EP2845658A1 - Procédé de fabrication de tubes métalliques à plusieurs parois - Google Patents
Procédé de fabrication de tubes métalliques à plusieurs parois Download PDFInfo
- Publication number
- EP2845658A1 EP2845658A1 EP13183363.4A EP13183363A EP2845658A1 EP 2845658 A1 EP2845658 A1 EP 2845658A1 EP 13183363 A EP13183363 A EP 13183363A EP 2845658 A1 EP2845658 A1 EP 2845658A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tube
- inner tube
- metal
- outer tube
- metal strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/14—Making tubes from doubled flat material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/08—Making tubes with welded or soldered seams
- B21C37/09—Making tubes with welded or soldered seams of coated strip material ; Making multi-wall tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C1/00—Manufacture of metal sheets, wire, rods, tubes or like semi-manufactured products by drawing
- B21C1/16—Metal drawing by machines or apparatus in which the drawing action is effected by means other than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, rods or tubes
- B21C1/22—Metal drawing by machines or apparatus in which the drawing action is effected by means other than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, rods or tubes specially adapted for making tubular articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, rods, wire, tubes, profiles or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/15—Making tubes of special shape; Making tube fittings
- B21C37/154—Making multi-wall tubes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
- Y10T29/49879—Spaced wall tube or receptacle
Definitions
- the invention relates to a method for producing a tube made of metal, which consists of an inner tube and at least one outer tube surrounding the same.
- metal is also understood to mean the term “alloy”.
- Double or multi-walled metallic pipes have a variety of applications, especially in the cable industry and for the transport of gases and liquids.
- a pipe can be plated inside and / or outside for reasons of corrosion protection.
- Electrically conductive cables can be made of the low-cost base material aluminum with copper plated on it and highly electrically conductive. In such composite pipes, the desired properties of the metals used are advantageously utilized.
- a metallic layer can be applied galvanically to a metal tube, as is done, for example, in the manufacture of galvanized steel tubes.
- the result is an insoluble composite of the two metal layers. Electroplating involves relatively low production speeds.
- the metal surfaces adhere to each other by frictional contact.
- the composite can be performed more or less firmly.
- Plating is the application of a metal layer to a second metal layer by pressure. Practically, the first layer is pressed or rolled onto the second. A plated metal strip can thus be formed into a tube and welded. In the weld area can become mix the two materials of the metal layers and optionally fuse to form an alloy, so that the material properties in the weld differ significantly from the properties of the two interconnected metal layers. This property difference can be undesirable if, for example, when welding a copper layer with an aluminum layer, the weld seam becomes considerably brittle.
- the longitudinal seam welding of one, two or more metal layers formed into a tube also has a disadvantageous effect when the longitudinal seam welding of all layers takes place together, a large total wall thickness is present and the inner tube contains a core. This can be damaged by the high heat input required by the high welding energy required.
- hydroforming also called hydroforming
- two metallic tubes are pushed into each other and the inner tube is deformed by internal high pressure such that it is pressed firmly against the outer tube.
- the internal high pressure is generated in a closed mold, in which the tubes are, by a water-oil emulsion in the inner tube.
- the invention has for its object to provide a continuous process for the production of coated metal tubes, which allows high production speeds.
- the invention also provides the advantage that the double or multi-walled tube produced by the continuous process according to the invention has a closed surface of the outer material, wherein the properties in the weld area only slightly different from those of different tube.
- the Verpressgrad the metal layers can be adapted to the particular intended application of the jacketed tube. If the metal layers are the same material, then the production process according to the process of the invention is more favorable compared with the production of a thick-walled, single-layered tube with regard to the required performance of the device used for the method. For example, the device must be designed for lower bending forces and less welding power must be installed. With the same welding performance, however, higher production speeds are possible, although more than one layer must be welded. Another, resulting advantage is the lower heat input in a possibly existing soul in the welding operations. In addition, pipes with low bending stiffness can be produced as the equivalent single-walled pipes.
