EP2524851A1 - Installation to change the wheel's spacing of a rail vehicle in motion - Google Patents

Installation to change the wheel's spacing of a rail vehicle in motion Download PDF

Info

Publication number
EP2524851A1
EP2524851A1 EP11177143A EP11177143A EP2524851A1 EP 2524851 A1 EP2524851 A1 EP 2524851A1 EP 11177143 A EP11177143 A EP 11177143A EP 11177143 A EP11177143 A EP 11177143A EP 2524851 A1 EP2524851 A1 EP 2524851A1
Authority
EP
European Patent Office
Prior art keywords
rails
spacing
wheel
installation
railway vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11177143A
Other languages
German (de)
French (fr)
Other versions
EP2524851B1 (en
Inventor
Henri Guillemaut
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to PL11177143T priority Critical patent/PL2524851T3/en
Publication of EP2524851A1 publication Critical patent/EP2524851A1/en
Application granted granted Critical
Publication of EP2524851B1 publication Critical patent/EP2524851B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F7/00Rail vehicles equipped for use on tracks of different width
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F3/00Types of bogies
    • B61F3/16Types of bogies with a separate axle for each wheel

Definitions

  • the invention relates to an installation for modifying the wheel spacing of a moving railway vehicle bogie and having wheels with adjustable spacing between at least two values.
  • each wheel of a bogie is slidably mounted on its shaft, in order to be able, in a spacer change installation, to be moved transversely by counter rails which, coming into contact with both sides of each wheel and at its base, are placed on the ground forming a converging or diverging V
  • each railway vehicle bogie is equipped with wheels adjustable spacing between at least two positions.
  • each wheel is integral with two opposite shaft ends that can slide transversely in their bearings.
  • Each shaft end cooperates, on the one hand, with locking means, unlockable, wedging it in each of its transverse positions and, on the other hand, with assistance means able to communicate to it a transverse translation movement. at least in one direction when changing gauge.
  • the object of the present invention is to supplement the equipment provided on the vehicles with the aim of modifying the wheel spacing to adapt it to that of a railway network by providing stationary means facilitating this adaptation.
  • each wheel is secured to two opposite ends of the shaft that can slide transversely in their bearings, each shaft end (10) cooperating, on the one hand, with means releasable locking the wedging in each of its transverse positions and, on the other hand and during the change of gauge, with assistance means able to communicate a transverse translational movement, these means being controlled by a control box carried by the vehicle.
  • the running rails are lined, internally and / or externally, by countersail adapted to come into contact with the wheel flange or each wheel to participate to the transverse translation of the wheel.
  • This arrangement ensures that the transverse displacement of each wheel is related to the variation of the spacing between the rails and eliminates any risk of derailment.
  • the conductor rails of the electricity are carried by insulators and so that their upper faces are at a vertical level greater than that of the upper faces of the rails for wheels.
  • the electrically conductive rails are electrically powered by a control cabinet under the control of means reacting or detecting the entry and exit of a railway vehicle into the modification station of the spacing.
  • each of the running rails has local deformations, inwards and outwards, of the order of 3 to 5 millimeters with respect to the theoretical direction of the rail, apt, after unlocking the shafts, to move transversely the wheel flanges to take off these trees from their bearings.
  • the reference V designates the chassis of the vehicle, C the chassis of the bogie and B1, B2 the chassis of two opposite bissels each carrying a train of coaxial wheels.
  • the frame C of the bogie is a cage frame comprising two horizontal walls, respectively upper 2a and lower 2b, connected by uprights 3 and / or end walls 4. This frame is articulated around a vertical pivot 5 carried by the frame V of the vehicle.
  • Chassis B1 and B2 of the two bissels are articulated on the bogie by hinges 18, whose vertical axis Z intersects the horizontal geometric axis G1 or G2 of the corresponding set of wheels.
  • the frame of each bissel is extended opposite its wheelset and towards the other bissel by a head 6a, 6b, arranged around the vertical pivot 5 and having a pivoting control joint of the bissel, generally designated by A.
  • the head 6a or 6b has a generally triangular shape and is integral with two lateral forks whose arms 8 are spaced by an interval E accommodating a wheel 9.
  • This ci is wedged on two shaft ends 10 and is independent in rotation of the other wheel of the same wheel train.
  • the two shaft ends are rotatably mounted in axle boxes 11, carried by the arms.
  • Each chassis B1 or B2 thus comprises two coaxial wheels 9 forming a train, front or rear, since the bogie carries two bissels.
  • the chassis B1 and B2 have bearing surfaces 12 for the suspension springs 13, bearing on the upper wall 2a of the frame C of the bogie.
  • Each of the wheels 9 is displaceable in translation in the interval E whose value is equal to the functional clearance, to the thickness of the wheel 9 plus half the difference L1 - L2 between the spacings of the channels on which the vehicle may be driven.
  • the transverse travel of each wheel is 116.5 millimeters. It is 217.5 millimeters to go from the standard gauge to the metric gauge, for example to switch from a train track to a track for tram, or vice versa.
  • This arrangement implements complementary means assisting the displacement of each wheel 9 in its bissel and locking means in each of the positions of each wheel.
  • each axle box 11 extends between the two walls of the arm 8 and has a stepped bore 61 in which is wedged a bearing 62, needle or roller.
  • Each shaft end 10 is mounted freely in rotation and in translation in this bearing 62 and is connected to an extension 10b, with the interposition of a thrust ball bearing 63 preventing the rotational movement of the shaft 10 is transmitted to the extension 10b.
  • This extension 10b comprises, in the axle box 11, two grooves 64, spaced apart and each capable of cooperating with a radial locking lock 65.
  • the body 66 of the lock is carried by the axle box 11 and contains a pneumatic piston 66b with a single effect, giving priority to the return action of the spring 66a to maintain the lock 65 in the locked position and using the pneumatic flow only to ensure the unlocking before and during the adjustment phase of the spacing.
  • the installation according to the invention comprises means F installed at a fixed position and means M carried by each of the railway vehicles.
  • the conductive rails 81 are carried by insulators 82 and so that their upper face is at a distance H1 from the ground having a value greater than the distance H2 between the ground and the top of the rails 80. They are electrically connected by conductors 83 to a stationary supply station 84. The latter is connected by electrical circuits 85a and 85b to signaling lights 86 and passing detectors 87.
  • the rails 80 are lined internally by counter rails 88 adapted to come into contact with the coil 9a of the wheels 9 to guide their transverse translation in the direction of the spacing.
  • This zone Z2 can also be bordered externally by counter-rails able to come into contact with the wheel to assist in its translation to the interior of the track.
  • the guiding of the wheels is provided by the heel or by the edges of the groove of the rails constituting the track.
  • the rails 80, against rails 88 and wheels 9 are lubricated at least in their contacting parts to reduce metal-to-metal friction, generating heating, wear and noise.
  • This lubrication can be performed manually or automatically, for example by spraying means not shown.
  • the means M carried by each vehicle comprise at least two pads 90 electrically conductive and, in this case, two metal brushes, spaced transversely and adapted to come into contact with the conductive rails 81.
  • Each pad 90 is worn under the vehicle by insulating means and is electrically connected by conductors 91 to the control box disposed in the vehicle and governing the operation of the pneumatic means 65-66 for locking the wheel shafts and those 67-68 for assisting the translation of the shafts of a wheel train.
  • the pads 90 are at a level that allows them to meet the switches, such as pedals, switches, crocodiles or the like.
  • the convoy is moved at low speed on the installation F, for example at a speed between 5 and 10 km / h, towards the Z1 or Z3 zone.
  • the control station 84 electrically feeds the conductive rails 81 and allows the pads 90 to supply the electropneumatic control means.
  • the locking means 65-66 are first brought pneumatically in the release position of the shafts 10, then it is the means 67-68 for assistance with the translation which are pneumatically supplied.
  • each wheel 9 and that of each lock 65-66 are detected by electrical contacts carried by the vehicle and reacting on the electropneumatic control means and on visual or audible control means of these positions.
  • the flanges of its wheels 9 come into contact either with the fungi of these rails, or with the edge of the rails 88 and are subjected to transverse forces which, with the using pneumatic assistance means 67-68, cause the transverse displacements of these wheels, between their original position and their position corresponding to another gauge of track.
  • the convoy is again coupled to a driving machine whose wheel spacing corresponds to the new wheel spacing of the vehicle.
  • each of the rails 80 has local deformations, inwardly and outwardly, of the order of 3 to 5 millimeters for a length of several meters, relative to the theoretical direction of the rail, giving it locally and in view over a sinusoidal shape.
  • This arrangement which is performed on the rails in an area thereof after the area in which the locks 65 are unlocked, uses the contact of the strands against the rails to generate alternating transverse forces degumming the shafts of their bearing and making easier subsequent translation changing the value of the wheel spacing.
  • the rails 80 may be associated with localized lubrication means, manual or automatic, reducing friction, wear and noise.
  • the wheel gap adjuster which has been described in an application with two spacings, can also work with other spacings having intermediate values.
  • the standard one of 1.435 meters and the maximum spacing the Spanish one of 1.668 meters, to obtain a wedging of the wheels for an intermediate spacing, corresponding for example to that of Russian tracks, having a value of 1.524 meter, it suffices, on each extension 10b, to add an additional groove between the grooves 64.
  • the installation according to the invention harmoniously complements the vehicles equipped with means for modifying the wheel spacing described in the state of the art and makes it possible, by simple means, inexpensive and operating fast, safe and reliable, to solve the problem of the change of gauge of the wheels to adapt it to the gauge of ways encountered.
  • the installation uses an electric power source only during the passage of vehicles and uses the compressed air available in all railway vehicles to temporarily actuate pneumatic means, while using the mechanical force of springs to ensure the safety functions , such as locking the wheel shafts.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The system has a fixed station (F) for modifying wheel base of a bogie, where the fixed station includes a transition area (Z2) in which base of two running rails (80) varies in a symmetrical and regular manner with respect to a median axis of a path. Two electricity conductive rails (81) are arranged in parallel and between the two running rails along the length of the station. Two electricity conductive flanges are transversely spaced under each rail, where the flanges are electrically connected to a control case carried by the rail vehicle.

