EP2620552B1 - Foundation element - Google Patents
Foundation element Download PDFInfo
- Publication number
- EP2620552B1 EP2620552B1 EP13151568.6A EP13151568A EP2620552B1 EP 2620552 B1 EP2620552 B1 EP 2620552B1 EP 13151568 A EP13151568 A EP 13151568A EP 2620552 B1 EP2620552 B1 EP 2620552B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- foundation
- foundation element
- reinforcement
- pile
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 230000002787 reinforcement Effects 0.000 claims description 43
- 239000002986 polymer concrete Substances 0.000 claims description 19
- 238000000034 method Methods 0.000 claims description 18
- 230000009969 flowable effect Effects 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000000853 adhesive Substances 0.000 claims description 4
- 230000001070 adhesive effect Effects 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 239000002131 composite material Substances 0.000 description 3
- 239000004567 concrete Substances 0.000 description 3
- 239000003822 epoxy resin Substances 0.000 description 3
- 229920000647 polyepoxide Polymers 0.000 description 3
- 239000004593 Epoxy Substances 0.000 description 2
- VVQNEPGJFQJSBK-UHFFFAOYSA-N Methyl methacrylate Chemical compound COC(=O)C(C)=C VVQNEPGJFQJSBK-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 229920006337 unsaturated polyester resin Polymers 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- ORQBXQOJMQIAOY-UHFFFAOYSA-N nobelium Chemical compound [No] ORQBXQOJMQIAOY-UHFFFAOYSA-N 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
Definitions
- the invention relates to a foundation element for forming a foundation pile for a foundation of a building, as well as to a foundation pile and to a method for forming a foundation pile.
- GB 2 292 408 A1 discloses a member for penetrating ground.
- WO 00/61876 A1 discloses a building structure with a hollow core, with a fibre layer, in which the hollow core may be filled with concrete.
- the foundation piles need to be made up of segments.
- the segments are pressed into the ground one by one.
- Steel tube segments are used, which are subsequently filled with concrete and possibly provided with reinforcement steel.
- a drawback of the known foundation pile is that the installation thereof is time-consuming, since the steel tube segments that are used need to be precisely welded together so as to be watertight. If the tube segments are not welded watertight, water will penetrate into the tube and that will first have to be sucked dry. Then the tube can be filled with concrete so as to obtain the required strength for the pressure load. Because of this the known foundation pile and the known method are relatively costly.
- the invention provides a foundation element according to claim 1.
- the foundation element comprises a foundation body substantially made of a polymer concrete (PC), such as polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methylmethacrylate (MMA), polymer concrete comprising epoxy resin (EB), or another similar or related composite.
- PC polymer concrete
- the polymer concrete or related composite provides excellent resistance to pressure loads, so that it is very suitable material for use as a foundation element.
- polymer concrete is corrosion resistant.
- the polymer concrete is furthermore relatively easy to produce, for example as a prefab element.
- the foundation element comprises a reinforcement element which extends substantially in a longitudinal direction of the foundation body. In this way damage to the foundation element caused by forces in a direction transversely to the longitudinal direction is prevented.
- the foundation body is furthermore a substantially solid foundation body, so that filling of the interior of the foundation element after installation thereof is no longer needed.
- the reinforcement element is preferably completely surrounded by the polymer concrete.
- the reinforcement element may be applied by means of an adhesive, such as a two-component adhesive, or a sealing ring so as to make the reinforcement element resistance to tensile force and watertight.
- the reinforcement element preferably extends substantially over the entire length of the foundation body. It may slightly project from the foundation body near the ends thereof or, on the contrary, terminate at a position spaced a minimal distance from an end of the foundation body. Connecting several foundation elements together thus becomes easier, as will be explained hereinafter.
- the reinforcement element and the foundation body are substantially concentric.
- the reinforcement element is located in the centre of the foundation body in that case.
- the reinforcement element preferably comprises a bar or a tube.
- the bar is preferably solid.
- the tube is preferably hollow.
- the bar or the tube is preferably made of a metal, for example steel or reinforcing steel.
- the reinforcement element is provided with a connecting element at one end thereof, which connecting element is designed to be connectable to a further foundation element, preferably to a further connecting element of a further reinforcement element of said further foundation element.
- Said connecting element may be simply provided with screw thread.
- At least one end of the foundation element also comprises connecting means designed to be connectable to one end of a further foundation element, preferably two further connecting means at one end of the further foundation element.
- the connecting means can be of very simple construction if the connecting means comprise one or more recesses or protrusions in the end face of the foundation body.
