EP2604568B2 - Kombinierte Hebebalkenanordnung für Windturbinenteile - Google Patents

Kombinierte Hebebalkenanordnung für Windturbinenteile Download PDF

Info

Publication number
EP2604568B2
EP2604568B2 EP11193562.3A EP11193562A EP2604568B2 EP 2604568 B2 EP2604568 B2 EP 2604568B2 EP 11193562 A EP11193562 A EP 11193562A EP 2604568 B2 EP2604568 B2 EP 2604568B2
Authority
EP
European Patent Office
Prior art keywords
interface
beam arrangement
wind turbine
lifting beam
tower wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11193562.3A
Other languages
English (en)
French (fr)
Other versions
EP2604568A1 (de
EP2604568B1 (de
Inventor
Rune Hartkopf
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=45346337&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2604568(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Siemens AG filed Critical Siemens AG
Priority to DK11193562T priority Critical patent/DK2604568T3/da
Priority to EP11193562.3A priority patent/EP2604568B2/de
Priority to CN201210541378.3A priority patent/CN103159128B/zh
Publication of EP2604568A1 publication Critical patent/EP2604568A1/de
Application granted granted Critical
Publication of EP2604568B1 publication Critical patent/EP2604568B1/de
Publication of EP2604568B2 publication Critical patent/EP2604568B2/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/108Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means for lifting parts of wind turbines

