EP2315915A1 - Modifizierung einer tbm-struktur zur bereitstellung einer dachstütze - Google Patents
Modifizierung einer tbm-struktur zur bereitstellung einer dachstützeInfo
- Publication number
- EP2315915A1 EP2315915A1 EP09793729A EP09793729A EP2315915A1 EP 2315915 A1 EP2315915 A1 EP 2315915A1 EP 09793729 A EP09793729 A EP 09793729A EP 09793729 A EP09793729 A EP 09793729A EP 2315915 A1 EP2315915 A1 EP 2315915A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tbm
- stabilizing
- tunnel
- stabilizing member
- receptacles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000004048 modification Effects 0.000 title description 4
- 238000012986 modification Methods 0.000 title description 4
- 238000009434 installation Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 230000000087 stabilizing effect Effects 0.000 claims description 37
- 239000003381 stabilizer Substances 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims 1
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 241000237983 Trochidae Species 0.000 description 4
- 230000005641 tunneling Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 244000309464 bull Species 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004901 spalling Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/11—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
- E21D9/112—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines by means of one single rotary head or of concentric rotary heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Definitions
- This invention will be found useful in the boring of tunnels through strata where unstable tunnel roofs conditions occur. It will be advantageous to use this invention in tunnels being bored by fairly large tunnel boring machines (TBM' s) which have tunneling capacities exceeding 3 meters. This invention may be most advantageously employed where roof instability is a problem.
- TBM' s tunnel boring machines
- This invention involves the removal of any extension parts from the front part of the TBM such as extension fingers on the stabilizer of the TBM and extrusion of tunnel roof lining members against the roof surface of the tunnel as the boring process is being carried out.
- the tunnel lining members are secured in place at predetermined spacing intervals. These tunnel lining members will be fed into suitable receptacles formed on the TBM just behind the rotating boring head.
- the material previously inserted into the receptacles provided for the tunnel lining members is fed out (extruded) to be placed against the roof of the tunnel.
- roof ribs (bow members) are secured (as soon as possible) in place behind the TBM. This assures that any debris from the tunnel roof which might fall due to roof instability is prevented from falling into the tunnel.
- TBM In boring large tunnels through strata of varying density, there is a tendency for the TBM boring head to undergo severe radial displacement as the boring process proceeds.
- TBM designers have developed a TBM stabilizing system which prevents the TBM' s rotating head from executing non-circular movement (wobble) in boring the tunnel.
- the stabilizing section of the TBM is located just behind the rotating boring head and presses against the entire circumferential surface of tunnel just previously bored so as to prevent the "wobble" of the rotating cutting head.
- the rotating head may weigh several tons and the spalling wheels which press against the tunnel face must not be subjected to any side thrust. This is prevented by the presence of the stabilizing section of the TBM.
- TBM' s function in a fundamental manner by using the walls of a tunnel just previously bored to be used to supply the force which presses the rotating head against the tunnel face.
- a pair of shaped wall grippers mounted on the TBM push against the walls of the tunnel and are subsequently used as a stop to press the rotating head against the tunnel face.
- the resulting force which is developed by the wall grippers which presses the rotating head against the tunnel face is massive. It easily overcomes the stabilizing force produced in the TBM by the stabilizing system which is quite small in comparison to the force generated by the wall grippers.
- the diameter of tunnel is determined by the diameter of the rotating head and it fell to the TBM operator to see that any excentric rotation of the tunneling machine head is avoided and thus prevent the wobble of the head during a tunnel boring operation.
- FIG. 2 is a sectional elevational view of the TBM shown in Figure 1;
- Figure 3 is a sectional view taken at Section 3.3 shown in Figure 2 showing the expanding stabilizer of this invention
- Figure 4 is a sectional elevational view taken at Section 4.4 of Figure 2 showing the tunnel wall gripper mechanism of this invention
- Figure 5 is a representation of the receptacles in the surface of the expanding stabilizer of this invention
- Figure 6 is a sectional view of the tunneling machine stabilizing member as per this invention.
- FIGS. 1 and 2 show the TBM 10 to which this invention has been applied.
- the TBM has a frame structure
- the main beam 12 (sometimes referred to as the main beam) on which most components involved in the tunneling operations are mounted.