Description

L'invention concerne une installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire en mouvement et possédant des roues à écartement réglable entre au moins deux valeurs.The invention relates to an installation for modifying the wheel spacing of a moving railway vehicle bogie and having wheels with adjustable spacing between at least two values.

Les réseaux ferrés utilisés dans le monde pour la circulation sur rails des véhicules ferroviaires transportant des personnes et/ou des marchandises se répartissent en trois grandes catégories se distinguant par la valeur de l'écartement de la voie :

  • le réseau standard International ayant un écartement de 1 435 mm,
  • le réseau Russe ayant un écartement de 1 524 mm,
  • le réseau Ibérique ayant un écartement de 1 668 mm.
The railway networks used worldwide for the rail traffic of railway vehicles carrying persons and / or goods fall into three broad categories distinguished by the value of the gauge of the track:
  • the international standard network with a spacing of 1435 mm,
  • the Russian network with a spacing of 1,524 mm,
  • the Iberian network having a spacing of 1668 mm.

Pour qu'un convoi de véhicules ferroviaires puisse passer d'un réseau ayant un écartement donné à un autre réseau ayant un écartement différent, il est nécessaire d'utiliser du matériel roulant spécial. A défaut, il faut mobiliser deux convois ferroviaires aptes à circuler sur des réseaux ayant des écartements différents et, dans la zone de transit entre les réseaux, transférer les personnes et les marchandises depuis les véhicules d'un convoi vers ceux de l'autre convoi.In order for a train of railway vehicles to pass from one network having a given spacing to another network having a different gauge, it is necessary to use special rolling stock. Failing this, two rail convoys capable of traveling on networks with different spacings must be mobilized and, in the transit zone between the networks, transferring persons and goods from the vehicles of one convoy to those of the other convoy. .

Cela prend du temps et n'est pas favorable à la réduction des temps de déplacements entre pays frontaliers.This takes time and is not conducive to reducing travel times between border countries.

Pour remédier à cela, le document CH517612 fournit une installation dans laquelle chaque roue d'un bogie est montée coulissante sur son arbre, pour pouvoir, dans une installation de changement d'écartement, être déplacée transversalement par des contre rails qui, venant en contact avec les deux cotés de chaque roue et à sa base, sont posées au sol en formant un V convergeant ou divergeantTo remedy this, the document CH517612 provides an installation in which each wheel of a bogie is slidably mounted on its shaft, in order to be able, in a spacer change installation, to be moved transversely by counter rails which, coming into contact with both sides of each wheel and at its base, are placed on the ground forming a converging or diverging V

Ce mode de déplacement des roues sur leur essieu génère des frottements importants qui sont des sources d'usure et de coincement.This mode of displacement of the wheels on their axle generates significant friction which are sources of wear and jamming.

Le document WO2006/027485 , au nom du déposant, remédie à cela en montant chaque roue à l'extrémité d'un bras, qui est lui-même monté libre en rotation et coulissant sur son axe, mais dont les mouvements de translation sur cet axe sont commandés par un vérin pneumatique axial et à double effet éliminant par sa position axiale les risques de coincement.The document WO2006 / 027485 , in the name of the applicant, remedies this by mounting each wheel at the end of an arm, which is itself rotatably mounted and sliding on its axis, but whose translational movements on this axis are controlled by a axial pneumatic jack with double effect eliminating by its axial position the risk of jamming.

Dans le document WO2009/071768 , également au nom du déposant, chaque boggie pour véhicule ferroviaire est muni de roues à écartement réglable entre au moins deux positions. Dans une forme de réalisation, chaque roue est solidaire de deux bouts d'arbre opposés pouvant coulisser transversalement dans leurs paliers. Chaque bout d'arbre coopère, d'une part, avec des moyens de verrouillage, déverrouillable, le calant dans chacune de ses positions transversales et, d'autre part, avec des moyens d'assistance aptes à lui communiquer un mouvement de translation transversale au moins dans un sens lors du changement d'écartement.In the document WO2009 / 071768 , also in the name of the applicant, each railway vehicle bogie is equipped with wheels adjustable spacing between at least two positions. In one embodiment, each wheel is integral with two opposite shaft ends that can slide transversely in their bearings. Each shaft end cooperates, on the one hand, with locking means, unlockable, wedging it in each of its transverse positions and, on the other hand, with assistance means able to communicate to it a transverse translation movement. at least in one direction when changing gauge.