Definitions

  • the present invention describes a combined lifting beam arrangement for handling wind turbine parts, in particular to a combined lifting beam arrangement for handling tower wall portions and a nacelle and/or a hub and/or a generator of a wind turbine without changing the lifting beam arrangement between two lifting operations.
  • the present invention further describes a method of handling different wind turbine parts using the same combined lifting beam arrangement.
  • Such a device is disclosed in document EP 2364949 A1 .
  • wind turbines are constructed as hollow steel towers made of prefabricated tower portions.
  • the tower is constructed or assembled by successively lifting and placing a series of tower wall portions on top of each other, whereby the lowest tower wall portion is mounted on a foundation, usually made of concrete, and includes access means such as a doorway to later allow access for a maintenance crew.
  • the tower wall portions become successively smaller in diameter towards the top of the tower.
  • Neighbouring tower wall portions are connected by means of fasteners such as construction bolts inserted into connection holes in the end flanges.
  • connection holes of the neighbouring portions are positioned such that connection holes in the top flange of the lower tower wall portion match the connection holes in the bottom flange of the upper tower wall portion.
  • a number of lifting fittings usually at least two - is mounted to one of the end flanges of the portion, usually the upper flange, and a cable is connected to the lifting fittings to allow a crane to hoist the portion onto the previously assembled partial tower wall portion.
  • the successive tower wall portions generally differ in diameter owing to the overall conical tower shape, and the spacings between the connection holes therefore also differ.
  • prior art lifting techniques have required multiple lifting fittings, sometimes even a specific lifting fitting for each tower section.
  • a lifting technique for the installation of a nacelle, hub and generator at the top of a wind turbine tower are also known in the art.
  • individual lifting brackets or sling systems are used for handling these wind turbine parts.
  • a special sling system is connected to a nacelle or hub or generator to lift it into the position at the top of the tower, wherein the sling system comprises a number of slings for holding the nacelle or the hub or the generator at special coupling means.
  • the object of the invention is achieved by the combined lifting beam arrangement according to claim 1, and by the method of handling wind turbine parts according to claim 10.
  • the combined lifting beam arrangement according to the invention is specifically adjusted for handling wind turbine parts, in particular wind turbine parts having different engaging structures, such as tower wall parts, nacelles, hubs, or generators of a wind turbine.
  • the combined lifting beam arrangement comprises a beam with a connecting element.
  • the connecting element is realized to be connected to the lifting device directly or via a coupling element such as a hook liftable by the lifting device.
  • the beam may be connectable to the lifting device by means of the connecting element, such as a pad eye, a loop, a grommet or the like.
  • the beam may be connectable to the connecting element in a detachable manner, for example for facilitating the transport, maintenance work of the lifting beam arrangement or the like.
  • the lifting beam arrangement further comprises a first interface for a first engaging structure and a second interface for a second engaging structure which are provided at the beam, preferably at different positions so that they cannot interfere with each other.
  • additional interfaces for a third or fourth or even more engaging structures may be present at the beam without deviating from the invention.
  • Interface means in the sense of the present invention, any connecting means adapted to a specific engaging structure of a wind turbine part such as of the tower wall portions, the nacelle, the hub, the generator or the like.
  • engaging structure means that the element to be lifted has a portion into which a holding member of the interface can be engaged by means of a structural engagement, e.g.
  • the first interface has a number of first holding members adapted for an engagement of the lifting beam arrangement with a tower wall portion of a wind turbine and the second interface has a number of second holding members adapted for an engagement of the lifting beam arrangement with coupling elements of a nacelle and/or a hub and/or a generator of a wind turbine.
  • a "holding member” can be any member suitable for holding the respective wind turbine part with a specific engaging structure such as a holding tool having a corresponding structural configuration.
  • the first and second holding members may comprise portions for locking the first and/or second holding members at the beam.
  • they can be locked at the beam in a releasable manner in one preferred position or may be slidable at the beam along its longitudinal direction.
  • an adaptation of the position of the first holding members to different diameters of the tower wall portions or of the second holding members to the geometry of the other wind turbine parts is possible.
  • one or more bolts may be provided which may be inserted into one or more holes in the first holding member and/or in the second holding member and/or in the beam.
  • the first and/or the second holding members may be integrally provided in the beam.
  • the above-described combined lifting beam arrangement may be used in the method according to the invention.
  • the method according to the invention is particularly straightforward and fast. Since no individual slings and lifting brackets are used for handling of wind turbine parts having different engaging structures and the same combined lifting beam arrangement is used for handling the tower wall portions and the nacelle and/or the hub and/or the generator, the main lifting device, e.g. a crane, can go directly from the tower top to the nacelle after transferring or installing the top tower wall portion. "Transferring" in the sense of the invention means any handling procedure used during installation, transportation or loading of wind turbine parts. Therefore, the method according to the invention reduces not only crane time and human resources needed for handling operations of wind turbine parts, but also reduces the overall costs.
  • the combined lifting beam arrangement according to the invention may preferably be constructed to handle wind turbine parts having different engaging structures, such as tower wall portions with different diameters or a nacelle or hub or generator of a wind turbine.
  • the beam of the combined lifting beam arrangement may have an elongated shape being extendable in its longitudinal direction.
