EP2620552B1 - Foundation element - Google Patents

Foundation element Download PDF

Info

Publication number
EP2620552B1
EP2620552B1 EP13151568.6A EP13151568A EP2620552B1 EP 2620552 B1 EP2620552 B1 EP 2620552B1 EP 13151568 A EP13151568 A EP 13151568A EP 2620552 B1 EP2620552 B1 EP 2620552B1
Authority
EP
European Patent Office
Prior art keywords
foundation
foundation element
reinforcement
pile
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP13151568.6A
Other languages
German (de)
French (fr)
Other versions
EP2620552A1 (en
Inventor
Oskar Peter Henriëtte Pudelko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Formicida Beheer Bv
Original Assignee
Formicida Beheer Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=47520863&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2620552(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Formicida Beheer Bv filed Critical Formicida Beheer Bv
Publication of EP2620552A1 publication Critical patent/EP2620552A1/en
Application granted granted Critical
Publication of EP2620552B1 publication Critical patent/EP2620552B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments

Definitions

  • the invention relates to a foundation element for forming a foundation pile for a foundation of a building, as well as to a foundation pile and to a method for forming a foundation pile.
  • GB 2 292 408 A1 discloses a member for penetrating ground.
  • WO 00/61876 A1 discloses a building structure with a hollow core, with a fibre layer, in which the hollow core may be filled with concrete.
  • the foundation piles need to be made up of segments.
  • the segments are pressed into the ground one by one.
  • Steel tube segments are used, which are subsequently filled with concrete and possibly provided with reinforcement steel.
  • a drawback of the known foundation pile is that the installation thereof is time-consuming, since the steel tube segments that are used need to be precisely welded together so as to be watertight. If the tube segments are not welded watertight, water will penetrate into the tube and that will first have to be sucked dry. Then the tube can be filled with concrete so as to obtain the required strength for the pressure load. Because of this the known foundation pile and the known method are relatively costly.
  • the invention provides a foundation element according to claim 1.
  • the foundation element comprises a foundation body substantially made of a polymer concrete (PC), such as polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methylmethacrylate (MMA), polymer concrete comprising epoxy resin (EB), or another similar or related composite.
  • PC polymer concrete
  • the polymer concrete or related composite provides excellent resistance to pressure loads, so that it is very suitable material for use as a foundation element.
  • polymer concrete is corrosion resistant.
  • the polymer concrete is furthermore relatively easy to produce, for example as a prefab element.
  • the foundation element comprises a reinforcement element which extends substantially in a longitudinal direction of the foundation body. In this way damage to the foundation element caused by forces in a direction transversely to the longitudinal direction is prevented.
  • the foundation body is furthermore a substantially solid foundation body, so that filling of the interior of the foundation element after installation thereof is no longer needed.
  • the reinforcement element is preferably completely surrounded by the polymer concrete.
  • the reinforcement element may be applied by means of an adhesive, such as a two-component adhesive, or a sealing ring so as to make the reinforcement element resistance to tensile force and watertight.
  • the reinforcement element preferably extends substantially over the entire length of the foundation body. It may slightly project from the foundation body near the ends thereof or, on the contrary, terminate at a position spaced a minimal distance from an end of the foundation body. Connecting several foundation elements together thus becomes easier, as will be explained hereinafter.
  • the reinforcement element and the foundation body are substantially concentric.
  • the reinforcement element is located in the centre of the foundation body in that case.
  • the reinforcement element preferably comprises a bar or a tube.
  • the bar is preferably solid.
  • the tube is preferably hollow.
  • the bar or the tube is preferably made of a metal, for example steel or reinforcing steel.
  • the reinforcement element is provided with a connecting element at one end thereof, which connecting element is designed to be connectable to a further foundation element, preferably to a further connecting element of a further reinforcement element of said further foundation element.
  • Said connecting element may be simply provided with screw thread.
  • At least one end of the foundation element also comprises connecting means designed to be connectable to one end of a further foundation element, preferably two further connecting means at one end of the further foundation element.
  • the connecting means can be of very simple construction if the connecting means comprise one or more recesses or protrusions in the end face of the foundation body.
  • the foundation body is in that case preferably constructed so that an end surface at a first end is designed to connect with a close fit to an end surface of a second end of a further foundation body.