- a rotating head 14 which carries a series of wheels 16 rotatably mounted in bearings (not shown) for contacting the tunnel face.
- Wheels 16 are made from a hard substance and have a sharp profile to spall the surface of the tunnel face.
- the materials selected for the wheels 16 tend to fracture rather than bend when subjected to lateral forces. For this reason, it is imperative that the rotating head 14 remains in the center of the tunnel at all times during a tunnel boring operation.
- the rotating head 14 is journalled in a suitable bearing 18 which is securely mounted on frame or main beam 12. This assures that any transverse forces experienced by the rotating head 14 are transferred to the frame 12.
- the rotating head is driven by a plurality of drive motors 20 two of which are shown in Figure 2.
- the drive motors 20 are supplied with suitable spur gears 22 which engage bull gear 24 which is rigidly attached to rotating head 14.
- Rotating wheel 14 is supplied with a series of loading buckets such as 26 which are placed at the periphery of wheel 14 so as to gather the debris or "muck" spalled from the tunnel rock face during its excursion from the bottom position of the wheel 14 to its top-most position on wheel 14.
- the bucket such as the one shown as 26 empties the debris or muck previously gathered on the upward excursion of bucket 26 into chute 28 of TBM 10; onto conveyor 30 which is mounted in the TBM 10 inside frame 12.
- Conveyor 30 removes the debris so obtained to a second conveyor or an awaiting railway car located behind the TBM (not shown).
- a non- rotating stabilizing member 40 mounted on frame 12 just behind the rotating head 14, is a non- rotating stabilizing member 40.
- Member 40 is more clearly shown in section in Figure 3.
- the member 40 is shown mounted on frame or main beam 12 by means of sliding joint 42.
- the sliding joint 42 comprises a mating box like structure which has an inner box 44 and an outer box 46 which is firmly secured to stabilizing member 40.
- Inner box member 44 is firmly secured to frame 12; in this manner the stabilizing member is confined to translatory movement in a plane fixed by the sliding joint 42.
- the conveyor 30 is shown in the interior of the frame or main beam 12.
- Upper shell 50 is movable up and down by a pair of actuating piston-cylinders 52 and 54 which are pivotably attached to main beam 12 at pivot points 56 respectively. Actuators 52 and 54 are also pivotably attached to upper shell 50 at pivot points 58 and 60. This permits upper shell to be moved vertically up and down by actuators 52 and 54 with respect to main beam 12.
- the upper shell 50 is provided with a pair of sliding joints 62 and 64 at the junction of the upper shell 50 and the lower shell 66.
- Lower shell 66 is a composite structure having lower side members 68 and 70 being pivotably supported on bottom support member 72 at pivots 74 and 76 respectively.
- Bottom support member is usually firmly attached to frame 12 and is incapable of any movement.
- the lower side members 68 and 70 are movable about pivots 74 and 76 by a pair of actuators; thus the diameter of the lower shell 66 is also adjustable within "certain" limits by means of actuators 78 and 80. This allows the upper shell 50 and the lower shell 66 of the stabilizing device 40 to be adjusted (within limits) to accommodate variations in tunnel diameters. It is noted that in Figure 3, only 3 drive motors 20 are shown for ease of illustration; there may be more motors driving wheel 24 of TBM 10.
- a pair of propulsion actuators 82 and 84 are shown also in Figures 1, 2 and 3.
- the actuators 82 and 84 are pivotably attached to frame 12 at one end thereof and pivotably attached to gripper device 90 more fully described in Figure 4.
- Gripper device 90 comprises a pair of actuator cylinders 92 and 94 in which a pair of gripper pistons 96 and 98 are respectively received.
- a pair of grippers 102 are separately actuated and are mounted on the ends of piston rods 96 and 98 respectively.
- Grippers 102 are used to contact the walls of the tunnel where it has been driven to provide a reference position for the TBM 10 as well as providing a fulcrum for pushing TBM 10 ahead to engage the tunnel face.
- the gripper device 90 is slidably mounted on main beam or frame 12 of TBM 10 so as to slide along on tracks 102 and 104 as boring proceeds.