  • the beam may for example be manufactured from a rigid material such as a metal, in particular iron or steel.
  • the beam may also be represented by a bar, a rod, a pole or the like.
  • the length of the beam (along its longitudinal direction) may range between about 2 m and 20 m, in particular between about 4 m and 10 m, more preferably between about 5 and 8 m.
  • the length of the beam may depend on the diameter or the length of the parts of a wind turbine to be lifted with the same lifting beam arrangement such as a tower wall portion, a nacelle or the like.
  • the length of the beam may be larger than the diameter of the largest tower wall portion and/or the length of the other parts to be lifted.
  • the beam may have a specific cross-sectional shape for providing a sufficient stiffness to withstand forces acting on the holding members and being transferred to the beam, when the tower wall portion and/or the other parts of a wind turbine such as the nacelle, the hub, or the generator are engaged by the interfaces.
  • the beam may have a cross-sectional shape such as a T-shape, H-shape, I-shape, U-shape, O-shape or any other shape providing a sufficient stiffness for holding and lifting a wind turbine part such as a tower wall portion or a nacelle or the like.
  • the first interface comprises an automatic hook system.
  • An automatic hook system may have a number of (in particular 2, 3, 4 or even more) locking elements for locking the tower wall portions at different positions.
  • An example of such a locking element is a grabbing element or a claw which can grab the top flange of a tower portion at different positions, in particular at two opposite positions at the inner perimeter of the tower top flange.
  • the first interface in particular the automatic hook system of the first interface, may further comprise a manually or automatically driven actuator moving at least one of the holding members.
  • actuators are hydraulic or pneumatic or electrical actuators like a piston, a motor, a magnetic valve, or the like. Those actuators may be driven by a battery or a fuel-driven generator.
  • the actuator is a remote controlled (for example by means of radio frequency) actuator which can be controlled from a site different from the place of the actuator.
  • the remote control may be handled from any position suitable to control the installation of a wind turbine, for example from the ground, a ship, a crane or the like.
  • Such an actuator may for example bring locking elements of an automatic hook system in engagement with the tower wall portion at a specific engagement position.
  • at least one of the first holding members comprises a locking element adapted for engaging with an engaging structure of a tower wall portion.
  • the locking elements are adapted for engaging with a flange arranged at an end, e.g. the top, of a tower wall portion during the handling operation.
  • the locking elements may be mechanically displaced from one inner position to one outer position, e.g. by activating two or more joined rods by an actuating means.
  • the locking elements are positioned behind at least a part of a bracket of an end part of a tower wall portion or a rim or a flange protruding from the tower wall portion inwards.
  • the locking elements and thereby the combined lifting beam arrangement may be locked or secured to the tower wall portion from falling down.
  • the locking of the tower wall portion to the first holding member may be stably achieved by increasing the distance between the locking elements, involving clamping radial outer portions of the locking elements between inner surfaces of the tower wall portion.
  • the second holding member comprises a number of, preferably essentially vertical, wires which can be used for handling and lifting a nacelle or a hub or a generator.
  • wires other flexible lifting means such as, e.g., slings, ropes, chains, or more stiff lifting means such as, e.g. plates, beams or frames, can be used.
  • stiff lifting means may be useful to withstand the weight or the structure of the turbine part.
  • frames or plates they can be combined with more flexible lifting means to provide a second holding member adjusted to a specific part of a wind turbine.
  • a frame for a nacelle, hub or generator made of a rigid material can be connected by means of a chain or a sling to the beam.
  • the holding members such as slings or wires are positioned such that they are in a nearly vertical position during operation, that means that the coupling means of the wind turbine part and the holding member connection with the combined lifting beam arrangement are vertically aligned
  • the forces in the lifting points i.e. the coupling means
  • the both ends of the slings are positioned at the beam in a position that each of the ends will be essentially vertical, i.e. up to an angle of about 1 to 15 degree, preferably between about 2 to 10 degree, more preferably between about 4 to 8 degree, especially about 6 degree.
  • connection points with the beam depends thus on the width of or the distance of the coupling means at the nacelle or other wind turbine parts to be lifted. Therefore, it is preferable that the second holding members may be movably connected to the beam so that the distance between two or three connection points at the beam can be manually or automatically varied.
  • a further advantage of vertical second holding members e.g. vertical slings, is that less force is applied to the lifting points and thus smaller slings can be used, for example slings made of wires with a smaller diameter than conventional wires. Hence, this would reduce the amount of material and thus lowers the costs and the weight of the second holding members and the whole combined lifting beam arrangement. Moreover, smaller and vertical slings may be easier to handle for the technicians.
  • the inventive combined lifting beam arrangement according to the invention may have one or two control line coupling means for connecting control lines for rotating the lifting beam arrangement and the wind turbine part hanging thereon.
  • the control lines are attached to the lifting beam arrangement and not to the tower wall portion, nacelle, hub or generator, the wind turbine parts can be freely rotated during the handling operation.
  • the combined lifting beam arrangement further may be designed to have a pitch system for adjusting a pitch of the beam from a horizontal position into a position angular to the horizontal position, preferably during operation of the lifting beam arrangement.
  • the pitch is the deviation of the main horizontal axis of the beam from the horizontal position. If the beam and the main horizontal axis of the lifted wind turbine part are nearly in a parallel position, the pitch may also be the deviation of the main axis of the wind turbine part from the horizontal position.
  • the pitch system preferably comprises at least two pitch system connecting members connecting the pitch system with the beam at two or more different coupling positions in a longitudinal direction of the beam.
