EP2525005B1 - Reusable constructing system - Google Patents

Reusable constructing system Download PDF

Info

Publication number
EP2525005B1
EP2525005B1 EP12168541.6A EP12168541A EP2525005B1 EP 2525005 B1 EP2525005 B1 EP 2525005B1 EP 12168541 A EP12168541 A EP 12168541A EP 2525005 B1 EP2525005 B1 EP 2525005B1
Authority
EP
European Patent Office
Prior art keywords
beams
skirting
coupling
floor panel
coupling means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP12168541.6A
Other languages
German (de)
French (fr)
Other versions
EP2525005A1 (en
Inventor
Antoine Leonard Eilers
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Neptunus Beheer Bv
Original Assignee
Neptunus Beheer BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neptunus Beheer BV filed Critical Neptunus Beheer BV
Publication of EP2525005A1 publication Critical patent/EP2525005A1/en
Application granted granted Critical
Publication of EP2525005B1 publication Critical patent/EP2525005B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2433Connection details of the elongated load-supporting parts using a removable key
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2463Connections to foundations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2481Details of wall panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2484Details of floor panels or slabs

Definitions

  • the present invention relates to a reusable construction system for a temporary building or tent.
  • the present invention also relates to a temporary building or tent with such a system.
  • Temporary buildings or tents are usually employed in situations where there is an urgent need for (extra) space but where the time-span necessary for permanent construction is not sufficient. Examples of such buildings are temporary accommodation for shops in cases where the original premises are being renovated, or sports centres for large sporting events.
  • buildings or tents have a temporary character
  • Temporary buildings or tents which comply with the above Buildings Decree. These temporary buildings or tents do however have a significant drawback.
  • a large part of the temporary building or tent is made with non-reusable components.
  • An important example of such a component is the floor and the manner in which it is supported.
  • a concrete foundation is usually first cast to which the rest of the building or tent can be anchored.
  • the floor can likewise be cast.
  • Such components are not reusable and have to be removed when the temporary building or the tent is disassembled. It will be apparent to the skilled person that such operations are costly and time-consuming.
  • a reusable system as defined in the preamble of claim 1 is known from EP 1 130 193 A1 . Further systems are known from US 3 971 172 A and FR 22 64 930 A1 .
  • An object of the present invention is to provide a solution to the above problem, and particularly to provide a solution which makes it possible to place temporary buildings or tents which are largely reusable.
  • a type of steel or metal is usually used as material for the beams. Such materials are characterized by a high thermal conductivity. The use of thermally insulating spacers prevents much heat being lost from the temporary building or the tent via the floor and the beams.
  • the floor panels are preferably thermally insulated. This can be made possible in that the floor consists of a material which conducts heat poorly, such as wood, or in that the floor is provided with an insulating layer.
  • the skirting preferably has a thermal conduction coefficient many times lower than that of the beams, good insulation of the temporary building or the tent is achieved. At the same time the mechanical construction achieves that the temporary building or the tent can meet strength requirements.
  • the beams are substantially of metal and/or the floor panel is a substantially wooden floor panel and/or the skirting is substantially a concrete skirting.
  • the particular combination of the above materials provides an advantageous construction in terms of strength and thermal insulation.
  • the skirting has a support edge at the position of the upper side of the beams for the purpose, together with the upper side of the beams, of supporting the floor panel.
  • the support edge of the skirting makes it easier for a user to place the floor panels. Such an edge further enhances the sealing of the whole system.
  • the pressure distribution via this edge also provides for a stable construction.
  • the floor panel is provided on a side facing toward the beams with a recess for partially flush placing of the floor panel between the beams.
  • the thickness of the floor panel is for instance smaller here at the position of the beams than between the beams, while the floor panel takes a flat form on the upper side. Such a recess achieves that floor panels are confined between the beams.
  • the skirting is provided on the underside with a recess for partially flush placing of the skirting between the beams. This also realizes a clamping of the skirting between the beams.
