuit in order to defrost the outdoor heat exchanger. Additionally, when the outdoor heat exchanger is defrosted by the reverse cycle operation of the refrigerant circuit, there is still a possibility of water freezing in the water circuit under the condition that the temperature of water in the water circuit and the temperature of outdoor air are low.
  • a heat pump hot water heater according to a first aspect of the present invention is defined in the appended claim 1.
  • the heat pump hot water heater is a heat pump device equipped with the refrigerant circuit and the water circuit that share the second heat exchanger.
  • the refrigerant at high temperature, compressed by the compressor of the refrigerant circuit is heat-exchanged with the water flowing through the water circuit in the second heat exchanger.
  • heat is transferred from the refrigerant flowing through the refrigerant circuit to the water flowing through the water circuit. Accordingly, the water flowing through the water circuit is heated, and hot water is produced.
  • the control unit is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the refrigerant circuit. In the forward cycle operation, the high-temperature refrigerant compressed by the compressor flows into the second heat exchanger.
  • the high-temperature refrigerant compressed by the compressor flows into the first heat exchanger. Chances are that frost is attached to the first heat exchanger installed in an outdoor space under conditions of low outdoor air temperature.
  • the present heat pump hot water heater is configured to perform the defrosting operation for eliminating the frost attached to the first heat exchanger.
  • the control unit is normally configured to perform the defrosting operation based on the reverse cycle operation. However, the control unit is configured to perform the defrosting operation based on the forward cycle operation when determining that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the forward cycle operation-based defrosting operation is performed by deactivating the water supply mechanism of the water circuit and by increasing the opening degree of an expansion mechanism of the refrigerant circuit.
  • heat exchange is inhibited in the second heat exchanger, and heat is accumulated in the second heat exchanger.
  • the increase in opening degree of the expansion mechanism the heat of the compressor and the second heat exchanger is transferred to the first heat exchanger via the expansion mechanism through the refrigerant. Accordingly, the first heat exchanger is heated and the frost attached to the first heat exchanger is eliminated.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation on the basis of the possibility of freezing of the water flowing through the water circuit.
  • the reverse cycle operation-based defrosting operation the high-temperature refrigerant compressed by the compressor directly flows into the first heat exchanger.
  • the frost attached to the first heat exchanger is efficiently eliminated.
  • heat exchange is performed in the second heat exchanger such that heat is transferred from the water flowing through the water circuit to the refrigerant flowing through the refrigerant circuit.
  • the temperature of the water in the water circuit is low or so forth, there is a possibility that the water in the water circuit freezes and breaks the water circuit.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation.
  • the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • a heat pump hot water heater relates to the heat pump hot water heater according to the first aspect, and wherein, when the air to be heat-exchanged in the first heat exchanger has a temperature of lower than or equal to a second temperature in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation.
  • the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • a heat pump hot water heater relates to the heat pump hot water heater according to any of the first to third aspects, and wherein, when the compressor has been deactivated for a first period of time or greater before starting the defrosting operation in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation.
  • the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • a heat pump hot water heater relates to the heat pump hot water heater according to any of the first to fourth aspects, and wherein, when the defrosting operation has been previously performed for a second period of time or less in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation.
  • the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • a heat pump hot water heater relates to the heat pump hot water heater according to any of the first to fifth aspects, and wherein, when the water flowing into the second heat exchanger has a temperature of lower than or equal to a third temperature during performing the defrosting operation based on the reverse cycle operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • the present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation during performing the reverse cycle operation-based defrosting operation.
  • the control unit is configured to determine that continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation.
  • a heat pump hot water heater relates to the heat pump hot water heater according to any of the first to fifth aspects, and wherein, when the water flowing into the second heat exchanger has a temperature of lower than or equal to a fourth temperature during performing the defrosting operation based on the reverse cycle operation, the control unit is configured to select to perform the forward cycle operation.
  • the present heat pump hot water heater is configured to select and perform either the normal operation for heating the water in the water circuit based on the forward cycle operation or the reverse cycle operation-based defrosting operation during performing the reverse cycle operation-based defrosting operation.
  • the control unit is configured to determine that continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit.
  • the present heat pump hot water heater is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based normal operation.
  • the heat pump hot water heater according to any of the first to fifth aspects of the present invention can prevent water freezing.
  • the heat pump hot water heater according to the present embodiment is a type of heater that is configured to heat water with use of a heat pump system and to heat air in an indoor space with use of the heat of the produced hot water.
  • a heat pump hot water heater 10 is mainly composed of a refrigerant circuit 20, a water circuit 30 and a control unit 40.
  • the refrigerant circuit 20 is a circuit that refrigerant circulates therethrough.
  • the water circuit 30 is a circuit that water circulates therethrough.
  • the refrigerant circuit 20 functions as a heat pump.
  • the refrigerant circuit 20 is a type of refrigerant circuit in which a first heat exchanger 21, a compressor 22, an expansion valve 23, a four-way switch valve 24 and a second heat exchanger 25 are mainly connected to each other.
  • the refrigerant circuit 20 includes a first temperature sensor 26.
  • the refrigerant circulating through the refrigerant circuit 20 is, for instance, R134a.
  • the refrigerant circuit 20 is configured to perform either a forward cycle operation or a reverse cycle operation in accordance with the circulation direction of the refrigerant.
  • FIGS. 1 and 3 are circuit configuration diagrams of the heat pump hot water heater 10 in the forward cycle operation of the refrigerant circuit 20.
  • FIG 2 is a circuit configuration diagram of the heat pump hot water heater 10 in the reverse cycle operation of the refrigerant circuit 20.
  • the flow direction of the refrigerant circulating through the refrigerant circuit 20 is indicated by arrows.
  • the forward cycle operation of the refrigerant circuit 20 is configured to be performed when the heat pump hot water heater 10 performs either a normal operation or a defrosting operation.
  • the reverse cycle operation of the refrigerant circuit 20 is performed when the heat pump hot water heater 10 performs the defrosting operation.
  • the normal operation of the heat pump hot water heater 10 is a type of operation for heating water circulating through the water circuit 30 and utilizing the produced hot water for heating.
  • the defrosting operation of the heat pump hot water heater 10 is a type of operation for eliminating frost attached to the first heat exchanger 21.
  • the refrigerant circuit 20 is capable of switching between the forward cycle operation and the reverse cycle operation.
  • the first heat exchanger 21 is a refrigerant-air heat exchanger. In the first heat exchanger 21, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and a heat source.
  • the heat source is, for instance, outdoor air and geothermal heat. In the present embodiment, the heat source is outdoor air.
  • the first heat exchanger 21 is, for instance, a plate fin coil heat exchanger.
  • a fan 21 a is installed in the vicinity of the first heat exchanger 21. The fan 21a is configured to feed outdoor air to the first heat exchanger 21 and discharge the outdoor air that is heat-exchanged with the refrigerant in the first heat exchanger 21.
  • the first heat exchanger 21 is an outdoor heat exchanger designed to be installed in an outdoor space.
  • the compressor 22 is a type of compressor that is configured to suck and compress the refrigerant at low pressure that flows in the refrigerant circuit 20 and discharge the refrigerant at high temperature and high pressure.
  • the compressor 22 is, for instance, a rotary compressor.
  • the expansion valve 23 is an electric valve for regulating the flow rate and the pressure of the refrigerant circulating through the refrigerant circuit 20.
  • the four-way switch valve 24 is a type of switch valve configured to switch between the forward cycle operation and the reverse cycle operation so as to reverse the direction of the refrigerant circulating through the refrigerant circuit 20.
  • the four-way switch valve 24 has a first port 24a, a second port 24b, a third port 24c and a fourth port 24d.
  • the four-way switch valve 24 is set in either a first communication state or a second communication state. As shown in FIGS. 1 and 3 , in the first communication state, the first port 24a and the second port 24b communicate with each other, and simultaneously, the third port 24c and the fourth port 24d communicate with each other. As shown in FIG.
  • the first port 24a and the third port 24c communicate with each other, and simultaneously, the second port 24b and the fourth port 24d communicate with each other.
  • the four-way switch valve 24 is set in the first communication state.
  • the four-way switch valve 24 is set in the second communication state.
  • the second heat exchanger 25 is a water-refrigerant heat exchanger. In the second heat exchanger 25, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and the water circulating through the water circuit 30. The refrigerant circuit 20 and the water circuit 30 share the second heat exchanger 25.
  • the second heat exchanger 25 has a refrigerant heat exchange part 25a that the refrigerant circulating through the refrigerant circuit 20 passes therethrough and a water heat exchange part 25b that the water circulating through the water circuit 30 passes therethrough.
  • the second heat exchanger 25 is a tornado heat exchanger having a construction that a refrigerant pipe as the refrigerant heat exchange part 25a is helically wound about the outer periphery of a water pipe as the water heat exchange part 25b, and additionally, the water pipe has grooves in the inside thereof.
  • the second heat exchanger 25 is an indoor heat exchanger designed to be installed in a space as a heating target.
  • the first temperature sensor 26 is a type of sensor configured to measure the temperature of the outdoor air to be heat-exchanged in the first heat exchanger 21.
  • the first temperature sensor 26 is configured to measure the temperature of the outdoor air to be fed to the first heat exchanger 21 by the fan 21a or the temperature of the air in the outdoor space that the first heat exchanger 21 is installed.
  • the first temperature sensor 26 is attached to the first heat exchanger 21.
  • the discharge side of the compressor 22 is connected to the first port 24a of the four-way switch valve 24.
  • the second port 24b of the four-way switch valve 24 is connected to the refrigerant heat exchange part 25a of the second heat exchanger 25.
  • the refrigerant heat exchange part 25a of the second heat exchanger 25 is connected to the expansion valve 23.
  • the expansion valve 23 is connected to the first heat exchanger 21.
  • the first heat exchanger 21 is connected to the third port 24c of the four-way switch valve 24.
  • the fourth port 24d of the four-way switch valve 24 is connected to the intake side of the compressor 22.
  • the forward cycle operation is configured to be performed when the heat pump hot water heater 10 performs the normal operation.
  • the refrigerant in a gaseous state at low pressure is sucked into the compressor 22 and is compressed therein.
  • the compressed refrigerant is discharged from the compressor 22 in a gaseous state at high temperature and high pressure, and is fed to the second heat exchanger 25 via the first and second ports 24a and 24b of the four-way switch valve 24.
  • the refrigerant passes through the refrigerant heat exchange part 25a, whereas the water passes through the water heat exchange part 25b.
  • the refrigerant in a gaseous state at high temperature and high pressure is condensed and changed into a liquid state at high pressure. Then, the refrigerant is reduced in pressure when passing through the expansion valve 23, and is changed into a gas-liquid two phase state at low pressure.
  • the refrigerant in the gas-liquid two phase state at low pressure evaporates in the first heat exchanger 21 as a result of heat exchange with the outdoor air, and is changed into a gaseous state at low pressure.
  • the refrigerant circuit 20, performing the forward cycle operation is configured to supply the heat of the outdoor air through the refrigerant to the water circulating through the water circuit 30 by repeating the aforementioned processing steps.
  • the refrigerant circuit 20 is configured to perform either the forward cycle operation or the reverse cycle operation when the heat pump hot water heater 10 performs the defrosting operation. An action of the refrigerant circuit 20 in the reverse cycle operation will be described below.
  • the water circuit 30 is a type of circuit in which the second heat exchanger 25, a water supply pump 31, a hot water storage tank 32 and a heating unit 33 are mainly connected to each other.
  • the water circuit 30 includes a second temperature sensor 34. Water circulates the water circuit 30. In the water circuit 30, the water circulates through the water supply pump 31, the second heat exchanger 25, the hot water storage tank 32, the heating unit 33 and back to the water supply pump 31 in this order. In FIGS. 1 and 2 , the direction of the water circulating through the water circuit 30 is indicated by arrows.
  • the water supply pump 31 is a type of pump configured to feed the water circulating through the water circuit 30 to the water heat exchange part 25b of the second heat exchanger 25.
  • the second heat exchanger 25 is a water-refrigerant heat exchanger. As described above, in the second heat exchanger 25, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and the water circulating through the water circuit 30. The water passes through the water heat exchange part 25b so as to be heat-exchanged in the second heat exchanger 25.
  • the inlet of the water heat exchange part 25b is connected to the water supply pump 31 through a pipe.
  • the outlet of the water heat exchange part 25b is connected to the hot water storage tank 32 through a pipe.
  • the hot water storage tank 32 is a type of tank for storing the water heated in the second heat exchanger 25.
  • the hot water stored in the hot water storage tank 32 is fed to the heating unit 33.
  • the hot water storage tank 32 may be provided with a keep-warm heater for keeping the warmth of the hot water stored therein.
  • the heating unit 33 is installed in a space to be heated by the normal operation of the heat pump hot water heater 10.
  • the heating unit 33 is a floor heating panel to be mounted to the floor surface of a room.
  • the heating unit 33 has a heating pipe 33a that the hot water heated in the second heat exchanger 25 flows therethrough.
  • the second temperature sensor 34 is a type of sensor configured to measure the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25.
  • the second temperature sensor 34 is attached to the pipe in the vicinity of the inlet of the water heat exchange part 25b.
  • the water is fed to the second heat exchanger 25 by the water supply pump 31.
  • the second heat exchanger 25 heat exchange is performed between the refrigerant and the water by thermal transference from the refrigerant at high temperature to the water at low temperature. Accordingly, the water is heated in the second heat exchanger 25.
  • the water heated in the second heat exchanger 25 is fed to the hot water storage tank 32 as hot water.
  • the hot water stored in the hot water storage tank 32 is supplied to the heating unit 33.
  • the heating unit 33 the hot water, flowing through the inside of the heating pipe 33a, heats the air in the space in which the heating unit 33 is installed.
  • the water, reduced in temperature after passing through the heating pipe 33a is fed to the water supply pump 31.
  • the control unit 40 is a computer for controlling the respective constituent elements of the heat pump hot water heater 10.
  • the control unit 40 is connected to the compressor 22, the expansion valve 23, the four-way switch valve 24, the first temperature sensor 26, the water supply pump 31, the heating unit 33 and the second temperature sensor 34.
  • the control unit 40 is installed in an electric component unit (not shown in the drawings) disposed inside the heat pump hot water heater 10.
  • the control unit 40 is capable of activating and deactivating the compressor 22 by regulating the operating frequency of the compressor 22.
  • the control unit 40 is capable of controlling the flow rate of the refrigerant passing through the expansion valve 23 by regulating the opening degree of the expansion valve 23.
  • the control unit 40 is capable of activating and deactivating the water supply pump 31 by controlling the rotational speed of the water supply pump 31.
  • the control unit 40 is capable of regulating the temperature of the space in which the heating unit 33 is installed by regulating the flow rate of the hot water to be fed to the heating unit 33.
  • the control unit 40 is capable of switching between the first communication state and the second communication state by controlling the four-way switch valve 24. Put differently, the control unit 40 is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the four-way switch valve 24.
  • the control unit 40 is capable of receiving the temperature measured by the first temperature sensor 26 of the refrigerant circuit 20, i.e., the temperature of the air to be heat-exchanged in the first heat exchanger 21.
  • the control unit 40 is capable of receiving the temperature measured by the second temperature sensor 34 of the water circuit 30, i.e., the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25.
  • control unit 40 stores information regarding the operation of the heat pump hot water heater 10.