  • the pitch system connecting members comprise two or more wires connecting the lifting device (e.g. a hook of a crane) with two or more different coupling positions at the beam for holding the beam in a working position.
  • the working position is generally horizontal in its basic modus, while the beam may be in a pitch modus by changing the length of at least one of the wires.
  • the wires i.e. of the pitch system connecting members
  • one, two or more of the wires may be provided with a winch to adjust the pitch (that means the angle between the beam and the horizontal position) of the lifting beam arrangement.
  • the winches are provided movable in longitudinal direction at the beam.
  • the pitch of the lifting beam arrangement may be adjusted by moving the position of one or more of at least two coupling positions at which at least two pitch system connecting wires are provided for connecting the pitch system with the beam in a longitudinal direction of the beam. If, for example, moving the position of one of the coupling positions to a different position nearer to the end of the beam the leverage force on the beam is changed.
  • the pitch of the wind turbine parts lifted can be changed by individually changing the length of the first and second holding members connecting the beam with the wind turbine part lifted. This change of the length can also be made by means of winches provided in the first or second holding members.
  • the first interface comprises parts of the second interface and/or the second interface comprises parts of the first interface.
  • the holding members of the first interface can be used together with or instead of some of the holding members of the second interface.
  • the slings for nacelle or generator lifting can be used as additional holding members during the handling or installation of the tower wall portions.
  • the tower wall portion can be supported by the second holding members. That means, e.g., the wires can be locked into separate coupling elements at the outside of the tower wall portion in order to stabilize the position of the tower wall portion during installation.
  • the wires constituting the second holding members may be used as control lines during the tower installation instead of separate control lines or together with separate control lines provided at the combined lifting beam arrangement.
  • the combined lifting beam arrangement comprises a remote control system realized to control parts of the first and/or the second interface.
  • a remote control system realized to control parts of the first and/or the second interface.
  • the remote controlled locking and releasing of the interfaces, in particular the holding members reduces installation time because the technician does not need to change the position and, in particular, the right surveillance eliminates the demand for having technicians in the tower when hooking on and off the tower. This will also allow the lifting apparatus such as the main crane, to be released faster to grab the nacelle, the hub or the generator.
  • the above described combined lifting beam arrangement may advantageously be used in the method of handling wind turbine parts according to the invention because it is specifically adapted for tower wall portion lifting and nacelle lifting and, optionally, hub or generator lifting.
  • a change of the lifting beams during the installation of a wind turbine is not necessary and the main crane can start nacelle installation subsequently after having installed the top of the wind turbine tower portions.
  • the time for installation can be significantly reduced with this combined lifting beam arrangement.
  • At least one of the engaging and/or transferring steps is controlled by remote control.
  • an automatic hook system is used for hooking on and off the tower wall portions. Then, the crane may go directly to hook on the nacelle without any change in the lifting beam arrangement after installation of the tower wall portions.
  • the second holding members are then engaged into the respective engaging structures to lift the nacelle.
  • an automatic system is used with the second holding members. Then, the first and the second interfaces can be remote controlled from a position outside the tower, for example on the ground or in a crane. If, for example, the first and/or the second interface is controlled by remote control mechanisms, installation time can be significantly decreased and the installation procedure can be made safer because it is not demanded that a technician need to climb up and down the tower to disengage the wind turbine parts.
  • a pitch control step for adjusting a pitch of a beam of the lifting beam arrangement from a horizontal position into a position angular to the horizontal position comprises changing the length of one of at least two pitch system connecting members connecting the pitch system with the beam at two or more different coupling positions in a longitudinal direction of the beam.
  • the working position of the lifting beam arrangement is generally horizontal in a basic modus.
  • the beam may be in a pitch modus by changing the length of at least one of the pitch system connecting members such as wires connecting the beam with the connecting element provided for connecting the lifting beam arrangement with a lifting device.
  • the length of the wires i.e. of the pitch system connecting members
  • one, two or more of the wires may be provided with a winch to adjust the pitch (that means the angle between the beam and the horizontal position) of the lifting beam arrangement.
  • the control step comprises moving the position of one or more of at least two coupling positions at which at least two pitch system connecting wires are provided for connecting the pitch system with the beam in a longitudinal direction of the beam.
  • the winches are provided movable in longitudinal direction at the beam.
  • the pitch of the lifting beam arrangement may be adjusted by moving the position of one or more of at least two coupling positions at which at least two pitch system connecting wires are provided for connecting the pitch system with the beam in a longitudinal direction of the beam. If, for example, moving the position of one of the coupling positions to a different position nearer to the end of the beam the leverage force on the beam is changed and a desired pitch can be foreseen.
  • Fig. 1 shows a side view of an embodiment of a combined lifting beam arrangement 1
  • Fig. 2 shows a sectional view of the combined lifting beam arrangement of Fig. 1
  • the combined lifting beam arrangement comprises a beam 2, a connecting element 3, and a first interface 4 with first holding members 5, locking members 8, and an actuator 13.
  • the Figures further show a second interface 6 with second holding members 7.
  • control line coupling means 9, control lines 10, pitch system connecting members 23, and coupling positions 24 as well as a tower 11 with an inner flange 12 are shown as well.
