EP2634313B1 - Improved anchoring element for ground consolidation - Google Patents

Improved anchoring element for ground consolidation Download PDF

Info

Publication number
EP2634313B1
EP2634313B1 EP13157515.1A EP13157515A EP2634313B1 EP 2634313 B1 EP2634313 B1 EP 2634313B1 EP 13157515 A EP13157515 A EP 13157515A EP 2634313 B1 EP2634313 B1 EP 2634313B1
Authority
EP
European Patent Office
Prior art keywords
anchoring element
bar
ground
cables
tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP13157515.1A
Other languages
German (de)
French (fr)
Other versions
EP2634313A2 (en
EP2634313A3 (en
Inventor
Gaetano Dalla Gassa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalla Gassa Srl
Original Assignee
Dalla Gassa Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalla Gassa Srl filed Critical Dalla Gassa Srl
Publication of EP2634313A2 publication Critical patent/EP2634313A2/en
Publication of EP2634313A3 publication Critical patent/EP2634313A3/en
Application granted granted Critical
Publication of EP2634313B1 publication Critical patent/EP2634313B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material

Definitions

  • the invention concerns an improved anchoring element particularly suitable for making slope consolidation structures, for stabilizing landslips, for making anchoring structures in various geotechnical applications.
  • Anchoring elements are known and widely used, which are constituted by tie rods made with prestressed steel strands or by solid bars in structural steel that are constrained in corresponding holes made in the ground through a cement mix.
  • Anchoring elements are also known that comprise self-perforating hollow bars generally consisting of a plurality of tubular elements that are threaded externally and axially connected one after the other through joining sleeves as they are driven into the ground.
  • the end of the first tubular element is provided with a perforating head and the tubular element is inserted in the ground through a rotary movement or a rotary percussive movement to which it is subjected by special power means.
  • a draining fluid is pumped into the bar, wherein said fluid can be air, water or more commonly a mixture of cement and water, called cement grout.
  • a fluid consisting of water and cement is pumped in together with additives, if any, and the hardening of the injected fluid guarantees that the bar is anchored into the ground.
  • Anchoring elements of the type described, in particular those using self-perforating bars, are widely and effectively used in many types of application.
  • self-perforating bars each one of them, when set in operation, is capable of developing a counteracting force that increases as its cross section increases.
  • the cost of the work increases with substantially linear proportionality as the cross section and the number of the bars used increase.
  • the anchoring element is known which is described in the patent document WO 2005/090690 , and which comprises a percussion device that makes a hole in the ground and during perforation introduces in the hole a tubular element that is placed on the bottom thereof, as well as tensioning elements constituted by bars or strands that occupy the entire length of the tubular element and of the hole.
  • a consolidation cement mix is introduced in the hole and the tensioning elements are set rotating through the rotation of a flange to which the ends of the tensioning elements projecting from the hole are constrained.
  • the limitation of this embodiment lies in that the tubular element does not project from the hole, since it occupies just one section of its length, and thus the flange acts exclusively on the tensioning elements to which it is connected. Consequently, the action of constraint to the ground developed by the anchoring element does not exploit the synergy produced by the resistance offered by the tensioning elements and by the tubular element, as the flange acts only on the latter.
  • the presence of the tubular element does not create a synergy with the tensioning elements to develop the constraining action of the anchoring element.
  • the present invention intends to substantially modify the limitations described above.
  • the anchoring element of the invention represents the implementation of the well-known anchoring technique with self-perforating bars and it can be installed with no need for the operators to substantially modify the way they work when they install self-perforating bars of the known type.
  • the higher ductility of the anchoring element or, in other words, the larger plastic deformation field allowed by it makes it possible to obtain structures that are safer, especially in case of seismic events.
  • said higher ductility or larger plastic deformation field can be modified during installation.
  • the anchoring element of the invention is shown in longitudinal cross section and in the installed configuration in Figure 1 , where it is indicated as a whole by 1.
  • ground indicates any means or element into which the bar 2 is driven.
  • prestressed steel indicates a high resistance steel whose characteristics are described in the European standard EN 10138.
  • the tubular bar 2 is provided with an external thread 2b and this makes it possible to make it in the desired length by connecting, through threaded connection sleeves 15 , several tubular elements 7 that are coaxial with each other and arranged one after the other.
  • tubular bar 2 is of the known self-perforating type and is provided with a drill bit 8 arranged at its end that comes in contact with the ground S into which it is driven.
  • cables 5 in prestressed steel they are of the known type, too, and are available on the market in various versions with a variable number of strands.
  • the tubular bar 2 is made of structural steel
  • the cables 5 are made of prestressed steel and the cement mix C that constrains the tubular bar 2 into the ground S and the cables 5 inside the tubular bar 2 is constituted by cement grout which is a mixture of cement and water in variable percentages according to the project.
  • structural steel indicates a steel for building applications that is used for metal structures in the field of civil engineering and has the characteristics described in the European standards EN 10210 and EN 10219.
  • the cement grout C fills the bar 2 completely, so that the cable or cables 5 is/are completely buried in the cement grout C and thus once the cement grout has set it/they is/are constrained over its/their entire length.
  • the anchoring element of the invention can be made even according to the embodiment indicated by 30 in Figure 2 , in which the cement grout C fills only the terminal part of the bar 2 and thus once the cement grout has set the cable or the cables 5 are constrained only for the length Cb corresponding to the cement grout C present in said bar.
  • the anchoring elements are equal to each other from a constructive point of view, since they comprise the same bar 2, the same cables 5 and the same fixing unit 6 and differ from each other only for the different constrainment condition of the cables inside the bar 2 that, as explained above, are completely or partially constrained in the cement grout C .
  • the fixing unit 6 used can be clearly seen in the detail of Figure 3 , where it can be observed that it comprises a load distribution plate 10 provided with a through hole 10a in which the end 2a of the self-perforating bar 2 is inserted, and a locking nut 11 that is screwed externally at the end 2a of the bar 2 projecting from the load distribution plate 10 and tightened against it.