  • an end surface at a first end is designed to connect with a close fit to an end surface of a second end of the same the foundation body. In this way it becomes possible to use a number of identical foundation elements in constructing a foundation pile.
  • the connecting means may in a particularly simple embodiment form part of a male-female connection.
  • the first end face may be constructed as a male coupling
  • the second end face may be constructed as a female coupling.
  • the foundation element may be designed to function as a base for a foundation pile built up of foundation elements.
  • the foundation element prefferably has a larger cross section near one end than at an opposite end so as to thus form a wider base of the foundation pile.
  • the end having the larger cross section is designed to be drilled or pressed into the ground.
  • Said end may be conical, rectangular, hexagonal or polygonal, pyramidal or helical in shape, depending on the ground structure to be penetrated.
  • the foundation element is provided with a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element.
  • Said flowable medium is preferably a medium that can be injected into the ground, for example various types of injection mortar, for forming an injected base.
  • the reinforcement element is also designed to function as the flow tube.
  • the hollow reinforcement elements can be connected together, the flow tube can extend along the length of a number of foundation elements.
  • the flow tube opens into an injection opening at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base for the foundation pile.
  • a foundation element can be used for being forced into the ground, after which eventually, once the desired length of the foundation pile is reached, a base can be formed. In this way the foundation pile is fixed in position.
  • a foundation pile comprising a number of stacked-together and interconnected foundation elements according to the invention.
  • a method for installing a foundation pile in the ground comprising the steps of providing a first foundation element according to the invention and providing a second foundation element according to the invention.
  • the method comprises the further steps of:
  • Said installation can be carried out by using a technique that is suitable for that purpose, for example pressing, driving (ramming) or drilling or a related technique. Combinations of these techniques are also conceivable, if desired. The skilled person will be able to use a suitable technique. In one embodiment, pressing is preferred, however.
  • a very advantageous aspect of the invention is the fact that fixing the first foundation element to the second foundation element can take place in a very simple and quick manner.
  • the foundation elements can be glued together, so that the time-consuming welding is no longer necessary.
  • a quick and watertight connection can be realised.
  • the method may comprise the additional steps of providing one or more further foundation elements according to the invention and fixing said one or more of further foundation elements to the foundation pile being formed.
  • step B the first and the second foundation element are glued together by means of an adhesive, such as an epoxy, for example.
  • an adhesive such as an epoxy
  • Other connections are (additionally) also conceivable, however, such as a snap connection, a pin joint, a rotating joint, etc.
  • the method may comprise the additional step D of fixing the reinforcement element of the first foundation element to the reinforcement element of the second foundation element.
  • the complete foundation pile is capable of taking up pressure forces and tensile forces.
  • connection can be effected in a simple manner by connecting the reinforcement element of the first foundation element and that of the second foundation element together in step D, using a screw connection.
  • the first foundation element is designed to function as the base of the foundation pile or to be formed into a base (for example by injecting a base).
  • FIG. 1 schematically shows a foundation pile 1.
  • the foundation pile 1 comprises a number of stacked-together foundation elements 2a-2d.
  • Each foundation element 2a-2d comprises a foundation body 4.
  • Said foundation body is substantially made of a polymer concrete (PC).
  • a suitable polymer concrete is, for example, polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methyl methacrylate (MMA) or polymer concrete comprising epoxy resin (EP). Other similar or related composites can also be used, of course.
  • the foundation body 4 further comprises a concentrically disposed reinforcement element 5, which extends substantially in a longitudinal direction L of the foundation body 4.
  • the reinforcement element 5 may be a steel tube or bar, for example of reinforcing steel. In the present embodiment, the bar is a solid bar, such that a relatively great strength is obtained.
  • the length of a foundation element forms a fraction of the total length of the foundation pile.
  • the foundation element 4 of said polymer concrete, provided with the reinforcement element 5, provides a foundation element 2 which is quite capable of taking up pressure forces and tensile forces being exerted thereon. Because of this the foundation element 2 is suitable for use as part of the foundation pile 2.