  • the combined lifting beam arrangement 1 consists of the beam 2 which extends in its longitudinal direction such that the two interfaces do not interfere with each other, but provides enough space for providing both thereon.
  • the total length depends on the parts to be lifted and is longer than the biggest distance of the lifting points (coupling points at the wind turbine parts to be lifted) at the biggest tower wall portion or the biggest other wind turbine part such as the nacelle, the hub or the generator.
  • the distance of the lifting points of a nacelle are bigger than the inner diameter of a tower wall portion so that the first interface 4 is provided in the middle of the longitudinal direction of the beam 2 and the second interface 6 is provided around the first interface 4 or closer to the ends of the beam 2 as shown in Figures 1 and 2 .
  • the connecting element 3 is provided at the top of the beam 2 and consists of a pitch system consisting of two wires 23 each of which is fixed to the upper side of the beam 2 in a middle position close to the gravity centre of the beam 2.
  • the wires 23 extend vertically to a point at which a hook can be locked and then each of them goes to one of the outer ends of the beam 2.
  • the wires 23 are connected to winches (not shown) provided at coupling positions 24.
  • the winches are useful to change the length of the wires 23 for adjusting the pitch of the beam, if necessary. If, for example, the right wire as the right pitch system connecting member 23 is shortened the right-hand side of the beam will be raised up and the beam 2 will be in a pitched position. The same can be made by prolonging the left-hand wire as the left pitch system connecting member 23. In a similar manner, the left-hand side of the beam 2 can be varied by changing the length of the right or the left wire 23 of the coupling means 3.
  • Fig. 2 the first interface 4 holding the tower wall portion 11 is shown.
  • the first interface 4 is mounted in the middle of the beam at its side opposite to the coupling means 3.
  • the tower wall portion 11 can be balanced more easily.
  • the interface 4 consists of an actuator 13 and holding members 5. At the end of the holding members 5, locking portions 8 protruding behind a flange 12 of the tower wall portion 11 in a locked position are shown.
  • the combined lifting beam arrangement 1 is engaged into the engaging structure, the flange 12, of the tower wall portion 11 by means of the first interface 4.
  • the tower wall portion 11 can be handled, for example, be installed on a foundation or placed in a transportation vessel. It is of course possible to lift and transport any such parts at the same time from one place to another place.
  • control line coupling means 9 are provided at both ends of the beam 2, at both ends of the beam 2, control line coupling means 9 are provided.
  • both control line coupling means 9 are provided at a separate part of the beam 2, a so called beam-extending portion 20.
  • This beam-extending portion 20 may be a fixed element or can be detachable or movable provided so that the position of the control line coupling means 9 can be varied manually and/or automatically before or during the handling operation.
  • the beam-extending portion 20 may be provided as a pivoting element if the lifted wind turbine parts may hinder the control lines 10 in the straight line position.
  • the control lines 10 are connected to the lifting device (not shown) such as a crane (not shown) to rotate the tower wall portion 11 into the correct position.
  • the second interface 6 with the second holding members 7 is not engaged in this embodiment where the tower wall portion is lifted.
  • Fig. 3 the same combined lifting beam arrangement 1 as in Fig. 1 and 2 is shown. However instead of handling and lifting a tower wall portion 11, a nacelle 15 is lifted by means of the second interface 6.
  • the combined lifting beam arrangement 1 has the same parts as in Fig. 1 and 2 , while the first interface 4 is not engaged at this time.
  • a nacelle 15 is held by means of two slings 7 of the second interface 6.
  • the slings 7 are connected to coupling means at the nacelle which are located at the front side 16 (preferably near to the gravity centre) and in the middle of the nacelle housing 17.
  • the sling 7 at the nacelle housing 17 goes through holes in the housing into the nacelle housing 17 and is connected to the inner wall of the nacelle housing 17.
  • the length of the slings 7 is such that the nacelle 15 is lifted in a slightly pitched manner.
  • the angel to the horizontal position is less than about 15 degree, preferably between 2 and 10 degrees, in particular about 6 degrees, while the combined lifting beam arrangement 1 is nearly in a horizontal position. If the desired pitch needs to be varied, this can be done by using the pitch system (not shown) as described before.
  • FIG. 4 a same combined lifting beam arrangement 1 as in the Fig. 1 to 3 is shown.
  • the lifted nacelle 15 is a nacelle 15 with a cooler 18 at its rear side.
  • the sling 7 at the front side 17 of the nacelle 15 comprises one wire 7 which is connected to a coupling means (not shown) at the middle of the front side 17 of the nacelle.
  • the other wire 7 is constituted of two separate wires which go to coupling means inside the nacelle housing 17 wherein one is provided at the left and the other at the right side of the nacelle housing 17 to achieve a stable lifting condition.
  • the combined lifting beam arrangement 1 is advantageous because any wind turbine parts, even though they have different engaging structures, such as a tower wall portion or a nacelle can be lifted without changing the lifting beam arrangement between two lifting procedures. Thereby the overall time of installation of a wind turbine, especially in an off-shore wind farm, can be reduced.
  • Fig. 5 shows a block diagram of the method of the invention.
  • step A a number of first holding members 5 of a first interface portion 4 of a combined lifting beam arrangement 1 are engaged into a tower wall portion 11 of a wind turbine.
  • step B the tower wall portion 11 is transferred from a first location to a second location, for example from a loading vessel on a ship to a foundation of an off-shore wind power plant.
  • step C the first interface 4 is disengaged from the tower wall portion 11, for example by using a remote controlled automatic hook system as described before.
  • a nacelle 15 of a wind turbine is engaged by means of a number of second holding members 7 of a second interface 6 of the lifting beam arrangement 1 as described beforehand (step D).
  • step E the nacelle 15 is transferred from a third location to a fourth location in step E.
  • step F the second interface 6 is disengaged from the nacelle 15 by using a remote controlled automatic second interface.
  • the method can be used for hub or generator installation after the nacelle has been installed (not shown).

