EP2655811A2 - Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur - Google Patents

Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur

Info

Publication number
EP2655811A2
EP2655811A2 EP12705819.6A EP12705819A EP2655811A2 EP 2655811 A2 EP2655811 A2 EP 2655811A2 EP 12705819 A EP12705819 A EP 12705819A EP 2655811 A2 EP2655811 A2 EP 2655811A2
Authority
EP
European Patent Office
Prior art keywords
fossil
steam generator
power
steam
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP12705819.6A
Other languages
German (de)
English (en)
Other versions
EP2655811B1 (fr
Inventor
Frank Thomas
Jan BRÜCKNER
Martin Effert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Siemens Corp
Original Assignee
Siemens AG
Siemens Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG, Siemens Corp filed Critical Siemens AG
Priority to PL12705819T priority Critical patent/PL2655811T3/pl
Publication of EP2655811A2 publication Critical patent/EP2655811A2/fr
Application granted granted Critical
Publication of EP2655811B1 publication Critical patent/EP2655811B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/06Control systems for steam boilers for steam boilers of forced-flow type
    • F22B35/10Control systems for steam boilers for steam boilers of forced-flow type of once-through type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D11/00Feed-water supply not provided for in other main groups
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D11/00Feed-water supply not provided for in other main groups
    • F22D11/003Emergency feed-water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22GSUPERHEATING OF STEAM
    • F22G5/00Controlling superheat temperature
    • F22G5/02Applications of combustion-control devices, e.g. tangential-firing burners, tilting burners
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22GSUPERHEATING OF STEAM
    • F22G5/00Controlling superheat temperature
    • F22G5/12Controlling superheat temperature by attemperating the superheated steam, e.g. by injected water sprays