  • FIG. 1 shows, a few foundation elements 2 are stacked together.
  • the reinforcement element 5 extends beyond the bottom end of the foundation body 4.
  • a recess Provided at the upper end of the foundation element 4, on the other hand, is a recess, because the reinforcement element extends only as far as a position spaced from the upper end of the foundation body 4.
  • the recess and the projecting reinforcement element 5 of two foundation elements 2a and 2b disposed adjacent to each other makes it easier to connect the two foundation elements together.
  • Said projecting reinforcement element 5 and said recess (together with the end of the reinforcement element 5 in said recess) form connecting elements 71, 72, as it were, which are designed for being connectable to each other.
  • the reinforcement elements 5 of two foundation elements 2a and 2b disposed adjacent to each other are connected together upon connection.
  • the connecting elements 71, 72 are designed so that they can be connected together in a simple manner. Think in this connection of an embodiment in which use is made of screw thread, for example.
  • the assembly of the lower two foundation elements 2c, 2d in figure 1 is designed to function as a base for the foundation pile 1 built up of foundation elements 2a-2d.
  • the foundation element 2d has a larger cross-section than the foundation element 2c disposed thereabove. In this way a widened base of the foundation pile 1 is formed.
  • the lowermost foundation element 2d has a shape designed for being drilled or forced into the ground. Its end may be spherical (11), conical (12), rectangular, hexagonal or polygonal, pyramidal or helical, depending on the ground structure to be penetrated.
  • the foundation pile 101 again comprises a number of stacked-together foundation elements 102a-102d.
  • Each foundation element 102a-102d comprises a foundation body 104 substantially made of a polymer concrete (PC), which comprises a concentrically disposed reinforcement element 105.
  • the reinforcement element 105 is a tube.
  • connecting means 171, 172 comprise the reinforcement element 105, analogous to the situation shown in figure 1 , in which a male-female connection between two adjacent foundation elements 102a-102b is provided.
  • FIG 2 there is shown that additionally the foundation bodies 104 themselves provide an improved and simplified connection.
  • the foundation body 104 is designed so that an upper end face 181 thereof closely abuts the lower end face 182 of the foundation body 104 disposed thereabove; see the connection between the element 102a and the element 102b.
  • the lower end face 181 is configured as a male connecting part and the upper end face 181 is configured as a female connecting part.
  • the reinforcement element 105 is hollow.
  • the reinforcement element 105 can thus function as a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element.
  • the reinforcement element 105 is therefore also configured as a flow tube.
  • an additional tube is provided as a flow tube, although the dual function leads to a relatively compact foundation element 102. It also applies in that case that in this way the flow tube can extend along the entire length of a number of foundation elements, preferably along the length of the foundation pile, because the hollow reinforcement elements 105 are designed to be connectable to each other.
  • the flow tube 105 can be used for forming an injected base 111 at the bottom side of the foundation pile 101.
  • the flowable medium is in that case a medium that can be injected into the ground for forming an injected base 111.
  • Suitable mediums are, for example, various types of injection mortars. The skilled person will be familiar with said mediums.
  • Two foundation elements described above can be used for forming a foundation pile in the ground.
  • the general method described below can be used for that purpose.
  • the foundation element 2d, 102c that is to form the base of the foundation pile is installed into the ground by pressing, drilling or ramming or another suitable technique. Said installation takes place over a length such that the upper side 81 of said foundation element will be positioned at approximately the same level as the ground surface.
  • a further foundation element 2c, 102b can be fixed on top thereof. Said fixation can take place by means of the connecting means 71, 72, 171, 172, 181, 182.
  • the connecting means may comprise a screw attachment, for example for the reinforcement element 5, 105.
  • the foundation bodies 4, 104 can be glued together.
  • An epoxy can be used for that purpose, for example.
  • Other (additional) connections are also conceivable, however, such as a snap connection, a pin joint, a rotating joint or the like.
  • the base 111 is yet to be formed.
  • the medium for forming the injected base 111 is introduced into the flow tube 105 from the upper side and will flow downward until the injection outlet 109 is reached. At this location the flowable medium will flow into the ground. After curing, the formation of the base 111 of the foundation pile 101 is complete.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Piles And Underground Anchors (AREA)