- the foundation body is in that case preferably constructed so that an end surface at a first end is designed to connect with a close fit to an end surface of a second end of a further foundation body.
- an end surface at a first end is designed to connect with a close fit to an end surface of a second end of the same the foundation body. In this way it becomes possible to use a number of identical foundation elements in constructing a foundation pile.
- the connecting means may in a particularly simple embodiment form part of a male-female connection.
- the first end face may be constructed as a male coupling
- the second end face may be constructed as a female coupling.
- the foundation element may be designed to function as a base for a foundation pile built up of foundation elements.
- the foundation element prefferably has a larger cross section near one end than at an opposite end so as to thus form a wider base of the foundation pile.
- the end having the larger cross section is designed to be drilled or pressed into the ground.
- Said end may be conical, rectangular, hexagonal or polygonal, pyramidal or helical in shape, depending on the ground structure to be penetrated.
- the foundation element is provided with a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element.
- Said flowable medium is preferably a medium that can be injected into the ground, for example various types of injection mortar, for forming an injected base.
- the reinforcement element is also designed to function as the flow tube.
- the hollow reinforcement elements can be connected together, the flow tube can extend along the length of a number of foundation elements.
- the flow tube opens into an injection opening at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base for the foundation pile.
- a foundation element can be used for being forced into the ground, after which eventually, once the desired length of the foundation pile is reached, a base can be formed. In this way the foundation pile is fixed in position.
- a foundation pile comprising a number of stacked-together and interconnected foundation elements according to the invention.
- a method for installing a foundation pile in the ground comprising the steps of providing a first foundation element according to the invention and providing a second foundation element according to the invention.
- the method comprises the further steps of:
- Said installation can be carried out by using a technique that is suitable for that purpose, for example pressing, driving (ramming) or drilling or a related technique. Combinations of these techniques are also conceivable, if desired. The skilled person will be able to use a suitable technique. In one embodiment, pressing is preferred, however.
- a very advantageous aspect of the invention is the fact that fixing the first foundation element to the second foundation element can take place in a very simple and quick manner.
- the foundation elements can be glued together, so that the time-consuming welding is no longer necessary.
- a quick and watertight connection can be realised.
- the method may comprise the additional steps of providing one or more further foundation elements according to the invention and fixing said one or more of further foundation elements to the foundation pile being formed.
- step B the first and the second foundation element are glued together by means of an adhesive, such as an epoxy, for example.
- an adhesive such as an epoxy
- Other connections are (additionally) also conceivable, however, such as a snap connection, a pin joint, a rotating joint, etc.
- the method may comprise the additional step D of fixing the reinforcement element of the first foundation element to the reinforcement element of the second foundation element.
- the complete foundation pile is capable of taking up pressure forces and tensile forces.
- connection can be effected in a simple manner by connecting the reinforcement element of the first foundation element and that of the second foundation element together in step D, using a screw connection.
- the first foundation element is designed to function as the base of the foundation pile or to be formed into a base (for example by injecting a base).
- FIG. 1 schematically shows a foundation pile 1.
- the foundation pile 1 comprises a number of stacked-together foundation elements 2a-2d.
- Each foundation element 2a-2d comprises a foundation body 4.
- Said foundation body is substantially made of a polymer concrete (PC).
- a suitable polymer concrete is, for example, polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methyl methacrylate (MMA) or polymer concrete comprising epoxy resin (EP). Other similar or related composites can also be used, of course.
- the foundation body 4 further comprises a concentrically disposed reinforcement element 5, which extends substantially in a longitudinal direction L of the foundation body 4.
- the reinforcement element 5 may be a steel tube or bar, for example of reinforcing steel. In the present embodiment, the bar is a solid bar, such that a relatively great strength is obtained.
- the length of a foundation element forms a fraction of the total length of the foundation pile.
- the foundation element 4 of said polymer concrete, provided with the reinforcement element 5, provides a foundation element 2 which is quite capable of taking up pressure forces and tensile forces being exerted thereon. Because of this the foundation element 2 is suitable for use as part of the foundation pile 2.
- FIG. 1 shows, a few foundation elements 2 are stacked together.
- the reinforcement element 5 extends beyond the bottom end of the foundation body 4.
- a recess Provided at the upper end of the foundation element 4, on the other hand, is a recess, because the reinforcement element extends only as far as a position spaced from the upper end of the foundation body 4.
- the recess and the projecting reinforcement element 5 of two foundation elements 2a and 2b disposed adjacent to each other makes it easier to connect the two foundation elements together.