  • a further advantage of the above recesses in skirting and floor part is that the overall height of the system can be smaller and that the thermal insulation is further improved.
  • a plurality of floor panels are placed adjacently of each other on the beams, wherein the floor panels are provided with coupling means for mutually coupling the floor panels in the first direction.
  • these coupling means of the floor panels comprise co-acting protrusions and recesses. These can for instance be embodied as a groove on one side of the floor panel and an edge connecting thereto on the other side. Different floor panels can hereby be coupled to each other.
  • the skirting is provided on a side thereof with a recess which extends in the skirting in a direction opposite to the first direction and which at least partially surrounds an upright coupled to the coupling part. Because an upright is generally surrounded on two sides by a skirting, it can be partially or wholly enclosed by the skirting. In addition to providing an aesthetically desirable appearance, this once again enhances the thermal insulation.
  • the first and third and the second and fourth coupling means can co-act to form a releasable and reusable connection.
  • the invention therefore provides a system which can suffice without use, or with moderate use of existing coupling means such as adhesive or cement. This increases reusability of the system and reduces the environmental impact.
  • the third and fourth or the first and second coupling means comprise protrusions, for instance in the form of pins, and the respective first and second or the third and fourth coupling means comprise holes or recesses for co-action with the protrusions.
  • the system comprises spacer elements placed between the beams and connected thereto.
  • spacer elements are advantageous in placing the beams at the correct distance. They further have a structurally strengthening effect on the system.
  • the system comprises a plurality of aforementioned beams which are mutually coupled by aforementioned skirtings and on which a plurality of floor panels are placed adjacently of each other.
  • a system can be obtained by placing a plurality of beams adjacently of each other. These beams can be mutually connected by skirtings. It is advantageous here for the floor panels to cover in each case half an upper side of a beam so that the other half can be utilized by an adjacent floor panel.
  • a beam lying on the outer side of the system is fixedly connected at the end thereof in a direction perpendicularly of the first direction, for instance in integral manner, to a further coupling part to which an upright can be coupled.
  • the outermost beams of the system give shape to the outer periphery of the system.
  • the system can be provided on all sides with uprights.
  • the system comprises a skirting embodied as described above. This skirting is placed in the first direction between two further coupling parts.
  • At least one of the aforementioned beams comprises a plurality of mutually coupled sections, wherein at least the end sections are coupled to the aforementioned coupling parts and/or wherein at least an end of a section is coupled to a further coupling part in a direction perpendicularly of the first direction.
  • An end section is here the final section in a given direction, and the end of a section is the final part of a given section.
  • the invention also provides a temporary building or tent comprising the above described reusable system, in addition to a plurality of uprights placed on separate coupling parts of the reusable system.
  • the temporary building or tent further comprises a plurality of side walls placed between the uprights, a lower side wall of which is coupled to a skirting of the reusable system, and it is provided with a roof coupled to the uprights.
  • Figure 1 shows a framework of a temporary building (1) in which the reusable system according to the invention is incorporated. Building 1 is placed on pressure distributors 2. It is not usually necessary to anchor pressure distributors 2 to the ground, for instance by placing pins through pressure distributors 2. This is related to the mechanical construction of building 1.
  • the core of the bearing construction of building 1 is formed by a plurality of metal beams 3 in parallel arrangement. These are mutually connected by spacer elements 4, which in this embodiment take the form of beams. Beams 3 are also mutually connected by skirtings 5. It is noted here that spacer elements 4 are also disposed adjacently of skirtings 5, see figure 2 . These elements 4 can be connected by means of bars 6 to beams 3.
  • Building 1 comprises a plurality of uprights 7 which support on separate coupling parts 3', 3" of beams 3. Uprights 7 in this way connect beams 3 to a per se known roof construction 8.
  • Crossbars 9 can also be arranged between roof construction 8 and beams 3, between different uprights 7, between upright 7 and beam 3 or between combinations thereof.