  • control unit 40 is configured to monitor and store activation timing of the compressor 22 and deactivation timing of the compressor 22. Accordingly, the control unit 40 is capable of calculating, for instance, duration of deactivation of the compressor 22, duration of the normal operation performed by the heat pump hot water heater 10, and duration of the defrosting operation performed by the heat pump hot water heater 10.
  • FIG 1 is a circuit configuration diagram of the heat pump hot water heater 10 performing the normal operation.
  • the refrigerant circuit 20 is configured to perform the forward cycle operation.
  • the four-way switch valve 24 of the refrigerant circuit 20 is herein set in the first communication state.
  • the water circuit 30 the water is fed to the second heat exchanger 25 by the water supply pump 31 and is heated in the second heat exchanger 25. Then, hot water is fed to the hot water storage tank 32 and the heating unit 33.
  • heat exchange which is thermal transference from the outdoor air to the refrigerant, is performed in the first heat exchanger 21 of the refrigerant circuit 20.
  • the heat of the outdoor air to be blown by the fan 21a is deprived in the first heat exchanger 21. Due to this, chances are that frost is attached to the first heat exchanger 21 under some conditions of low outdoor air temperature such as cold weather places and the winter season.
  • frost is attached to the first heat exchanger 21, in comparison with a condition that frost is not attached to the first heat exchanger 21, heat exchange efficiency is degraded in the first heat exchanger 21 and then operating efficiency is degraded in the heat pump hot water heater 10.
  • the heat pump hot water heater 10 is required to regularly perform the defrosting operation of eliminating the frost attached to the first heat exchanger 21.
  • the defrosting operation of the heat pump hot water heater 10 is performed by melting the frost attached to the first heat exchanger 21 with heat.
  • the heat pump hot water heater 10 In performing the defrosting operation, the heat pump hot water heater 10 is configured to perform it either in the reverse cycle operation of the refrigerant circuit 20 or in the forward cycle operation of the refrigerant circuit 20.
  • FIG 2 is a circuit configuration diagram of the heat pump hot water heater 10 performing the reverse cycle operation-based defrosting operation.
  • FIG 3 is a circuit configuration diagram of the heat pump hot water heater 10 performing the forward cycle operation-based defrosting operation.
  • the direction of the refrigerant circulating through the refrigerant circuit 20 in the reverse cycle operation is opposite to that of the refrigerant circulating through the refrigerant circuit 20 in the forward cycle operation.
  • the refrigerant in the refrigerant circuit 20 passes and circulates through the compressor 22, the four-way switch valve 24 (the first port 24a and the third port 24c), the first heat exchanger 21, the expansion valve 23, the second heat exchanger 25, the four-way switch valve 24 (the second port 24b and the fourth port 24d) and back to the compressor 22 in this order.
  • the control unit 40 deactivates the compressor 22 by zeroing the rotational speed of the compressor 22.
  • the normal operation is terminated by the deactivation of the compressor 22.
  • the control unit 40 switches the four-way switch valve 24 from the first communication state into the second communication state.
  • the control unit 40 starts an operation of the compressor 22 by increasing the rotational speed of the compressor 22 from zero.
  • the defrosting operation of the heat pump hot water heater 10 is started by the activation of the compressor 22. In the defrosting operation, the refrigerant at high temperature, discharged from the compressor 22, flows into the first heat exchanger 21.
  • the heat accumulated in the second heat exchanger 25 in the normal operation is supplied to the first heat exchanger 21 through the refrigerant circulating through the refrigerant circuit 20. Accordingly, frost attached to the first heat exchanger 21 melts, and thus, the first heat exchanger 21 is defrosted.
  • the water supply pump 31 of the water circuit 30 is being operated in the reverse cycle operation-based defrosting operation.
  • the control unit 40 deactivates the water supply pump 31 by zeroing the rotational speed of the water supply pump 31. Water supply to the second heat exchanger 25 is stopped by the deactivation of the water supply pump 31.
  • the control unit 40 increases the opening degree of the expansion valve 23. Additionally, the control unit 40 maintains the four-way switch valve 24 in the first communication state. Put differently, similarly to the normal operation, the refrigerant at high temperature, discharged from the compressor 22, is supplied to the second heat exchanger 25 in the forward cycle operation-based defrosting operation.
  • the water is not passing through the water heat exchange part 25b, and thus, heat exchange between the refrigerant and the water is inhibited in the second heat exchanger 25. Due to this, the heat of the refrigerant at high temperature supplied from the compressor 22 is accumulated in the second heat exchanger 25. As a result, the temperature of the second heat exchanger 25 is increased. Additionally, the temperature of the compressor 22 is also increased by the operation of the compressor 22. The heat accumulated in the compressor 22 and the second heat exchanger 25 is supplied to the first heat exchanger 21 via the expansion valve 23 through the refrigerant circulating through the refrigerant circuit 20. Accordingly, frost attached to the first heat exchanger 21 melts, and thus, the first heat exchanger 21 is defrosted.
  • control unit 40 is configured to determine a possibility of water freezing in the water circuit 30 and select to perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to perform the forward cycle operation-based defrosting operation when determining that the water circuit 30 has a possibility of water freezing.
  • the control unit 40 is configured to perform the reverse cycle operation-based defrosting operation when determining that the water circuit 30 has no possibility of water freezing.
  • the control unit 40 determines the possibility of water freezing in the water circuit 30 at least either in the timing of terminating the normal operation and starting the defrosting operation or during performing the reverse cycle operation-based defrosting operation.
  • FIG. 4 is a flowchart showing a routine that the control unit 40 determines the possibility of water freezing in the water circuit 30 in the timing of terminating the normal operation and starting the defrosting operation.
  • the routine is composed of Steps S11 to S15.
  • Step S11 the control unit 40 terminates the normal operation.
  • Step S12 the control unit 40 determines the possibility of water freezing in the water circuit 30.
  • Step S13 When determining that the water circuit 30 has the possibility of water freezing, the control unit 40 performs processing in Step S13.
  • the control unit 40 performs processing in Step S14.
  • Step S13 the control unit 40 starts the forward cycle operation-based defrosting operation.
  • Step S14 the control unit 40 starts the reverse cycle operation-based defrosting operation.
  • Step S15 the control unit 40 terminates the defrosting operation.
  • FIG. 5 is a flowchart showing a routine that the control unit 40 determines the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation.
  • the routine is composed of Steps S21 to S25.
  • Step S21 the control unit 40 terminates the normal operation.
  • Step S22 the control unit 40 starts the reverse cycle operation-based defrosting operation.
  • Step S23 the control unit 40 determines the possibility of water freezing in the water circuit 30.
  • the control unit 40 performs processing in Step S24.
  • the control unit 40 continues the reverse cycle operation-based defrosting operation.
  • Step S24 the control unit 40 terminates the reverse cycle operation-based defrosting operation and starts the forward cycle operation-based defrosting operation.
  • Step S25 the control unit 40 terminates the defrosting operation.
  • control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of any one of six determination criteria to be explained below. Next, the respective determination criteria will be explained.
  • the control unit 40 determines the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation.
  • the control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30.
  • the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then, start the forward cycle operation-based defrosting operation.
  • control unit 40 When the temperature of the water flowing into the water heat exchange part 25b is higher than the predetermined temperature, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then, start the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation.
  • the control unit 40 is configured to obtain the temperature of the air to be heat-exchanged in the first heat exchanger 21 from the first temperature sensor 26 of the refrigerant circuit 20.
  • the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation.
  • control unit 40 When the temperature of the air to be heat-exchanged in the first heat exchanger 21 is higher than the predetermined temperature, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation.
  • the control unit 40 is configured to obtain information regarding the operation of the compressor 22 of the refrigerant circuit 20.
  • the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation.
  • control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation.
  • the control unit 40 is configured to obtain information regarding the defrosting operation of the heat pump hot water heater 10.
  • the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation after terminating the normal operation.
  • the control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30.
  • the control unit 40 is configured to deactivate the water supply pump 31 of the water circuit 30, switch the four-way switch valve 24 from the second communication state into the first communication state, and then start the forward cycle operation-based defrosting operation.
  • the control unit 40 continues the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation after terminating the normal operation.
  • the control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30.
  • the control unit 40 is configured to switch the four-way switch valve 24 from the second communication state into the first communication state in order to terminate the defrosting operation, and then start a forward cycle operation-based normal operation.
  • the control unit 40 continues the reverse cycle operation-based defrosting operation.
  • the present heat pump hot water heater 10 is a heat pump device equipped with the refrigerant circuit 20 and the water circuit 30 that share the second heat exchanger 25.
  • the refrigerant at high temperature, compressed by the compressor 22 of the refrigerant circuit 20, is heat-exchanged with the water flowing through the water circuit 30 in the second heat exchanger 25.
  • heat is transferred from the refrigerant flowing through the refrigerant heat exchange part 25a to the water flowing through the water heat exchange part 25b. Accordingly, the water flowing through the water circuit 30 is heated, and hot water is produced.
  • the hot water herein produced is temporarily stored in the hot water storage tank 32, and is utilized for heating of the indoor space by the heating unit 33.
  • the control unit 40 is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the four-way switch valve 24 of the refrigerant circuit 20. Chances are that frost is attached to the first heat exchanger 21 under conditions of low outdoor air temperature.
  • the heat pump hot water heater 10 is capable of performing the defrosting operation for eliminating the frost attached to the first heat exchanger 21.
  • the control unit 40 is normally configured to perform the reverse cycle operation-based defrosting operation. However, the control unit 40 is configured to perform the forward cycle operation-based defrosting operation when determining that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30.
  • the forward cycle operation-based defrosting operation is performed by deactivating the water supply pump 31 of the water circuit 30 and by increasing the opening degree of the expansion valve 23 of the refrigerant circuit 20.
  • heat exchange is inhibited in the second heat exchanger 25, and heat is accumulated in the second heat exchanger 25.
  • the increase in opening degree of the expansion valve 23 the heat accumulated in the compressor 22 and the second heat exchanger 25 is transferred to the first heat exchanger 21 via the expansion valve 23 through the refrigerant. Accordingly, the first heat exchanger 21 is heated and the frost attached to the first heat exchanger 21 is eliminated.
  • the present heat pump hot water heater 10 is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation on the basis of the possibility of freezing of the water flowing through the water circuit 30.
  • the refrigerant at high temperature compressed by the compressor 22 directly flows into the first heat exchanger 21.
  • the frost attached to the first heat exchanger 21 is efficiently eliminated.
  • heat exchange is performed in the second heat exchanger 25 such that heat is transferred from the water flowing through the water circuit 30 to the refrigerant flowing through the refrigerant circuit 20.
  • the temperature of the water flowing into the second heat exchanger 25 is low, the temperature of the water to be heat-exchanged in the second heat exchanger 25 falls and this could result in water freezing.
  • freezing water increases in volume.
  • the control unit 40 of the heat pump hot water heater 10 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of the first to sixth determination criteria and is configured to select to perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the first determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30.
  • the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the second determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30.
  • the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the third determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30.
  • the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the fourth determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30.
  • the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the fifth determination criterion, continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30.
  • the heat pump hot water heater 10 is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation.
  • the control unit 40 is configured to determine that, based on the sixth determination criterion, continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30.
  • the heat pump hot water heater 10 is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based normal operation.
  • the temperature of the water flowing into the second heat exchanger 25 does not fall. Hence, the possibility of water freezing in the water circuit 30 is low.
  • the temperature of the first heat exchanger 21 does not easily rise until a sufficient amount of heat is accumulated in the second heat exchanger 25. Hence, a longer time will be required for defrosting the first heat exchanger 21. Due to the above, when performing only the forward cycle operation-based defrosting operation, the heat pump hot water heater 10 degrades in average heating performance. On the other hand, when performing only the reverse cycle operation-based defrosting operation, the heat pump hot water heater 10 has the possibility of water freezing in the water circuit 30.
  • the heat pump hot water heater 10 is configured to select to perform either the reverse cycle operation-based defrosting operation or the forward cycle operation-based defrosting operation in accordance with the possibility of water freezing in the water circuit 30. Accordingly, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 and is also capable of reliably achieving required average heating performance.
  • control unit 40 of the heat pump hot water heater 10 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of any one of the first to sixth determination criteria.
  • control unit 40 may be configured to select two or more of the first to sixth determination criteria and determine the possibility of water freezing in the water circuit 30 on the basis of combination of the selected determination criteria.
  • the heat pump hot water heater 10 may be configured to start the defrosting operation on the basis of the first and second determination criteria.
  • the control unit 40 may be configured to start the forward cycle operation-based defrosting operation when either of the following conditions is fulfilled: that the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to a predetermined temperature; and that the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to another predetermined temperature.
  • control unit 40 may be configured to start the forward cycle operation-based defrosting operation when the both of the following conditions are fulfilled: that the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to the predetermined temperature; and that the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to the another predetermined temperature.
  • the heat pump hot water heater 10 may be configured to start the defrosting operation on the basis of the first determination criterion. Moreover, during performing the reverse cycle operation-based defrosting operation, the heat pump hot water heater 10 may be configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation on the basis of the fifth determination criterion.
  • the heat pump hot water heater 10 may be configured to terminate the forward cycle operation-based defrosting operation and start the reverse cycle operation-based defrosting operation.
  • control unit 40 may be configured to start the reverse cycle operation-based defrosting operation on the basis of the fifth determination criterion. Specifically, when the temperature of the water flowing into the water heat exchange part 25b is higher than a predetermined temperature during performing the forward cycle operation-based defrosting operation, the control unit 40 may be configured to start the reverse cycle operation-based defrosting operation by activating the water supply pump 31 of the water circuit 30 and switching the four-way switch valve 24 from the first communication state into the second communication state. When the temperature of the water flowing into the water heat exchange part 25b is herein lower than or equal to the predetermined temperature, the control unit 40 is configured to continue the forward cycle operation-based defrosting operation.
  • control unit 40 when the forward cycle operation-based defrosting operation has been performed for more than a predetermined period of time, the control unit 40 may be configured to determine that the possibility of water freezing in the water circuit 30 becomes zero and to start the reverse cycle operation-based defrosting operation by activating the water supply pump 31 of the water circuit 30 and switching the four-way switch valve 24 from the first communication state into the second communication state.
  • the heat pump hot water heater according to the present invention is capable of preventing water freezing.