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Claims (14)

  1. Kombinierte Hebebalkenanordnung (1) zur Handhabung von Windkraftanlagenteilen, welche umfasst:
    - einen Balken (2) mit einem Verbindungselement (3), das dafür ausgebildet ist, mit einem Hebezeug verbunden zu werden,
    - eine erste Schnittstelle (4) mit einer Anzahl von ersten Halteelementen (5), die für einen Eingriff der Hebebalkenanordnung mit einem Turmwandabschnitt (11) einer Windkraftanlage eingerichtet sind, wobei mindestens eines der ersten Halteelemente (5) ein Verriegelungselement (8) umfasst, das für einen Eingriff mit einem Flansch (12) ausgelegt ist, der an einem Ende des Turmwandabschnitts (11) angeordnet ist, und
    - eine zweite Schnittstelle (6) mit einer Anzahl von zweiten Halteelementen (7), die für einen Eingriff der Hebebalkenanordnung mit Kopplungselementen einer Gondel (15) und/oder einer Nabe und/oder eines Generators einer Windkraftanlage eingerichtet sind.
  2. Kombinierte Hebebalkenanordnung nach Anspruch 1, wobei die erste Schnittstelle (4) ein automatisches Hakensystem umfasst.
  3. Kombinierte Hebebalkenanordnung nach Anspruch 1 oder 2, wobei die erste Schnittstelle einen Aktuator (13), vorzugsweise einen HF-gesteuerten Aktuator, umfasst, der mindestens eines der Halteelemente (5) bewegt.
  4. Kombinierte Hebebalkenanordnung nach einem der vorhergehenden Ansprüche, wobei das zweite Halteelement eine Anzahl von Drähten (7) umfasst.
  5. Kombinierte Hebebalkenanordnung nach einem der vorhergehenden Ansprüche, welche ein oder zwei Steuerungsleitungs-Kopplungsmittel (9) aufweist.
  6. Kombinierte Hebebalkenanordnung nach einem der vorhergehenden Ansprüche, welche ein Neigungssystem zum Verstellen einer Neigung des Balkens (2) aus einer horizontalen Position in eine schräg zu der horizontalen Position verlaufende Position aufweist.
  7. Kombinierte Hebebalkenanordnung nach Anspruch 6, wobei das Neigungssystem (3) mindestens zwei Neigungssystem-Verbindungselemente (23) umfasst, welche das Neigungssystem (3) mit dem Balken (2) an zwei oder mehr verschiedenen Kopplungspositionen (24) in einer Längsrichtung des Balkens verbinden.
  8. Kombinierte Hebebalkenanordnung nach einem der vorhergehenden Ansprüche, wobei die erste Schnittstelle (4) Teile der zweiten Schnittstelle (6) umfasst und/oder die zweite Schnittstelle (6) Teile der ersten Schnittstelle (4) umfasst.
  9. Kombinierte Hebebalkenanordnung nach einem der vorhergehenden Ansprüche, welche ein Fernsteuerungssystem umfasst, das dafür ausgebildet ist, Teile der ersten und/oder der zweiten Schnittstelle (4, 6) zu steuern.
  10. Verfahren zur Handhabung von Windkraftanlagenteilen, welches die folgenden Schritte umfasst:
    - Ineingriffbringen (A) eines Turmwandabschnitts (11) einer Windkraftanlage mit einer Anzahl von ersten Halteelementen (5) eines ersten Schnittstellenabschnitts (4) einer kombinierten Hebebalkenanordnung (1) nach einem der Ansprüche 1 bis 9, wobei mindestens eines der ersten Halteelemente (5) ein Verriegelungselement (8) umfasst, das für einen Eingriff mit einem Flansch (12) ausgelegt ist, der an einem Ende des Turmwandabschnitts (11) angeordnet ist;
    - Transportieren (B) des Turmwandabschnitts (11) von einem ersten Ort zu einem zweiten Ort,
    - Lösen (C) der ersten Schnittstelle (4) von dem Turmwandabschnitt (11),
    - Ineingriffbringen (D) einer Gondel (15) oder einer Nabe oder eines Generators einer Windkraftanlage mit einer Anzahl von zweiten Halteelementen (7) einer zweiten Schnittstelle (6) der Hebebalkenanordnung (1),
    - Transportieren (E) der Gondel (15) oder der Nabe oder des Generators von einem dritten Ort zu einem vierten Ort, und
    - Lösen (F) der zweiten Schnittstelle (6) von der Gondel (15) oder der Nabe oder dem Generator.
  11. Verfahren nach Anspruch 10, wobei mindestens einer der Schritte des Ineingriffbringens und/oder Transportierens mittels Fernsteuerung gesteuert wird.
  12. Verfahren nach Anspruch 10 oder 11, welches ferner einen Neigungssteuerungsschritt zum Verstellen einer Neigung eines Balkens (2) der Hebebalkenanordnung (1) aus einer horizontalen Position in eine schräg zu der horizontalen Position verlaufende Position umfasst.
  13. Verfahren nach Anspruch 12, wobei der Neigungssteuerungsschritt das Ändern der Länge eines von mindestens zwei Neigungssystem-Verbindungselementen (23) umfasst, welche das Neigungssystem (3) mit dem Balken (2) an zwei oder mehr verschiedenen Kopplungspositionen (24) in einer Längsrichtung des Balkens verbinden.
  14. Verfahren nach Anspruch 12 oder 13, wobei der Steuerungsschritt das Bewegen der Position einer oder mehrerer von mindestens zwei Kopplungspositionen (24), an denen mindestens zwei Neigungssystem-Verbindungsdrähte (23) zum Verbinden des Neigungssystems (3) mit dem Balken (2) vorgesehen sind, in einer Längsrichtung des Balkens umfasst.
EP11193562.3A 2011-12-14 2011-12-14 Kombinierte Hebebalkenanordnung für Windturbinenteile Active EP2604568B2 (de)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DK11193562T DK2604568T3 (da) 2011-12-14 2011-12-14 Kombineret løftebomindretning til vindmølledele
EP11193562.3A EP2604568B2 (de) 2011-12-14 2011-12-14 Kombinierte Hebebalkenanordnung für Windturbinenteile
CN201210541378.3A CN103159128B (zh) 2011-12-14 2012-12-14 用于处理风力涡轮机部件的组合提升梁设备和方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP11193562.3A EP2604568B2 (de) 2011-12-14 2011-12-14 Kombinierte Hebebalkenanordnung für Windturbinenteile