  • a number of side walls 10 can be received between uprights 7.
  • the lower row of side walls 10 is coupled here to skirtings 5 in that these latter are provided on the upper side with a profiling 11.
  • skirtings 5 For the sake of clarity only one side wall 10 is shown in figured 1.
  • Floor panels 12 Placed on beams 3 are floor panels 12, of which only a small number are shown in figure 1 .
  • Floor panels 12 preferably take an elongate form in a direction perpendicularly of beams 3.
  • Figure 2 is a detail view of the right-hand upper corner of the framework of figure 1 , wherein several floor panels are shown separately of each other for the sake of clarity. Skirtings 5 and 5' are shown in figure 2 . These differ from each other in that skirting 5, i.e. the skirting placed perpendicularly of beams 3, is provided with a support edge 13 lying in the same horizontal plane as the upper side of beams 3, see also figure 4 . Edge 13 together with beams 3 hereby provides a support surface on which floor panels 12 can be placed. Skirting 5' does not have such an edge because this skirting lies against a beam 3. Also shown in figure 2 is the profiling 11 according to the invention which is engaged by a side wall 10 lying above (not shown) for mutual coupling.
  • FIG 3 is a detail view of the right-hand bottom corner of the framework of figure 1 .
  • This figure shows clearly that floor panel 12 is provided at the position of beam 3 with a recess 12' , whereby floor panel 12 can be placed flush between beams 3.
  • Figure 6 is a perspective view of floor panel 12. Shown herein are thermally insulating spacers 14 which for instance comprise rubber. These spacers prevent a direct contact between floor panel 12 and metal beam 3. A direct contact would after all result in the formation of a cold bridge.
  • grooves 18 Arranged in floor panels 12 are grooves 18 which can co-act with edges 19 formed on the opposite side of floor panels 12, see also figure 4 . Adjacent floor panels can in this way be mutually coupled in the direction of beams 3.
  • Figure 4 is a detail view of the connection between a beam, skirting and upright in the embodiment of figure 1 .
  • Figure 4 shows that skirting 5 also has a recess 5'. This enables the forming of support edge 13, while it also provides for confinement of skirting 5 between adjacent beams 3. Skirtings 5 are also provided with recesses 15 which ensure that upright 7 is partially surrounded by skirtings 5. This also achieves a better sealing of the system.
  • Figure 5 shows an embodiment of a beam 3 which can be used in the system according to the invention.
  • This figure shows how beam 3 is integrally connected to a coupling part 3'.
  • This part comprises a support element 16 for coupling to an upright 7 to be placed thereon by means of a pin 21 through corresponding openings in upright 7 and support element 16.
  • Coupling part 3' also comprises first and second coupling means, here in the form of holes 17. These holes can co-act with third and fourth coupling means which comprise pins 20 (shown in broken lines) arranged on the underside of skirting 5. Use is made here of metalwork attached to the underside of skirting 5 during casting of skirting 5.
  • Figure 5 also shows a further coupling part 3".
  • This part can be fixed to beam 3 but can also be connected integrally to this beam.
  • the resulting combination of beam 3 and coupling parts 3', 3" can for instance be used in the corners of building 1 where two uprights 7 are placed.
  • the upper hole 17 of further coupling part 3" in figure 5 can be used for the coupling to a skirting 5' for the purpose of forming the side of building 1 running parallel to beam 3, see also figure 1 .
  • the lower hole 17 can be left unused here.
  • the other coupling part 3" necessary for placing of such a skirting 5' is likewise connected to a beam 3.
  • the locations where this has taken place can be identified in figure 1 in that an upright 7 is placed at these locations.
  • Figure 7 shows a cross-section of a further embodiment of the present invention. Shown here are beams 30 which fulfil a similar function to beams 3 of the above described embodiment. Connected to beams 30 are projections 31 on which rest floor panels 120. It is noted here that the end floor panels 120 do not support on an edge of a skirting 50 such as edge 13 of skirting 5 of figures 2 and 4 . This aspect also follows from figure 8 which shows a cross-section parallel to the longitudinal direction of beams 30.
  • Floor panels 120 are mutually coupled in a direction parallel to the longitudinal direction of beams 30 by co-acting recesses and projections of adjoining floor panels 121 in similar manner as shown in respect of elements 18 and 19 in figures 4 and 6 . These recesses and projections are designated in their entirety with numeral 122.
  • cover plates 121 are used in order to fill the space between floor panels 120.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Tents Or Canopies (AREA)