Description

  • The invention relates to a foundation element for forming a foundation pile for a foundation of a building, as well as to a foundation pile and to a method for forming a foundation pile.
  • Foundation piles and methods for installing the same in the ground are generally known.
  • DE 295 00 713.3 U1 discloses a support or palisade pole in general.
  • GB 2 292 408 A1 discloses a member for penetrating ground.
  • WO 00/61876 A1 discloses a building structure with a hollow core, with a fibre layer, in which the hollow core may be filled with concrete.
  • According to the prior art foundation elements, use is made of the pressure principle for replacing the foundations of existing buildings. Because the available space is limited in the case of existing buildings, the foundation piles need to be made up of segments. The segments are pressed into the ground one by one. Steel tube segments are used, which are subsequently filled with concrete and possibly provided with reinforcement steel.
  • A drawback of the known foundation pile is that the installation thereof is time-consuming, since the steel tube segments that are used need to be precisely welded together so as to be watertight. If the tube segments are not welded watertight, water will penetrate into the tube and that will first have to be sucked dry. Then the tube can be filled with concrete so as to obtain the required strength for the pressure load. Because of this the known foundation pile and the known method are relatively costly.
  • Accordingly it is an object of the invention to provide a foundation element that can be installed more quickly, more simply and at lower cost, in particular for replacing the foundations of existing buildings.
  • In order to achieve that object, the invention provides a foundation element according to claim 1. According to the invention, the foundation element comprises a foundation body substantially made of a polymer concrete (PC), such as polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methylmethacrylate (MMA), polymer concrete comprising epoxy resin (EB), or another similar or related composite. The polymer concrete or related composite provides excellent resistance to pressure loads, so that it is very suitable material for use as a foundation element. Furthermore, polymer concrete is corrosion resistant. The polymer concrete is furthermore relatively easy to produce, for example as a prefab element. To take up the pressure forces and tensile forces exerted thereon, the foundation element comprises a reinforcement element which extends substantially in a longitudinal direction of the foundation body. In this way damage to the foundation element caused by forces in a direction transversely to the longitudinal direction is prevented.
  • The foundation body is furthermore a substantially solid foundation body, so that filling of the interior of the foundation element after installation thereof is no longer needed. The reinforcement element is preferably completely surrounded by the polymer concrete. The reinforcement element may be applied by means of an adhesive, such as a two-component adhesive, or a sealing ring so as to make the reinforcement element resistance to tensile force and watertight.
  • The reinforcement element preferably extends substantially over the entire length of the foundation body. It may slightly project from the foundation body near the ends thereof or, on the contrary, terminate at a position spaced a minimal distance from an end of the foundation body. Connecting several foundation elements together thus becomes easier, as will be explained hereinafter.
  • In order to be able to take up the pressure forces and the tensile forces as effectively as possible, it is preferred that the reinforcement element and the foundation body are substantially concentric. The reinforcement element is located in the centre of the foundation body in that case.
  • The reinforcement element preferably comprises a bar or a tube. The bar is preferably solid. The tube is preferably hollow. The bar or the tube is preferably made of a metal, for example steel or reinforcing steel.
  • To make it possible to connect foundation elements together as already described before, it is quite preferable if the reinforcement element is provided with a connecting element at one end thereof, which connecting element is designed to be connectable to a further foundation element, preferably to a further connecting element of a further reinforcement element of said further foundation element.
  • Said connecting element may be simply provided with screw thread.
  • Additionally it is preferable if at least one end of the foundation element also comprises connecting means designed to be connectable to one end of a further foundation element, preferably two further connecting means at one end of the further foundation element.
  • The connecting means can be of very simple construction if the connecting means comprise one or more recesses or protrusions in the end face of the foundation body. The foundation body is in that case preferably constructed so that an end surface at a first end is designed to connect with a close fit to an end surface of a second end of a further foundation body. To contribute to the modular nature of the foundation body, it is preferable if an end surface at a first end is designed to connect with a close fit to an end surface of a second end of the same the foundation body. In this way it becomes possible to use a number of identical foundation elements in constructing a foundation pile.
  • The connecting means may in a particularly simple embodiment form part of a male-female connection. For example, the first end face may be constructed as a male coupling, and the second end face may be constructed as a female coupling.
  • In one embodiment, the foundation element may be designed to function as a base for a foundation pile built up of foundation elements.
  • It is possible in that case for the foundation element to have a larger cross section near one end than at an opposite end so as to thus form a wider base of the foundation pile.
  • In one embodiment, the end having the larger cross section is designed to be drilled or pressed into the ground. Said end may be conical, rectangular, hexagonal or polygonal, pyramidal or helical in shape, depending on the ground structure to be penetrated.