- Said projecting reinforcement element 5 and said recess (together with the end of the reinforcement element 5 in said recess) form connecting elements 71, 72, as it were, which are designed for being connectable to each other.
- the reinforcement elements 5 of two foundation elements 2a and 2b disposed adjacent to each other are connected together upon connection.
- the connecting elements 71, 72 are designed so that they can be connected together in a simple manner. Think in this connection of an embodiment in which use is made of screw thread, for example.
- the assembly of the lower two foundation elements 2c, 2d in figure 1 is designed to function as a base for the foundation pile 1 built up of foundation elements 2a-2d.
- the foundation element 2d has a larger cross-section than the foundation element 2c disposed thereabove. In this way a widened base of the foundation pile 1 is formed.
- the lowermost foundation element 2d has a shape designed for being drilled or forced into the ground. Its end may be spherical (11), conical (12), rectangular, hexagonal or polygonal, pyramidal or helical, depending on the ground structure to be penetrated.
- the foundation pile 101 again comprises a number of stacked-together foundation elements 102a-102d.
- Each foundation element 102a-102d comprises a foundation body 104 substantially made of a polymer concrete (PC), which comprises a concentrically disposed reinforcement element 105.
- the reinforcement element 105 is a tube.
- connecting means 171, 172 comprise the reinforcement element 105, analogous to the situation shown in figure 1 , in which a male-female connection between two adjacent foundation elements 102a-102b is provided.
- FIG 2 there is shown that additionally the foundation bodies 104 themselves provide an improved and simplified connection.
- the foundation body 104 is designed so that an upper end face 181 thereof closely abuts the lower end face 182 of the foundation body 104 disposed thereabove; see the connection between the element 102a and the element 102b.
- the lower end face 181 is configured as a male connecting part and the upper end face 181 is configured as a female connecting part.
- the reinforcement element 105 is hollow.
- the reinforcement element 105 can thus function as a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element.
- the reinforcement element 105 is therefore also configured as a flow tube.
- an additional tube is provided as a flow tube, although the dual function leads to a relatively compact foundation element 102. It also applies in that case that in this way the flow tube can extend along the entire length of a number of foundation elements, preferably along the length of the foundation pile, because the hollow reinforcement elements 105 are designed to be connectable to each other.
- the flow tube 105 can be used for forming an injected base 111 at the bottom side of the foundation pile 101.
- the flowable medium is in that case a medium that can be injected into the ground for forming an injected base 111.
- Suitable mediums are, for example, various types of injection mortars. The skilled person will be familiar with said mediums.
- Two foundation elements described above can be used for forming a foundation pile in the ground.
- the general method described below can be used for that purpose.
- the foundation element 2d, 102c that is to form the base of the foundation pile is installed into the ground by pressing, drilling or ramming or another suitable technique. Said installation takes place over a length such that the upper side 81 of said foundation element will be positioned at approximately the same level as the ground surface.
- a further foundation element 2c, 102b can be fixed on top thereof. Said fixation can take place by means of the connecting means 71, 72, 171, 172, 181, 182.
- the connecting means may comprise a screw attachment, for example for the reinforcement element 5, 105.
- the foundation bodies 4, 104 can be glued together.
- An epoxy can be used for that purpose, for example.
- Other (additional) connections are also conceivable, however, such as a snap connection, a pin joint, a rotating joint or the like.
- the base 111 is yet to be formed.
- the medium for forming the injected base 111 is introduced into the flow tube 105 from the upper side and will flow downward until the injection outlet 109 is reached. At this location the flowable medium will flow into the ground. After curing, the formation of the base 111 of the foundation pile 101 is complete.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Piles And Underground Anchors (AREA)
Description
- The invention relates to a foundation element for forming a foundation pile for a foundation of a building, as well as to a foundation pile and to a method for forming a foundation pile.
- Foundation piles and methods for installing the same in the ground are generally known.
-
DE 295 00 713.3 U1 discloses a support or palisade pole in general. -
discloses a member for penetrating ground.GB 2 292 408 A1 -
discloses a building structure with a hollow core, with a fibre layer, in which the hollow core may be filled with concrete.WO 00/61876 A1 - According to the prior art foundation elements, use is made of the pressure principle for replacing the foundations of existing buildings. Because the available space is limited in the case of existing buildings, the foundation piles need to be made up of segments. The segments are pressed into the ground one by one. Steel tube segments are used, which are subsequently filled with concrete and possibly provided with reinforcement steel.