Description

    TEHCNICAL FIELD
  • The present invention relates to a heat pump hot water heater.
  • BACKGROUND ART
  • A hot water dispenser, a hot water heater and so forth, in which a heat pump system is utilized, have been conventionally used. For example, Patent Literature 1 ( JP 2010 - 181104 A ) discloses a hot water dispenser as a heat pump device equipped with a refrigerant circuit and a water circuit. The refrigerant circuit is a type of circuit composed of a compressor, an outdoor heat exchanger and an indoor heat exchanger, and makes refrigerant circulate therethrough. The water circuit is a type of circuit sharing the indoor heat exchanger with the refrigerant circuit, and makes water flow therethrough. In the refrigerant circuit, the refrigerant, compressed to have high temperature in the compressor, is heat-exchanged with the water and cooled down in the indoor heat exchanger, and is reduced in pressure, and then is heat-exchanged with outdoor air and heated in the outdoor heat exchanger. The water, flowing through the water circuit, is heat-exchanged with the refrigerant and heated in the indoor heat exchanger.
  • In a heat pump device equipped with the outdoor heat exchanger in which the outdoor air and the refrigerant are heat-exchanged as with the aforementioned hot water dispenser, there is a possibility that when the temperature of the outdoor air is low, frost is attached to the outdoor heat exchanger and this results in degradation in operating efficiency. In this case, the heat pump device performs a defrosting operation for melting the frost attached to the outdoor heat exchanger. For example, the heat pump device performs a reverse cycle operation for causing the refrigerant to circulate through the refrigerant circuit in a direction opposite to that in a normal operation. Accordingly, the refrigerant, compressed to have high temperature in the compressor, flows into the outdoor heat exchanger, and the outdoor heat exchanger is defrosted.
  • EP 2 530 410 A1 discloses a heat pump which comprises a refrigerant circuit, a water circuit, a control unit, and an expansion valve. The refrigerant circuit through which refrigerant is to circulate, the refrigerant circuit including a first heat exchanger, a second heat exchanger and a compressor, the first heat exchanger being configured to cause heat exchange between air and the refrigerant, the second heat exchanger being configured to cause heat exchange between the refrigerant and water, the compressor being configured to compress the refrigerant. The water circuit through which the water is to flow, the water circuit including the second heat exchanger and a water supply mechanism, the water supply mechanism being configured to supply the water to the second heat exchanger. The control unit being configured to control the refrigerant circuit and the water circuit so as to perform a defrosting operation of the first heat exchanger. The expansion valve is an electric valve for regulating the flow rate and the pressure of the refrigerant circulating through the refrigerant circuit.
  • SUMMARY OF THE INVENTION <Technical Problem>
  • However, there is a possibility that the water freezes in the water circuit when the reverse cycle operation-based defrosting is performed for a long period of time under the condition that the temperature of outdoor air is low. A type of heat pump device has been known that is configured to defrost the outdoor heat exchanger by utilizing the heat of hot water remaining in the water circuit in order to prevent water freezing. For example, Patent Literature 1 discloses a heat pump device configured to perform the reverse cycle operation-based defrosting after heat is accumulated in the indoor heat exchanger by feeding hot water, stored in a hot water storage tank connected to the water circuit, to the indoor heat exchanger. On the other hand, Patent Literature 2 ( WO 2006/103815 ) discloses a heat pump device having a mode for performing the reverse cycle operation-based defrosting by utilizing the heat of hot water remaining in the water circuit and a mode for performing defrosting by causing the high-temperature refrigerant discharged from the compressor in the refrigerant circuit to flow through the outdoor heat exchanger, and subsequently, by causing the refrigerant having passed through the outdoor heat exchanger to flow back to the compressor without changing the status quo of the refrigerant.
  • However, the aforementioned heat pump devices are required to change either the configuration of the refrigerant circuit or that of the water circuit in order to defrost the outdoor heat exchanger. Additionally, when the outdoor heat exchanger is defrosted by the reverse cycle operation of the refrigerant circuit, there is still a possibility of water freezing in the water circuit under the condition that the temperature of water in the water circuit and the temperature of outdoor air are low.
  • It is an object of the present invention to provide a heat pump hot water heater that is capable of preventing water freezing.
  • <Solution to Problem>
  • A heat pump hot water heater according to a first aspect of the present invention is defined in the appended claim 1.
  • The heat pump hot water heater is a heat pump device equipped with the refrigerant circuit and the water circuit that share the second heat exchanger. The refrigerant at high temperature, compressed by the compressor of the refrigerant circuit, is heat-exchanged with the water flowing through the water circuit in the second heat exchanger. In the second heat exchanger, heat is transferred from the refrigerant flowing through the refrigerant circuit to the water flowing through the water circuit. Accordingly, the water flowing through the water circuit is heated, and hot water is produced. The control unit is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the refrigerant circuit. In the forward cycle operation, the high-temperature refrigerant compressed by the compressor flows into the second heat exchanger. In the reverse cycle operation, the high-temperature refrigerant compressed by the compressor flows into the first heat exchanger. Chances are that frost is attached to the first heat exchanger installed in an outdoor space under conditions of low outdoor air temperature. The present heat pump hot water heater is configured to perform the defrosting operation for eliminating the frost attached to the first heat exchanger. The control unit is normally configured to perform the defrosting operation based on the reverse cycle operation. However, the control unit is configured to perform the defrosting operation based on the forward cycle operation when determining that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. The forward cycle operation-based defrosting operation is performed by deactivating the water supply mechanism of the water circuit and by increasing the opening degree of an expansion mechanism of the refrigerant circuit. With the deactivation of the water supply mechanism, heat exchange is inhibited in the second heat exchanger, and heat is accumulated in the second heat exchanger. With the increase in opening degree of the expansion mechanism, the heat of the compressor and the second heat exchanger is transferred to the first heat exchanger via the expansion mechanism through the refrigerant. Accordingly, the first heat exchanger is heated and the frost attached to the first heat exchanger is eliminated.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation on the basis of the possibility of freezing of the water flowing through the water circuit. In the reverse cycle operation-based defrosting operation, the high-temperature refrigerant compressed by the compressor directly flows into the first heat exchanger. Thus, the frost attached to the first heat exchanger is efficiently eliminated. However, heat exchange is performed in the second heat exchanger such that heat is transferred from the water flowing through the water circuit to the refrigerant flowing through the refrigerant circuit. Thus, when the temperature of the water in the water circuit is low or so forth, there is a possibility that the water in the water circuit freezes and breaks the water circuit. On the other hand, in the forward cycle operation-based defrosting operation, while heat exchange is inhibited in the second heat exchanger, the frost attached to the first heat exchanger is eliminated by the heat of the compressor and the second heat exchanger. Hence, in the forward cycle operation-based defrosting operation, there is no possibility of water freezing in the water circuit. Consequently, the present heat pump hot water heater can prevent water freezing in the defrosting operation.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation. When the temperature of the water flowing into the second heat exchanger is lower than or equal to a predetermined temperature, the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • A heat pump hot water heater according to a second aspect of the present invention relates to the heat pump hot water heater according to the first aspect, and wherein, when the air to be heat-exchanged in the first heat exchanger has a temperature of lower than or equal to a second temperature in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation. When the temperature of the air to be heat-exchanged in the first heat exchanger is lower than or equal to a predetermined temperature, the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • A heat pump hot water heater according to a third aspect of the present invention relates to the heat pump hot water heater according to any of the first to third aspects, and wherein, when the compressor has been deactivated for a first period of time or greater before starting the defrosting operation in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation. When the normal operation for heating the water in the water circuit based on the forward cycle operation has been deactivated for a predetermined period of time or greater in starting the defrosting operation, the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • A heat pump hot water heater according to a fourth aspect of the present invention relates to the heat pump hot water heater according to any of the first to fourth aspects, and wherein, when the defrosting operation has been previously performed for a second period of time or less in starting the defrosting operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation in starting the defrosting operation. When the defrosting operation has been previously performed for a predetermined period of time or less, the control unit is configured to determine that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to start the forward cycle operation-based defrosting operation.
  • A heat pump hot water heater according to a fifth aspect of the present invention relates to the heat pump hot water heater according to any of the first to fifth aspects, and wherein, when the water flowing into the second heat exchanger has a temperature of lower than or equal to a third temperature during performing the defrosting operation based on the reverse cycle operation, the control unit is configured to select to perform the forward cycle operation and deactivate the water supply mechanism.
  • The present heat pump hot water heater is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation during performing the reverse cycle operation-based defrosting operation. When the temperature of the water flowing into the second heat exchanger is lower than or equal to a predetermined temperature during performing the reverse cycle operation-based defrosting operation, the control unit is configured to determine that continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation.
  • A heat pump hot water heater according to a reference example of the present invention relates to the heat pump hot water heater according to any of the first to fifth aspects, and wherein, when the water flowing into the second heat exchanger has a temperature of lower than or equal to a fourth temperature during performing the defrosting operation based on the reverse cycle operation, the control unit is configured to select to perform the forward cycle operation.
  • The present heat pump hot water heater is configured to select and perform either the normal operation for heating the water in the water circuit based on the forward cycle operation or the reverse cycle operation-based defrosting operation during performing the reverse cycle operation-based defrosting operation. When the temperature of the water flowing into the second heat exchanger is lower than or equal to a predetermined temperature during performing the reverse cycle operation-based defrosting operation, the control unit is configured to determine that continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit. In this case, the present heat pump hot water heater is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based normal operation.
  • <Advantageous Effects of Invention>
  • The heat pump hot water heater according to any of the first to fifth aspects of the present invention can prevent water freezing.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • FIG. 1 is a circuit configuration diagram of a heat pump hot water heater in a normal operation.
    • FIG. 2 is a circuit configuration diagram of the heat pump hot water heater in a reverse cycle operation-based defrosting operation.
    • FIG. 3 is a circuit configuration diagram of the heat pump hot water heater in a forward cycle operation-based defrosting operation.
    • FIG. 4 is a flowchart showing a routine for determining a possibility of water freezing in a water circuit when the defrosting operation is started after terminating the normal operation.
    • FIG. 5 is a flowchart showing a routine for determining the possibility of water freezing in the water circuit when the reverse cycle operation-based defrosting operation is performed.
    DESCRIPTION OF EMBODIMENTS