Description

  • The present invention relates to a reusable construction system for a temporary building or tent. The present invention also relates to a temporary building or tent with such a system.
  • Temporary buildings or tents are usually employed in situations where there is an urgent need for (extra) space but where the time-span necessary for permanent construction is not sufficient. Examples of such buildings are temporary accommodation for shops in cases where the original premises are being renovated, or sports centres for large sporting events.
  • Despite the fact that such buildings or tents have a temporary character, it is desirable that these buildings or tents can provide a certain degree of comfort and that they have sufficient structural strength to be able to guarantee safety.
  • National legislation or regulations usually apply to temporary buildings or tents. An example hereof is the Netherlands Buildings Decree 2003 as published in the Netherlands Gazette 410. Newly constructed temporary buildings or tents must at the same time meet strict requirements here in respect of thermal insulation and strength.
  • Temporary buildings or tents are known which comply with the above Buildings Decree. These temporary buildings or tents do however have a significant drawback. In order to be able to comply with the above Buildings Decree a large part of the temporary building or tent is made with non-reusable components. An important example of such a component is the floor and the manner in which it is supported. In the known temporary buildings or tents a concrete foundation is usually first cast to which the rest of the building or tent can be anchored. The floor can likewise be cast. Such components are not reusable and have to be removed when the temporary building or the tent is disassembled. It will be apparent to the skilled person that such operations are costly and time-consuming.
  • A reusable system as defined in the preamble of claim 1 is known from EP 1 130 193 A1 . Further systems are known from US 3 971 172 A and FR 22 64 930 A1 .
  • An object of the present invention is to provide a solution to the above problem, and particularly to provide a solution which makes it possible to place temporary buildings or tents which are largely reusable.
  • This object is achieved according to the invention with a reusable system for constructing a temporary building or tent according to claim 1, which system is characterized in that the floor panel is partially located above the upper sides of the beams and supported thereby.
  • According to the invention both the floor and the uprights for the side walls, as well as the side walls themselves, rest on the beams via the skirtings. It is hereby not necessary in many cases to anchor the beams to the ground surface. It is usually possible to suffice with pressure distributors, which are preferably thermally insulating and which are placed under the beams at the different pressure points in the system.
  • A type of steel or metal is usually used as material for the beams. Such materials are characterized by a high thermal conductivity. The use of thermally insulating spacers prevents much heat being lost from the temporary building or the tent via the floor and the beams.
  • The floor panels are preferably thermally insulated. This can be made possible in that the floor consists of a material which conducts heat poorly, such as wood, or in that the floor is provided with an insulating layer.
  • Because the skirting preferably has a thermal conduction coefficient many times lower than that of the beams, good insulation of the temporary building or the tent is achieved. At the same time the mechanical construction achieves that the temporary building or the tent can meet strength requirements.
  • In an embodiment of the present invention the beams are substantially of metal and/or the floor panel is a substantially wooden floor panel and/or the skirting is substantially a concrete skirting. The particular combination of the above materials provides an advantageous construction in terms of strength and thermal insulation.
  • In embodiment of the present invention the skirting has a support edge at the position of the upper side of the beams for the purpose, together with the upper side of the beams, of supporting the floor panel. The support edge of the skirting makes it easier for a user to place the floor panels. Such an edge further enhances the sealing of the whole system. The pressure distribution via this edge also provides for a stable construction.
  • According to the present invention, the floor panel is provided on a side facing toward the beams with a recess for partially flush placing of the floor panel between the beams. The thickness of the floor panel is for instance smaller here at the position of the beams than between the beams, while the floor panel takes a flat form on the upper side. Such a recess achieves that floor panels are confined between the beams.
  • According to the present invention the skirting is provided on the underside with a recess for partially flush placing of the skirting between the beams. This also realizes a clamping of the skirting between the beams.
  • A further advantage of the above recesses in skirting and floor part is that the overall height of the system can be smaller and that the thermal insulation is further improved.
  • In an embodiment of the present invention a plurality of floor panels are placed adjacently of each other on the beams, wherein the floor panels are provided with coupling means for mutually coupling the floor panels in the first direction. In a further embodiment these coupling means of the floor panels comprise co-acting protrusions and recesses. These can for instance be embodied as a groove on one side of the floor panel and an edge connecting thereto on the other side. Different floor panels can hereby be coupled to each other.