- a pair of steering actuators 108 and 110 are shown to change the angle of beam 12 once the grippers 102 have been deployed against the tunnel walls. Here the actuators 108 and 110 are used to cause movement of the main beam 12 about gripper trunion assembly 100. Most of the steering of the TBM is accomplished by the adjustment of actuators 108 and 110 and adjustment of actuators 96 and 98 on the gripper shoes 102.
- a rear support cylinder 112 is shown in Figure 2 having piston 114 and sliding pad 116 attached thereto to carry the rear of TBM 10 during periods of gripper adjustment.
- the TBM as illustrated functions as follows: The TBM of Figure 1 is shown with driving arms 82 and 84 fully extended.
- grippers 102 are actuated to contact the tunnel walls and grippers 102 are set in their working position.
- Propulsion cylinders are then actuated to push the rotating head against the tunnel face to continue the boring operation. It is understood that steering devices 108
- RECTIFIED SHEET (RULE 91 .1) and 110 have been adjusted to be set at the desired angle of TBM 10 in the tunnel so that the steering of TBM 10 is maintained.
- Some steering (trim) is obtained through the adjustment of devices 52, 54, 78 and 80 of stabilizer 40.
- Stabilizer 40 is supplied with adjustable upper shell 50 and adjustable lower shell 66. The upper shell is movable by actuating actuators 52 and 54 as shown in Figure 3. Because stabilizing member 40 is so long (maybe 3-4 meters) a second set of actuators may be used in Figure 2 having pivot points 60.
- Mounted on the exterior surface of top shell 50 of stabilizer 40 is a series of longitudinally extending members 130.
- Members 130 are usually steel angles and form a series of receptacles 132 on top shell 50 of stabilizer 40.
- the receptacles 132 in this instance are rectangular in cross section but may be of any desired shape.
- the receptacles 132 are formed by "L" shaped angle members welded or secured to top shell 50 of the stabilizer 40.
- the shape of the resulting receptacles 132 is dictated by the shape of members 130.
- the members 130 extend the entire length of the stabilizer 40 thus the receptacles 132 are of the same length as members 130.
- the TBM functions as follows.
- the grippers 102 contact the tunnel walls with the propulsion actuators 82 and 84 retracted as shown in Figure 2.
- Great force is exerted on the tunnel walls by the actuation of grippers 102.
- the actuators 96, 98, 110 and 108 on gripper device 90 are set to orient the TBM in the desired direction.
- Rotating head 14 is now stabilized for a tunnel boring operation.
- the members 130 secured to top shell 50 contact the surface of the tunnel with considerable force.
- Each receptacle 132 is filled with a "roof support” member 134 which has been previously fed into the receptacles 130 by a laborer on the scene.
- the roof support members 134 are "extruded" from the receptacles 132 as the TBM 10 moves ahead in the tunnel boring process.
- roof supports in the form of tunnel arch members 140 or complete tunnel rings 142 may be installed as to support the extruded tunnel roof members 134 against the surface of the tunnel roof as shown in Figure 6. These supporting rings 142 should be installed as quickly as possible after the TBM 10 moves ahead.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12959408P | 2008-07-07 | 2008-07-07 | |
PCT/CA2009/000107 WO2010003213A1 (en) | 2008-07-07 | 2009-01-30 | Modification to a tbm structure to provide roof support installation |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2315915A1 true EP2315915A1 (de) | 2011-05-04 |
Family
ID=41506609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09793729A Withdrawn EP2315915A1 (de) | 2008-07-07 | 2009-01-30 | Modifizierung einer tbm-struktur zur bereitstellung einer dachstütze |
Country Status (4)
Country | Link |
---|---|
US (1) | US20110103892A1 (de) |
