EP2799623A2 - Procédé permettant de fournir une fondation pour une tour d'électricité haute tension, réseau de tours d'électricité haute tension munies d'une fondation et tour d'électricité haute tension munie d'une fondation - Google Patents

Procédé permettant de fournir une fondation pour une tour d'électricité haute tension, réseau de tours d'électricité haute tension munies d'une fondation et tour d'électricité haute tension munie d'une fondation Download PDF

Info

Publication number
EP2799623A2
EP2799623A2 EP14166790.7A EP14166790A EP2799623A2 EP 2799623 A2 EP2799623 A2 EP 2799623A2 EP 14166790 A EP14166790 A EP 14166790A EP 2799623 A2 EP2799623 A2 EP 2799623A2
Authority
EP
European Patent Office
Prior art keywords
tower
foundation
voltage
piles
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP14166790.7A
Other languages
German (de)
English (en)
Other versions
EP2799623A3 (fr
Inventor
Arthur Lucas Adrianus van Noort
Arend Jan Tibbe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Koninklijke BAM Groep NV
Original Assignee
Koninklijke BAM Groep NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koninklijke BAM Groep NV filed Critical Koninklijke BAM Groep NV
Publication of EP2799623A2 publication Critical patent/EP2799623A2/fr
Publication of EP2799623A3 publication Critical patent/EP2799623A3/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations

Definitions

  • the invention relates to a method for providing a foundation for a high-voltage electricity tower, to a network of high-voltage electricity towers provided with a foundation and to a high-voltage electricity tower provided with a foundation.
  • High-voltage electricity towers also referred to as high-voltage power pylons, are used to support cable lines, such as high-voltage cables through which electricity is transported from a first location to a second location at high voltage.
  • High-voltage electricity towers are divided into:
  • lattice towers In the Netherlands, most high-voltage electricity towers are configured as lattice towers. These lattice towers are composed of a very large number (tens or hundreds of) metal angle profiles, also referred to as lattices. These angle profiles are attached to each other by means of bolts.
  • the bottom part of the lattice tower has four legs which support the lattice tower on piles. The legs may be short, but may also be very tall, so that agricultural vehicles can pass under them.
  • the so-called tower On top of this bottom part, the so-called tower is placed, which is usually of a tapering design, at least in the Netherlands. Arms are fitted to the tower, also referred to as crossbars, which project on either side of the tower and carry the cable lines.
  • tube towers In addition to lattice towers, there are also tube towers, also called duct towers.
  • the construction of tube towers is in the shape of a pile, and they are referred to in the remainder of this application as a high-voltage tower pile.
  • This high-voltage tower pile is provided with arms from which the cable lines are suspended.
  • the high-voltage tower pile is usually configured as a metal structure which often, but not always, tapers.
  • Wintrack tower A recent further development of the tube tower is the so-called Wintrack tower.
  • a single Wintrack tower consists of two high-voltage tower piles which, viewed in a direction at right angles to the longitudinal direction of the cable lines, are arranged next to each other at a distance of approximately 8-20 metres apart.
  • the present invention relates to tube towers and in particular to tube towers comprising two juxtaposed high-voltage tower piles per tower.
  • High-voltage electricity towers are provided with a foundation in the ground.
  • the high-voltage electricity tower has to be able to transmit the forces exerted by the supported cable lines to the ground.
  • a good foundation or anchoring in the ground is therefore necessary.
  • the high-voltage tower piles may be too close together to allow for a separate foundation slab for each high-voltage tower pile and it is known to make use of a single rectangular concrete foundation slab which may or may not be provided with a further foundation in the form of piles.
  • a common foundation consisting of a rectangular concrete slab of approximately 17 m x 11 m is known, comprising two tower foundations at a mutual centre-to-centre distance of approximately 9 m.
  • a problem when providing a foundation for a high-voltage electricity tower is that this is expensive and time-consuming.
  • this object is achieved by the method for providing a foundation for high-voltage electricity towers according to claim 1.
  • the method comprises the step of excavating a pit in the ground for receiving a ground foundation.
  • Excavating is also referred to as digging (out), in which case the pit is an excavation or also an open excavation.
  • the term 'open' is intended to refer to the fact that the top of the pit is open, in such a manner that the ground foundation can be received or placed.
  • the ground may be of any type, but is in particular clay soil with an aquifer situated underneath it.
  • the method furthermore comprises the step of forming the ground foundation in the pit and placing two or more tower foundations on the ground foundation, in such a way that the ground foundation connects the tower foundations to one another across a distance.
  • the tower foundations are often placed a distance apart which is significantly smaller than the distance between two high-voltage electricity towers.
  • the tower foundations are, for example, cylindrical, but may also be shaped differently, such as frustoconical or pyramidal, but may also be box-shaped.
  • the method furthermore comprises the step of placing a vertically oriented high-voltage tower pile on each of the tower foundations.
  • the high-voltage tower piles carry the cable lines at a predetermined orientation of a longitudinal direction of the cable lines with respect to the high-voltage tower piles.
  • This is understood to mean that the cable lines which are carried by the high-voltage tower piles come in from a certain direction and exit in a certain direction. This results in an orientation of the longitudinal direction of the cable lines with respect to the high-voltage tower piles.
  • the incoming direction is identical to the outgoing direction. This is the case with a so-called suspension tower.
  • the incoming direction is not identical to the outgoing direction. This is the case with a so-called angle tower.