  • In an embodiment of the present invention the skirting is provided on a side thereof with a recess which extends in the skirting in a direction opposite to the first direction and which at least partially surrounds an upright coupled to the coupling part. Because an upright is generally surrounded on two sides by a skirting, it can be partially or wholly enclosed by the skirting. In addition to providing an aesthetically desirable appearance, this once again enhances the thermal insulation.
  • In an embodiment of the present invention the first and third and the second and fourth coupling means can co-act to form a releasable and reusable connection. The invention therefore provides a system which can suffice without use, or with moderate use of existing coupling means such as adhesive or cement. This increases reusability of the system and reduces the environmental impact.
  • In a further embodiment of the present invention the third and fourth or the first and second coupling means comprise protrusions, for instance in the form of pins, and the respective first and second or the third and fourth coupling means comprise holes or recesses for co-action with the protrusions.
  • In an embodiment of the present invention the system comprises spacer elements placed between the beams and connected thereto. Such spacer elements are advantageous in placing the beams at the correct distance. They further have a structurally strengthening effect on the system.
  • In an embodiment of the present invention the system comprises a plurality of aforementioned beams which are mutually coupled by aforementioned skirtings and on which a plurality of floor panels are placed adjacently of each other. Such a system can be obtained by placing a plurality of beams adjacently of each other. These beams can be mutually connected by skirtings. It is advantageous here for the floor panels to cover in each case half an upper side of a beam so that the other half can be utilized by an adjacent floor panel.
  • In a further embodiment of the present invention a beam lying on the outer side of the system is fixedly connected at the end thereof in a direction perpendicularly of the first direction, for instance in integral manner, to a further coupling part to which an upright can be coupled. The outermost beams of the system give shape to the outer periphery of the system. By also providing these with a coupling part embodied as described above, the system can be provided on all sides with uprights. In a further embodiment the system comprises a skirting embodied as described above. This skirting is placed in the first direction between two further coupling parts.
  • In an embodiment of the present invention at least one of the aforementioned beams comprises a plurality of mutually coupled sections, wherein at least the end sections are coupled to the aforementioned coupling parts and/or wherein at least an end of a section is coupled to a further coupling part in a direction perpendicularly of the first direction. An end section is here the final section in a given direction, and the end of a section is the final part of a given section. With the combination of the above stated measures a system can be obtained which is provided round its whole periphery with skirtings and wherein uprights are also placed all the way around.
  • The invention also provides a temporary building or tent comprising the above described reusable system, in addition to a plurality of uprights placed on separate coupling parts of the reusable system. The temporary building or tent further comprises a plurality of side walls placed between the uprights, a lower side wall of which is coupled to a skirting of the reusable system, and it is provided with a roof coupled to the uprights.
  • The invention will be discussed in more detail hereinbelow, wherein:
    • Figure 1 shows the framework of a temporary building in which the reusable system according to the invention is incorporated;
    • Figure 2 is a detail view of the right-hand upper corner of the framework of figure 1;
    • Figure 3 is a detail view of the right-hand lower corner of the framework of figure 1;
    • Figure 4 is a detail view of the connection between a beam, skirting and upright in the embodiment of figure 1;
    • Figure 5 shows an embodiment of a beam which can be used in the system according to the invention;
    • Figure 6 is a perspective view of a floor panel of the embodiment of figure 1;
    • Figure 7 shows a cross-section of a second embodiment of the reusable system according to the invention; and
    • Figure 8 shows another cross-section of the embodiment of the reusable system according to the invention.
  • Figure 1 shows a framework of a temporary building (1) in which the reusable system according to the invention is incorporated. Building 1 is placed on pressure distributors 2. It is not usually necessary to anchor pressure distributors 2 to the ground, for instance by placing pins through pressure distributors 2. This is related to the mechanical construction of building 1.
  • The core of the bearing construction of building 1 is formed by a plurality of metal beams 3 in parallel arrangement. These are mutually connected by spacer elements 4, which in this embodiment take the form of beams. Beams 3 are also mutually connected by skirtings 5. It is noted here that spacer elements 4 are also disposed adjacently of skirtings 5, see figure 2. These elements 4 can be connected by means of bars 6 to beams 3.
  • Building 1 comprises a plurality of uprights 7 which support on separate coupling parts 3', 3" of beams 3. Uprights 7 in this way connect beams 3 to a per se known roof construction 8. Crossbars 9 can also be arranged between roof construction 8 and beams 3, between different uprights 7, between upright 7 and beam 3 or between combinations thereof.