EP (1) | EP2315915A1 (de) |
CA (1) | CA2774492A1 (de) |
WO (1) | WO2010003213A1 (de) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806927B (zh) * | 2014-02-21 | 2016-04-27 | 中铁工程装备集团有限公司 | 钢拱架拼装机 |
JP6615034B2 (ja) * | 2015-10-09 | 2019-12-04 | 川崎重工業株式会社 | トンネル掘削機及びトンネル掘削方法 |
CN105864126B (zh) * | 2016-05-24 | 2018-02-09 | 浙江大学 | 一种节能设计的tbm推进支撑液压系统 |
CN110344837B (zh) * | 2019-07-31 | 2021-10-29 | 中国铁建重工集团股份有限公司 | 一种土压平衡盾构机 |
JP7469101B2 (ja) * | 2020-03-27 | 2024-04-16 | 株式会社小松製作所 | トンネル掘削装置 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3640077A (en) * | 1969-03-26 | 1972-02-08 | Robbins & Assoc James S | Shield tunneling method |
US3870388A (en) * | 1973-03-12 | 1975-03-11 | Innovare I Taby Aktiebolag | Self-locking corner joint for the walls of cupboard-like structures |
DE2314703C3 (de) * | 1973-03-24 | 1980-10-09 | Gewerkschaft Eisenhuette Westfalia, 4670 Luenen | Dachschild zum Auffahren unterirdischer Hohlräume |
US3870368A (en) * | 1973-05-23 | 1975-03-11 | Dresser Ind | Tunneling shield |
US3979921A (en) * | 1973-05-23 | 1976-09-14 | Dresser Industries, Inc. | Tunneling shield |
US3989302A (en) * | 1975-07-25 | 1976-11-02 | Dresser Industries, Inc. | Continuous roof support system for tunnel boring |
US4420188A (en) * | 1977-06-02 | 1983-12-13 | The Robbins Company | Double shield tunnel boring machine |
US5890771A (en) * | 1996-12-11 | 1999-04-06 | Cass; David T. | Tunnel boring machine and method |
CA2297456C (en) * | 1999-03-03 | 2009-06-30 | Michael P. Mcnally | Method and apparatus for feeding a tunnel roof support system from the roof shield of a tbm |
US7832960B2 (en) * | 2008-12-17 | 2010-11-16 | The Robbins Company | All-conditions tunnel boring machine |
-
2009
- 2009-01-30 EP EP09793729A patent/EP2315915A1/de not_active Withdrawn
- 2009-01-30 CA CA2774492A patent/CA2774492A1/en not_active Abandoned
- 2009-01-30 US US12/737,356 patent/US20110103892A1/en not_active Abandoned
- 2009-01-30 WO PCT/CA2009/000107 patent/WO2010003213A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
See references of WO2010003213A1 * |
Also Published As
Publication number | Publication date |
---|---|
CA2774492A1 (en) | 2010-01-14 |
US20110103892A1 (en) | 2011-05-05 |
WO2010003213A1 (en) | 2010-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3967463A (en) | Continuous tunnel boring machine and method | |
US20110103892A1 (en) | Modifications to a tbm structure to provide roof support installation | |
US4420188A (en) | Double shield tunnel boring machine | |
US3784257A (en) | Steering system for a tunnel boring machine | |
CN103993889B (zh) | 一种硬岩隧道掘进机 | |
CN1204331C (zh) | 采矿机和采矿方法 | |
RU2704407C2 (ru) | Тоннелепроходческая машина для работы с твердыми породами | |
US8393828B1 (en) | Boring machine steering system with force multiplier | |
US3963080A (en) | Tunneling machine for boring a side drift | |
SK51122005A3 (sk) | Tunelovací stroj na plnoprofilové razenie tunelovhlavne s podkovovitým priečnym profilom | |
CN113374486A (zh) | 硬岩隧道掘进机 | |
EP0412092B1 (de) | Vorrichtung und verfahren zur herstellung unterirdischer leitungen | |
EP0024445B2 (de) | Tunnelvortriebmaschine | |
US5005911A (en) | Quadrishoe tunnel boring machine | |
US5915790A (en) | Tunnel boring machine | |
CN102787621A (zh) | 连续式挖槽机 | |
CA2263299A1 (en) | Tunnelling process and device | |
US5527099A (en) | Tunnel boring machine anchor shoe structure and process of operating a tunnel boring machine having such anchor shoe structure | |
EP3388620B1 (de) | Bohrvorrichtung und verfahren zum erstellen einer bohrung im boden | |
JP3611286B2 (ja) | エレクタ装置及びトンネル掘削機 | |
US2804754A (en) | Apparatus for tunnelling | |
US3776595A (en) | Tunneling machine having access passageway and invert cleaner | |
JP4610520B2 (ja) | 拡径掘削機 | |
JP7556701B2 (ja) | トンネル掘削装置 | |
JP4347683B2 (ja) | トンネル掘削機 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20110105 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20140801 |