- A drawback of the known foundation pile is that the installation thereof is time-consuming, since the steel tube segments that are used need to be precisely welded together so as to be watertight. If the tube segments are not welded watertight, water will penetrate into the tube and that will first have to be sucked dry. Then the tube can be filled with concrete so as to obtain the required strength for the pressure load. Because of this the known foundation pile and the known method are relatively costly.
- Accordingly it is an object of the invention to provide a foundation element that can be installed more quickly, more simply and at lower cost, in particular for replacing the foundations of existing buildings.
- In order to achieve that object, the invention provides a foundation element according to
claim 1. According to the invention, the foundation element comprises a foundation body substantially made of a polymer concrete (PC), such as polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methylmethacrylate (MMA), polymer concrete comprising epoxy resin (EB), or another similar or related composite. The polymer concrete or related composite provides excellent resistance to pressure loads, so that it is very suitable material for use as a foundation element. Furthermore, polymer concrete is corrosion resistant. The polymer concrete is furthermore relatively easy to produce, for example as a prefab element. To take up the pressure forces and tensile forces exerted thereon, the foundation element comprises a reinforcement element which extends substantially in a longitudinal direction of the foundation body. In this way damage to the foundation element caused by forces in a direction transversely to the longitudinal direction is prevented. - The foundation body is furthermore a substantially solid foundation body, so that filling of the interior of the foundation element after installation thereof is no longer needed. The reinforcement element is preferably completely surrounded by the polymer concrete. The reinforcement element may be applied by means of an adhesive, such as a two-component adhesive, or a sealing ring so as to make the reinforcement element resistance to tensile force and watertight.
- The reinforcement element preferably extends substantially over the entire length of the foundation body. It may slightly project from the foundation body near the ends thereof or, on the contrary, terminate at a position spaced a minimal distance from an end of the foundation body. Connecting several foundation elements together thus becomes easier, as will be explained hereinafter.
- In order to be able to take up the pressure forces and the tensile forces as effectively as possible, it is preferred that the reinforcement element and the foundation body are substantially concentric. The reinforcement element is located in the centre of the foundation body in that case.
- The reinforcement element preferably comprises a bar or a tube. The bar is preferably solid. The tube is preferably hollow. The bar or the tube is preferably made of a metal, for example steel or reinforcing steel.
- To make it possible to connect foundation elements together as already described before, it is quite preferable if the reinforcement element is provided with a connecting element at one end thereof, which connecting element is designed to be connectable to a further foundation element, preferably to a further connecting element of a further reinforcement element of said further foundation element.
- Said connecting element may be simply provided with screw thread.
- Additionally it is preferable if at least one end of the foundation element also comprises connecting means designed to be connectable to one end of a further foundation element, preferably two further connecting means at one end of the further foundation element.
- The connecting means can be of very simple construction if the connecting means comprise one or more recesses or protrusions in the end face of the foundation body. The foundation body is in that case preferably constructed so that an end surface at a first end is designed to connect with a close fit to an end surface of a second end of a further foundation body. To contribute to the modular nature of the foundation body, it is preferable if an end surface at a first end is designed to connect with a close fit to an end surface of a second end of the same the foundation body. In this way it becomes possible to use a number of identical foundation elements in constructing a foundation pile.
- The connecting means may in a particularly simple embodiment form part of a male-female connection. For example, the first end face may be constructed as a male coupling, and the second end face may be constructed as a female coupling.
- In one embodiment, the foundation element may be designed to function as a base for a foundation pile built up of foundation elements.
- It is possible in that case for the foundation element to have a larger cross section near one end than at an opposite end so as to thus form a wider base of the foundation pile.
- In one embodiment, the end having the larger cross section is designed to be drilled or pressed into the ground. Said end may be conical, rectangular, hexagonal or polygonal, pyramidal or helical in shape, depending on the ground structure to be penetrated.
- In another embodiment, the foundation element is provided with a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element. Said flowable medium is preferably a medium that can be injected into the ground, for example various types of injection mortar, for forming an injected base.
- It is particular preferable in that regard to use a hollow reinforcement element, in which case the reinforcement element is also designed to function as the flow tube. In this way a compact construction is obtained. Because the hollow reinforcement elements can be connected together, the flow tube can extend along the length of a number of foundation elements.
- In one embodiment the flow tube opens into an injection opening at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base for the foundation pile. Such a foundation element can be used for being forced into the ground, after which eventually, once the desired length of the foundation pile is reached, a base can be formed. In this way the foundation pile is fixed in position.