  • A heat pump hot water heater according to an embodiment of the present invention will be explained with reference to drawings. The heat pump hot water heater according to the present embodiment is a type of heater that is configured to heat water with use of a heat pump system and to heat air in an indoor space with use of the heat of the produced hot water.
  • (1) Construction of Heat Pump Hot Water Heater
  • A heat pump hot water heater 10 according to the present embodiment is mainly composed of a refrigerant circuit 20, a water circuit 30 and a control unit 40. The refrigerant circuit 20 is a circuit that refrigerant circulates therethrough. The water circuit 30 is a circuit that water circulates therethrough. The refrigerant circuit 20 functions as a heat pump.
  • (1-1) Refrigerant Circuit
  • The refrigerant circuit 20 is a type of refrigerant circuit in which a first heat exchanger 21, a compressor 22, an expansion valve 23, a four-way switch valve 24 and a second heat exchanger 25 are mainly connected to each other. The refrigerant circuit 20 includes a first temperature sensor 26. The refrigerant circulating through the refrigerant circuit 20 is, for instance, R134a.
  • The refrigerant circuit 20 is configured to perform either a forward cycle operation or a reverse cycle operation in accordance with the circulation direction of the refrigerant. FIGS. 1 and 3 are circuit configuration diagrams of the heat pump hot water heater 10 in the forward cycle operation of the refrigerant circuit 20. FIG 2 is a circuit configuration diagram of the heat pump hot water heater 10 in the reverse cycle operation of the refrigerant circuit 20. In FIGS. 1 to 3, the flow direction of the refrigerant circulating through the refrigerant circuit 20 is indicated by arrows. The forward cycle operation of the refrigerant circuit 20 is configured to be performed when the heat pump hot water heater 10 performs either a normal operation or a defrosting operation. The reverse cycle operation of the refrigerant circuit 20 is performed when the heat pump hot water heater 10 performs the defrosting operation. The normal operation of the heat pump hot water heater 10 is a type of operation for heating water circulating through the water circuit 30 and utilizing the produced hot water for heating. The defrosting operation of the heat pump hot water heater 10 is a type of operation for eliminating frost attached to the first heat exchanger 21. The refrigerant circuit 20 is capable of switching between the forward cycle operation and the reverse cycle operation.
  • The first heat exchanger 21 is a refrigerant-air heat exchanger. In the first heat exchanger 21, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and a heat source. The heat source is, for instance, outdoor air and geothermal heat. In the present embodiment, the heat source is outdoor air. The first heat exchanger 21 is, for instance, a plate fin coil heat exchanger. A fan 21 a is installed in the vicinity of the first heat exchanger 21. The fan 21a is configured to feed outdoor air to the first heat exchanger 21 and discharge the outdoor air that is heat-exchanged with the refrigerant in the first heat exchanger 21. The first heat exchanger 21 is an outdoor heat exchanger designed to be installed in an outdoor space.
  • The compressor 22 is a type of compressor that is configured to suck and compress the refrigerant at low pressure that flows in the refrigerant circuit 20 and discharge the refrigerant at high temperature and high pressure. The compressor 22 is, for instance, a rotary compressor.
  • The expansion valve 23 is an electric valve for regulating the flow rate and the pressure of the refrigerant circulating through the refrigerant circuit 20.
  • The four-way switch valve 24 is a type of switch valve configured to switch between the forward cycle operation and the reverse cycle operation so as to reverse the direction of the refrigerant circulating through the refrigerant circuit 20. The four-way switch valve 24 has a first port 24a, a second port 24b, a third port 24c and a fourth port 24d. The four-way switch valve 24 is set in either a first communication state or a second communication state. As shown in FIGS. 1 and 3, in the first communication state, the first port 24a and the second port 24b communicate with each other, and simultaneously, the third port 24c and the fourth port 24d communicate with each other. As shown in FIG. 2, in the second communication state, the first port 24a and the third port 24c communicate with each other, and simultaneously, the second port 24b and the fourth port 24d communicate with each other. When the refrigerant circuit 20 performs the forward cycle operation, the four-way switch valve 24 is set in the first communication state. When the refrigerant circuit 20 performs the reverse cycle operation, the four-way switch valve 24 is set in the second communication state.
  • The second heat exchanger 25 is a water-refrigerant heat exchanger. In the second heat exchanger 25, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and the water circulating through the water circuit 30. The refrigerant circuit 20 and the water circuit 30 share the second heat exchanger 25. The second heat exchanger 25 has a refrigerant heat exchange part 25a that the refrigerant circulating through the refrigerant circuit 20 passes therethrough and a water heat exchange part 25b that the water circulating through the water circuit 30 passes therethrough. For example, the second heat exchanger 25 is a tornado heat exchanger having a construction that a refrigerant pipe as the refrigerant heat exchange part 25a is helically wound about the outer periphery of a water pipe as the water heat exchange part 25b, and additionally, the water pipe has grooves in the inside thereof. The second heat exchanger 25 is an indoor heat exchanger designed to be installed in a space as a heating target.
  • The first temperature sensor 26 is a type of sensor configured to measure the temperature of the outdoor air to be heat-exchanged in the first heat exchanger 21. The first temperature sensor 26 is configured to measure the temperature of the outdoor air to be fed to the first heat exchanger 21 by the fan 21a or the temperature of the air in the outdoor space that the first heat exchanger 21 is installed. The first temperature sensor 26 is attached to the first heat exchanger 21.
  • The configuration of the refrigerant circuit 20 in the forward cycle operation will be explained. The discharge side of the compressor 22 is connected to the first port 24a of the four-way switch valve 24. The second port 24b of the four-way switch valve 24 is connected to the refrigerant heat exchange part 25a of the second heat exchanger 25. The refrigerant heat exchange part 25a of the second heat exchanger 25 is connected to the expansion valve 23. The expansion valve 23 is connected to the first heat exchanger 21. The first heat exchanger 21 is connected to the third port 24c of the four-way switch valve 24. The fourth port 24d of the four-way switch valve 24 is connected to the intake side of the compressor 22.
  • An action of the refrigerant circuit 20 in the forward cycle operation will be explained. The forward cycle operation is configured to be performed when the heat pump hot water heater 10 performs the normal operation. The refrigerant in a gaseous state at low pressure is sucked into the compressor 22 and is compressed therein. The compressed refrigerant is discharged from the compressor 22 in a gaseous state at high temperature and high pressure, and is fed to the second heat exchanger 25 via the first and second ports 24a and 24b of the four-way switch valve 24. In the second heat exchanger 25, the refrigerant passes through the refrigerant heat exchange part 25a, whereas the water passes through the water heat exchange part 25b. In the second heat exchanger 25, heat is transferred from the refrigerant at high temperature to the water at low temperature, and thus, heat exchange is performed between the refrigerant and the water. Accordingly, in the second heat exchanger 25, the refrigerant in a gaseous state at high temperature and high pressure is condensed and changed into a liquid state at high pressure. Then, the refrigerant is reduced in pressure when passing through the expansion valve 23, and is changed into a gas-liquid two phase state at low pressure. The refrigerant in the gas-liquid two phase state at low pressure evaporates in the first heat exchanger 21 as a result of heat exchange with the outdoor air, and is changed into a gaseous state at low pressure. Then, the refrigerant passes through the third and fourth ports 24c and 24d of the four-way switch valve 24 and is fed to the compressor 22. The refrigerant circuit 20, performing the forward cycle operation, is configured to supply the heat of the outdoor air through the refrigerant to the water circulating through the water circuit 30 by repeating the aforementioned processing steps.
  • It should be noted that the refrigerant circuit 20 is configured to perform either the forward cycle operation or the reverse cycle operation when the heat pump hot water heater 10 performs the defrosting operation. An action of the refrigerant circuit 20 in the reverse cycle operation will be described below.
  • (1-2) Water Circuit
  • The water circuit 30 is a type of circuit in which the second heat exchanger 25, a water supply pump 31, a hot water storage tank 32 and a heating unit 33 are mainly connected to each other. The water circuit 30 includes a second temperature sensor 34. Water circulates the water circuit 30. In the water circuit 30, the water circulates through the water supply pump 31, the second heat exchanger 25, the hot water storage tank 32, the heating unit 33 and back to the water supply pump 31 in this order. In FIGS. 1 and 2, the direction of the water circulating through the water circuit 30 is indicated by arrows.
  • The water supply pump 31 is a type of pump configured to feed the water circulating through the water circuit 30 to the water heat exchange part 25b of the second heat exchanger 25.
  • The second heat exchanger 25 is a water-refrigerant heat exchanger. As described above, in the second heat exchanger 25, heat exchange is performed between the refrigerant circulating through the refrigerant circuit 20 and the water circulating through the water circuit 30. The water passes through the water heat exchange part 25b so as to be heat-exchanged in the second heat exchanger 25. The inlet of the water heat exchange part 25b is connected to the water supply pump 31 through a pipe. The outlet of the water heat exchange part 25b is connected to the hot water storage tank 32 through a pipe.
  • The hot water storage tank 32 is a type of tank for storing the water heated in the second heat exchanger 25. The hot water stored in the hot water storage tank 32 is fed to the heating unit 33. The hot water storage tank 32 may be provided with a keep-warm heater for keeping the warmth of the hot water stored therein.
  • The heating unit 33 is installed in a space to be heated by the normal operation of the heat pump hot water heater 10. For example, the heating unit 33 is a floor heating panel to be mounted to the floor surface of a room. The heating unit 33 has a heating pipe 33a that the hot water heated in the second heat exchanger 25 flows therethrough.
  • The second temperature sensor 34 is a type of sensor configured to measure the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25. For example, the second temperature sensor 34 is attached to the pipe in the vicinity of the inlet of the water heat exchange part 25b.
  • An action of the water circuit 30 will be explained. The water is fed to the second heat exchanger 25 by the water supply pump 31. In the second heat exchanger 25, heat exchange is performed between the refrigerant and the water by thermal transference from the refrigerant at high temperature to the water at low temperature. Accordingly, the water is heated in the second heat exchanger 25. The water heated in the second heat exchanger 25 is fed to the hot water storage tank 32 as hot water. The hot water stored in the hot water storage tank 32 is supplied to the heating unit 33. In the heating unit 33, the hot water, flowing through the inside of the heating pipe 33a, heats the air in the space in which the heating unit 33 is installed. The water, reduced in temperature after passing through the heating pipe 33a, is fed to the water supply pump 31.
  • (1-3) Control Unit
  • The control unit 40 is a computer for controlling the respective constituent elements of the heat pump hot water heater 10. The control unit 40 is connected to the compressor 22, the expansion valve 23, the four-way switch valve 24, the first temperature sensor 26, the water supply pump 31, the heating unit 33 and the second temperature sensor 34. For example, the control unit 40 is installed in an electric component unit (not shown in the drawings) disposed inside the heat pump hot water heater 10.
  • The control unit 40 is capable of activating and deactivating the compressor 22 by regulating the operating frequency of the compressor 22. The control unit 40 is capable of controlling the flow rate of the refrigerant passing through the expansion valve 23 by regulating the opening degree of the expansion valve 23. The control unit 40 is capable of activating and deactivating the water supply pump 31 by controlling the rotational speed of the water supply pump 31. The control unit 40 is capable of regulating the temperature of the space in which the heating unit 33 is installed by regulating the flow rate of the hot water to be fed to the heating unit 33.
  • The control unit 40 is capable of switching between the first communication state and the second communication state by controlling the four-way switch valve 24. Put differently, the control unit 40 is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the four-way switch valve 24.
  • The control unit 40 is capable of receiving the temperature measured by the first temperature sensor 26 of the refrigerant circuit 20, i.e., the temperature of the air to be heat-exchanged in the first heat exchanger 21. The control unit 40 is capable of receiving the temperature measured by the second temperature sensor 34 of the water circuit 30, i.e., the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25.