La présente invention à pour objet de compléter l'équipement ménagé sur les véhicules dans le but de modifier l'écartement des roues pour l'adapter à celui d'un réseau ferroviaire en fournissant des moyens à poste fixes facilitant cette adaptation.The object of the present invention is to supplement the equipment provided on the vehicles with the aim of modifying the wheel spacing to adapt it to that of a railway network by providing stationary means facilitating this adaptation.

Elle concerne plus particulièrement une installation d'accueil de véhicules ferroviaires dans lesquels chaque roue est solidaire de deux bouts d'arbre opposés pouvant coulisser transversalement dans leurs paliers, chaque bout d'arbre (10) coopérant, d'une part, avec des moyens de verrouillage déverrouillable le calant dans chacune de ses positions transversales et, d'autre part et lors du changement d'écartement, avec des moyens d'assistance aptes à lui communiquer un mouvement de translation transversale, ces moyens étant commandés par un boitier de commande porté par le véhicule.It relates more particularly to a reception facility for rail vehicles in which each wheel is secured to two opposite ends of the shaft that can slide transversely in their bearings, each shaft end (10) cooperating, on the one hand, with means releasable locking the wedging in each of its transverse positions and, on the other hand and during the change of gauge, with assistance means able to communicate a transverse translational movement, these means being controlled by a control box carried by the vehicle.

L'installation selon l'invention comprend :

  1. A) à un poste fixe F de modification de l'écartement des roues,
    • une zone Z1 avec des rails de roulement ayant un écartement large L1,
    • une zone Z3 avec des rails de roulement ayant un écartement réduit L2,
    • et une zone de transition Z2 dans laquelle l'écartement des rails de roulement varie de manière symétrique et régulière par rapport à l'axe médian de la voie et entre la valeur maximale L1 de l'écartement de la zone large Z1 et la valeur L2 de la zone étroite Z3
    • et, au moins sur la longueur du poste F, deux rails conducteurs de l'électricité, disposés parallèlement et entre les deux rails de roulement; et
  2. B) sous chaque véhicule ferroviaire, au moins deux patins conducteurs de l'électricité espacés transversalement et aptes à venir en contact avec les rails conducteurs, ces patins étant reliés électriquement au boitier de commande portés par le véhicule.
The installation according to the invention comprises:
  1. A) at a fixed station F for changing the wheel spacing,
    • a zone Z1 with rolling rails having a wide spacing L1,
    • a zone Z3 with rolling rails having a reduced spacing L2,
    • and a transition zone Z2 in which the spacing of the running rails varies symmetrically and uniformly with respect to the median axis of the track and between the maximum value L1 of the spacing of the wide zone Z1 and the value L2. from the Z3 narrow zone
    • and, at least over the length of the station F, two electrically conductive rails, arranged parallel and between the two rails; and
  2. B) under each rail vehicle, at least two electrically conductive pads spaced transversely and adapted to come into contact with the conductive rails, these pads being electrically connected to the control box carried by the vehicle.

Grace à cet aménagement, quand le véhicule parvient au poste de modification de l'écartement des voies, ses patins conducteurs viennent en contact avec les rails conducteurs et permettent l'alimentation électrique des moyens régissant le déverrouillage des moyens de verrouillage en translation des bouts d'arbre et les moyens pneumatiques d'assistance de la translation des arbres dans leur paliers. L'assistance à la translation tranversale des arbres et des roues n'est déclenchée que quand ces roues circulent sur le tronçon de voie modifiant l'écartement.Thanks to this arrangement, when the vehicle reaches the position of modification of the gauge of the tracks, its conductive pads come into contact with the conductor rails and allow the power supply of the means governing the unlocking of the locking means in translation of the ends of the tracks. shaft and pneumatic means for assisting the translation of the shafts in their bearings. The assistance with the transverse translation of the shafts and the wheels is only triggered when these wheels circulate on the section of lane modifying the spacing.

Dans une forme d'exécution de l'invention, au poste de changement d'écartement, les rails de roulement sont bordés, intérieurement et/ou extérieurement, par des contrerails aptes à venir en contact avec le boudin des roues ou chaque roue pour participer à la translation transversale de la roue.In one embodiment of the invention, at the spacing change station, the running rails are lined, internally and / or externally, by countersail adapted to come into contact with the wheel flange or each wheel to participate to the transverse translation of the wheel.

Cet aménagement garantit que le déplacement transversal de chaque roue s'effectue en rapport avec la variation de l'écartement entre les rails de roulement et supprime tous risques de déraillement.This arrangement ensures that the transverse displacement of each wheel is related to the variation of the spacing between the rails and eliminates any risk of derailment.

Avantageusement, les rails conducteurs de l'électricité sont portés par des isolateurs et de manière que leurs faces supérieures soient à un niveau vertical supérieur à celui des faces supérieures des rails pour roues.Advantageously, the conductor rails of the electricity are carried by insulators and so that their upper faces are at a vertical level greater than that of the upper faces of the rails for wheels.

Grâce à cette précaution les patins ne risquent pas, hors de la zone de modification de l'écartement, de heurter des équipements de voie, tels que pédales de commande ou « crocodiles ».With this precaution the pads do not risk, outside the zone of change of the gauge, to hit track equipment, such as pedals or "crocodiles".

Dans une forme d'exécution préférée, les rails conducteurs de l'électricité sont alimentés électriquement par une armoire de commande sous le contrôle de moyens réagissant ou détectant l'entrée et la sortie d'un véhicule ferroviaire dans le poste de modification de l'écartement.In a preferred embodiment, the electrically conductive rails are electrically powered by a control cabinet under the control of means reacting or detecting the entry and exit of a railway vehicle into the modification station of the spacing.

Ainsi, c'est seulement lorsqu'un véhicule traverse le poste de modification de l'écartement que le courant circule dans les rails électriques, de sorte que, quelles que soient les caractéristiques du courant, le personnel est protégé.Thus, it is only when a vehicle passes through the gauge change station that the current flows in the electrical rails, so that, regardless of the characteristics of the current, the personnel is protected.

Dans une réalisation, dans chacune des zones Z1 et Z2 ayant un écartement de voie constant, chacun des rails de roulement comporte des déformations locales, vers l'intérieur et vers l'extérieur, de l'ordre de 3 à 5 millimètres par rapport à la direction théorique du rail, apte, après déverrouillage des arbres, à déplacer transversalement les boudins de roues pour décoller ces arbres de leur paliers.In one embodiment, in each zone Z1 and Z2 having a constant track gauge, each of the running rails has local deformations, inwards and outwards, of the order of 3 to 5 millimeters with respect to the theoretical direction of the rail, apt, after unlocking the shafts, to move transversely the wheel flanges to take off these trees from their bearings.

Ces déformations sinisoïdales des rails exercent sur les boudins de roues des efforts transversaux qui se communiquent aux arbres et éliminent ainsi tout effort résistant pouvant, par effet de gommage, gêner la translation de réglage.These sinisoidal deformations of the rails exert on the wheel flanges transverse forces which communicate with the trees and thus eliminate any resistant force that can, by gumming effect, interfere with the adjustment translation.