- FIG. 1 shows a schematic representation of an apparatus for producing a pipe made of metal according to an embodiment of the method according to the invention.
- a metal strip 2 is withdrawn and a forming device 3, e.g. a roller or sliding tool fed.
- the metal strip 2 can be cut to size prior to entry into the shaping device 3 by means of a strip edge shear 4.
- the metal strip 2 in the shaping device is formed into a slot tube around a simultaneously supplied inner tube 5, which is moved in its axial direction.
- the inner tube 5 may contain a cable core or another type of filling.
- the juxtaposed edges running in the longitudinal direction of the slot tube are welded together in a welding device 6 in order to obtain a completely closed outer tube 7.
- the outer tube 7 is detected and pulled by a arranged in front of the discharge device 8 9 for reducing the diameter.
- the diameter-reducing device 9 may be, for example, a die, with which the two tubes are pressed together.
- the diameter-reducing device 9 may consist of at least one roller frame (for example a so-called Turk's head) with which the outer tube is rolled onto the inner tube.
- the roller frame can be driven or not driven.
- the extraction device 8 may for example consist of a tape or a collet chuck.
- a further extraction device 11 may be arranged in front of the die or roller frame 9.
- the further take-off device 11 brings the force that is required to unwind the metal strip 2 from the unwinder 1 and to pull through the possibly existing band edge cutter 4 and the shaping device 3, if they have no own drive.
- the extraction device 8 then only has to apply the force that is required for the deformation of the outer tube in the die or roller frame 9. Furthermore, when pulling down the tube smaller vibrations and a twist of the Outside tube occur. These movements can have a negative effect on the welding result.
- the further extraction device 11 is used to decouple the effects of reducing the welding in the upstream welding device. 6
- the finished metal tube 10 can then be fed to further processing or storage facilities (not shown).
- the finished metal tube 10 can be supplied as a new inner tube 5 in the described inventive method of the molding apparatus 3.
- an annealing process e.g. the recrystallization annealing, to restore the original structural state changed by the pressing or rolling.
- the finished, double or multi-walled metal tube 10 can be fed to a rewinder or a cutting unit.
- connection between the outer and the inner tube can be made more or less firm.
- the contact pressure between the outer and the inner tube is determined by the diameter of the diameter-reducing device 9, through which the outer tube is pulled down onto the inner tube. If the two tubes are pressed together so strongly that a practically insoluble mechanical connection between them is formed, it is called plating. In this case, the inner tube can also be plastically deformed.
- the inner surface of the outer tube and the outer surface of the inner tube may be cleaned and activated before being pulled down.
- This surface treatment can be carried out, for example chemically, ie by means of a liquid or a gas, or with plasma.
- an adhesive may be applied to at least one of the two (possibly chemically activated before) contact surfaces are applied before the outer tube is pulled down on the inner tube.
- the inner tube may be heated or cooled before the outer tube is pulled down.
- the inner tube When the inner tube is heated, its deformation resistance decreases, so that the outer tube is connected as firmly as possible to the inner tube, i. can be plated, with lower forces than with a non-heated inner tube are necessary. If the inner tube is cooled, among other things, its outer diameter shrinks slightly. When the material of the inner tube heats up after the outer tube has been pulled down, the inner tube again seeks its starting diameter, so that a high surface pressure can be achieved between the two tubes.
- the outer tube can be heated before pulling down. Due to the shrinkage of the pulled-down outer tube during cooling, the contact pressure on the inner tube is increased in relation to a previously unheated outer tube. Furthermore, its deformation resistance is reduced, whereby the required deformation forces are lower than in a non-heated outer tube.
- the outer surface of the inner tube can be machined prior to delivery with a peeling tool, by brushing or by grinding. In particular, it is thus possible to remove an oxide layer which is an obstacle, for example, for the plating process. Likewise, the contact surface of the metal strip can be pretreated accordingly. In order to prevent the formation of a new oxide layer, the steps of feeding, welding and drawing down can be carried out under a protective gas atmosphere.