Definitions

  • the invention relates to a method for controlling a short-term increase in output of a steam turbine with an upstream fossil-fueled continuous steam generator with a number of a flow path-forming, flowed through by a flow medium economizer, evaporator and Matterhitzersammlung surfaces.
  • a fossil-fueled steam generator produces superheated steam using the heat generated by burning fossil fuels.
  • Fossil fueled steam generators are mostly used in steam power plants, which are mainly used for power generation.
  • the generated steam is fed to a steam turbine.
  • the fossil-fueled steam generator also comprises a plurality of pressure stages with different thermal states of the respectively contained water-steam mixture.
  • the first (high) pressure level the flow medium passing through the flow path on its first economiser, to use the residual heat Voricar ⁇ mung of the flow medium, and then various levels of dene ⁇ evaporator and superheater.
  • the evaporator the flow medium is evaporated, then separated any residual moisture in a separator and further heated the remaining steam in the superheater. Thereafter, the superheated steam in the high pressure part of the steam turbine flows, is there decompressed, and the following print ⁇ stage of the steam generator is supplied. There he is again supplied via ⁇ hitzt (reheat) and the next-pressure part of the steam turbine.
  • the heat output transferred to the superheaters can fluctuate greatly. There- It is often necessary to control the overheating temperature. Usually, this is usually achieved by an injection of feed water before or after individual superheater heating surfaces for cooling, ie, an overflow branch branches off from the main flow of the flow medium and leads to injection coolers arranged accordingly there.
  • the injection is customarily controlled by a predetermined for the Tempe ⁇ raturabweichungen by a temperature setpoint at the outlet of the superheater characteristic parameter value with the aid of valves.
  • Such power changes of a power plant block in the se ⁇ customer area are possible only by a coordinated interaction of steam generator and steam turbine.
  • the contribution of fossil fuel-fired steam generator can do this is by using his memory, ie the steam but also the fuel storage, as well as rapid changes in the controlling variable ⁇ SEN feedwater, injection water, fuel and air.
  • This measure an increase in performance is achieved within a few seconds. This additional power can be released in a relatively short time, so that the delayed power increase can be at least partially compensated by the increase in the firing capacity.
  • the entire block makes by this measure immediately a jump in performance and can also permanently maintain or exceed this level of performance by a subsequent increase in the firing capacity, ⁇ the system was set at the time of additional requested power reserves in the partial load range.
  • a permanent throttling of the turbine valves for Vorhal ⁇ tion of a reserve however, always leads to a loss ⁇ efficiency, so that for an economical driving the degree of throttling should be kept as low as absolutely necessary.
  • some types of fossil-fueled steam generators such. B. forced flow steam generator may have a significantly smaller storage volume than z. B. natural circulation steam generator.
  • the difference in the size of the memory has an influence on the behavior of changes in the power plant block in the method described above.
  • the design pressure in the entire steam generator must not be exceeded, so that this measure in the upper load range only limited or can not be applied.
  • This object is achieved according to the invention, by increasing the short-term ⁇ power increase of the steam turbine, the flow of fluid medium through the fossil-fired steam generator.
  • the invention is based on the consideration that the introduced heat output into the steam generator is determined by the firing capacity and only has a comparatively slow effect in the event of a sudden change.
  • a zusiger ⁇ Liche power delivery in the steam turbine should be performed by a use of the stored in the heating surfaces of the steam generator heat energy. The withdrawal of this heat requires a lowering of the average material temperature. This should be achieved by increasing the flow, ie the amount of flow medium flowing through per unit of time. Due to the higher flow with comparatively lower medium temperatures, the average material temperature of all heating surfaces is lowered by this measure and as a result thermal energy is released from all these heating surfaces and released in the steam turbine in the form of additional power.
  • the enthalpy desired value is reduced at the exit of an evaporator heating surface .
  • the setpoint value for the specific enthalpy is used in the control system of the Dampferzeu ⁇ gers as a control variable for the determination of the desired value for the flow of the flow medium.
  • This switching action has two effects: First, the basic setpoint for the evaporator flow rate calculated in the feedwater setpoint determination increases. Second, the increased Enthalpiekor ⁇ rekturregler - especially when the reduction particularly rapidly (suddenly) is carried out - by now larger anste ⁇ rising control deviation to be output to rapidly as possible to reduce the enthalpy at the evaporator outlet. As a result, the amount of feed water at the beginning of this measure even increases disproportionately and it is a particularly fast storage of heat from the heating surfaces with the associated glossentitati in the steam turbine possible.
  • the enthalpy desired value is reduced to a given minimum enthalpy value . This is a ⁇ hand in all load conditions, a maximum tripodentbin- while maintaining operational safety.
  • the Swiss-Shenthalpiewert is dimensioned such that in all load conditions of the fossil-fueled steam generator complete Verdamp ⁇ tion of the flow medium is achieved in the evaporator heating.
  • Verdamp ⁇ tion of the flow medium is achieved in the evaporator heating.
  • subcritical operation namely, should be ensured that the enthalpy at the evaporator ⁇ outlet is not lowered too far and consequently a seizure of residual water in a downstream separator can be safely avoided.
  • a maximum increase in additional feed water and thus additional performance relief should be achieved with the safest possible driving.
  • the parameters of the measures taken are matched to the required power release in the steam turbine and optimized. For this amount and / or duration of the reduction of Enthalpiesollwerts be determined from the Need Beer ⁇ saturated power increase.
  • flow medium removed in the flow path in the region of a superheater heating surface of the steam generator is injected for short-term increase in output of the steam turbine.
  • Derar ⁇ term injections can in fact make a further contribution to the short-term rapid change in performance.
  • the stored thermal energy is used for ei ⁇ ne temporary increase in power of the steam turbine. This thus results in the additional advantage that a particularly high excess power can be maintained at a constant level over a geeig ⁇ designated coordinating all measures available quickly and as long as possible.
  • the material load can also be positively influenced.
  • the heat input is increased in the fossil-fired steam generator, that is, increases the firing capacity of the burner.
  • a temperature reduction at the evaporator outlet can be favorably influenced or even completely avoided by the described method, since the measure acts as a Vorhaltsignal on the Spei ⁇ sewasser.
  • the method not only allows a short-term increase in performance, but is also used for faster adjustment of a longer-term performance increase.
  • a control system for a fossil-fired steam generator with a number of flow-forming, flowed through by a flow medium economizer, evaporator and Kochhitzersammlungflä- chen means for carrying out the method.
  • a fossil-fired steam generator for a steam power plant comprises such a control system and a steam power plant such a fossil-fired steam generator.
  • FIG. 1 shows a diagram with simulation results for improving the instantaneous reserve of a fossil-fired continuous steam generator by increasing the feedwater quantity together with injection of high-pressure steam, reheat steam and in each case in both pressure systems in an upper load range, and
  • FIG. 2 shows a diagram with simulation results for improving the immediate reserve of a fossil-fueled continuous steam generator by increasing the amount of feed water together with injection of high-pressure steam, reheat steam and in each case in both pressure systems in a lower load range.
  • FIG 1 is a diagram showing simulation results by taking advantage of the control method in a fossil-fired steam generator, ie a sudden reduction in the contained ⁇ piesollwerts at the evaporator outlet to increase the feed water flow at constant ⁇ firing.
  • Up ⁇ carry the percent additional power is related to full load 1 against time in seconds after a 2 sprunghaf ⁇ th reduction of the target value of the specific enthalpy at the evaporator outlet to 100 kJ / kg at 95% load.
  • This reduction tion provides the control concept for an increase in Lucaswas ⁇ ser diehne.
  • Curve 4 shows the result without ⁇ additional use of injections
  • curves 6 and 8 represent the results for an additional use of injections in the high pressure stage or in the high-pressure and medium-pressure stage.
  • additional cure ⁇ ventool 10 shown 12, 14, which results in high pressure stage without raised stabili ⁇ hung the supply amount of water, but by sole use of injections (curve 10), medium-pressure stage (curve 12) and two pressure stages (curve 14 ) demonstrate.
  • the injection is achieved by reducing the setpoint for live steam temperature and, if appropriate, reheaction temperature by 20 K.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Control Of Turbines (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