  • the ground foundation is provided with one or more beams in a beam pattern and the method furthermore comprises the step of determining the beam pattern. Determining the beam pattern is based on a distribution of forces on the ground foundation which results from axial forces in the cable lines and the orientation of the longitudinal direction of the cable lines with respect to the high-voltage tower piles.
  • the advantage of laying a ground foundation in the form of beams in a beam pattern compared to a foundation slab is that significantly less soil has to be excavated and that the excavation is significantly less wide. This makes it possible to provide a foundation in a less expensive and quicker way. As less soil has to be excavated, the risk of the ground bursting is reduced.
  • the cable lines which are carried by the high-voltage tower piles exert an axial force.
  • This axial force has to be transmitted to the ground via the high-voltage electricity tower, that is to say via the high-voltage tower pile, the tower foundation and the ground foundation.
  • the way in which the axial force acts on the high-voltage tower pile depends on the orientation of the longitudinal direction of the cable lines with respect to the high-voltage tower pile. Since this orientation is known beforehand, it is therefore also possible to determine the beam pattern beforehand. Consequently, on the one hand, a reduced pit to be excavated is possible and, on the other hand, the ground foundation is sufficiently large and strong to absorb the distribution of forces resulting from the cable lines.
  • the method furthermore comprises the step of producing one or more ground foundation troughs and placing the ground foundation troughs in the pit in a pattern, wherein the pattern of the ground foundation troughs corresponds to the beam pattern. Subsequently, concrete is poured into the ground foundation troughs in order to form the ground foundation. This is particularly advantageous, as this makes it possible to place the ground foundation in situ more quickly and easily.
  • the ground foundation troughs form a skeleton of the ground foundation, as it were. Several ground foundation troughs can form the final desired shape of the ground foundation.
  • the ground foundation troughs may, for example, be in the form of beams and be placed in such a manner that the beam pattern is produced.
  • the ground foundation troughs provide a direct counterweight to the possible bursting of the ground. Due to the fact that the ground foundation troughs can be placed immediately after the pit has been excavated, i.e. in the wet, it is even possible to immediately fill in the ground next to the troughs. This results in a further reduction in costs and makes it possible to work more quickly.
  • the ground foundation troughs are preferably open at the top and comprise side walls, which define a shape of a beam, as well as a bottom.
  • the ground foundation troughs are made of concrete. However, they may also be made of wood and/or steel.
  • the ground foundation troughs may be modular and/or prefabricated.
  • the bottom of the ground foundation troughs has holes for accommodating piles.
  • the step of determining the beam pattern comprises choosing a beam pattern having an I-shape, in which the axial forces and the orientation of the longitudinal direction of the cable lines correspond to those at suspension towers. In this way, a suspension tower is produced.
  • I-shape is understood to mean a single beam, preferably a slender and thin beam which has a beam width which is equal to or smaller than a largest diameter, viewed in the horizontal plane, of the tower foundation.
  • the beam width is equal to or smaller than a smallest diameter, viewed in the horizontal plane, of the tower foundation.
  • the corresponding beam pattern is such that it comprises a single beam whose longitudinal direction is at right angles to the longitudinal direction of the cable lines.
  • the advantage of such a beam pattern is that a distribution of forces resulting from and originating from cable lines which are oriented in such a way can be transmitted to the ground foundation in an optimum manner and that the ground foundation has a beam pattern which makes it possible to excavate less soil.
  • the cable line is at right angles to an imaginary perpendicular bisector between a first high-voltage tower pile and a second high-voltage tower pile.
  • a suspension tower corresponds to a cable line having a longitudinal direction which is, viewed in the horizontal plane, at right angles to an imaginary perpendicular bisector between two high-voltage tower piles.
  • the step of determining the beam pattern comprises choosing a beam pattern having an H-shaped pattern, in which the axial forces and the orientation of the longitudinal direction of the cable lines correspond to those at dead-end towers.
  • a high-voltage electricity tower is produced which is a dead-end tower.
  • a cable line ends near the high-voltage tower pile. That is to say that an incoming cable line exerts a greater axial force than a corresponding outgoing cable line.
  • the dead-end tower is adapted to carry such a cable line.