- According to one aspect of the invention, there is provided a foundation pile comprising a number of stacked-together and interconnected foundation elements according to the invention.
- According to one aspect of the invention, there is provided a method for installing a foundation pile in the ground, comprising the steps of providing a first foundation element according to the invention and providing a second foundation element according to the invention. The method comprises the further steps of:
- A installing the first foundation element into the ground;
- B fixing a second foundation element to the first foundation element so as to form at least part of a foundation pile; as well as
- C installing the foundation pile obtained in step B into the ground.
- Said installation can be carried out by using a technique that is suitable for that purpose, for example pressing, driving (ramming) or drilling or a related technique. Combinations of these techniques are also conceivable, if desired. The skilled person will be able to use a suitable technique. In one embodiment, pressing is preferred, however.
- A very advantageous aspect of the invention is the fact that fixing the first foundation element to the second foundation element can take place in a very simple and quick manner. The foundation elements can be glued together, so that the time-consuming welding is no longer necessary. In particular in combination with the embodiment in which the upper end of the first foundation element is designed for being connected to the lower end of the second foundation element in a form-locked manner, a quick and watertight connection can be realised.
- The method may comprise the additional steps of providing one or more further foundation elements according to the invention and fixing said one or more of further foundation elements to the foundation pile being formed.
- As already said before, it is preferable if in step B the first and the second foundation element are glued together by means of an adhesive, such as an epoxy, for example. Other connections are (additionally) also conceivable, however, such as a snap connection, a pin joint, a rotating joint, etc.
- The method may comprise the additional step D of fixing the reinforcement element of the first foundation element to the reinforcement element of the second foundation element. In this way the complete foundation pile is capable of taking up pressure forces and tensile forces.
- The connection can be effected in a simple manner by connecting the reinforcement element of the first foundation element and that of the second foundation element together in step D, using a screw connection.
- In one embodiment of the method, the first foundation element is designed to function as the base of the foundation pile or to be formed into a base (for example by injecting a base).
- The invention will now be explained by way of illustration by means of a description of the appended figures, in which:
-
Figure 1 is a schematic side view of a first embodiment of a foundation pile comprising foundation elements according to the present invention; -
Figure 2 is a schematic side view of a second embodiment of a foundation pile comprising foundation elements according to the present invention. -
Figure 1 schematically shows afoundation pile 1. Thefoundation pile 1 comprises a number of stacked-togetherfoundation elements 2a-2d. Eachfoundation element 2a-2d comprises afoundation body 4. Said foundation body is substantially made of a polymer concrete (PC). A suitable polymer concrete is, for example, polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methyl methacrylate (MMA) or polymer concrete comprising epoxy resin (EP). Other similar or related composites can also be used, of course. Thefoundation body 4 further comprises a concentrically disposedreinforcement element 5, which extends substantially in a longitudinal direction L of thefoundation body 4. Thereinforcement element 5 may be a steel tube or bar, for example of reinforcing steel. In the present embodiment, the bar is a solid bar, such that a relatively great strength is obtained. The length of a foundation element forms a fraction of the total length of the foundation pile. - The
foundation element 4 of said polymer concrete, provided with thereinforcement element 5, provides a foundation element 2 which is quite capable of taking up pressure forces and tensile forces being exerted thereon. Because of this the foundation element 2 is suitable for use as part of the foundation pile 2. - As
figure 1 shows, a few foundation elements 2 are stacked together. In order to effect a strong connection, thereinforcement element 5 extends beyond the bottom end of thefoundation body 4. Provided at the upper end of thefoundation element 4, on the other hand, is a recess, because the reinforcement element extends only as far as a position spaced from the upper end of thefoundation body 4. The recess and the projectingreinforcement element 5 of two 2a and 2b disposed adjacent to each other makes it easier to connect the two foundation elements together. Said projectingfoundation elements reinforcement element 5 and said recess (together with the end of thereinforcement element 5 in said recess) 71, 72, as it were, which are designed for being connectable to each other. Preferably, theform connecting elements reinforcement elements 5 of two 2a and 2b disposed adjacent to each other are connected together upon connection. It is also possible for the connectingfoundation elements 71, 72 to be designed so that they can be connected together in a simple manner. Think in this connection of an embodiment in which use is made of screw thread, for example.elements - The assembly of the lower two