  • a cable or strand locking plate 12 positioned against the locking nut 11 and provided with one or more through holes 12a , in each one of which a cable or strand locking wedge 13 is inserted that locks the end of each strand or cable 5 to the plate 12.
  • a variant embodiment of the fixing unit indicated as a whole by 26 is shown in Figure 4 and differs from the embodiment just described and shown in Figure 3 only in that it is provided with a locking nut 21 whose length 21a is shorter than the length of the end 2a of the bar 2 to which it is tightened and owing to the presence of a spacer ring 23 interposed between the nut 21 and the cable locking plate 12.
  • the inner diameter of the spacer ring 23 is larger than the external diameter of the bar 2 and thus can be coupled with it with a radial play.
  • the two embodiments 6 and 26 of the fixing unit are interchangeable, so that it is possible to obtain the anchoring element of the invention, indicated as a whole by 1 and 30.
  • the installation of the anchoring element 1 is performed according to the sequence represented in Figures from 5 to 13.
  • the drill bit 8 is arranged in contact with the ground S and the opposite end of the tubular element 7' is connected to a mechanical unit, not represented herein, which sets it rotating or performing a rotary percussive movement as indicated by the arrows, in order to drive it in the ground S according to the known art.
  • cement grout C is injected in the bar 2, so that, according to the known art, said cement grout favours the penetration of the bar by bringing up to the surface all the material that has been excavated during perforation.
  • a second tubular element 7" is coupled at its end through a connection sleeve 15 and then the perforation is started again and continued, as shown in Figure 7 , until the bar 2 in the desired length has been completely driven into the ground S and completely buried in the cement grout C present both inside and outside the bar.
  • cement grout C fills the bar 2 completely, in which case the cables 5 are buried therein for their entire length.
  • the cables will be locked in the bar 2 and will be tensioned using the known hydraulic or mechanic tensioning means, as will be explained in greater detail below.
  • the bar 2 At the end of the operations the bar 2 will be anchored to the ground with the cables 5 tensioned and buried in the cement grout C for their entire length, as shown in Figure 9 .
  • the cable or cables 5 that are inserted inside it will be immersed only with their terminal part, for the length corresponding to the height Cb of the cement grout, as shown in Figure 8a .
  • the bar 2 At the end of the operations the bar 2 will be anchored into the ground and the cables 5 will in turn be anchored inside the bar 2 only for their terminal part, as shown in Figure 9a .
  • the ends 2a and 5a, respectively of the bar 2 and of the cables 5 must be constrained to the ground S through one of the anchoring units 6 or 26 previously described.
  • the load distribution plate 10 of the anchoring unit 6 is positioned in contact with the ground S and then the locking nut 11 is tightened externally to the end 2a of the bar 2 in order to force it against the plate 10 , as shown in Figure 10 .
  • the cable locking plate 12 is positioned axially against the locking nut 11 , as shown in Figure 11 , taking care to ensure that the ends 5a of the cables 5 are arranged so that they pass through the holes 12a present in the plate 12.
  • the cables 5 are tensioned until reaching the desired tensioning values by means of a hydraulic jack M that, as shown in Figure 12 , is placed in contact with the cable locking plate 12.
  • the ends 5a of the cables 5 are then locked in the respective holes 12a through the cable locking wedges 13 that, having a conical profile that matches the conical profile of the respective holes 12a , lock the cables 5 through radial compression.
  • the filling with cement grout preserves the metal from corrosion.
  • structural steel means a steel of the known type suited to be used for geotechnical applications and having a low carbon percentage
  • prestressed steel means a highly elastic silicon steel of the known type, used in the field of prefabricated building structures.
  • both the bar 2 and the cables 5 can be made with other metallic or non metallic materials.
  • the description provided above can be completely referred to the case where the bar 2 driven in the ground in the configuration of Figure 9 is used, in which case, once the operations have been completed, the anchoring element 1 shown in Figure 1 will be obtained.
  • the anchoring element of the invention bears loads that are considerably higher than those born by equivalent anchoring elements of the known type, as could be verified by means of tests that will be illustrated further on in the description.
  • the force generated by the cables 5 is discharged onto the load distribution plate 10 and at the end of installation only the load due to the tightening force exerted on the bar 2 will be born by the nut 11 or 21.
  • the anchoring element of the invention described herein in both its embodiments 1 or 30 , makes it possible to obtain structures that resist to higher loads compared to the structures that would be obtained using self-perforating bars of the known art.
  • the use of the anchoring elements of the invention reduces the cost per constrained ton, as the addition of the metal cables 5 to the self-perforating bar 2 involves a very low percentage cost increase vis-à-vis the percentage increase in the achievable resistance, which instead is very high. Therefore, using the anchoring elements 1 of the invention it is possible to make containment structures that develop greater counteracting forces even though they use a smaller number of anchoring elements compared to analogous structures made with self-perforating bars or other known anchoring elements.
  • the anchoring element of the invention is more ductile than the known anchoring elements.
  • the values of the loads are given in the Y-axis and correspond to the pressure, in bars, applied to operate the hydraulic jack that tensions the elements being tested, while the elongation values are given in the X-axis and expressed in millimeters.
  • curves 30a, 30b and 30c are related to increasing tensions on the cables 5.
  • the combination of the known cables 5 in prestressed steel with the known self-perforating bars 2 in structural steel makes it possible to obtain a synergy among the different materials used and to obtain a high ductility of the anchoring element, much higher than that obtainable using the known self-perforating bars.
  • Said increase in the ductility of the anchoring elements is extremely important when it comes to increasing the safety of the structures, above all those destined to operate in a seismic environment, where it is important to ensure that the structure, even if damaged, will not collapse.
  • anchoring element of the invention in both its variant embodiments 1 and 30 described herein, achieves all the set objects and advantages.
  • anchoring element can be made using tubular bars in any length and with any diameter, and that any number of cables can be placed inside it according to the loads defined for the project.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Cultivation Of Plants (AREA)