  • the method preferably furthermore comprises the step of positioning the cable line on the high-voltage tower pile at such an orientation.
  • the corresponding beam pattern is such that a first beam is fitted in a longitudinal direction at right angles to the longitudinal direction of the incoming cable lines and a second beam and third beam are fitted in a longitudinal direction parallel to the longitudinal direction of the cable lines.
  • a dead-end tower which is configured in this way corresponds to a cable line which ends near the dead-end tower, viewed in the horizontal plane. This results in a second bending moment on the high-voltage tower pile about a second moment axis, wherein the second moment axis is parallel to an imaginary perpendicular bisector which extends parallel to the beam pattern between two high-voltage tower piles.
  • the step of determining the beam pattern comprises choosing a beam pattern having a cruciform pattern, in which the axial forces and the orientation of the longitudinal direction of the cable lines correspond to those at angle towers.
  • a high-voltage electricity tower is produced which is an angle tower.
  • the cable line viewed in the horizontal plane, makes an angle. That is to say that a longitudinal direction of an incoming section of the cable line is at an angle to a longitudinal direction of an outgoing section of a cable line, with the incoming section and outgoing section belonging to the same cable line.
  • the angle tower is adapted to carry such a cable line.
  • the method preferably furthermore comprises the step of positioning the cable line on the high-voltage tower pile at such an orientation.
  • a cruciform pattern is understood to mean that the beams form at least one cross.
  • the beam pattern comprises two crosses which are connected to each other by means of a leg of the two crosses, respectively.
  • beams have been positioned in a cruciform beam pattern underneath each separate tower foundation, wherein the intersection of the cruciform beam pattern coincides with an imaginary vertical axis of the tower foundation, or the vertical axis of the respective high-voltage tower pile.
  • the high-voltage electricity tower comprises two high-voltage tower piles
  • the respective cruciformly positioned beams are integrally connected to each other.
  • the legs of the beams are connected and form one integral elongate beam.
  • an angle tower which is configured in this way corresponds to a cable line which, viewed in the horizontal plane, makes an angle with the high-voltage tower pile.
  • the moment axes are at right angles to and parallel to, respectively, the imaginary perpendicular bisector which extends parallel to the beam pattern between two high-voltage tower piles.
  • each of the beams has a beam length and beam width, viewed in a horizontal plane, in which the beam width is smaller than a largest diameter of a horizontal foundation surface of the tower foundation.
  • This is particularly advantageous, as this minimizes an amount of soil to be excavated.
  • large foundation slabs are used as ground foundation, but a lot of soil has to be excavated for these.
  • Slender, thin beams in a beam pattern reduce the requirement to excavate. This is not only quicker and less expensive, but also reduces the risk of the ground bursting, as a result of which less dewatering is required.
  • the method furthermore comprises the step of ramming one or more piles into the ground in order to support the ground foundation and placing the ground foundation on a first end of the one or more piles.
  • the piles serve to anchor the ground foundation into the ground.
  • the piles are, for example, made of wood, concrete and/or steel.
  • the ground foundation rests on one or more piles.
  • the piles are arranged in the ground at an angle to the vertical such that a second end of the one or more piles projects beyond an outer periphery of the ground foundation, viewed in a vertical plane.
  • the one or more piles are arranged in a centre of two tower foundations, viewed in a vertical plane.
  • the method furthermore comprises the steps of placing high-voltage electricity towers at a mutual distance apart and mutually connecting high-voltage electricity towers by cable lines which are carried by the high-voltage electricity towers. Furthermore, the method comprises providing a foundation for each of the high-voltage electricity towers according to one of the above embodiments.
  • the invention furthermore relates to a network of spaced-apart high-voltage electricity towers.
  • these are high-voltage electricity towers which have been installed according to the method of providing a foundation according to one of the above embodiments.
  • the network comprises at least a first high-voltage electricity tower and a second high-voltage electricity tower.
  • Each of the high-voltage electricity towers comprises two or more spaced-apart vertically oriented high-voltage tower piles which can carry cable lines.
  • each of the high-voltage electricity towers comprises tower foundations placed underneath the respective high-voltage tower piles in order to support the high-voltage tower piles.