D'autre caractéristiques et avantages ressortiront de la description qui suit, en référence au dessin schématique annexé, dans lequel :

  • Figure 1 est une vue de coté en coupe partielle d'une forme d'exécution d'un boggie équipant un véhicule selon l'invention ;
  • Figure 2 est une vue en plan par dessus du boggie de figure 1,
  • Figure 3 est une vue en plan par-dessus d'une forme de réalisation du poste de modification de l'écartement ;
  • Figure 4 est une vue partielle en coupe suivant IV-IV de figure 3, montrant à échelle agrandie les différents rails, contre rails et isolateurs ;
  • Figure 5 est une vue partielle en coupe suivant V-V de figure 2 montrant à échelle agrandie les moyens pneumatiques associés aux bouts d'arbre d'une roue ;
  • Figure 6 est une vue en coupe suivant VI-VI de figure 5 montrant une forme d'exécution des moyens de verrouillage d'un bout d'arbre.
Other features and advantages will emerge from the description which follows, with reference to the appended schematic drawing, in which:
  • Figure 1 is a side view in partial section of an embodiment of a bogie fitted to a vehicle according to the invention;
  • Figure 2 is a plan view over the boggie of figure 1 ,
  • Figure 3 is a plan view over an embodiment of the gauge change station;
  • Figure 4 is a partial sectional view along IV-IV of figure 3 , showing on an enlarged scale the different rails, against rails and insulators;
  • Figure 5 is a partial sectional view along VV of figure 2 showing on an enlarged scale the pneumatic means associated with the shaft ends of a wheel;
  • Figure 6 is a sectional view along VI-VI of figure 5 showing an embodiment of the locking means of a shaft end.

Les moyens décrits dans les documents antérieurs du déposant et qui sont utiles à la compréhension de l'invention par l'homme de métier, vont d'abord être décrits en référence aux figures 1 à 2 et 5 à 6.The means described in the prior documents of the applicant and which are useful for the understanding of the invention by those skilled in the art, will first be described with reference to the Figures 1 to 2 and 5 to 6 .

A ces figures, la référence V désigne le châssis du véhicule, C le châssis du boggie et B1, B2 les châssis de deux bissels opposés portant chacun un train de roues coaxiales. Le châssis C du boggie est un châssis cage comprenant deux parois horizontales, respectivement supérieure 2a et inférieure 2b, reliées par des montants 3 et/ou des parois extrêmes 4. Ce châssis est articulé autour d'un pivot vertical 5 porté par le châssis V du véhicule.In these figures, the reference V designates the chassis of the vehicle, C the chassis of the bogie and B1, B2 the chassis of two opposite bissels each carrying a train of coaxial wheels. The frame C of the bogie is a cage frame comprising two horizontal walls, respectively upper 2a and lower 2b, connected by uprights 3 and / or end walls 4. This frame is articulated around a vertical pivot 5 carried by the frame V of the vehicle.

Les châssis B1 et B2 des deux bissels sont articulés sur le boggie par des articulations 18, dont l'axe vertical Z sécante l'axe géométrique horizontal G1 ou G2 du train de roues correspondant. Le châssis de chaque bissel se prolonge à l'opposé de son train de roues et vers l'autre bissel par une tête 6a, 6b, disposée autour du pivot vertical 5 et comportant une articulation de commande de pivotement du bissel, désignée de façon générale par A.Chassis B1 and B2 of the two bissels are articulated on the bogie by hinges 18, whose vertical axis Z intersects the horizontal geometric axis G1 or G2 of the corresponding set of wheels. The frame of each bissel is extended opposite its wheelset and towards the other bissel by a head 6a, 6b, arranged around the vertical pivot 5 and having a pivoting control joint of the bissel, generally designated by A.

Comme le montre la figure 2, la tête 6a ou 6b a une forme générale triangulaire et est solidaire de deux fourches latérales dont les bras 8 sont espacés par un intervalle E accueillant une roue 9. Celle ci est calée sur deux bouts d'arbre 10 et est indépendante en rotation de l'autre roue du même train de roues. Les deux bouts d'arbres sont montés libres en rotation dans des boites d'essieu 11, portées par les bras. Chaque châssis B1 ou B2 comporte donc deux roues 9 coaxiales formant un train, avant ou arrière, puisque le boggie porte deux bissels. Les châssis B1 et B2 présentent des surfaces d'appui 12 pour les ressorts de suspension 13, prenant appui sur la paroi supérieure 2a du châssis C du boggie.As shown in figure 2 , the head 6a or 6b has a generally triangular shape and is integral with two lateral forks whose arms 8 are spaced by an interval E accommodating a wheel 9. This ci is wedged on two shaft ends 10 and is independent in rotation of the other wheel of the same wheel train. The two shaft ends are rotatably mounted in axle boxes 11, carried by the arms. Each chassis B1 or B2 thus comprises two coaxial wheels 9 forming a train, front or rear, since the bogie carries two bissels. The chassis B1 and B2 have bearing surfaces 12 for the suspension springs 13, bearing on the upper wall 2a of the frame C of the bogie.

Chacune des roues 9 est déplaçable en translation dans l'intervalle E dont la valeur est égale, au jeu fonctionnel près, à l'épaisseur de la roue 9 majorée de la moitié de la différence L1 - L2 entre les écartements des voies sur lesquelles le véhicule peut être amené à circuler. C'est ainsi que pour des véhicules européens amenés à circuler sur des voies à l'écartement standard de 1,435 mètre et sur des voies à l'écartement espagnol de 1,668 mètre, la course transversale de chaque roue est de 116,5 millimètres. Elle est de 217,5 millimètres pour passer de l'écartement standard à l'écartement métrique, par exemple pour passer d'une voie pour train à une voie pour tram, ou inversement.Each of the wheels 9 is displaceable in translation in the interval E whose value is equal to the functional clearance, to the thickness of the wheel 9 plus half the difference L1 - L2 between the spacings of the channels on which the vehicle may be driven. Thus, for European vehicles driven on lanes at the standard gauge of 1.435 meters and on tracks with a Spanish spacing of 1.668 meters, the transverse travel of each wheel is 116.5 millimeters. It is 217.5 millimeters to go from the standard gauge to the metric gauge, for example to switch from a train track to a track for tram, or vice versa.

Cet aménagement met en oeuvre des moyens complémentaires assistant le déplacement de chaque roue 9 dans son bissel et des moyens de verrouillage dans chacune des positions de chaque roue.This arrangement implements complementary means assisting the displacement of each wheel 9 in its bissel and locking means in each of the positions of each wheel.

Dans la forme d'exécution représentée aux figures 5 et 6, chaque boite d'essieu 11 s'étend entre les deux parois du bras 8 et présente un alésage épaulé 61 dans lequel est calé un roulement 62, à aiguilles ou à rouleaux. Chaque bout d'arbre 10 est monté libre en rotation et en translation dans ce roulement 62 et est lié à un prolongement 10b, avec interposition d'une butée à billes 63 empéchant que le mouvement de rotation de l'arbre 10 se transmette au prolongement 10b.In the form of execution shown in Figures 5 and 6 each axle box 11 extends between the two walls of the arm 8 and has a stepped bore 61 in which is wedged a bearing 62, needle or roller. Each shaft end 10 is mounted freely in rotation and in translation in this bearing 62 and is connected to an extension 10b, with the interposition of a thrust ball bearing 63 preventing the rotational movement of the shaft 10 is transmitted to the extension 10b.