2c, 2d infoundation elements figure 1 is designed to function as a base for thefoundation pile 1 built up offoundation elements 2a-2d. Thefoundation element 2d has a larger cross-section than thefoundation element 2c disposed thereabove. In this way a widened base of thefoundation pile 1 is formed. Thelowermost foundation element 2d has a shape designed for being drilled or forced into the ground. Its end may be spherical (11), conical (12), rectangular, hexagonal or polygonal, pyramidal or helical, depending on the ground structure to be penetrated. - With reference now to
figure 2 , there is described an alternative embodiment of afoundation pile 101. Thefoundation pile 101 again comprises a number of stacked-togetherfoundation elements 102a-102d. Eachfoundation element 102a-102d comprises afoundation body 104 substantially made of a polymer concrete (PC), which comprises a concentrically disposedreinforcement element 105. In the present embodiment, thereinforcement element 105 is a tube. - In this embodiment, too, a few foundation elements 102 are stacked together. In order to effect a strong connection between the foundation elements, use is again made of connecting
171, 172. Said connecting means comprise themeans reinforcement element 105, analogous to the situation shown infigure 1 , in which a male-female connection between twoadjacent foundation elements 102a-102b is provided. Referring tofigure 2 again, there is shown that additionally thefoundation bodies 104 themselves provide an improved and simplified connection. Thefoundation body 104 is designed so that anupper end face 181 thereof closely abuts thelower end face 182 of thefoundation body 104 disposed thereabove; see the connection between theelement 102a and theelement 102b. Thelower end face 181 is configured as a male connecting part and theupper end face 181 is configured as a female connecting part. Upon placement of the two foundation elements 102 one on top of the other, it is advantageous if the male connecting part is placed on top of the female connecting part, because in this way a self-aligning guide is realised. - Another difference in comparison with
figure 1 is that thereinforcement element 105 is hollow. Thereinforcement element 105 can thus function as a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element. Infigure 2 thereinforcement element 105 is therefore also configured as a flow tube. It is of course conceivable that in addition to the reinforcement element 105 (which may be either hollow or solid), an additional tube is provided as a flow tube, although the dual function leads to a relatively compact foundation element 102. It also applies in that case that in this way the flow tube can extend along the entire length of a number of foundation elements, preferably along the length of the foundation pile, because thehollow reinforcement elements 105 are designed to be connectable to each other. - The
flow tube 105 can be used for forming an injectedbase 111 at the bottom side of thefoundation pile 101. The flowable medium is in that case a medium that can be injected into the ground for forming an injectedbase 111. Suitable mediums are, for example, various types of injection mortars. The skilled person will be familiar with said mediums. - Two foundation elements described above can be used for forming a foundation pile in the ground. The general method described below can be used for that purpose.
- First the
2d, 102c that is to form the base of the foundation pile is installed into the ground by pressing, drilling or ramming or another suitable technique. Said installation takes place over a length such that thefoundation element upper side 81 of said foundation element will be positioned at approximately the same level as the ground surface. Now a 2c, 102b can be fixed on top thereof. Said fixation can take place by means of the connectingfurther foundation element 71, 72, 171, 172, 181, 182. What is a very advantageous in this regard is that the connection between the first foundation element and the second foundation element can be effected in a simple and quick manner. The connecting means may comprise a screw attachment, for example for themeans 5, 105. Thereinforcement element 4, 104 can be glued together. An epoxy can be used for that purpose, for example. Other (additional) connections are also conceivable, however, such as a snap connection, a pin joint, a rotating joint or the like. Once the connection has been realised, the assembly of the foundation pile thus formed can be pressed or driven (rammed) (or otherwise) into the ground, again until thefoundation bodies 2c, 102b is positioned at approximately the same level as the ground surface. Now another foundation element can again be fixed to the foundation pile and said assembly can also be installed into the ground by pressing, driving (ramming), drilling or otherwise. The aforesaid steps may be repeated, if desired, until the desired length of the foundation pile is realised.further foundation element - As regards the embodiment shown in
figure 2 , thebase 111 is yet to be formed. The medium for forming the injectedbase 111 is introduced into theflow tube 105 from the upper side and will flow downward until theinjection outlet 109 is reached. At this location the flowable medium will flow into the ground. After curing, the formation of thebase 111 of thefoundation pile 101 is complete. - It is noted that the installation into the ground of the foundation elements as described above can take place in various ways, and that the terms pressing, driving, ramming, drilling or otherwise have merely been used by way of illustration. The invention is not limited to the manner of installing the foundation element into the ground, however.
- The skilled person will appreciate that the invention has been described in the foregoing with reference to a few preferred embodiments, and that various alternatives and/or equivalent embodiments are conceivable within the framework of the invention, which embodiments may fall within the scope defined in the appended claims.