  • A number of side walls 10 can be received between uprights 7. The lower row of side walls 10 is coupled here to skirtings 5 in that these latter are provided on the upper side with a profiling 11. For the sake of clarity only one side wall 10 is shown in figured 1.
  • Placed on beams 3 are floor panels 12, of which only a small number are shown in figure 1. Floor panels 12 preferably take an elongate form in a direction perpendicularly of beams 3.
  • Figure 2 is a detail view of the right-hand upper corner of the framework of figure 1, wherein several floor panels are shown separately of each other for the sake of clarity. Skirtings 5 and 5' are shown in figure 2. These differ from each other in that skirting 5, i.e. the skirting placed perpendicularly of beams 3, is provided with a support edge 13 lying in the same horizontal plane as the upper side of beams 3, see also figure 4. Edge 13 together with beams 3 hereby provides a support surface on which floor panels 12 can be placed. Skirting 5' does not have such an edge because this skirting lies against a beam 3. Also shown in figure 2 is the profiling 11 according to the invention which is engaged by a side wall 10 lying above (not shown) for mutual coupling.
  • Figure 3 is a detail view of the right-hand bottom corner of the framework of figure 1. This figure shows clearly that floor panel 12 is provided at the position of beam 3 with a recess 12' , whereby floor panel 12 can be placed flush between beams 3. Figure 6 is a perspective view of floor panel 12. Shown herein are thermally insulating spacers 14 which for instance comprise rubber. These spacers prevent a direct contact between floor panel 12 and metal beam 3. A direct contact would after all result in the formation of a cold bridge. Arranged in floor panels 12 are grooves 18 which can co-act with edges 19 formed on the opposite side of floor panels 12, see also figure 4. Adjacent floor panels can in this way be mutually coupled in the direction of beams 3.
  • Figure 4 is a detail view of the connection between a beam, skirting and upright in the embodiment of figure 1. Figure 4 shows that skirting 5 also has a recess 5'. This enables the forming of support edge 13, while it also provides for confinement of skirting 5 between adjacent beams 3. Skirtings 5 are also provided with recesses 15 which ensure that upright 7 is partially surrounded by skirtings 5. This also achieves a better sealing of the system.
  • Figure 5 shows an embodiment of a beam 3 which can be used in the system according to the invention. This figure shows how beam 3 is integrally connected to a coupling part 3'. This part comprises a support element 16 for coupling to an upright 7 to be placed thereon by means of a pin 21 through corresponding openings in upright 7 and support element 16. Coupling part 3' also comprises first and second coupling means, here in the form of holes 17. These holes can co-act with third and fourth coupling means which comprise pins 20 (shown in broken lines) arranged on the underside of skirting 5. Use is made here of metalwork attached to the underside of skirting 5 during casting of skirting 5.
  • Figure 5 also shows a further coupling part 3". This part can be fixed to beam 3 but can also be connected integrally to this beam. The resulting combination of beam 3 and coupling parts 3', 3" can for instance be used in the corners of building 1 where two uprights 7 are placed. The upper hole 17 of further coupling part 3" in figure 5 can be used for the coupling to a skirting 5' for the purpose of forming the side of building 1 running parallel to beam 3, see also figure 1. The lower hole 17 can be left unused here. The other coupling part 3" necessary for placing of such a skirting 5' is likewise connected to a beam 3. The locations where this has taken place can be identified in figure 1 in that an upright 7 is placed at these locations.
  • Figure 7 shows a cross-section of a further embodiment of the present invention. Shown here are beams 30 which fulfil a similar function to beams 3 of the above described embodiment. Connected to beams 30 are projections 31 on which rest floor panels 120. It is noted here that the end floor panels 120 do not support on an edge of a skirting 50 such as edge 13 of skirting 5 of figures 2 and 4. This aspect also follows from figure 8 which shows a cross-section parallel to the longitudinal direction of beams 30.
  • Floor panels 120 are mutually coupled in a direction parallel to the longitudinal direction of beams 30 by co-acting recesses and projections of adjoining floor panels 121 in similar manner as shown in respect of elements 18 and 19 in figures 4 and 6. These recesses and projections are designated in their entirety with numeral 122.
  • For flat finishing of the floor, cover plates 121 are used in order to fill the space between floor panels 120.
  • Use is preferably also made in the embodiment of figures 7 and 8 of thermally insulating spacers similar to element 14 of figure 6, in order to prevent the formation of cold bridges between beam 30 and floor panel 12.
  • It will be apparent from the above description that load on building 1 is transmitted to the ground via beams 3. Due to the own weight of building 1 an anchoring of beams 3 is therefore never or hardly ever necessary. In addition, a good thermal insulation is achieved with the construction according to the invention. This combination makes it possible to realize in a reusable manner temporary buildings which comply with currently valid building regulations. The buildings can hereby also remain in use for a longer time. The environmental impact of buildings realized according to the present invention can also be described as very low because the material to be discarded is limited to a minimum.
  • It will be apparent to the skilled person that various modifications are possible to the embodiments shown here without departing from the scope of protection of the present invention, which is defined by the following claims.