  • the high-voltage electricity towers also comprise a ground foundation placed underneath the tower foundations in order to connect the two or more tower foundations to each other across a distance, with the tower foundations resting on the ground foundation.
  • the first high-voltage electricity tower is connected to the second high-voltage electricity tower by means of the cable lines, a longitudinal direction of the cable lines being oriented with respect to the high-voltage tower piles of the first and the second high-voltage electricity tower.
  • the ground foundation of each of the high-voltage electricity towers comprises one or more beams in a beam pattern, the beam pattern being based on a distribution of forces resulting from and originating from the orientation of the longitudinal direction of the cable lines with respect to the high-voltage tower piles.
  • This is advantageous because this reduces the amount of soil which has to be excavated in order to accommodate the ground foundation therein. This makes it possible to produce the foundation of the high-voltage electricity towers in a less expensive and quicker way.
  • such high-voltage electricity towers can be installed quickly and inexpensively in a soil layer above an aquifer, as less vacuum-assisted dewatering which reduces the pressure in the aquifer is required as the ground foundation is reduced.
  • each of the beams viewed in the horizontal plane, has a beam length and beam width, and the beam width is smaller than a largest diameter of a horizontal foundation surface of the tower foundation.
  • This has the advantage that the ground foundation can be reduced in size even further.
  • it is possible to dig trenches which form the pit. Digging trenches has the advantage that undesired excavation of soil can be prevented more efficiently, or that soil situated between the trenches can be left in situ and does not have to be excavated.
  • each of the high-voltage tower piles is tubular.
  • a horizontal foundation surface of the tower foundation is larger than the cross-sectional surface of the high-voltage tower pile. This has the advantage that the transmission of forces from the high-voltage tower pile to the tower foundation is improved.
  • the longitudinal direction of the cable lines is at right angles to an imaginary perpendicular bisector which extends parallel to the single beam between a first high-voltage tower pile and a second high-voltage tower pile.
  • the ground foundation comprises a single beam having a longitudinal direction at right angles to the longitudinal direction of the cable lines. This has the advantage that a very significant reduction in the size of the ground foundation is possible with suspension towers.
  • the beam pattern of the ground foundation is I-shaped.
  • the corresponding high-voltage electricity tower is a suspension tower.
  • a separate cable line in which the high-voltage tower piles can carry one or more cable lines, a separate cable line, viewed in the horizontal plane, ends near the high-voltage tower pile.
  • the corresponding ground foundation comprises several beams.
  • the beam pattern is such that a first beam is arranged in a longitudinal direction at right angles to the longitudinal direction of an incoming section of the cable line, and a second beam and third beam are arranged in a longitudinal direction parallel to the longitudinal direction of the cable lines.
  • the axial forces in the incoming section of the cable line are greater than the axial forces in the outgoing section of the cable line.
  • the outgoing section of the cable line is configured to end near the high-voltage electricity tower. This has the advantage that a reduction in the size of the ground foundation is possible with dead-end towers.
  • the beam pattern of the ground foundation is H-shaped in this case.
  • the corresponding high-voltage electricity tower is a dead-end tower.
  • a separate cable line makes an angle, viewed in the horizontal plane.
  • the corresponding ground foundation comprises several beams.
  • the beam pattern is such that a first beam is arranged in a longitudinal direction at right angles to the longitudinal direction of an incoming section of the cable line.
  • a second beam and third beam are arranged in a longitudinal direction at right angles to the longitudinal direction of the first beam.
  • the beam pattern of the ground foundation is cruciform in this case.
  • the corresponding high-voltage electricity tower is an angle tower.
  • the lowest point of the ground foundations is situated at 1.5 m below a ground surface.
  • the tower foundation has a horizontal radial periphery smaller than the respective tube diameter increased by half the respective tube diameter.
  • the tower foundation has a horizontal radial periphery smaller than the respective tube diameter increased by 2.0 m.
  • the tube diameters of the high-voltage tower piles are of equal size.
  • each of the high-voltage electricity towers furthermore comprises one or more piles anchored in the ground in order to support the ground foundation, with the ground foundation resting on the one or more piles.
  • the piles are arranged in the ground at an angle to the vertical such that a second end of the one or more piles projects beyond an outer periphery of the ground foundation, viewed in a vertical plane.