Claims (15)
- A foundation element (2) comprising a foundation body (4) characterised in that the foundation body (4) is substantially made of polymer concrete and which comprises a reinforcement element (5) that extends substantially in a longitudinal direction of the foundation body (4) for absorbing pressure forces and tensile forces exerted on the foundation element (2).
- A foundation element (2) according to claim 1, wherein the reinforcement element (5) extends substantially along the entire length of the foundation body.
- A foundation element (2) according to claim 1 or 2, wherein the reinforcement element (5) and the foundation body (4) are substantially concentric.
- A foundation element (2) according to any one of the preceding claims, wherein the reinforcement element (5) comprises a bar or a tube, preferably made of a metal, for example steel.
- A foundation element (2) according to any one of the preceding claims, wherein the reinforcement element (5) is provided with a connecting element (71, 72) at one end thereof, for instance wherein the connecting element (71, 72) is provided with screw thread, which connecting element (71, 71) is designed to be connectable to a further foundation element (2), preferably to a further connecting element (71, 72) of a further reinforcement element (5) of the further foundation element (2).
- A foundation (2) element according to any one of the preceding claims, wherein at least one end of the foundation element (102c) also comprises connecting means (181) designed to be connectable to one end of a further foundation element, preferably to further connecting means (182) at one end of the further foundation element (102b), and in particular wherein the coupling means form part of a male-female-connection.
- A foundation element according to claim 6, wherein the connecting means comprise one or more recesses (181) or protrusions (182) in the end face of the foundation body.
- A foundation element according to one or more of the preceding claims, wherein the foundation element is designed to function as a base (2c) for a foundation pile built up of foundation elements.
- A foundation element according to claim 8, wherein the foundation body (4) has a cross-section that is larger near one end than near an opposite end so as to thus form a widened base of the foundation pile, wherein the end having the larger cross section is designed to be installed into the ground, and wherein in particular said end is conical, rectangular, pyramidal or helical in shape.
- A foundation element according to one or more of the preceding claims, wherein the foundation element is provided with a flow tube (105) for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element, and in particular wherein the reinforcement element (105) is also designed to function as the flow tube.
- A foundation element according to claim 11, wherein the flow tube opens into an injection opening (109) at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base (111) for the foundation pile (101).
- A foundation pile (1, 101) characterised by a number of stacked-together and interconnected foundation elements (2a-c, 102a-c) according to any one of the preceding claims.
- A method for installing a foundation pile (1, 101) into the ground, characterised in that the method comprises the steps of providing a first foundation element (2c, 102c) according to one of claims 1-11, as well as providing a second foundation element (2b, 102b) according to one of claims 1-7, or 10, wherein the method comprises the further steps of:A installing the first foundation element (2c, 102c) into the ground;B fixing a second foundation element (2b, 102b) to the first foundation element so as to form at least part of a foundation pile (1, 101); as well asC installing the foundation pile obtained in step B into the ground.
- A method according to claim 13, wherein in step B the first (2c, 102c) and the second foundation element (2b, 102b) are glued together by means of an adhesive.