Ce prolongement 10b comporte, dans la boite d'essieu 11, deux gorges 64, espacées et aptes chacune à coopérer avec un verrou radial de calage 65. Le corps 66 du verrou est porté par la boite d'essieu 11 et contient un piston pneumatique 66b à simple effet, privilégiant l'action de rappel du ressort 66a pour maintenir le verrou 65 en position verrouillée et ne faisant appel au flux pneumatique que pour assurer le déverrouillage avant et pendant la phase de réglage de l'écartement .This extension 10b comprises, in the axle box 11, two grooves 64, spaced apart and each capable of cooperating with a radial locking lock 65. The body 66 of the lock is carried by the axle box 11 and contains a pneumatic piston 66b with a single effect, giving priority to the return action of the spring 66a to maintain the lock 65 in the locked position and using the pneumatic flow only to ensure the unlocking before and during the adjustment phase of the spacing.

Au-delà des gorges 64, chaque prolongement 10b est conformé en piston pneumatique 67 apte à être déplacé dans une chambre étanche 68. Cette dernière est reliée, par un canal 70 et des conduits 71, à une boite de commande non représentée. Celle-ci à pour fonction de régir successivement :

  • l'alimentation pneumatique des corps 66 pour assurer le déplacement des verrous 65 dans le sens de leur deverrouillage,
  • l'alimentation des chambres 68, ayant le plus petit volume et la mise à l'atmosphère des chambres disposées de l'autre coté de chaque roue, pour assister le déplacement transversal des arbres 10 et des roues 9,
  • et, en fin de mouvement, la mise à l'atmosphère des moyens de commande 66, pour rendre prépondérants les ressorts 66a et assurer, par le verrou 65 correspondant, le verrouillage de la roue 9 dans sa nouvelle position transversale.
Beyond the grooves 64, each extension 10b is shaped as a pneumatic piston 67 adapted to be moved in a sealed chamber 68. The latter is connected by a channel 70 and conduits 71 to a control box not shown. Its function is to govern successively:
  • the pneumatic supply of the bodies 66 to ensure the displacement of the locks 65 in the direction of their unlocking,
  • feeding the chambers 68, having the smallest volume and venting chambers disposed on the other side of each wheel, to assist the transverse displacement of the shafts 10 and the wheels 9,
  • and, at the end of the movement, venting the control means 66, to make the springs 66a predominant and ensure, by the corresponding lock 65, the locking of the wheel 9 in its new transverse position.

L'installation selon l'invention comprend des moyens F installés à poste fixe et des moyens M portés par chacun des véhicules ferroviaires.The installation according to the invention comprises means F installed at a fixed position and means M carried by each of the railway vehicles.

La figure 3 montre que les moyens faisant partie d'un poste fixe F de modification de l'écartement des roues, comprennent :

  • une zone Z1 avec des rails de roulement 80 ayant un écartement large L1, et s'étendant avec un écart constant sur un longueur S1 ;
  • une zone Z3 avec les mêmes rails 80, mais ceux-ci ayant un écartement constant réduit L2 et s'étendant sur une longueur S3 ;
  • et une zone de transition Z2 de longueur S2 et dans laquelle l'écartement entre les deux rails 80 varie de manière symétrique et régulière par rapport à l'axe médian de la voie et entre la valeur maximale L1 de l'écartement de la zone large Z1 et la valeur L2 de la zone Z3, correspondants aux deux écartements de voies ;
  • et, au moins sur la longueur du poste F, deux rails 81 conducteurs de l'électricité, disposés parallèlement et entre les deux rails de roulement.
The figure 3 shows that the means forming part of a fixed station F for modifying the wheel spacing, comprise:
  • a zone Z1 with rolling rails 80 having a wide spacing L1, and extending with a constant distance over a length S1;
  • a zone Z3 with the same rails 80, but these having a reduced constant spacing L2 and extending over a length S3;
  • and a transition zone Z2 of length S2 and in which the spacing between the two rails 80 varies symmetrically and uniform to the center line of the track and between the maximum value L1 of the wide zone spacing Z1 and the value L2 of the zone Z3 corresponding to the two track gauges;
  • and, at least along the length of the station F, two electrically conductive rails 81 arranged in parallel and between the two rails.

Les rails conducteurs 81 sont portés par des isolateurs 82 et de manière que leur face supérieure soit à une distance H1 du sol ayant une valeur supérieure à la distance H2 entre le sol et le sommet des rails 80. Ils sont connectés électriquement par des conducteurs 83 à un poste fixe d'alimentation 84. Ce dernier est relié par des circuits électriques 85a et 85b à des feux de signalisation 86 et à des détecteurs de passage 87.The conductive rails 81 are carried by insulators 82 and so that their upper face is at a distance H1 from the ground having a value greater than the distance H2 between the ground and the top of the rails 80. They are electrically connected by conductors 83 to a stationary supply station 84. The latter is connected by electrical circuits 85a and 85b to signaling lights 86 and passing detectors 87.

Dans la zone de transition Z2 et comme montré dans la forme d'exécution de la figure 4, les rails 80 sont bordés intérieurement par des contre-rails 88 aptes à venir en contact avec le boudin 9a des roues 9 pour guider leur translation transversale, dans le sens de l'écartement. Cette zone Z2 peut aussi être bordée extérieurement par des contre-rails aptes à venir en contact avec la roue pour l'assister dans sa translation vers l'intérieur de la voie.In the transition zone Z2 and as shown in the embodiment of the figure 4 , the rails 80 are lined internally by counter rails 88 adapted to come into contact with the coil 9a of the wheels 9 to guide their transverse translation in the direction of the spacing. This zone Z2 can also be bordered externally by counter-rails able to come into contact with the wheel to assist in its translation to the interior of the track.

Dans une autre forme de réalisation concernant plus particulièrement les trams, le guidage des roues est assuré par le talon ou par les bords de la gorge des rails constituant la voie.In another embodiment more particularly trams, the guiding of the wheels is provided by the heel or by the edges of the groove of the rails constituting the track.

Avantageusement, dans la zone de transition Z2, les rails de roulement 80, contre-rails 88 et roues 9 sont lubrifiés au moins dans leurs parties venant en contact pour réduire les frottements métal contre métal, générant des échauffements, des usures et des bruits. Cette lubrification peut être effectuée manuellement ou automatiquement, par exemple par des moyens de pulvérisation non représentés.Advantageously, in the transition zone Z2, the rails 80, against rails 88 and wheels 9 are lubricated at least in their contacting parts to reduce metal-to-metal friction, generating heating, wear and noise. This lubrication can be performed manually or automatically, for example by spraying means not shown.

Les moyens M portés par chaque véhicule comprennent au moins deux patins 90 conducteurs de l'électricité et, en l'occurrence, deux brosses métalliques, espacés transversalement et aptes à venir en contact avec les rails conducteurs 81. Chaque patin 90 est portés sous le véhicule par des moyens isolants et est reliés électriquement par des conducteurs 91 au boitier de commande disposé dans le véhicule et régissant le fonctionnement des moyens pneumatiques 65-66 de verrouillage des arbres de roue et ceux 67-68 d'assistance à la translation des arbres d'un train de roues.The means M carried by each vehicle comprise at least two pads 90 electrically conductive and, in this case, two metal brushes, spaced transversely and adapted to come into contact with the conductive rails 81. Each pad 90 is worn under the vehicle by insulating means and is electrically connected by conductors 91 to the control box disposed in the vehicle and governing the operation of the pneumatic means 65-66 for locking the wheel shafts and those 67-68 for assisting the translation of the shafts of a wheel train.