  • the one or more piles are arranged in a centre of two tower foundations, viewed in a vertical plane.
  • the one or more piles are arranged in the ground at an angle to the vertical based on the orientation of the longitudinal direction of the cable lines with respect to the high-voltage tower piles.
  • the invention furthermore relates to a high-voltage electricity tower provided with a foundation according to claim 16.
  • Figure 1 shows a ground foundation 7 with two tower foundations 4a, 4b arranged thereon according to a first embodiment. This is the result of a method for providing a foundation for a high-voltage electricity tower.
  • the method comprises the step of digging a pit 3 in the ground 9, as is shown more clearly in Fig. 2 , which shows a front and side view.
  • the ground foundation 7 is accommodated in the pit 3.
  • Digging the pit is carried out in such a way that the pit is not significantly larger than the dimensions of the ground foundation 7.
  • the ground foundation 7 is formed in the pit 3. This can be effected by placing the entire ground foundation 7 in the pit, but is preferably effected by first providing ground foundation troughs which are subsequently filled with concrete. These ground foundation troughs are preferably prefabricated, so that they can easily be placed in situ in the pit 3. The pattern of the ground foundation troughs corresponds to the beam pattern of the ground foundation 3. After the ground foundation troughs have been placed, they are filled with concrete in order to form the ground foundation 3.
  • the ground foundation 3 connects the tower foundations 4a, 4b to each other across a distance.
  • a vertically oriented high-voltage tower pile 10a, 10b is placed both on the first and the second tower foundation 4a, 4b.
  • the high-voltage tower piles 10a, 10b carry cable lines 20a, 21 a; 20b, 21 b, as illustrated in Figure 3 .
  • the cable lines 20a, 21 a; 20b, 21 b have a predetermined orientation of a longitudinal direction of the cable lines with respect to the high-voltage tower piles 10a, 10b.
  • the ground foundation 3 is provided with one or more beams 11 in a beam pattern which, in the embodiment according to Figs. 1-3 , consists of a single beam 11 and which, in the embodiments according to Figs. 4-9 , consists of several beams.
  • the method comprises the step of determining the beam pattern, with determining the beam pattern being based on the distribution of forces on the ground foundation 3 resulting from axial forces in the cable lines 20a, 21 a, 20b, 21 b and the orientation of the longitudinal direction of the cable lines 20a, 21 a, 20b, 21 b with respect to the high-voltage tower piles 10a, 10b.
  • a so-called suspension tower is installed, that is to say the foundation for the suspension tower is placed in a construction pit 3. This is illustrated in Figures 1 and 2 .
  • the associated orientation of the cable lines 20a, 20b is illustrated in Figure 3 .
  • the method for providing a foundation for the suspension tower comprises selecting a beam pattern having an
  • the orientation of the longitudinal direction of the cable lines 20a, 20b corresponds to the orientation in the case of the suspension towers, as illustrated in Figure 3 .
  • a first cable line 20a is carried by a first high-voltage tower pile 10a and a second cable line 20b is carried by a second high-voltage tower pile 10b.
  • the high-voltage tower piles 10a, 10b are not illustrated in Figure 3 , the corresponding tower foundations 4a, 4b are illustrated.
  • the longitudinal direction of the cable lines 20a, 21 a; 20b, 21 b is situated at right angles to an imaginary perpendicular bisector 12 between the first and the second high-voltage tower piles 10a, 10b.
  • the axial forces in the cable lines 20a, 21 a; 20a, 20b are such that they do not generate a bending moment about a moment axis which is situated parallel to the imaginary perpendicular bisector 12 between the first and the second high-voltage tower pile 10a, 10b.
  • the axial forces of an incoming section 20a, 20b and an outgoing section 21 a, 21 b of the cable lines cancel each other out.
  • the ground foundation 7 is such that the bending moment, whose moment axis is at right angles to the imaginary perpendicular bisector 12 between the first and the second high-voltage tower pile 10a, 10b, can be absorbed by the ground foundation 7.
  • the longitudinal direction of the single beam 11 is situated parallel to the abovementioned perpendicular bisector 12.
  • Figures 1 , 2a , 2b and 3 show a so-called suspension tower, at least a foundation and associated orientation of cable lines are illustrated which correspond to that at a suspension tower.
  • a so-called dead-end tower is installed, that is to say the foundation of the dead-end tower is placed in a construction pit 103.
  • This is illustrated in Figures 4 and 5 .
  • the associated orientation of the cable lines 120a, 121 a, 120b, 121 b is illustrated in Figure 6 .
  • Components of the second embodiment which are similar to components in the first embodiment are denoted by the same reference numeral, but increased by 100. The advantages and description of components with the first embodiment accordingly also apply to the second embodiment.