- A method according to claim 13 or 14, comprising the additional step D of fixing the reinforcement element (5) of the first foundation element (2c) to the reinforcement element (5) of the second foundation (2b) element, in particular in that they are fixed together by means of a screw connection.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NL2008192A NL2008192C2 (en) | 2012-01-27 | 2012-01-27 | FOUNDATION ELEMENT. |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2620552A1 EP2620552A1 (en) | 2013-07-31 |
| EP2620552B1 true EP2620552B1 (en) | 2015-01-14 |
Family
ID=47520863
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13151568.6A Not-in-force EP2620552B1 (en) | 2012-01-27 | 2013-01-17 | Foundation element |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP2620552B1 (en) |
| NL (1) | NL2008192C2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL2015482B1 (en) * | 2015-09-22 | 2017-04-19 | Formicida Beheer B V | Foundation element made of polymer-reinforced concrete. |
| NL2020352B1 (en) * | 2018-01-31 | 2019-08-07 | Boskalis Bv Baggermaatschappij | Assembly of a segmented lance and a handling tool therefore |
| CN111945711B (en) * | 2020-08-05 | 2024-09-17 | 武汉正远岩土科技有限公司 | A high-load-bearing large-diameter assembled composite engineering pile and its construction method |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE29500713U1 (en) * | 1995-01-18 | 1995-03-16 | Rydmann, Theo, 67310 Hettenleidelheim | Support post |
| GB9502025D0 (en) * | 1995-02-02 | 1995-03-22 | Jackaman James N | Improvements in and relating to and relating to sheet piles,and the like |
| GB9908467D0 (en) * | 1999-04-14 | 1999-06-09 | Lang Domhnall | Building structure |
-
2012
- 2012-01-27 NL NL2008192A patent/NL2008192C2/en not_active IP Right Cessation
-
2013
- 2013-01-17 EP EP13151568.6A patent/EP2620552B1/en not_active Not-in-force
Also Published As
| Publication number | Publication date |
|---|---|
| EP2620552A1 (en) | 2013-07-31 |
| NL2008192C2 (en) | 2013-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101143310B1 (en) | Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same | |
| JP5955108B2 (en) | Pile reinforcement structure of existing building and its construction method | |
| JP4599384B2 (en) | Embankment structure and construction method thereof | |
| JP5023219B2 (en) | Precast temporary structure and construction method thereof | |
| KR20130006420A (en) | Method of constructing underground structure to be newly built | |
| KR100954967B1 (en) | Prefab apparatus for reinforcing head of pile | |
| EP2620552B1 (en) | Foundation element | |
| KR101615200B1 (en) | Splice Sleeve And Conclusion Method Thereof | |
| CN110700274A (en) | Mechanically-connected assembled stand column and stand column pile | |
| JP5113342B2 (en) | Embankment structure | |
| KR100786360B1 (en) | Concrete pile file | |
| KR20110044720A (en) | Ikyung Compound Pile | |
| KR101021302B1 (en) | Foundation file and construction method | |
| JP2001342623A (en) | Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile | |
| KR101612637B1 (en) | Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings | |
| KR102075437B1 (en) | Composite phc pile for soil retaining wall | |
| KR100870861B1 (en) | Concrete filling head reinforcement device of steel pipe pile | |
| KR101041605B1 (en) | Block Type Reinforced Earth Retaining Wall Using Multi-Stage Connector | |
| JP6866980B2 (en) | Joining cap and pile head joining structure | |
| KR20110016846A (en) | Steel beam with solid extension | |
| KR102197107B1 (en) | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it | |
| CN220768090U (en) | Variable cross-section foundation pit bracing member | |
| JP4533371B2 (en) | Embankment structure and construction method thereof | |
| KR101452185B1 (en) | Concrete Composite Steel Pile and Its Manufacturing Apparatus and Method | |
| CN110952538A (en) | A connecting piece for precast concrete components and connecting method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| 17P | Request for examination filed |
Effective date: 20140123 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E02D 5/03 20060101AFI20140811BHEP Ipc: E02D 5/52 20060101ALI20140811BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20140827 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 3 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 707150 Country of ref document: AT Kind code of ref document: T Effective date: 20150215 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013000815 Country of ref document: DE Effective date: 20150305 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20150129 Year of fee payment: 3 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: CA Effective date: 20150421 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20150129 Year of fee payment: 3 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 707150 Country of ref document: AT Kind code of ref document: T Effective date: 20150114 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20150128 Year of fee payment: 3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150414 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150414 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150514 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150415 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602013000815 Country of ref document: DE |
|
| PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
| 26 | Opposition filed |
Opponent name: EP OPPOSITION FOUNDATION Effective date: 20151014 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PLAK | Information related to reply of patent proprietor to notice(s) of opposition modified |
Free format text: ORIGINAL CODE: EPIDOSCOBS3 |
|
| PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150117 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013000815 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20160930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160131 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160802 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160201 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20170119 Year of fee payment: 5 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130117 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PLAY | Examination report in opposition despatched + time limit |
Free format text: ORIGINAL CODE: EPIDOSNORE2 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20170117 |
|
| PLBD | Termination of opposition procedure: decision despatched |
Free format text: ORIGINAL CODE: EPIDOSNOPC1 |
|
| PLBP | Opposition withdrawn |
Free format text: ORIGINAL CODE: 0009264 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R100 Ref document number: 602013000815 Country of ref document: DE |
|
| PLBC | Reply to examination report in opposition received |
Free format text: ORIGINAL CODE: EPIDOSNORE3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150117 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170117 |
|
| PLBM | Termination of opposition procedure: date of legal effect published |
Free format text: ORIGINAL CODE: 0009276 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION PROCEDURE CLOSED |
|
| 27C | Opposition proceedings terminated |
Effective date: 20171014 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20180201 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180201 |