Grâce à la hauteur H1 des rails conducteurs 81, les patins 90 sont à un niveau qui leur permet de ne pas rencontrer les appareils de voie, tels que pédales, aiguillages, crocodiles ou équivalents.Thanks to the height H1 of the conductive rails 81, the pads 90 are at a level that allows them to meet the switches, such as pedals, switches, crocodiles or the like.

Quand un convoi de véhicules parvient à proximité d'un poste F de modification de l'écartement des roues, sa machine de traction est détachée du convoi, orientée sur une voie de garage et remplacée par une machine pousseuse. C'est parce qu'il n'existe pas, à ce jour, de machine équipée de roues à écartement variable que cette phase préparatoire est indispensable.When a vehicle convoy arrives close to a wheel changing station F, its traction machine is detached from the convoy, oriented on a siding and replaced by a pushing machine. It is because there is no machine to this day equipped with variable gauge wheels that this preparatory phase is indispensable.

Pendant l'opération de modification de l'écartement des roues, le convoi est déplacé à faible allure sur l'installation F, par exemple à une vitesse comprise entre 5 et 10 Km/h, en direction de la zone Z1 ou Z3.During the operation of changing the spacing of the wheels, the convoy is moved at low speed on the installation F, for example at a speed between 5 and 10 km / h, towards the Z1 or Z3 zone.

Dès que le premier véhicule est détecté par un capteur 87 le poste de commande 84 alimente électriquement les rails conducteurs 81 et permet aux patins 90 d'alimenter les moyens de commande électropneumatiques. Les moyens de verrouillage 65-66 sont d'abord amenés pneumatiquement en position de libération des arbres 10, puis ce sont les moyens 67-68 d'assistance à la translation qui sont alimentés pneumatiquement.As soon as the first vehicle is detected by a sensor 87 the control station 84 electrically feeds the conductive rails 81 and allows the pads 90 to supply the electropneumatic control means. The locking means 65-66 are first brought pneumatically in the release position of the shafts 10, then it is the means 67-68 for assistance with the translation which are pneumatically supplied.

Le choix entre les moyens d'assistance pneumatique qui sont disposés à l'intérieur du bogie et ceux qui sont disposés à l'extérieur, est effectué en fonction du sens de déplacement du véhicule ferroviaire sur la zone Z2, donc entre réduction ou accroissement de l'écartement, et peut donc être automatiquement réalisé par le poste de commande. Dans une réalisation, la position transversale de chaque roue 9 et celle de chaque verrou 65-66 sont détectées par des contacts électriques portés par le véhicule et réagissant sur les moyens de commande électropneumatiques et sur des moyens de contrôle, visuels ou sonores de ces positions.The choice between the pneumatic assistance means which are arranged inside the bogie and those which are arranged outside, is made according to the direction of movement of the railway vehicle on the zone Z2, therefore between reduction or increase of the gap, and can therefore be automatically achieved by the control station. In one embodiment, the transverse position of each wheel 9 and that of each lock 65-66 are detected by electrical contacts carried by the vehicle and reacting on the electropneumatic control means and on visual or audible control means of these positions. .

Quand un véhicule est déplacé sur la zone de transition Z2, les boudins de ses roues 9 viennent en contact soit avec les champignons de ces rails, soit avec le bord des contre-rails 88 et sont soumis à des efforts transversaux qui, avec l'aide des moyens d'assistance pneumatique 67-68, provoquent les déplacements transversaux de ces roues, entre leur position d'origine et leur position correspondant à un autre écartement de voie.When a vehicle is moved on the transition zone Z2, the flanges of its wheels 9 come into contact either with the fungi of these rails, or with the edge of the rails 88 and are subjected to transverse forces which, with the using pneumatic assistance means 67-68, cause the transverse displacements of these wheels, between their original position and their position corresponding to another gauge of track.

Quand le véhicule quitte le poste F de modification de l'écartement des roues, avec toutes les roues de ses boggies au nouvel écartement, les patins 90 perdent contact avec les rails 81 alimentés électriquement, de sorte que la boite de commande électropneumatique du véhicule n'est plus alimentée. Il en résulte que les divers moyens pneumatiques sont reliés à l'atmosphère et que, dans les moyens de verrouillage 65-66, les ressorts 66a deviennent prépondérants et ramènent les verrous 65 en position de verrouillage, en assurant le blocage de chaque roue 9 dans sa nouvelle position. Il est à noter que l'arbre 10 de chaque roue est bloqué en translation par un verrou intérieur et par un verrou extérieur, ce qui garantit son calage en translation.When the vehicle leaves the station F for changing the wheel spacing, with all the wheels of its bogies at the new spacing, the pads 90 lose contact with the rails 81 electrically powered, so that the electropneumatic control box of the vehicle is more fueled. As a result, the various pneumatic means are connected to the atmosphere and that, in the locking means 65-66, the springs 66a become predominant and return the locks 65 to the locking position, ensuring the locking of each wheel 9 in his new position. It should be noted that the shaft 10 of each wheel is locked in translation by an inner lock and an outer lock, which guarantees its stalling in translation.

En sortie du poste F, le convoi est à nouveau attelé à une machine motrice dont l'écartement des roues correspond au nouvel écartement des roues du véhicule.At the exit of the station F, the convoy is again coupled to a driving machine whose wheel spacing corresponds to the new wheel spacing of the vehicle.

Dans une forme de réalisation, dans chacune des zones Z1 et Z3 ayant un écartement de voie constant, chacun des rails 80 comporte des déformations locales, vers l'intérieur et vers l'extérieur, de l'ordre de 3 à 5 millimètres pour une longueur de plusieurs mètres, par rapport à la direction théorique du rail, lui donnant localement et en vue par-dessus une forme sinusoïdale.In one embodiment, in each zone Z1 and Z3 having a constant track gauge, each of the rails 80 has local deformations, inwardly and outwardly, of the order of 3 to 5 millimeters for a length of several meters, relative to the theoretical direction of the rail, giving it locally and in view over a sinusoidal shape.

Cet agencement, qui est réalisé sur les rails dans une zone de ceux-ci située après la zone dans laquelle les verrous 65 sont déverrouillés, utilise le contact des boudins contre les rails pour générer des efforts transversaux alternés dégommant les arbres de leur palier et rendant plus aisée la translation ultérieure modifiant la valeur de l'écartement des roues.This arrangement, which is performed on the rails in an area thereof after the area in which the locks 65 are unlocked, uses the contact of the strands against the rails to generate alternating transverse forces degumming the shafts of their bearing and making easier subsequent translation changing the value of the wheel spacing.

Là aussi, les rails 80 peuvent être associés à des moyens de lubrification localisée, manuels ou automatiques, réduisant les frottements, les usures et les bruits.Again, the rails 80 may be associated with localized lubrication means, manual or automatic, reducing friction, wear and noise.