  • the method for providing a foundation for the dead-end tower comprises choosing a beam pattern having an H-shaped pattern during the step of determining the beam pattern. This is illustrated in Figure 4 .
  • the orientation of the longitudinal direction of the cable lines 120a, 121 a, 120b, 121 b corresponds to the orientation of the dead-end towers, as illustrated in Figure 6 .
  • the cable line 120a, 121 a, 120b, 121 b ends near the dead-end tower, viewed in the horizontal plane, which results in a bending moment on the high-voltage tower pile 110a, 110b about a moment axis which runs parallel to the imaginary perpendicular bisector 112 between the two high-voltage tower piles 110a, 110b.
  • Figure 6 shows two cable lines, a first cable line 120a, 121 a and a second cable line 120b, 121 b which are oriented with respect to a first high-voltage tower pile 110a and a second high-voltage tower pile 110b, respectively.
  • the respective first tower foundation 104a and second tower foundation 104b are also illustrated in Figure 6 .
  • the first cable line 120a, 121 a consists of an incoming section 120a and an outgoing section 121 a. Axial forces in the incoming section are smaller than the axial forces in the outgoing section 121 a. The reason for this is that the incoming section 120a is smaller because it ends. A smaller incoming section 120a means less weight and thus smaller axial forces.
  • FIGS. 4 , 5 and 6 show a so-called dead-end tower, at least a foundation and associated orientation of cable lines are illustrated which correspond to those at a dead-end tower.
  • a so-called angle tower is installed, that is to say the foundation of the angle tower is placed in a construction pit 203. This is illustrated in Figures 7 and 8 .
  • the associated orientation of the cable lines 220a, 220b is illustrated in Figure 9 .
  • Components of the third embodiment which are similar to components in the preceding embodiments are denoted by the same reference numeral, but increased by a multiple of 100, i.e. starting with 200. The advantages and description of components of the preceding embodiment accordingly also apply to the third embodiment.
  • the beam pattern is cruciform, i.e. the beams 211 a, 211 b, 211 c, viewed in a horizontal plane, have a cruciform pattern, as can be seen in Figure 7 and Figure 9 .
  • the axial forces and the orientation of the longitudinal direction of the cable lines correspond to those at so-called angle towers, which carry cable lines 220a, 221 a, 220b, 221 b, as illustrated in Figure 9 .
  • a first cable line 220a, 221 a consists of an incoming section 220a of the cable line and an outgoing section 221 a of the cable line.
  • the incoming section 220a of the cable line makes an angle with the outgoing section 221 a of the cable line. This results in a distribution of forces on the high-voltage tower pile 210a and therefore on the ground foundation 203.
  • the distribution of forces is absorbed by the ground foundation 203 by the beam pattern comprising the beams 211 a, 211 b, 211 c.
  • the above has the advantage that the beam pattern is such that the amount of soil to be excavated to produce the pit 203 is minimized, while the distribution of forces can be absorbed to a sufficient degree by the tower foundation 203.
  • Figures 7 , 8 and 9 show a so-called angle tower, at least a foundation and associated orientation of cable lines are illustrated which correspond to those at an angle tower.
  • the beam width is smaller than a largest diameter of a horizontal foundation surface of the tower foundation 4a, 4b, 104a, 104b, 204a, 204b.
  • the beam length and beam width are defined as lying in a horizontal plane.
  • the method furthermore comprises the step of ramming one or more piles 5a, 5b, 105a, 205a into the ground in order to support the ground foundation 7, 107, 207.
  • the ground foundation 7, 107, 207 is placed on a first end of the one or more piles 5a, 5b, 105a, 205a.
  • the ground foundation 7, 107, 207 rests on the one or more piles 5a, 5b, 105a, 205a.
  • piles 5a, 105a, 205a are arranged in the ground at an angle to the vertical, such that a second end of the one or more piles 5a, 105a, 205a projects beyond an outer periphery of the ground foundation, viewed in a vertical plane. This can be seen in the front and side views of Figures 2a, 2b , 5 , and 8 .
  • one or more piles 5b are arranged in a centre of two tower foundations, viewed in a vertical plane. This can be seen in the front and side views in Figures 2a and 2b , in which one pile 5a is arranged centrally between the first tower foundation 4a and the second tower foundation 4b of the first embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)
  • Electric Cable Installation (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
EP14166790.7A 2013-05-02 2014-05-01 Procédé permettant de fournir une fondation pour une tour d'électricité haute tension, réseau de tours d'électricité haute tension munies d'une fondation et tour d'électricité haute tension munie d'une fondation Withdrawn EP2799623A3 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2010754 2013-05-02