- the inner tube and the outer tube may be made of identical metals, such as steel, stainless steel or a non-ferrous metal.
- the inner tube and the metal band may also consist of different metals.
- a widely used pipe is, for example, a CCA pipe ( copper-clad aluminum for copper-clad aluminum), which consists of an aluminum pipe having an outer copper layer.
- the finished metal tube 10 may pass through a further reducing stage in which the metal tube, which has a certain initial diameter, is pulled down to a final diameter reduced from the initial diameter. If it is necessary to obtain a thin-walled outer tube, as in the case of the CCA tube, the wall thicknesses of the inner and outer tubes can be reduced at the same time in this reducing step, e.g. using a Mandrille in the area of the drawing tool.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP13183363.4A EP2845658A1 (fr) | 2013-09-06 | 2013-09-06 | Procédé de fabrication de tubes métalliques à plusieurs parois |
| US14/453,128 US20150068020A1 (en) | 2013-09-06 | 2014-08-06 | Method for producing multi-walled metallic tubes |
| CN201410446672.5A CN104416339A (zh) | 2013-09-06 | 2014-09-03 | 制造多层壁金属管的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP13183363.4A EP2845658A1 (fr) | 2013-09-06 | 2013-09-06 | Procédé de fabrication de tubes métalliques à plusieurs parois |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP2845658A1 true EP2845658A1 (fr) | 2015-03-11 |
Family
ID=49123725
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13183363.4A Withdrawn EP2845658A1 (fr) | 2013-09-06 | 2013-09-06 | Procédé de fabrication de tubes métalliques à plusieurs parois |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20150068020A1 (fr) |
| EP (1) | EP2845658A1 (fr) |
| CN (1) | CN104416339A (fr) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| MX385741B (es) * | 2015-10-27 | 2025-03-18 | Net Boru Sanayi Ve Dis Ticaret Kollektif Sirketi Bora Saman Ve Ortagi | Ensamble conformado por rodillos de metal de paredes múltiples. |
| KR20190084963A (ko) * | 2016-11-16 | 2019-07-17 | 산드빅 인터렉츄얼 프로퍼티 에이비 | 시스템 및 시스템의 제조 방법 |
| US12433874B2 (en) * | 2022-04-28 | 2025-10-07 | Prescience Biotechnology Inc. | Liposome comprising rapamycin or a derivative thereof and use thereof in therapy |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5524786A (en) * | 1978-08-12 | 1980-02-22 | Fujikura Ltd | Manufacturing method for composite metal pipe |
| JPS58221686A (ja) * | 1982-06-17 | 1983-12-23 | Mitsubishi Heavy Ind Ltd | クラツド鋼管の製造方法 |
| JPS59202117A (ja) * | 1983-05-02 | 1984-11-15 | Nisshin Steel Co Ltd | 二重管の製造方法 |
| DE68916383T2 (de) | 1988-12-09 | 1995-02-09 | Sumitomo Metal Ind | Verfahren zur Herstellung eines plattierten Metallrohres. |
| JPH08290214A (ja) * | 1995-04-19 | 1996-11-05 | Mitsubishi Materials Corp | 複合金属棒材の製造方法およびその装置 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3648356A (en) * | 1969-02-13 | 1972-03-14 | Kabel Metallwerke Ghh | Method for making copper plated aluminum wires |
| JPS52147784A (en) * | 1976-06-02 | 1977-12-08 | Sumitomo Electric Ind Ltd | Method of manufacturing composite wires |
| US5611874A (en) * | 1995-07-26 | 1997-03-18 | Surface Genesis, Inc. | Clad shape memory alloy composite structure and method |
-
2013
- 2013-09-06 EP EP13183363.4A patent/EP2845658A1/fr not_active Withdrawn
-
2014
- 2014-08-06 US US14/453,128 patent/US20150068020A1/en not_active Abandoned