Description

  • The invention concerns an improved anchoring element particularly suitable for making slope consolidation structures, for stabilizing landslips, for making anchoring structures in various geotechnical applications.
  • Anchoring elements are known and widely used, which are constituted by tie rods made with prestressed steel strands or by solid bars in structural steel that are constrained in corresponding holes made in the ground through a cement mix.
  • Anchoring elements are also known that comprise self-perforating hollow bars generally consisting of a plurality of tubular elements that are threaded externally and axially connected one after the other through joining sleeves as they are driven into the ground.
  • The end of the first tubular element is provided with a perforating head and the tubular element is inserted in the ground through a rotary movement or a rotary percussive movement to which it is subjected by special power means.
  • While the ground is being perforated, a draining fluid is pumped into the bar, wherein said fluid can be air, water or more commonly a mixture of cement and water, called cement grout.
  • Once the desired perforation depth has been reached, a fluid consisting of water and cement is pumped in together with additives, if any, and the hardening of the injected fluid guarantees that the bar is anchored into the ground.
  • Anchoring elements of the type described, in particular those using self-perforating bars, are widely and effectively used in many types of application. With regard, in particular, to self-perforating bars, each one of them, when set in operation, is capable of developing a counteracting force that increases as its cross section increases.
  • Obviously, even the cost of each bar increases as its cross section increases.
  • It is thus absolutely evident that the cost of a containment work depends on the number and size of the anchoring elements that must be installed, which in turn depend on the total thrust they have to be able to oppose once they have been laid.
  • In particular, the cost of the work increases with substantially linear proportionality as the cross section and the number of the bars used increase.
  • The anchoring element is known which is described in the patent document WO 2005/090690 , and which comprises a percussion device that makes a hole in the ground and during perforation introduces in the hole a tubular element that is placed on the bottom thereof, as well as tensioning elements constituted by bars or strands that occupy the entire length of the tubular element and of the hole.
  • A consolidation cement mix is introduced in the hole and the tensioning elements are set rotating through the rotation of a flange to which the ends of the tensioning elements projecting from the hole are constrained.
  • The limitation of this embodiment lies in that the tubular element does not project from the hole, since it occupies just one section of its length, and thus the flange acts exclusively on the tensioning elements to which it is connected. Consequently, the action of constraint to the ground developed by the anchoring element does not exploit the synergy produced by the resistance offered by the tensioning elements and by the tubular element, as the flange acts only on the latter.
  • In other words, the presence of the tubular element does not create a synergy with the tensioning elements to develop the constraining action of the anchoring element.
  • The present invention intends to substantially modify the limitations described above.
  • It is a first object of the invention to provide an anchoring element that is more resistant than known anchoring elements having the same cross section.
  • It is another object of the invention to provide an anchoring element whose cost per ton of anchoring element produced is lower compared to equivalent anchoring elements of the known type.
  • It is another object of the invention to provide an anchoring element that is more ductile than the known anchoring elements.
  • It is another yet not the least object of the invention to provide an anchoring element whose ductility can be modified upon installation.
  • The objects described above are achieved by an anchoring element in accordance with the main claim, to which the reader should refer for the sake of brevity.
  • Other details of the invention are described in the dependent claims. Advantageously, the anchoring element of the invention represents the implementation of the well-known anchoring technique with self-perforating bars and it can be installed with no need for the operators to substantially modify the way they work when they install self-perforating bars of the known type.
  • Still advantageously, the higher ductility of the anchoring element or, in other words, the larger plastic deformation field allowed by it makes it possible to obtain structures that are safer, especially in case of seismic events.
  • To further advantage, said higher ductility or larger plastic deformation field can be modified during installation.
  • The objects and advantages described above will be highlighted in greater detail in the description of preferred embodiments of the invention that are supplied as indicative, non-limiting examples with reference to the enclosed drawings, wherein:
    • Figure 1 shows the longitudinal cross section of the anchoring element of the invention when installed;
    • Figure 2 shows the longitudinal cross section of a variant embodiment of the anchoring element of the invention when installed;
    • Figure 3 shows a detail of Figures 1 and 2;
    • Figure 4 shows a construction variant of the detail shown in Figure 3;
    • Figures from 5 to 13 show different steps of the installation of the anchoring element of the invention;
    • Figures from 14 to 17 show the forces acting on the fixing unit of the anchoring element of the invention when the latter is installed;
    • Figure 18 shows, in the same load-elongation diagram, the curves regarding a self-perforating bar of the known type and the anchoring element of the invention according to an embodiment of the same;
    • Figure 19 shows, in the same load-elongation diagram, the curves regarding a self-perforating bar of the known type and the anchoring element of the invention according to a variant embodiment of the same;
    • Figure 20 shows, in the same load-elongation diagram, all the curves shown in Figures 18 and 19.
  • The anchoring element of the invention is shown in longitudinal cross section and in the installed configuration in Figure 1, where it is indicated as a whole by 1.