Claims (14)

  1. Reusable system for constructing a temporary building (1) or tent, comprising a plurality of beams (3; 30), a separate coupling part (3', 3"), an upright (7), at least two skirtings (5, 5'; 50), a side wall (10), and a floor panel (12; 120, 121); wherein:
    said beams (3) extending parallel in a first direction and each connected fixedly at an end thereof, for instance in integral manner, to a respective separate coupling part (3', 3"), wherein the coupling part of a beam is provided on an upper side with first and second coupling means (17) and further comprises a support element (16) for supporting said upright placed on the coupling part;
    said skirtings being each provided on an underside thereof with third and fourth coupling means (20) placed on opposite sides of the skirting, wherein the skirtings are each provided on the underside with a recess (5') on either side of the skirting for partially flush placing of the skirting between a pair of adjacent beams, and wherein each skirting is placed perpendicular to the first direction on an upper side of said pair of adjacent beams and extending vertically therefrom by coupling between the first coupling means of the coupling part of one beam of said pair of adjacent beams and the third coupling means of the skirting and by coupling between the second coupling means of the coupling part of the other beam of said pair of adjacent beams and the fourth coupling means of the skirting, wherein each skirting comprises on an upper side thereof a profiling (11) for coupling to said side wall of the system that extends between uprights placed on the upright supports;
    said floor panel extending between said pair of adjacent beams in a direction perpendicular to the first direction and resting thereon, wherein the floor panel is provided on an underside, at least at the position of the beams, with a thermally insulating spacer (14) for preventing a cold bridge between floor panel and beam;
    wherein the floor panel is provided on a side facing toward the beams with a recess (12') for partially flush placing of the floor panel between the pair of adjacent beams;
    characterized in that the floor panel is partially located above the upper sides of the beams and supported thereby.
  2. System as claimed in claim 1, wherein the skirting has on either side thereof a recess (15) which extends in the skirting in a direction perpendicular to the first direction and which extends vertically parallel to the upright that is coupled to the coupling part that is fixedly connected to the beam on which the relevant side of the skirting rests, said recess allowing the skirting to at least partially surround said upright on a side of said upright that faces the floor panel.
  3. System as claimed in claim 1, wherein the beams are substantially metal beams and/or wherein the floor panel is a substantially wooden floor panel and/or wherein the skirting is a substantially concrete skirting.
  4. System as claimed in claim 1 or 2, wherein the skirting has a support edge (13) at the position of the upper side of the beams for the purpose, together with the upper side of the beams, of supporting the floor panel.
  5. System as claimed in any of the foregoing claims, wherein a plurality of floor panels are placed adjacently of each other on the beams, wherein the floor panels are provided with coupling means (19, 20) for mutually coupling the floor panels in the first direction.
  6. System as claimed in claim 5, wherein the coupling means of the floor panels comprise co-acting protrusions (19) and recesses (20).
  7. System as claimed in any of the foregoing claims, wherein the first and third and the second and fourth coupling means can co-act to form a releasable and reusable connection.
  8. System as claimed in claim 7, wherein the third and fourth or the first and second coupling means comprise protrusions, for instance in the form of pins, and wherein the respective first and second or the third and fourth coupling means comprise holes or recesses for co-action with the protrusions.
  9. System as claimed in any of the foregoing claims, further comprising spacer elements (4) placed between the beams and connected thereto.
  10. System as claimed in any of the foregoing claims, comprising a plurality of aforementioned beams which are mutually coupled by aforementioned skirtings and on which a plurality of floor panels are placed adjacently of each other.
  11. System as claimed in claim 10, wherein a beam lying on the outer side of the system is fixedly connected at the end thereof in a direction perpendicularly of the first direction to a further coupling part.
  12. System as claimed in claim 11, further comprising a skirting according to claim 1 placed in the first direction between two further coupling parts.
  13. System as claimed in any of the foregoing claims, wherein at least one of the aforementioned beams comprises a plurality of mutually coupled sections, wherein at least the end sections are coupled to the aforementioned coupling parts and/or wherein at least an end of a section is coupled to a further coupling part in a direction perpendicularly of the first direction.
  14. Temporary building or tent comprising:
    the reusable system as claimed in any of the foregoing claims; a plurality of uprights placed on separate coupling parts of the reusable system;
    a plurality of side walls placed between the uprights, a lower side wall of which is coupled to a skirting of the reusable system;
    a roof (8) coupled to the uprights.
EP12168541.6A 2011-05-20 2012-05-18 Reusable constructing system Active EP2525005B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2006820A NL2006820C2 (en) 2011-05-20 2011-05-20 REUSABLE BUILDING SYSTEM.