  • Additionally, the control unit 40 stores information regarding the operation of the heat pump hot water heater 10. For example, the control unit 40 is configured to monitor and store activation timing of the compressor 22 and deactivation timing of the compressor 22. Accordingly, the control unit 40 is capable of calculating, for instance, duration of deactivation of the compressor 22, duration of the normal operation performed by the heat pump hot water heater 10, and duration of the defrosting operation performed by the heat pump hot water heater 10.
  • (2) Action of Heat Pump Hot Water Heater (2-1) Explanation of Normal Operation and Defrosting Operation
  • The action of the heat pump hot water heater 10 will be explained. The heat pump hot water heater 10 is configured to perform either the normal operation or the defrosting operation. FIG 1 is a circuit configuration diagram of the heat pump hot water heater 10 performing the normal operation. In the normal operation of the heat pump hot water heater 10, the refrigerant circuit 20 is configured to perform the forward cycle operation. As shown in FIG. 1, the four-way switch valve 24 of the refrigerant circuit 20 is herein set in the first communication state. In the water circuit 30, the water is fed to the second heat exchanger 25 by the water supply pump 31 and is heated in the second heat exchanger 25. Then, hot water is fed to the hot water storage tank 32 and the heating unit 33.
  • In the normal operation of the heat pump hot water heater 10, heat exchange, which is thermal transference from the outdoor air to the refrigerant, is performed in the first heat exchanger 21 of the refrigerant circuit 20. Put differently, the heat of the outdoor air to be blown by the fan 21a is deprived in the first heat exchanger 21. Due to this, chances are that frost is attached to the first heat exchanger 21 under some conditions of low outdoor air temperature such as cold weather places and the winter season. When frost is attached to the first heat exchanger 21, in comparison with a condition that frost is not attached to the first heat exchanger 21, heat exchange efficiency is degraded in the first heat exchanger 21 and then operating efficiency is degraded in the heat pump hot water heater 10. Therefore, for the purpose of inhibiting degradation in operating efficiency under the conditions of low outdoor air temperature, the heat pump hot water heater 10 is required to regularly perform the defrosting operation of eliminating the frost attached to the first heat exchanger 21. The defrosting operation of the heat pump hot water heater 10 is performed by melting the frost attached to the first heat exchanger 21 with heat.
  • In performing the defrosting operation, the heat pump hot water heater 10 is configured to perform it either in the reverse cycle operation of the refrigerant circuit 20 or in the forward cycle operation of the refrigerant circuit 20. FIG 2 is a circuit configuration diagram of the heat pump hot water heater 10 performing the reverse cycle operation-based defrosting operation. FIG 3 is a circuit configuration diagram of the heat pump hot water heater 10 performing the forward cycle operation-based defrosting operation.
  • The direction of the refrigerant circulating through the refrigerant circuit 20 in the reverse cycle operation is opposite to that of the refrigerant circulating through the refrigerant circuit 20 in the forward cycle operation. Specifically, in the reverse cycle operation, the refrigerant in the refrigerant circuit 20 passes and circulates through the compressor 22, the four-way switch valve 24 (the first port 24a and the third port 24c), the first heat exchanger 21, the expansion valve 23, the second heat exchanger 25, the four-way switch valve 24 (the second port 24b and the fourth port 24d) and back to the compressor 22 in this order.
  • Next, explanation will be provided for an action to be performed when the heat pump hot water heater 10 terminates the normal operation and starts the reverse cycle operation-based defrosting operation. First, the control unit 40 deactivates the compressor 22 by zeroing the rotational speed of the compressor 22. The normal operation is terminated by the deactivation of the compressor 22. Next, the control unit 40 switches the four-way switch valve 24 from the first communication state into the second communication state. Subsequently, the control unit 40 starts an operation of the compressor 22 by increasing the rotational speed of the compressor 22 from zero. The defrosting operation of the heat pump hot water heater 10 is started by the activation of the compressor 22. In the defrosting operation, the refrigerant at high temperature, discharged from the compressor 22, flows into the first heat exchanger 21. Additionally, in the defrosting operation, the heat accumulated in the second heat exchanger 25 in the normal operation is supplied to the first heat exchanger 21 through the refrigerant circulating through the refrigerant circuit 20. Accordingly, frost attached to the first heat exchanger 21 melts, and thus, the first heat exchanger 21 is defrosted. It should be noted that the water supply pump 31 of the water circuit 30 is being operated in the reverse cycle operation-based defrosting operation.
  • Next, explanation will be provided for an action to be performed when the heat pump hot water heater 10 terminates the normal operation and starts the forward cycle operation-based defrosting operation. First, the control unit 40 deactivates the water supply pump 31 by zeroing the rotational speed of the water supply pump 31. Water supply to the second heat exchanger 25 is stopped by the deactivation of the water supply pump 31. Next, the control unit 40 increases the opening degree of the expansion valve 23. Additionally, the control unit 40 maintains the four-way switch valve 24 in the first communication state. Put differently, similarly to the normal operation, the refrigerant at high temperature, discharged from the compressor 22, is supplied to the second heat exchanger 25 in the forward cycle operation-based defrosting operation. In the second heat exchanger 25, the water is not passing through the water heat exchange part 25b, and thus, heat exchange between the refrigerant and the water is inhibited in the second heat exchanger 25. Due to this, the heat of the refrigerant at high temperature supplied from the compressor 22 is accumulated in the second heat exchanger 25. As a result, the temperature of the second heat exchanger 25 is increased. Additionally, the temperature of the compressor 22 is also increased by the operation of the compressor 22. The heat accumulated in the compressor 22 and the second heat exchanger 25 is supplied to the first heat exchanger 21 via the expansion valve 23 through the refrigerant circulating through the refrigerant circuit 20. Accordingly, frost attached to the first heat exchanger 21 melts, and thus, the first heat exchanger 21 is defrosted.
  • (2-2) Explanation of Determining Water Freezing Probability
  • In the heat pump hot water heater 10, the control unit 40 is configured to determine a possibility of water freezing in the water circuit 30 and select to perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation. The control unit 40 is configured to perform the forward cycle operation-based defrosting operation when determining that the water circuit 30 has a possibility of water freezing. The control unit 40 is configured to perform the reverse cycle operation-based defrosting operation when determining that the water circuit 30 has no possibility of water freezing.
  • The control unit 40 determines the possibility of water freezing in the water circuit 30 at least either in the timing of terminating the normal operation and starting the defrosting operation or during performing the reverse cycle operation-based defrosting operation.
  • FIG. 4 is a flowchart showing a routine that the control unit 40 determines the possibility of water freezing in the water circuit 30 in the timing of terminating the normal operation and starting the defrosting operation. The routine is composed of Steps S11 to S15. In Step S11, the control unit 40 terminates the normal operation. In Step S12, the control unit 40 determines the possibility of water freezing in the water circuit 30. When determining that the water circuit 30 has the possibility of water freezing, the control unit 40 performs processing in Step S13. When determining that the water circuit 30 has no possibility of water freezing, the control unit 40 performs processing in Step S14. In Step S13, the control unit 40 starts the forward cycle operation-based defrosting operation. In Step S14, the control unit 40 starts the reverse cycle operation-based defrosting operation. In Step S15, the control unit 40 terminates the defrosting operation.
  • FIG. 5 is a flowchart showing a routine that the control unit 40 determines the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation. The routine is composed of Steps S21 to S25. In Step S21, the control unit 40 terminates the normal operation. In Step S22, the control unit 40 starts the reverse cycle operation-based defrosting operation. In Step S23, the control unit 40 determines the possibility of water freezing in the water circuit 30. When determining that the water circuit 30 has the possibility of water freezing, the control unit 40 performs processing in Step S24. When determining that the water circuit 30 has no possibility of water freezing, the control unit 40 continues the reverse cycle operation-based defrosting operation. In Step S24, the control unit 40 terminates the reverse cycle operation-based defrosting operation and starts the forward cycle operation-based defrosting operation. In Step S25, the control unit 40 terminates the defrosting operation.
  • Specifically, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of any one of six determination criteria to be explained below. Next, the respective determination criteria will be explained.
  • (2-2-1) First Determination Criterion
  • In the first determination criterion, the control unit 40 determines the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation. The control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30. When the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to a predetermined temperature, the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then, start the forward cycle operation-based defrosting operation. When the temperature of the water flowing into the water heat exchange part 25b is higher than the predetermined temperature, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then, start the reverse cycle operation-based defrosting operation.
  • (2-2-2) Second Determination Criterion
  • In the second determination criterion, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation. The control unit 40 is configured to obtain the temperature of the air to be heat-exchanged in the first heat exchanger 21 from the first temperature sensor 26 of the refrigerant circuit 20. When the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to a predetermined temperature, the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation. When the temperature of the air to be heat-exchanged in the first heat exchanger 21 is higher than the predetermined temperature, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • (2-2-3) Third Determination Criterion
  • In the third determination criterion, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation. The control unit 40 is configured to obtain information regarding the operation of the compressor 22 of the refrigerant circuit 20. When the compressor 22 has been successively deactivated for a predetermined period of time or greater before starting the defrosting operation, the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation. When the compressor 22 has been successively deactivated for less than the predetermined period of time before starting the defrosting operation, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • (2-2-4) Fourth Determination Criterion
  • In the fourth determination criterion, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 when terminating the normal operation and starting the defrosting operation. The control unit 40 is configured to obtain information regarding the defrosting operation of the heat pump hot water heater 10. When the defrosting operation has been previously performed for a predetermined period of time or less, the control unit 40 is configured to deactivate the water supply pump 31, maintain the four-way switch valve 24 in the first communication state, and then start the forward cycle operation-based defrosting operation. When the defrosting operation has been previously performed for more than the predetermined period of time, the control unit 40 is configured to switch the four-way switch valve 24 from the first communication state into the second communication state, and then start the reverse cycle operation-based defrosting operation.
  • (2-2-5) Fifth Determination Criterion
  • In the fifth determination criterion, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation after terminating the normal operation. The control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30. When the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to a predetermined temperature, the control unit 40 is configured to deactivate the water supply pump 31 of the water circuit 30, switch the four-way switch valve 24 from the second communication state into the first communication state, and then start the forward cycle operation-based defrosting operation. When the temperature of the water flowing into the water heat exchange part 25b is higher than the predetermined temperature, the control unit 40 continues the reverse cycle operation-based defrosting operation.
  • (2-2-6) Sixth Determination Criterion