Publications (2)

Publication Number Publication Date
EP2799623A2 true EP2799623A2 (fr) 2014-11-05
EP2799623A3 EP2799623A3 (fr) 2014-11-19

Family

ID=48703778

Family Applications (2)

Application Number Title Priority Date Filing Date
EP14166787.3A Withdrawn EP2799622A1 (fr) 2013-05-02 2014-05-01 Tour de haute tension avec un fondement
EP14166790.7A Withdrawn EP2799623A3 (fr) 2013-05-02 2014-05-01 Procédé permettant de fournir une fondation pour une tour d'électricité haute tension, réseau de tours d'électricité haute tension munies d'une fondation et tour d'électricité haute tension munie d'une fondation

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP14166787.3A Withdrawn EP2799622A1 (fr) 2013-05-02 2014-05-01 Tour de haute tension avec un fondement

Country Status (1)

Country Link
EP (2) EP2799622A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019107266A1 (de) * 2019-03-21 2020-09-24 Wobben Properties Gmbh Gründung für ein Turmbauwerk, Turm für eine Windenergieanlage und Windenergieanlage sowie Verfahren zur Gründung eines Turmbauwerks

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10028755B4 (de) * 2000-06-09 2009-04-23 Tessag Technische Systeme & Services Ag Verfahren zum Verstärken von Fundamenten von Hochspannungsmasten
NL1017953C2 (nl) * 2001-04-27 2002-11-05 Kema Nv Hoogspanningsmast met verzwaarde fundatie.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None

Also Published As

Publication number Publication date
EP2799623A3 (fr) 2014-11-19
EP2799622A1 (fr) 2014-11-05

Similar Documents

Publication Publication Date Title
US20200338786A9 (en) Foundation with pedestal and ribs for towers
EP2229313B1 (fr) Charpente pour fondation flottante à composants de flottaison, de type de construction dispersée
EP2471153B1 (fr) Système de protection contre la foudre
US11976432B2 (en) Foundation for wind turbine towers
US20110061321A1 (en) Fatigue reistant foundation system
EP2837554A1 (fr) Plateforme marine partiellement flottante pour éoliennes en mer, ponts et constructions maritimes, et procédé de fabrication
EP2981654B1 (fr) Ensemble tour pour une structure de tour
US10851763B2 (en) Wind turbine foundation and method of constructing a wind turbine foundation
CN113417300B (zh) 边坡支护系统及其施工方法
CN112609725A (zh) 适用于中心城区的预制钢沉井施工方法
WO2013044977A1 (fr) Système d'élément de paroi pour une installation de stockage d'énergie en mer
WO2022089858A1 (fr) Système d'énergie éolien offshore
EP2799623A2 (fr) Procédé permettant de fournir une fondation pour une tour d'électricité haute tension, réseau de tours d'électricité haute tension munies d'une fondation et tour d'électricité haute tension munie d'une fondation
CN206485522U (zh) 一种漂浮电站桩锚系统
JP2019100070A (ja) 洋上風力発電施設の基礎構造およびその施工方法
CN105064357A (zh) 一种预应力锚索内嵌式锚固装置及锚固方法
KR101146252B1 (ko) 인장 하중이 분산되는 앙카
KR20070109022A (ko) 지하 가시설의 강선 보강 구조물
CN107190757B (zh) 可装配可回收的深基坑支护体系的施工方法及支护体系
CN202450838U (zh) 一种拼装式铁塔基站
CN112779923A (zh) 一种高边坡上建筑工程的桩基础结构及其施工工艺
CN211666852U (zh) 一种风电机组箱式变电站一体式基础
JP7536020B2 (ja) オフショア設備用の重力式基礎を製造するための方法および重力式基礎
CN216615880U (zh) 一种基坑支护结构
CN218779526U (zh) 一种用于风电场分散式储能系统的固定装置

Legal Events

Date Code Title Description
PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140501

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 27/50 20060101AFI20141016BHEP

RIN1 Information on inventor provided before grant (corrected)

Inventor name: TIBBE, AREND JAN

Inventor name: VAN NOORT, ARTHUR LUCAS ADRIANUS

Inventor name: VERSLUIS, ARIANUS CORNELIS

R17P Request for examination filed (corrected)

Effective date: 20150316

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: VERSLUIS, ARIANUS CORNELIS

Inventor name: TIBBE, AREND JAN

Inventor name: VAN NOORT, ARTHUR LUCAS ADRIANUS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20160120

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20160531