Publications (2)

Publication Number Publication Date
EP2525005A1 EP2525005A1 (en) 2012-11-21
EP2525005B1 true EP2525005B1 (en) 2017-07-12

Family

ID=46052675

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12168541.6A Active EP2525005B1 (en) 2011-05-20 2012-05-18 Reusable constructing system

Country Status (2)

Country Link
EP (1) EP2525005B1 (en)
NL (1) NL2006820C2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019218177A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 Construction method for house having pipe and wire separate from main structure
CN108775076B (en) * 2018-08-08 2024-05-07 艺搭环保科技(上海)有限公司 Building system with crossbeam building module
CN109972741A (en) * 2019-04-15 2019-07-05 安徽鸿昊钢结构彩板有限公司 A kind of folding container room easy to assemble

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1928919A1 (en) * 1969-06-06 1970-12-10 Waggon U Maschinenfabriken Gmb Construction cell
DE1928916A1 (en) * 1969-06-06 1970-12-10 Waggon U Maschinenfabriken Gmb Construction cell
FR2264930A1 (en) * 1974-03-20 1975-10-17 Francon Jean Prefabricated building pieces - has foundation with supports for uprights; cross-pieces and vert panels
RO79813A (en) * 1974-05-08 1982-09-09 Industrielle De Constructions Mobiles,Fr PREFABRICATED CONSTRUCTION WITH METAL STRUCTURE
FR2471454A1 (en) * 1979-12-17 1981-06-19 Lapalu Jean Paul Collapsible watertight canopy for garage or garden - consists of rigidly interlocking flooring beams, uprights and roofing cross-members covered by panels
EP1130193A1 (en) * 2000-03-01 2001-09-05 Metal Plan Fast build construction
FR2891810B1 (en) * 2005-10-11 2010-08-13 Walter Sas PROTECTIVE STRUCTURE FOR CONTAINER

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP2525005A1 (en) 2012-11-21
NL2006820C2 (en) 2012-11-21

Similar Documents

Publication Publication Date Title
US9194118B2 (en) Brick bracket for installation of a ledger on the brick facing or veneer of a structure and associated methods for the installation of the brick bracket on the brick facing
AU2015100173B4 (en) An interlocking masonry block
AU2017304226B2 (en) Precast concrete formwork, floor system and a method of construction
US8375677B1 (en) Insulated poured concrete wall structure with integal T-beam supports and method of making same
CN112982824B (en) Notch steel beam with flange embedded into floor slab, floor slab structure and construction method
EP2525005B1 (en) Reusable constructing system
KR100521647B1 (en) Panel assembly for construction and wall structure thereof
JP4018740B2 (en) Formwork method for interior / exterior material foundation formwork panel and concrete structure
US10132077B2 (en) Fast construction of energy-efficient buildings
KR101027973B1 (en) Foam block structure of constructing wall
WO2016203483A1 (en) Composite framing and wall
JP6196088B2 (en) Integrated foundation formwork and foundation formwork connection structure
KR101216632B1 (en) the method of constructing wall using foam block structure
KR101120360B1 (en) Light weight assembly for hollow and light slab using the same
GB2495319A (en) Beam and slab floor construction
RU2589779C1 (en) Platform assembly-monolithic joint
KR101366503B1 (en) Concrete composite wall for improving concrete pouring pressure resistance ability and the construction method therefor
WO2011042848A1 (en) Elements for construction
JP4961483B2 (en) Concrete formwork for concrete and concrete structure with this on the outer surface
JP2020165174A (en) Floor panel for wooden building
US20130295318A1 (en) Reversible, thermo-acoustic panel for reversible, variable-geometry formwork
KR200425809Y1 (en) Deck framework system equipped with filling member
RU2453662C1 (en) Collapsible-monolithic framing of building
JP2019035250A (en) Floor plate lattice beam forming floor
AU2010101458A4 (en) An interlocking corner masonry block

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130521

17Q First examination report despatched

Effective date: 20150205

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NEPTUNUS HOLDING B.V.

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NEPTUNUS BEHEER B.V.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 1/24 20060101AFI20161125BHEP

Ipc: E04B 1/343 20060101ALI20161125BHEP

INTG Intention to grant announced

Effective date: 20161215

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602012034354

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: E04B0001343000

Ipc: E04H0001020000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20170512

RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 1/02 20060101AFI20170428BHEP

Ipc: E04B 1/24 20060101ALI20170428BHEP

Ipc: E04H 1/12 20060101ALI20170428BHEP

Ipc: E04H 15/00 20060101ALI20170428BHEP

Ipc: E04B 1/343 20060101ALI20170428BHEP

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 908492

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012034354

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 908492

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171012

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171013

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171112

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171012

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012034354

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

26N No opposition filed

Effective date: 20180413

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120518

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170712

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170712

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230518

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230525

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20230529

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230529

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20240526

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240530

Year of fee payment: 13