  • In another embodiment, the foundation element is provided with a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element. Said flowable medium is preferably a medium that can be injected into the ground, for example various types of injection mortar, for forming an injected base.
  • It is particular preferable in that regard to use a hollow reinforcement element, in which case the reinforcement element is also designed to function as the flow tube. In this way a compact construction is obtained. Because the hollow reinforcement elements can be connected together, the flow tube can extend along the length of a number of foundation elements.
  • In one embodiment the flow tube opens into an injection opening at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base for the foundation pile. Such a foundation element can be used for being forced into the ground, after which eventually, once the desired length of the foundation pile is reached, a base can be formed. In this way the foundation pile is fixed in position.
  • According to one aspect of the invention, there is provided a foundation pile comprising a number of stacked-together and interconnected foundation elements according to the invention.
  • According to one aspect of the invention, there is provided a method for installing a foundation pile in the ground, comprising the steps of providing a first foundation element according to the invention and providing a second foundation element according to the invention. The method comprises the further steps of:
    1. A installing the first foundation element into the ground;
    2. B fixing a second foundation element to the first foundation element so as to form at least part of a foundation pile; as well as
    3. C installing the foundation pile obtained in step B into the ground.
  • Said installation can be carried out by using a technique that is suitable for that purpose, for example pressing, driving (ramming) or drilling or a related technique. Combinations of these techniques are also conceivable, if desired. The skilled person will be able to use a suitable technique. In one embodiment, pressing is preferred, however.
  • A very advantageous aspect of the invention is the fact that fixing the first foundation element to the second foundation element can take place in a very simple and quick manner. The foundation elements can be glued together, so that the time-consuming welding is no longer necessary. In particular in combination with the embodiment in which the upper end of the first foundation element is designed for being connected to the lower end of the second foundation element in a form-locked manner, a quick and watertight connection can be realised.
  • The method may comprise the additional steps of providing one or more further foundation elements according to the invention and fixing said one or more of further foundation elements to the foundation pile being formed.
  • As already said before, it is preferable if in step B the first and the second foundation element are glued together by means of an adhesive, such as an epoxy, for example. Other connections are (additionally) also conceivable, however, such as a snap connection, a pin joint, a rotating joint, etc.
  • The method may comprise the additional step D of fixing the reinforcement element of the first foundation element to the reinforcement element of the second foundation element. In this way the complete foundation pile is capable of taking up pressure forces and tensile forces.
  • The connection can be effected in a simple manner by connecting the reinforcement element of the first foundation element and that of the second foundation element together in step D, using a screw connection.
  • In one embodiment of the method, the first foundation element is designed to function as the base of the foundation pile or to be formed into a base (for example by injecting a base).
  • The invention will now be explained by way of illustration by means of a description of the appended figures, in which:
    • Figure 1 is a schematic side view of a first embodiment of a foundation pile comprising foundation elements according to the present invention;
    • Figure 2 is a schematic side view of a second embodiment of a foundation pile comprising foundation elements according to the present invention.
  • Figure 1 schematically shows a foundation pile 1. The foundation pile 1 comprises a number of stacked-together foundation elements 2a-2d. Each foundation element 2a-2d comprises a foundation body 4. Said foundation body is substantially made of a polymer concrete (PC). A suitable polymer concrete is, for example, polymer concrete comprising unsaturated polyester resin (UB), polymer concrete comprising methyl methacrylate (MMA) or polymer concrete comprising epoxy resin (EP). Other similar or related composites can also be used, of course. The foundation body 4 further comprises a concentrically disposed reinforcement element 5, which extends substantially in a longitudinal direction L of the foundation body 4. The reinforcement element 5 may be a steel tube or bar, for example of reinforcing steel. In the present embodiment, the bar is a solid bar, such that a relatively great strength is obtained. The length of a foundation element forms a fraction of the total length of the foundation pile.
  • The foundation element 4 of said polymer concrete, provided with the reinforcement element 5, provides a foundation element 2 which is quite capable of taking up pressure forces and tensile forces being exerted thereon. Because of this the foundation element 2 is suitable for use as part of the foundation pile 2.
  • As figure 1 shows, a few foundation elements 2 are stacked together. In order to effect a strong connection, the reinforcement element 5 extends beyond the bottom end of the foundation body 4. Provided at the upper end of the foundation element 4, on the other hand, is a recess, because the reinforcement element extends only as far as a position spaced from the upper end of the foundation body 4. The recess and the projecting reinforcement element 5 of two foundation elements 2a and 2b disposed adjacent to each other makes it easier to connect the two foundation elements together. Said projecting reinforcement element 5 and said recess (together with the end of the reinforcement element 5 in said recess) form connecting elements 71, 72, as it were, which are designed for being connectable to each other. Preferably, the reinforcement elements 5 of two foundation elements 2a and 2b disposed adjacent to each other are connected together upon connection. It is also possible for the connecting elements 71, 72 to be designed so that they can be connected together in a simple manner. Think in this connection of an embodiment in which use is made of screw thread, for example.