  • According to the invention it comprises:
    • a tubular bar 2 with mainly longitudinal development driven in the ground S where it is constrained by means of a cement mix C;
    • one or more cables 5 or prestressed steel strands arranged inside the bar 2 and constrained by means of the cement mix C present inside said bar 2;
    • a fixing unit 6 connected to the ends 5a of the cables 5 and 2a of the bar 2 projecting from the ground S to constrain the anchoring element.
  • It should be noted that the word "ground" indicates any means or element into which the bar 2 is driven.
  • Furthermore, it should also be noted that the term "prestressed steel" indicates a high resistance steel whose characteristics are described in the European standard EN 10138.
  • The tubular bar 2 is provided with an external thread 2b and this makes it possible to make it in the desired length by connecting, through threaded connection sleeves 15, several tubular elements 7 that are coaxial with each other and arranged one after the other.
  • This constructive solution is adopted especially when the tubular bar 2 is very long, since this would make the bar 2 difficult to install and to transport if it were made in single piece.
  • It should also be observed that the tubular bar 2 is of the known self-perforating type and is provided with a drill bit 8 arranged at its end that comes in contact with the ground S into which it is driven.
  • Regarding the cables 5 in prestressed steel, they are of the known type, too, and are available on the market in various versions with a variable number of strands.
  • Furthermore, the tubular bar 2 is made of structural steel, the cables 5 are made of prestressed steel and the cement mix C that constrains the tubular bar 2 into the ground S and the cables 5 inside the tubular bar 2 is constituted by cement grout which is a mixture of cement and water in variable percentages according to the project.
  • It should be noted that the term "structural steel" indicates a steel for building applications that is used for metal structures in the field of civil engineering and has the characteristics described in the European standards EN 10210 and EN 10219.
  • In the anchoring element of the invention 1, made according to the embodiment shown in Figure 1, the cement grout C fills the bar 2 completely, so that the cable or cables 5 is/are completely buried in the cement grout C and thus once the cement grout has set it/they is/are constrained over its/their entire length.
  • The anchoring element of the invention can be made even according to the embodiment indicated by 30 in Figure 2, in which the cement grout C fills only the terminal part of the bar 2 and thus once the cement grout has set the cable or the cables 5 are constrained only for the length Cb corresponding to the cement grout C present in said bar.
  • It is important to point out that in the two embodiments 1 and 30 the anchoring elements are equal to each other from a constructive point of view, since they comprise the same bar 2, the same cables 5 and the same fixing unit 6 and differ from each other only for the different constrainment condition of the cables inside the bar 2 that, as explained above, are completely or partially constrained in the cement grout C.
  • This differentiation is obtained during the installation of the anchoring element and, as can be better understood from the description of the installation procedure provided here below, it makes it possible to obtain, at the end of the work, different conditions of resistance of the anchoring element of the invention, better than those obtainable with the known self-perforating bars. The fixing unit 6 used can be clearly seen in the detail of Figure 3, where it can be observed that it comprises a load distribution plate 10 provided with a through hole 10a in which the end 2a of the self-perforating bar 2 is inserted, and a locking nut 11 that is screwed externally at the end 2a of the bar 2 projecting from the load distribution plate 10 and tightened against it.
  • There is also a cable or strand locking plate 12 positioned against the locking nut 11 and provided with one or more through holes 12a, in each one of which a cable or strand locking wedge 13 is inserted that locks the end of each strand or cable 5 to the plate 12.
  • It should be noted that the words cable, cable locking plate and cable locking wedge will be used from this point onwards.
  • It can be observed in particular that the length 11a of the locking nut 11 exceeds the length 2b of the end 2a of the bar 2 to which it is screwed and which is consequently spaced from the overlying cable locking plate 12, as can be seen in Figures 1 and 2.
  • A variant embodiment of the fixing unit indicated as a whole by 26 is shown in Figure 4 and differs from the embodiment just described and shown in Figure 3 only in that it is provided with a locking nut 21 whose length 21a is shorter than the length of the end 2a of the bar 2 to which it is tightened and owing to the presence of a spacer ring 23 interposed between the nut 21 and the cable locking plate 12.
  • It can be observed that the inner diameter of the spacer ring 23 is larger than the external diameter of the bar 2 and thus can be coupled with it with a radial play.
  • Furthermore, its length 23a exceeds the length 2c of the end 2a of the bar 2 that projects from the locking nut 21, which thus remains spaced from the cable locking plate 12, as shown in Figure 4.
  • The two embodiments 6 and 26 of the fixing unit are interchangeable, so that it is possible to obtain the anchoring element of the invention, indicated as a whole by 1 and 30.
  • In practice, the installation of the anchoring element 1 is performed according to the sequence represented in Figures from 5 to 13.
  • The operations start, as shown in Figure 5, with the arrangement of the first tubular element 7' that constitutes the self-perforating bar 2 in the vertical insertion position.
  • The drill bit 8 is arranged in contact with the ground S and the opposite end of the tubular element 7' is connected to a mechanical unit, not represented herein, which sets it rotating or performing a rotary percussive movement as indicated by the arrows, in order to drive it in the ground S according to the known art.
  • During the perforation of the ground, cement grout C is injected in the bar 2, so that, according to the known art, said cement grout favours the penetration of the bar by bringing up to the surface all the material that has been excavated during perforation.