Le dispositif de réglage de l'écartement des roues qui a été décrit dans une application avec deux écartements, peut aussi fonctionner avec d'autres écartements ayant des valeurs intermédiaires. Ainsi, pour un véhicule dont les roues peuvent présenter comme écartement minimal, celui standard de 1,435 mètre et comme écartement maximal, celui espagnol de 1,668 mètre, pour obtenir un calage des roues pour un écartement intermédiaire, correspondant par exemple à celui des voies russes, ayant une valeur de 1,524 mètre, il suffit, sur chaque prolongement 10b, d'ajouter une gorge supplémentaire entre les gorges 64.The wheel gap adjuster which has been described in an application with two spacings, can also work with other spacings having intermediate values. Thus, for a vehicle whose wheels may have the minimum spacing, the standard one of 1.435 meters and the maximum spacing, the Spanish one of 1.668 meters, to obtain a wedging of the wheels for an intermediate spacing, corresponding for example to that of Russian tracks, having a value of 1.524 meter, it suffices, on each extension 10b, to add an additional groove between the grooves 64.

Il ressort de ce qui précède que l'installation selon l'invention complète harmonieusement les véhicules équipés de moyens de modification de l'écartement des roues décrits dans l'état de la technique et permet, par des moyens simples, peu onéreux et de fonctionnement rapide, sûr et fiable, de résoudre le problème du changement d'écartement des roues pour l'adapter aux écartement de voies rencontrés. L'installation n'utilise une source de courant électrique que pendant le passage des véhicules et se sert de l'air comprimé disponible dans tous véhicules ferroviaires pour actionner temporairement des moyens pneumatiques, tout en utilisant la force mécanique de ressorts pour assurer les fonctions sécuritaires, telle que le verrouillage des arbres de roue.It follows from the foregoing that the installation according to the invention harmoniously complements the vehicles equipped with means for modifying the wheel spacing described in the state of the art and makes it possible, by simple means, inexpensive and operating fast, safe and reliable, to solve the problem of the change of gauge of the wheels to adapt it to the gauge of ways encountered. The installation uses an electric power source only during the passage of vehicles and uses the compressed air available in all railway vehicles to temporarily actuate pneumatic means, while using the mechanical force of springs to ensure the safety functions , such as locking the wheel shafts.

Claims (7)

Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire V en mouvement possédant des roues (9) à écartement réglable entre au moins deux positions et dans lequel chaque roue (9) est solidaire de deux bouts d'arbre opposés (10) pouvant coulisser transversalement dans leurs paliers (11), chaque bout d'arbre (10) coopérant, d'une part, avec des moyens de verrouillage (65, 66) déverrouillable le calant dans chacune de ses positions transversales et, d'autre part et lors du changement d'écartement, avec des moyens d'assistance (67) aptes à lui communiquer un mouvement de translation transversale, ces moyens étant commandés par un boitier de commande porté par le véhicule V, caractérisé en ce que qu'elle comprend : A) à un poste fixe F de modification de l'écartement des roues (9), • une zone Z1 avec des rails de roulement (80) ayant un écartement constant large L1, • une zone Z3 avec des rails de roulement (80) ayant un écartement constant réduit L2, • et une zone de transition Z2 dans laquelle l'écartement des rails de roulement (80) varie de manière symétrique et régulière par rapport à l'axe médian de la voie et entre la valeur maximale L1 de l'écartement de la zone large Z1 et la valeur L2 de la zone étroite Z3 • et, au moins sur la longueur du poste F, deux rails (81) conducteurs de l'électricité, disposés parallèlement et entre les deux rails de roulement (80); et B) sous chaque véhicule ferroviaire V, au moins deux patins (90), conducteurs de l'électricité, espacés transversalement et aptes à venir en contact avec les rails conducteurs (81), ces patins étant reliés électriquement au boitier de commande portés par le véhicule. Installation for modifying the wheel spacing of a moving railway vehicle bogie V having wheels (9) with adjustable spacing between at least two positions and wherein each wheel (9) is integral with two opposing shaft ends ( 10) being able to slide transversely in their bearings (11), each shaft end (10) cooperating, on the one hand, with locking means (65, 66) unlocking the wedging in each of its transverse positions and, d ' on the other hand and during the change of gauge, with assistance means (67) capable of communicating a transverse translational movement, these means being controlled by a control box carried by the vehicle V, characterized in that it includes: A) at a fixed station F for changing the wheel spacing (9), A zone Z1 with rolling rails (80) having a constant wide spacing L1, A zone Z3 with rolling rails (80) having a constant reduced spacing L2, And a transition zone Z2 in which the spacing of the running rails (80) varies symmetrically and uniformly with respect to the median axis of the track and between the maximum value L1 of the spacing of the wide zone Z1 and the value L2 of the narrow zone Z3 And, at least along the length of the station F, two electrically conductive rails (81) arranged in parallel and between the two rails (80); and B) under each railway vehicle V, at least two pads (90), electrically conductive, spaced transversely and adapted to come into contact with the conductive rails (81), these pads being electrically connected to the control box carried by the vehicle. Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce que, au poste de modification de l'écartement, les rails de roulement (80) sont bordés, intérieurement et/ou extérieurement, par des contre-rails (88) aptes à venir en contact avec le boudin (9a) des roues (9) ou la roue pour guider leur translation transversale.Installation for modifying the wheel spacing of a railway vehicle bogie according to claim 1, characterized in that , at the spacing modification station, the running rails (80) are lined, internally and / or externally, by against rails (88) adapted to come into contact with the coil (9a) of the wheels (9) or the wheel to guide their transverse translation. Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce que les rails (81) conducteurs de l'électricité sont portés par des isolateurs (82) et de manière que leur face supérieure soit à une distance du sol (H1) supérieure à celle (H2) de la face supérieure des rails de roulement (80).Installation for modifying the wheel spacing of a railway vehicle bogie according to claim 1, characterized in that the electrically conducting rails (81) are carried by insulators (82) and so that their upper face is a distance from the ground (H1) greater than that (H2) of the upper face of the running rails (80). Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce que les rails (81) conducteurs de l'électricité sont alimentés électriquement par une armoire de commande (84) et sous le contrôle de moyens (87) réagissant ou détectant l'entrée et la sortie d'un véhicule ferroviaire V au poste F de modification de l'écartement des roues.Installation for modifying the wheel spacing of a railway vehicle bogie according to claim 1, characterized in that the electrically conducting rails (81) are electrically powered by a control cabinet (84) and under the control of means (87) reacting or detecting the entry and exit of a railway vehicle V at the wheel changing station F. Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce que, dans chacune des zones Z1 et Z3 ayant un écartement de voie constant, chacun des rails de roulement (80) comporte des déformations transversales, vers l'intérieur et vers l'extérieur, donnant à chaque rail (80) un profil sinusoïdal apte, après déverrouillage des arbres (10), à déplacer transversalement les boudins de roues (9a) pour décoller ces arbres de leur paliers (11).Installation for modifying the wheel spacing of a railway vehicle bogie according to Claim 1, characterized in that , in each of the zones Z1 and Z3 having a constant track gauge, each of the running rails (80) comprises transverse deformations. , inwardly and outwardly, giving each rail (80) a suitable sinusoidal profile, after unlocking the shafts (10), to move transversely the wheel flanges (9a) to take off these shafts from their bearings (11). ). Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce qu'elle comprend, dans la zone de transition Z2, des moyens assurant la lubrification des rails de roulement 80, des contre-rails 88 et des roues 9 dans leurs parties venant en contact les unes avec les autres.Installation for modifying the wheel spacing of a railway vehicle bogie according to claim 1 characterized in that it comprises, in the transition zone Z2, means ensuring the lubrication of the rails 80, counter rails 88 and wheels 9 in their parts coming into contact with each other. Installation pour modifier l'écartement des roues d'un bogie de véhicule ferroviaire selon la revendication 1 caractérisé en ce chaque véhicule ferroviaire V comporte dans chacun de ses bogies B1 ou B2 des contacts électriques qui, détectant la position transversale de chacune des roues (9) de ses train de roues et la position de ses moyens de verrouillage (65-66), sont reliés électriquement au boitier de commande électropneumatique dont l'alimentation est assurée par les patins (90).Installation for modifying the wheel spacing of a railway vehicle bogie according to claim 1 characterized in that each rail vehicle V has in each of its bogies B1 or B2 electrical contacts which, detecting the transverse position of each of the wheels (9 ) of its wheels and the position of its locking means (65-66), are electrically connected to the electropneumatic control unit which is supplied by the pads (90).
EP11177143.2A 2010-08-27 2011-08-10 Installation to change the wheel's spacing of a rail vehicle in motion Active EP2524851B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL11177143T PL2524851T3 (en) 2010-08-27 2011-08-10 Installation to change the wheel's spacing of a rail vehicle in motion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1003465A FR2964076B1 (en) 2010-08-27 2010-08-27 INSTALLATION FOR MODIFYING THE WHEEL DIFFERENCE OF A RAIL VEHICLE BOGIE