Publications (3)

Publication Number Publication Date
EP2604568A1 EP2604568A1 (de) 2013-06-19
EP2604568B1 EP2604568B1 (de) 2014-04-16
EP2604568B2 true EP2604568B2 (de) 2018-11-07

Family

ID=45346337

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11193562.3A Active EP2604568B2 (de) 2011-12-14 2011-12-14 Kombinierte Hebebalkenanordnung für Windturbinenteile

Country Status (3)

Country Link
EP (1) EP2604568B2 (de)
CN (1) CN103159128B (de)
DK (1) DK2604568T3 (de)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018113878A1 (en) 2016-12-21 2018-06-28 Vestas Wind Systems A/S Wind turbine service or construction method and apparatus
CN114249240A (zh) * 2021-11-25 2022-03-29 江苏中车电机有限公司 一种大型风力发电机整机翻身吊运装置及吊运方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3458229A (en) 1967-06-26 1969-07-29 Jules G Nagy Universal lifting spreader
US3971478A (en) 1974-10-10 1976-07-27 Institutul de Proiectare Tehnologica Pentru Laminoare --IPROLAM-- Overhead crane with lifting beam provided with C-shaped claws
DE3239534A1 (de) 1982-10-26 1984-04-26 Flachform Stahl KG, 5760 Arnsberg Hebewerkzeug fuer lasten mit vertikaler mitteloeffnung
US5037151A (en) 1989-01-28 1991-08-06 Sankyu Inc. Lifting sling
US5306062A (en) 1993-04-21 1994-04-26 Dodge John P Adjustable lifting device for sewer frame or the like
JP2000204792A (ja) 1999-01-12 2000-07-25 Mitsubishi Heavy Ind Ltd 塔状建築物の組立及び/又はメインテナンス用架構、及び、かかる塔状建築物の組立及び/又はメインテナンス方法
US7455338B2 (en) 2005-10-07 2008-11-25 Jenney Alfred P Leveling device for lifting apparatus and associated methods
WO2010142983A1 (en) 2009-06-10 2010-12-16 Continental Polymers Limited Lifting apparatus
US20110056168A1 (en) 2009-09-10 2011-03-10 National Oilwell Varco, L.P. Windmill installation system and method for using same
WO2011026970A2 (de) 2009-09-07 2011-03-10 Suzlon Energy Gmbh Hubvorrichtung für einen rotor einer windturbine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK1925583T4 (da) * 2006-11-23 2013-07-15 Siemens Ag Fremgangsmåde til håndtering af vindmølleblade og anordning til montering af vindmølleblade, især montering af blade på en vindmølle
US20110221215A1 (en) * 2010-03-12 2011-09-15 Vestas Wind Systems A/S Methods and apparatus for handling a tower section of a wind turbine with a crane
DE102010022996B4 (de) * 2010-06-08 2013-05-29 Wader-Wittis Gmbh Hubvorrichtung für Turmsegmente