  • After the insertion of the first tubular element 7', as shown in Figure 6, a second tubular element 7" is coupled at its end through a connection sleeve 15 and then the perforation is started again and continued, as shown in Figure 7, until the bar 2 in the desired length has been completely driven into the ground S and completely buried in the cement grout C present both inside and outside the bar.
  • Before the cement grout C starts setting, one or more cables in prestressed steel 5 are buried inside it, as shown in Figure 8, the number and size of said cables depending on the resistance that the anchoring element must guarantee.
  • In particular, the cement grout C fills the bar 2 completely, in which case the cables 5 are buried therein for their entire length.
  • Once the cement grout has set, the cables will be locked in the bar 2 and will be tensioned using the known hydraulic or mechanic tensioning means, as will be explained in greater detail below.
  • At the end of the operations the bar 2 will be anchored to the ground with the cables 5 tensioned and buried in the cement grout C for their entire length, as shown in Figure 9.
  • Alternatively, if once the bar 2 has been driven into the ground some of the cement grout C contained therein is extracted, the remaining cement grout fills only the terminal part of the bar 2, up to the height Cb shown in Figure 7a.
  • In this case, the cable or cables 5 that are inserted inside it will be immersed only with their terminal part, for the length corresponding to the height Cb of the cement grout, as shown in Figure 8a.
  • At the end of the operations the bar 2 will be anchored into the ground and the cables 5 will in turn be anchored inside the bar 2 only for their terminal part, as shown in Figure 9a.
  • Independently of the final conditions shown in Figure 9 or 9a, the ends 2a and 5a, respectively of the bar 2 and of the cables 5, must be constrained to the ground S through one of the anchoring units 6 or 26 previously described. Taking as a reference the bar 2 driven in the ground in the configuration shown in Figure 9a and using the anchoring unit in the embodiment indicated as a whole by 6, the load distribution plate 10 of the anchoring unit 6 is positioned in contact with the ground S and then the locking nut 11 is tightened externally to the end 2a of the bar 2 in order to force it against the plate 10, as shown in Figure 10.
  • Then the cable locking plate 12 is positioned axially against the locking nut 11, as shown in Figure 11, taking care to ensure that the ends 5a of the cables 5 are arranged so that they pass through the holes 12a present in the plate 12. The cables 5 are tensioned until reaching the desired tensioning values by means of a hydraulic jack M that, as shown in Figure 12, is placed in contact with the cable locking plate 12.
  • The ends 5a of the cables 5 are then locked in the respective holes 12a through the cable locking wedges 13 that, having a conical profile that matches the conical profile of the respective holes 12a, lock the cables 5 through radial compression.
  • It is evident, as already explained, that the description provided above can be completely referred also to the use of the fixing unit 26, in which case the spacer ring 23 is superimposed to the locking nut 21 and the cable locking plate 12 is placed against the spacer ring 23 in the configuration shown in Figure 4.
  • At the end of installation the anchoring element 30 shown in Figure 2 will thus be obtained.
  • At this point, the space inside the bar 2 where there are the cables 5 is filled with cement grout, not shown in the figures, in order to obtain a single block in which the structural steel of the bar 2 and the prestressed steel of the cables 5 work in synergy.
  • Furthermore, the filling with cement grout preserves the metal from corrosion.
  • It should be noticed that the term structural steel means a steel of the known type suited to be used for geotechnical applications and having a low carbon percentage, while the term prestressed steel means a highly elastic silicon steel of the known type, used in the field of prefabricated building structures.
  • It should also be underlined that both the bar 2 and the cables 5, instead of being made of steel, can be made with other metallic or non metallic materials. The description provided above can be completely referred to the case where the bar 2 driven in the ground in the configuration of Figure 9 is used, in which case, once the operations have been completed, the anchoring element 1 shown in Figure 1 will be obtained.
  • Advantageously, the anchoring element of the invention bears loads that are considerably higher than those born by equivalent anchoring elements of the known type, as could be verified by means of tests that will be illustrated further on in the description.
  • For this purpose, it is appropriate to describe the static behaviour of the anchoring element 1 when installed, and in particular of the fixing unit 6 that constrains its end to the ground S as shown in Figures from 14 to 16.
  • When the locking nut 11 is tightened against the load distribution plate 10, as shown in Figure 14, this receives the thrusting action T from the underlying ground S and discharges it onto the nut 11.
  • When the cables 5 are tensioned by the tensioning jack M as shown in Figure 15, they are thrust upwards in the direction indicated by the arrow F and the reaction of the tensioning jack M is discharged onto the nut 11, generating a compression force F' contrary to the tensioning force F.
  • When, at the end of the tensioning operation, the cables 5 are locked by the cable locking wedges 13 and the tensioning jack M is removed, as shown in Figure 16, the cables 5 force downwards the cable locking plate 12 to which they are connected and discharge the compression force F' against the nut 11. Therefore, when the anchoring element 1 is in operation, the nut 11 is loaded on its opposing faces by the forces T and F' that are contrary to each other, as shown in Figure 16.
  • The same considerations apply even if the fixing unit 26 provided with the spacer ring 21 is used, in which case the compression force F' will act on the nut 21, not directly but through the interposition of the spacer ring 21, as shown in Figure 17.
  • The force generated by the cables 5 is discharged onto the load distribution plate 10 and at the end of installation only the load due to the tightening force exerted on the bar 2 will be born by the nut 11 or 21.
  • Advantageously, the anchoring element of the invention described herein, in both its embodiments 1 or 30, makes it possible to obtain structures that resist to higher loads compared to the structures that would be obtained using self-perforating bars of the known art.