  • The assembly of the lower two foundation elements 2c, 2d in figure 1 is designed to function as a base for the foundation pile 1 built up of foundation elements 2a-2d. The foundation element 2d has a larger cross-section than the foundation element 2c disposed thereabove. In this way a widened base of the foundation pile 1 is formed. The lowermost foundation element 2d has a shape designed for being drilled or forced into the ground. Its end may be spherical (11), conical (12), rectangular, hexagonal or polygonal, pyramidal or helical, depending on the ground structure to be penetrated.
  • With reference now to figure 2, there is described an alternative embodiment of a foundation pile 101. The foundation pile 101 again comprises a number of stacked-together foundation elements 102a-102d. Each foundation element 102a-102d comprises a foundation body 104 substantially made of a polymer concrete (PC), which comprises a concentrically disposed reinforcement element 105. In the present embodiment, the reinforcement element 105 is a tube.
  • In this embodiment, too, a few foundation elements 102 are stacked together. In order to effect a strong connection between the foundation elements, use is again made of connecting means 171, 172. Said connecting means comprise the reinforcement element 105, analogous to the situation shown in figure 1, in which a male-female connection between two adjacent foundation elements 102a-102b is provided. Referring to figure 2 again, there is shown that additionally the foundation bodies 104 themselves provide an improved and simplified connection. The foundation body 104 is designed so that an upper end face 181 thereof closely abuts the lower end face 182 of the foundation body 104 disposed thereabove; see the connection between the element 102a and the element 102b. The lower end face 181 is configured as a male connecting part and the upper end face 181 is configured as a female connecting part. Upon placement of the two foundation elements 102 one on top of the other, it is advantageous if the male connecting part is placed on top of the female connecting part, because in this way a self-aligning guide is realised.
  • Another difference in comparison with figure 1 is that the reinforcement element 105 is hollow. The reinforcement element 105 can thus function as a flow tube for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element. In figure 2 the reinforcement element 105 is therefore also configured as a flow tube. It is of course conceivable that in addition to the reinforcement element 105 (which may be either hollow or solid), an additional tube is provided as a flow tube, although the dual function leads to a relatively compact foundation element 102. It also applies in that case that in this way the flow tube can extend along the entire length of a number of foundation elements, preferably along the length of the foundation pile, because the hollow reinforcement elements 105 are designed to be connectable to each other.
  • The flow tube 105 can be used for forming an injected base 111 at the bottom side of the foundation pile 101. The flowable medium is in that case a medium that can be injected into the ground for forming an injected base 111. Suitable mediums are, for example, various types of injection mortars. The skilled person will be familiar with said mediums.
  • Two foundation elements described above can be used for forming a foundation pile in the ground. The general method described below can be used for that purpose.
  • First the foundation element 2d, 102c that is to form the base of the foundation pile is installed into the ground by pressing, drilling or ramming or another suitable technique. Said installation takes place over a length such that the upper side 81 of said foundation element will be positioned at approximately the same level as the ground surface. Now a further foundation element 2c, 102b can be fixed on top thereof. Said fixation can take place by means of the connecting means 71, 72, 171, 172, 181, 182. What is a very advantageous in this regard is that the connection between the first foundation element and the second foundation element can be effected in a simple and quick manner. The connecting means may comprise a screw attachment, for example for the reinforcement element 5, 105. The foundation bodies 4, 104 can be glued together. An epoxy can be used for that purpose, for example. Other (additional) connections are also conceivable, however, such as a snap connection, a pin joint, a rotating joint or the like. Once the connection has been realised, the assembly of the foundation pile thus formed can be pressed or driven (rammed) (or otherwise) into the ground, again until the further foundation element 2c, 102b is positioned at approximately the same level as the ground surface. Now another foundation element can again be fixed to the foundation pile and said assembly can also be installed into the ground by pressing, driving (ramming), drilling or otherwise. The aforesaid steps may be repeated, if desired, until the desired length of the foundation pile is realised.
  • As regards the embodiment shown in figure 2, the base 111 is yet to be formed. The medium for forming the injected base 111 is introduced into the flow tube 105 from the upper side and will flow downward until the injection outlet 109 is reached. At this location the flowable medium will flow into the ground. After curing, the formation of the base 111 of the foundation pile 101 is complete.
  • It is noted that the installation into the ground of the foundation elements as described above can take place in various ways, and that the terms pressing, driving, ramming, drilling or otherwise have merely been used by way of illustration. The invention is not limited to the manner of installing the foundation element into the ground, however.
  • The skilled person will appreciate that the invention has been described in the foregoing with reference to a few preferred embodiments, and that various alternatives and/or equivalent embodiments are conceivable within the framework of the invention, which embodiments may fall within the scope defined in the appended claims.