  • In the sixth determination criterion, the control unit 40 is configured to determine the possibility of water freezing in the water circuit 30 during performing the reverse cycle operation-based defrosting operation after terminating the normal operation. The control unit 40 is configured to obtain the temperature of the water flowing into the water heat exchange part 25b of the second heat exchanger 25 from the second temperature sensor 34 of the water circuit 30. When the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to a predetermined temperature, the control unit 40 is configured to switch the four-way switch valve 24 from the second communication state into the first communication state in order to terminate the defrosting operation, and then start a forward cycle operation-based normal operation. When the temperature of the water flowing into the water heat exchange part 25b is higher than the predetermined temperature, the control unit 40 continues the reverse cycle operation-based defrosting operation.
  • (3) Features of Heat Pump Hot Water Heater
  • The present heat pump hot water heater 10 is a heat pump device equipped with the refrigerant circuit 20 and the water circuit 30 that share the second heat exchanger 25. The refrigerant at high temperature, compressed by the compressor 22 of the refrigerant circuit 20, is heat-exchanged with the water flowing through the water circuit 30 in the second heat exchanger 25. In the second heat exchanger 25, heat is transferred from the refrigerant flowing through the refrigerant heat exchange part 25a to the water flowing through the water heat exchange part 25b. Accordingly, the water flowing through the water circuit 30 is heated, and hot water is produced. The hot water herein produced is temporarily stored in the hot water storage tank 32, and is utilized for heating of the indoor space by the heating unit 33.
  • The control unit 40 is capable of switching between the forward cycle operation and the reverse cycle operation by controlling the four-way switch valve 24 of the refrigerant circuit 20. Chances are that frost is attached to the first heat exchanger 21 under conditions of low outdoor air temperature. The heat pump hot water heater 10 is capable of performing the defrosting operation for eliminating the frost attached to the first heat exchanger 21. The control unit 40 is normally configured to perform the reverse cycle operation-based defrosting operation. However, the control unit 40 is configured to perform the forward cycle operation-based defrosting operation when determining that performing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30. The forward cycle operation-based defrosting operation is performed by deactivating the water supply pump 31 of the water circuit 30 and by increasing the opening degree of the expansion valve 23 of the refrigerant circuit 20. With the deactivation of the water supply pump 31, heat exchange is inhibited in the second heat exchanger 25, and heat is accumulated in the second heat exchanger 25. With the increase in opening degree of the expansion valve 23, the heat accumulated in the compressor 22 and the second heat exchanger 25 is transferred to the first heat exchanger 21 via the expansion valve 23 through the refrigerant. Accordingly, the first heat exchanger 21 is heated and the frost attached to the first heat exchanger 21 is eliminated.
  • The present heat pump hot water heater 10 is configured to select and perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation on the basis of the possibility of freezing of the water flowing through the water circuit 30.
  • In the reverse cycle operation-based defrosting operation, the refrigerant at high temperature compressed by the compressor 22 directly flows into the first heat exchanger 21. Thus, the frost attached to the first heat exchanger 21 is efficiently eliminated. However, in the reverse cycle operation-based defrosting operation, heat exchange is performed in the second heat exchanger 25 such that heat is transferred from the water flowing through the water circuit 30 to the refrigerant flowing through the refrigerant circuit 20. Thus, when the temperature of the water flowing into the second heat exchanger 25 is low, the temperature of the water to be heat-exchanged in the second heat exchanger 25 falls and this could result in water freezing. When freezing, water increases in volume. Hence, there is a possibility that when the water in the water circuit 30 freezes in the pipe of the water circuit 30, the pipe is broken due to increase in pressure inside the pipe. On the other hand, in the forward cycle operation-based defrosting operation, heat exchange is inhibited in the second heat exchanger 25, and the frost attached to the first heat exchanger 21 is eliminated by the heat accumulated in the compressor 22 and the second heat exchanger 25. Hence, there is no possibility of water freezing in the water circuit 30. Consequently, the heat pump hot water heater 10 can prevent water freezing in the defrosting operation.
  • The control unit 40 of the heat pump hot water heater 10 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of the first to sixth determination criteria and is configured to select to perform either the forward cycle operation-based defrosting operation or the reverse cycle operation-based defrosting operation.
  • When the temperature of the water flowing into the second heat exchanger 25 is lower than or equal to a predetermined temperature in starting the defrosting operation, the control unit 40 is configured to determine that, based on the first determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30. In the configuration, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • On the other hand, when the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to a predetermined temperature in starting the defrosting operation, the control unit 40 is configured to determine that, based on the second determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30. In the configuration, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • But then, when the normal operation for heating the water in the water circuit 30 based on the forward cycle operation has been deactivated for a predetermined period of time or greater in starting the defrosting operation, the control unit 40 is configured to determine that, based on the third determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30. In the configuration, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • Then again, when the defrosting operation has been previously performed for a predetermined period of time or less in starting the defrosting operation, the control unit 40 is configured to determine that, based on the fourth determination criterion, performing the reverse cycle operation-based defrosting operation could result in water freezing in the water circuit 30. In the configuration, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 by terminating the normal operation and starting the forward cycle operation-based defrosting operation.
  • Then again, when the temperature of the water flowing into the second heat exchanger 25 is lower than or equal to a predetermined temperature during performing the reverse cycle operation-based defrosting operation, the control unit 40 is configured to determine that, based on the fifth determination criterion, continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30. In the configuration, the heat pump hot water heater 10 is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation.
  • Then again, when the temperature of the water flowing into the second heat exchanger 25 is lower than or equal to a predetermined temperature during performing the reverse cycle operation-based defrosting operation, the control unit 40 is configured to determine that, based on the sixth determination criterion, continuing the reverse cycle operation-based defrosting operation could result in freezing of the water flowing through the water circuit 30. In the configuration, the heat pump hot water heater 10 is configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based normal operation.
  • In the forward cycle operation-based defrosting operation, the temperature of the water flowing into the second heat exchanger 25 does not fall. Hence, the possibility of water freezing in the water circuit 30 is low. However, the temperature of the first heat exchanger 21 does not easily rise until a sufficient amount of heat is accumulated in the second heat exchanger 25. Hence, a longer time will be required for defrosting the first heat exchanger 21. Due to the above, when performing only the forward cycle operation-based defrosting operation, the heat pump hot water heater 10 degrades in average heating performance. On the other hand, when performing only the reverse cycle operation-based defrosting operation, the heat pump hot water heater 10 has the possibility of water freezing in the water circuit 30. The heat pump hot water heater 10 according to the present embodiment is configured to select to perform either the reverse cycle operation-based defrosting operation or the forward cycle operation-based defrosting operation in accordance with the possibility of water freezing in the water circuit 30. Accordingly, the heat pump hot water heater 10 is capable of preventing water freezing in the water circuit 30 and is also capable of reliably achieving required average heating performance.
  • (4) Modifications
  • Specific configurations of the embodiment of the present invention can be changed without departing from the scope of the present invention. Modifications applicable to the embodiment of the present invention will be hereinafter explained.
  • (4-1) Modification A
  • In the present embodiment, the control unit 40 of the heat pump hot water heater 10 is configured to determine the possibility of water freezing in the water circuit 30 on the basis of any one of the first to sixth determination criteria. However, the control unit 40 may be configured to select two or more of the first to sixth determination criteria and determine the possibility of water freezing in the water circuit 30 on the basis of combination of the selected determination criteria.
  • For example, in terminating the normal operation and starting the defrosting operation, the heat pump hot water heater 10 may be configured to start the defrosting operation on the basis of the first and second determination criteria. In this case, the control unit 40 may be configured to start the forward cycle operation-based defrosting operation when either of the following conditions is fulfilled: that the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to a predetermined temperature; and that the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to another predetermined temperature. In addition, in this case, the control unit 40 may be configured to start the forward cycle operation-based defrosting operation when the both of the following conditions are fulfilled: that the temperature of the water flowing into the water heat exchange part 25b is lower than or equal to the predetermined temperature; and that the temperature of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal to the another predetermined temperature.
  • Alternatively, in terminating the normal operation and starting the defrosting operation, the heat pump hot water heater 10 may be configured to start the defrosting operation on the basis of the first determination criterion. Moreover, during performing the reverse cycle operation-based defrosting operation, the heat pump hot water heater 10 may be configured to terminate the reverse cycle operation-based defrosting operation and start the forward cycle operation-based defrosting operation on the basis of the fifth determination criterion.
  • (4-2) Modification B
  • During performing the forward cycle operation-based defrosting operation, the heat pump hot water heater 10 may be configured to terminate the forward cycle operation-based defrosting operation and start the reverse cycle operation-based defrosting operation.
  • For example, the control unit 40 may be configured to start the reverse cycle operation-based defrosting operation on the basis of the fifth determination criterion. Specifically, when the temperature of the water flowing into the water heat exchange part 25b is higher than a predetermined temperature during performing the forward cycle operation-based defrosting operation, the control unit 40 may be configured to start the reverse cycle operation-based defrosting operation by activating the water supply pump 31 of the water circuit 30 and switching the four-way switch valve 24 from the first communication state into the second communication state. When the temperature of the water flowing into the water heat exchange part 25b is herein lower than or equal to the predetermined temperature, the control unit 40 is configured to continue the forward cycle operation-based defrosting operation.
  • Moreover, in the present modification, when the forward cycle operation-based defrosting operation has been performed for more than a predetermined period of time, the control unit 40 may be configured to determine that the possibility of water freezing in the water circuit 30 becomes zero and to start the reverse cycle operation-based defrosting operation by activating the water supply pump 31 of the water circuit 30 and switching the four-way switch valve 24 from the first communication state into the second communication state.
  • INDUSTRIAL APPLICABILITY
  • The heat pump hot water heater according to the present invention is capable of preventing water freezing.
  • REFERENCE SIGNS LIST
  • 10
    Heat pump hot water heater
    20
    Refrigerant Circuit
    21
    First heat exchanger
    22
    Compressor
    25
    Second heat exchanger
    30
    Water circuit
    31
    Water supply pump (water supply mechanism)
    40
    Control unit
    CITATION LIST PATENT LITERATURE
    • PTL 1: Japan Laid-open Patent Application Publication No. 2010-181104
    • PTL2: International Patent Application Publication No. WO2006/103815