- 2014-09-03 CN CN201410446672.5A patent/CN104416339A/zh active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5524786A (en) * | 1978-08-12 | 1980-02-22 | Fujikura Ltd | Manufacturing method for composite metal pipe |
| JPS58221686A (ja) * | 1982-06-17 | 1983-12-23 | Mitsubishi Heavy Ind Ltd | クラツド鋼管の製造方法 |
| JPS59202117A (ja) * | 1983-05-02 | 1984-11-15 | Nisshin Steel Co Ltd | 二重管の製造方法 |
| DE68916383T2 (de) | 1988-12-09 | 1995-02-09 | Sumitomo Metal Ind | Verfahren zur Herstellung eines plattierten Metallrohres. |
| JPH08290214A (ja) * | 1995-04-19 | 1996-11-05 | Mitsubishi Materials Corp | 複合金属棒材の製造方法およびその装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20150068020A1 (en) | 2015-03-12 |
| CN104416339A (zh) | 2015-03-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE19604357B4 (de) | Verfahren zur Herstellung von Rohren mit Abschnitten unterschiedlicher Wanddicke | |
| DE1966816A1 (de) | Rohr | |
| EP2147958B1 (fr) | Procédé de fabrication d'un composant sandwich à partir de feuillard laminé à froid | |
| DE102015207809A1 (de) | Induktionsglühen als ein Verfahren für expandierte hydrogeformte Rohrumformbarkeit | |
| EP0706843A1 (fr) | Procédé et dispositif pour la production de pièces courbées | |
| EP2862641B1 (fr) | Procédé de fabrication de tubes composites métalliques | |
| EP2602032B1 (fr) | Procédé de fabrication d'un tube métallique multicouche | |
| DE1527875B2 (de) | Verfahren und Einrichtung zum Ummanteln eines zylindrischen Metallkernes mit einem Metallummantelungsstreifen | |
| DE102022112397A1 (de) | Wertstromprozess zum profilieren und doppelschulterwerkzeug-rührreibschweissen von aluminiumblech zum bilden von fahrzeugstrukturschienen | |
| WO2001085430A1 (fr) | Procede de production de tuyaux composites metalliques multicouches | |
| DE2356968A1 (de) | Verfahren zur herstellung von zusammengesetztem lagermaterial | |
| DE102016101989B4 (de) | Verfahren zur Herstellung eines Aluminiumrohres und einer Rohrleitung sowie Aluminiumrohr und Rohrleitung | |
| DE102009012973A1 (de) | Anschlussverbindung für zylindrische Elemente und Verfahren zum Herstellen einer solchen | |
| EP1200253A1 (fr) | Procede de production d'un materiau composite en aluminium | |
| DE102016205943A1 (de) | Vorrichtung und Verfahren zum Fertigen von metallischen Bauteilen | |
| DE2357045C2 (de) | Vorrichtung zum Aufbringen von Schmiermitteln bei der Herstellung längsnahtgeschweißter Rohre | |
| EP0849027B1 (fr) | Méthode de fabrication de plaques et bandes profilées | |
| WO1980000133A1 (fr) | Procede et installation de fabrication de tuyaux multicouches | |
| EP3668673B1 (fr) | Procédé pour fabriquer une pièce tubulaire moulée, en particulier par rechargement dur | |
| EP4259353B1 (fr) | Procédé de fabrication d'un produit extrudé | |
| DE102005053347B4 (de) | Verfahren und Anlage zum Herstellen eines Mehrschicht-Verbundrohres | |
| DE10138600B4 (de) | Anordnung sowie Verfahren zum Tiefziehen von Kunststoff-Metall-Kunststoff-Mehrschichtrohren | |
| DE2226863A1 (de) | Verfahren zur herstellung von durch einlagen von faserstrukturen verstaerkten metallwerkstoffen | |
| DE69306862T2 (de) | Herstellung von mineralisolierten elektrischen Kabeln | |
| DE102015201879A1 (de) | Verfahren zum Herstellen eines Bauteils aus einem Sandwichmaterial und Bauteil aus einem Sandwichmaterial |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 17P | Request for examination filed |
Effective date: 20140606 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20170401 |