Claims (15)

  1. A foundation element (2) comprising a foundation body (4) characterised in that the foundation body (4) is substantially made of polymer concrete and which comprises a reinforcement element (5) that extends substantially in a longitudinal direction of the foundation body (4) for absorbing pressure forces and tensile forces exerted on the foundation element (2).
  2. A foundation element (2) according to claim 1, wherein the reinforcement element (5) extends substantially along the entire length of the foundation body.
  3. A foundation element (2) according to claim 1 or 2, wherein the reinforcement element (5) and the foundation body (4) are substantially concentric.
  4. A foundation element (2) according to any one of the preceding claims, wherein the reinforcement element (5) comprises a bar or a tube, preferably made of a metal, for example steel.
  5. A foundation element (2) according to any one of the preceding claims, wherein the reinforcement element (5) is provided with a connecting element (71, 72) at one end thereof, for instance wherein the connecting element (71, 72) is provided with screw thread, which connecting element (71, 71) is designed to be connectable to a further foundation element (2), preferably to a further connecting element (71, 72) of a further reinforcement element (5) of the further foundation element (2).
  6. A foundation (2) element according to any one of the preceding claims, wherein at least one end of the foundation element (102c) also comprises connecting means (181) designed to be connectable to one end of a further foundation element, preferably to further connecting means (182) at one end of the further foundation element (102b), and in particular wherein the coupling means form part of a male-female-connection.
  7. A foundation element according to claim 6, wherein the connecting means comprise one or more recesses (181) or protrusions (182) in the end face of the foundation body.
  8. A foundation element according to one or more of the preceding claims, wherein the foundation element is designed to function as a base (2c) for a foundation pile built up of foundation elements.
  9. A foundation element according to claim 8, wherein the foundation body (4) has a cross-section that is larger near one end than near an opposite end so as to thus form a widened base of the foundation pile, wherein the end having the larger cross section is designed to be installed into the ground, and wherein in particular said end is conical, rectangular, pyramidal or helical in shape.
  10. A foundation element according to one or more of the preceding claims, wherein the foundation element is provided with a flow tube (105) for transporting a flowable medium therethrough from one end of the foundation element to the other end of the foundation element, and in particular wherein the reinforcement element (105) is also designed to function as the flow tube.
  11. A foundation element according to claim 11, wherein the flow tube opens into an injection opening (109) at the other end of the foundation element for injecting the flowable medium into the ground so as to form an injected base (111) for the foundation pile (101).
  12. A foundation pile (1, 101) characterised by a number of stacked-together and interconnected foundation elements (2a-c, 102a-c) according to any one of the preceding claims.
  13. A method for installing a foundation pile (1, 101) into the ground, characterised in that the method comprises the steps of providing a first foundation element (2c, 102c) according to one of claims 1-11, as well as providing a second foundation element (2b, 102b) according to one of claims 1-7, or 10, wherein the method comprises the further steps of:
    A installing the first foundation element (2c, 102c) into the ground;
    B fixing a second foundation element (2b, 102b) to the first foundation element so as to form at least part of a foundation pile (1, 101); as well as
    C installing the foundation pile obtained in step B into the ground.
  14. A method according to claim 13, wherein in step B the first (2c, 102c) and the second foundation element (2b, 102b) are glued together by means of an adhesive.
  15. A method according to claim 13 or 14, comprising the additional step D of fixing the reinforcement element (5) of the first foundation element (2c) to the reinforcement element (5) of the second foundation (2b) element, in particular in that they are fixed together by means of a screw connection.
EP13151568.6A 2012-01-27 2013-01-17 Foundation element Not-in-force EP2620552B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2008192A NL2008192C2 (en) 2012-01-27 2012-01-27 FOUNDATION ELEMENT.