Publications (2)

Publication Number Publication Date
EP2524851A1 true EP2524851A1 (en) 2012-11-21
EP2524851B1 EP2524851B1 (en) 2013-06-05

Family

ID=43825328

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11177143.2A Active EP2524851B1 (en) 2010-08-27 2011-08-10 Installation to change the wheel's spacing of a rail vehicle in motion

Country Status (3)

Country Link
EP (1) EP2524851B1 (en)
FR (1) FR2964076B1 (en)
PL (1) PL2524851T3 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2607380R1 (en) * 2015-09-29 2017-05-08 Patentes Talgo, S.L. Railway Shaft Assembly
CN112537336A (en) * 2020-11-27 2021-03-23 中车长江车辆有限公司 Rail gauge changing method for railway vehicle
EP3936405A4 (en) * 2019-06-21 2022-04-27 CRRC Qingdao Sifang Co., Ltd. Locking mechanism for gauge-changeable wheel set, gauge-changeable wheel set and gauge-changeable bogie

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH517612A (en) 1970-10-06 1972-01-15 Vevey Atel Const Mec Railway installation
WO2006027485A1 (en) 2004-09-07 2006-03-16 Henri Guillemaut Truck for railway vehicles having independent wheels that can be oriented according to the curvature of the tracks
WO2009071768A1 (en) 2007-09-24 2009-06-11 Henri Guillemaut Rail bogie having wheels which can be oriented according to the curvature of the track

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH517612A (en) 1970-10-06 1972-01-15 Vevey Atel Const Mec Railway installation
WO2006027485A1 (en) 2004-09-07 2006-03-16 Henri Guillemaut Truck for railway vehicles having independent wheels that can be oriented according to the curvature of the tracks
WO2009071768A1 (en) 2007-09-24 2009-06-11 Henri Guillemaut Rail bogie having wheels which can be oriented according to the curvature of the track

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2607380R1 (en) * 2015-09-29 2017-05-08 Patentes Talgo, S.L. Railway Shaft Assembly
EP3936405A4 (en) * 2019-06-21 2022-04-27 CRRC Qingdao Sifang Co., Ltd. Locking mechanism for gauge-changeable wheel set, gauge-changeable wheel set and gauge-changeable bogie
CN112537336A (en) * 2020-11-27 2021-03-23 中车长江车辆有限公司 Rail gauge changing method for railway vehicle

Also Published As

Publication number Publication date
EP2524851B1 (en) 2013-06-05
PL2524851T3 (en) 2013-11-29
FR2964076A1 (en) 2012-03-02
FR2964076B1 (en) 2012-08-17

Similar Documents

Publication Publication Date Title
EP2524851B1 (en) Installation to change the wheel's spacing of a rail vehicle in motion
EP2193063B1 (en) Rail bogie having wheels which can be oriented according to the curvature of the track
FR2532967A1 (en) ROLLER TRACK MACHINE WITH TWO CHASSIS OF A ROLLING VEHICLE JOINED THEREWITH ARTICULATED
EP1789301B1 (en) Truck for railway vehicles having independent wheels that can be oriented according to the curvature of the tracks
EP3222483B1 (en) Bogie with outer motor and associated rail vehicle
EP0208598B1 (en) Guided vehicle with swivelling wheel axles
EP0285643B1 (en) Axle with magnetic steering for railway vehicle
EP1694525A1 (en) Device for guiding and powering a vehicle by a trough in the ground
FR2696484A1 (en) Railroad tamping machine continuously movable.
WO2013131910A1 (en) Pendulation device absorbing transverse and longitudinal forces
EP3521125B1 (en) Bogie for rail vehicle
EP1958846B1 (en) End car of a railway convoy for passenger transport and corresponding convoy
FR2778612A1 (en) Electrical supply system for motors on front and rear axles of urban tram or railway
WO2008132355A2 (en) Rolling equipment for cantilevered monorail vehicles
EP1323610A1 (en) System for optimizing the steering of railway axles
FR3017588A1 (en) RAIL VEHICLE BEARING RAIL, RAILWAY VEHICLE AND COMBINATION OF AT LEAST TWO SUCH RAILWAY VEHICLES
FR3049252A1 (en) BOGIE COMPRISING A RIGID CONNECTION BETWEEN THE AXLE BOXES AND THE RAIL VEHICLE ASSOCIATED THEREWITH
EP0031757B1 (en) Wheel and axle assembly for a variable track-width railway vehicle
EP2127917B1 (en) Suspension system with electric suspension equipped with a reduction gear and application
WO2022171754A1 (en) Device for moving a load rolling on rails
FR3104119A1 (en) PUBLIC TRANSPORT SYSTEM
WO2018141803A1 (en) Switch element for a track carrying a rubber-tyred vehicle, track switchgear made from said elements and method for transporting passengers along a rail provided with such switchgear
EP3842275B1 (en) Device for capturing electrical energy for a vehicle, in particular a railway vehicle, and vehicle, in particular a railway vehicle, including such a device
FR2683199A1 (en) HIGH SPEED TRAIN COMPRISING MEANS OF MODIFYING ITS AERODYNAMIC PROFILE.
FR2864508A1 (en) Passenger transport vehicle cabin suspending device for urban transport system, has computer with program to vary vertical length of suspenders, identically or differentially when vehicle is in movement or at stop

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120713

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 615490

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130615

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011001915

Country of ref document: DE

Effective date: 20130801

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 615490

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130905

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130916

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130906

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130605

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130905

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131007

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131005

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

BERE Be: lapsed

Owner name: GUILLEMAUT, HENRI

Effective date: 20130831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140301

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

26N No opposition filed

Effective date: 20140306

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011001915

Country of ref document: DE

Effective date: 20140301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130810

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130810

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110810

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20150810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150810

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: FR

Ref legal event code: TP

Owner name: DOMINIQUE GUILLEMAUT, FR

Effective date: 20171201

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130605

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20230804

Year of fee payment: 13

Ref country code: FR

Payment date: 20230825

Year of fee payment: 13