L'invention concerne un procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur comprenant un générateur de vapeur en continu à combustible fossile monté en amont qui comporte un certain nombre de surfaces de chauffe d'économiseur, d'évaporateur et de surchauffeur qui forment une trajectoire d'écoulement et qui sont parcourues par une substance d'écoulement. Le procédé selon l'invention doit être conçu en particulier pour permettre une augmentation de puissance de courte durée d'une turbine à vapeur montée en aval, sans altérer de manière excessive le rendement du processus de vapeur. A cet effet, pour permettre une augmentation de puissance de courte durée de la turbine à vapeur, le flux de la substance d'écoulement dans le générateur de vapeur en continu à combustible fossile est accru.
EP12705819.6A 2011-02-25 2012-02-10 Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur Active EP2655811B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL12705819T PL2655811T3 (pl) 2011-02-25 2012-02-10 Sposób regulacji krótkookresowego wzrostu mocy turbiny parowej

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102011004712 2011-02-25
PCT/EP2012/052312 WO2012113662A2 (fr) 2011-02-25 2012-02-10 Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur

Publications (2)

Publication Number Publication Date
EP2655811A2 true EP2655811A2 (fr) 2013-10-30
EP2655811B1 EP2655811B1 (fr) 2015-10-14

Family

ID=45757393

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12705819.6A Active EP2655811B1 (fr) 2011-02-25 2012-02-10 Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur

Country Status (8)

Country Link
US (1) US9080467B2 (fr)
EP (1) EP2655811B1 (fr)
JP (1) JP5815753B2 (fr)
KR (1) KR101818090B1 (fr)
CN (1) CN103492678B (fr)
DK (1) DK2655811T3 (fr)
PL (1) PL2655811T3 (fr)
WO (1) WO2012113662A2 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016218763A1 (de) 2016-09-28 2018-03-29 Siemens Aktiengesellschaft Verfahren zur kurzfristigen Leistungsanpassung einer Dampfturbine eines Gas-und Dampfkraftwerks für die Primärregelung

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4933002A (fr) 1972-08-04 1974-03-26
FR2401380A1 (fr) 1977-08-23 1979-03-23 Sulzer Ag Generateur de vapeur a circulation forcee
EP0308728B1 (fr) 1987-09-21 1991-06-05 Siemens Aktiengesellschaft Méthode d'exploitation d'un générateur de vapeur à passage unique
DE4117796A1 (de) 1991-05-30 1993-01-21 Ver Energiewerke Ag Verfahren zur dampftemperaturregelung an ueberhitzern von dampfanlagen
KR100251011B1 (ko) 1992-05-04 2000-04-15 칼 하인쯔 호르닝어 관류 증기 발생기
DE19749452C2 (de) * 1997-11-10 2001-03-15 Siemens Ag Dampfkraftanlage
DE19750125A1 (de) 1997-11-13 1999-03-11 Siemens Ag Verfahren und Vorrichtung zur Primärregelung eines Dampfkraftwerkblocks
US6230480B1 (en) * 1998-08-31 2001-05-15 Rollins, Iii William Scott High power density combined cycle power plant
US6766646B1 (en) 2003-11-19 2004-07-27 General Electric Company Rapid power producing system and method for steam turbine
US7690201B2 (en) * 2005-11-07 2010-04-06 Veritask Energy Systems, Inc. Method of efficiency and emissions performance improvement for the simple steam cycle
EP2194320A1 (fr) * 2008-06-12 2010-06-09 Siemens Aktiengesellschaft Procédé de fonctionnement d'un générateur de vapeur à passage unique et générateur de vapeur à passage unique
DE102010041964A1 (de) 2010-10-05 2012-04-05 Siemens Aktiengesellschaft Verfahren zur Regelung einer kurzfristigen Leistungserhöhung einer Dampfturbine
US9091182B2 (en) * 2010-12-20 2015-07-28 Invensys Systems, Inc. Feedwater heater control system for improved rankine cycle power plant efficiency
US9316122B2 (en) * 2010-12-20 2016-04-19 Invensys Systems, Inc. Feedwater heater control system for improved Rankine cycle power plant efficiency