Publications (2)

Publication Number Publication Date
EP2620552A1 EP2620552A1 (en) 2013-07-31
EP2620552B1 true EP2620552B1 (en) 2015-01-14

Family

ID=47520863

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13151568.6A Not-in-force EP2620552B1 (en) 2012-01-27 2013-01-17 Foundation element

Country Status (2)

Country Link
EP (1) EP2620552B1 (en)
NL (1) NL2008192C2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2015482B1 (en) * 2015-09-22 2017-04-19 Formicida Beheer B V Foundation element made of polymer-reinforced concrete.
NL2020352B1 (en) * 2018-01-31 2019-08-07 Boskalis Bv Baggermaatschappij Assembly of a segmented lance and a handling tool therefore
CN111945711B (en) * 2020-08-05 2024-09-17 武汉正远岩土科技有限公司 A high-load-bearing large-diameter assembled composite engineering pile and its construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29500713U1 (en) * 1995-01-18 1995-03-16 Rydmann, Theo, 67310 Hettenleidelheim Support post
GB9502025D0 (en) * 1995-02-02 1995-03-22 Jackaman James N Improvements in and relating to and relating to sheet piles,and the like
GB9908467D0 (en) * 1999-04-14 1999-06-09 Lang Domhnall Building structure

Also Published As

Publication number Publication date
EP2620552A1 (en) 2013-07-31
NL2008192C2 (en) 2013-07-30

Similar Documents

Publication Publication Date Title
KR101143310B1 (en) Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
JP5955108B2 (en) Pile reinforcement structure of existing building and its construction method
JP4599384B2 (en) Embankment structure and construction method thereof
JP5023219B2 (en) Precast temporary structure and construction method thereof
KR20130006420A (en) Method of constructing underground structure to be newly built
KR100954967B1 (en) Prefab apparatus for reinforcing head of pile
EP2620552B1 (en) Foundation element
KR101615200B1 (en) Splice Sleeve And Conclusion Method Thereof
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile
JP5113342B2 (en) Embankment structure
KR100786360B1 (en) Concrete pile file
KR20110044720A (en) Ikyung Compound Pile
KR101021302B1 (en) Foundation file and construction method
JP2001342623A (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
KR101612637B1 (en) Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings
KR102075437B1 (en) Composite phc pile for soil retaining wall
KR100870861B1 (en) Concrete filling head reinforcement device of steel pipe pile
KR101041605B1 (en) Block Type Reinforced Earth Retaining Wall Using Multi-Stage Connector
JP6866980B2 (en) Joining cap and pile head joining structure
KR20110016846A (en) Steel beam with solid extension
KR102197107B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it
CN220768090U (en) Variable cross-section foundation pit bracing member
JP4533371B2 (en) Embankment structure and construction method thereof
KR101452185B1 (en) Concrete Composite Steel Pile and Its Manufacturing Apparatus and Method
CN110952538A (en) A connecting piece for precast concrete components and connecting method thereof

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20140123

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 5/03 20060101AFI20140811BHEP

Ipc: E02D 5/52 20060101ALI20140811BHEP

INTG Intention to grant announced

Effective date: 20140827

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 707150

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150215

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013000815

Country of ref document: DE

Effective date: 20150305

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20150129

Year of fee payment: 3

REG Reference to a national code

Ref country code: FR

Ref legal event code: CA

Effective date: 20150421

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20150129

Year of fee payment: 3

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 707150

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150114

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20150128

Year of fee payment: 3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150414

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150414

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150514

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150415

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602013000815

Country of ref document: DE

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

26 Opposition filed

Opponent name: EP OPPOSITION FOUNDATION

Effective date: 20151014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PLAK Information related to reply of patent proprietor to notice(s) of opposition modified

Free format text: ORIGINAL CODE: EPIDOSCOBS3

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602013000815

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20160930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20170119

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PLAY Examination report in opposition despatched + time limit

Free format text: ORIGINAL CODE: EPIDOSNORE2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20170117

PLBD Termination of opposition procedure: decision despatched

Free format text: ORIGINAL CODE: EPIDOSNOPC1

PLBP Opposition withdrawn

Free format text: ORIGINAL CODE: 0009264

REG Reference to a national code

Ref country code: DE

Ref legal event code: R100

Ref document number: 602013000815

Country of ref document: DE

PLBC Reply to examination report in opposition received

Free format text: ORIGINAL CODE: EPIDOSNORE3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150117

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170117

PLBM Termination of opposition procedure: date of legal effect published

Free format text: ORIGINAL CODE: 0009276

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: OPPOSITION PROCEDURE CLOSED

27C Opposition proceedings terminated

Effective date: 20171014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20180201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180201