Claims (5)

  1. A heat pump hot water heater (10), comprising:
    a refrigerant circuit (20) through which refrigerant is to circulate, the refrigerant circuit including a first heat exchanger (21), a second heat exchanger (25) and a compressor (22), the first heat exchanger (21) being configured to cause heat exchange between air and the refrigerant, the second heat exchanger (25) being configured to cause heat exchange between the refrigerant and water, the compressor (22) being configured to compress the refrigerant;
    a water circuit (30) through which the water is to flow, the water circuit (30) including the second heat exchanger (25) and a water supply mechanism (31), the water supply mechanism (31) being configured to supply the water to the second heat exchanger (25);
    a control unit (40) being configured to control the refrigerant circuit (20) so as to perform a defrosting operation of the first heat exchanger (21), and
    an expansion valve (23) being an electric valve for regulating the flow rate and the pressure of the refrigerant circulating through the refrigerant circuit (20),
    wherein the heat pump hot water heater further comprises a four-way switch valve (24) configured to switch between a forward cycle operation and a reverse cycle operation,
    the refrigerant circuit (20) is capable of switching between
    the forward cycle operation causing the refrigerant to sequentially circulate through the compressor (22), the four-way switch valve (24), the second heat exchanger (25), the expansion valve (23), the first heat exchanger (21), the four-way switch valve (24), and back to the compressor (22), and
    the reverse cycle operation causing the refrigerant to sequentially circulate through the compressor (22), the four-way switch valve (24), the first heat exchanger (21), the expansion valve (23), the second heat exchanger (25), the four-way switch valve (24), and back to the compressor (22), and
    characterised in that
    at least either in starting the defrosting operation or during performing the defrosting operation, the control unit (40) is configured to determine a possibility of freezing of the water in the water circuit (30) and select to perform either the forward cycle operation or the reverse cycle operation so as to perform the defrosting operation,
    the control unit (40) is configured to control the water circuit (30) so as to perform a defrosting operation of the first heat exchanger,
    the control unit (40) is configured to perform the forward cycle operation-based defrosting operation when determining that the water circuit (30) has a possibility of water freezing by deactivating the water supply mechanism (31) and by increasing an opening degree of the expansion valve (23), and
    when the water flowing into the second heat exchanger (25) has a temperature of lower than or equal to a first temperature in starting the defrosting operation, the control unit (40) is configured to select to perform the forward cycle operation and deactivate the water supply mechanism (31).
  2. The heat pump hot water heater (10) according to claim 1, wherein
    when the air to be heat-exchanged in the first heat exchanger (21) has a temperature of lower than or equal to a second temperature in starting the defrosting operation, the control unit (40) is configured to select to perform the forward cycle operation and deactivate the water supply mechanism (31).
  3. The heat pump hot water heater (10) according to any one of claims 1 to 2, wherein
    when the compressor (22) has been deactivated for a first period of time or greater before starting the defrosting operation in starting the defrosting operation, the control unit (40) is configured to select to perform the forward cycle operation and deactivate the water supply mechanism (31).
  4. The heat pump hot water heater (10) according to any one of claims 1 to 3, wherein
    when the defrosting operation has been previously performed for a second period of time or less in starting the defrosting operation, the control unit (40) is configured to select to perform the forward cycle operation and deactivate the water supply mechanism (31).
  5. The heat pump hot water heater (10) according to any one of claims 1 to 4, wherein
    when the water flowing into the second heat exchanger (25) has a temperature of lower than or equal to a third temperature during performing the defrosting operation based on the reverse cycle operation, the control unit (40) is configured to select to perform the forward cycle operation and deactivate the water supply mechanism (31).
EP12891024.7A 2012-12-26 2012-12-26 Heat pump hot water heater Active EP2940407B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/083692 WO2014102934A1 (en) 2012-12-26 2012-12-26 Heat pump hot water heater