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012113662A2 *

Also Published As

Publication number Publication date
PL2655811T3 (pl) 2016-03-31
WO2012113662A3 (fr) 2013-03-21
WO2012113662A2 (fr) 2012-08-30
JP5815753B2 (ja) 2015-11-17
CN103492678A (zh) 2014-01-01
KR101818090B1 (ko) 2018-01-12
CN103492678B (zh) 2016-03-09
JP2014508272A (ja) 2014-04-03
AU2012219798A1 (en) 2013-08-29
KR20140007857A (ko) 2014-01-20
DK2655811T3 (en) 2016-01-11
US9080467B2 (en) 2015-07-14
US20130327043A1 (en) 2013-12-12
EP2655811B1 (fr) 2015-10-14

Similar Documents

Publication Publication Date Title
EP2603672B1 (fr) Générateur de vapeur à récupération de chaleur
EP2606206B1 (fr) Procédé pour réguler une augmentation de puissance à court terme d'une turbine à vapeur
DE102009036064B4 (de) rfahren zum Betreiben eines mit einer Dampftemperatur von über 650°C operierenden Zwangdurchlaufdampferzeugers sowie Zwangdurchlaufdampferzeuger
EP3025031B1 (fr) Procédé de fonctionnement d'une centrale à turbine à vapeur
DE102012204081A1 (de) Energiespeicherkraftwerk
CH621187A5 (fr)
EP1421317B1 (fr) Procede de mise en marche d'un generateur de vapeur comportant un canal a gaz chauffant pouvant etre traverse par un gaz chauffant dans une direction approximativement horizontale et generateur de vapeur
EP3269948B1 (fr) Procédé d'adaptation de la puissance d'une centrale à turbine à vapeur et centrale à turbine à vapeur
DE102012204218A1 (de) Leistungsregelung und/oder Frequenzregelung bei einem solarthermischen Dampfkraftwerk
EP2616643B1 (fr) Procédé de régulation d'une augmentation de puissance à court terme d'une turbine à vapeur
DE102011078193A1 (de) Zusätzliche Regelanzapfung für einen Vorwärmer zur Verbesserung der Anlagendynamik und Frequenzregelung bei einem Dampfkraftwerk
WO2018059840A1 (fr) Procédé d'adaptation à court terme de la puissance d'une turbine à vapeur d'une centrale à gaz et à vapeur pour la régulation primaire
EP2655811B1 (fr) Procédé pour ajuster une augmentation de puissance de courte durée d'une turbine à vapeur
DE102010043683A1 (de) Fossil befeuerter Dampferzeuger
EP3014178A2 (fr) Procédé permettant de faire fonctionner un générateur de vapeur à circulation forcée chauffé par l'extérieur
EP2625390B1 (fr) Générateur de vapeur à combustibles fossiles
WO2013149900A1 (fr) Centrale électrique et procédé permettant de faire fonctionner une centrale électrique
DE102011078195A1 (de) Sollwertanpassung bei einem Dampfkraftwerk
AT512176B1 (de) Abhitzedampferzeuger
WO2014146846A2 (fr) Procédé de fonctionnement d'une centrale héliothermique
EP2900945A1 (fr) Procédé de fonctionnement flexible d'une centrale électrique
CH338472A (de) Verfahren zur Regelung von bei hohem Druck betriebenen Zwangdurchlaufdampferzeugern und Einrichtung zur Durchführung des Verfahrens

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130725

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150515

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 755260

Country of ref document: AT

Kind code of ref document: T

Effective date: 20151015

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502012004909

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20160107

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20151014

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160214

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160114

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160115

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160215

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502012004909

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

26N No opposition filed

Effective date: 20160715

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20161028

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 755260

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170210

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151014

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 502012004909

Country of ref document: DE

Owner name: SIEMENS ENERGY GLOBAL GMBH & CO. KG, DE

Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20220825 AND 20220831

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20230220

Year of fee payment: 12

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20240229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240229

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20250226

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20250121

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20250225

Year of fee payment: 14

Ref country code: GB

Payment date: 20250218

Year of fee payment: 14