  • Laboratory resistance tests have made it possible to verify that the anchoring elements 1 and 30 of the invention guarantee much higher resistance than, for example, self-perforating bars of the known type having the same diameter. Advantageously, this higher resistance involves also a considerable economic advantage.
  • In fact, the construction cost of a containment structure using the anchoring elements of the invention and being able to guarantee the same total resistance, expressed in tons, is much lower than the construction cost of structures made with anchoring elements of the known type.
  • In other words, the use of the anchoring elements of the invention reduces the cost per constrained ton, as the addition of the metal cables 5 to the self-perforating bar 2 involves a very low percentage cost increase vis-à-vis the percentage increase in the achievable resistance, which instead is very high. Therefore, using the anchoring elements 1 of the invention it is possible to make containment structures that develop greater counteracting forces even though they use a smaller number of anchoring elements compared to analogous structures made with self-perforating bars or other known anchoring elements.
  • Even in this case, accounting checks have shown cost reductions that can reach even 60% per ton of counteracting force achievable.
  • Furthermore, as already explained, the anchoring element of the invention is more ductile than the known anchoring elements.
  • For this purpose, a series of loading tests have been performed on self-perforating bars of the known type and on anchoring elements of the invention in the embodiment indicated as a whole by 1 and also in the embodiment indicated as a whole by 30, with the cables 5 constrained in the bar 2 respectively for their entire length or partially.
  • The diagrams shown in Figures 18 and 19 have thus been obtained, in which:
    • the letter A identifies the diagram regarding the self-perforating bar of the known type;
    • the numbers 1 and 30 identify the diagrams regarding the anchoring elements of the invention in the two variant embodiments, respectively 1 and 30.
  • In the diagrams, the values of the loads are given in the Y-axis and correspond to the pressure, in bars, applied to operate the hydraulic jack that tensions the elements being tested, while the elongation values are given in the X-axis and expressed in millimeters.
  • With reference to Figure 18, it can be observed that:
    • the values of the ultimate tensile strength R of the self-perforating bar 2 of the known type and of the anchoring element of the invention 1 are almost the same and equal to 340 bars;
    • in the presence of the same load, the anchoring element 1 of the invention always shows higher elongation values compared to those of the self-perforating bar A;
    • in the anchoring element 1 the yield effect Rs appears in the presence of a load of approximately 200 bars and therefore much earlier compared to the self-perforating bar A, where it appears in the presence of a load of approximately 260 bars;
    • in the anchoring element 1 the plastic phase P extends for a much greater section compared to the self-perforating bar A and this makes it more ductile.
  • With reference to Figure 19, in addition to the curve relating to the self-perforating bar A of the known type, it is possible to observe also three curves relating to three anchoring elements 30 of the invention, each one of which has the cables 5 tensioned with different loads.
  • In particular, the curves 30a, 30b and 30c are related to increasing tensions on the cables 5.
  • It can be observed that:
    • the values of the ultimate tensile strength R of the self-perforating bar A of the known type and of the anchoring element 30 of the invention are practically the same and equal to 340 bars;
      • in the presence of the same load, the anchoring elements 30 always show higher elongation values compared to those of the self-perforating bar A;
      • in the anchoring elements 30 the yield effect Rs appears in the presence of a load of approximately 220 bars and therefore earlier, also in this case, than in the self-perforating bar A, where it appears in the presence of a load of approximately 260 bars;
      • as the tension of the cables 5 increases, also the stiffness of the anchoring elements 30 increases, which is shown by their lower elongation values in the presence of the same load;
      • in any case, the plastic phase P of the anchoring elements 30 of the invention extends for a much larger section compared to the self-perforating bar A.
  • Observing the diagram of Figure 20 that combines the diagrams of Figures 18 and 19, it can be understood that the anchoring elements 1 and 30 of the invention have larger plastic phases P than the self-perforating bars A of the known type, compared to which, therefore, they are more ductile, thus achieving another object of the invention.
  • In fact, the combination of the known cables 5 in prestressed steel with the known self-perforating bars 2 in structural steel makes it possible to obtain a synergy among the different materials used and to obtain a high ductility of the anchoring element, much higher than that obtainable using the known self-perforating bars.
  • Said increase in the ductility of the anchoring elements is extremely important when it comes to increasing the safety of the structures, above all those destined to operate in a seismic environment, where it is important to ensure that the structure, even if damaged, will not collapse.
  • It can be observed that using the anchoring elements carried out according to the embodiment 30 and properly pre-tensioning the cables 5 means offering the designer the opportunity to modify the ductility of the anchoring element depending on the project, and thus to obtain characteristics that cannot be achieved with the known self-perforating bars, which constitutes a further advantage of the invention.
  • It can thus be understood that the anchoring element of the invention, in both its variant embodiments 1 and 30 described herein, achieves all the set objects and advantages.
  • It is obvious that the anchoring element can be made using tubular bars in any length and with any diameter, and that any number of cables can be placed inside it according to the loads defined for the project.
  • Any variant embodiments, not described herein and not illustrated in the figures, of the anchoring element of the invention, must however be considered protected by the present patent, provided that they fall within the scope of the claims that follow.