Publications (3)

Publication Number Publication Date
EP2940407A1 EP2940407A1 (en) 2015-11-04
EP2940407A4 EP2940407A4 (en) 2016-05-25
EP2940407B1 true EP2940407B1 (en) 2018-11-14

Family

ID=51020092

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12891024.7A Active EP2940407B1 (en) 2012-12-26 2012-12-26 Heat pump hot water heater

Country Status (4)

Country Link
EP (1) EP2940407B1 (en)
JP (1) JP6190388B2 (en)
ES (1) ES2710923T3 (en)
WO (1) WO2014102934A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6258804B2 (en) * 2014-07-18 2018-01-10 株式会社コロナ Combined heat source heat pump device
JP6501392B2 (en) * 2015-02-02 2019-04-17 三菱重工サーマルシステムズ株式会社 Control device, control method and program
FR3049697B1 (en) * 2016-04-01 2019-08-02 Societe Industrielle De Chauffage (Sic) SYSTEM FOR REFRIGERATION, AIR CONDITIONING OR HEATING WITH SEPARATE UNITS
GB2567331B (en) * 2016-08-04 2021-01-13 Mitsubishi Electric Corp Heat source system
JP6896054B2 (en) * 2016-08-04 2021-06-30 三菱電機株式会社 Heat source system
CN107525295B (en) * 2017-07-18 2020-02-21 广东美的暖通设备有限公司 Water heater
JP6907110B2 (en) * 2017-12-27 2021-07-21 株式会社コロナ Heat pump device
JP6945741B2 (en) 2018-07-20 2021-10-06 三菱電機株式会社 Air conditioner control device, outdoor unit, repeater, heat source unit and air conditioner
WO2021009924A1 (en) * 2019-07-18 2021-01-21 三菱電機株式会社 Air conditioning device
CN111189098A (en) * 2020-01-13 2020-05-22 欧贝多物联科技(嵊州)有限公司 Intelligent heating hydraulic module
CN111649451A (en) * 2020-05-11 2020-09-11 宁波奥克斯电气股份有限公司 Two-combined-supply system and control method thereof

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61191828A (en) * 1985-02-21 1986-08-26 Matsushita Electric Ind Co Ltd Solar heat utilizing hot water supplier
JPS62213654A (en) * 1986-03-14 1987-09-19 株式会社日立製作所 Heat pump type refrigeration cycle
JP2001108256A (en) * 1999-10-07 2001-04-20 Daikin Ind Ltd Hot water supplying device
JP2003090653A (en) * 2001-09-13 2003-03-28 Denso Corp Heat pump type hot water supply apparatus
JP3783711B2 (en) * 2003-11-19 2006-06-07 松下電器産業株式会社 Heat pump water heater
DE102004010066B4 (en) * 2004-03-02 2021-01-21 Stiebel Eltron Gmbh & Co. Kg Defrosting procedure for a heat pump
CN100504256C (en) 2005-03-28 2009-06-24 东芝开利株式会社 Hot water supply device
JP2010060182A (en) * 2008-09-02 2010-03-18 Daikin Ind Ltd Air conditioner
JP5427428B2 (en) 2009-02-06 2014-02-26 三菱重工業株式会社 Heat pump type hot water supply / air conditioner
EP2530410B1 (en) * 2010-01-26 2018-05-30 Mitsubishi Electric Corporation Heat pump device
WO2012070082A1 (en) * 2010-11-24 2012-05-31 三菱電機株式会社 Heat pump hot-water supply device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP2940407A1 (en) 2015-11-04
JP6190388B2 (en) 2017-08-30
WO2014102934A1 (en) 2014-07-03
JPWO2014102934A1 (en) 2017-01-12
ES2710923T3 (en) 2019-04-29
EP2940407A4 (en) 2016-05-25

Similar Documents

Publication Publication Date Title
EP2940407B1 (en) Heat pump hot water heater
US9581361B2 (en) Heat pump system
US8657207B2 (en) Hot water circulation system associated with heat pump and method for controlling the same
EP2420767B1 (en) Heat-pump hot water supply and air conditioning apparatus
CN107076477B (en) System and method for free and active defrost
JP5634071B2 (en) Air conditioner and defrosting operation method of air conditioner
EP2522934A2 (en) Heat storing apparatus having cascade cycle and control process of the same
JP2009036485A (en) Water heater
JP2013119954A (en) Heat pump hot water heater
EP2522933B1 (en) Heat storing apparatus having cascade cycle and control process of the same
JP2011257098A (en) Heat pump cycle device
JP2013130344A (en) Hot water supply/air conditioning system, and control method thereof
JP2012013350A (en) Hot-water heater
GB2414289A (en) A heat pump installation
JP5701084B2 (en) Heating system
JP2009264716A (en) Heat pump hot water system
AU2020438844B2 (en) Heat pump heat source device and heat pump water heater
JP4236542B2 (en) Heat pump water heater
JP5909380B2 (en) Water heater
JP2012083065A (en) Air conditioner
KR101488903B1 (en) Heat storaging apparatus and Control process of the same
WO2005114056A1 (en) Heat pump installation
JP6367642B2 (en) Air conditioner
JP2011117643A (en) Storage type water heater
JP2005241039A (en) Heat storage type air conditioner

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20150724

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: F24H 1/00 20060101ALI20151110BHEP

Ipc: F25B 47/02 20060101AFI20151110BHEP

Ipc: F25B 49/02 20060101ALI20151110BHEP

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20160422

RIC1 Information provided on ipc code assigned before grant

Ipc: F25B 49/02 20060101ALI20160418BHEP

Ipc: F24H 1/00 20060101ALI20160418BHEP

Ipc: F25B 47/02 20060101AFI20160418BHEP

17Q First examination report despatched

Effective date: 20161208

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20180601

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: OCHI, HIROKI

Inventor name: CHIKAMI, HIDEO

Inventor name: COESSENS, TIM

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1065308

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181115

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012053654

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20181114

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1065308

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181114

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2710923

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20190429

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190314

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190214

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190314

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190215

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012053654

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181226

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20190815

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181114

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181114

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20121226

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20221118

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20230109

Year of fee payment: 11

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231102

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20231110

Year of fee payment: 12

Ref country code: FR

Payment date: 20231108

Year of fee payment: 12

Ref country code: DE

Payment date: 20231031

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231121

Year of fee payment: 12