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3458229A (en) 1967-06-26 1969-07-29 Jules G Nagy Universal lifting spreader
US3971478A (en) 1974-10-10 1976-07-27 Institutul de Proiectare Tehnologica Pentru Laminoare --IPROLAM-- Overhead crane with lifting beam provided with C-shaped claws
DE3239534A1 (de) 1982-10-26 1984-04-26 Flachform Stahl KG, 5760 Arnsberg Hebewerkzeug fuer lasten mit vertikaler mitteloeffnung
US5037151A (en) 1989-01-28 1991-08-06 Sankyu Inc. Lifting sling
US5306062A (en) 1993-04-21 1994-04-26 Dodge John P Adjustable lifting device for sewer frame or the like
JP2000204792A (ja) 1999-01-12 2000-07-25 Mitsubishi Heavy Ind Ltd 塔状建築物の組立及び/又はメインテナンス用架構、及び、かかる塔状建築物の組立及び/又はメインテナンス方法
US7455338B2 (en) 2005-10-07 2008-11-25 Jenney Alfred P Leveling device for lifting apparatus and associated methods
WO2010142983A1 (en) 2009-06-10 2010-12-16 Continental Polymers Limited Lifting apparatus
WO2011026970A2 (de) 2009-09-07 2011-03-10 Suzlon Energy Gmbh Hubvorrichtung für einen rotor einer windturbine
US20110056168A1 (en) 2009-09-10 2011-03-10 National Oilwell Varco, L.P. Windmill installation system and method for using same

Also Published As

Publication number Publication date
CN103159128B (zh) 2016-11-23
DK2604568T3 (da) 2014-05-05
EP2604568A1 (de) 2013-06-19
EP2604568B1 (de) 2014-04-16
CN103159128A (zh) 2013-06-19

Similar Documents

Publication Publication Date Title
EP2604850B1 (de) Hebearm
EP2640965B1 (de) Verfahren zur kranlosen handhabung von windturbinenschaufeln über eine turbinennabe
US8764082B2 (en) Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
US8939299B2 (en) Method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method
US9624902B2 (en) Assembly method for a main rotor shaft and an installation tool thereto
EP2794455B1 (de) Verfahren und vorrichtung zur handhabung von windturbinenkomponenten während des transports und des zusammenbaus
EP3559441B1 (de) Verfahren und anordnung zur handhabung von windturbinenschaufeln
EP3329071B1 (de) System und verfahren zur installation eines spanngliedes in einem windturbinenturm
EP3314119B1 (de) Verfahren zum errichten eines kabelgebundenen windturbinenturms
KR20160148682A (ko) 풍력터빈 날개의 해체 및 조립 방법과 시스템
WO2012062352A1 (en) Lifting beam for use in hoisting a wind turbine blade
US11719227B2 (en) Method and assembly for handling wind turbine blades
EP2664790A2 (de) Verfahren und Vorrichtung zum Drehen einer Schaufel oder eines Schaufelteils für eine Windturbine während der Herstellung oder Montage
JP2020515484A (ja) 風力タービン設置用巻き上げシステム
EP2604568B2 (de) Kombinierte Hebebalkenanordnung für Windturbinenteile
WO2018086836A1 (en) Rotor blade assembly
WO2011055021A2 (en) A method and an apparatus for assembling a wind power plant
CN111511670B (zh) 操纵风力涡轮机部件的方法和具有起重机的风力涡轮机
WO2022119452A1 (en) Systems and methods related to climbing and assembling tower structures
EP4077932A1 (de) Verfahren zum installieren oder entfernen von windturbinenkomponenten

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130719

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 1/10 20060101AFI20130829BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20131111

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20140501

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 662395

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011006173

Country of ref document: DE

Effective date: 20140528

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 662395

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140416

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20140416

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140716

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140816

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140716

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140717

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140818

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602011006173

Country of ref document: DE

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

26 Opposition filed

Opponent name: VESTAS WIND SYSTEMS A/S

Effective date: 20150116

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602011006173

Country of ref document: DE

Effective date: 20150116

PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

Free format text: ORIGINAL CODE: EPIDOSCOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141214

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20150831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141214

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20111214

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

APAH Appeal reference modified

Free format text: ORIGINAL CODE: EPIDOSCREFNO

PLAB Opposition data, opponent's data or that of the opponent's representative modified

Free format text: ORIGINAL CODE: 0009299OPPO

R26 Opposition filed (corrected)

Opponent name: VESTAS WIND SYSTEMS A/S

Effective date: 20150116

PLBP Opposition withdrawn

Free format text: ORIGINAL CODE: 0009264

APBU Appeal procedure closed

Free format text: ORIGINAL CODE: EPIDOSNNOA9O

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: SIEMENS AKTIENGESELLSCHAFT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

PUAH Patent maintained in amended form

Free format text: ORIGINAL CODE: 0009272

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT MAINTAINED AS AMENDED

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140416

27A Patent maintained in amended form

Effective date: 20181107

AK Designated contracting states

Kind code of ref document: B2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R102

Ref document number: 602011006173

Country of ref document: DE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20181221

Year of fee payment: 8

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011006173

Country of ref document: DE

Owner name: SIEMENS GAMESA RENEWABLE ENERGY A/S, DK

Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181107

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20191128 AND 20191204

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231220

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231214

Year of fee payment: 13