Claims (12)

  1. Anchoring element (1; 30) for making ground (S) containment and consolidation structures, comprising:
    - a tubular bar (2) with mainly longitudinal development inserted in said ground (S) in which it is constrained through a cement mix (C);
    - one or more cables (5) arranged inside said bar (2) and constrained through the cement mix (C) present inside said bar (2);
    - a fixing unit (6) suited to fix said anchoring element (1; 30) to the ground (S),
    characterized in that said fixing unit (6) is connected to the ends (5a, 2a) of said one or more cables (5) and of said bar (2) projecting from said ground (S).
  2. Anchoring element (1) according to claim 1), characterized in that said cement mix (C) fills said bar (2) completely and said one or more cables (5) are immersed in said cement mix (C) for their entire length.
  3. Anchoring element (30) according to claim 1), characterized in that said cement mix (C) partially fills said bar (2) for a section of its length (Cb) in which the ends of said one or more cables (5) are immersed.
  4. Anchoring element (1; 30) according to any of the preceding claims, characterized in that said tubular bar (2) is provided with an external thread (2d) and consists of a plurality of tubular elements (7; 7'; 7") that are coaxial with one another and connected one after the other through threaded connection sleeves (15).
  5. Anchoring element (1; 30) according to any of the preceding claims, characterized in that said tubular bar (2) is of the self-perforating type, being provided with a drill bit (8) arranged at the end that is in contact with the ground (S).
  6. Anchoring element (1; 30) according to any of the preceding claims, characterized in that said tubular bar (2) is made of structural steel and said one or more cables (5) are made of prestressed steel.
  7. Anchoring element (1; 30) according to any of the preceding claims, characterized in that said cement mix (C) is cement grout.
  8. Anchoring element (1; 30) according to any of the preceding claims, characterized in that said fixing unit (6) comprises:
    - a load distribution plate (10) placed against the ground (S) and provided with a through hole (10a) in which the end (2a) of said tubular bar (2) is introduced;
    - a locking nut (11) tightened externally to said end (2a) and placed against said load distribution plate (10);
    - a cable locking plate (12) placed against said locking nut (11) and provided with one or more through holes (12a) in each one of which a cable locking wedge (13) is inserted that houses the end (5a) of a corresponding cable (5) passing therethrough.
  9. Anchoring element (1; 30) according to claim 8), characterized in that the length (11a) of said locking nut (11) exceeds the length (2b) of the end (2a) of said tubular bar (2) that projects from said load distribution plate (10).
  10. Anchoring element (1; 30) according to any of the preceding claims from 1) to 7), characterized in that said fixing unit (26) comprises:
    - a load distribution plate (10) placed against the ground (S) and provided with a through hole (10a) in which the end (2a) of said tubular bar (2) is introduced;
    - a locking nut (21) tightened externally to said end (2a) of said tubular bar (2) and placed against said load distribution plate (10);
    - a spacer ring (23) placed against said nut (21);
    - a cable locking plate (12) placed against said spacer ring (23) and provided with one or more through holes (12a) in each one of which a cable locking wedge (13) is inserted that houses the end (5a) of a corresponding cable (5) passing therethrough.
  11. Anchoring element (1; 30) according to claim 10), characterized in that the inner diameter of said spacer ring (23) is longer than the outer diameter of said tubular bar (2) and the length (23a) of said spacer ring exceeds the length (2c) of said end (2a) of said tubular bar (2) projecting from said locking nut (21).
  12. Anchoring element (1) according to any of the preceding claims from 8) to 11), characterized in that said through holes (12a) of said cable locking plate (12) and said cable locking wedges (13) have conical profiles that match each other.
EP13157515.1A 2012-03-02 2013-03-01 Improved anchoring element for ground consolidation Active EP2634313B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT000051A ITVI20120051A1 (en) 2012-03-02 2012-03-02 PERFORATED ANCHORAGE ELEMENT FOR THE CONSOLIDATION OF SOIL

Publications (3)

Publication Number Publication Date
EP2634313A2 EP2634313A2 (en) 2013-09-04
EP2634313A3 EP2634313A3 (en) 2014-07-09
EP2634313B1 true EP2634313B1 (en) 2015-11-18

Family

ID=46001622

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13157515.1A Active EP2634313B1 (en) 2012-03-02 2013-03-01 Improved anchoring element for ground consolidation

Country Status (2)

Country Link
EP (1) EP2634313B1 (en)
IT (1) ITVI20120051A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10907317B2 (en) 2016-02-10 2021-02-02 Soletanche Freyssinet Method for producing an anchoring tie rod and anchoring tie rod

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162743B (en) * 2018-09-26 2020-03-13 西南交通大学 Friction-shearing combined quasi-constant-resistance large-deformation anchor cable

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1236744B (en) * 1989-12-15 1993-03-31 PROCEDURE FOR INSERTING BARS OF REINFORCEMENT PIPES INTO GROUNDS OR EXCAVATION WALLS AND EQUIPMENT SUITABLE FOR CARRYING OUT THAT PROCEDURE
AT505959B1 (en) * 2004-03-23 2011-06-15 Alwag Tunnelausbau Gmbh METHOD AND DEVICE FOR DRILLING, IN PARTICULAR BUTTING OR TORQUE DRILLING OF A HOLE IN GROUND OR ROCK MATERIAL AND FOR FORMING AN ANCHORAGE

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10907317B2 (en) 2016-02-10 2021-02-02 Soletanche Freyssinet Method for producing an anchoring tie rod and anchoring tie rod

Also Published As

Publication number Publication date
ITVI20120051A1 (en) 2013-09-03
EP2634313A2 (en) 2013-09-04
EP2634313A3 (en) 2014-07-09

Similar Documents

Publication Publication Date Title
KR101152265B1 (en) Prestressed bored pile construction method and structures
US4305687A (en) Anchoring system for rock bolts
EP2609258B1 (en) System for anchoring a load
KR100861938B1 (en) The earth anchor and construction method for use of that
EP1880059B1 (en) Method to increase the load capability of a soil
DE2443282A1 (en) METHOD AND MEANS OF DISMANTLING A PRE-TENSIONED STEEL ANCHOR ANCHORED IN THE GROUND
EP2379843B1 (en) Sleeved cable bolt
EP2634313B1 (en) Improved anchoring element for ground consolidation
KR20090110399A (en) Micro pile to improve frictional force of pile end
KR100591367B1 (en) Slope reinforcement method and devece thereof
CN114150664A (en) Rapid construction device and method for prestressed basalt fiber anchor rod
JP5207047B2 (en) Seismic reinforcement method for existing foundation and seismic reinforcement structure for existing foundation
KR100666678B1 (en) Micro-pile having a end supporting round-plate
KR102054994B1 (en) Cylindrical wedge anchor for reinforcing the ground and method for constructing this same
KR102143635B1 (en) Permanent anchor apparatus
KR20070026953A (en) Prestressing lock bolt apparatus
KR101488970B1 (en) Supporting pile with reinforcing blade and construction method thereof
JP4097643B2 (en) Strengthening method of landslide prevention pile
KR101045231B1 (en) Head cone of Ground anchor
KR100913320B1 (en) Multifunctional complex type anchor body
KR100965273B1 (en) Reinforcing methods using apparatus for reinforcing inclined plane
JP6218130B2 (en) Seismic reinforcement structure and method for reinforced concrete
WO2007015614A1 (en) Preceding tension type lock bolt and construction method using the same
KR20130076057A (en) Multipurpose load dispersion style removal anchor
KR102655153B1 (en) Small-diameter multi-axial stabilizing pile structure and construction method for slope reinforcement

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 5/80 20060101AFI20140602BHEP

17P Request for examination filed

Effective date: 20150108

RAX Requested extension states of the european patent have changed

Extension state: BA

Payment date: 20150108

Extension state: ME

Payment date: 20150108

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150601

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 761653

Country of ref document: AT

Kind code of ref document: T

Effective date: 20151215

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013003802

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 4

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160218

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 761653

Country of ref document: AT

Kind code of ref document: T

Effective date: 20151118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160218

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160219

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160318

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013003802

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160331

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20160819

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160301

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160301

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160331

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130301

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151118

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230327

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240320

Year of fee payment: 12

Ref country code: GB

Payment date: 20240320

Year of fee payment: 12